--- title: Wilkes County Code of Ordinances, Sec. 8-140. Ground mounted SES collection: local-codes id: local-code:wilkes-county/code/8-140 cite_as: Wilkes County, Ga., Code of Ordinances § 8-140 canonical_url: https://georgiacommons.org/counties/wilkes/code/8-140 md_url: https://georgiacommons.org/counties/wilkes/code/8-140.md text_url: https://georgiacommons.org/counties/wilkes/code/8-140/text source_url: https://library.municode.com/ga/wilkes_county/codes/code_of_ordinances date: 2026-11-23 status: active jurisdiction: county:wilkes jurisdiction_name: Wilkes County county_fips: "13317" corpus_version: local-codes-wilkes-county-f27c4c1a53c1 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/counties/wilkes/code/~part-code-of-ordinances/~chapter-8/~article-vi.md previous: https://georgiacommons.org/counties/wilkes/code/8-139.md next: https://georgiacommons.org/counties/wilkes/code/8-141.md index: https://georgiacommons.org/counties/wilkes.md branch: code edition: As published by Municode, retrieved 2026-11-23 edition_date_kind: retrieved source_publisher: Municode version_id: local-code:wilkes-county/code/8-140@2026-11-23-6bd54a1666 --- # Wilkes County Code of Ordinances, Sec. 8-140. Ground mounted SES > As published by Municode, retrieved 2026-11-23 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Part - CODE OF ORDINANCES / Chapter 8 - BUILDINGS AND BUILDING REGULATIONS / Article VI - SOLAR INSTALLATIONS (a) Signage. Ground mounted SES facilities shall display signs in a clearly visible manner that: (1) State the risk that may result from contact with an SES; (2) Identify the manufacturer or installer and the owner or operator of the SES; and (3) Provide a 24-hour emergency contact phone number, which shall be placed at the entrance of the facility. (b) Setbacks. A ground mounted SES: (1) Shall be located no closer than 100 feet from any public right-of-way; (2) Shall be located no closer than 200 feet from any property line, provided, however that the owner of the abutting property may agree to allow the SES to be less than the distance required herein by providing written, signed and notarized permission; and (3) Shall be located no closer than 300 feet from any residential dwelling or any other building actively being used as a school, hospital, church, nursing home, retirement home or restaurant, provided, however that the owner of the building may agree to allow the SES to be less than the distance required herein by providing written, signed and notarized permission. (c) Buffers. A ground mounted SES shall have a visual buffer of natural vegetation, plantings, earth berms, and/or fencing that provides a reasonable visual and lighting screen to reduce the view of the SES from surrounding property lots consistent with the zoning, character, and uses of the area. (d) Decommissioning plan; annual reporting. A ground mounted SES shall have and maintain a valid and current decommissioning plan that includes all of the elements set forth in section 8-140(f)(2)l. below. The special use permit holder shall: (i) revise the decommissioning plan within 30 days of any material changes, problems as determined by the county, or material inaccuracies in the plan; and (ii) certify annually, on the anniversary of the special use permit approval, in writing to the board of commissioners that all of the elements of the decommissioning plan are accurate, valid, and workable, including, but not limited to, providing proof satisfactory that the surety bond required in this article remains in force and effect and is sufficient to cover the costs associated with decommissioning. (e) Emergency personnel access. To ensure emergency personnel access, ground mounted SESs shall provide adequate access and spacing in order to: (1) ensure access and egress; and (2) provide pathways throughout area. (f) Special use permit. A ground mounted SES shall be allowed only by special use permit solely within the agricultural and industrial districts. In addition to the general requirements for a special use permit application set forth in the county zoning code, the following shall be contained in any special use permit application for a ground mounted SES, to be considered by the planning commission and board of commissioners as additional criteria for their respective recommendation and decision: (1) Basic information. The applicant shall submit documentation that provides the following: a. The address of the property on which the SES will be located; b. The applicant's name, address, telephone number, and e-mail address; c. The property owners name, address, telephone number, and e-mail address; d. If known, the SES operator's name, address, telephone number, and e-mail address; e. If known, the installation company's name, address, telephone number, e-mail address, and license number; and f. Evidence of the applicant's control of the property, such as a deed, lease, or other agreement with the landowner. (2) Planning. The applicant shall submit the following: a. Fee schedule. A application filing fee schedule may be established by the board of commissioners to help defray the cost of processing reasonably necessary to process a special use permit hereunder. All filing fees must be paid in full prior to review of an application. b. A site plan of the property that depicts the locations of all existing and proposed structures (including solar arrays, inverters, transformers, electrical substations, and buildings), property lines, rights-of-way, roads, required setbacks, and buffers, and the percentage of the proposed surface area coverage of the SES facilities on the lot; c. A topographic map that depicts vegetative cover, watersheds, or wetlands on the property; d. Plans depicting proposed grading and topographical changes to the site. e. Plans depicting proposed lighting, fencing, and vegetation management. f. Plans depicting new vegetative cover on the site and plans designed to avoid the removal of trees or natural vegetation. g. A soil erosion plan that adequately protects from erosion and runoff during construction and post construction. h. To the extent the SES is in the agricultural district, a map that describes the land quality and identifies prime farmland. i. A buffer plan that demonstrates that any buffer will: (i) minimize impacts of the SES on surrounding residential dwelling units and buildings actively being used as a school, hospital, church, nursing home, retirement home or restaurant, as required by this ordinance; and (ii) seek to preserve the natural tree growth, natural vegetation, natural landforms, and views along the SES perimeter to the extent reasonably practicable. j. Plans for connecting the SES to the electrical grid. k. A list of all federal and state permits required for the solar farm. l. A decommissioning plan that contains the following: 1. The name, address, telephone number, and e-mail address of the person(s) and/or entity(ies) responsible for implementing the decommissioning plan. The plan shall also state that the property owner has been informed by the applicant or SES owner/operator of the decommissioning responsibility and projected cost if that responsibility is allocated to the property owner by agreement between the SES owner/operator and property owner; 2. A statement of conditions that require the decommissioning plan to be implemented; 3. A removal plan that identifies all structures, components, and non-utility owned equipment that shall be removed; 4. A restoration plan to return the property to its condition prior to the installation of the SES or to some other condition reasonably appropriate for the designated land use after the SES is removed; 5. The anticipated life of the SES and the estimated decommissioning cost; 6. A surety bond in an amount sufficient, in the determination of the board of commissioners, to guarantee that funds will be available for decommissioning and restoration of the SES. The bond shall be issued by a surety that is authorized by law to conduct surety business in Georgia and is listed in the most recent edition of the U.S. Department of the Treasury Circular 570 as being approved as a surety in an amount no less than the amount of the surety bond required hereunder. i. The bond shall consist of three components for purposes of determining its amount. The first component will address environmental liabilities including hazardous materials liabilities, such as risks associated with hazardous waste and hazardous substances. The second component will address the decommissioning, removal, and proper disposal, as appropriate, of improvements and facilities. The third component will address reclamation, revegetation, restoration, and soil stabilization. There shall be a single instrument to cover all potential liabilities. The entire bond amount may be used to address a single risk event such as hazardous materials release or groundwater contamination regardless of the fact that in calculating the total bond amount other risks were also considered. If the bond is used to address a particular risk, the holder would then be required to increase the bond amount to compensate for this use. ii. The surety bond shall remain in place as long as the SES exists, regardless of whether it is actively operating. The surety bond shall be released if all work required under the decommissioning plan is propBULDINGS AND BUILDING REGULATIONS § 8-140 erly and timely executed. If the work required under the decommissioning plan is not properly or timely executed, the county may call or forfeit such surety bond and use the proceeds therefrom to execute the decommissioning plan. m. A plan that details a fire suppression system sufficient to prevent a fire from spreading off the site. This can be accomplished by removing vegetation, and spreading gravel or other fire-resistant material underneath any equipment likely to drop burning debris should a fire occur. A minimum six-foot wide firebreak composed of gravel or other fire-resistant material placed around the perimeter of the installation may also be used in lieu of, or in addition to the above. n. Proof of notification to the managing authority of any airport located within five miles of the proposed location. o. Any other relevant studies, reports, certificates and approvals as may be reasonably requested by the county, including, but not limited to, design review. (3) Changes to SES facility. a. Material alteration. An expansion or demolition and reconstruction of an SES facility that covers 20 percent or more of the current total lot coverage of the SES facility shall be considered a material alteration for purposes of this subsection. A special use permit holder seeking to accomplish a material alteration shall be required to obtain an updated special use permit by following the procedures provided in section 8-140(f). b. Minor alteration. An expansion or demolition and reconstruction of an SES facility that is less than 20 percent of the current total lot coverage shall be considered a minor alteration for purposes of this subsection. A special use permit holder seeking to accomplish a minor alteration shall be required to obtain approval from the board of commissioners and shall provide sufficient information showing that the alteration will be consistent with the existing permit and plans, including, if necessary, increasing the bond required in this article for decommissioning. (g) Decommissioning. To the extent a ground mounted SES facility has not been active and in continuous service for a period of one year, the applicable special use permit shall be deemed abandoned and shall terminate upon written notice to the permit holder; thereafter, the site shall not recommence operations unless a new special use permit is obtained. A ground mounted SES facility that has not been active and in continuous service for a period of one year shall be required to commence decommissioning pursuant to the approved decommissioning plan. Decommissioning shall be completed, and the site restored pursuant to the approved restoration plan, within six months of commencement of decommissioning. A site will be considered decommissioned when, after inspection and approval by the county, all structures and equipment are removed, and the site is restored pursuant to the approved decommissioning plan. ## History (Ord. No. 01112024(1), § I, 1-11-2024)