Skip to content
Georgia Commons
Menu

County: Cobb County

Cobb County Board of Commissioners public hearing, February 20, 2024

9:00 AM · 81 pages

These are the minutes as Cobb County Board of Commissioners posted them, read from the file on its own website. Georgia Commons is independent and is not affiliated with Cobb County Board of Commissioners.

Copy for LLM, View as markdown, and Send to AI use the Markdown version: the summary Georgia Commons wrote, under a heading that names it, then the record as posted. View raw is the record alone.

Records of this meeting

Each link opens the body's own website or meeting portal.

Summary

No summary has been written for this record yet.

Agenda items (6)

Found in the minutes by their headings. Where an outcome is shown, it was read by rule from the item's own words: a guide to the text, not part of the record.

  1. 3. Department ofTransportation comments andrecommendations
  2. 4. Applicant agreed tofiveadditional stipulations (attached andmade apartofthese minutes)Adopted
  3. 6. Anyother usemust come backbefore theBoard ofCommissioners asanOtherBusiness applicationA vote
  4. 9. Inclusion on the Consent Agenda for the Board of Commissioners' Zoning Hearing on February 20, 2024Adopted
  5. 16. This is a cashless operation and staff will be on- site during operating hoursA vote
  6. 17) Applicant agrees to comply with all Cobb County Department of Transportation requirements applicable to the Subject Property.A vote

Answers are written by AI from this document, and every quotation is checked against it. Not legal advice.

The minutes

As posted on cobbcoga.api.civicclerk.com, read November 26, 2026. Nothing below is written by Georgia Commons.

MINUTES OFZONING HEARING

COBB COUNTY BOARD OFCOMMISSIONERS

FEBRUARY 20, 2024

9:00A.M.

TheBoard ofCommissioners’ Zoning Hearing washeldonTuesday, February 20, 2024, in thesecond-floorpublic meeting room of Cobb County Building A, 100Cherokee Street, Marietta, Georgia. Present andcomprising aquorum oftheBoard were:

LisaCupid, Chairwoman Commissioner JoAnnBirrell Commissioner KeliGambrill Commissioner JericaRichardson Commissioner Monique Sheffield

CALLTOORDER – CHAIRWOMAN CUPID

Chairwoman Cupid calledthehearing toorderat9:01a.m.

Commissioner Birrell presented thefollowing revised statement dated 1/22/24totheClerk which wasattached toeachvotetaken attoday’shearing (attached andmade apartofthese minutes):

IdonotsupporttheHomeRuleChallengeofthemajorityofthisboard. Itis unconstitutionalandillegal. Ivotedagainsttheamendedmapthree timesin2022 1/25/22, 10/11/22and10/25/22).

IhaveadutytorepresentmyconstituentsandwillnothavemyvotesuppressedasIwas dulyelectedonNovember8, 2022, underthestatemap (HB1154) votedonbythe GeorgiaGeneralAssemblyinFebruary2022andsignedintolawbyGovernorKemp onMarch2, 2022andcertifiedbytheCobbBoardofElectionsonNovember15, 2022.

Inaddition, IdosupporttheOrderonCrossMotionsforSummaryJudgment (Civil ActionFileNo. 23-1-02428-56) fromJudgeAnnB. HarrisintheSuperiorCourtofCobb CountydatedJanuary8, 2024whichfindstheCounty'sAmendmenttoAct562 (the AmendmentorAmendedAct") isanactexcludedfromtheCounty'sHomeRule authoritygrantedintheGeorgiaConstitution, andthereforeisvoid.

Commissioner Gambrill asked thatthefollowing statement beattached toeachvotetaken at today’shearing (attached andmade apartofthese minutes):

WhentheBoardfirstenteredExecutiveSessioninMarch2022todiscussthe “Home Rule” challenge, IchallengedtheCountyAttorney’sOfficeonthepremiseand requestedoutsidecounseltobesought.

WhiletheCountyAttorney’sOfficeclaimstheAssociationofCountyCommissioners ofGeorgia (ACCG) providedlegaladvice, Itooaminreceiptofthedocumentsfrom theACCGregardingHomeRule, towhichitclearlydefinesthelimitofthisBoard's Constitutional powersastoredistricting. IalsocontendthattheBoardof CommissionersdidnotfollowtheHomeRulechallengeinitsentirety.

MINUTES OFZONING HEARING

COBB COUNTY BOARD OFCOMMISSIONERS

FEBRUARY 20, 2024

PAGE2

Commissioner Gambrill’sstatement (cont.)

Inaddition, theGeorgiaSupremeCourthasruledthattheGAConstitutionlimits legislativeactionbytheBoardofCommissioners tomattersforwhichnoprovisionhas beenmadebygenerallaw. Furthermore, the “HomeRule” powersgrantedtothe BoardofCommissionersdonotextendtoanymatterswhichtheGeorgiaGeneral assemblybygenerallawhaspreempted, liketheredistrictingmaphereinCobbCo.

CommissionersofWayneCo. v. Smith240Ga. 540 (1978); Brophyv. McCranie264 Ga. 187 (1994).

Infact, eveninFederalCourtin Georgia, thecourthasruledthe GeneralAssembly istheonlylegislativebodywiththepowertoenactredistrictinglegislationforthe counties; therefore, wheretheGeneralAssemblyfailedtoenactreapportionment legislationforacertaincounty, althoughitwasentitledtoconsiderationasan expressionofcountypolicy, areapportionmentplanproposedbyacountywasnota legislativelyenactedplanrequiringdeferentialtreatmentandthedistrictcourtwas requiredtofashionareapportionmentplan. Bodkerv. Taylor, 2002U.S. Dist. LEXIS 27447 (N.D. Ga. June5, 2002). InJanuary, GeorgiaStateAttorneyGeneral, Chris CarrstatedthattheCobbCountyCommission'smovetoamenditselectoral redistrictingmapis “inappropriateandnotlegallybinding.”

Pertheletterdated December 22, 2022, fromC. RyanGermany, General Counsel forthe Office oftheSecretary ofState, “ youshould notconsider theministerial function offiling theAmendment withouroffice orthepublishing oftheAmendment tothecomment on whether theAmendment isallowable under statelaworaproper exercise oftheauthority bytheCobb County Commission, norshould yourelyonthistoattempt toestablish the validity oftheAmendment.” “ Infact” hecontinues “ itappears thattheAmendment is verylikelyanunauthorized exercise ofauthority bytheCobb County Commissioner that doesnotcomply toGeorgia LawortheStateConstitution.

Withthemajority ofthisBoard actions onOctober 25, 2022 andtheresulting filing and recording withtheOffice oftheSecretary ofState onOctober 26, 2022, theboundaries of thedistricts fromwhichcounty commissioners wereelected inDistricts 1and3were changed (14) dayspriortotheGeneral Election, andeight (8) daysafterearly voting had begun using district boundaries for Districts 1and3asapproved bytheGovernor.

Furthermore, theBoard ofElections certified theelection ofCommissioners inDistrict 1 and3usingthemapasapproved bytheGovernor onMarch 2, 2022onNovember 15, 2022andnotthemaps thattheBoard ofCommissioners made effective onOctober 26, 2022.

Mr. JohnPederson, Zoning Division Manager, reviewed thehearing procedures and announced thefollowing cases which werewithdrawn orcontinued.

MINUTES OFZONING HEARING

COBB COUNTY BOARD OFCOMMISSIONERS

FEBRUARY 20, 2024

PAGE3

WITHDRAWN ANDCONTINUED CASES

23 Z-30 QUIKTRIP CORPORATION (BKCanton, LLC, owner) requesting rezoning from GCtoNRCforaconvenience store withfuelsales inlandlot th 60ofthe16 district. Property islocated onthesouth sideofJamerson Road, andthewest sideofCanton Road (4815Canton Road). (Previously heldby thePlanning Commission ( PC) fromtheSeptember 5, 2023, through November 7, 2023, PChearings untiltheDecember 5, 2023, PChearing;

heldbytheBoard ofCommissioners (BOC) fromtheDecember 19, 2023, BOCZoning hearing untiltheFebruary 20, 2024, BOCZoning hearing).

WITHDRAWN WITHOUT PREJUDICE

23 LUP-30 DONALD PERRY (Sandra Galloway andDonald Perry, Sr., owners) requesting aTemporary LandUsePermit toallow more vehicles thanthe th codeallows inlandlot559ofthe19 district. Property islocated onthe southeast sideofFarmington Drive attheterminus ofAngus Trail (2639 Farmington Drive). (Previously heldbythePlanning Commission ( PC) fromtheDecember 5, 2023, PC hearing untiltheFebruary 6, 2024, PC hearing). WITHDRAWN WITHOUT PREJUDICE

23 Z-15 SDPACQUISITIONS, LLC (McCamy Investments, L.P.; McCamy Properties, LLC; BKProperties, L.P.; VKEP-B, LLCowners) requesting rezoning fromR-20, RA-4, GC, O&I, NS, andOStoPVC and OSfora mixed-usedevelopment consisting oftownhomes, multifamily, office, retail, th andwholesale distribution inlandlots364, 365, 428, and429ofthe16 district. Property islocated onthesouth sideofChastain Road, onthewest sideofChastain Meadows Parkway (Chastain Road, Chastain Meadows Parkway). (Previously continued byStafffromtheMay2, 2023, through theSeptember 5, 2023, Planning Commission (PC) hearings untilthe October 3, 2023, PChearing; heldbythePCfromtheOctober 3, 2023, and November 7, 2023, PChearings untiltheDecember 5, 2023, PChearing;

heldbytheBoard ofCommissioners (BOC) fromtheDecember 19, 2023, hearing untiltheFebruary 20, 2024; continued byStafffromtheFebruary 20, 2024, hearing untiltheMarch 19, 2024, BOCZoning hearing;

therefore, wasnotconsidered atthishearing).

23 Z-36 MICHESTER INC. (Michester, Inc., owner) requesting rezoning from R- th 20toLROforanoffice inlandlot15ofthe17 district. Property islocated ontheeastsideofAustell Road, north ofHicks Road (2513Austell Road).

Previously heldbytheBoard ofCommissioners (BOC) fromtheOctober 17, 2023, BOCZoning hearing untiltheNovember 21, 2023, BOCZoning hearing; continued byStafffromtheNovember 21, 2023, andDecember 19, 2023, BOCZoning hearings untiltheMarch 19, 2024, BOCZoning hearing; therefore, wasnotconsidered atthishearing).

MINUTES OFZONING HEARING

COBB COUNTY BOARD OFCOMMISSIONERS

FEBRUARY 20, 2024

PAGE4

WITHDRAWN ANDCONTINUED CASES (CONT.)

23 Z-40 ATLANTA REMEDIATION GROUP, LLC (Vanessa Pichardo, owner) requesting rezoning fromR-20toLIforspecialty contractor, parking ofRVs th boats inlandlot204ofthe16 district. Property islocated onthesouth sideofShallowford Road, eastofCanton Road (1018Shallowford Road).

Previously continued byStafffrom theOctober 3, 2023, through the February 6, 2024, Planning Commission (PC) hearings untiltheMarch 5, 2024, PChearing; therefore, wasnotconsidered atthishearing).

23 Z-52 1054INVESTMENT GROUP, LLC (1054Investment Group, LLC; James Vincent Manley, owners) requesting rezoning fromR-20toLIforcontractor th offices andparking ofvehicles inlandlot204ofthe16 district. Property is located onthesouth sideofShallowford Road, eastofOldShallowford Road 1022, 1028, and1054Shallowford Road). (Previously heldbythePlanning Commission ( PC) from theNovember 7, 2023, PC hearing untilthe December 5, 2023, PChearing; continued byStaff fromtheFebruary 6, 2024, PChearing untiltheMarch 5, 2024, PChearing; therefore, wasnot considered atthishearing).

23 Z-59 SSDEVELOPERS, LLC (SamirK. Barman andSujata Barman, owners) requesting rezoning from R-20to RA-5 and LROforasingle-family subdivision andprofessional office inlandlots124, 125, 142, and143ofthe th 20 district. Property islocated onthewest sideofJimOwens Road atthe terminus ofNewRutledge Road (3049JimOwens Road). (Previously continued byStafffromtheDecember 5, 2023, andFebruary 6, 2024, Planning Commission (PC) hearings untiltheMarch 5, 2024, PChearing;

therefore, wasnotconsidered atthishearing).

23 Z-60 MRE-CANTON, LLC (MRE-Canton, LLC, owner) requesting rezoning fromGCtoNRCforaconvenience storewithfuelsales inlandlot60ofthe th 16 district. Property islocated ontheeast sideofCanton Roadandthenorth sideofJamerson Road (4852Canton Road). ( Previously heldbythe Planning Commission (PC) fromtheDecember 5, 2023, PChearing until theFebruary 6, 2024, PChearing; continued byStafffromtheFebruary 6, 2024, PChearing untiltheMarch 5, 2024, PChearing; therefore, was notconsidered atthishearing).

23 Z-61 DAVID PEARSON COMMUNITIES, INC. (LandAcquisition Investments, LLC; Parklane CapitalII. LLC, owners) requesting rezoning fromRM-12, R-20, CRC, andNStoRM-12foratownhome community in th landlots421, 422, 443, and444ofthe17 district. Property islocated onthe westsideofAtlanta Road, northofDaniell Drive (1972Atlanta Road).

Previously continued byStafffromtheDecember 5, 2023, andFebruary 6, 2024, Planning Commission (PC) hearings untiltheMarch 5, 2024, PC hearing; therefore, wasnotconsidered atthishearing).

MINUTES OFZONING HEARING

COBB COUNTY BOARD OFCOMMISSIONERS

FEBRUARY 20, 2024

PAGE5

WITHDRAWN ANDCONTINUED CASES (CONT.)

23 Z-64 CEDAR REALESTATE GROUP IV, LLC (Randall R. Osborne, owner) requesting rezoning fromR-20toLIforafreight terminal inland lots497, th 504, and505ofthe18 district. Property islocated onthenorth sideofSix FlagsParkway, westofQueensferry Drive (439SixFlagsParkway).

Previously continued byStafffromtheDecember 5, 2023, andFebruary 6, 2024, Planning Commission (PC) hearings untiltheMarch 5, 2024, PC hearing; therefore, wasnotconsidered atthishearing).

Clerk’ 23 sNote: Mr. Pederson announced thatsinceZ-64 isapending PC case, itwillbeshown as “Withdrawn” ontheMarchPCZoning Agenda.

Z-2 FLOURNOY DEVELOPMENT GROUP, LLC (Cobb County, owner) requesting rezoning fromGCtoRRCforamultifamily residential building th inlandlots763and764ofthe17 district. Property islocated onthewest sideofAtlanta Road andontheeastsideofI-285, south oftheintersection ofI-285andAtlanta Road (4600Atlanta Road). (Continued byStafffrom theFebruary 6, 2024, Planning Commission (PC) hearing untiltheMarch 5, 2024, PChearing; therefore, wasnotconsidered atthishearing).

Z-3 ASHWANI KUMAR KAURA (Ashwani Kaura, owner) requesting rezoning from R-20toFSTforatownhome community inlandlots35and th 38ofthe16 district. Property islocated ontheeast sideofAlabama Road andonthenorthandsouth sidesofLindsey Way (Alabama Road, 4721 Lindsey Way). (Continued byStafffromtheFebruary 6, 2024, Planning Commission (PC) hearing untiltheMarch 5, 2024, PChearing; therefore, wasnotconsidered atthishearing).

Z-4 BIGGYMTHERAPY, LLC (Cynthia B. Bickman, owner) requesting rezoning from NStoNRCforagym andfitness facility andadministrative th offices inlandlot278ofthe16 district. Property islocated onthewest side ofCanton Road, north ofKensington Drive (4005Canton Road). (Continued byStafffrom theFebruary 6, 2024, Planning Commission (PC) hearing untiltheMarch 5, 2024, PChearing; therefore, wasnotconsidered atthis hearing).

Z-6 INLINE COMMUNITIES, LLC (GraceA. Bennett, Trustee U/IGraceA.

Bennett datedAugust 30, 1995; JamesH. Bennett andJoyAnnBennett Declaration ofTrust dated January 28, 1992, andrestated onAugust 3, 2011, owners) requesting rezoning fromR-20andR-30toR-20forasingle-family home subdivision inlandlots1248, 1249, 1250, 1268, 1269, and1322ofthe th 19 district. Property islocated ontheeast sideofBrown Road, north ofStout Parkway (5270Brown Road, 5613 Holloman Road). (Continued byStaff fromtheFebruary 6, 2024, Planning Commission (PC) hearing untilthe March 5, 2024, PChearing; therefore, wasnotconsidered atthishearing).

MINUTES OFZONING HEARING

COBB COUNTY BOARD OFCOMMISSIONERS

FEBRUARY 20, 2024

PAGE6

WITHDRAWN ANDCONTINUED CASES (CONT.)

O.B. 23 40 Toconsider amending thesiteplanforKerley Family Homes, LLCregarding rezoning application Z-43of2019, forproperty located onthesoutheast side th ofCooper LakeRoad, south ofVinings LakeDrive inlandlot181ofthe17 district (Cooper LakeRoad). ( Previously continued bytheBoard of Commissioners (BOC) fromtheSeptember 19, 2023, BOCZoning hearing untiltheOctober 17, 2023, BOCZoning hearing; continued byStafffrom theOctober 17, 2023, through theFebruary 20, 2024, BOCZoning hearings untiltheMarch 19, 2024, BOCZoning hearing; therefore, was notconsidered atthishearing).

O.B. 23 66 Toconsider amending thestipulations forChick-fil-AInc. regarding rezoning application Z-8of2022, forproperty located onthesoutheast intersection sideofVeterans Memorial Highway andHickory Trail inland th lot165ofthe18 district (Veterans Memorial Highway). ( Previously continued bytheBoard ofCommissioners (BOC) fromtheDecember 19, 2023, BOCZoning hearing untiltheFebruary 20, 2024, BOCZoning hearing; continued byStafffromtheFebruary 20, 2024, BOCZoning hearing untiltheMarch 19, 2024, BOCZoning hearing; therefore, wasnot considered atthisharing).

O.B. 23 68 Toconsider aSettlement ofLitigation forNobleStorage, LLC, Estate of Doty, andDonaldK. Nixregarding caseZ-4of2023. Theproperty islocated onthesouth sideofFreeman Road, eastofJohnson FerryRoad inlandlot th 539ofthe16 district (4290Freeman Road). (Previously continued byStaff fromtheDecember 19, 2023, andFebruary 20, 2024, Board of Commissioners’ ( BOC) Zoning hearings untilthe March 19, 2024, BOC Zoning hearing; therefore, wasnotconsidered atthishearing).

O.B. 2 Toconsider areduction ofpublic roadfrontage from75-feetto64-feetanda lotsizereduction from 20,000square-feetto12,876square-feetfor360 Property Solutions LLC. Theproperty islocated onthenorthsideof th Nottingham Drive, westofBuckingham Drive inlandlot280ofthe16 district (375Nottingham Drive).

Mr. Pederson presented theApplicant’srequest tocontinue O.B. 2; thereafter, thefollowing motion wasmade:

MOTION: Motion byBirrell, second bySheffield, tocontinue O.B. 2until theMarch 19, 2024, Board ofCommissioners’ Zoning Hearing.

VOTE: ADOPTED 5-0 (Statements previously submitted byCommissioner Birrell andCommissioner Gambrill areattached andmade apartofthese minutes.)

MINUTES OFZONING HEARING

COBB COUNTY BOARD OFCOMMISSIONERS

FEBRUARY 20, 2024

PAGE7

Mr. Pederson made thefollowing announcement andreadinthecases fortheConsent Agenda:

INFORMATION REGARDING ZONING CASES

Allinformation regarding zoning casesmustbeturned intotheZoning Office onthe Wednesday priortothezoning hearing forconsideration. Ifsaidinformation isturned in pastthedeadline, thenitisattheBoard’sdiscretion astowhether theinformation willbe considered.

Priortoreading intheConsent Agenda, Mr. Pederson announced thatCommissioner Gambrill 23 asked thatLUP-32 ( JuliaWelton) bepulled fromtheConsent Agenda andheard ontheRegular Agenda initsnumeric order (seepage12ofthese minutes).

CONSENT AGENDA

MOTION: Motion byCupid, second byBirrell, toapprove thefollowing cases onthe Consent Agenda, asrevised:

23 Z-66 41PARKATOY & SELFSTORAGE, INC. (41ParkAToy & Self Storage, Inc., owners) requesting rezoning fromGC and R-20to LIfora th climate-controlled self-storagefacilityinlandlots2and37ofthe20 district.

Property islocated ontheeastsideofCobb Parkway, south ofThirdArmy Road (4820 CobbParkway). (Previously heldbythePlanning Commission PC) fromtheDecember 5, 2023, PChearing untiltheFebruary 6, 2024, PChearing).

23 TodeleteZ-66totheNRCzoning district, subject to:

1. Letter ofagreeable conditions fromParksHuffdated January 31, 2024 (attached andmade apartofthese minutes), which includes the revised SitePlan

2. FireDepartment comments andrecommendations

3. Water andSewer Department comments andrecommendations

4. Stormwater Management Division comments andrecommendations

5. CobbDOTcomments andrecommendations

6. Anyandallchanges togoback totheBoard ofCommissioners for approval

7. Noon-siteservicing orrepairs ofboats, RVs, four-wheelers, orother Toys”, astheyarecalled, andparked there; andspecifically, nooil changes

8. Allother stipulations, nototherwise inconflict, including those stated intheSeptember 11, 2003, stipulation letterfromGarvis Sams, Jr.

attached andmade apartoftheseminutes), willapply

MINUTES OFZONING HEARING

COBB COUNTY BOARD OFCOMMISSIONERS

FEBRUARY 20, 2024

PAGE8

CONSENT AGENDA (CONT.)

23 SLUP-8 41PARKATOY & SELFSTORAGE, INC. (41ParkAToy & Self Storage, Inc., owner) requesting aSpecial LandUsePermit foraclimate-th controlled self-storage facility inlandlots2and37ofthe20 district.

Property islocated ontheeastsideofCobb Parkway, south ofThirdArmy Road (4820 CobbParkway). (Previously heldbythePlanning Commission PC) fromtheDecember 5, 2023, PChearing untiltheFebruary 6, 2024, PChearing).

23 Toapprove SLUP-8, subject to:

1. Letter ofagreeable conditions fromParksHuffdated January 31, 2024 (attached andmade apartofthese minutes), which includes the revised SitePlan

2. FireDepartment comments andrecommendations

3. Water andSewer Department comments andrecommendations

4. Stormwater Management Division comments andrecommendations

5. CobbDOTcomments andrecommendations

6. Anyandallchanges togoback totheBoard ofCommissioners for approval

7. Noon-siteservicing orrepairs ofboats, RVs, four-wheelers, orother Toys”, astheyarecalled, andparked there; andspecifically, nooil changes

8. Allother stipulations, nototherwise inconflict, including those stated intheSeptember 11, 2003, stipulation letterfromGarvis Sams, Jr.

attached andmade apartofthese minutes), willapply Z-5 MARIANNA KOVITCH (Mt. Bethel Church, Inc., owner) requesting rezoning from RA-4toLROforamedical office inlandlots9and10ofthe st 1 district. Property islocated onthesouth sideofLower Roswell Road, west ofWoodlawn Drive (4608Lower Roswell Road).

TodeleteZ-5toLPSP (Limited Professional Services Permit), subject to:

1. SitePlandated January 2, 2024, withtheDistrict Commissioner approving minor modifications ( attached andmade apartofthese minutes)

2. Health practitioner orprofessional office useonly, withspecific users subject totheDistrict Commissioner approval

3. Landscape Plan, whichincludes a10-footbuffer adjacent tothe existing residential properties, tobeapproved bytheDistrict Commissioner

4. Department ofTransportation comments andrecommendations

5. FireDepartment comments andrecommendations

6. Stormwater Management Division comments andrecommendations

MINUTES OFZONING HEARING

COBB COUNTY BOARD OFCOMMISSIONERS

FEBRUARY 20, 2024

PAGE9

CONSENT AGENDA (CONT.)

Z-5 MARIANNA KOVITCH (CONT.)

7. Water andSewer Division comments andrecommendations

8. Letter ofagreeable conditions fromKevin Moore dated January 29, 2024 (attached andmadeapartofthese minutes)

Atthecall forLUP-1 (Christel Y. Herrera, Jr.), theApplicant wasnotpresent, andthere wasnoopposition present. Commissioner Gambrill requested thatStaffattempt toreach the Applicant, andthecasewasputonholdwhile theApplicant wasbeing contacted. Seepage 12ofthese minutes fortheoutcome ofthecase.

LUP-4 CONGREGATION ETZCHAIM (Congregation EtzChaim, Inc., owner) requesting aTemporary LandUsePermit (Renewal) foradaycare inland th lot969ofthe16 district. Property islocated onthesouth sideofRoswell Road andonthenorth sideofFairfield Drive, eastofIndian HillsParkway 1190Indian HillsParkway).

Toapprove LUP-4for24months, subject to:

1. SitePlanreceived bytheZoning Division onNovember 15, 2023 attached andmade apartofthese minutes)

2. FireDepartment comments andrecommendations

3. Department ofTransportation comments andrecommendations

4. Allprevious stipulations fromLUP-10of2010andLUP-12of2012, including letterofagreeable conditions from ParkHuffdated March 15, 2010 (attached andmade apartofthese minutes)

LUP-5 YOLANDA CASTILLO (Yolanda Castillo, owner) requesting a Temporary LandUsePermit toallow morevehicles andadults thanthe th codeallows inland lot64ofthe17 district. Property islocated onthesouth sideofLowell Drive, eastofCunningham Road (689Lowell Drive).

Toapprove LUP-5for24months, subject to:

1. Noparking ofvehicles ontheright-of-wayonanovernight basis

2. Allvehicles owned bythepermanent residents beparked inthe driveway

LUP-6 EARLY EDUCATION, LLC (EarlyEducation, LLC, owner) requesting a Temporary LandUsePermit (Renewal) foradaycare inland lots50, 51, th 94, and 95ofthe17 district. Property islocated onthewest sideofHurt Road, north ofPlantation Road (488HurtRoad).

Toapprove LUP-6for24months, subject to:

1. Themaximum number ofstudents permitted bystateandfirecodes

MINUTES OFZONING HEARING

COBB COUNTY BOARD OFCOMMISSIONERS

FEBRUARY 20, 2024

PAGE10

CONSENT AGENDA (CONT.)

OTHER BUSINESS

O.B. 1 Toconsider areduction ofpublic road frontage from 75-feettozerofeetand asetback variance foranexisting accessory structure forScott andJudie Ebert. Theproperty islocated onthenorthendofTrailRoad, south ofDue West th Roadinlandlot298ofthe20 district (4541DueWestRoad).

Toapprove O.B. 1, subject to:

1. Road frontage tobeatzerofeetandtheaccessory structure variance tobeapproved

2. Stormwater Management Division comments andrecommendations contained intheOtherBusiness packet (attached andmade apartof these minutes)

3. FireDepartment comments andrecommendations contained inthe OtherBusiness packet (attached andmade apartoftheseminutes) O.B. 3 Toconsider areduction ofpublic road frontage from75-feettozerofeetfor JanetandDennis Wells, andtoallowsetback andlocation variances for accessory structures forGlen andKathleen Barnett. Theproperty islocated th attheendofParisLaneinlandlot871ofthe16 district (41and42Paris Lane).

Toapprove O.B. 3, subject to:

1. 41ParisLanetobeapproved forzerofeetofpublic road frontage

2. 42ParisLanetobeapproved fortheaccessory structures asshown ontheSitePlanreceived bytheZoning Division onJanuary 17, 2024 attached andmade apartofthese minutes)

AtthecallforO.B. 4 (LukeWemette), theApplicant waspresent andtherewasopposition present; therefore, O.B. 4waspulled fromtheConsent Agenda andheard ontheRegular Agenda initsnumerical order (seepage14ofthese minutes).

O.B. 5 Toconsider amending thesiteplanandstipulations forFifthThirdBank regarding rezoning application Z-223of1988andZ-95of1990, forproperty located onthewest sideofGordyParkway, andonthenorthsideof th Shallowford Road inlandlots335and386ofthe16 district (Gordy Parkway).

Toapprove O.B. 5, subject to:

1. SitePlanreceived bytheZoning Division onJanuary 16, 2024 attached andmade apartofthese minutes)

MINUTES OFZONING HEARING

COBB COUNTY BOARD OFCOMMISSIONERS

FEBRUARY 20, 2024

PAGE11

CONSENT AGENDA (CONT.)

OTHER BUSINESS (CONT.)

O.B. 5 ( CONT.)

2. District Commissioner toapprove thefinalbuilding elevations, signage, treesaveplan, andlandscaping plansafterArchitecture Control Committee review

3. Approvals (14pages) fromtheArchitecture Control Committee attached andmade apartofthese minutes)

4. Applicant agreed tofiveadditional stipulations (attached andmade apartofthese minutes)

5. Stormwater Management Division comments andrecommendations contained intheOtherBusiness packet (attached andmade apartof these minutes)

6. FireDepartment comments andrecommendations contained inthe OtherBusiness packet (attached andmade apartoftheseminutes)

7. CobbDOTcomments andrecommendations contained intheOther Business packet (attached andmade apartoftheseminutes)

8. Allprevious stipulations andconditions, nototherwise inconflict, to remain ineffect

23 Priortoapproving theConsent Agenda, Commissioner Sheffield requested thatZ-57 Gordon ToddSpencer) beadded totheConsent Agenda. TheApplicant waspresent and therewasnoopposition present. Mr. Pederson readinthecase, themotion wasmade toadd thecasetotheConsent Agenda, andthentheCommissioner readinherstipulations.

MOTION: Motion 23 bySheffield, second byBirrell, toaddZ-57 totheConsent Agenda.

VOTE: ADOPTED 5-0 (Statements previously submitted byCommissioner Birrell and Commissioner Gambrill areattached andmade apartofthese minutes.)

23 Z-57 GORDON TODD SPENCER (Atlanta Secure CareServices, Inc., owner) requesting rezoning fromGC and CFto NRCforalaundromat (self- and th full-service) inlandlot775ofthe19 district. Property islocated ontheeast sideofAustell Road, northofAmyLane (3377Austell Road). (Previously heldbythePlanning Commission (PC) fromtheDecember 5, 2023, PC hearing untiltheFebruary 6, 2024, PChearing).

23 Toapprove Z-57 totheNRCzoning district, subject to:

1. Theenclosure toconsist ofthesame material astheprimary structure andtobeapproved bytheDistrict Commissioner

2. Construction hours shallbeMonday through Saturday from7:00 a.m. until7:00p.m.; construction isprohibited onSunday

MINUTES OFZONING HEARING

COBB COUNTY BOARD OFCOMMISSIONERS

FEBRUARY 20, 2024

PAGE12

CONSENT AGENDA (CONT.)

23 Z-57 GORDON TODD SPENCER (CONT.)

3. Business hours shall belimited toSunday through Thursday from 6:00a.m. until9:00p.m.; andFriday andSaturday from6:00a.m.

until10:00p.m.

4. Approval isforthisuseonly

5. Liquor stores areprohibited atthislocation

6. Anyother usemust come backbefore theBoard ofCommissioners asanOtherBusiness application

7. Planning Commission comments andrecommendations ( attached andmadeapartoftheseminutes), withthefollowing exception:

A. Stipulation No. 1 - Inthestipulation letterfromToddSpencer datedJanuary 19, 2024 (attached andmade apartofthese

minutes), strike paragraph 6(b)(v) thatreferences “ Change Machine”

8. FinalLighting Plantobeapproved bytheDistrict Commissioner LUP-1 CHRISTEL Y. HERRERA, JR. (ChristelY. Herrera, Jr., owner) requesting aTemporary Land UsePermit toallow more vehicles thanthecodeallows th inlandlot216ofthe20 district. Property islocated onthesouthsideof Hood Circle andontheeastsideofKennesaw DueWestRoad (2562Hood Circle).

Mr. Pederson announced thatStaffhadnotheard back fromtheApplicant for LUP-1; therefore, Commissioner Gambrill made thefollowing motion to continue thecase:

MOTION: Motion byGambrill, second byRichardson, tocontinue LUP-1 untiltheMarch 19, 2024, Board ofCommissioners’ Zoning Hearing.

VOTE: ADOPTED 5-0 (Statements previously submitted byCommissioner Birrell andCommissioner Gambrill areattached andmade apartofthese minutes.)

CONSENT VOTE: ADOPTED 5-0 (Statements previously submitted byCommissioner Birrell andCommissioner Gambrill areattached andmade apartofthese minutes.)

REGULAR AGENDA

23 LUP-32 JULIA WELTON (JuliaD. Welton, LLC, owner) requesting aTemporary LandUsePermit toallowdogboarding anddaycare inland lot148ofthe th 20 district. Property islocated onthenortheast sideofHillRoad andonthe northwest sideofMarsHillRoad (4990HillRoad). (Previously heldbythe Planning Commission (PC) fromtheDecember 5, 2023, PChearing until theFebruary 6, 2024, PChearing).

MINUTES OFZONING HEARING

COBB COUNTY BOARD OFCOMMISSIONERS

FEBRUARY 20, 2024

PAGE13

REGULAR AGENDA (CONT.)

23 LUP-32 JULIA WELTON (CONT.)

Thepublic hearing wasopened, andJuliaWelton addressed theBoard.

Following thepresentation anddiscussion, thefollowing motion wasmade:

MOTION: Motion 23 byGambrill, second byRichardson, todenyLUP-32.

VOTE: ADOPTED 5-0 (Statements previously submitted byCommissioner Birrell andCommissioner Gambrill areattached andmade apartofthese minutes.)

Z-1 MIRNA ARACELY TORRES CASTRO (LuisG. Escobar Torres and MirnaA. Torres Castro, owner) requesting rezoning fromRA-5andPSCto th LRCforanoffice inlandlot189ofthe18 district. Property islocated on theeastsideofMableton Parkway andonthenorth sideofCommunity Road 6265Mableton Parkway).

Thepublic hearing wasopened; Darrell Johnson, InellMcCrary andRonald McCrary addressed theBoard. Following thepresentation anddiscussion, thefollowing motion wasmade:

MOTION: Motion bySheffield, second byBirrell, toapprove Z-1tothe LRCzoning district, subject to:

1. Construction hours shall beMonday through Saturday from7:00 a.m. until7:00p.m.

2. Sidewalks shallbeinstalled onCommunity Road pursuant tothe Development Code andnot feeinlieuofsidewalks, butactual sidewalks tobeinstalled

3. Planning Commission comments andrecommendations dated February 6, 2024 (attached andmadeapartofthese minutes)

4. Allconstruction vehicles shallberestricted tothesubject property

5. Construction equipment shallnotuseanyadjacent parcels forany reason

6. Staff comments andrecommendations, nototherwise inconflict VOTE: ADOPTED 5-0 (Statements previously submitted byCommissioner Birrell andCommissioner Gambrill areattached andmade apartofthese minutes.)

Chairwoman Cupid calledforabriefrecess from 10:10a.m. until10:15a.m.

MINUTES OFZONING HEARING

COBB COUNTY BOARD OFCOMMISSIONERS

FEBRUARY 20, 2024

PAGE14

REGULAR AGENDA (CONT.)

LUP-2 RONALD MCDOWELL (Ronald Bernard McDowell, SrandKimDenise McDowell, owners) requesting aTemporary LandUsePermit toallow more th vehicles than thecode allows inland lot365ofthe16 district. Property islocated onthenorth sideofLakeside Drive, northwest ofChastain Lakes Drive (158Lakeside Drive).

Thepublic hearing wasopened; Ronald McDowell andMichele Sutcliffe addressed theBoard. Following thepresentation anddiscussion, the following motion wasmade:

MOTION: Motion byBirrell, second byGambrill, todeny LUP-2, subject to:

1. Applicant tocome intocompliance within 60days anddirectStaffto address anyviolations

Priortothevote, Commissioner Birrell withdrew herpriormotion todeny thecaseandmade thefollowing motion:

MOTION: Motion byBirrell, second byRichardson, toholdLUP-2untilthe March 19, 2024, Board ofCommissioners’ Zoning Hearing.

Clerk’sNote: Commissioner Birrell directed theApplicant toworkwithStaff andhisHOA (homeowners association).

VOTE: ADOPTED 5-0 (Statements previously submitted byCommissioner Birrell andCommissioner Gambrill areattached andmade apartofthese minutes.)

AtthecallforLUP-3 (Fasilat Adesina), theApplicant wasnotpresent, andthere wasno opposition present. ThecasewasputonholdtoseeiftheApplicant could becontacted (see page 15ofthese minutes fortheoutcome ofthiscase). Other Business case, O.B. 4 (Luke Wemette), wasmoved upontheagenda andheardnext.

OTHER BUSINESS

O.B. 4 Toconsider amending thesiteplanandstipulations forLukeWemette regarding applications Z-83andSLUP-14of2016, forproperty located on thesouth sideofPowder Springs Road, eastofSanders Road inlandlots838 th and865ofthe19 district (2951Powder Springs Road).

Thepublic hearing wasopened; Luke Wemette, PastorFrederick Anderson, andMattHunter addressed theBoard. Following thepresentation and discussion, thefollowing motion wasmade:

MINUTES OFZONING HEARING

COBB COUNTY BOARD OFCOMMISSIONERS

FEBRUARY 20, 2024

PAGE15

OTHER BUSINESS (CONT.)

O.B. 4 ( CONT.)

MOTION: Motion bySheffield, second byBirrell, toapprove O.B. 4, subject to:

1. Hours ofconstruction shallbeMonday through Saturday 7:00a.m.

until7:00p.m.

2. Staff comments andrecommendations, nototherwise inconflict

3. SitePlanreceived bytheZoning Division onJanuary 17 16, 2024 attached andmade apartofthese minutes), withtheDistrict Commissioner approving minor modifications

4. Stormwater Management Division comments andrecommendations contained intheOtherBusiness packet (attached andmade apartof these minutes)

5. FireDepartment comments andrecommendations contained inthe OtherBusiness packet (attached andmadeapartofthese minutes)

6. CobbDOTcomments andrecommendations contained intheOther Business packet (attached andmade apartoftheseminutes)

7. Building elevation contained intheOtherBusiness packet (attached andmade apartofthese minutes), withthefinal elevation tobe approved bytheDistrict Commissioner

8. Allprevious stipulations andconditions, nototherwise inconflict, to remain ineffect

VOTE: ADOPTED 5-0 (Statements previously submitted byCommissioner Birrell andCommissioner Gambrill areattached andmade apartofthese minutes.)

Clerk’sNote: ThedateontheSitePlanisJanuary 16, 2024, ratherthan January 17, 2024, aspreviously readintotherecord.

REGULAR AGENDA (CONT.)

LUP-3 FASILAT ADESINA (FasilatAdesina, owner) requesting aTemporary LandUsePermit toallow more adults thanthecodeallows inlandlot645 th ofthe19 district. Property islocated onthewest sideofRidgecrest Circle, north ofRidgecrest Drive (2871Ridgecrest Circle).

Mr. Pederson announced thatStaff didcontact theApplicant forLUP-3and thatshewasnotgoing tobeabletoattend thehearing today; thereafter, the following motion wasmade:

MOTION: Motion bySheffield, second byBirrell, tocontinue LUP-3until theMarch 19, 2024, Board ofCommissioners’ Zoning Hearing.

MINUTES OF ZONING HEARING

COBB COUNTY BOARD OF COMMISSIONERS

FEBRUARY 20, 2024

PAGE 16

REGULAR AGENDA ( CONT.)

LUP- 3 FASILAT ADESINA ( CONT.)

VOTE: ADOPTED 5- 0 ( Statements previously submitted by Commissioner Birrell and Commissioner Gambrill are attached and made a part of these minutes.)

ADJOURNMENT

The hearing adjourned at 11: 26 a.m.

C SeNv— Robin L. Stone, Deputy County Clerk Cobb County Board of Commissioners

Min. Pk. Petition No. A-LL Doc. Type Cen•..tw: sslm..er 5 - v- Oct- 40 ea-a-G.. \ take. , Meeting Date 2•--A0- d oalJ-Commissioner Birrell' s Statement - Revised 1/ 22/ 24 I do not support the Home Rule Challenge of the majority of this board. It is unconstitutional and illegal. I voted against the amended map three times in 2022 ( 1/ 25/ 22, 10/ 11/ 22 and 10/ 25/ 22).

I have a duty to represent my constituents and will not have my vote suppressed as I was duly elected on November 8, 2022 under the state map ( HB 1154) voted on by the Georgia General Assembly in February 2022 and signed into law by Governor Kemp on March 2, 2022 and certified by the Cobb Board of Elections on November 15, 2022.

In addition, I do support the Order on Cross Motions for Summary Judgement ( Civil Action File No. 23- 1- 02428- 56) from Judge Ann B.

Harris in the Superior Court of Cobb County dated January 8, 2024 which finds the County' s Amendment to Act 562 ( the " Amendment or Amended Act") is an act excluded from the County' s Home Rule authority granted in the Georgia Constitution, and therefore is void.

9-0( A/CAA--

Jo Ann K. Birrell District 3 Commissioner

Milt 13k. R9 Petition No. # LL Doc. Type CovK4. 4s s t M.e.r C-la .b rr t 5 S Qe,N* add.Qd - 4n e...e.- vokc, Meeting Date 9.- ao-Commissioner Gambrill' s statement:

When the Board first entered Executive Session in March 2022 to discuss the " Home Rule" challenge, I challenged the County Attorney' s Office on the premise and requested outside counsel to be sought.

While the County Attorney' s Office claims the Association ofCounty Commissioners ofGeorgia( ACCG) provided legal advice, Itoo am in receipt ofthe documents from the ACCG regarding Home Rule, to which it clearly defines the limit ofthis Board's Constitutional powers as to redistricting. I also contend that the Board of Commissioners did notfollow the Home Rule challenge in its entirety.

In addition, the Georgia Supreme Court has ruled that the GA Constitution limits legislative action by the Board ofCommissioners to matters for which no provision has been made by general law. Furthermore, the " Home Rule" powers granted to the Board of Commissioners do not extend to any matters which the Georgia General assembly by general law has preempted, like the redistricting map here in Cobb Co.

Commissioners of Wayne Co. v. Smith 240 Ga. 540( 1978); Brophy v. McCranie 264 Ga. 187( 1994).

In fact, even in Federal Court in Georgia, the court has ruled the General Assembly is the only legislative body with the power to enact redistricting legislation for the counties; therefore, where the General Assemblyfailed to enact reapportionment legislationfor a certain county, although it was entitled to consideration as an expression of county policy, a reapportionment plan proposed by a county was not a legislatively enacted plan requiring deferential treatment and the district court was required to fashion a reapportionment plan. Bodker v. Taylor, 2002 U.S. Dist. LEXIS 27447( ND. Ga. June 5, 2002).

In January, Georgia State Attorney General, Chris Carr stated that the Cobb County Commission's move to amend its electoral redistricting map is " inappropriate and not legally binding."

Per the letter dated December 22, 2022, from C. Ryan Germany, General Counsel for the Office ofthe Secretary ofState, " you should not consider the ministerialfunction offiling the Amendment with our office or the publishing ofthe Amendment to the comment on whether the Amendment is allowable under state law or aproper exercise ofthe authority by the Cobb County Commission, nor should you rely on this to attempt to establish the validity of the Amendment." " In fact" he continues " it appears that the Amendment is very likely an unauthorized exercise ofauthority by the Cobb County Commissioner that does not comply to Georgia Law or the State Constitution.

With the majority of this Board actions on October 25, 2022 and the resulting filing and recording with the Office ofthe Secretary ofState on October 26, 2022, the boundaries ofthe districts from which county commissioners were elected in Districts 1 and 3 were changed( 14) days prior to the General Election, and eight( 8) days after early voting had begun using district boundaries for Districts 1 and 3 as approved by the Governor.

Furthermore, the Board ofElections certified the election of Commissioners in District 1 and 3 using the map as approved by the Governor on March 2, 2022 on November 15, 2022 and not the maps that the Board ofCommissioners made effective on October 26, 2022.

Mize. Bk. ` M Petition No. - 57 s3 Doc. Type pt...` a^. Gr...wAssit-.

MINUTES OF ZONING HEARING

a dwa[ cv c'• r- S' l COBB COUNTY PLANNING COMMISSION Meeting Date 1;2-44 - 1-

FEBRUARY 6, 2024

PAGE 6

CONSENT AGENDA( CONT.)

Z- 5 MARIANNA KOVITCH ( Mt. Bethel Church, Inc., owner) requesting rezoning from RA-4 to LRO for a medical office in land lots 9 and 10 of the Pt district. Property is located on the south side ofLower Roswell Road, west of Woodlawn Drive (4608 Lower Roswell Road).

To recommend deletion of Z- 5 to LPSP ( Limited Professional Services Permit), subject to:

1. Site Plan dated January 2, 2024, with District Commissioner approving minor modifications ( on file in the Zoning Division)

2. Health practitioner or professional office use only, with specific users subject to District Commissioner approval

3. Landscape Plan, which includes a 10- foot buffer adjacent to existing residential properties, to be approved by the District Commissioner

4. Department of Transportation comments and recommendations

5. Fire Department comments and recommendations

6. Stormwater Management Division comments and recommendations

7. Water and Sewer Division comments and recommendations

8. Letter of agreeable conditions from Kevin Moore dated January 29, 2024 ( on file in the Zoning Division)

9. Inclusion on the Consent Agenda for the Board of Commissioners' Zoning Hearing on February 20, 2024

MOTION: Motion by Beloin, second by Anderson, to amend the Consent Agenda to include Z- 5, as previously read in.

VOTE: ADOPTED 3- 0, Dance and Vault not present CONSENT VOTE: ADOPTED 3- 0, Dance and Vault not present

REGULAR AGENDA

Z- 57' 23 GORDON TODD SPENCER (Atlanta Secure Care Services, Inc., owner) requesting rezoning from GC and CF to NRC for a laundromat ( self- and full- service) in land lot 775 of the 19th district. Property is located on the east side of Austell Road, north of Amy Lane ( 3377 Austell Road).

The public hearing was opened, and Todd Spencer addressed the Planning Commission. Following the presentation and discussion, the following motion was made:

MOTION: Motion by Hughes, second by Beloin, to recommend approval of Z- 5723 to the NRC zoning district, subject to:

1. Stipulation letter from Todd Spencer dated January 19, 2024( on file in the Zoning Division)

Petition No. Z.- S Meeting Date a.-?-- o -

MINUTES OF ZONING HEARING

Continued

COBB COUNTY PLANNING COMMISSION

FEBRUARY 6, 2024

PAGE 7

REGULAR AGENDA( CONT.)

Z- 57' 23 GORDON TODD SPENCER( CONT.)

2. Revised Site Plan dated January 19, 2024 ( on file in the Zoning Division)

3. Variances as stated in the Zoning comments

4. Fire Department comments and recommendations

5. Site Plan Review comments and recommendations

6. Planning Division comments and recommendations

7. Stormwater Management Division comments and recommendations

8. Water and Sewer Division comments and recommendations

9. Department of Transportation comments and recommendations

10. The non- brick parts of building to be painted an earth- tone color approved by the District Commissioner

11. No outdoor storage or outdoor display of merchandise

12. Hours of operation are limited to 6: 00 a. m. to 10: 00 p. m. only

13. Applicant/ owner/ developer to install a six- foot solid wooden privacy fence along north property line from Austell Road to the dumpster location

14. Final architectural elevations to be approved by the District Commissioner

15. The final Security Plan and Landscape Plan be reviewed and approved by the District Commissioner based on the January 19, 2024, Preliminary Plans submitted by the Applicant

16. This is a cashless operation and staff will be on- site during operating hours

VOTE: ADOPTED 3- 0, Dance and Vault not present LUP- 30' 23 DONALD PERRY ( Sandra Galloway and Donald Perry, Sr., owners) requesting a Temporary Land Use Permit to allow more vehicles than the code allows in land lot 559 of the 19th district. Property is located on the southeast side of Farmington Drive at the terminus of Angus Trail ( 2639 Farmington Drive).

The public hearing was opened; Donald Perry and Sandra Galloway addressed the Planning Commission. Following discussion, the Applicant requested to withdraw without prejudice. Thereafter, following motion was made:

MOTION: Motion by Hughes, second by Anderson, to allow LUP- 30' 23 to be withdrawn without prejudice.

VOTE: ADOPTED 3- 0, Dance and Vault not present

as Min. Bk. 99 Petition No. Z- 57 Doc. Type ( et1 er GTS Consulting LLC

G. Todd Spencer, AIA— Registered Architect— GA# RA009618 G T S Meeting Date a:b- 7- o y.

300 Lucinda Ct NW, Marietta, GA 404- 277 5206 Email toddngtscons. co30064m rawAil Phone Stipulation Letter — Zoning Case Z- 57- 2023 CONSULIINGa Date: January 19, 2024 Project Name: Evergreen Oasis Laundry— Zoning Case Z- 57- 2023 Project Address: 3377 Austell Road 4c4

OF GF

Marietta, GA 30064 Ay" ZS.

Client/ Titleholder: Atanta Secure Care Services INC 1 * A3. TO D SpEl ER * Alfie Igbadume i

Cell: ( 678) 622- 8099 1Z‘ `. P;

I- f E- mail: atlantacaresaol. com ci 4%cATE NO 0° RED pV ' Architect: G. Todd Spencer— GA License# RA009618 Cobb County Planning Commission and Board of Commissioners:

The purpose of this letter is to outline exactly how we plan to address the concerns related to this proposed project as presented by the Planning Commission and the property owners who spoke in opposition to the project at the Planning Commission meeting on 12/ 5/ 23.

We have reached out to Jill Gordon- Evans and Nikki Teague who are opposed to the project to discuss their concerns and how we might address those.

1. Hours of Operation: The proposed plan is for the facility to be open 24 hours a day, 7 days a week. Opposition to these hours was mentioned by all three people who spoke at the meeting in opposition to the project. The Owner has decided to change the hours of operation to 6: 00 am to 10: 00 pm, Monday through Sunday. The facility will be closed from 10: 00 pm to 6:00 am, Monday through Sunday.

2. At the request of the Planning Commission Staff, a six-foot solid wooden privacy fence will be installed along the north property line from Austell Road to the dumpster location.

3. At the request of the Planning Commission Staff, the non- brick parts of the building to be painted an Earth- tone color that must be approved by the District Commissioner.

4. At the request of the Planning Commission Staff, no outdoor storage or outdoor display of merchandise will be present on the property.

5. We pledge to review and address all comments and recommendations of the Fire Department, Site Plan Review, Planning Division, Stormwater Management Division, Water and Sewer Division and the Department of Transportation.

Evergreen Oasis Laundry- Stipulation Letter. docx

Petition No. Z-57 ' Meeting Date o-Continued

6. CRIME: One of the concerns mentioned by the neighboring property owners was crime, especially in the parking lot. According to the U. S. Department of Justice, around 4- 6% of all crimes occur in parking lots, making them a common target for potential crime. They are the third most common place where crimes occur. There are two main ways we plan to address this concern.

a. LIGHTING. Having a well- lit parking lot can act as a deterrent to theft and vandalism. By providing better visibility, people are better aware of their surroundings, and the lighting creates a more inviting and welcoming atmosphere.

Research from the U. S. Department of Justice indicates that well- lit parking lots experience an average of 27% lower incidence of car break- ins and a 38% reduction in theft and other crime. Additionally, well- lit parking lots can also help prevent accidents, especially when it comes to pedestrians. Drivers are better able to see pedestrians and other obstacles in well- lit areas, which can reduce the likelihood of accidents occurring. We will design the parking lot lighting to provide adequate lighting at night with enough pole lights in the right areas.

We will utilize LED ( Light Emitting Diodes) rather than HID lighting. LED lighting is directional, unlike HID lighting, which only focuses on one spot, with limited visibility and uneven lighting. They can be aimed at directing a higher concentration of light to targeted areas. They are also " dark sky" friendly, meaning that the lighting is designed to have minimal impact on the night sky. This includes reducing glare and light pollution and protecting our night sky and the life that depends on it.

b. SECURITY CAMERAS. A commercial laundromat must be concerned with the safety of its customers. Many laundromats are particularly susceptible to vandalism and theft during their early or late opening hours. The best way to keep an eye on the safety of the customers and the neighbors is to install security cameras. There are 5 key places in which security cameras will be installed.

i. Parking Lot— The parking lot is probably the most important location to have surveillance footage from a security camera when it comes to providing a safer laundromat for the customers and neighbors. When customers must do their laundry later at night or early in the morning, they want to know that they are safe while walking to and from their cars.

ii. Entrance — The security camera at the entrance will get a clear facial image. If something should happen inside your business, law enforcement will be able to identify the perpetrators. The camera will be positioned in such a way that backlighting doesn' t prevent getting a clear image of a customer' s face and that no light is coming through the windows that would cause interference.

iii. Office — To deter employee theft, a security camera will be installed in the office. This will help ensure that employees are more trustworthy and provide a safer laundromat experience.

iv. Focused on the Equipment— There will be at least one security camera focused on the equipment. This will drastically reduce opportunities for Evergreen Oasis Laundry- Stipulation Letter.docx Page 2 of 4

Petition No.

Meeting Date 2.—at.

Continued vandalism, theft and fraudulent loss claims once customers and staff realize they are being watched. Wide- angle security cameras will also eliminate blind spots within the facility. These cameras can also be used as evidence" should a customer report stolen items OR should anyone have a slip/ fall while doing business at your facility.

v. Change Machine — A security camera will be installed by the change machine. This laundromat will offer a variety of payment options; however, if we choose to offer coin laundry machines, many customers will still rely on the change machine. These machines are common ground for theft and are seen as easy targets. We will install a small camera above each machine and angle it in such a way that it will effectively identify the person tampering with the machine. The camera will be positioned so that it provides high- quality images that can be handed over to the authorities.

7. LANDSCAPING: One of the issues raised by a neighboring property owner is the need for attractive landscaping, trees and a landscape buffer between this property and adjacent properties. We are going to focus on designing an attractive landscape especially around the parking area. Parking lots are one of the first things people see when they arrive at a building and, as a result, parking lots have a big impact on people' s perception of the building and the business conducted there. Here are some design elements and concepts we are going to incorporate into our landscape design.

a. GREEN SPACES. The parking lot will not be entirely covered with asphalt. We will incorporate some types of green spaces. These may include grass patches, trees, commercial parking lot planters and other items. Having some small dedicated green areas will make our parking lot feel more organic and welcoming and set the tone for staff and visitors.

b. LOW MAINTENANCE PLANTS. We know that the parking lot landscaping won' t be the easiest area to maintain due to challenges such as watering plants and cleaning up fallen debris. We will be installing low-maintenance plants that don' t require a ton of water, are able to handle direct sunlight, and don' t give off a ton of debris to clean up. We will be considering plants native to this region that have the best chance of thriving in this parking lot, even if the conditions are challenging.

c. BUILD PATHWAYS AND HARDSCAPES. We are putting ourselves in the shoes of the people visiting our property. One way or another, they need to get from their vehicle to the front doors of the building. Would they rather do so by walking across asphalt? Or would your experience be enhanced by walking on a more attractive pathway? We will be installing some type of pavers, stones or stamped / colored concrete pathway leading from the parking lot to the building entrance. We are also considering adding some type of greenery along this path.

d. WIDE RANGE OF FLOWERS AND PLANTS. We will be installing a wide range of colors, sizes and types of plants and flowers to elevate our space and make it stand out.

Evergreen Oasis Laundry - Stipulation Letter. docx Page 3 of 4

Petition No. Z- 57 ' a 3 Meeting Date Continued

e. SHRUBS. The Planning Commission is requiring a six-foot wooden privacy fence between this property and the adjacent mobile home park to the north. We don' t want to simply build this fence and leave it as it is. We will elevate the visual appeal of this fence by incorporating small trees, shrubs, and vines.

f. TREES. We know that the addition of some small, hardwood trees to the property will be beneficial. We will install a few new trees around the property in strategic locations.

8. CIVIL ENGINEER: Since this project will require an LDP ( Land Disturbance Permit), a qualified, registered Civil Engineer ( PE) will be retained for this project to produce civil engineering drawings for the parking lot and landscaping around this building. This is being required by Cobb County since this redevelopment project creates, adds or replaces 5, 000 square feet or greater of new impervious surface area. It will be the task of the Civil Engineer to address all comments and recommendations provided by Cobb County Stormwater Management Department.

9. AUSTELL ROAD LCI STUDY: It has been noted in the Planning Division comments that this property is included in the Austell Road LCI Study area and that the proposal does NOT comply with the design guidelines for this area. Further study of this Austell Road LCI Study and its accompanying design guidelines will need to be made to determine how this property can be made to comply with these design requirements.

10. WATER AND SEWER DEPARTMENT: The Cobb County Water and Sewer Department is requiring that a fire flow test be conducted. We will conduct this fire flow test as required.

11. CCDOT ( COBB COUNTY DEPARTMENT OF TRANSPORTATION): It will be the task of the Civil Engineer to address all comments and recommendations provided by CCDOT. These include but are not limited to the following comments:

a. Recommend Austell Road driveway be upgraded to commercial standards. This recommendation is pursuant to Cobb County Development Standard 402. 8, Non- Residential Driveways and Cobb County Development Standard Detail 116, Commercial Driveway Requirements.

b. Recommend extending Austell Road driveway uninterrupted access ( distance to the first internal parking space or drive aisle) to a minimum of 50 feet from the edge of right-of-way line or 100 feet from the edge of travelled way, whichever is further. This recommendation is to allow for vehicle stacking and is pursuant to Cobb County standards ( Development Standard 402. 8, Non- Residential Driveways and Cobb County Development Standard Detail 116) and GDOT requirements, respectively.

This concludes this stipulation letter. If there are any questions or concerns regarding this letter, please contact Todd Spencer via email at toddqtscons. com or via mobile at 404- 277- 5206.

Evergreen Oasis Laundry- Stipulation Letter. docx Page 4 of 4

aa Mia. Bk. 11 Petition No. Z d' Doc. Type 1 fit,- ;row, All-1044 Meeting Date ?.- ao- 12eyy-SOH

GARVIS L. SAMS, JR.

SAMS, LARKIN & HUFF 770- 422- 7016

JOEL L. LARKIN A LIMITED LIABILITY PARTNERSHIP TELEPHONE

k PARKS F. HUFF - SUITE 100 770. 426. 6583

376 POWDER SPRINGS STREET FACSIMILE

i

MARIETTA, GEORGIA 30064- 3448

I January 31, 2024 1 i

VIA EMAIL

1 i Mr. John P. Pederson, AICP, Manager Cobb County Zoning Division 1 Community Development Agency 1 1150 Powder Springs Road, Suite 400 k Marietta, GA 30064 1 1 I Re: Application of 41 Park A Toy& Self Storage, Inc. to Rezone a 4. 96- Acre Tract from GC& R-20 to LI; Land Lots 2 and 37 of the 20th District; located on the east side of Cobb Parkway, north of Awtrey Church Road( 4820 Cobb Parkway, NW) Z- 66 & SLUP- 8 of 2023

3 Dear John:

i This firm has been engaged by and represents 41 Park A Toy& Self Storage, Inc.

Applicant") concerning the above- captioned Application for Rezoning and the accompanying Special Land Use Permit(" SLUP") Application being filed under separate cover. Park A Toy is an existing self-storage facility on Cobb Parkway that has a combination of outdoor storage and traditional single- story storage buildings. Because of the proximity to Lake Allatoona, there is a huge need for the outdoor storage of boats and RV' s. To meet this demand, the applicant proposes to expand the existing facility onto land already owned by the applicant that sits behind 1 the existing facility. Expanding the existing facility has a lot of advantages by creating additional storage for residents without adding additional curb cuts.

1 The staff has reviewed the application and recommends approval ofthe request. The applicant has met with the staff and concerned neighbors and has revised the site plan to address 1 some of the concerns expressed by the neighbors. Additionally, below are some proposed zoning Iconditions to be included in the approval of the rezoning request.

1. The property will be rezoned to NRC with a Special Land Use Permit for a Icombination of outdoor boat and recreational vehicle storage on a gravel lot and single- story storage building as reflected on the attached site plan dated January 30, 1 2023, that we filed today.

1 1i 1 I I 1 I

Petition No. a- 66 SuiP-SAMS LARKIN & HUFF 8 } 3 Meeting Date a- ao- ao2..l-A LIMITED LIABILITY PARTNERSHIP Continued

VIA EMAIL

Mr. John P. Pederson, AICP, Manager Cobb County Zoning Division Community Development Agency January 31, 2024 Page 2

2. The proposed expansion will be operated as part of the existing storage facility so it will not require any additional bathrooms or a septic system to manage waste water because the office and restrooms will remain in the current location.

3. The applicant will comply with all stormwater requirements for the proposed expansion to limit any negative impact on Lake Allatoona. The Stormwater Division' s comments reflect sensitivity because of the proximity to the lake and during plan review these comments will be addressed.

4. There shall be a 20- foot undisturbed buffer on the north property line adjacent to property zoned R-20. There shall be a 10- foot undisturbed buffer on the eastern and southern property line as depicted on revised site plan.

5. The property will be developed in phases with the first phase being the outdoor storage and the second phase including the potential storage building.

6. The use shall be limited to outdoor storage of recreational vehicles on paved or gravel surfaces and single-story storage building( s). Additional uses must be approved by the district commissioner.

7. Access to the property shall be through the existing facility.

8. The District Commissioner shall have the authority to approve minor modifications to these stipulations, the site plan, architectural renderings/ elevations and all other components of this development as it proceeds through the Plan Review Process and thereafter. However, the District Commissioner shall not have the authority to approve modifications or revisions which:

a. Increase the size of the building.

b. Reduce the size or composition of an approved buffer or landscape strip adjacent to contiguous properties.

c. Relocate a structure closer to a perimeter property line.

d. Increase the height of a building so that it exceeds the at-grade level of buildings located on contiguous and/ or adjacent properties.

Petition No. .- 6 6 ' 4 S .u-P- B -

SAMS,

LARKIN & HUFF Meeting Date a•-- -0- 6A-4.- lj A LIMITED LIABILITY PARTNERSHIP Continued i i

VIA EMAIL

i 1 Mr. John P. Pederson, AICP, Manager 1 Cobb County Zoning Division Community Development Agency January 31, 2024 r Page 3 1

e. Which seek additional waivers from the Cobb County Zoning Ordinance other 1

than those referenced herein and/ or depicted upon the current site plan.

i IPark a Toy looks forward to the approval ofthe expansion of the business that serves the surrounding community with quality indoor storage and the storage ofrecreational vehicles.

Please let me know if you need any additional information or have any questions regarding the I proposed conditions. With kind regards, I am I

Very truly yours, 1 1

SAMS, LARKIN& HUFF, LLP

1 9 2...., z4a. 4, Parks F. Huff phuffAsamslarkinhuff. com PFH/jac Enclosure/Attachment

cc: ON FOLLOWING PAGE

i i 1 1 i 1 1 1 1 i Ii i 3 3 1 i

Petition No. Z- 46 w.P- 8 SAMS, LARKIN & HUFF Meeting Date a- 9.o- a00- 4- A LIMITED LIABILITY PARTNERSHIP Continued

VIA EMAIL

Mr. John P. Pederson, AICP, Manager Cobb County Zoning Division Community Development Agency January 31, 2024 Page 4 cc: Members, Cobb County Board of Commissioners( via email) Members, Cobb County Planning Commission( via email) Dr. Jackie McMorris, County Manager( via email) Board of Commissioners Assistants( via email) Ms. Jessica Guinn, AICP, Director( via email) Ms. Jeannie Peyton, AICP, Senior Planner( via email) Mr. Terry Martin, AICP, CNU-A, Planner III (via email) Mr. LeDarius Scott, AICP Candidate, Planner II( via email) Mr. Cameron Jones, Planner II( via email)

Ms. Pam Mabry, County Clerk( via email) Ms. Robin Stone, Deputy County Clerk( via email) Ms. Leila Washington, Deputy County Clerk( via email) Mr. Jeff Byrd, Fire Marshal' s Office( via email) Ms. Ligia Florim, Cobb DOT( via email)

Mr. Andrew Heath, P. E., Stormwater Management Division( via email) Mr. Tim Davidson, P. E., Development Review Engineer, Water System( via email) Mr. Leman B. ( Moose) McCray( via email)

P4i3 atOneele rdr..

2— -, air/ . .

n 000F4i 53f ;:

71q4 ar° r.•' 1 1 yO M a N.

N. 1.

aii 1e i et 13\ ,, S 1 ;.

I IM I 11 1 / r l k' // F i , n 1 r I t_ I 1 i / I / 1i , 1; ; / 1 J i - ' 4, i / g I a 1 ' `, I 8 t_ / 1 k il 3ip 1 i 3y 1 I M1 J tr+.

gRA 1l m n , b t= r* cD O 0 F k P r s CD Oiip12 1 R' I.

1 1 n Q A b., I I 11 d e t,-,,,. [(, r( Cj{/.

h l.

i s T i , Z y , 1 I I I N < i d 9DL__ 10

SIZAWFO

BY0710, ' 04 43 1 ii y.;hu

laa Min. Bk... gq Petition No., Z- 64 d S c. uP- g''', Doc. Type / ale- Garvts Saw.s.. Sr.

kscc 9- Z- Pc, Meeting Date J—. o—ax.24- Min. Bk. of5 Petition No.Z- 14t SAMS, LARKIN & HUFF Doc, Type ee& de

A LIMITED LIABILITY PARTNERSHIP PCk.t •¢

0 ATTORNEYS AT LAW Meeting Date to t o7. 1 Q3

SUITE 100

376 POWDER SPRINGS STREET

MARIETTA, GEORGIA 30064- 3448

GARVIS L. SAMS, JR. 770. 422. 7016

JOEL L. LARHIN TELEPHONE

PARKS F. HUFF

770. 426. 6583

RICHARD A. HARRAH

FACSIMILE

MICHAEL P. PRYOR September 11, 2003

SAMSLARKIN@AOL. COM

OF COUNSEL E- MAIL

DAVID P. HART IN

VIA HAND DELIVERY 0. ie i Q T L,

Mr. John P. Pederson, Planner III Ii • P I I [ t1U, i i t-Cobb County Zoning Department L ___. 4______ 7_17.."zit 1-1 191 Lawrence Street C bei cr' e. M +, EV UtPI Suite 300 ZON! ti; nr;[ « y Marietta, GA 30060- 1661 Re: Application of McCray Properties, Inc. to Rezone a 7. 62 Acre Tract from LI, GC & R- 20 to LI ( No. Z- 141)

Dear John:

As you know, I have been engaged by and represent the applicant which is also the property owner concerning the above- captioned application for rezoning. In that regard, the application is scheduled to be heard and considered by the Cobb County Planning Commission on October 7, 2003 and, thereafter, scheduled for final action by the Cobb County Board of Commissioners on October 21, 2003.

With respect to the foregoing and in keeping with our ongoing discussions with staff and area residents, please allow this letter to serve as the applicant' s expression of agreement with the following stipulations which, upon approval ofthe rezoning, shall become conditions and a part of the grant ofthe requested rezoning and binding upon the subject property thereafter:

1. A rezoning ofthe subject property to the Light Industrial ( LI) classification specifically for purposes of a self service storage facility and permitted uses related to the moving and storage industry.

2. The submission of a landscape plan during the Plan Review process, subject to the staff' s review and approval, including the following:

a. Meeting or exceeding vegetative requirements, perimeter landscape strips and setbacks provided in the SSSF Ordinance.

Petition No. 3- 6` d St_uP- Et Meeting Date a- 24,- 2‘"•2' 41- SAMS, LARKIN & HUFF Continued

A LIMITED LIABILITY PARTNERSHIP

Petition No. Z J4i Meeting Date 101. 24/ 03 Continued

VIA HAND DELIVERY

Mr. John P. Pederson, Planner III Cobb County Zoning Department September 11, 2003 Page 2

b. All vegetation requirements under and pursuant to the LI classification and the SSSF Ordinance and agreed to by the applicant shall be maintained by the applicant or his successors in title at all times.

c. Dumpsters and trash receptacles shall be incorporated into the landscape plan, situated within the interior of the subject property and adequately screened from view from public rights- of-way and adjacent properties.

3. Uniform architectural treatment and architectural theme which shall include the following:

a. The color scheme shall be limited to earth tone colors.

b. All buildings shall be a maximum of two- stories in height with brick and/ or masonry facade accents. The climate controlled storage building shall be brick and/ or masonry on at least three( 3) sides.

c. The subject property shall be gated and secure and shall include the erection of a fence along the subject property' s frontage. Additionally, the perimeter of the subject property shall be fenced in accordance with SSSF Ordinance requirements.

d. Storage bay access doors and accents shall be painted the same type earth tone colors as the storage bays.

e. There shall be no roof mounted air conditioning units or other mechanical equipment on the roofs of the buildings.

f. Mechanical equipment for the climate controlled storage unit( s) shall be located within the interior of the proposed development.

3 a3 Petition No. Z- 44 a. ot SLu P- 8 SAM S, LAR IN & HUFF Meeting Date a- ao- o- y-A LIMITED LIABILITY PARTNERSHIP Continued Petition No Z- 1'/

Meeting Date 10j ai 03 VIA HAND DELIVERY Continued Mr. John P. Pederson, Planner III Cobb County Zoning Department September 11, 2003 Page 3

4. Subject to recommendations from the Cobb County Department of Transportation with respect to traffic/ transportational issues, as follows:

a. Construction of a 150' deceleration lane and appropriate taper along the subject property' s frontage on North Cobb Parkway( U. S. 41/ S. R. 3).

b. The installation of curb and gutter along the subject property' s frontage.

c. Turning movements with respect to ingress/ egress shall be" right-in/right-out" only.

d. Any encroachments onto North Cobb Parkway( U. S. 41/ S. R. 3) shall require GDOT approval.

e. The proposed access to the site shall be coordinated with GDOT and Cobb County DOT to insure adequate sight distance.

5. Utilization of low intensity, environmental type shoebox lighting which shall not exceed a maximum height of 20', subject to review and approval by staff.

6. All exterior lighting shall be shielded and direct illumination shall be confined within the perimeter of the subject property.

7. Subject to recommendations from the Stormwater Management Division with respect to detention, hydrology and down stream considerations, including recognition of 50' stream bank buffers.

8. Compliance with the Cobb County Sign Ordinance with the construction of ground-based, monument style signage with a brick or masonry base, consistent with the architectural style and theme as aforementioned.

9. An agreement that there shall be no outside speakers except as may be required by law in connection with the security/ alarm system.

Petition No. Z- 64 SLuP- s Meeting Date a- ae- aoa5c SAMS, LARKIN & HUFF Continued

A LIMITED LIABILITY PARTNERSHIP

Pentium No. Z—I4!

Meeting Date l oiaa/ 03 VIA HAND DELIVERY Conanut,:d Mr. John P. Pederson, Planner III Cobb County Zoning Department September 11, 2003 Page 4

10. An agreement that there will be 24- hour security which will include constant video monitoring/ surveillance.

11. Business hours of operation shall be from 7: 00 a. m. until 9: 00 p. m., Monday through Saturday, and 9: 00 a. m. until 6: 00 p. m on Sundays.

12. The granting of a contemporaneous variance allowing the applicant to exceed 25% of the total buildable area for outside storage of automobiles, boats and recreational vehicles.

Reference to the Future Land Use Map shows that a preponderance of the subject property is presently positioned within an area denominated for Industrial Compatible( IC) uses.

Moreover, most of the property is already zoned in the Light Industrial ( LI) and General Commercial( GC) classifications, respectively. Please do not hesitate to call should you or the staff need any additional documentation or information prior to the formulation of your recommendation to the Cobb County Planning Commission and the Cobb County Board of Commissioners.

Very truly yours,

SAMS HUFF, LLP

GLSjr/jbmc cc: Members, Cobb County Board of Commissioners Members, Cobb County Planning Commission Ms. Sandra Richardson, Deputy County Clerk Mr. Leman B. McCray

Min. Bk. q Petition No. - 1 Doc. Type law,.: Q . w. isst

MINUTES OF ZONING HEARING

Cow. w ar- s recorvviwewd- a-41n..s ' ' IL- 1 COBB COUNTY PLANNING COMMISSION Meeting Date a.- a o oZo4.+

FEBRUARY 6, 2024

PAGE 8

REGULAR AGENDA ( CONT.)

LUP- 32' 23 JULIA WELTON ( Julia D. Welton, LLC, owner) requesting a Temporary Land Use Permit to allow dog boarding and daycare in land lot 148 of the 20th district. Property is located on the northeast side of Hill Road and on the northwest side of Mars Hill Road( 4990 Hill Road).

The public hearing was opened; Julia Welton and Mallory Welton addressed the Planning Commission. Following the presentation and discussion, the following motion was made:

MOTION: Motion by Beloin, second by Hughes, to recommend approval of LUP- 32' 23 for 12 months, subject to:

1. Maximum number of dogs to be boarded is 10

2. Hours of operation for doggy daycare( for non- boarding activities) to be Monday through Friday from 8: 00 a. m. until 6: 00 p. m.

3. There shall be no unattended dogs on the site

4. Fire Department comments and recommendations

5. Stormwater Management Division comments and recommendations

6. Department of Transportation comments and recommendations

7. Inclusion on the Consent Agenda for the Board of Commissioners' Zoning Hearing on February 20, 2024

VOTE: ADOPTED 3- 0, Dance and Vault not present Z- 1 MIRNA ARACELY TORRES CASTRO ( Luis G. Escobar Torres and Mirna A. Torres Castro, owner) requesting rezoning from RA-5 and PSC to LRC for an office in land lot 189 of the 18th district. Property is located on the east side of Mableton Parkway and on the north side of Community Road 6265 Mableton Parkway).

The public hearing was opened; Darrell Johnson and Robin Meyer addressed the Planning Commission. Following the presentation and discussion, the following motion was made:

MOTION: Motion by Hughes, second by Beloin, to recommend approval of Z- 1 to the LRC zoning district, subject to:

1. Revised Site Plan dated January 25, 2024, with minor modifications to be approved by the District Commissioner

2. Variances as stated in the Zoning comments

3. Fire Department comments and recommendations

4. Water and Sewer Division comments and recommendations

5. Stormwater Management Division comments and recommendations

6. Department of Transportation comments and recommendations

Petition No. a .- I Meeting Date MINUTES OF ZONING HEARING Continued

COBB COUNTY PLANNING COMMISSION

FEBRUARY 6, 2024

PAGE 9

REGULAR AGENDA( CONT.)

Z- 1 MIRNA ARACELY TORRES CASTRO ( CONT.)

7. Professional office use only

8. District Commissioner to approve the final landscape plan, architectural plan, and signage plan

9. The structure will comply with the Mableton Parkway Design Guidelines

VOTE: ADOPTED 3- 0, Dance and Vault not present Vice Chairman Hughes calledfor a briefrecess from 10: 15 a.m. until 10: 20 a.m.

LUP- 1 CHRISTEL Y. HERRERA, JR.( Christel Y. Herrera, Jr., owner) requesting a Temporary Land Use Permit to allow more vehicles than the code allows in land lot 216 of the 20th district. Property is located on the south side of Hood Circle and on the east side of Kennesaw Due West Road ( 2562 Hood Circle).

The public hearing was opened, and Christel Herrera addressed the Planning Commission. Following the presentation and discussion, the following motion was made:

MOTION: Motion by Beloin, second by Anderson, to recommend approval of LUP- 1 for 24 months, subject to:

1. The car that has its wheels removed is to be moved into the garage within 30 days from the approval date by the Board of

Commissioners

2. There is to be a maximum of four vehicles parked in the driveway on a regular basis

3. Inclusion on the Consent Agenda for the Board of Commissioners' Zoning Hearing on February 20, 2024

VOTE: ADOPTED 3- 0, Dance and Vault not present LUP- 2 RONALD MCDOWELL ( Ronald Bernard McDowell, Sr and Kim Denise McDowell, owners) requesting a Temporary Land Use Permit to allow more vehicles than the code allows in land lot 365 of the 16th district. Property is located on the north side of Lakeside Drive, northwest of Chastain Lakes Drive ( 158 Lakeside Drive).

The public hearing was opened, and Ronald McDowell addressed the Planning Commission. Following the presentation and discussion, the following motion was made:

v....

otos S5[.

L9 MO.

i¢ 1u wa Y 9L00£ 1.

9tlo3on3mSob

S3181SINIW

NVU.

SRIHO

1NVN3AOOL

a A" Oot 335' lln35N0Wot 31111J.

31111.

I1411111141 V S31?

JLSINIW

NVILSRIHO

1NVN3A0D

o` Si 4 z q 4 Wild 3115 6 I c 1 1 i Z] 0 0 o wJO Z CL C i t QZ r Ef Q0It tLCY 111 440 I= fr I— AO Ei-.

e.

5, 1 o i Z

OAF-.

sQz F :

sCO i z a'' a Cr x CS tq-gd t: ' f CL 1 Z 3 Q I— a R.

O z O IT U O cc 1-- CD

CDZ

I= Un I— Z O i da o b b o q z b r 144 lalltr VP b ..

Illi 1 1 4 111 solo.

i\ ( .

e 14, t.

9 its tY b te. :

ll R _ ` bo n e r t arCyt Wit - ;

1 ' 1 .

vim'- fQ Page 1359 of

Z-05-

DEPARTMENT

COMMENTS —

Zoning Division pro w® w ogip x96o1DS-Dob 3NOHd p 111 illioii l i I QV', 960 LK PO N0H 8o9b YDa03` J' 88CY) ' iV, N 741IMITEITIOMEll

HOMAO

VNNVRtMN

avaa 973.

vJJa a3nw98o9b 8 3.

LIS

NO lir VI n g z cc p w Ei tQ f Or 1 4 g S cr i;

vi f u • ilii i 5R p;

I Ie , a P r i liksNit ,/ 0.

f\_ I fJ 1 11 I:

i r i NS 1 Y 1 ilr 515 4 , - J _.

i 4, 1 - i\ \ 1 ''''- (--- to.- 45, \ 1 \ t 1 i 1 41 0 C* 5 al AiW t:

5.

0 Page 874 of

MOORE INGRAM JOHNSON & STEELE

A WHITED UABKTTY PARTNERSHIP

W W W. MIJS. COM

MARIETTA, GEORGIA KNOXVILLE, TENNESSEE JACKSONVILLE, FLORIDA BRENTWOOD, TENNESSEE

EMERSON OVERLOOK 408 N. CEDAR BLUFF ROAD 10201 CENTURION PARKWAY N. 5300 MARYLAND WAY

326 ROSWELL STREET SUITE 500 SUITE 401 SUITE 200

SUITE 100 KNOXVILLE, TENNESSEE 37923 JACKSONVILLE, FLORIDA 32256 BRENTWOOD, TENNESSEE 37027

MARIETTA. GEORGIA 30080 TELEPHONE 9186) 6924038 TELEPHONE( 904) 428- 1465

TELEPHONE( 615) 425- 7347

TELEPHONE( 770) 429- 1499

LEXINGTON, KENTUCKY ORLANDO, FLORIDA HARRISBURG, PENNSYLVANIA

2408 SIR BARTON WAY 390 N. ORANGE AVENUE 101 ERFORD ROAD

SUITE 375 SUITE 825 SUITE 300

LEXINGTON, KY 40508 ORLANDO, FLORIDA 32801 CAMP HILL PA 17011

TELEPHONE( 959) 309- 0026 TELEPHONE( 407) 367- 6233 TELEPHONE( 717) 790- 2854 January 29, 2024

Mics. Bk. q9 Petition No.

Doc. Type I afar Via E-mail Only Meeting Date o1-. 10-, 2D.'} Mr. John P. Pederson, AICP Zoning Division Manager Zoning Division Cobb County Community Development Agency Suite 400 1150 Powder Springs Road Marietta, Georgia RE: Application for Rezoning - Application No.: Z- 5 ( 2024) Applicant: Marianna Kovitch Property Owner: Mt. Bethel Church, Inc.

Property: 1. 13 acres, more or less, located on the southerly side of Lower Roswell Road, westerly of Woodlawn Drive, being more particularly known as 4608 Lower Roswell Road, Land Lots 9 and 10, 1St District, 2nd Section, Cobb County, Georgia Dear John:

The undersigned and this firm represent Marianna Kovitch, the Applicant( hereinafter referred to as " Applicant"), as well as, the Property Owner, Mt. Bethel Church, Inc. ( hereinafter referred to as" Owner" or" Property Owner"), in the above-referenced Application for Rezoning with regard to a developed parcel located at 4608 Lower Roswell Road, being 1. 13 acres, more or less, located on the southerly side of Lower Roswell Road, westerly of Woodlawn Drive, Land Lots 9 and 10, 15` District, 2nd Section, Cobb County, Georgia ( hereinafter referred to as the " Property" or the " Subject Property"). After meetings and continuing discussions with County Staff;

meetings and discussions with area residents and homeowner representatives; reviewing the Departmental Comments and Staff Recommendations; and reviewing the uses of surrounding properties, we have been authorized by the Applicant to submit this letter of agreeable stipulations and conditions, which, if the Application for Rezoning is approved, as submitted, shall become a part of the grant of the requested zoning and shall be binding upon the Subject Property. The proposed stipulations are as follows:

MOORE INGRAM JOHNSON & STEELE Petition No.

Meeting Date 002- Lk' Mr. John P. Pederson, AICP Continued Zoning Division Manager Zoning Division Cobb County Community Development Agency Page 2 of 5 January 29, 2024

1) The stipulations and conditions set forth herein shall replace and supersede in full any and all prior stipulations and conditions, in whatsoever form, which are currently in place on the Subject Property; together with any and all Departmental Comments and Staff Recommendations relating to the Subject Property from any prior zoning actions.

2) Rezoning of the Subject Property shall be from the existing zoning classification of RA-4 to the proposed, deleted zoning classification of Limited Professional Services Permit (" LPSP"), with reference to the Site Plan prepared for Applicant by OnSite Civil Group, LLC, dated January 2, 2024, and submitted to the Cobb Zoning Division on January 3, 2024. A reduced copy of the Site Plan is attached as Exhibit" A" and incorporated herein by reference.

3) The Subject Property is comprised of 1. 13 acres, more or less, and has an existing building, with parking and landscaping.

4) Approval of the proposed LPSP shall be use- specific for medical, dental, professional, and administrative offices.

5) The following uses shall be prohibited:

a) Contractor' s offices where trucks, cars, trailers, and supplies would be stored;

b) Veterinary offices where animals would require outside runs and/ or defecation areas; and

c) No offices which would ( i) have large equipment stored externally on- site;

or( ii) have vehicles parked overnight.

6) Applicant states the hours of operation shall be 7: 00 a.m. to 6: 00 p.m.

7) Applicant requests the following waivers from the LPSP requirements:

i) Waiver of the requirement that approval of the LPSP is specific to the owner of the Property only; and

MOORE INGRAM JOHNSON & STEELE Petition No.

Meeting Date a.o-a.o Mr. John P. Pederson, AICP Continued Zoning Division Manager Zoning Division Cobb County Community Development Agency Page 3 of 5 January 29, 2024 ii) Waiver of the requirement that approval of the LPSP is for an existing single- family, detached dwelling and a residential façade must be used the Property consists of an existing non- residential, commercial building).

8) Any material, substantive renovations to the exterior of the building shall be submitted for District Commissioner approval, with a copy sent to the East Cobb Civic Association, Inc. " Material, substantive" changes shall mean changes that alter the architectural design, but shall not include painting or regular maintenance of the exterior.

9) The existing canopy structure( located to the side of the building), as identified on the Site Plan, may remain. In the event the existing canopy is removed and not replaced, Applicant agrees to install additional landscaping/ tree plantings in such area.

10) All lighting shall be cast downwards with no lighting extending beyond the boundaries ofthe Property.

11) Digital signage shall not be permitted.

12) The entrance area, together with any islands, planted areas, and streetscape area along Lower Roswell Road will be professionally designed, implemented, and maintained.

13) Any landscape buffer requirements adjacent to residential properties shall be consistent with the existing conditions.

14) Applicant agrees to install additional landscaping ( e. g., tree plantings) in areas along the western boundary line where existing gaps in screening are located.

15) The doors on the dumpster shall remain closed at all times. No trash or refuse shall be permitted outside the enclosed area.

16) Applicant agrees to comply with all Cobb County Stormwater Management requirements applicable to the Subject Property.

17) Applicant agrees to comply with all Cobb County Department of Transportation requirements applicable to the Subject Property.

MOORE INGRAM JOHNSON & STEELE Petition No. R.--C-Meeting Date a- Ao-sMeeting ao a4 Mr. John P. Pederson, AICP Continued

Zoning Division Manager Zoning Division Cobb County Community Development Agency Page 4 of 5 January 29, 2024 We believe the proposed office is an appropriate use of the Subject Property. The renovation of the existing building, together with the improvements and upgrades to landscaping and parking, will be an enhancement to the Subject Property and the community as a whole. Thank you for your consideration in this request.

With kindest regards, I remain Very truly yours,

MOORE, INGRAM, JOHNSON& STEELE, LLP

011ir Oglevin Moore JKM:cc Attachment c: Cobb County Board of Commissioners:

Lisa N. Cupid, Chairwoman JoAnn Birrell Keli A. Gambrill Jerica Richardson Monique Sheffield With Copy of Attachment) Cobb County Planning Commission:

Stephen Vault, Chairman David Anderson Fred Beloin Deborah Dance Michael Hughes With Copy of Attachment)

MOORE INGRAM JOHNSON & STEELE Petition No. S Meeting Date a- a.o- at>

Mr. John P. Pederson, AICP Continued Zoning Division Manager Zoning Division Cobb County Community Development Agency Page 5 of 5

January 29, 2024 c: Jeannie Peyton Senior Planner Zoning Division Cobb County Community Development Agency With Copy of Attachment)

Jacquelyn Bettadapur East Cobb Civic Association, Inc.

With Copy of Attachment) Marianna Kovitch With Copy of Attachment)

Z '° 8 • , 71 1 Igr u gg2::

1!

I II 1960, 35- 003:

3N0Hd 3103030' Ammo sew , 1 II 45i14, I, Ti , I)' avot 1133IS011 11333471 800 Cre011 TM/ 3SM

IMAM

900 I .

2 !^ , I ta.., i-IfigTO gl' Ige

7 • IFIO ' .;

HaLIAOX

3NNSTIIVII

U/ 4311D I 1.

191HX3 D3113102311 0 E3 !

gI , ' , 1

HITS

NOi hq.

p.

Ip' 1- tel 1 A rt4 , r6 2 LI x 33 8 g" z Cn" II 402 CI d as a.)

0 , n Iiii al i ' 4 - Oi.

Clou C.

5 i 0 ii 2 1 i6154, '

12. 3 1 .1 ri ad!

iPi t tit g A i' d.

i" f i,_ 3_ 1-------.

1 t7o-- kte,/ T 7"' 744,- 74—L• 44• 441— --- 7- 7--- -- nil* i 5,- 1\ k i''.---'''..

6„.\,- t7,' \ A, U„-- t L,\*, tt.

1, 1 \' rl ' '''' \ i\ N , 1, AO \ 1:- An :' \ I c-cr X VZ.

A '‘.

1At. .

a. .

It.

tr.

As % 23 i;

t 4 1c.'• , ' i 4.,, ' \ 1 4, F\\ t 4!

4.• , A $ 40.

r\:) \ 4 . - • s , ;.,, ........

P..../ 44)---:

r1- 2°- i ..

A' \ IP.

1 CO./ It44. CtZ IOC II

CZ LAJ 0 CC

EXHIBIT"

A”

LUP-4-

DEPARTMENT

COMMENTS—

Zoning Division 1c, o.1 .1- og = gipp Edi !

jrt Iii 1 a 1 8 ti 1 i 5.

1;

IAD

e I:

PI 1;

titi !!

f i!

1 1;

@ @ !

n 1 i t ;

i pi e!

@{ ` ;

iii 1 { !- O` 1 f e 0E 0' ` e 9d !

3.

inQ55p ilig 3 7E4 , { 1d 4 g' i { @ •` ` I.

s.` @ •• I 0— e C I s El 1• llihi4 '$ i x i '.

Pd i 4!!$ @ r¢/ y p@ c51 g= F, ii;

F, e U 6) @ f!

1* r -.,,," C4,?

ke Rpt J-0 4 9 r l ,« y.

tie til i;

fi @{.

1{_ f, x L g 1.

214;

4i; {;

l ` 11 ii 1 1 @!

I{_ • t'.

4f@, gid_ @ 1 I 11 t i U 9 oa @ii 11 I:

d i• d@ g Z 111 @ z le T gd C7 s 4' _.

A 1 { CL ii r.

14444, d; .

7 1 Zv 414 ° I_ 1 f p e{ I;

t i @ lig. ! , "$, i E.

1 IP til f 1 §` 1- II:* j 4gt i j.

@I ii Ai ' C l@qqi.

J .

r` rte'-,.

y719:

t -- - F ty.' 19 it 4 i / , sv. ,,, d s r j,,,-""., ,,,,,,,,,- Ziti,, r3 iii I.critql 1 Id Z J,, r ilWE f @ Is:;_

IIS

I a ill 5 l g$' !

@t 1 f1i11 ' 1i # 9Ef f 1t t{ , sa@141011111111" Ni(;{ 1 t!

x!= 1{{ ee 1!

t .{ il 111 241461{ flfl!

@1 i1li1f111 :

a.

1.

e, 11=.

dH i , err.

1.

aefill.

cetstr.

w,^.$.« a+ Tf _.

d Page 933 of

49 Petition No. L.u.P- 4- ype Prev i eu.s figi ulkm ts, s LU..?-tto oc a to vi,..' nr.g Date a.-9.4)- 42. 0?- 44.

MINUTES OF ZONING HEARING

COBB COUNTY BOARD OF COMMISSIONERS

APRIL 20, 2010

PAGE 4

CONSENT AGENDA( Continued) LUP- 10 CONGREGATION ETZ CHAIM, INC. (owner) requesting a Land Use Permit ( Renewal) for the purpose of a Day Care in Land Lot 969 of the 16th

District. Located on the south side of Roswell Road and on the north side of Fairfield Drive, east of Indian Hills Parkway ( 1190 Indian Hills Parkway).

MOTION: Motion by Ott, second by Goreham, as part of the Consent Agenda, to approve Land Use Permit for 24 months subject to:

site plan received by the Zoning Division February 3, 2010, with the District Commissioner approving minor changes ( attached and made a part of these minutes)

letter of agreeable conditions from Mr. Parks Huff, dated March 15, 2010 ( attached and made a part of these minutes) Fire Department comments and recommendations

Cobb DOT comments and recommendations

VOTE: ADOPTED 3- 0

LUP- 12 MOST REVEREND WILTON D. GREGORY, S.L.D., AS

ARCHBISHOP OF THE ROMAN CATHOLIC ARCHDIOCESE OF

ATLANTA AND/ OR HIS SUCCESSORS IN OFFICE ( owner)

requesting a Land Use Permit ( Renewal) for the purpose of a Catholic Campus Ministry in Land Lot 97 of the 20th District. Located on the west side of Campus Loop Road ( formally Frey Lake Road), north of Big Shanty Road( 3487 Frey Lake Road).

MOTION: Motion by Ott, second by Goreham, as part of the Consent Agenda, to approve Land Use Permit for 24 months subject to:

site plan received by the Zoning Division February 4, 2010 attached and made a part of these minutes)

all parking be done in the driveway, or at Kennesaw State University

signage to match other house- to- office conversions on this side of Campus Loop Road, if a free standing sign is needed Fire Department comments and recommendations

Cobb DOT comments and recommendations

VOTE: ADOPTED 3- 0

Petition No. LIA)—* Meeting Date a- ao- aoa-4 Continued um' a. q po' nwn• w. xT ccdort) ctt ufLry rm m

TcL.d TILE Re fl' Y P • YiA5 YTE V ion u ® i

w. V

37dW31 NANO Z13

l; h Jaysagabb Ali wNdraoodou aHr.cavnna oe rr r O ,;,-;

4 salWAAVA4io-Lora Min. Bk. WO Petition No. PIu An` 1fOQ13` ' li

Doc. Type Si. 12 ? tem) Y 4 4• Meeting Date 4 I a t o g f fi O sliTz.

O or em O O k 0 . V• l —_— i M \ M 4 E!' b I g+,, 1LfDxJF, O .

dam• • .

r, `..' I I .-.. ~ ` T Y t YI Ir _ I 2i i i 1 a c*r r r4 m I ° T • /• , jib?kit•.-' } '' 10, 08 f"fy -_ Iii=Igl Of/ NO‘"---",, v• 1 : P'' fr A /Iii _.41. • • , 1 fi I!. ! I ! I 11 il 1 • 1 i ii 11 O .a,.. - il iit. y, 1% y., :' toffI 1 ill ill E!

v' 51 " S 1....., 1 „,,,,_. ..._.;.::: ;,, t, ill 114 v i pt ip w• i 11 c i 1 e iti y i.xl ! 1 le 0 v; i 0 aw t.

1 liall 1` E II-gg s ` ig ii Illi . ill et 14 I O `.':I; • aYl /! Y: 11! illa4111 Y1 y i IE sI41 IP! YESe E.

3 P-0• nNv i - p YQ! R , ft tiM & es r 1 a 0ti- li VII iii -' e y ttEt E YY156yne2AAL Aee.- aa"ee. u: av: E„ AsIFSA4Fp dmQtCElCS*. itFlkE445; 4ti

Petition No. L(A?-+ Meeting Date a- ao- a.e.

Continued

SAMS. LARKIN & HUFF i-. i

A LIMITED LIABILITY PARTNERSHIP

GARVIS L. SAMS. JR. SUITE 100 I- 44g. 41476tilo _...

JOEL L. LARKIN 376 POWDER SPRINGS STREET TELEPHONE

PARKS F. HUFF MARIETTA. GEORGIA 30064- 3448

JAMES A. 13ALLI FAGs1MiLLr

MELISSA P. HAISTEN

JUSTIN H. MEEKS SAM SLARKINHUFF. COM

March 15, 2010 Mia. Pk, loo Petition No. L' V P` 10 Doc. Type le -er P. arr — e LAonai-\+Dn c i VIA HAND DELIVERY Meeting Date l II Mr. Mark A. Danneman, Manager Cobb County Zoning Department Suite 300 191 Lawrence Street Marietta, Georgia 30060- 1661 Re: Application of Congregation Etz Chaim for a LUP on a tract of property zoned R- 20 and located at 1190 Indian Hills Parkway, Marietta, Cobb County, Georgia for the purposes of preschool program affiliated with the Synagogue. ( LUP- 10- 2010, Renewal of LUP- 3- 2009).

Dear Mark:

As a service to its congregation and as an outreach program to the community at large, Congregation Etz Chaim operates a preschool program for children from one to five years of age.

Although the program mainly serves members of the synagogue, it is open to the general public.

To allow this program, the Board of Commissioners approved a twelve- month Temporary Land Use Permit( LUP- 3- 2009) on March 17, 2009. The approval was subject to:

1) The site plan received by the zoning staff dated December 31, 2008, with the district commissioner approving minor modifications.

2) A letter of agreeable stipulations dated February 24, 2009.

3) Fire Department comments and recommendations.

4) DOT comments and recommendations.

Congregation Etz Chaim wishes to renew LUP- 3 —2009 for 24 months subject to the same terms and conditions that were approved previously with the District Commissioner approving minor modifications so it can continue this valuable service to the community.

Following is a recitation of the conditions that were included in the previous letter of agreeable stipulations dated February 24, 2009 with the updated term of twenty- four months:

Petition No.

Meeting Date a-o y4.

Continued

SAMS. LARKIN & HUFF

A LIMITED LIABILITY PARTNERSHIP U.) ( -

Petition No.

Meeting Date VIA HAND DELIVERY Continued Mr. Mark Danneman, Manager Cobb County Zoning Department Page 2 March 15, 2010

l. The preschool program will continue to serve children from the ages of 12 months through 5 years of age.

2. The program will be limited to no more than 100 children.

3. There isn' t anticipated to be any additional signage for the daycare program. Any signage for the preschool program will comply with the county sign ordinance.

4. The school will maintain a drop- off and pick- up schedule and plan that ensures that there is free flowing ingress and egress to the synagogue and no traffic backing up onto adjacent roadways. Carpool lines will continue to be lined up around the back of the synagogue, well away from any county streets.

5. The preschool program will continue to be operated solely from the Education Wing of the main building located at 1190 Indian Hills Parkway.

6. The renewal term of the Temporary Land Use Permit will be for 24 months.

7. Minor modifications to the conditions may be approved by the District Commissioner.

Please do not hesitate to contact me should you or the staff require any further information or documentation prior to the formulation of your analysis and recommendation to the Board of Commissioners and Planning Commission.

Very truly yours,

SA S, LARK pI & HUFF, LLP

Parks F. Huff phuff samslarkinhuff.com

PFH

cc: Shown next page

Petition No. LLAP—4- Meeting Date a- ao- away.

SAMS, LARKIN & HUFF Continued

A LIMITED LIABILITY PARTNERSHIP

VIA HAND DELIVERY retitw, Nft l.J — I Mectin Da Mr. Mark Danneman, Manager Continued.

Cobb County Zoning Department Page 3 March 15, 2010 cc: Members, Cobb County Board of Commissioners - VIA Hand Delivery Members, Cobb County Planning Commissioners- VIA First Class Mail Ms. Karen King, Deputy County Clerk- VIA Hand Delivery Ms. Lori Presnell, Deputy County Clerk- VIA Hand Delivery Ms. Jill Flamm, VP ECCA

Jane Stricklin, DOT- VIA Email David Breaden, Stormwater Division- VIA Email

in, Pk. q9 Petition No.

lc. type PrtvicK s cv. c cPn.,.

oc ex,

MINUTES OF ZONING HEARING

ng Gate eZ- o- o• 4-

COBB COUNTY BOARD OF COMMISSIONERS

JUNE 19, 2012

PAGE 4

CONSENT AGENDA( Continued) Z-24 MONICA T. MADDEN ( Joan Pletch Clayton, owner) requesting Rezoning from LRO to NRC for the purpose of a Hair Salon in Land Lot 149 of the 16`h District. Located on the north side of Hawkins Store Road, east of Bells Ferry Road( 222 Hawkins Store Road).

MOTION: Motion by Goreham, second by Birrell, as part of the Consent Agenda, to approve Rezoning to the NRC zoning district subject to:

site plan received by the Zoning Division on April 4, 2012, with the District Commissioner approving minor modifications ( attached and made a part of these minutes)

for this use only and by appointment only, with any changes in use to come back for approval by the Board of Commissioners as an Other Business Item

Water and Sewer Division comments and recommendations Cobb DOT comments and recommendations

owner/ developer to enter into a Development Agreement pursuant to O. C.G.A. § 36- 71- 13 for dedication of system improvements to mitigate traffic concerns

VOTE: ADOPTED unanimously LUP- 12 TREVOR L. TUTHEROW ( Trevor L. Tutherow and Jacquelyn C.

Tutherow, owners) requesting a Land Use Permit for the purpose of a General Contractor' s Office in Land Lot 75 of the 20th District. Located

on the north side of Silver Lace Lane, northwest of Acworth Dallas Highway( 6034 Silver Lace Lane).

MOTION: Motion by Goreham, second by Birrell, as part of the Consent Agenda, to approve Land Use Permit for 12 months, subject to:

office use only and all business activity must be invisible to neighborhood

bookkeeper to work a maximum of three( 3) days a week with four

4) hour shifts deliveries of paperwork by subcontractors or sales representatives limited to once a day, five( 5) days per week

Petition No. t..uP- 4- Meeting Date a- ao- ao any Continued

MINUTES OF ZONING HEARING

COBB COUNTY BOARD OF COMMISSIONERS

JUNE 19, 2012

PAGE 5

CONSENT AGENDA( Continued) LUP- 12 TREVOR L. TUTHEROW( Continued) one work related vehicle ( maximum gross weight of 12, 500 pounds) allowed as provided in the Cobb County Code no signs

no business related storage or equipment no on- street parking of business related vehicles VOTE: ADOPTED unanimously

REGULAR AGENDA— NEW BUSINESS

Z- 20 ALTERMAN WOODLAWN, LLC ( owner) requesting Rezoning from NS with Stipulations to CRC for the purpose of Office and Retail in Land Lot 13 of the

1st District. Located at the southeast intersection of Johnson Ferry Road and Woodlawn Parkway ( 1197 Johnson Ferry Road).

The public hearing was opened and Mr. John Moore, Ms. Trish Steiner, and Ms. Jill Flamm addressed the Board. Following presentation and discussion, the following motion was made:

MOTION: Motion by Ott, second by Birrell, to delete Rezoning to the NRC zoning district, subject to:

specific to site plan received by the Zoning Division on May 30, 2012 ( attached and made a part of these minutes) letter of agreeable conditions from Mr. John Moore dated May 30, 2012 ( attached and made a part of these minutes) with the following changes:

Item No. 4 — add to end: `, with no more than 8,000 squarefeet set aside for automotive work."

Item No. 6 a — revise to read: " No body work including automotive painting"

Item No. 6 c— add to end: " including any work that requires the removal of the engine or transmission from the vehicle"

Man Bk. _ Ici_ Petition No. 4): B. f FEBRUARY 20, 2024 ZONING HEARING Doc. T7 •+`° W" " ""^ f 1; rc. 1. rt.

CA WYNN 41.1%."‘" V 0-.4-j"s coo w•. d06A1 C ... s OTHER BUSINESS" Meeting Date : ti- ao- a.,oay-COMMISSION DISTRICT 1 i

ITEM OB- 1- 2024

PURPOSE

To consider a reduction of public road frontage from 75-feet to zero-feet and a setback variance for an existing accessory structure for Scott and Judie Ebert. The property is located on the north end of Trail Road, south of Due West Road in Land Lot 298 of the 20th District ( 4541 Due West Road).

BACKGROUND

The property is zoned R- 30 and is required to have 75-feet of public road frontage. The applicant has 0- feet of public road frontage with a proposed lot size of 2. 1 acres. The applicant is going to demolish the existing house that was built in 1942, and they will build new house in its place. Staff researched the property and could not locate a deed that grandfathered the property. The applicant would also need a setback variance for the existing accessory structure, which will remain. If approved, the new lot would meet setbacks, lot size, impervious surface, and other zoning criteria.

STAFF COMMENTS

Stormwater Management:

1. Stormwater Management has no objection to this other business item as requested.

2. If the Other Business Item is approved, stormwater runoff mitigation is required if the new or redeveloped impervious area exceeds 5000sf or the existing Zoning maximum impervious area allowed is exceeded. A site plan demonstrating how stormwater mitigation will be provided is required.

Water and Sewer: No comments.

Fire Department: See attached.

Cobb DOT: Recommend applicant be required to meet all Cobb County Development Standards and Ordinances related to project improvements.

Site Plan Review: No comments.

RECOMMENDATION

The Board of Commissioners conduct a Public Hearing and consider the proposed public road frontage reduction and setback reduction.

ATTACHMENTS

Other Business Application.

FEBRUARY 20, 2024 ZONING HEARING

OTHER BUSINESS" ITEM OB- 1- 2024 Petition No. 1

COMMISSION DISTRICT 1

Meeting Date a -as- aoay-Continued Page 2 APPLICANT: Scott and Judie Ebert PETITION NO.: OB- 1

FIRE COMMENTS:

The owner/ tenant maintain the sole responsibility for the design and correcting all errors, omissions, problems, and code ( if any) exposed during construction AFTER authorization by Cobb County

RESIDENTIAL SINGLE- FAMILY ACCESS:

Driveway must have a minimum 12- foot driving surface width ( CCDS 402. 07. 01) with a minimum 25 foot inside turning radius.

Fully developed landscaping shall be at least 7 feet 0 inches from center of drive 14- foot clear width) and 13 foot 6 inches vertical clearance.

Maximum grade shall not exceed 18%, angle of departure shall not exceed 8. 5%.

Driveway must extend within 150 feet of the most remote portion of the structure.

Driveway is limited to 1000 feet maximum from roadway unless an approved turn- around is provided:

a) Residential cul- de- sac without an island shall have a 38 foot outside radius.

A cul- de- sac with an island reverts to the commercial standards, refer to www. cobbfire. org for dimensions.

b) Hammerhead turn- around: total of 102 feet needed ( 45 feet + 12 foot drive 45 feet) with the turn- around leg to be a minimum of 20 feet wide.

Driveway must support 25 Tons ( 50, 000 lbs.).

FIRE HYDRANTS:

Hydrant location within 500 feet of the structure.* ( Additional hydrant may need to be installed.)

The above is not an all- inclusive list, all applicable fire and life safety provisions must be met.

Jeff Byrd

770) 528- 8814 jeffrey.byrd@cobbcounty.org

milt. pt.M.-Petition We.

Doc. TypeType 4 ce..e.E.tertAtiru-elk- wre.4.

04 5,Sn.busys., sv....-j-ki ill; As.c pt....

Meeting Date ( 2,- 9.0- dx?a* E::::: .....,, REc....„7 ,,.,„..), i

JAN 1 7 2024 '

rr''1 - , ZOtlit1G I avr,,i,er.- al J aireuifr rIitt ctilm I TrWitliTh'

RIS,-N , --... -

c., 4 iv....

1 I r, r 1 I I 1 0 10, t 1, , V ILICIR 3101Dit A til A I A rt i 1 0$ :

1 LU Is.

it % 01 I ger':;IVA 1 s.....'*.:...

t.. t t I./ ,... .- curIctu 4--,, \ .... t..„ , A- Ati,.: 4 ‘ ' 1,,\''..-•,‘ ::

13- t. k J.'', e I i•i.. ''...

4.. " 14 ;' A tt = Jo i ‘ - -.....,.. , 1 t. _ I 4 a! -...„,/,#) -...........

1 1 per/ ilf.''.. f.-.,,.. ...--• , _... 4 gaVe: w+--.••• tvit opoxiwr,,-.

1- AN,,---- 7- 4:

A* ::,, ,, 1-----' 1 / / 4111i;;-:. r.-•-.';.' 7 i• - e,..

41----.., 2""'—.

f4(40- 0 4, -,,;*, ar-1,://,, IX"..: . Ai p.• ! N‘ /, / ,.;-, ....-' 11- I• xyr././7,. I r...:' 't '- :-.:

N` A.A. f• -- On..‘- ;'- 9- • --- remerr.,- V. .1,. - e.•-• tirtr.:-.*:::':

i k::::;::,'' 1:11:.'-- 1- 1,-.- .''' :';- ' ' .:;" .

v"-- 1"- V•441 1,.' -,... ' 1.'"„ i''• t ,,,,,,,;.%--, 4..

I 4 Pv.....

7,: 1 L._ 1: LI-..1,:

1 Cul.' . -' 2

E.-71M. *. A',

S6d. i Ur..

2 .‘„,..\ II Ivaco, i'' I, 1 s I . 1, CD ; j3p . No...: Weir: 4101,...

MA't 1 4 . ; 0ff•dittra'''' 1 ‘ 2,4K.,,,,,,..'‘' ''''''''' I " ,- NO VIrtrIM

t' . 1#: . llwri..,: wro• ii •",;.,.: 1'...., f• i 1 7l'i,,, L _, 3....'......."..:' Z...

pAPII i \ 1. 10MC.

OWNirit trairrr. -

Min. Bk. q 9 Petition No. oa4 FEBRUARY 20, 2024 ZONING HEARING Doc. Type 1. 1. ,. Mr, .,.k tfek, o...aC. 6b DoT

OTHER BUSINESS" 4204- " 4"` 41" "

Meeting Date

COMMISSION DISTRICT 4

ITEM OB- 4- 2024

To consider amending the site plan and stipulations for Luke Wemette regarding applications Z- 83 and SLUP- 14 of 2016. The property is located on the south side of Powder Springs Road, east of Sanders Road in Land Lots 838 and 865 of the 19th District 2951 Powder Springs Road).

BACKGROUND

The subject property was rezoned in 2016 to Community Retail Commercial ( CRC) for a church and private school. Phase 1 was going to include three buildings comprising of 12, 600 square-feet towards the rear of the property, and this phase was for the church and the school. Phase 2 was going to be three- story 60,000 square-foot main sanctuary building with offices located at the front half of the property. The applicant would like to revise the phasing plan to have one phase for a one- story building with mezzanine that has 31, 385 square- foot. The proposed building would have a sanctuary, a gym, offices, and classrooms. The building would have an exterior of light- colored smooth and split face block. The building will have cornices along the roof to help break up the walls, and a color elevation is attached to this report. If the site plan amendment is approved, all previous stipulations would remain in effect.

STAFF COMMENTS AND RECOMENDATIONS

Water and Sewer: No additional comments.

Stormwater Management: Previous guidance with respect to Stormwater Management issues should be followed as stated in Z- 83- 2016 and SLUP- 14 of 2016.

Site Plan Review: No comments.

Fire Department: See attached.

Cobb DOT: See attached.

RECOMMENDATION

The Board of Commissioners conduct a Public Hearing and consider the proposed site plan and stipulation amendment.

ATTACHMENTS

Other Business application and stipulations.

Continued on the next page)

FEBRUARY 20, 2024 ZONING HEARING

OTHER BUSINESS" ITEM OB- 4-2024 Petition No. 03. 4-

COMMISSION DISTRICT 4

Meeting Date ( 2- 94)- 2-'+- Continued

PAGE 2

FIRE COMMENTS:

The owner/ tenant maintain the sole responsibility for the design and correcting all errors, omissions, problems, and code (if any) exposed during construction AFTER authorization by Cobb County

COMMERCIAL/ INDUSTRIAL ACCESS:

Fire apparatus access roads shall extend to within 150 feet of all portions of the facility or any portion of the exterior wall of the first floor.

All access roads shall meet the American Association of State and Highway Transportation Officials ( AASHTO) design manual live load standard HS20 ( 75, 000 lbs.)

with an unobstructed width of not less than 20 feet, 35 foot inside radius, 50 foot outside turning radius and unobstructed vertical clearance of not less than 13 feet 6 inches.

Maximum slope of the access road in reference to the apparatus is 10% front to back and 5% side to side. ( IFC D103. 2)

Aerial apparatus access shall be required for all structures over 30 feet in height measured from the lowest level of fire department access to the highest roof surface.

IFC: D105. 1)

Aerial fire apparatus access roads shall be a minimum width of 26 feet and between 15' and 30' from the structure and be positioned parallel to one of the entire long sides of the building.

No overhead utility and power lines shall be located within the aerial fire apparatus access. ( Cobb County Development Standards 401. 08. 02)

FIRE HYDRANTS:

Hydrant location within 500 feet of the most remote portion of the structure.

Fire Flow Test from closest existing hydrant shall be provided meeting the minimum.* Required Flow: 1, 500 gpm @ 20 psi)

Continued on the next page)

FEBRUARY 20, 2024 ZONING HEARING

OTHER BUSINESS" ITEM OB- 4- 2024 Petition No. c.-g.+

COMMISSION DISTRICT 4

l( eeti w Date o.- - aoaa+

PAGE 3

FIRE COMMENTS CONTINUED

IFC 510- EMERGENCY RESPONDER RADIO COVERAGE:

New buildings are required to provide radio coverage for emergency responders per the International Fire Code. Testing is required by a third party and when deemed necessary amplification systems are required before the building will be issued a certificate of occupancy. This message is to serve as an early notification to owners and developers for budgeting purposes.

COMMERCIAL AND INDUSTRIAL DEVELOPMENTS:

Buildings or facilities exceeding 30 feet (9144 mm) or three stories in height shall have not fewer than two means of fire apparatus access for each structure. D104. 1 Buildings or facilities having a gross building area of more than 62, 000 square feet 5760 m2 ) shall be provided with two separate and approved fire apparatus access roads. D104. 2

Exception:

Projects having a gross building area of up to 124, 000 square feet (11 520 m2 ) that have a single approved fire apparatus access road where all buildings are equipped throughout with approved automatic sprinkler systems.

Remoteness:

Where two fire apparatus access roads are required, they shall be placed a distance apart equal to not less than one half of the length of the maximum overall diagonal dimension of the lot or area to be served, measured in a straight line between accesses. D104. 3

FIRE PROTECTION:

Automatic sprinkler protection must be provided where mandated by the applicable codes.

C/ O:

Plans must be submitted to the Cobb County Fire Marshal' s Office to initiate the Certificate of Occupancy process.

Continued on the next page)

FEBRUARY 20, 2024 ZONING HEARING

OTHER BUSINESS" ITEM OB- 4- 2024 Petition No. o•3. 4- Meeting Date a- ao- a -

COMMISSION DISTRICT 4

Continued

PAGE 4

FIRE COMMENTS CONTINUED

ADDRESSING:

Street numbers shall be installed in accordance with Section 106- 2 Cobb County Code.

Number shall be on the street side of the building, not less than 6 inches high, numbers shall be reflective on a contrasting background or contrasting numbers on a reflective background. Where monument signs are used address numbers shall be installed on both side of the monument sign. Landscaping materials shall not obstruct the street numbers.

The above is not an all- inclusive list, all applicable fire and life safety provisions must be met.

Jeff Byrd

770) 528- 8814 jeffrey.byrd@cobbcounty.org Continued on the next page)

FEBRUARY 20, 2024 ZONING HEARING

OTHER BUSINESS" ITEM OB- 4- 2024 Petition No.

COMMISSION DISTRICT 4

Meeting Date ao- a- y-Continued

PAGE 5

TRANSPORTATION COMMENTS

Roadway Speed limit Jurisdictional Min. R. O. W.

Roadway classification MPH) control requirements Powder Springs Road Arterial 45 Cobb DOT 100' Average daily Level of Roadway Location trips service vpd) Powder Springs Road West of Hopkins Road 30, 700 D Based on 2022 AADT counting data taken by GDOT, as published on their website, for Powder Springs Road.

Planning Level ofService based on available Average Daily Trips using GRTA guideline thresholds. Classification thresholds Jor LOS A and LOS B are not available for state highways or local roadways from this data source.

LOS C or D is acceptable based on GDOT Design Policy Manual criteria.

ITE

Lan Expected In Out In PM d Description Si(

KSF)

ze vph ( vph Total ( vph Out Total Daily (vpd) Use vph) ) ( vph) ( vph) 560 Church* 24, 910 NA NA NA 119 139 258 784 vph= vehicles per hour, vpd= vehicles per day, KSF= 1, 000 square feet, NA= Not Applicable Development gross trip generation based on available development size and rates from the Institute of Transportation Engineers( ITE) Trip Generation, I i" edition.

Sunday and Sunday Peak Hr Generator Comments and observations Powder Springs Road is classified as an arterial and according to the available information the existing right- of-way does meet the minimum requirements for this classification.

Based on Site Plan dated January 16, 2024, this development requires a traffic study submittal.

Recommendations:

1. Recommend a traffic study pursuant to Code Section 134- 121( b)( 8). Study assumptions ( such as study intersections, trip distribution, future analysis years, and annual growth rate) should be submitted in a memorandum ( Submittal 1) and agreed to by Cobb DOT before continuing the full traffic study ( Submittal 2).

Cobb DOT recommendations may be revised after the study' s receipt.

2. Recommend replacing any disturbed curb, gutter, and sidewalk along the Powder Springs Road. This recommendation is pursuant to Cobb County Development Standard 401. 15, Curbs and Gutters ( including subsections), Cobb County Development Standard 404 Sidewalks and Pathways, Cobb County Development Standard 405 Accessibility Requirements, and Cobb County Development Standard Detail 106, Concrete Curbs, Medians. The site Plan dated January 16, 2024, does comply with this recommendation.

Continued on the next page)

FEBRUARY 20, 2024 ZONING HEARING

OTHER BUSINESS" ITEM OB-4-2024 Petition No. a $ 4-

COMMISSION DISTRICT 4

Meeting Date a- ao- ao Continued

PAGE 6

TRANSPORTATION COMMENTS CONTINUED

3. Recommend extending Powder Springs Road driveway uninterrupted access distance to the first internal parking space or drive aisle) to a minimum of 50 feet from the edge of right- of-way line. This recommendation is to allow for vehicle stacking and is pursuant to Cobb County Development Standard 402. 8, Non- Residential Driveways.

4. Recommend Powder Springs Road access include deceleration lane, taper and/ or improved curve radius to address safety because Powder Springs Road is an arterial roadway. This recommendation is pursuant to Cobb County Development Standard 402. 9, Deceleration Lanes/ Roadway Improvements Along Existing Streets, and Cobb County Development Standard Detail 401A, Deceleration Lanes as reviewed for potential limited right- of-way availability.

This deceleration lane is shown on the revised site plan submitted on January 16, 2024. Recommend location and design be determined during plan review, subject to Cobb DOT approval.

5. Recommend applicant be required to meet all Cobb County Development Standards and Ordinances related to project improvements.

W vo euaii peoa l 0 7 annunnisvner l s6u 1d$ 1apMod G96Z Vr"} 0 a S d sai} siww N 0 ttil uensu3 lueuanop a i;)* 1 t P ....., 01trz IF.

I 57f, ) i, rd h 11 ii

ITN

11 1 II I MI II a 3 g r , , , t 14- I— I I I I II se oo N!

1 '—, a I

III

I I II CC c C z 0 I I I I II c.

e/ 6ii r f Q I I I I I I k.

i I i 4 Ci 1:

11 —) rti I I 111 ,_ 1 S I II1 V r i I _.

I I 1 I .

1 1 1 1 11 I L I I I I .

1 1 I ;

E I t 1i I+. . ,

III

1 ' 1 r 1, y_ - A I I;

fl i11 i A i J 84 __ - ., i i` iiijj i P" i1 .

1 1 1 f t1 I 11 i 1I1:

1 c t 1II 1

t. , l ii 11i i II _ 1 L.

J i• , , 1i i 0- 1-•_• r _ - — — o-ll , II .

J, L-I , . .

11 1 1 /' 1 1 , e I 1 !

I I' L 1 I " I 11 1 Ii 1 1 I I .

1' ' .

I I1 I P 11111 I I i l:' Y` I.

1 r 1 i 1 Q Il I w I

ILII:

I I D w 1 1 .

1 Ce tlIL o;

III ,

LLe

IIIA

iM moriMalmm-11 Z a m ii tl® i I I " II II Page 1361 cff

A w yJellaueyy' peoa I .,, r 3Mmoralsvtla Nl s6uuds JaPMOd 196Z 4,-.

44..

O i 4, S I V cv sauisiuy a uelisugo lueuanoo t il T !;. ,; .- t ii:

f .

7 ai ` I 1 I ci 1 1 i , i 1 I I I Ii ! ( I I Ii b ' 0 I C;

CI i 7..

II

III

i iii i a) Ill i Ii q i iiiit I i 11 j j.

I I I' I 0— l-4_._ i y c , r ti ii + 1 ` i II1it 1 1 1 i I i ....

r' t 1111 .

2 I I fir ,.

11111 1 11 .

N.

IMI

11 I

III1I

I I i r I I ` , ist I' 1 I I I Ik.I :

I I

IIIA '

111 I it

IIIIS , ,

I I . .

L1 I I 1 I LI I I jU 1 1 0--„__.__,--.„ 1-_- i i-1 -- -- 1 I I I I i I .

0- f-I-- I ` f- -

II1I1 ;

1 f L' I .

I' I k wI 1_ I+ I I I I I 111 I I 11 i) t• 1 1

I 1III

11 I I:

I 1 I I.

I I' I I II I G

III

i I np I I I I , I I I r, I I I , : ' I I ' ,., I A,_ 1.

1:

1..

1.

1 I I I I I.

i I

ILI

0- I ! 1~ - -` ' - - I i 0-- 14- 14-.- I II — , n o I i 11 o I I11 1., , f I I

III

W I II ;

Li ( 1 1 1 1 I I, 1 u,

IIIA

I-1 111

SII

1 I I

III

m 1 0

III ,

orklemmummu Page matIMECIMEEMOMMEMEMB 1362 of

L£ 10£ 1171.

a6ed I r 1 1 1 I Fr 1 1 1+ 1' iii 0 '!

Q I 1111 # 4 i (!` 2 .

ice, 11/ Li— f ---- I --- - -- ------ 1 ----, a, - -_•.- - - i -- --- _.

1.-,......

1-,..

A_ x, 1 , 41 ,:

l;_, e rj s --__- 1 p i tl I r r-j 1 / s 1 9I I e II i,_ ' Ii 1 I j b1 UR L_ l j 9n, • i` Y --, If f f l 1 I .

t aa ti a r i,\ V C' y 1 ,, f 1 A J• ali (= J O 10 H r CI 111 i A lY 1- l, x 1 = IE` i s i ii a utI iiP1 Iuj r n y Irr u+ ( l I 4 EE 1 ` I 0 1 fly, Pin r a 1 E!!, !

d 1 ri 1 ' fi IN F?

s' 1} ` Ali +!' aili`!

al lla ii1 l j !!!

1[ i a1ra a 1 31 0 l i( 1‘ 111%....

t " 00;

0 ( 6)

FIFTH

THIRD

BANK-SHALLOWFORD

ROAD

NE M

Min. Bk. .....rPetition No. OZS Doc. Type ptwebv. i.Q1, Traws..

A/44-'40.w,1/4 C4,..41-uL Cbw4,046_, 04- e...5... Meeting Date

FILED WITH COUNTY CLERK THIS acA' DAY

OFFe,,A9C/ AJB. 5'

s

20. 1-4 BY Cb h....... •Sz Ain.t.: 13; rrioa RE

care_ 0:Z• S- Apprevat. greli109..../ A5rrjetAe_cky,c,g_ evil...4r*RA

COUNTY CLERK/ ASST COUNTY CLERK/ DEPUTY COUNTY CLERK

COBB COUNTY GEORGIA

EXTERIOR FINISH IMAGES FXrER/ Oli FINISH SCHEDULE ACM PANEGEAMPAA NOTES frvir arvaDa“. .... e.. T. A. ,— ACAVA 1 ... TA AI Ammon* vrmin. lo. lawass....• ImaterINIAMAAIMIll 1

7-' 111/ 17-:—.

4' ill'::' I. .‘;>11 af;,r'....

7;----- ,,,,,,,- 7-1.:-- - ,--- _ ==== i7x.,: - 7....-___ pRAXIS3 7-----\ 1 11 .11 IIII . t----- lilt II 1E11 r7.".

II t 2= 2.--- 11111111111. 1r 1111111111111 IIII 12==.

05,-, s 1_ 21

FIFTH THIRD BANK

ELE.. N

ovoefolir 7

4, 4) FIFTH MIRO BANK

2925 GORDY PKVN

1 1, 900 SF iXe 2..= rat,/ I ior trz..71-- OM t.. IIIII on mom 4?"...

A 4 ttik$ 4 1-- „. _.....:„...___..„: 11" um I

EAST ELEVATI0q;- 1

efil A- 200 1

SEHDFTF« TN* HMIS. •

Petition No.

Meeting Date a- ao- 94:za' f-Continued

ORM= EMSSHIELADES EXT• SIOR FINISH SCHEDULE ACM PANE GENF., NCTET

FITENIVIFNI __._. NW« rIEN 1 A

1- --- F1s4 -- I i'":4' 41'''''?''.

T-. z --,__----- '•-.,..- 4,-- ....,- 72%:77:::EN: e: FN7«."-. ri PRAXIS3 z7...:.!,....--..... 7,..: 2:...= 1-,--,-- --,--,---.---- - 7:::...-:-....., ,,,.....,,„ 11- -----

I i-..- - t -- r„..

FM 1 4 7...........«-'« N«......« C oNNS• Nome I.'"•••••

ENS

t....,,,,,,...,..

FIFTH THIRD BANK

am. 4 Ift ABTA

NORTH ELEVATION ,-,•-- n

1 ( 4^ 441« Ii. DMZ F

AT J

V t

FI FTH THIRD BANK

0OY 1, 1,-.-- if.- i IlliMMI 1111111111 4 1,41. 1,, ti rs 14 4 7 I 1 ar./ n-I j.

r A- 201 - 1 r

WEST ELEVATION],,. r. e., 1

Petition No. 0 . 5- Meeting Date A- ao- 6).x. ..o+ Continued 7-7

EXTERIOR, iNISX SCHEDULE

1-...,___.`

E4FNFRAI NOTES

r.-="'''''''''' =7,, rzi,.: __...r.:,=,..-razz: , „„:,„,,--„,:::::,-„: 77-„,-;:::_, films

u...., roe. wun wr., k 5:

P• Ke.

i'•' i:1 zr,...-;- 4.-...tv::-.' s.

r.v.,:.°,:,::: 27°-°'..., L7.2 i IM 0: 91 y ay, / Art • ,:--- f.,..- 4,-- zar....-.= 1...--,...- fz------ z.7,=,--„,,,,t-- *$:: 44 -,.., 1:::::1

fr_ d., Es-,,,,,,,, m -. 7.4;,,,—,...---,..... 1.

I A' L T- A - T, T, TT... tc.::::AWTXNT: F.r.

30 2. 222. 7...:ft-',-,r4-..41"...:,,° T.:„ A,'" 4 4. 4, 4• 444,4•4• 4 iv".0

lit\ •• a a r a.4,,, ... ... .= Hi 0•11....,..,

TRESS ENCLOSURE CAP SEC1TON -

Oleg VW MAW.. igr.• 1 S e \ N E'.7

IITX''''' ' ' ' 43 ''''''''''''

1 2.2.1.: 72 . . 3 Ty r -r--:,-.., ir r if../ 2.

I II:

II f..

1'--, r - litilla ,'.'', hiIrr' ', TN now BANK 4 I -',.. 1... 4,. 19.""4,'`A, 3 7..,..... v, mmiti ZI. I.'..,= I? ' In..'" 7: 71.

I. II' III" I - .,,

1• , 420 Hill Ir,7,7 eiiiilinD, .,,.

7:3= rmr..• r Ir....7. ..:= 4.47-.

A '.,. ,

514.1r411111e , 1 FIFTH THIRD BARK

r 2925 GORDY PKWY

bat41.1i-----q- DCERIOR IN. IMAGES 1900 SF

TRASH ENCLOSURE PLAN A 4 44. 1 TRASH ENCLOSURE WAL1 SECTION I...--, 0, 4 444, I 1

1 ,,,„,, l. 6.,-1.. t.40, MIVICk blAt' 1" 5 i i

4 XT-4.

i r......, I rEr-1 i AW 1 „,, 1 rilr1, 1 11 1, 1[ 1. 1 . ail Ea 1 1 1 '•. 1101101. 11111 111111M' I I ,I 1

TRASH ENCLOSURE • T-111111

11111 ' 1 11 h II' 11 1 MI/3e 3 4.*

AND DETAILS

9 111111 1[ 11 i 1 i, F

1 1 TRASH ENCLOSURE SICE ELEVATION I

uTT' 4, 1 2 TRASH ENCLOSURE FRONT ELEVATION I --.. [ 3 A- 190

Petition No. 0.3.5 Meeting Date ao- F Continued 4 gI g' cry. ts,rs i QyE t w uuons iw i F, 4E J Ill, tee-40 4/11/ e-3 1 ; I , k, ,,,,,..,,,,,..,„, / _.__ ar_......---._ h

Y 1L. Q a CeO d J/ pa ri y , I _ r I fAej Q i Nv, N ., r 1 r` Y I er ,- try` ~ m 1 .\ S minty w Sl ti.

ro X1rbt.0..1- vis S pitse

Petition No. 0.3 S Meeting Date a.- ao-? o2c}.

Continued i; , Ai4.04„, i, k

SITE

SS lASOLOT SW

e4 COW caw MAI u.

1- w cn ue rix 7 tY;

71: 2111_ I 4 rr s ii' t r a 40 ' rp' in -....---7.-7272:_t::::::- =: 1.11=.-...- ff.____ r Cf”

TREE SAVE AREA ' I,

r

111 NEW 5

RY yT 0 i Hutt a a,.

t°1hMIV I 4- 0" j I x 2 P rf' j t . J j,, 5 .-, 42,...........,_.... ate ..

A t.

i 0on P44U0 i i,_ M tk i 4.

4.

it 9 a f.

A.

Mr, M a A o A n s m i t m

A A i S 1 7 ir1 a z j 3 5

AVI

i, tit 1 sI z a w to 1.:, \ • ' ,,, , I.

I i IF It u 8 b a co • CD W Yf

n m m i 1 l-Iti a A:

g ist, _'`:"*".

Q ` i'' II I 1 41111111.

t AzX:

I 1111-

NLL

i.

1 j a i, w 11.

11111411.

nib E.• g.

g.0 neoPD Po

f J?© ` \ tit';

fib .

ee y ;!

E.

disa m d 1 I 2 7".".- 4 a j x y% \\ 1/ 4 7 7 i':,,,,,,,,,, w Y 4 » © i 2, 1( 1 1 i 7 w I 4 w 7 41 jA P 07,-- 4- CD j.

a .., z Q . CD Pp y

n y ti m 1 ilk i r E Is.

has v 4 4 ,,,, wd. i o 0^;

Q crq 0o p .co tu V GO N 4

Petition No. e)" i$" Meeting Date A- ax;)

Continued Illuminated Letterset Mounted to Canopy 1. 0140. 1 la te MM. VOA Map Building Type: 1900 Square I Front Elevation 49'- 0' Action

rt, taii New 111, 06081 I 0060, 1' 2/ 0 canotty 32.11014 C Mater6B

ritti to.' Far, 06 lime 4311s r s4S 140t& 3 * CiP( S 6010* Front Elevation 0S: 02,: sess 40, 34 2 ss Scale: 3/ 32"= 1, 0" Alf14° 7- 7 F--"- 71" =-')-- t•- ''.-- D i-t -\ 1--- 7.,:-/ , ' iTh — „, 111-\.< J----) 1--,),,`, . I, (\\ .

fisf _.------ k 0,,,,i4...

51ign Ty. A B C D E F C = 0- 2 1300 4026 t I 3 r reLsos• elDe MC Aonnuin bernnikr vo be prow. CD INi 6 rsaurrefty ereier

11) i i I : 603/ 0. 34. 00 s33411 01 10 0140V pc3res ear.

I 74- 11 weep hole serer to r3• 301te ore- 430,re Ann., era III

433.4, 4 34 II reee01334e irr

3. 43. i, 1- '' 13 eimer4ronaeray 1\ I 1 ' s Is 0, 10. 13 ter. 044- MI IS, aers. le0. 011 return rere saris eroulaw 2..-.._ 1:,, :., 1 3. 3 3, 3.•, 0 s

4 PP . 3..

TG 2925 Gordy Pkwy t 01. 441re 4,000341srale 33, 11 SO 1 210 Marietta, GA rir+. 666, 6 vsevr al e0140',..` 10 1- 7. 20, 3 181906

Petition No. o:BS Meeting Date_ Continued Illuminated Letterset Mounted Hush to Fascia Building Type: 1900 Square I Side Elevation A i.

i to be ca.. between brawl, alpe A DA. 201og, Ice Action j•

in, tail Nevi% Inflated LettarSet.

Cain, If Matanals Mill a I aid '''''' 111i op EMI , , r,;

Side Elevation A Scale* 3/ 32"- 1'- 0" 4.

1pl041 k I/ 0

S. gr* ype A 6 C D E a

IMO

y I i'l 0, 411\, 47.4.

1 ;

ri. 1....

t ci•, ,,,,,,, Cr..

f tv ' ur. a1s, mnct e.,.., A wrew Iraq, atdr- lt,actyk sta.

ckl` k.

1„...:::: wzgmumm.

i ..

r.,,,, TG 2975 6udy P, sky atlas SO2

10. 1/ i.

2l I0D 23 Mar4etta, GA 181% o

4 411..• Petition No.

Meeting DateDate a- ao- aba-44.

Continued Illuminated Letterset Mounted to Canopy Building Type: 1900 Square I Rear Elevation Pr tan some 10 le18190118, 18182

Action nstall New AITPITIetell Letterset. c!' It2,1.21FrA N K Sok, A Materwis

MN Rear Elevatlan g/ 111 k'/ I.

ti, 144.

5 Sige Type A 8 C D E F G 1.- li

513- CT PAD WP II- 32 , T•-• *

e 1- I/ br 4 rUT.11 11)ej T ii i all e.

12 nese* Ye 13 r neer, te. et re Are,* D A:.. e.., 7' i„,; 77,7-'--- ';.: 44 - X ' `' l X - , r" TG 2925 Gordy Pkwy

l' IllaS ltil,:l, llltar:,.:;%t:'e-"''''' S03 TLD Mantua, GA

t soo r9_,Ame

10. 17. 2028 181906

Petition No. 0•6 S' Meeting Date a.-ao Continued Face Replacements for D/ F Multi- Tenant Monument Construction Intent Manufacture and instal new acrykc faces for DIF Mule- Tenant Monument tone panel for each Side' Nth oath tenants: Storage on top S Bane en bottom i.

W Measurements& Materials as well as existing tenant art& colors TBD.

Colors: t EMIo ' 4py a 36, u P., Po 2..,AAked SIM Sa, l,x a„ v;.', a to xo ? Go . nosgtt, ear Grasp 4a vs:„ r XP ti;-iy

C__.._ i Seme!' Went calor Ta0

TBL

SPACE

SHOP

SELF STORAGE

t' 0 e 1 tt FIFTH THIRDi fE ' I BANK 1 toc;

61S TG 2925 Gordy Pkv.

cc' itiass.

SO4 RD Marietta, GA

10. 17 2023 81906

Mn. iBk. 91 , Petition No. A.

Doc. Type Tve a r} Sa,. k§41194.44frn5 Mareed..{

b) " ifm... t;

ting Date a as- r...._ Proposed Site Plan Approval conditions for Fifth Third Bank at 2925 Gordy Parkway.

1. The attached plans have been approved by the Architectural Control Committee ( ACC) for Firth Third Bank. These plans consist of Fourteen ( 14) numbered pages.

2. HVAC units, satellite dishes, and roof vents will not be visible by pedestrians walking along adjacent sidewalks or from driver seats in car on adjacent streets. Presently submitted elevations are acceptable provided they are installed per approved ACC plans. If after actual installation they are visible, then a louver parapet will need to be installed.

3. Dumpster to be brick veneer to match the same brick used on building.

4. All existing trees presently in streetscape along Gordy Parkway will remain " as is".

5. Add border landscaping around lawn area in the rear along driveways.

FILED WITH COUNTY CLERK THIS 2.o* Pe

OF V. 20 a4 BY 3oA,•...3:rre-ll RE a3. 5- e-L 4,T ws atrdrc 40 b3 41/......Ate l: c.a.. 4

COUNTY CLERK/ ASST. COUNTY CLERK/ DEPUTY COUNTY CLERK

COBB COUNTY, GEORGIA

Mitt. Bk. R9 Petition No. 0.B.5.

FEBRUARY 20, 2024 ZONING HEARING Doe. Type asks ses li OTHER BUSINESS" Meeting Date 2- Zo 410244- _ w

COMMISSION DISTRICT 3

ITEM OB- 5- 2024

To consider amending the site plan and stipulations for Fifth Third Bank regarding rezoning application Z- 223 of 1988 and Z- 95 of 1990, for property located on the west side of Gordy Parkway, and on the north side of Shallowford Road in Land Lots 335 and 386 of the 16th District (Gordy Parkway).

BACKGROUND

The subject property was rezoned in 1988 to General Commercial as part of a larger mixed- use rezoning case. The back of the property was developed as a movie theater initially, and this use has redeveloped into a climate- controlled self-service storage facility. This 1. 1- acre property was approved in 2023 for a restaurant, and the restaurant has decided not to develop. The applicant would like to amend the site plan to allow a bank with drive- thru facilities on the property. The site plan is attached which meets zoning criteria for the proposal, including the 40- foot landscape buffer adjacent to the county park. Renderings of the building and signage are also attached for review. If the site plan amendment is approved, all previous stipulations would remain in effect.

STAFF COMMENTS AND RECOMENDATIONS

Water and Sewer: No additional comments.

Stormwater Management: Stormwater Management has no objection to this other business item as requested. Previous guidance with respect to Stormwater Management issues should be followed with respect to previous Zoning cases for this site, as applicable. Current Stormwater Management requirements should be followed to the extent they exceed requirements from the previous Zoning cases. A concept meeting is recommended for this site.

Site Plan Review: No comments.

Cobb DOT: See attached.

Fire Department: See attached.

RECOMMENDATION

The Board of Commissioners conduct a Public Hearing and consider the proposed site plan and stipulation amendment.

ATTACHMENTS

Other Business application and stipulations.

Continued on the next page)

FEBRUARY 20, 2024 ZONING HEARING

OTHER BUSINESS" ITEM OB- 5- 2024

Petition No. a i3•S'

COMMISSION DISTRICT 3

Meeting Date a-ao- a4- Continued

PAGE 2

DEPARTMENT OF TRANSPORTATION COMMENTS

Cobb DOT has a roadway project, B2306 Shallowford Road at Gordy Pkwy.

Recommendations

1. Recommend applicant consider entering into a development agreement pursuant to

O. C. G. A. 36- 71- 13 for dedication of the following system improvements to mitigate traffic concerns: a) donation of right- of-way on the west side of Gordy Parkway, a minimum of 40' from the roadway centerline.

2. Recommend the applicant coordinate with Cobb DOT to ensure the proposed development plans are compatible with project B2306. Shallowford Road at Gordy Pkwy.

3. Recommend the access on Gordy Parkway be restricted to right- in/ right- out access.

This recommendation is due to the proximity of the signalized intersection of Shallowford Road and Gordy Parkway.

4. Recommend replacing disturbed curb, gutter, and sidewalk along the Gordy Parkway and Shallowford Road frontages.

5. As necessitated by this development, recommend Shallowford Road and Gordy Parkway access points include taper and/ or improved curve radius. Recommend location and design be determined during plan review, subject to Cobb County DOT approval.

6. Recommend extending driveway uninterrupted access to a minimum of 50' from the edge of right- of-way per Development Standard 402. 08.

7. Recommend applicant be required to meet all Cobb County Development Standards and Ordinances related to project improvements.

Continued on the next page)

FEBRUARY 20, 2024 ZONING HEARING

OTHER BUSINESS" ITEM OB- 5- 2024 Petition No. b.tt.s Meeting Date g- at,- a•oa.4 COMMISSION DISTRICT 3 Continued

PAGE 3

FIRE COMMENTS:

The owner/ tenant maintain the sole responsibility for the design and correcting all errors, omissions, problems, and code ( if any) exposed during construction AFTER authorization by Cobb County

FIRE HYDRANTS:

Hydrant location within 500 feet of the most remote portion of the structure.* Additional hydrant may need to be installed.)

Fire Flow Test from closest existing hydrant shall be provided meeting the minimum.* Required Flow: 1, 500 gpm @ 20 psi)

IFC 510- EMERGENCY RESPONDER RADIO COVERAGE:

New buildings are required to provide radio coverage for emergency responders per the International Fire Code. Testing is required by a third party and when deemed necessary amplification systems are required before the building will be issued a certificate of occupancy. This message is to serve as an early notification to owners and developers for budgeting purposes.

FIRE PROTECTION:

Automatic sprinkler protection must be provided where mandated by the applicable codes.

C/ O:

Plans must be submitted to the Cobb County Fire Marshal' s Office to initiate the Certificate of Occupancy process.

ADDRESSING:

Street numbers shall be installed in accordance with Section 106- 2 Cobb County Code.

Number shall be on the street side of the building, not less than 6 inches high, numbers shall be reflective on a contrasting background or contrasting numbers on a reflective background. Where monument signs are used address numbers shall be installed on both side of the monument sign. Landscaping materials shall not obstruct the street numbers.

The above is not an all- inclusive list, all applicable fire and life safety provisions must be met.

Jeff Byrd ( 770) 528- 8814 jeffrey.byrd@cobbcounty.org

Machine-readable https://georgiacommons.org/meetings/2024-02-20/cobb-county-board-of-commissioners-public-hearing.md · https://georgiacommons.org/meetings/local/index.md · MCP https://mcp.georgiacommons.org/mcp

Cobb County Board of Commissioners public hearing, February 20, 2024 | Georgia Commons