City of Douglasville MINUTES City Council Regular Meeting Monday, May 20, 2024 6:00 PM 6695 Church Street Douglasville, GA 30134 http://www.douglasvillega.gov Conference Center Auditorium, 6700 Church Street Public Listening via YouTube Live Stream @ www.MyCITITV.com Public Comment Card (www.Douglasvillega.gov/comments) was required 1-hour prior to the scheduled meeting. Members Present: Mayor Rochelle Robinson Mayor Pro Tem Terry S. Miller Councilmember Nycole N. Miller Councilmember Elena Hudson Councilmember Dr. LaShun Burr Danley Councilmember Chris "Coach" Watts Members Absent: Councilmember Sam Davis Councilmember Howard M. Estes Staff Present: Joel Dodson, City Attorney Miranda Jordan, Staff Attorney Marcia Hampton, City Manager Chelsea Jackson, Deputy City Manager Karin Callan, Assistant City Manager/CFO Candyce James, Deputy City Clerk Kristen Tate, Operations Coordinator Chris Dixon, Multimedia Specialist & Webmaster Emily Hardaway, Community Outreach Coordinator Samuel Jenkins, IT Director Chase Morgan, IT Support Specialist Tyler Stapler, Helpdesk Technician J. R. Davidson, Deputy Chief Marissa Jackson, Planning and Zoning Administrator Chris Bass, Parks and Recreation Director Shajra Thrasher, Recreation Program Manager, Parks and Recreation James Gordon, Sr. Project Manager Melissa Burdette, Assistant Director, Public Services Cameron Anderson, Executive Assistant Dana Gray, Senior Planner 1. Call to Order Mayor Rochelle Robinson; 6:02 p.m. City Council Regular Meeting Minutes May 20, 2024 City of Douglasville Page 2. Invocation Pastor Roger Vest, Senior Pastor of Douglasville First United Methodist Church 3. Pledge of Allegiance Mayor Pro Tem Terry Miller 4. Approval of Agenda A. Adoption of the Regular Meeting Agenda for May 20, 2024. Item #24-169 Item #24-169 - Pdf RESULT: ADOPTED MOVER: Councilmember N. Miller SECONDER: Councilmember Watts AYES: Mayor Pro Tem T. Miller, Councilmember N. Miller, Councilmember Hudson, Councilmember Danley, and Councilmember Watts ABSENT: Councilmember Davis and Councilmember Estes 5. Approval of Minutes A. Minutes of May 1, 2024 (budget workshop day 1), Minutes of May 2, 2024 (budget workshop day 2/executive session/legislative work session) and Minutes of May 6, 2024 (regular meeting) were approved as presented. Item #24-167 Item #24-167 - Pdf 6. Consent Agenda Motion to approve the Consent Agenda as presented. RESULT: ADOPTED MOVER: Councilmember Hudson SECONDER: Mayor Pro Tem T. Miller AYES: Mayor Pro Tem T. Miller, Councilmember N. Miller, Councilmember Hudson, Councilmember Danley, and Councilmember Watts ABSENT: Councilmember Davis and Councilmember Estes A. Authorize the Mayor to sign a Memorandum of Understanding with the Georgia Department of Community Affairs to continue the City’s participation in the Georgia Classic Main Street Program. (William Smith) Economic Development Committee - Chairman Terry Miller Item #24-161 ACT-2024-64 Item #24-161 - Pdf City Council Regular Meeting Minutes May 20, 2024 City of Douglasville Page B. Authorize the Mayor to sign a Contract with Mike Westmoreland Contracting, Inc. for West Pines Golf Course Driving Range improvements, in the amount of $357,132.00. (Chris Cartwright) Finance Committee - Chairman Chris Watts Item #24-155 ACT-2024-65 Item #24-155 - Pdf C. Adopt an ordinance to amend Section 38-18(e)(5) of the Code of Ordinances for the City of Douglasville to update the state code section reference for appellate procedures of an abatement court order. (Miranda Jordan) Legislative & Intergovernmental Committee - Chairman Terry Miller Item #24-165 ORD-2024-16 Item #24-165 - Pdf D. Reappoint B. Keith Rollins as Chief Municipal Court Judge for a term of May 21, 2024 through June 30, 2025, and authorize the Mayor to sign an Employment Agreement with him for that purpose. (Judge Keith Rollins) Personnel & Organization Committee - Chairman Howard Estes Item #24-158 ACT-2024-66 Item #24-158 - Pdf E. Amend ORD-2022-23 to correct the ordinance to conform to the application for rezoning from GC and R-2 to PUD and the contents of the presentation and public hearing which took place on May 12, 2022. (Shayla Reed) Planning & Development Committee - Chairwoman Nycole Miller Item #24-164 ORD-2024-17 Item #24-164 - Pdf F. Consider a request for final plat approval for the purpose of consolidating four lots, for 41.430 acres at Preston Boulevard and Bob Arnold Boulevard in Land Lot 677, District 18, Section 2, Parcels 2 and 5, Land Lot 678, District 18, Section 2, Parcel 10 and Land Lot 709, District 18, Section 2, Parcel 2. Application by Kaylee Murtagh. (James Gordon) Planning & Development Committee - Chairwoman Nycole Miller Item #24-157 RES-2024-24 Item #24-157 - Pdf City Council Regular Meeting Minutes May 20, 2024 City of Douglasville Page G. Consider a request for Revised Final Plat approval for Silverman Phase 4 to correct a line dimension along Tract IV, on +/- 57.99 acres at 7600 Wood Road in Land Lot 162, District 2, Section 5, Parcel ID 01620250001. Application by SL Douglas Place II, LLC c/o Steven Moon. (James Gordon) Planning & Development Committee - Chairwoman Nycole Miller Item #24-174 RES-2024-25 Item #24-174 - Pdf H. Authorize the Douglasville Police Department to apply for the 2024 Bullet Proof Vest Grant from the U.S. Department of Justice (DOJ) Bureau of Justice Assistance, in the amount of $36,330 for ½ the cost of 42 bulletproof vests. (Chf. Gary Sparks) Public Safety Committee - Chairwoman LaShun B. Danley Item #24-162 ACT-2024-67 Item #24-162 - Pdf I. Adopt a resolution declaring May 19-25, 2024 as National Travel and Tourism Week in the City of Douglasville. (Samantha Rosado) Recreation, Culture & Tourism Committee - Chairman Chris Watts Item #24-166 RES-2024-26 Item #24-166 - Pdf J. Authorize the Mayor to sign the Georgia Department of Transportation 2024 Supplemental LMIG (LRA) grant application for a grant for road maintenance in the amount of $482,755.53. (Todd Dresdow) Transportation Committee - Chairwoman LaShun B. Danley Item #24-134 ACT-2024-68 Item #24-134 - Pdf 7. Planning & Development Committee - Chairwoman Nycole Miller A. Motion to remove from the table Item 24-114. Item #24-168 ACT-2024-69 Item #24-168 - Pdf RESULT: ADOPTED MOVER: Councilmember Watts SECONDER: Mayor Pro Tem T. Miller AYES: Mayor Pro Tem T. Miller, Councilmember N. Miller, Councilmember Hudson, Councilmember Danley, and Councilmember Watts ABSENT: Councilmember Davis and Councilmember Estes City Council Regular Meeting Minutes May 20, 2024 City of Douglasville Page B. Tabled from April 15, 2024 - Consider a request to amend Exhibit C of ORD-2021-56 to amend condition 14 regarding camera systems throughout the community to require instead “Vehicular tag reader system to be installed at the entrance to development” for +/- 13.83 acres on Vansant Road in Land Lot 902, District 18, Section 2, Parcel ID 09021820018. Application by Starlight Homes Georgia, LLC c/o Joe Ingram. (Marissa Jackson) Item #24-114 ORD-2024-12 Item #24-114 - Pdf RESULT: TABLED Next: 05/30/2024 MOVER: Councilmember N. Miller SECONDER: Councilmember Watts AYES: Mayor Pro Tem T. Miller, Councilmember N. Miller, Councilmember Hudson, Councilmember Danley, and Councilmember Watts ABSENT: Councilmember Davis and Councilmember Estes C. Consider a request for a change in zoning from PSP (Public-Semi-Public District) to HI (Heavy Industrial District) for +/- 2.526 acres at 1435 Municipal Parkway in Land Lot 735, District 18, Section 2, Parcel ID 07351820017. Application by Craig Wire Products, LLC. (Marissa Jackson) Item #24-147 ORD-2024-18 Item #24-147 - Pdf RESULT: ADOPTED MOVER: Councilmember N. Miller SECONDER: Mayor Pro Tem T. Miller AYES: Mayor Pro Tem T. Miller, Councilmember N. Miller, Councilmember Hudson, Councilmember Danley, and Councilmember Watts ABSENT: Councilmember Davis and Councilmember Estes D. Consider a request for a variance from section 5.05(B) of the Unified Development Ordinance to increase the maximum principal building height from 50 feet to 60 feet on a lot of +/- 2.526 acres at 1435 Municipal Parkway in Land Lot 735, District 18, Section 2, Parcel ID 07351820017. Application by Craig Wire Products, LLC. (Marissa Jackson) Item #24-148 RES-2024-22 Item #24-148 - Pdf RESULT: ADOPTED MOVER: Councilmember N. Miller SECONDER: Councilmember Hudson AYES: Mayor Pro Tem T. Miller, Councilmember N. Miller, Councilmember Hudson, Councilmember Danley, and Councilmember Watts ABSENT: Councilmember Davis and Councilmember Estes City Council Regular Meeting Minutes May 20, 2024 City of Douglasville Page E. Consider a request for a variance from section 8.01(E) of the Unified Development Ordinance to reduce the required parking spaces from 750 to 125 parking spaces and a variance from section 8.03(C) to increase the maximum light mounting height from 20 feet to 40 feet on a lot of +/-55.37 acres at 1701 North River Road in Land Lot 173, District 1, Section 5, Parcel ID 01730150012. Application by DC Blox, Inc., c/o Chip Scaglione and Dillon Callaham. (Marissa Jackson) Item #24-163 RES-2024-23 Item #24-163 - Pdf RESULT: ADOPTED MOVER: Councilmember N. Miller SECONDER: Mayor Pro Tem T. Miller AYES: Mayor Pro Tem T. Miller, Councilmember N. Miller, Councilmember Hudson, Councilmember Danley, and Councilmember Watts ABSENT: Councilmember Davis and Councilmember Estes 8. Other Business Mayor Rochelle Robinson addressed concerns about illegal dumping and requested an update on the matter. City Manager Marcia Hampton responded, stating that they are currently awaiting the expiration of a notice. Once expired, the Legal and Community Development departments will proceed with the necessary actions. 9. Updates from City Staff A. City Manager Marcia Hampton made the following announcement:  Questions have been raised about when we will begin leasing the Town Green area. The Taste of Douglasville was our first leasing event. We will present leasing rates to the City Council on May 30. For now, we plan to only lease the area for events with fewer than 1,000 people due to construction, which will affect loading, parking, and business crowding. Managing smaller events will be easier during this period. 10. Comments from Citizens and Delegates Cindy Welch 11. Adjournment 6:29 p.m. Rochelle Robinson, Mayor Vicki L. Acker, City Clerk AGENDA ITEM REPORT Item Number: Meeting: Staff Contact: 24-169 05-20-2024 - City Council Regular Meeting (6:00 PM) Vicki Acker, City Clerk Adoption of the Regular Meeting Agenda for May 20, 2024. Budget Impact: Is this an Agreement or Contract: N/A If YES, check one: ☐ Original Agreement ☐ Change Order, Change Order # Is it budgeted? N/A If so, what Account #? AGENDA ITEM REPORT Item Number: Meeting: Staff Contact: 24-167 05-20-2024 - City Council Regular Meeting (6:00 PM) Vicki Acker, City Clerk Minutes of May 1, 2024 (budget workshop day 1), Minutes of May 2, 2024 (budget workshop day 2/executive session/legislative work session) and Minutes of May 6, 2024 (regular meeting). Attachments: 05-01-2024 - City Council Budget Workshop - Day 1 - Minutes - Draft Final 05-02-2024 - City Council Budget Workshop - Day 2 - Minutes - Draft Final 05-02-2024 - City Council Legislative Work Session - Minutes - Draft Final 05-06-2024 - City Council Regular Meeting - Minutes - Draft Final 5-10-24 Budget Impact: Is this an Agreement or Contract: N/A If YES, check one: ☐ Original Agreement ☐ Change Order, Change Order # Is it budgeted? N/A If so, what Account #? City of Douglasville MINUTES City Council Budget Workshop - Day 1 Wednesday, May 1, 2024 9:00 AM 6695 Church Street Douglasville, GA 30134 http://www.douglasvillega.gov Conference Center Meeting Room, 6700 Church Street Members Present: Mayor Rochelle Robinson Mayor Pro Tem Terry S. Miller Councilmember Dr. LaShun Burr Danley Councilmember Sam Davis Councilmember Howard M. Estes Councilmember Elena Hudson Councilmember Nycole N. Miller Councilmember Chris "Coach" Watts Staff Present: Marcia Hampton, City Manager Chelsea Jackson, Deputy City Manager Karin Callan, Assistant City Manager/CFO Miranda Jordan, Staff Attorney Vicki Acker, City Clerk Candyce James, Deputy City Clerk Kristen Tate, Operations Coordinator Jason Post, Community Relations Director Samuel Jenkins, IT Director Shayla Reed, Community Development Director Chris Bass, Parks and Recreation Director Shane Byrd, Assistant Finance Director Courtney Hunter, Financial Analyst Heather Campbell, Accounting Manager 1. Call to Order & Opening Comments Mayor Rochelle Robinson 9:30 a.m. – 9:45 a.m. 2. Finance Committee - Chairman Chris Watts A. Staff presentations of the proposed budget for fiscal year 2024-25. Item #24-152 3. Adjournment 3:45 p.m. City of Douglasville Page 1 MINUTES City Council Budget Workshop - Day 2 Thursday, May 2, 2024 9:00 AM 6695 Church Street Douglasville, GA 30134 http://www.douglasvillega.gov Conference Center Meeting Room, 6700 Church Street Members Present: Mayor Rochelle Robinson Councilmember Sam Davis Councilmember Nycole N. Miller Mayor Pro Tem Terry S. Miller Councilmember Chris "Coach" Watts Councilmember Elena Hudson Councilmember Howard M. Estes Members Absent: Councilmember Dr. LaShun Burr Danley Staff Present: Miranda Jordan, Staff Attorney Marcia Hampton, City Manager Chelsea Jackson, Deputy City Manager Karin Callan, Assistant City Manager/CFO Joel Dodson, City Attorney 1. Call to Order & Opening Comments Mayor Rochelle Robinson 1:00 p.m. – 1:15 p.m. 2. Finance Committee - Chairman Chris Watts A. Staff presentations of the proposed budget for fiscal year 2024-25. Item #24-153 3. Executive Session A. Adjourn into executive session to discuss property acquisition. (Marcia Hampton) Item #24-150 ACT-2024-58 RESULT: ADOPTED MOVER: Councilmember Watts SECONDER: Councilmember Estes AYES: Councilmember Davis, Councilmember N. Miller, Mayor Pro Tem T. Miller, Councilmember Watts, Councilmember Hudson, and Councilmember Estes ABSENT: Councilmember Danley 4. Adjournment 4:45 p.m. City Council Budget Workshop - Day 2 Minutes May 2, 2024 City of Douglasville Page 2 Rochelle Robinson, Mayor Vicki L. Acker, City Clerk City of Douglasville Page 1 MINUTES City Council Legislative Work Session Thursday, May 2, 2024 6:00 PM 6695 Church Street Douglasville, GA 30134 http://www.douglasvillega.gov Conference Center Auditorium, 6700 Church Street Public Listening via YouTube Live Stream @ www.MyCITITV.com Public Comment Card (www.Douglasvillega.gov/comments) was required 1-hour prior to the scheduled meeting. Members Present: Mayor Rochelle Robinson Councilmember Dr. LaShun Burr Danley Councilmember Sam Davis Councilmember Howard M. Estes Councilmember Elena Hudson Councilmember Nycole N. Miller Mayor Pro Tem Terry S. Miller City Attorney Joel Dodson Members Absent: Councilmember Chris "Coach" Watts Staff Present: Miranda Jordan, Staff Attorney Marcia Hampton, City Manager Chelsea Jackson, Deputy City Manager Vicki Acker, City Clerk Candyce James, Deputy City Clerk Kristen Tate, Operations Coordinator Jason Post, Community Relations Director Emily Hardaway, Community Outreach Coordinator Samuel Jenkins, IT Director Chase Morgan, IT Support Specialist Gary Sparks, Chief of Police Shayla Reed, Community Development Director Marissa Jackson, Planning and Zoning Administrator Dana Gray, Senior Planner Chris Bass, Parks and Recreation Director Shajra Thrasher, Recreation Program Manager Karin Callan, Assistant City Manager/CFO Marcus Thompson, City Engineer James Gordon, Sr. Project Manager Bryan Westfield, Human Resources Director Greg Roberts, Public Services Director Angie Cochran, Court Administrator Deborah Foreman, Court Clerk, Municipal Court Kristen Leatherwood, Court Supervisor Keith Rollins, Municipal Court Judge 1. Call to Order Mayor Rochelle Robinson; 6:00 p.m. City Council Legislative Work Session Minutes May 2, 2024 City of Douglasville Page 2 2. Invocation Pastor JP of Kingdom Builders Ministry 3. Pledge of Allegiance Mayor Pro Tem Terry Miller 4. Announcements - Presentations A. Mayor Rochelle Robinson presented a proclamation to City Clerk Vicki Acker and Deputy City Clerk Candyce James, declaring May 5 through May 11, 2024, as the 55th Annual Professional Municipal Clerks Week in the City of Douglasville. Item #24-020 B. Mayor Rochelle Robinson presented a proclamation to the following Municipal Court Clerks declaring June 10 through 14, 2024 as the 2nd Annual Municipal Court Clerks Week in the City of Douglasville: 1. Angie Cochran, Court Service Administrator 2. Kristen Leatherwood, Court Supervisor 3. Deborah Foreman, Senior Court Clerk 4. Brandy Smith, Court Clerk 5. Chelsea McCallie, Court Clerk 6. Jasmine Hood, Court Clerk 7. Mary Beth Wigley, Court Clerk 8. Robin Caldwell, Court Clerk 9. Tanya Dooley, Court Clerk 10. Christine Roberts, Court Clerk Item #24-097 5. Discussion City Council discussed various matters and speakers were heard. 6. Updates from City Staff A. City Manager Marcia Hampton made the following announcement: • For item 24-154, City Council will need to decide whether to provide a letter of support for one of the two applicants seeking a Low-Income Housing Tax Credit. The deadline for the application is May 15, 2024. 7. Staff Reports A. Staff report regarding the Wednesday Wind Down Concert Series. (Jason Post) Recreation, Culture & Tourism Committee - Chairman Chris Watts Item #24-139 8. Adjournment 7:29 p.m. City of Douglasville Page 1 MINUTES City Council Regular Meeting Monday, May 6, 2024 6:00 PM 6695 Church Street Douglasville, GA 30134 http://www.douglasvillega.gov Conference Center Auditorium, 6700 Church Street Public Listening via YouTube Live Stream @ www.MyCITITV.com Public Comment Card (www.Douglasvillega.gov/comments) was required 1-hour prior to the scheduled meeting. Members Present: Mayor Rochelle Robinson Mayor Pro Tem Terry S. Miller Councilmember Nycole N. Miller Councilmember Elena Hudson Councilmember Dr. LaShun Burr Danley Councilmember Sam Davis Councilmember Howard M. Estes Members Absent: Councilmember Chris "Coach" Watts Staff Present: Joel Dodson, City Attorney Miranda Jordan, Staff Attorney Chelsea Jackson, Deputy City Manager Vicki Acker, City Clerk Kristen Tate, Operations Coordinator Steve Jones, Digital Media Manager Tyler Stapler, Helpdesk Technician J. R. Davidson, Deputy Chief Shayla Reed, Community Development Director Chelsea Tubbs, Planner I Marissa Jackson, Planning and Zoning Administrator Dana Gray, Senior Planner Chris Bass, Parks and Recreation Director Karin Callan, Assistant City Manager/CFO James Gordon, Sr. Project Manager Bryan Westfield, Human Resources Director Greg Roberts, Public Services Director Todd Dresdow, Maintenance Supervisor Melissa Dickinson, Assistant Director, Public Services Cameron Anderson, Executive Assistant Michael Bennamon, Athletic Coordinator 1. Call to Order Mayor Rochelle Robinson; 6:04 p.m. 2. Invocation Pastor James Harper of First Presbyterian Church Douglasville City Council Regular Meeting Minutes May 6, 2024 City of Douglasville Page 2 3. Pledge of Allegiance Mayor Pro Tem Terry Miller 4. Announcements - Presentations A. Presentation by Mayor Rochelle Robinson of a proclamation declaring May 19 – 25, 2024 as National Public Works Week with the theme of "Advancing Quality of Life For All" in the City of Douglasville. Item #24-127 B. Presentation by Mayor Rochelle Robinson of a proclamation declaring May 6 – 10, 2024 as National Economic Development Week with the theme of "Economic Development Heroes" in the City of Douglasville. (Chris Pumphrey) Item #24-151 5. Approval of Agenda A. Adoption of the Regular Meeting Agenda for May 6, 2024. Item #24-128 RESULT: ADOPTED MOVER: Councilmember N. Miller SECONDER: Mayor Pro Tem T. Miller AYES: Mayor Pro Tem T. Miller, Councilmember N. Miller, Councilmember Hudson, Councilmember Danley, Councilmember Davis, and Councilmember Estes ABSENT: Councilmember Watts 6. Approval of Minutes A. Minutes of April 11, 2024 (legislative work session) and Minutes of April 15, 2024 (committees meeting/executive session, regular meeting/executive session) were approved as presented. Item #24-129 7. Consent Agenda Motion to approve the Consent Agenda as presented. RESULT: ADOPTED MOVER: Councilmember Estes SECONDER: Mayor Pro Tem T. Miller AYES: Mayor Pro Tem T. Miller, Councilmember N. Miller, Councilmember Hudson, Councilmember Danley, Councilmember Davis, and Councilmember Estes ABSENT: Councilmember Watts A. Approve a resolution for the authorization to amend the Redevelopment Plan for the City’s “Tax Allocation District Number 1 – Downtown and North Side” to change the name of the district to “Tax Allocation District Number 1 – Downtown and New Horizons” and make conforming changes to related documents. (Karin Callan) Finance Committee - Chairman Chris Watts Item #24-118 RES-2024-17 City Council Regular Meeting Minutes May 6, 2024 City of Douglasville Page 3 B. Authorize the Mayor to sign Change Order 10 with Reeves Young, LLC in the amount of $192,313.43 for the Jessie Davis Park Gym and Pool remediations necessary due to adverse weather conditions. (Marcus Thompson) Finance Committee - Chairman Chris Watts Item #24-138 ACT-2024-59 C. Authorize the Mayor to sign the Emergency Shelter Grant application to the Georgia Department of Community Affairs in support of Vision 21 Concepts, Inc. (Carolyn Pounds) Housing & Community Affairs Committee - Chairman Howard Estes Item #24-154 ACT-2024-60 D. Adopt a resolution approving the issuance of revenue refunding bonds by the Development Authority of Douglas County. (Joe Fowler) Legislative & Intergovernmental Committee - Chairman Terry Miller Item #24-141 RES-2024-18 E. Adopt an ordinance to amend the Personnel Policies and Procedures for the City of Douglasville, Section 17-9, to amend the dress code requirements to add instructions for Building Inspectors, Code Compliance Officers and Engineering employees. (Dr. Bryan Westfield) Personnel & Organization Committee - Chairman Howard Estes Item #24-130 ORD-2024-13 F. Adopt an ordinance to amend the Personnel Policies and Procedures for the City of Douglasville, Section 8-8, to amend the disciplinary appeals process for non-appointed employees. (Dr. Bryan Westfield) Personnel & Organization Committee - Chairman Howard Estes Item #24-131 ORD-2024-14 G. Consider a request for Exemption Plat approval for the purpose of splitting +/- 11.78 acres at 7125 West Strickland Street in Land Lots 192 and 193, District 2, Section 5, Parcel 0193025A004. Application by SEH Holdings, LLC c/o Michelle Macauley. (James Gordon) Planning & Development Committee - Chairwoman Nycole Miller Item #24-144 RES-2024-19 H. Consider a request for Exemption Plat approval for the purpose of combining +/- 4.97 acres, +/- 0.62 acres and +/- 0.39 acres into a +/- 5.98 Acre Parcel at 8523 Durelee Lane in Land Lot 50, District 1, Section 5, Parcels 00500150072, 00500150120 and Previous Public R/W. Application by SP Durelee, LLC c/o Jesse Swofford. (James Gordon) Planning & Development Committee - Chairwoman Nycole Miller Item #24-146 RES-2024-20 City Council Regular Meeting Minutes May 6, 2024 City of Douglasville Page 4 I. Consider a request for Final Re-Plat approval for the purpose of establishing the as-built locations of the townhome buildings for lots 39-43, 134-139 and 140-146 of Laurelwood Phase 2, for +/- 12.018 acres at 5059 Reservoir Drive in Land Lots 23 and 24, District 1, Section 5. Application by FR Arbor Place, LLC c/o Greg Hasty. (James Gordon) Planning & Development Committee - Chairwoman Nycole Miller Item #24-145 RES-2024-21 J. Authorize the Mayor to sign a Memorandum of Understanding with Georgia Recreation and Park Association, Inc. and the Conflict of Interest and Disclosure Policy for participation in the Georgia Recreation and Park Association, Inc.’s BOOST Program, under which the City’s Parks and Recreation Department receives funding and provides comprehensive out-of-school time services to K-12 students. (Chris Bass) Recreation, Culture & Tourism Committee - Chairman Chris Watts Item #24-136 ACT-2024-61 K. Adopt an ordinance to amend the speed limit ordinance for Selman Drive, Bowden Street, and Duncan Street within the City of Douglasville. (Marcus Thompson) Transportation Committee - Chairwoman LaShun B. Danley Item #24-142 ORD-2024-15 8. Housing & Community Affairs Committee - Chairman Howard Estes A. Authorize the City to sign a letter of support with Douglasville Proper for their application for a GICH Low-Income Housing Tax Credit (LIHTC). (Marissa Jackson) Item #24-160 ACT-2024-62 RESULT: ADOPTED MOVER: Councilmember Estes SECONDER: Councilmember Danley AYES: Mayor Pro Tem T. Miller, Councilmember N. Miller, Councilmember Hudson, Councilmember Danley, Councilmember Davis, and Councilmember Estes ABSENT: Councilmember Watts NOTE: Mayor Rochelle Robinson opened the floor for a motion regarding item 24-160. • Prior to any motions, Deputy City Manager Chelsea Jackson instructed each Councilmember to use the provided tally sheet to select a candidate and sign it. • After tallying the submissions, Ms. Jackson announced a tie of 3 - 3 tie: o Douglasville Proper: Danley, Davis, Estes o Highland Park Sr. Village: Hudson, N. Miller, T. Miller • Mayor Robinson broke the tie by selecting Douglasville Proper to receive the letter of support. • Councilman Estes then formally moved for item 24-160, acknowledging Mayor Robinson’s selection of Douglasville Proper. Dr. Danley seconded the motion. The vote was ratified with affirmative electronic votes from the following Council Members: E. Hudson, L. Danley, S. Davis, H. Estes, N. Miller, and T. Miller City Council Regular Meeting Minutes May 6, 2024 City of Douglasville Page 5 9. Updates from City Staff A. Deputy City Manager Chelsea Jackson made the following announcements: • Food Truck Mondays are currently underway outside the Douglasville Conference Center until 8:00 p.m. • Tomorrow, May 7, 2024, there will be a Ward 1 Town Hall Meeting at the Arbor Station clubhouse beginning at 6:00 p.m. • A Downtown Master Plan kick-off meeting will be held at the Douglasville Conference Center on Thursday, May 9, 2024, starting at 6:00 p.m. 10. Adjournment 6:38 p.m. Rochelle Robinson, Mayor Vicki L. Acker, City Clerk AGENDA ITEM REPORT Total Cost of Project: Item Number: Meeting: Staff Contact: 24-161 05-20-2024 - City Council Regular Meeting (6:00 PM) Chelsea Jackson, William "Jonathan" Smith, Authorize the Mayor to sign a Memorandum of Understanding with the Georgia Department of Community Affairs to continue the City’s participation in the Georgia Classic Main Street Program. (William Smith) Attachments: 2024-2025 Classic Main Street MOU_Douglasville Recommendation(s): ACT-2024-63 Budget Impact: Is this an Agreement or Contract: Yes If YES, check one: ☒ Original Agreement ☐ Change Order, Change Order # Is it budgeted? N/A If so, what Account #? 2024-2025 Classic Main Street MOU Memorandum of Understanding This document should be signed by all local parties (Authorized City Representative, Board Chair, and Main Street Program Manager) by July 1, 2024 Please email ellen.hill@dca.ga.gov with any questions. Page 20 of 334 GEORGIA CLASSIC MAINSTREET PROGRAM MEMORANDUM OF UNDERSTANDING 2024 -2025 Program Year This agreement is entered into and executed by the Georgia Department of Community Affairs Office of Downtown Development (hereinafter referred to as “DCA”), the City/Town of Georgia (hereinafter referred to as “Community”), the Local Main Street Program Board of Directors, and the Downtown Manager for the Community. DCA will enter into this agreement with the above parties to provide services in return for active and meaningful participation in the Georgia Classic Main Streets Program by the Community as specified below. This agreement outlines the necessary requirements set forth by DCA for the Community’s participation in the Georgia Classic Main Streets Program for the stated term. DCA is the sponsoring state agency for the Georgia Classic Main Street program and is licensed by the National Main Street Center (hereinafter referred to as “National Program”) to designate, assess, and recommend for accreditation Main Street programs within the State of Georgia. In recognition of the agreement by DCA, the Community, the Board of Directors, and the Downtown Manager to maintain an active Local Main Street Program, the parties have agreed to the following: ARTICLE 1: THE COMMUNITY AGREES TO— 1. Appoint or contract with an entity to serve as the Board of Directors for the local Main Street Program. The city council may not serve as the Main Street Board. 2. Set and review boundaries for the target area of the local Main Street Program. a. A copy of these boundaries should be on file with DCA and uploaded to the Main Street Boundary Map folder in your program’s shared DCA Dropbox folder at all times. b. The Community should work with the Board of Directors to review boundaries at least once every three years. 3. Employ a full-time paid professional downtown manager responsible for the daily administration of the local Main Street Program. a. The downtown manager must have a job description that identifies atleast 75% of their duties that relate directly to the Main Street program. A copy of the job description should remain on file with DCA at all times. b. The downtown managershould be paid a salary consistent with other community and economic development professionals within the state. The program manager’s salary must be paid in excess of minimum wage. c. The Community must notify DCA within one week of any downtown manager vacancy, and the Community must appoint an interim downtown manager until the position is filled. DCA must have accurate contact information for the downtown manager at all times. d. The Community shall be afforded a period of thirty (30) days to assess the vacant position and publish the job opening. Programs with staff vacancies exceeding ninety (90) days may be placed under probationary status or risk forfeiture of their designation. e. Provide an annual evaluation of the downtown manager. If the manager is employed by an entity other than the local government, require that entity to provide an annual evaluation and performance review. 4. Provide forlocal Main Street Program solvency through a variety of direct and in-kind financialsupport. a. If the downtown manager is an employee of the local Main Street Program and not the Community, the Community assuresthat the program has the financial meansto pay forsaid manager for the period of this agreement. b. The local Main Street program must maintain an identifiable and publicly accessible office space. Douglasville DCA recommends this space to be in the local Main Street program area. c. The local Main Street program must have sufficient funding to provide travel and training forthe downtown manager and the Board of Directors. 5. Assistthe downtown managerin compiling data required as part of the monthly reporting process. a. Provide for a positive relationship between the downtown manager and key city staff to access the following information in a timely manner: i. Businesslicense data ii. Building permit data iii. Property tax data iv. Geographic Information Systems data (mapping support when available) b. Review reported data submitted by the downtown managerto assure accuracy. 6. Use the “Main Street America™” name in accordance with the Main Street America® policy on the use of the name Main Street. 7. Notify DCA in writing prior to any wholesale changes in the local program, including staff changes, major funding changes, changes in organizational structure/placement of the program, or major turnover in the board of directors. Such notice should be received by DCA one month prior to said changes. Changes may result in program probation, the loss of accreditation, or the removal of program designation. ARTICLE 2: THE BOARD OF DIRECTORS AGREES TO— 1. Assistthe downtown managerin creating an annual work plan that incorporates incremental and meaningful goals related to the Main Street Approach™, utilizing Community Transformation Strategies and the Main Street Four Point Approach. a. The work plan should include specific tasks, assignments, or a point of contact for the task, related budget needs, and a timeline. b. The work plan will serve as a strategic plan for the local program for a period of three years or less. c. A copy of the work plan must be on file and uploaded to the Work Plan folder in the program’s shared DCA Dropbox folder and updated annually with DCA. 2. Provide opportunities for regular public engagement and support of the Local Main Street Program. a. DCA recommends a public downtown visioning event/town hall meeting annually. b. The Board should identify opportunitiesfor volunteersupport and assistance in executing the work plan. c. The Board should actively engage the community for financial and in-kind support of the local program. 3. Conduct, at minimum, one board training, orientation, or planning retreat per year for the local program. 4. Meet a minimum of 10 times per year and ensure that the minutes of each meeting are maintained and distributed. Such meetings should be open to the public and public notice should be given related to meeting times and agendas. 5. Attend training to become better informed about the Main Street Approach™ and trends for downtown revitalization and to support the downtown manager. 6. All Board Members are required to have at least 2 hours of continuing education annually. Training must be documented using the required training log template and uploaded to the corresponding Dropbox folder. 7. All newly appointed Board Members are required to become Main Street 101 certified within the first year of their first term. A copy of each Board Member’s Main Street 101 certification must be uploaded to the Training Log folder in your program’s shared DCA Dropbox folder. 8. All current Board Members must be Main Street 101 certified. A copy of each Board Member’s Main Street 101 certification must be uploaded to the Training Log folder in your program’s shared DCA Dropbox folder. 9. Assure the financial solvency and effectiveness of the Local Main Street Program. a. Adopt an annual budget that is adequate to support the annual work plan, maintain an office and supportstaff, and provide for training and travel. b. Maintain current membership of the Local Main Street Program to the National Main Street Center to be eligible for accreditation. c. Provide for policies to expend funds, enter into debt, and provide programming support for the local Main Street Program. ARTICLE 3: THE DOWNTOWN MANAGER AGREES TO— 1. Complete all reporting required by DCA to maintain National Accreditation of the local Main Street Program. a. Complete monthly economic and programming activity reports, including portions ofsaid reports that are required as part of the local program assessment process by DCA. These reports must be completed by the 30th of the following month. (Example: March report due by April 30th). Failure to complete monthly reports in a timely manner may result in program probation, the loss of accreditation, or the removal of program designation. b. Participate in the annual manager’s survey provided by DCA. Failure to complete the annual manager’s survey by the deadline may result in the loss of accreditation. c. Provide documentation of all meetings, work plans, budgets, job descriptions, andmission/vision statementsfor the organization. d. Provide documentation to support the work of the organization as it relates to the Main Street Approach™, including information related to historic preservation as required by the National Main Street Center. e. Provide, from time to time, documentation related to local ordinances, plans, codes, and policiesthat are specific to the Community’s downtown area. 2. Participate in training to broaden the impact of the local Main Street Program. a. The downtown manager and/or board members are expected to attend at least one preservation or economic development-related training annually. b. DCA requires managers to attend at least 30 hours of training annually (including webinars, annual trainings, statewide workshops, etc.) Eligible training hours can come from both DCA and non-DCA hosted training events. Training must be relevant to the field of downtown development, historic preservation, planning, community development, and economic development. A record of the manager’s training hours must be uploaded to the Training Log folder in your program’s shared DCA Dropbox folder. 3. Respond to requests by DCA in a timely manner. 4. Take advantage of the Georgia Main Street network of professional downtown managers. 5. All newly hired managers must complete Main Street 101 training with DCA within the first 6 months of employment in the local community. All existing downtown managers must be Main Street 101 certified. 6. Provide regular updates between the local Main Street Program and the Community. a. Managers are encouraged to provide at least quarterly reports to the local government. b. Managers are encouraged to provide copies of all minutes, budgets, and work plans to the local government in a timely manner. 7. Maintain and preserve project files. Document downtown projects and other major local program information in a thorough and systematic fashion. All relevant programmatic documentation should be uploaded and stored in the DCA shared Dropbox folder created for your local program, following the organization structure outlined in DCA’s “A Visual Guide to Dropbox Management” document, which is located in the “Resources” folder of the Georgia Main Street website. This is to help ensure a seamless transfer of project files to city representatives or successor managers in the event of personnel changes. ARTICLE 4: DCA AGREES TO— 1. Supervise all communications between the Community, state government agencies and the National Main Street Center as it relates to the local Main Street Program. 2. Conduct a curriculum of training on an annual basis to assist the downtown manager, the Main Street Board, and the Community with the local downtown revitalization program. 3. Assist local Main Street Programs with organizational issues that may prevent the successful progress of the Community’s downtown revitalization strategy. a. DCA may assist communities in selecting candidatesforthe position of downtown manager as requested. b. DCA may require a local Main Street Program to host an on-site assessment visit if the program has had a leadership or organization change, is currently in a probationary status, or is in jeopardy of losing accreditation or designation status. 4. Provide timely assistance and guidance to the Community as a result of requests for service, monthly reports, or the annual assessment process. a. DCA may contact a community upon observation of monthly reporting abnormalities, missing data or missing reports. If a community becomes delinquent in multiple reports, DCA may contact the local board chair or city administrator about the delinquency. b. DCA may assist in training local staff or volunteers in the reporting process. c. DCA will provide unlimited telephone consultations with local programs. d. DCA will attempt to provide on-site assistance as feasible. 5. Provide ongoing press coverage of the Georgia Classic Main Streets Program, including social media outreach, to recognize and publicize the work of local programs. 6. Provide access to resource materials, sample codes and ordinances, organizational documents, and templates for local programs. 7. Conduct an annual program assessment for the Community highlighting success and opportunities forimprovement. 8. Provide economic development assistance to encourage small business development, real estate development, and property rehabilitation within the downtown area. 9. Provide fee-based strategic planning assistance to the local program. ARTICLE 5: ALL PARTIES AGREE THAT— 1. This agreementshall be valid through June 30, 2025. 2. This agreement may be terminated by DCA or the Community by written notice of 60 days. Termination of this agreement by the Community will result in the loss of local Main Street designation. Communities that choose to terminate their Georgia Classic Main Streets Program affiliation will be required to formally apply for and participate in the Start-Up process if they desire to regain their National Accreditation in the future. 3. If the Community, Board of Directors, and/or Downtown Manager fail to fulfill their obligations set forth in this agreement, DCA reserves the right to determine a course of action for the local Main Street Program as it deems appropriate. This may include probation, loss of accreditation, or termination of designation. 4. If, at any point during the 2024-2025 program year, there is a change in the local program manager, the local program is required to submit a new MOU, including the new manager’s signature, certifying that person’s understanding of the requirements of this relationship. 5. Any change in the terms of this agreement must be made in writing and approved by both parties.  GEORGIA CLASSIC MAIN STREET PROGRAM MEMORANDUM OF UNDERSTANDING: 2024-2025 Program Year THIS AGREEMENT IS HEREBY EXECUTED BY AND BETWEEN THE PARTIES BELOW: LOCAL GOVERNMENT (COMMUNITY): Authorized City Representative (ACR) Signature ACR Name Printed Date ACR Title MAIN STREET BOARD OF DIRECTORS Board Chair Signature Date Board Chair Printed Name Date Term Expires DOWNTOWN MANAGER Manager’s Signature Date Manager Printed Name Date Hired Please check here if this position is vacant. GEORGIA DEPARTMENT OF COMMUNITY AFFAIRS OFFICE OF DOWNTOWN DEVELOPMENT GEORGIA MAIN STREET PROGRAM ODD Director’s Signature Jessica Worthington Director, Office of Downtown Development Georgia Department of Community Affairs 60 Executive Park South, NE Atlanta, Georgia 30329 Date Phone: 404-520-4271 Email: Jessica.worthington@dca.ga.gov Douglasville Rochelle Robinson Mayor David A. Wilson Jonathan William Smith June 22, 2023 March 22, 2026 May 20, 2024 May_____, 2024 May_____, 2024 AGENDA ITEM REPORT Item Number: Meeting: Staff Contact: 24-155 05-20-2024 - City Council Regular Meeting (6:00 PM) Chris Bass, Chris Cartwright, Authorize the Mayor to sign a Contract with Mike Westmoreland Contracting, Inc. for West Pines Golf Course Driving Range improvements, in the amount of $357,132.00. (Chris Cartwright) Attachments: Council memorandum - RFP 2024-001 Driving Range Renovation West Pines Contract 5-7-2024 Legal Approval_ West Pines Drvg Rng Reno 5-7-24 Recommendation(s): ACT-2024-64 Budget Impact: Is this an Agreement or Contract: Yes If YES, check one: ☐ Original Agreement ☐ Change Order, Change Order # Is it budgeted? Yes If so, what Account #? INTEROFFICE MEMORANDUM TO: MAYOR AND CITY COUNCIL FROM: ALYSSA GORDON, FINANCE DEPARTMENT SUBJECT: RFP 2024-001 DRIVING RANGE RENOVATION AT WEST PINES GOLF CLUB DATE: MAY 7, 2024 CC: MARCIA HAMPTON, CITY MANAGER KARIN CALLAN, ASSISTANT CITY MANAGER/CFO CHRIS CARTWRIGHT, PROJECT MANAGER • The RFP 2023-001 Driving Range Renovation at West Pines Golf Club was posted on Bidnetdirect.com, and Georgia Procurement Registry on January 22, 2024. • The proposals were due by February 21, 2024. • Criteria to be used in the selection process was dedicated personnel for the project, firm’s related previous experience, project approach, timeframe, and cost estimate. • Three proposals were received. Bidder Name Bid Year Bid Amount Digital Copy Mike Westmoreland Contracting, Inc 2024 $357,132.00 Y Kent Quinn Turf MGMT LLC 2024 $403,948.00 Y Viridity, LLC 2024 $642,326.00 Y Scoring Criteria Criteria Dedicated Personnel for the Project (10 points) Firm’s Related Previous Experience (30 points) Project Approach (10 points) Timeframe (30 points) Cost Estimate (20 points) Total (100 Points) Selection Committee • Chris Cartwright – Golf Professional • Abby Williams – Accounting Specialist • Matthew Sanders – Assistant Golf Professional • Scott Wilson – Golf Operations Manager For RFP 2024-001, I endorse Mike Westmoreland Contracting, Inc. Their recommendation is based on stellar references, good committee scores, and a well-crafted proposal. With a keen grasp of the project's scope and the city's requirements, they stood out among competitors. Not only do they have extensive experience, but their pricing also outshines the competition. As the most cost-effective and responsive bidder, they epitomize value and expertise, making them the clear choice for this endeavor. Sincerely, Chris Cartwright, Project Manager MIKE WESTMORELAND CONTRACTING, INC. 308 RIDGEVIEW TRACE CANTON, GEORGIA30114 PHONE (404) 291-4887 CONTRACT - West Pines Golf Course Driving Range Improvements Bid Reference# 2024-001 PARTIES OWNER: City of Douglasville OWNER REPRESENTATIVE: Bill Bergin CONTRACTOR: Mike Westmoreland Contracting, Inc. PROJECT LOCATION Site: West Pines Golf Club - Douglasville, Ga PROJECT SCOPE Scope of Work: Driving Range Improvements, Create Target Greens, Enlarge Driving Range Tee. PROJECT TIME FRAME Schedule: Start date approx. June 2024 - August 15, 2024. Construction as weather permits. CONTRACT ITEMS Contract is based on Lump Sum Prices with additional unit prices for tluctuating items. Any additions or deletions will be made according to the following price schedule. UNIT PRICE ITEMS: See Attached Bid Sheet APPROXIMATE PROJECT TOTAL $ 357,132.00 CONTRACT TOTAL ESTIMATED TOTAL $ 357,132.00 CHANGE ORDERS Any change orders or additions to contract will be completed with a change order signed by both parties. PAYMENT TERMS Invoices will only be submitted for work which has been completed. Payment to be made within 30 days of invoice. Entire payment to be made within 30 days of final completion of project. 5/20/2024 Rochelle Robinson, Mayor Attest:______________________________________ City Clerk From: Gordon, Alyssa To: Jordan, Miranda; Acker, Vicki Cc: City Clerk"s Office Subject: RE: TENTATIVE: 05-16-2024 - City Council Legislative Work Session - 24-155 - Mike Westmoreland Contracting, Inc.AGR (RFP 2024-001 Driving Rng Reno @ West Pines Golf Club) Date: Tuesday, May 7, 2024 12:03:20 PM Ms. Vicki, The wording is below as approved by Miranda. Authorize the Mayor to sign a Contract with Mike Westmoreland Contracting, Inc. for West Pines Golf Course Driving Range improvements, in the amount of $357,132.00. Thanks, From: Jordan, Miranda Sent: Tuesday, May 7, 2024 11:57 AM To: Gordon, Alyssa ; Acker, Vicki Cc: City Clerk's Office Subject: RE: TENTATIVE: 05-16-2024 - City Council Legislative Work Session - 24-155 - Mike Westmoreland Contracting, Inc.AGR (RFP 2024-001 Driving Rng Reno @ West Pines Golf Club) Hi Alyssa, You can just swap out the new contract amount in the agenda wording that we had before. Thanks! Miranda Miranda Jordan Staff Attorney Legal Main: (770) 920-3000 Direct: (678) 449-3024 From: Gordon, Alyssa Sent: Tuesday, May 7, 2024 11:51 AM To: Acker, Vicki Cc: Jordan, Miranda ; City Clerk's Office Subject: RE: TENTATIVE: 05-16-2024 - City Council Legislative Work Session - 24-155 - Mike Westmoreland Contracting, Inc.AGR (RFP 2024-001 Driving Rng Reno @ West Pines Golf Club) Hi Ms. Vicki, We are going to proceed with this item. I have attached the revised contract. They will honor the bid amount. Miranda, will you please provide the new language? Thanks, From: Acker, Vicki Sent: Friday, May 3, 2024 9:13 AM To: Gordon, Alyssa Cc: Jordan, Miranda ; City Clerk's Office Subject: RE: TENTATIVE: 05-16-2024 - City Council Legislative Work Session - 24-155 - Mike Westmoreland Contracting, Inc.AGR (RFP 2024-001 Driving Rng Reno @ West Pines Golf Club) Great, thank you so much! Vicki Acker, City Clerk 678-449-3018/ Main: (770) 920-3000 From: Gordon, Alyssa Sent: Friday, May 3, 2024 9:12 AM To: Acker, Vicki Cc: Jordan, Miranda ; City Clerk's Office Subject: RE: TENTATIVE: 05-16-2024 - City Council Legislative Work Session - 24-155 - Mike Westmoreland Contracting, Inc.AGR (RFP 2024-001 Driving Rng Reno @ West Pines Golf Club) Good morning Ms. Vicki, Happy Friday! This item can be removed. The RFP will be re-advertised. Thanks, From: Acker, Vicki Sent: Thursday, May 2, 2024 11:13 AM To: Gordon, Alyssa Cc: Jordan, Miranda ; City Clerk's Office Subject: RE: TENTATIVE: 05-16-2024 - City Council Legislative Work Session - 24-155 - Mike Westmoreland Contracting, Inc.AGR (RFP 2024-001 Driving Rng Reno @ West Pines Golf Club) Yes, hit “sent” too quick -- the name was changed immediately after sent. Vicki Acker, City Clerk 678-449-3018/ Main: (770) 920-3000 Vicki Acker, GCC City Clerk City Clerk's Office Main: (770) 920-3000 Direct: 678-449-3018 From: Gordon, Alyssa Sent: Thursday, May 2, 2024 11:12 AM To: Acker, Vicki ; Jordan, Miranda Cc: James, Candyce Subject: RE: TENTATIVE: 05-16-2024 - City Council Legislative Work Session - 24-155 - Mike Westmoreland Contracting, Inc.AGR (RFP 2024-001 Driving Rng Reno @ West Pines Golf Club) I think saying it’s tentative is alright. It’s not Greg’s project though. Chris Cartwright is the project manager for this one and it’s Chris Bass’ department. I have contacted the vendor to let them know that they can adjust their contract amount to match the original bid amount, or they can withdraw their bid. Miranda, what do you think? Alyssa Gordon Senior Accounting Specialist Finance Main: (770) 920-3000 Direct: (678) 449-3074 From: City of Douglasville Sent: Thursday, May 2, 2024 10:10 AM To: Gordon, Alyssa ; Jordan, Miranda Cc: Acker, Vicki ; James, Candyce Subject: TENTATIVE: 05-16-2024 - City Council Legislative Work Session - 24-155 - Mike Westmoreland Contracting, Inc.AGR (RFP 2024-001 Driving Rng Reno @ West Pines Golf Club) Please be cautious This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. Ladies, this is the tentative wording until matter is cleared up about the different total amounts. Please click here - Go to Item - to view the following item: Meeting: 05-16-2024 - City Council Legislative Work Session Committee Assignment: Item Number: 24-155 Short Title: Mike Westmoreland Contracting, Inc.AGR (RFP 2024-001 Driving Rng Reno @ West Pines Golf Club) Item: TENTATIVE: Authorize the Mayor to sign a Contract with Mike Westmoreland Contracting, Inc. for West Pines Golf Course Driving Range improvements, in the amount of $403,372.00. (Greg Roberts) Staff/Department: Greg Roberts,Melissa Dickinson - Contact Us AGENDA ITEM REPORT Item Number: Meeting: Staff Contact: 24-165 05-20-2024 - City Council Regular Meeting (6:00 PM) Miranda Jordan, Staff Attorney Adopt an ordinance to amend Section 38-18(e)(5) of the Code of Ordinances for the City of Douglasville to update the state code section reference for appellate procedures of an abatement court order. (Miranda Jordan) Attachments: Court Abatement Amendment 2024 Ord (5-20-24 Item 24-165 ORD-2024-16) Approval 24-165 Recommendation(s): ORD-2024-16 Budget Impact: Is this an Agreement or Contract: N/A If YES, check one: ☐ Original Agreement ☐ Change Order, Change Order # Is it budgeted? N/A If so, what Account #? Ordinance Number ORD-2024-16 AN ORDINANCE To amend Section 38-18(e)(5) of the Code of Ordinances for the City of Douglasville to update the state code section reference for appellate procedures of an abatement court order; to repeal any conflicting ordinances; to provide an effective date; and other purposes. BE IT ORDAINED by the Mayor and City Council of Douglasville, Georgia, and it is hereby ordained by the authority thereof as follows: SECTION ONE Section 38-18(e)(5) of the Code of Ordinances for the City of Douglasville is amended to read as follows: Section 38-18(e)(5). Where the abatement action does not commence in the superior court, review of a court order requiring the repair, alteration, improvement, or demolition of a dwelling, building, or structure shall be by petition for review to the superior court pursuant to Title 5, Chapter 3 of the Official Code of Georgia Annotated. SECTION TWO All ordinances and parts of ordinances in conflict with this ordinance shall stand repealed on the effective date of this ordinance. SECTION THREE This ordinance shall become effective on the date after its enactment. All ordinances and parts of ordinances in conflict with this ordinance are hereby repealed. Ordinance Number ORD-2024-16 Ordained this 20th day of May 2024. Mayor Rochelle Robinson Mayor Pro Tem Terry Miller Councilwoman Dr. LaShun Burr Danley Councilman Sam Davis Councilman Howard Estes Councilwoman Elena Hudson Councilwoman Nycole Miller Councilman Christopher “Coach” Watts Attest: Candyce James, Deputy City Clerk Acker, Vicki From: Jordan, Miranda Sent: Wednesday, May 8, 2024 4:31 PM To: City Clerk's Office Subject: FW: Amendment to abatement ordinance Attachments: ORD - abatement amendment 2024.docx Good afternoon Clerks! Please add for May 16 and 20. Agenda language: “Adopt an ordinance to amend Section 38-18(e)(5) of the Code of Ordinances for the City of Douglasville to update the state code section reference for appellate procedures of an abatement court order.” (Miranda Jordan) Thanks! Miranda From: Hampton, Marcia Sent: Wednesday, May 8, 2024 3:37 PM To: Jordan, Miranda Subject: Re: Amendment to abatement ordinance Approved. Marcia Sent from my iPhone Marcia Hampton City Manager City Manager's Office Main: (770) 920-3000 Direct: (678) 449-3022 On May 8, 2024, at 1:26 PM, Jordan, Miranda wrote: Good afternoon Marcia, I would like to place this amendment on the next round. It corrects the code section reference for appeals of a municipal court abatement proceeding, since the state law changed drastically for appeals. Let me know if it is okay to add. Thank you, Miranda Miranda Jordan Staff Attorney Legal Main: (770) 920-3000 Direct: (678) 449-3024 AGENDA ITEM REPORT Total Cost of Project: Item Number: Meeting: Staff Contact: 24-158 05-20-2024 - City Council Regular Meeting (6:00 PM) Angie Cochran, Court Administrator Reappoint B. Keith Rollins as Chief Municipal Court Judge for a term of May 21, 2024 through June 30, 2025, and authorize the Mayor to sign an Employment Agreement with him for that purpose. (Judge Keith Rollins) Attachments: K - Judge Rollins employment agreement (2024-2025) Recommendation(s): ACT-2024-65 Budget Impact: Is this an Agreement or Contract: Yes If YES, check one: ☒ Original Agreement ☐ Change Order, Change Order # Is it budgeted? Yes If so, what Account #? EMPLOYMENT AGREEMENT MUNICIPAL COURT CHIEF JUDGE FOR THE CITY OF DOUGLASVILLE This Agreement by and between the City of Douglasville, Georgia, a municipal corporation, hereinafter referred to as the “City,” and B. Keith Rollins, hereinafter referred to as “Rollins”, is as follows: WHEREAS, the Mayor and City Council have appointed Rollins to serve as Chief Judge of the City's Municipal Court; and WHEREAS, Rollins accepts the appointment; and WHEREAS, Rollins understands this is a part time position covering seven days per week; and WHEREAS, in order to provide for the services of Chief Judge of the Municipal Court and to establish compensation for such services, it is appropriate for the City to enter into an Employment Agreement with Rollins for such services. NOW, THEREFORE, in consideration of the mutual covenants, conditions and terms contained herein, the City and Rollins agree as follows: 1. TERM OF APPOINTMENT AND AGREEMENT. Rollins accepts the position of Chief Judge of the Municipal Court of the City of Douglasville in accordance with the provisions of Section 4.11 of the City of Douglasville Charter as supplemented by this Agreement for a term expiring 365 days from the date of signing of this Agreement. The term of this Agreement shall run concurrent with the term of appointment and shall expire 365 days from the signing of this Agreement. This Agreement supersedes any Agreement between the City and Rollins that is currently in place as of the date of the signing of this Agreement. Rollins shall be, and remain, an attorney admitted to practice law before the courts of record for the State of Georgia. Rollins must also be a citizen of the United States of America and the State of Georgia. Rollins must immediately report to the City Manager any change affecting his membership in good standing with the State Bar of Georgia. The City shall pay the cost for Rollins to attend annual training for judges on the same basis it pays for regular City employees to attend training and pursuant to the City of Douglasville Travel Policy. 2. SCOPE OF SERVICES. Rollins shall perform all duties legally prescribed for a judicial officer serving as a judge of a lawfully constituted Municipal Court according to the requirements of the United States Constitution, the Georgia Constitution, the Official Code of Georgia Annotated, the Georgia Uniform Rules for Municipal Courts, the Georgia Code of Judicial Conduct, and such other rules as may be prescribed by the Supreme Court of the State of Georgia. The parties acknowledge that Rollins is currently holding court on a schedule that includes approximately 92 full days of court annually and as scheduled by the Court Administrator. The Judge shall ensure that each court day is completed no later than 5:00pm on each day of court. The Judge shall at all times faithfully and to the best of his ability administer activities of the court, assign and hear all cases and fulfill obligations of the Court as established by State or local law, rule, statute, regulation and City ordinance. 3. JUDICIAL INDEPENDENCE AND ADMINISTRATION. The Legislative, Executive and Judicial branches of government are co-equal. Each has the responsibility for the criminal justice system and cooperation with each other is necessary to meet its separate responsibility and is fundamental to our system of government. Rollins shall be accorded independence from the Executive and Legislative branches when performing judicial responsibilities and nothing contained herein shall be construed to interfere with Rollins when performing judicial duties. Furthermore, Rollins shall be responsible for ensuring that court staff and officials subject to the court's direction and control comply with applicable provisions of the Code of Judicial Conduct, court rules, ordinances and statutes. The Court Administrator is appointed by the Mayor and Council. Rollins agrees and understands that the Court Administrator is responsible for coordinating administrative activities concerning City and municipal court procedures, court scheduling, City and municipal court policies, and the budget in an effort to retain and ensure consistency and common practices throughout the City. 4. COMPENSATION. For the performance of services pursuant to this Agreement, the City agrees to pay Rollins a monthly gross salary of $9,666.66 (NINE THOUSAND SIX HUNDRED SIXTY-SIX DOLLARS AND SIXTY-SIX CENTS) payable in installments at the same time as City employees are paid. Additionally, the City shall continue to offer Rollins insurance on the same terms they are made available to full-time regular City employees, the City paying the same amount toward the premium as it pays for a regular City employee. Rollins shall pay the employee portion of the insurance premium for the insurance in advance for at least six months of coverage at a time. Additionally, the City shall provide and pay for pension benefits as currently specified for the Chief Judge in the City's defined benefit pension contract with its primary pension provider. 5. NOTICES. Any written notices to be served on either party shall be served or mailed to the following addresses: IF TO THE CITY: IF TO ROLLINS: City Manager B. Keith Rollins City of Douglasville PO Box 1113 PO Box 219 Douglasville, GA 30133 Douglasville, GA 30133 6. TERMINATION OF AGREEMENT. This Agreement may be terminated by the City during Rollins's term of office as provided in the City Charter, the City Code, the Official Code of Georgia Annotated and other relevant Georgia law. Rollins may terminate this Agreement at any time by giving written notice of resignation. 7. MERGER AND AMENDMENT. This Agreement contains the entire understanding of the City and Rollins with respect to the matters set forth herein, and any prior or contemporaneous understandings are merged herein. This Agreement shall not be modified except by written instruments executed by the City and Rollins hereto. This Agreement shall be governed under the laws of the State of Georgia, and any dispute regarding this Employment Agreement shall be resolved in Douglas County Superior Court, State of Georgia. 8. SEVERABILITY. If any provision of this Agreement or their application to any circumstance is held invalid, the remainder of this Agreement and their application to other circumstances is not affected. IN WITNESS WHEREOF the parties hereto do hereby execute this Agreement. CITY OF DOUGLASVILLE B. KEITH ROLLINS By: _______________________ By: _______________________ Rochelle Robinson, Mayor B. Keith Rollins, Judge Date: ______________________ Date: _____________________ Attest: ___________________________ Vicki Acker, City Clerk AGENDA ITEM REPORT Item Number: Meeting: Staff Contact: 24-164 05-20-2024 - City Council Regular Meeting (6:00 PM) Shayla Reed, Community Development Director Amend ORD-2022-23 to correct the ordinance to conform to the application for rezoning from GC and R-2 to PUD and the contents of the presentation and public hearing which took place on May 12, 2022. (Shayla Reed) Attachments: Staff Memo - Veterans and Whitley Drive ORD-2024-17 Correct ORD-2022-23 RZ-CG-R2 to PUD (24-164) (16.5 acs Vet Mem Hwy K Woods PEC) ORD-2022-23 RZ-CG_R2-PRD Veterans Mem Hwy 16.5 acs, Kenneth Woods, PEC Veterans and Whitley Drive Rezoning Application PEC Site Zone-3 Updated PEC Survey Letter of Intent - REV PEC Zoning Conditions PEC Legal Description PEC Property Tax Statements PRZ22-0005 Veterans Memorial Hwy Traffic Study Community Questions and Answers Follow Up From Site Visit Neighborhood Meeting Minutes Recommendation(s): ORD-2024-17 Budget Impact: Is this an Agreement or Contract: No If YES, check one: ☐ Original Agreement ☐ Change Order, Change Order # Is it budgeted? No If so, what Account #? TO: City of Douglasville’s Mayor and Council FROM: Shayla Reed, Community Development Director DATE: May 16, 2024 SUBJECT: Amendments to ORD 2022-23 ITEM #: 24-164 Background: On April 26, 2022, the Community Development Department received a rezoning application for several parcels at the intersection of Veterans Memorial Hwy. and Whitley Drive. The application notes a request for rezoning from GC (General Commercial) and R-2 (Single-Family Residential) to PUD (Planned Unit Development). The ordinance to approve the rezoning has a scrivener's error where it noted a request to rezone to PRD (Planned Residential District) instead of PUD (Planned Unit Development). At the public hearing on Thursday, May 12, 2022, staff, and the applicant both noted that the rezoning was to PUD (Planned Unit Development). However, the final ordinance to approve the rezoning signed on May 16, 2022, noted a PRD (Planned Residential Development) zoning. Needed Actions: Council to consider whether to amend the written ordinance to reflect the PUD (Planned Unit Development) zoning as requested by the applicant and as discussed during the public hearing. Ordinance Number ORD-2024-17 AN ORDINANCE ALLOWING AN AMENDMENT TO ORD-2022-23 It is hereby ordained by the City Council of Douglasville, Georgia as follows: WHEREAS, Kenneth Woods, on behalf of Planners and Engineers Collaborative, duly filed an application for rezoning of certain property being +/- 16.5 acres zoned GC (General Commercial) and R-2 (Single Family Development) to PUD (Planned Unit Development), located at 12711, 12701, and 12691 Veterans Memorial Highway in Land Lot 192, District 2, Section 5, Parcels 64, 63, 62, 61, 60 and 59 (Parcel IDs 01920250064, 01920250063, 01920250062, 01920250061, 01920250060 and 01920250059), lying and being within the boundaries of Douglasville, Georgia (the “Application”); and WHEREAS, the Planning Commission of the City of Douglasville held a public hearing on the Application on May 3, 2022, and the City Council of the City of Douglasville held a public hearing on May 12, 2022 and voted to approve the Application on May 16, 2022; and WHEREAS, the Application only referenced rezoning from GC and R-2 to PUD, and the discussions and public hearings at both the Planning Commission meeting on May 3, 2022 and the City Council legislative work session meeting on May 12, 2022 and the regular voting meeting on May 16, 2022 only referenced rezoning from GC and R-2 to PUD; and WHEREAS, the Ordinance that was signed (ORD-2022-23) contained a typographical error where “PRD” (Planned Residential Development) was erroneously placed instead of “PUD”; and WHEREAS, this Amendment to ORD-2022-23 is necessary to correct ORD-2022-23 to conform the written ordinance to the Application and the contents of the presentation and public hearings which took place at the Planning Commission meeting on May 3, 2022, the legislative work session of the City Council on May 12, 2022, and the regular voting meeting of the City Council on May 16, 2022. NOW, THEREFORE, it is hereby ordained that ORD-2022-23 is amended to replace all references to “PRD (Planned Residential Development)” to “PUD (Planned Unit Development)”. All remaining language on ORD-2022-23 shall remain in full force and effect, and all of the conditions attached with ORD-2022-23 shall remain in full force and effect. It is hereby directed that the Official Zoning Map of the City of Douglasville be amended as necessary to reflect this amendment to ORD-2022-23. Ordinance Number ORD-2024-17 So amended this the 20th day of May, 2024. _______________________________________ ______________________________________ Rochelle Robinson, Mayor Terry Miller, Mayor Pro Tem _______________________________________ ______________________________________ Dr. LaShun B. Danley, Councilmember Sam Davis, Councilmember _______________________________________ ______________________________________ Howard M. Estes, Councilmember Elena Hudson, Councilmember _______________________________________ ______________________________________ Nycole N. Miller, Councilmember Chris “Coach” Watts, Councilmember Attest: _______________________________________ Vicki L. Acker, City Clerk Ordinance Number ORD-2022-23 AN ORDINANCE ALLOWING REZONING It is hereby ordained by the City Council of Douglasville, Georgia as follows: WHEREAS, Kenneth Woods, on behalf of Planners and Engineers Collaborative, has duly filed an application for rezoning of certain property being +/- 16.5 acres zoned GC (General Commercial) and R-2 (Single Family Development) to PRD (Planned Residential District), located at 12711, 12701, and 12691 Veterans Memorial Highway in Land Lot 192, District 2, Section 5, Parcels 64, 63, 62, 61, 60 and 59 (Parcel IDs 01920250064, 01920250063, 01920250062, 01920250061, 01920250060 and 01920250059), lying and being within the boundaries of Douglasville, Georgia; and WHEREAS, the Douglasville Planning Commission duly considered and investigated said application and held a public hearing thereon. NOW, THEREFORE, it is hereby ordained that the aforementioned property described on the attached Exhibit A be duly rezoned to PRD (Planned Residential Development District) to adopt the PRD plan attached as Exhibit B. In addition to the requirements of PRD zoning established by the City of Douglasville Unified Development Ordinance, the following special conditions are imposed upon the property as additional conditions of rezoning: 1. A density rate of approximately 6.01 imits per acre for townhome and multi-familv dwellings and 5 units per acre for single-family detached residential dwellings 2. Developments required to meet UDO. Section 2.04 (A) and (L) 3. Stagger fronts of townhouses at a minimum of 3' 4. Provide turn around areas at each dead-end street or as approved by acceptable fire department turn aroimd per appendix D of the IFC 5. All townhome units required to be protected with automatic fire sprinkler system 6. Applicant offers 17 (seventeen) additional conditions that staff supports. Conditions from the applicant (PEC+) are listed on the attached Exhibit C. entitled "Proposed Conditions of Zoning" and dated on March 27. 2022. It is hereby directed that the Official Zoning Map of the City of Douglasville be amended to reflect this rezoning. Ordinance Number ORD-2022-23 Enacted this the 16^ day of May, 2022. Rdc^elle Robinson, Mayor Terry Mil^r, Mayor Pro Tern Mark Adams, Councilmember r. LaShun B. Danley, Councilrrfember -^am Davis, Councilmember Howard M. Estes, Councilmember Nycole N. Miller, Councilmember Chris "Coach" Watts, Councilmember Attest: Vicki L. Acker, City Clerk EXHIBIT A TRACT ONE SURVEYED PROPERTY DECSRIPTION ALL that tract or parcel of land lying and being in Land Lot 192, 2nd District, Sth Section, City of Douglasville, Douglas County, Georgia and being more particularly described as follows: COMMENCING at an iron pin set (#4rebar) where the southeasterly right of way margin of Bankhead Highway also known as Veterans Memorial Highway (80' Right of Way) intersects the westerly right of way margin of Whitley Drive (40' Right of Way), said point being the TRUE POINT OF BEGINNING; THENCE in a southerly direction along the westerly right of way margin of Whitley Drive along a curve to the right an arc distance of 196.38 feet, having a radius of 618.24 feet, and being subtended by a chord of South 08 degrees 55 minutes 10 seconds East for a distance of 195.55 feet to a point; THENCE continuing along the westerly right of way margin of Whitley Drive South 00 degrees 10 minutes 49 seconds West for a distance of 263.15 feet to an axle found; THENCE departing the westerly right of way margin of Whitley Drive North 89 degrees 28 minutes 08 seconds west for a distance of 176.63 feet to a 1" open top pipe found; open top pipe found; THENCE South 00 degrees 40 minutes 44 seconds West for a distance of 159.21 feet to a 1" open top pipe found; open top pipe found; THENCE South 00 degrees 30 minutes 47 seconds West for a distance of 119.67 feet to a 1" open to pipe found; open to pipe found; THENCE South 01 degrees 05 minutes 37 seconds East for a distance of 270.23 feet to a 1" crimp top pipe found; crimp top pipe found; THENCE South 00 degrees 52 minutes 48 seconds West for a distance of 175.89 feet to an iron pin set (#4 rebar) on the northwesterly right of way margin of Pinecrest Drive (50' Right of Way); THENCE in a southwesterly direction along the northwesterly right of way margin of Pinecrest Drive along a curve to the left an arc distance of 46.36 feet, having a radius of 222.53 feet, and being subtended by a chord of South 63 degrees 04 minutes 56 second West for a distance of 46.27 feet to a point; THENCE continuing along the northwesterly right of way margin of Pinecrest Drive South 57 degrees 08 minutes 47 seconds West for a distance of 55.16 feet to a point; THENCE continuing along the northwesterly right of way margin of Pinecrest Drive South 54 degrees 19 minutes 41 seconds West for a distance of 122.04 feet to an iron pin set (#4 rebar); THENCE departing the northwesterly right of way margin of Pinecrest Drive South 85 degrees 04 minutes 38 seconds West for a distance of 399.90 feet to a standing rock found; THENCE North 00 degrees 51 minutes 19 seconds West for a distance of 985.71 feet to an iron pin set (#4 rebar) on the southeasterly right of way margin of Bankhead Highway also known as Veterans Memorial Highway (80' Right of Way); THENCE in a northeasterly direction along the southeasterly right of way margin of Bankhead Highway also known as Veterans Memorial Highway North 64 degrees 53minutes 13 seconds East for a distance of 825.55 feet to an iron pin set (#4rebar) where the southeasterly right of way margin of Bankhead Highway also known as Veterans Memorial Highway (80' Right of Way) intersects the westerly right of way margin of Whitley Drive (40' Right of Way) and the TRUE POINT OF BEGINNING. Said tract of land contains 16.46 acres (716,815 sq. ft.) more or less. EXHIBIT A TRACT TWO SURVEYED PROPERTY DECSRIPTION ALL that tract or parcel of land lying and being in Land Lot 192, 2nd District, 5th Section, City of Douglasville, Douglas County, Georgia and being more particularly described as follows: COMMENCING at an iron pin found (#4 rebar) on the southeasterly right of way margin of Pinecrest Drive (SO' Right of Way) and the north line of Lot 7 of Parkside Subdivision as recorded in Plat Book 21 Page 7, Douglas County records and having state plane coordinates of North-1361950.93, East 2115819.02, said iron pin being the TRUE POINT OF BEGINNING; THENCE in a northeasterly direction along the southeasterly right of way margin of Pinecrest Drive North 54 degrees 19 minutes 41 seconds East for a distance of 36.78 feet to a point; THENCE continuing along the southeasterly right of way margin of Pinecrest Drive North 57 degrees 06 minutes 57 seconds East for a distance of 53.94 feet to a point; THENCE continuing along the southeasterly right of way margin of Pinecrest Drive along a curve to the right an arc distance of 15.39 feet, having a radius of 169.79 feet, and being subtended by a chord of North 59 degrees 39 minutes 56 seconds East for a distance of 15.39 feet to an iron pin set (#4 rebar); THENCE departing the southeasterly right of way margin of Pinecrest Drive South 01 degrees 01 minutes 07 seconds West for a distance of 34.23 feet to a 1/2" open top pipe found on the north line of Lot 7 of Parkside Subdivision; open top pipe found on the north line of Lot 7 of Parkside Subdivision; THENCE along the north line of Lot 7 of Pinecrest Subdivision South 74 degrees 34 minutes 09 seconds West for a distance of 91.13 feet to an iron pin found (#4 rebar) on the southeasterly right of way margin of Pinecrest Drive and the TRUE POINT OF BEGINNING. Said tract of land contains 0.04 acres (1592 sq. ft) more or less. EXHIBIT B I 'r.r.- .-i -vl ' 1'^ M =^ri-z-3+S>5s LOCATION NAP f - 200O' Mmf 9WB?MW 16.4S AC. Am*/ a iA\ 0 K c RY FOR REVIEW tj^sco MTAAtt^s LMO ntie sjA^r rat Juaskins IPA ACCiMSnONS U LLC NWTH AMVUCAfJ T17L£ INSURANCE COUPAHY TflACTC t A 2 LOCA TED W LI. 192 2Aa DiSTPiCT. Slh SECTION arr of oouCLAsm.E OODCLAS COUNTY. CA. » isytKf^ix A>TS . EXHIBITC Planners & Engineers Collaborative'- 3/27/2022 Re: Proposed Conditions of Zoning Veterans Memorial Highway at Pinecrest Drive - Rezoning Planned Unit Development 16.43 Acres - Residential Mixed Project PEC+ Project No. 20273.DOA Dear Community Development Department, City of Douglasville Planning Commission and City Council: See below the proposed conditions of zoning that shall be associated with proposed rezoning request from R-2 & GCto PUD (Planned Unit Development) for the above referenced project. Based on multiple meetings with the surrounding neighborhoods we offer the following additional zoning conditions to be made part of the rezoning application for the land: 1. The site plan will be developed in general conformance to the site plan submitted to city staff dated March 11, 2022 based on final design with site topography and constraints. 2. Sidewalk to be constructed along all frontages of the development. Where damaged or in poor condition, we will replace the existing 4' sidewalk along the western side of Whitley Drive to corner of Pinecrest Drive. 3. Applicant to work with the City of Douglasville Public Works department to help and assist the city with recommendations on where the city can install traffic calming speed tables along Whitley Drive for cut through traffic and "no parking" signs near the corner of Whitley Drive and the existing funeral home. 4. A mandatory HOA will be established and set up by the builder to be taken over once the project is fully sold out. 5. The rental restriction for the HOA is to be capped at a maximum of 10% of the homes at all times. 6. Minimum SF of the homes is to be 1,600 sf and up for townhomes and 2,000 sf for detached homes. 7. Elevations are to be all cementitious material and consist of a combination of brick, stone, shake, hardy panels, hardy plank or real stucco. No vinyl siding or synthetic stucco is allowed on the homes. Elevations are to be in general conformance to elevations submitted to staff. 8. There shall be a 5' black vinyl chain link or 5' privacy fence along the property line of the eastern side that abuts the single family homes, the south side where the pond is located, and the western commercially zoned property. 9. The minimum lot size for single family detached allowed in the development is 4,200 sf. And 41 feet in width for the single family detached lots. 10. All open space, setbacks, and lot dimensions are defined on the attached site plan dated March 27, 2022. 11. There will be a 30-foot replanted landscape strip along the eastern border with the R-2 properties and a 25' replanted landscape strip along the western side to the GC property. 350 Research Ct, Ste. 200, Peachtree Corners, Georgia 30092 ■ 48 Atlanta Street, Marietta, Georgia 30060 Main: (770) 451-2741 ■ Fax: (770) 451-3915 www.pecatl.com Page 53 of 334 Project No. 20273.OOA Veterans 12. The project is to obtain a permit from Georgia DOT for the entrance on Veterans Memorial Highway. 13. The front of all homes along Pinecrest Drive are to be set back from the edge of pavement at least 50 feet. 14. Right of Way dedication along Whitley Drive to obtain 25' from centerline of existing roadway. 15. Project is to comply with providing the multi-use trail from the corner of Whitley and Veterans Memorial to our entrance on Veterans per the City of Douglasville trail map. 16. Stormwater for the site will follow City of Douglasville stormwater latest standards at time of permitting. 17. Lighting will be required along the external public road frontages as required by City of Douglasville Code. ra hd DOUGLASVILLE GEORGIA Rezoning Application Project VETERANS MEMORIAL HIGHWAY @ WHITLEY ROAD Project Name 12711, 12701, 12691 VETERANS MEMORIAL HIGHWAY DOUGLASVILLE, GA 30133 Property Address/Location City State Zip 192 2 5 MANY (SEE ATTACHMENT) ~16.5 * cres | Land Lot District Section Parcel Property ID Property Size | GC & R-2 to P UD Adjacent Zoning: PUD R-2, PUD R-2 GC Current Zoning Proposed Zoning North South East West Overlay District: Ohistoric Overlay District OiQuality Growth Development Overlay *ONone Applicant/Representative KEN WOOD, PEC+ Applicant/ Agent or Attorney KEN@PEC.PLUS PLANNERS AND ENGINEERS COLLABORATIVE + HTODD@PEC.PLUS aE EEaS Company E-mail Address Phone | 350 RESEARCH COURT, STE 200 PEACHTREE CORNERS, GA 30092 Mailing Address City State Zip Owner JASON BRISTER, ON BEHALF OF THE HARRIET F. BRISTER ESTATE Property Owner Company E-mail Address Phone Mailing Address City State Zip Applicant Signature —_ | hereby certify thavall in mation provided herein is true and correct. d Z 2/24 fe oZZ2 «| Applicant/Owner or Representative Signature Date | - —_— i O Application Approved for Staff Review OApplication Rejected Fee: $ | | Zoning Administrator Date a ere: ae ee | City of Douglasville | Community Development Department | 6701 Church St, Douglasville. GA 30134 | Rezoning Application Packet Rev. 7/23/19 | Page 5 NO. PIN ADDRESS OWNER PER GIS OWNERS PER ESTATE/TRUST OWNER ADDRESS ACREAGE (per GIS) 1 1920250064 12711 VETERANS MEMORIAL HWY HARRIET F. BRISTER ESTATE JASON BRISTER ON BEHALF OF THE BETTYE B. WHITE ESTATE 6201 DOUGLAS MANOR CT DOUGLASVILLE, GA 30134 13 2 1920250063 12701 VETERANS MEMORIAL HWY HARRIET F. BRISTER ESTATE JASON BRISTER ON BEHALF OF THE BETTYE B. WHITE ESTATE 6202 DOUGLAS MANOR CT DOUGLASVILLE, GA 30134 0.99 3 1920250062 12691 VETERANS MEMORIAL HWY HARRIET F. BRISTER ESTATE JASON BRISTER ON BEHALF OF THE BETTYE B. WHITE ESTATE 6203 DOUGLAS MANOR CT DOUGLASVILLE, GA 30134 0.92 4 1920250061 VETERANS MEMORIAL HWY HARRIET F. BRISTER ESTATE JASON BRISTER ON BEHALF OF THE BETTYE B. WHITE ESTATE 6204 DOUGLAS MANOR CT DOUGLASVILLE, GA 30134 0.47 5 1920250060 VETERANS MEMORIAL HWY HARRIET F. BRISTER ESTATE JASON BRISTER ON BEHALF OF THE BETTYE B. WHITE ESTATE 6205 DOUGLAS MANOR CT DOUGLASVILLE, GA 30134 0.41 6 1920250059 WHITLEY DR HARRIET F. BRISTER ESTATE JASON BRISTER ON BEHALF OF THE BETTYE B. WHITE ESTATE 6206 DOUGLAS MANOR CT DOUGLASVILLE, GA 30134 0.83 PROPERTY OWNERS AND INFORMATION ATTACHMENT A rw be“ DOUGLASVILLE Rezoning Application GEORGIA aes Consent of Owner Property Owner The property owner shall read the following carefully and complete the consent form below: x | understand that failure to supply all required information per the rezoning checklist provided and requirements of the City of Douglasville Unified Development Ordinance will result in rejection of application * | understand that preliminary approval of my plans does not authorize final approval of my rezoning request, and all subsequent applications and permits, including but not limited to land disturbance, building, sanitary sewer, and signs, may not be issued until rezoning approval is obtained x | understand that representation associated with this application on behalf of the property owner (i.e. project coordinator, potential property owner, agent, or other such representative) shall be binding x | have read the provisions of O.C.G.A. 36-67A as required regarding Campaign Disclosures; my signed Campaign Disclosure report is included with this application JASON BRISTER, ON BEHALF OF THE ——. | , HARRIET FE BRISTER ESTATE I, , aS property owner, respectfully petition that this property as described in this application be considered for a change in zoning from GC &R-2__ to =PUD __. | acknowledge and fully understand all above statements made by the City of Douglasville. | hereby certify that all information provided herein is true and correct. Property Owner Signature Date Address City State Zip Phone _ | Representative (if applicable) KEN WOOD, PEC+ _ a CDM al Lay feorr | Attormey/Agent Signature = © Date we | ! 350 RESEARCH COURT, STE 200 PEACHTREE CORNERS, GA 30092 Address City State Zip Phone ey ERIN Fai, SPE ROTAR +. Sworn and subscribed beforenie EXPines |, 3 This 24" day of fap, 202 | GEORGIA Perea ae Sy Par) ans 3 Q ‘ 4 WM pay LR Sat “og ce $ ALA <,, NET cove" Notary Pliblic “ 44; \ tary City of Douglasville | Community Development Department | 6701 Church St, Douglasville, GA 30134 | Rezoning Application Packet Rev. 7/23/19 | Page 6 ry Bas “ j 7 | (eee DOUGLASVILLE Rezoning Application - GEORGIA “= Consent of Owner Property Owner ; The property owner shall read the following carefully and complete the consent form below: s | understand that failure to supply all required information per the rezoning checklist provided and requirements of the City of Douglasville Unified Development Ordinance will result in rejection of application z | understand that preliminary approval of my plans does not authorize final approval of my rezoning request, and all subsequent applications and permits, including but not limited to land disturbance, building, sanitary sewer, and signs, may not be issued until rezoning approval is obtained x | understand that representation associated with this application on behalf of the property owner (i.¢. project coordinator, potential property owner, agent, or other such representative) shall be binding x | have read the provisions of O.C.G.A. 36-67A as required regarding Campaign Disclosures; my signed Campaign Disclosure report is included with this application __ JASON BRISTER, ON BEHALF OF THE 4 apt a ba aiea . @8 property owner, respectfully petition that this properly as described in | this application be considered for a change in zoning from GC &R2_ to . PUD __. / acknowledge and | fully understand all above statements made by the City of Douglasville. | hereby certify that all information provided heyeinjis true and correct. VA ea $ (26/22 te Property Signature Da (21 Poche Morse Ch Dueheville GA Sosy Yap 55-2549 i betes Z a ity State _ Zip Phone (if applic 5) REN WOOD. FEC z Zz ZOE fay foe ent Signature C Date oH 350 RESEARCH COURT, STE 200 PEACHTREE CORNERS, GA 30092 foros City State Zip Phone ey Mts, i a eM ERIN Ry tay Ph ee SOTA MO, Swom and subscribed beforenfe / expmes , & & This By" day offze 208A | GEORGIA | : nt omber tases z % @° P| 2 - iy, NET < Notary Phiblic thea ots i City of Douglasville |' Community Development Department | 6701 Church St, Douglasville, GA 30134 | Rezoning Application Packet Rev. veaiPage-58 of 334 Pe A IIE TTR FE TA aS ge wane tee Nast agent geal TE = he ane = D> DOUGLASVILLE Pe an isent ner =: GEORGIA a Consent oT : Property Owner a The property owner shall read the following carefully and complete the consent form below: i 4 | understand that failure to supply all required information per the rezoning checklist provided and : requirements of the City of Douglasville Unified Development Ordinance will result in rejection of application : | x | understand that preliminary approval of my plans does not authorize final approval of my f rezoning request, and all subsequent applications and permits, including but not limited to land disturbance, building, sanitary sewer, and signs, may not be issued until rezoning approval is obtained x | understand that representation associated with this application on behalf of the property owner i (i.e. project coordinator, potential property owner, agent, or other such representative) shall be binding | ee x | have read the provisions of O.C.G.A. 36-67A as required regarding Campaign Disclosures; my signed Campaign Disclosure report is included with this application _JASON BRISTER, ON BEHALF OF THE Vd, PARE EN TaD ae a property owner, respectfully petition that this property as described in | this application be considered for a change in zoning from GC XR2_ to —PUD__. f acknowledge and fully understand all above staternents made by the City of Douglasville. | hereby certify that all information provided hereinjis true and correct, é La ¥ (26/22 Property Signature Date : ate | Cad 6 | Pous lec Meno CR Duckie GA Sosy (YA¢) TSB_- 2543 | Address City Slate Zip Phone if applic 3) KENWOOD. FEC: as i Attorhey/Agent Signature == Date Ye ie | 350 RESEARCH COURT, STE 200 PEACHTREE CORNERS, GA 30092 | | Address City State Zip Phone = ¥ es Sworn and subscribed beforenfe = expres 9, 4, ae rey City of Douglasville | Community Development Department | 6701 Church St, Douglasville, GA 30134 | Rezoning Application Packet Rev. TRY Pgge59 of 334 1-=17p POET apg: rman Rae 350 Research Ct, Ste. 200, Peachtree Corners, Georgia 30092  48 Atlanta Street, Marietta, Georgia 30060 Main: (770) 451-2741  Fax: (770) 451-3915 www.pecatl.com 4/29/2022 City of Douglasville 6695 Church St Douglasville, GA 30134 Re: Applicant Responses Veterans Memorial Highway @ Whitley Drive ± 16.4 Acres Planners and Engineers Collaborative, Inc. Project No. 20273.00A Dear Planning and Zoning officials, Below are responses to the zoning questions listed on Page 11 of the Rezoning Packet. 1. Is the proposed amendment consistent with the purpose and intent of this UDO as stated under Article I, Introductory Provisions? The proposed amendment is consistent with the purpose and intent of the City of Douglasville UDO as stated under Article I, Introductory Provisions. The proposed development is a mixed-residential, single-family detached and attached subdivision with ample open space provided that will promote the orderly and beneficial development and expansion of the city, and advance the health, safety, morals and welfare of the City of Douglasville. 2. Does the proposed amendment further or is it compatible with the purpose and intent of the most recent comprehensive plan? Yes. The Future Land Use map in the City of Douglasville 2024 Comprehensive Plan identifies this 16-acre parcel as ‘Mixed Use Design’. The mixed use future land use designation is intended to encourage the best possible site plan and building arrangements under a unified plan of development. The mixed use design concept is intended to ensure the provision of park and recreation land, and facilities for the use of occupants of the development. The mixed-use design designation requires at least two types of land uses that are otherwise not allowed together, or at least two types of residential density. The mixed use design concept is meant to be a relatively large-scale project on a site of ten acres or more. The proposed project completely meets the intent of the future land use designation and addresses the planning concerns that will advance the objectives of the comprehensive plan. The project proposes three types of residential density in one master-planned subdivision 3. Is the proposed amendment required to adequately address new or changing conditions or to properly implement the most recent comprehensive plan? The proposed development is fully supported by the comprehensive plan. This area is experiencing growth in a variety of sectors which is evident by the mix of uses emerging around the site. This proposal would contribute to the mixed context that is being guided by the comprehensive plan. 4. Does the proposed amendment reasonably promote the public health, safety, or general welfare? Yes, the PUD zoning district would strike a balance between rational land use, creating an engaging and unique residential development where people can live, play, and have access to nearby uses, and an economically viable development. Many zoning districts allow only one type of use to be constructed, where the PUD allows for a balance of product types. The feasibility of larger scale projects depends on a variety of Project No. 20273.00A 4/29/2022 2 product types and balancing their location on the site. Doing this gives a variation of price points and community residents. In this way, the proposed development is not only feasible from an economic standpoint, it also is the best land use that would further the intent of the comprehensive plan and would contribute to the mix of uses developing in this area. 5. Will the proposed use cause an unsafe increase in traffic congestion in the surrounding area? A traffic study is currently underway for the site and the development proposal. It is not anticipated that the proposed use will cause an unsafe increase in traffic congestion in the surrounding area. 6. Are nearby railroad crossings adequate to safely handle any resulting increases in heavy trucks and heavy equipment? The site is not expected to generate heavy trucks or equipment on a regular basis outside of those required for land disturbance and construction. 7. Will the proposed use generate unreasonable pollution or negative environmental effects, including but not limited to dust, noise, contamination of surface water or water table, or unreasonable level of light at night? The proposed use will not generate unreasonable pollution or negative environmental effects. Dust, noise, and light will be limited to the land disturbance phase, and even then, the scale of the development will not yield critical disturbances. The site plan also includes water treatment and runoff reduction ponds that will maintain good water quality on-site. 8. Will the proposed use generate unreasonable levels of vibration which may damage structures or business operations in the surrounding area? The proposed use will not generate unreasonable levels of vibration at any time. 9. Will the effects of the proposed use cause or contribute to the devaluation of property in the surrounding area for future use of the property as currently zoned or used? No. The majority of the surrounding properties are already fully developed with either local commercial/institutional/office uses, or residential subdivisions. The proposed development would build on the existing residential character of the surrounding neighborhoods, to create a reasonable transition in land use intensity from the surrounding neighborhoods to said commercial uses. Existing uses will be left unaffected by the proposed development and will not suffer as a result. Home prices within the new development are expected to be on-par or compatible with surrounding home prices, so it is not expected that existing homes would be devalued as a result. 10. Will the effects of proposed use cause or contribute to devaluation of existing businesses in the surrounding area? See above response. It is not anticipated that the proposed use and development would cause or contribute to devaluation of existing businesses in the surrounding area. In fact, it is likely that the businesses will flourish with the new development, given the new rooftops and residents to support said businesses. 11. Is the proposed use consistent with existing uses and zoning of nearby property? Yes, the properties surrounding the properties are developed with a mixture of uses ranging from residential to institutional and office space. The site is a natural transition from the commercial density along Veterans Memorial and the neighboring residential uses. This site will further enhance nearby uses with a variety of lot sizes and a mixture of residents to support the school, jobs, medical center jobs, and all other commercial activity in the immediate area. Project No. 20273.00A 4/29/2022 3 12. The extent to which property values are diminished by the existing zoning restrictions; The property values are diminished under the existing GC and R-2 zoning regulations due to factors outside of the applicant’s control. The frontage of the site is zoned Commercial, and over the years, has been left underdeveloped or undeveloped due to market conditions. The rest of the parcel, long and narrow, is cut off from the Veterans Memorial frontage, leaving Pinecrest as the only vehicular access. As we have heard from the neighbors, this is not a viable point of access for any development, given the existing traffic in the area. The resulting proposal unites the frontage and the rest of the parcel, with access out onto Veterans Memorial, so as not to disturb surrounding uses. The proposed PUD district would enable the more efficient and creative use of the property. 13. The relative gain to the public, as compared to the hardship imposed upon the individual property owner; This site has a long history of attempted development, including as recently as 2019. The plans proposed previously have been rejected time and time again by the surrounding community, who has shown that they will only support high-quality projects where they can foresee some benefit to their communities. The developer has met with the neighbors and plans to work with them on the project and the proposal to ensure that it suits their needs. This can already be seen by the choices of outlet onto Veterans Memorial, and not surrounding roadways. The proposal includes high-quality, single-family homes at a density that match the surrounding subdivisions, which will contribute to—and not detract from—property values in surrounding neighborhoods. This is a win for both the public and the developer of this site. 14. The suitability of the subject property for the zoned purposes; As stated before, the R-2 zoning district limits lot sizes to be a minimum size, which is infeasible for this particular property, given the long, narrow shape. The proposal includes homes that would be built under the R-2 zoning, but on smaller lots, so that the site can be used efficiently while maintaining the character of the neighborhood, with the addition of townhomes, which are accessible to a variety of markets. 15. The length of time the property has been vacant as zoned considered in the context of land development in the area in the vicinity of the property; The site has been underutilized for years, whereas all of the surrounding properties were developed as subdivisions by at least the early 2000s (according to satellite imagery). 16. Are public services, public facilities, and utilities adequate to serve the proposed use? Yes, the public services, facilities and utilities are adequate to serve the proposed use. The site will not cause a burdensome on the above items. The site proposes a mixture of residential home sizes, which will curb the burden on local schools. Additionally, the site proposes several entrances and exits which should ease traffic concerns, but a traffic study is underway to examine these effects on the site. For fire and police services, there will be an HOA formed to help watch over the community and identify maintenance needs. The Douglasville Water and Sewer staff have noted that it is not likely there will be sewer capacity issues or complications providing water to the site, since such infrastructure already exists nearby. 17. Will the proposed use result in an over concentration of the subject use type within the area of the proposed use? No. The proposed use matches the context of existing neighborhoods and would not result in an overconcentration of residential uses. Project No. 20273.00A 4/29/2022 4 18. Will the aesthetic and architectural design of the site be compatible with the intent and requirements of the comprehensive plan, the character area study, and all applicable zoning ordinance regulations? Yes. The neighborhood will be constructed to the development standards and guidelines enumerated in the City of Douglasville UDO. The development will consist of high-quality single-family detached homes that will complement the architecture of surrounding neighborhoods. 19. Will the proposed use be compatible with adjacent properties and land uses based on consideration of the size, scale, and massing of the proposed buildings and overall site design? Yes. The proposed use and development will be compatible with adjacent properties and land uses in terms of size, scale, and massing. The site plan is high-quality and compatible with neighboring developments. Sincerely, Planners and Engineers Collaborative, Inc. Kenneth J. Wood, P.E., LEED AP President For the Firm kjw/ht DOUGLASVILLE Campaign Contribution GEORGIA = Disclosure Report Have you made, within 2 years immediately preceding the hearing for rezoning, campaign contributions aggregating $250 or more or made gifts having an aggregate value of $250 or more to the Douglasville Mayor or member of the City Council or Planning Commission who will consider the application? 0 YES XO NO If YES, you and the attorney representing you must file this disclosure report with the Zoning Division at least five (5) days prior to the scheduled public hearing. Please supply the following information, which will be considered as the required disclosure: Date Government Official Position Description Amount We certify that the fore g information is true and correct, this t day ott cb 204322 . Appticant Signature Attorney City of Douglasville | Community Development Department | 6701 Church St, Douglasville, GA 30134 | Rezoning Application Packet Rev. 7/23/19 | Page 10 STORMWATER FACILITY MAIL KIOSKCOURTYARD STORMWATER FACILITY FULL ACCESS ENTRANCE WITH DECEL 30' LANDSCAPE STRIP PLAY FIELD & PASSIVE AMENITIES CORNER GREEN 25' LANDSCAPE STRIP COURTYARD OPEN SPACE 20' FIRE ACCESS ONLY 1 2 3 4 5 6 7 8 9 10 11 1920212223 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 5253 545556575859 606162636465 66 67 68 7071 72737475 76 77 78 79 80 8182 88 87 86 85 84 83 8990919293 94959697 9899 24' PRIVATE ROAD 50' R/W 24' PRIVATE ROAD 50' R/W 24' PRIVATE ROAD 50' R/W 24' PRIVATE ROAD 50' R/W 24' PRIVATE ROAD 50' R/W 24' PRIVATE ROAD 50' R/W 20' ALLEY WITH 30' R/W COURT YARD 12131415161718 5' BLACK VINYL CHAIN LINK FENCE ALONG BUFFER EDGE 5' BLACK VINYL CHAIN LINK FENCE ALONG BUFFER EDGE 69 ZONED GC ZONED GC ZONED GC ZONED GC ZONED R2 ZONED R2 ZONED R2 ZONED PUD FIRE DEPARTMENT GATE WITH KNOX BOX LANDSCAPE AREA DOWNTOWN MULTI-USE TRAIL ALONG FRONTAGE 5' BLACK VINYL CHAIN LINK FENCE ALONG SOUTH PROPERTY LINE 5' BLACK VINYL CHAIN LINK FENCE ALONG WEST PROPERTYLINE NARNIA ZONING MASTER PLANZ1 J:\2020\2027300A\De\Concepts & Exhibits\Zoning\20273.00A-Site-Zone-3.dwg - SLinton - 4/27/2022 3:03 PM AT P: (770) 451-2741 350 RESEARCH COURT STE 200 PEACHTREE CORNERS, GA 30092 F: (770) 451-3915 WWW.PEC.PLUS Planners & Engineers Collaborative+ LAND PLANNINGSURVEYING & CONSTRUCTION CIVIL ENGINEERING ARBORISTS LANDSCAPE ARCHITECTURE + + WATER RESOURCES + + 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 KJIHGFEDCBA 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 SCALE: DATE: PROJECT: NO. DATE BY DESCRIPTION GEORGIA WEST ZONE GRID NORTH SHEET REVISIONS c This drawing is the property of Planners and Engineers Collaborative and is not to be copied in whole or in part. It is not to be used on any other project and is to be returned upon request. Planners and Engineers Collaborative. PROJECT FOR 1" = 80' 0 40 80 160 320 THIS SEAL IS ONLY VALID IF COUNTER SIGNED AND DATED WITH AN ORIGINAL SIGNATURE. GSWCC LEVEL II DESIGN PROFESSIONAL CERTIFICATION # 0000059389 EXP. 10/29/2024 20273.00A 2/2/2022 WILDWOOD PROPERTY GROUP Veterans Memorial at Whitley Drive A MASTER PLANNED MIXED RESIDENTIAL DEVELOPMENT MUNICIPALITY PROJECT # VETERANS MEMORIAL HIGHWAY AT WHITLEY DRIVE CITY OF DOUGLASVILLE ,DOUGLAS COUNTY JURISDICTION R Knowwhat'sbelow. Callbefore you dig. www.Georgia811.com N 24 HOUR CONTACT: ROB ADAMSON SITE LOCATION MAP NOT TO SCALE FEMA MAP NOT TO SCALE SITE LOCATION SITE LOCATION SITE DATA: SITE AREA 16.46 ACRES ZONING EXISTING ZONING R-2 AND GC PROPOSED ZONING PUD ZONING JURISDICTION CITY OF DOUGLASVILLE USE CALCULATIONS TOTAL SITE AREA 16.46 ACRES PROPERTY SETBACK REQUIREMENTS FRONT SETBACK 10 FEET SIDE SETBACK 20 FEET REAR SETBACK 20 FEET LANDSCAPE STRIP EAST SIDE OF PROPERTY 30 FEET LANDSCAPE STRIP WEST SIDE OF PROPERTY 25 FEET DETACHED LOT SETBACK REQUIREMENTS FRONT YARD SETBACK 20 FEET ( FRONT LOAD) / 10 FEET ( REAR LOAD) SIDE YARD SETBACK 5 FEET MAJOR SIDE YARD/SIDE STREET SETBACK 5 FEET REAR SETBACK 15 FEET (FRONT LOAD) 15 FEET ( REAR LOAD) ( 22' Driveway Min) DEVELOPMENT STANDARDS TOTAL RESIDENTIAL LOTS 99 LOTS 24' REAR LOADED ATTACHED HOMES 43 LOTS SINGLE FAMILY DETACHED REAR LOAD 37 LOTS SINGLE FAMILY DETACHED FRONT LOAD 19 LOTS TOTAL SINGLE FAMILY DETACHED LOTS 56 LOTS SITE DENSITY 6.01 LOTS/ACRE MAX. HEIGHT 3 STORIES / 40 FEET PARKING REQUIREMENTS PARKING SPACES REQUIRED 198 SPACES ( 2 SPACES/DWELLING) PARKING PROVIDED (FRONT-LOADED UNITS) 396 SPACES ( 2 SPACES DRIVE/2 GARAGE) GUEST PARKING PROVIDED 43 SPACES (41.3%) TOTAL PARKING PROVIDED 439 SPACES *1 03-27-2022 kw Neighbor Comments *2 03-31-2022 kw Staff Comments *3 04-27-2022 kw Added Fence Notes Canton Office 147 Reinhardt College Pkwy Ste. 3 Canton, GA 30114 Phone: (770) 479-9698 Marietta Office 1266 Powder Springs Rd Marietta, GA 30064 Phone: (770) 424-7168 www.gscsurvey.com LSF# 789 ENGINEERING SURVEYING PLANNING/CONSULTING CONSTRUCTION MGMT Lawrenceville Office 558 Old Norcross Rd Ste. 204 Lawrenceville, GA 30046 Phone: (770) 299-1005 PRELIMINARY FOR REVIEW ” ” ” ” ” 350 Research Ct, Ste. 200, Peachtree Corners, Georgia 30092  48 Atlanta Street, Marietta, Georgia 30060 Main: (770) 451-2741  Fax: (770) 451-3915 www.pecatl.com 4/29/2022 Re: Letter of Intent Veterans Highway and Whitley Drive Rezoning (16.4 +/- acres) PEC+ Project No. 20273.00A Dear Community Development officials, This rezoning application is being submitted on behalf of the developer and applicant. This application proposes to rezone the 16.4-acre property located at 12691, 12701, and 12711 Veterans Memorial Highway from GC and R-2 to PUD. This rezoning would facilitate the development of a new 99-unit single-family attached and detached community. Existing Conditions: The uses surrounding the property include:  North: single-family detached subdivision  East: single-family detached subdivision  South: single-family detached subdivision  West: undeveloped, some highway auto uses As it currently exists, the property is largely undeveloped, with the exception of a few low-density structures. The site is bordered by Veterans Memorial Highway to the north, Whitley Drive to the east, and Pinecrest Drive to the south. There is a 25-foot-wide landscape strip proposed along the western property line and a 30-foot wide landscape strip proposed along the eastern property line. Proposed Development The proposed development consists of 99 single-family attached and detached lots. The detached front and rear load lots would have a minimum width of 42 feet each. The single-family attached homes are a minimum of 24 feet wide with two-car garages. The proposed overall site density for the 16-acre tract is approximately 6.01 units per acre, which is in conformance with the City of Douglasville comprehensive plan. The proposed development would be accessed from Veterans Memorial Highway, with no vehicular access to Whitley Drive. There would be emergency access only along Pinecrest to the south. These access points have been informed by the comments received by the community members to the east. There would be several shared courtyards and pocket parks within the community. The proposed buildings would be buffered from the surrounding development by the substantial natural features (vegetation and streams) existing on site along the property lines. There are two stormwater facilities proposed on the site that would collect runoff during significant rain events. Zoning Rationale The proposed project completely meets the intent of the future land use designation and addresses the planning concerns that will advance the objectives of the comprehensive plan. The project is large-scale and proposes three residential products proximity to one another, including front-loaded lots, rear-loaded lots, and single-family attached homes. Additionally, the project proposes a substantial amount of parks and open space—approximately 15% of the site is set aside as ‘open space,’ and of that, over 50% would be usable, recreational space for residents of the development. Project No. 20273.00A 4/29/2022 2 In addition to the consistency with the comprehensive plan’s vision and objectives, the proposed PUD zoning matches the surrounding context of adjacent parcels. The single-family detached lots border two similar single-family detached neighborhoods that are also zoned PUD and R-2. The most dense portion of the site, the attached homes, would be located along the Veterans Memorial Frontage. The plan is similar in density to other recently approved developments in the vicinity, including multi-family housing and townhomes. The proposed layout is designed to create a rational transition between the more intense uses that the future land use map identifies for the parcels to the west along Veterans Memorial, and the slightly lower-density residential uses to the east of the site. The proposed site plan will also create new residences in close proximity to Downtown Douglasville, further to the east. Conclusion The applicant and owner respectfully request that the City of Douglasville City Council, Planning Commission and Planning Staff approve and support the Applicant’s rezoning request to allow for the rezoning of this property from GC and R-2 to PUD. This would facilitate the development of a new, single-family attached and detached community that would contribute to the advancement of the purpose and intent of the City of Douglasville comprehensive plan. The developer and their representatives welcome the opportunity to meet with all interested parties and representatives. Sincerely, Planners and Engineers Collaborative, Inc. Kenneth J. Wood, P.E., LEED AP President 350 Research Ct, Ste. 200, Peachtree Corners, Georgia 30092  48 Atlanta Street, Marietta, Georgia 30060 Main: (770) 451-2741  Fax: (770) 451-3915 www.pecatl.com 3/27/2022 Re: Proposed Conditions of Zoning Veterans Memorial Highway at Pinecrest Drive – Rezoning Planned Unit Development 16.43 Acres – Residential Mixed Project PEC+ Project No. 20273.00A Dear Community Development Department, City of Douglasville Planning Commission and City Council: See below the proposed conditions of zoning that shall be associated with proposed rezoning request from R-2 & GC to PUD (Planned Unit Development) for the above referenced project. Based on multiple meetings with the surrounding neighborhoods we offer the following additional zoning conditions to be made part of the rezoning application for the land: 1. The site plan will be developed in general conformance to the site plan submitted to city staff dated March 27, 2022 based on final design with site topography and constraints. 2. Sidewalk to be constructed along all frontages of the development. Where damaged or in poor condition, we will replace the existing 4’ sidewalk along the western side of Whitley Drive to corner of Pinecrest Drive. 3. Applicant to work with the City of Douglasville Public Works department to help and assist the city with recommendations on where the city can install traffic calming speed tables along Whitley Drive for cut through traffic and “no parking” signs near the corner of Whitley Drive and the existing funeral home. 4. A mandatory HOA will be established and set up by the builder to be taken over once the project is fully sold out. 5. The rental restriction for the HOA is to be capped at a maximum of 10% of the homes at all times. 6. Minimum SF of the homes is to be 1,600 sf and up for townhomes and 2,000 sf for detached homes. 7. Elevations are to be all cementitious material and consist of a combination of brick, stone, shake, hardy panels, hardy plank or real stucco. No vinyl siding or synthetic stucco is allowed on the homes. Elevations are conceptual as shown, final elevations to be submitted to the city. 8. There shall be a 5’ black vinyl chain link or 5’ privacy fence along the property line of the eastern side that abuts the single family homes, the south side where the pond is located, and the western commercially zoned property. 9. The minimum lot size for single family detached allowed in the development is 4,200 sf. And 41 feet in width for the single family detached lots. 10. All open space, setbacks, and lot dimensions are defined on the attached site plan dated March 27, 2022. . 11. There will be a 30-foot replanted landscape strip along the eastern border with the R-2 properties and a 25’ replanted landscape strip along the western side to the GC property. Project No. 20273.00A Veterans 4/28/2022 2 12. The project is to obtain a permit from Georgia DOT for the entrance on Veterans Memorial Highway. 13. The homes along Pinecrest Drive are to be set back from the edge of pavement at least 50 feet. 14. Right of Way dedication along Whitley Drive to obtain 25’ from centerline of existing roadway. 15. Project is to comply with providing the multi-use trail from the corner of Whitley and Veterans Memorial to our entrance on Veterans per the City of Douglasville trail map. 16. Stormwater for the site will follow City of Douglasville stormwater latest standards at time of permitting. 17. Lighting will be required along the external public road frontages as required by City of Douglasville Code. TRACT ONE SURVEYED PROPERTY DECSRIPTION ALL that tract or parcel of land lying and being in Land Lot 192, 2nd District, 5th Section, City of Douglasville, Douglas County, Georgia and being more particularly described as follows: COMMENCING at an iron pin set (#4rebar) where the southeasterly right of way margin of Bankhead Highway also known as Veterans Memorial Highway (80' Right of Way) intersects the westerly right of way margin of Whitley Drive (40' Right of Way), said point being the TRUE POINT OF BEGINNING; THENCE in a southerly direction along the westerly right of way margin of Whitley Drive along a curve to the right an arc distance of 196.38 feet, having a radius of 618.24 feet, and being subtended by a chord of South 08 degrees 55 minutes 10 seconds East for a distance of 195.55 feet to a point; THENCE continuing along the westerly right of way margin of Whitley Drive South 00 degrees 10 minutes 49 seconds West for a distance of 263.15 feet to an axle found; THENCE departing the westerly right of way margin of Whitley Drive North 89 degrees 28 minutes 08 seconds west for a distance of 176.63 feet to a 1” open top pipe found; open top pipe found; THENCE South 00 degrees 40 minutes 44 seconds West for a distance of 159.21 feet to a 1” open top pipe found; open top pipe found; THENCE South 00 degrees 30 minutes 47 seconds West for a distance of 119.67 feet to a 1” open to pipe found; open to pipe found; THENCE South 01 degrees 05 minutes 37 seconds East for a distance of 270.23 feet to a 1” crimp top pipe found; crimp top pipe found; THENCE South 00 degrees 52 minutes 48 seconds West for a distance of 175.89 feet to an iron pin set (#4 rebar) on the northwesterly right of way margin of Pinecrest Drive (50' Right of Way); THENCE in a southwesterly direction along the northwesterly right of way margin of Pinecrest Drive along a curve to the left an arc distance of 46.36 feet, having a radius of 222.53 feet, and being subtended by a chord of South 63 degrees 04 minutes 56 second West for a distance of 46.27 feet to a point; THENCE continuing along the northwesterly right of way margin of Pinecrest Drive South 57 degrees 08 minutes 47 seconds West for a distance of 55.16 feet to a point; THENCE continuing along the northwesterly right of way margin of Pinecrest Drive South 54 degrees 19 minutes 41 seconds West for a distance of 122.04 feet to an iron pin set (#4 rebar); THENCE departing the northwesterly right of way margin of Pinecrest Drive South 85 degrees 04 minutes 38 seconds West for a distance of 399.90 feet to a standing rock found; THENCE North 00 degrees 51 minutes 19 seconds West for a distance of 985.71 feet to an iron pin set (#4 rebar) on the southeasterly right of way margin of Bankhead Highway also known as Veterans Memorial Highway (80' Right of Way); THENCE in a northeasterly direction along the southeasterly right of way margin of Bankhead Highway also known as Veterans Memorial Highway North 64 degrees 53minutes 13 seconds East for a distance of 825.55 feet to an iron pin set (#4rebar) where the southeasterly right of way margin of Bankhead Highway also known as Veterans Memorial Highway (80' Right of Way) intersects the westerly right of way margin of Whitley Drive (40' Right of Way) and the TRUE POINT OF BEGINNING. Said tract of land contains 16.46 acres (716,815 sq. ft.) more or less. TRACT TWO SURVEYED PROPERTY DECSRIPTION ALL that tract or parcel of land lying and being in Land Lot 192, 2nd District, 5th Section, City of Douglasville, Douglas County, Georgia and being more particularly described as follows: COMMENCING at an iron pin found (#4 rebar) on the southeasterly right of way margin of Pinecrest Drive (50' Right of Way) and the north line of Lot 7 of Parkside Subdivision as recorded in Plat Book 21 Page 7, Douglas County records and having state plane coordinates of North-1361950.93, East 2115819.02, said iron pin being the TRUE POINT OF BEGINNING; THENCE in a northeasterly direction along the southeasterly right of way margin of Pinecrest Drive North 54 degrees 19 minutes 41 seconds East for a distance of 36.78 feet to a point; THENCE continuing along the southeasterly right of way margin of Pinecrest Drive North 57 degrees 06 minutes 57 seconds East for a distance of 53.94 feet to a point; THENCE continuing along the southeasterly right of way margin of Pinecrest Drive along a curve to the right an arc distance of 15.39 feet, having a radius of 169.79 feet, and being subtended by a chord of North 59 degrees 39 minutes 56 seconds East for a distance of 15.39 feet to an iron pin set (#4 rebar); THENCE departing the southeasterly right of way margin of Pinecrest Drive South 01 degrees 01 minutes 07 seconds West for a distance of 34.23 feet to a 1/2” open top pipe found on the north line of Lot 7 of Parkside Subdivision; open top pipe found on the north line of Lot 7 of Parkside Subdivision; THENCE along the north line of Lot 7 of Pinecrest Subdivision South 74 degrees 34 minutes 09 seconds West for a distance of 91.13 feet to an iron pin found (#4 rebar) on the southeasterly right of way margin of Pinecrest Drive and the TRUE POINT OF BEGINNING. Said tract of land contains 0.04 acres (1592 sq. ft) more or less. Printed: 02/24/2022 13:01:55 PM Of?cial Tax Receipt Douglas County, GA 8700 Hospital Drive Douglasville, 30134 --0nline Receipt-- Property ID / District Original Interest & Description Due Penalty $19.71 Trans No 2021 - HSE/NV HSE/0.99 ACRE, 8006690 WEST BROAD STREET $126049 Fees: $35.00 Totals: $1,260.49 $54.71 Amount Due $1,315.20 $1,315.20 Phone: 770-920-7272 Amount Paid $0.00 $0.00 Charge Amount: $0.00 BRISTER, HARRIET F. ESTATE PO. BOX 506 Scan this code with your BRISTER, HARRIET F. ESTATE mobile phone to View this Transaction Balance $1,315.20 $1,315.20 Printed: 02/24/2022 13:03:09 PM Of?cial Tax Receipt Douglas County, GA 8700 Hospital Drive Douglasville, 30134 --0nline Receipt-- Property ID / District Original Interest & Amount Description Due Penalty Due $5.49 2021 — V/0.83 ACRE, WHITLEY 8006686 DRIVE 5351-85 Fees: $392.34 $35.00 Totals: $351.85 $40.49 $392.34 Trans No Phone: 770-920-7272 Amount Paid $0.00 $0.00 Charge Amount: $0.00 BRISTER, HARRIET F. ESTATE P 0 BOX 506 Scan this code with your BRISTER, HARRIET F. ESTATE mobile phone to View this Transaction Balance $392.34 $392.34 Printed: 02/24/2022 13:05:23 PM Of?cial Tax Receipt Douglas County, GA 8700 Hospital Drive Douglasville, 30134 --Online Receipt-- Property ID / District Original Interest & Description Due Penalty $7.26 Trans No 2021 - V/0.41 ACRE, WEST BROAD $464 25 8006687 ST @ WHITELY DR ' Fees: $35.00 Totals: $464.25 $42.26 Amount Due $506.51 $506.51 Phone: 770-920-7272 Amount Paid $0.00 $0.00 Charge Amount: $0.00 BRISTER, HARRIET F. ESTATE PO. BOX 506 Scan this code with your BRISTER, HARRIET F. ESTATE mobile phone to View this Transaction Balance $506.51 $506.51 Printed: 02/24/2022 13:05:31 PM Of?cial Tax Receipt Douglas County, GA 8700 Hospital Drive Douglasville, 30134 --Online Receipt-- Property ID / District Original Interest & Amount Description Due Penalty Due $7.77 2021 — V/LOT, WEST BROAD 8006688 STREET 53496-83 Fees: $539.60 $35.00 Totals: $496.83 $42.77 $539.60 Trans No Phone: 770-920-7272 Amount Paid $0.00 $0.00 Charge Amount: $0.00 BRISTER, HARRIET F. ESTATE PO. BOX 506 Scan this code with your BRISTER, HARRIET F. ESTATE mobile phone to View this Transaction Balance $539.60 $539.60 Printed: 02/24/2022 13:07:29 PM Of?cial Tax Receipt Douglas County, GA 8700 Hospital Drive Douglasville, 30134 --Online Receipt-- Property ID / District Original Interest & Description Due Penalty $22.05 Trans No 2021 - HSE/0.92 ACRE, WEST 8006689 BROAD STREET $141068 Fees: $35.00 Totals $1,410.68 $57.05 Amount Due $1,467.73 $1,467.73 Phone: 770-920-7272 Amount Paid $0.00 $0.00 Charge Amount: $0.00 BRISTER, HARRIET F. ESTATE P 0 BOX 506 Scan this code with your Transaction Balance $1,467.73 $1,467.73 Printed: 02/24/2022 13:10:33 PM Of?cial Tax Receipt Douglas County, GA 8700 Hospital Drive Douglasville, 30134 --0nline Receipt-- Property ID / District Original Interest & Description Due Penalty $42.87 Trans No 2021 - HSE(NV)/13.00 ACRES +, W 8006691 BROAD STREET $234317 Fees: $35.00 Totals: $2,743.17 $77.87 Amount Due $2,821.04 $2,821.04 Phone: 770-920-7272 Amount Paid $0.00 $0.00 Charge Amount: $0.00 BRISTER, HARRIET F. ESTATE PO. BOX 506 Sean this code with your BRISTER, HARRIET F. ESTATE mobile phone to View this Transaction Balance $2,821.04 $2,821.04 T RAFFIC I M P A C T STUDY FOR RESIDENTIAL DE V E L O P M E N T O N VE T E R A N S ME M O R I A L HIGHWAY IN CITY OF D O U G L A S V I L L E , GEORGIA Prepared for: Planners and Engineers Collaborative 350 Research Court Peachtree Corners, GA 30092 Prepared By: March 10, 2022 A & R Project # 22-025 A&R Engineering Inc. 2160 Kingston Court, Suite O Marietta, GA 30067 Tel: (770) 690-9255 Fax: (770) 690-9210 www.areng.com T A B L E O F C O N T E N T S I t e m P a g e 1.0 Introduction ...........................................................................................................................1 2.0 Existing Facilities / Conditions .................................................................................................4 2.1 Roadway Facilities.........................................................................................................................4 2.1.1 Veterans Memorial Highway ....................................................................................................4 2.1.2 West Strickland Street ..............................................................................................................4 2.1.3 Cedar Mountain Road...............................................................................................................4 2.1.4 Whitley Drive ............................................................................................................................4 2.1.5 Pinecrest Drive ..........................................................................................................................4 3.0 Study Methodology ................................................................................................................5 3.1 Unsignalized Intersections............................................................................................................5 3.2 Signalized Intersections ................................................................................................................6 4.0 Existing 2022 Traffic Analysis...................................................................................................7 4.1 Existing Traffic Volumes................................................................................................................7 4.2 Existing Traffic Operations............................................................................................................9 5.0 Proposed Development.........................................................................................................11 5.1 Trip Generation...........................................................................................................................13 5.2 Trip Distribution..........................................................................................................................13 6.0 Future 2024 Traffic Analysis ..................................................................................................15 6.1.1 Future “No-Build” Conditions.................................................................................................15 6.1.2 Annual Traffic Growth.............................................................................................................15 6.2 Future “Build” Conditions...........................................................................................................15 6.3 Auxiliary Lane Analysis................................................................................................................18 6.3.1 Left Turn Lane Analysis ...........................................................................................................18 6.3.2 Deceleration Turn Lane Analysis.............................................................................................18 6.4 Future Traffic Operations............................................................................................................19 7.0 Conclusions and Recommendations.......................................................................................23 7.1 Recommendation for Site Access Configuration ........................................................................23 Appendix L I S T O F T A B L E S I t e m P a g e Table 1 – Level-of-service Criteria for Unsignalized Intersections................................................................5 Table 2 – Level-of-service Criteria for Signalized Intersections....................................................................6 Table 3 – Existing Intersection Operations...................................................................................................9 Table 4 – Trip Generation ...........................................................................................................................13 Table 5 - GDOT Requirements for Left Turn Lanes.....................................................................................18 Table 6 - GDOT Requirements for Deceleration Lanes...............................................................................18 Table 7 – Future Intersection Operations...................................................................................................19 Table 9 - Future Intersection Operations with Traffic Signal………………………………………….……………………….20 L I S T O F F I G U R E S I t e m P a g e Figure 1 – Location Map................................................................................................................................3 Figure 2 – Existing Weekday Peak Hour Volumes.........................................................................................8 Figure 3 – Existing Traffic Control and Lane Geometry ..............................................................................10 Figure 4 – Site Plan......................................................................................................................................12 Figure 5 – Outer Leg Trip Distribution and Site Generated Peak Hour Volumes........................................14 Figure 6 – Future (No-Build) Peak Hour Volumes.......................................................................................16 Figure 7 – Future (Build) Peak Hour Volumes.............................................................................................17 Figure 8 – Future Traffic Control and Lane Geometry (Unsignalized) ........................................................21 Figure 8b - Future Traffic Control and Lane Geometry (Signalized)………………………………………………………..22 A&R Engineering Inc. 1.0 I N T R O D U C T I O N The purpose of this study is to determine the traffic impact from the proposed residential development located on Veterans Memorial Highway in City of Douglasville, Georgia. The traffic analysis evaluates the current operations and future conditions with the traffic generated by the development. The proposed development will consist of: • Single-Family Attached Housing: 55 units • Single-Family Detached Housing: 49 units The development proposes access at the following location: • Site Driveway 1: Full-access driveway on Veterans Memorial Highway aligning with Cedar Mountain Road A&R Engineering Inc. The AM and PM peak hours have been analyzed in this study. In addition to the site access points, this study includes the evaluation of traffic operations at the intersections of: • West Strickland Street at Cedar Mountain Road • Veterans Memorial Highway at Cedar Mountain Road • Veterans Memorial Highway at Whitley Drive • Whitley Drive at Pinecrest Drive Recommendations to improve traffic operations have been identified as appropriate and are discussed in detail in the following sections of the report. The location of the development and the surrounding roadway network is shown in Figure 1. SITE Fairways Dr Roselake Cir Roselake Cir Rose Ave Rose Ave Selman Dr Pinecrest Dr Whitley Dr Morningside Ct Pinecrest Dr Bill Arp Rd W.Strickland St W.Strickland St Ashley Fls Ct Timberlane Dr Timberlane Dr Cedar Forest Dr Cedar Mountain Rd Pounds Cir Braylen Manor Dr Hillspire Dr Glenview St Creek Pl Crystal Branch Crossing Way Chicago Ave James D. Simpson Ave 3 LOCATION MAP FIGURE 1 A&R Engineering Inc. Study Intersections 1 3 2 A&R Engineering Inc. 2.0 E X I S T I N G F A C I L I T I E S / C O N D I T I O N S 2.1 Roadway Facilities The following is a brief description of each of the roadway facilities located in proximity to the site: 2.1.1 Veterans Memorial Highway Veterans Memorial Highway is an east-west, two-lane, undivided roadway with a posted speed limit of 35 mph in the vicinity of the site. Georgia Department of Transportation (GDOT) traffic counts (Station ID’s 097-0021 & 097-0023) indicate that the daily traffic volume on Veterans Memorial Highway in 2019 was 11,100 vehicles per day, northeast of Whitely Drive and 12,300 vehicles per day, northeast of Club Drive. GDOT classifies Veterans Memorial Highway as an Urban Minor Arterial roadway. 2.1.2 West Strickland Street West Strickland Street is an east-west, two-lane, undivided roadway and posted with a speed limit of 35 mph in the vicinity of the site. 2.1.3 Cedar Mountain Road Cedar Mountain Road is a north-south, two-lane, undivided roadway and posted with a speed limit of 25 mph in the vicinity of the site. 2.1.4 Whitley Drive Whitley Drive is a north-south, two-lane, undivided roadway and posted with a speed limit of 30 mph in the vicinity of the site. 2.1.5 Pinecrest Drive Pinecrest Drive is an east-west, two-lane, undivided roadway with a posted speed limit of 30 mph in the vicinity of the site. A&R Engineering Inc. 3.0 S T U D Y M E T H O D O L O G Y In this study, the methodology used for evaluating traffic operations at each of the subject intersections is based on the criteria set forth in the Transportation Research Board’s Highway Capacity Manual, 6th edition (HCM 6). Synchro software, which utilizes the HCM methodology, was used for the analysis. The following is a description of the methodology employed for the analysis of unsignalized and signalized intersections. 3.1 Unsignalized Intersections For unsignalized intersections controlled by a stop sign on minor streets, the level-of-service (LOS) for motor vehicles with controlled movements is determined by the computed control delay according to the thresholds stated in Table 1 below. LOS is determined for each minor street movement (or shared movement), as well as major street left turns. LOS is not defined for the intersection as a whole or for major street approaches. The LOS of any controlled movement which experiences a volume to capacity ratio greater than 1 is designated as “F” regardless of the control delay. Control delay for unsignalized intersections includes initial deceleration delay, queue move-up time, stopped delay, and final acceleration delay. Several factors affect the control delay for unsignalized intersections, such as the availability and distribution of gaps in the conflicting traffic stream, critical gaps, and follow-up time for a vehicle in the queue. Level-of-service is assigned a letter designation from “A” through “F”. Level-of-service “A” indicates excellent operations with little delay to motorists, while level-of-service “F” exists when there are insufficient gaps of acceptable size to allow vehicles on the side street to cross the main road without experiencing long total delays. Table 1 – Level-of-service Criteria for Unsignalized Intersections Control Delay (sec/vehicle) LOS by Volume-to-Capacity Ratio* v/c ≤ 1.0 v/c ≥ 1.0 ≤ 10 A F > 10 and ≤ 15 B F > 15 and ≤ 25 C F > 25 and ≤ 35 D F > 35 and ≤ 50 E F > 50 F F *The LOS criteria apply to each lane on a given approach and to each approach on the minor street. LOS is not calculated for major-street approaches or for the intersection. Source: Highway Capacity Manual, 6th edition, Exhibit 20-2 LOS Criteria: Motorized Vehicle Mode A&R Engineering Inc. 3.2 Signalized Intersections According to HCM procedures, LOS can be calculated for the entire intersection, each intersection approach, and each lane group. HCM uses control delay alone to characterize LOS for the entire intersection or an approach. Control delay per vehicle is composed of initial deceleration delay, queue move-up time, stopped delay, and final acceleration delay. Both control delay and volume-to-capacity ratio is used to characterize LOS for a lane group. A volume-to-capacity ratio of 1.0 or more for a lane group indicates failure from capacity perspective. Therefore, such a lane group is assigned LOS F regardless of the amount of control delay. Table 2 below summarizes the LOS criteria from HCM for motorized vehicles at signalized intersection. Table 2 – Level-of-service Criteria for Signalized Intersections Control Delay (sec/vehicle) * LOS for Lane Group by Volume-to-Capacity Ratio* v/c ≤ 1.0 v/c ≥ 1.0 ≤ 10 A F > 10 and ≤ 20 B F > 20 and ≤ 35 C F > 35 and ≤ 45 D F > 55 and ≤ 80 E F > 80 F F *For approach-based and intersection wide assessments, LOS is defined solely by control delay Source: Highway Capacity Manual, 6th edition, Exhibit 19-8 LOS Criteria: Motorized Vehicle Mode LOS A is typically assigned when the volume-to-capacity (v/c) ratio is low and either progression is exceptionally favorable, or the cycle length is very short. LOS B is typically assigned when the v/c ratio is low and either progression is highly favorable, or the cycle length is short. However, more vehicles are stopped than with LOS A. LOS C is typically assigned when progression is favorable, or the cycle length is moderate. Individual cycle failures (one or more queued vehicles are not able to depart because of insufficient capacity during the cycle) may begin to appear at this level. Many vehicles still pass through the intersection without stopping, but the number of vehicles stopping is significant. LOS D is typically assigned when the v/c ratio is high and either progression is ineffective, or the cycle length is long. There are many vehicle-stops and individual cycle failures are noticeable. LOS E is typically assigned when the v/c ratio is high, progression is very poor, the cycle length is long, and individual cycle failures are frequent. LOS F is typically assigned when the v/c ratio is very high, progression is very poor, the cycle length is long, and most cycles fail to clear the queue. A&R Engineering Inc. 4.0 E X I S T I N G 2 0 2 2 T R A F F I C A N A L Y S I S 4.1 Existing Traffic Volumes Existing traffic counts were obtained at the following study intersections: • West Strickland Street at Cedar Mountain Road • Veterans Memorial Highway at Cedar Mountain Road • Veterans Memorial Highway at Whitley Drive • Whitley Drive at Pinecrest Drive Turning movement counts were collected on 10th Thursday, February 2022. All turning movement counts were recorded during the AM and PM peak hours between 7:00am to 9:00am and 4:00pm to 6:00pm, respectively. The four consecutive 15-minute interval volumes that summed to produce the highest volume at the intersections were then determined. These volumes make up the peak hour traffic volumes for the intersections counted and are shown in Figure 2. Pinecrest Dr Whitley Dr W.Strickland St W.Strickland St Cedar Mountain Rd Pinecrest Dr SITE 1 2 3 4 Veterans Memorial Way Veterans Memorial Way 8 EXISTING WEEKDAY PEAK-HOUR VOLUMES A&R Engineering Inc. (AM) PM FIGURE 2 (238) 489 (2) 7 (74) 54 (376) 428 (5) 9 (36) 41 (37) 51 (2) 4 (4) 2 (1) 3(4) 1 (76) 48 (29) 86 (234) 444 (337) 384 (43) 114 (101) 120 (120) 98 (6) 7 (17) 25 (54) 67 (53) 50 (20) 20 (4) 13 (8) 7 (129) 101 (5) 8 (27) 63 (32) 99 (13) 38 A&R Engineering Inc. 4.2 Existing Traffic Operations Existing 2022 traffic operations were analyzed at the study intersections in accordance with the HCM methodology. The results of the analyses are shown in Tables 3, the existing traffic control and lane geometry for the intersections are shown in Figure 3. Table 3 – Existing Intersection Operations Intersection Traffic Control LOS (Delay) AM Peak Hour PM Peak Hour 1 West Strickland Street @ Cedar Mountain Road -Eastbound Approach -Westbound Approach -Northbound Approach -Southbound Approach Stop Controlled on All Approaches except NB Approach A (8.1) A (7.6) A (8.2) A (7.7) A (8.4) A (8.9) A (8.3) A (9.0) A (9.3) A (8.7) 2 Veterans Memorial Highway @ Cedar Mountain Road -Eastbound Left -Southbound Approach Stop Controlled on SB Approach A (7.9) C (19.7) A (9.2) F (61.1) 3 Veterans Memorial Highway @ Whitley Drive -Westbound Left -Northbound Approach Stop Controlled on NB Approach A (8.3) B (14.6) A (8.5) C (21.7) 4 Pinecrest Drive @ Whitley Drive -Eastbound Approach -Westbound Approach -Southbound Approach Stop Controlled on All Approaches A (7.4) A (7.3) A (6.8) A (7.7) A (7.2) A (7.3) A (6.8) A (7.6) The results of existing traffic operations analysis indicate that all the study intersections are operating at level of service “C” or better in both the AM and PM peak hours, except the southbound approach of the intersection Veterans Memorial Highway at Cedar Mountain Road is operating at level of service “F” in the PM peak hour. These areas are addressed in the Future Traffic Operation section. Pinecrest Dr Whitley Dr W.Strickland St W.Strickland St Cedar Mountain Rd Pinecrest Dr SITE 1 2 3 4 Veterans Memorial Way Veterans Memorial Way 10 EXISTING TRAFFIC CONTROL AND LANE GEOMETRY A&R Engineering Inc. FIGURE 3 Existing Lane Geometry Ex STOP Existing Signed Approach Ex Existing Traffic Signal LEGEND STOP Ex STOP Ex STOP Ex STOP Ex STOP STOP Ex STOP STOP A&R Engineering Inc. 5.0 P R O P O S E D D E V E L O P M E N T The development will consist of: • Single-Family Attached Housing: 55 units • Single-Family Detached Housing: 49 units The development proposes access at the following location: • Site Driveway 1: Full-access driveway on Veterans Memorial Highway aligning with Cedar Mountain Road A site plan is shown in Figure 4. FIGURE 4 A&R Engineering Inc. SITE PLAN 12 A&R Engineering Inc. 5.1 Trip Generation Trip generation estimates for the project were based on the rates and equations published in the 11th edition of the Institute of Transportation Engineers (ITE) Trip Generation report. This reference contains traffic volume count data collected at similar facilities nationwide. The trip generation was based on the following ITE Land Uses: 215-Single-Family Attached Housing and 210- Single-Family Detached Housing. The calculated total trip generation for the proposed development is shown in Table 4. Table 4 – Trip Generation Land Use Size AM Peak Hour PM Peak Hour 24 Hour Enter Exit Total Enter Exit Total Two-way ITE 215 –Single-Family Attached Housing 55 Units 7 16 23 16 13 29 369 ITE 210 –Single-Family Detached Housing 49 Units 10 29 39 32 19 51 523 New External Trips 17 45 62 48 32 80 892 5.2 Trip Distribution The trip distribution describes how traffic arrives and departs from the site. An overall trip distribution was developed for the site based on a review of the existing travel patterns in the area and the locations of major roadways and highways that will serve the development. The site-generated peak hour traffic volumes, shown in Table 4, were assigned to the study area intersections based on this distribution. The outer-leg distribution and AM and PM peak hour new traffic generated by the site are shown in Figure 5. Pinecrest Dr Whitley Dr W.Strickland St W.Strickland St Cedar Mountain Rd Pinecrest Dr SITE 1 2 3 4 Veterans Memorial Way Veterans Memorial Way 14 A&R Engineering Inc. TRIP DISTRIBUTION AND SITE-GENERATED WEEKDAY PEAK HOUR VOLUMES (AM) PM FIGURE 5 (0) 0 (0) 0 (0) 0 (0) 0(0) 0 (0) 0 (1) 1 (1) 1 (2) 2 (0) 1 (1) 1 (1) 2 (7) 5 (5) 3 (34) 24 (2) 5 (3) 7 (13) 36 (34) 24 (13) 36 A&R Engineering Inc. 6.0 F U T U R E 202 4 T R A F F I C A N A L Y S I S The future 2024 traffic operations are analyzed for the “Build” and “No-Build” conditions. 6.1.1 Future “No-Build” Conditions The “No-Build” (or background) conditions provide an assessment of how traffic will operate in the study horizon year without the study site being developed as proposed, with projected increases in through traffic volumes due to normal annual growth. The Future “No-Build” volumes consist of the adjusted existing traffic volumes (Figure 3) plus increase in annual growth of through traffic. 6.1.2 Annual Traffic Growth In order to evaluate future traffic operations in this area, a projection of normal traffic growth was applied to the existing volumes. The Georgia Department of Transportation recorded average daily traffic volumes at several locations in the vicinity of the site. Reviewing the growth over the last three years revealed growth of approximately 1% in the area. This growth factor was applied to the existing traffic volumes between collector and arterial roadways in order to estimate the future year traffic volumes prior to the addition of site-generated traffic. The resulting Future “No-Build” volumes on the roadway are shown in Figure 5. 6.2 Future “Build” Conditions The “Build” or development conditions include the estimated background traffic from the “No-Build” conditions plus the added traffic from the proposed development. In order to evaluate future traffic operations in this area, the additional traffic volumes from the site (Figure 5) were added to base traffic volumes (Figure 6) to calculate the future traffic volumes after the construction of the development. These total future “Build” traffic volumes are shown in Figure 7. Pinecrest Dr Whitley Dr W.Strickland St W.Strickland St Cedar Mountain Rd Pinecrest Dr SITE 1 2 3 4 Veterans Memorial Way Veterans Memorial Way 16 A&R Engineering Inc. FUTURE (NO-BUILD) WEEKDAY PEAK HOUR VOLUMES (AM) PM FIGURE 6 (243) 499 (2) 7 (75) 55 (384) 437 (5) 9 (37) 42 (38) 52 (2) 4 (4) 2 (1) 3(4) 1 (78) 49 (30) 88 (239) 453 (344) 392 (44) 116 (103) 122 (122) 100 (6) 7 (17) 26 (55) 68 (54) 51 (20) 20 (4) 13 (8) 7 (132) 103 (5) 8 (28) 64 (33) 101 (13) 39 Pinecrest Dr Whitley Dr W.Strickland St W.Strickland St Cedar Mountain Rd Pinecrest Dr SITE 1 2 3 4 Veterans Memorial Way Veterans Memorial Way 17 FUTURE (BUILD) WEEKDAY PEAK HOUR VOLUMES A&R Engineering Inc. (AM) PM FIGURE 7 (256) 535 (2) 7 (75) 55 (418) 461 (5) 9 (37) 42 (38) 52 (2) 4 (4) 2 (1) 3(4) 1 (78) 49 (30) 88 (239) 453 (13) 36 (344) 392 (3) 7 (44) 116 (103) 122 (2) 5 (122) 100 (34) 24 (5) 3 (7) 5 (6) 7 (17) 26 (56) 70 (55) 52 (20) 20 (4) 13 (8) 7 (132) 104 (5) 8 (30) 66 (34) 102 (14) 40 A&R Engineering Inc. 6.3 Auxiliary Lane Analysis Included below are analyses for left-turn lanes and deceleration lanes for all site driveways per GDOT standards. The analyses below are based off the trip distribution included in Section 5.2. According to the trip distribution, the 24-hour two-way volume entering and exiting of the site are 892 vehicles. 6.3.1 Left Turn Lane Analysis For two lane roadways with AADT’s greater than 6,000 vehicles and a posted speed limit of 35 mph, the daily site generated traffic left-turn movement’s threshold to warrant a left-turn lane is 200 left-turning vehicles a day. The projected left-turn volumes per day for each driveway are included below. Left turn lane is warranted at the Site Driveway 1 on Veterans Memorial Highway as per GDOT standard. 6.3.2 Deceleration Turn Lane Analysis For two lane roadways with AADT’s greater than 6,000 vehicles and a posted speed limit of 35 mph, the daily site generated traffic right-turn movements threshold to warrant a deceleration lane is 100 right turning vehicles a day. The projected right-turn volumes per day for each driveway are included in Table 6. Deceleration lane is not warranted at the Site Driveway 1. Table 5 - GDOT Requirements for Left Turn Lanes Intersection Left turn traffic (% total entering) Left turn / roadway direction Left-turn volume (vehicle/day) Roadway speed/ # lanes / ADT GDOT threshold (vehicle/day) Warrant met? Cedar Mountain Rd @ Veteran Hwy 75% Veterans Memorial Highway (WB) 335 (Total trips) ÷ 2 × 0.75 = (892) ÷ 2 x 0.75 = 335 35 mph / 2-lane/ >=6000 200 Yes Table 6 - GDOT Requirements for Deceleration Lanes Intersection Right-turn traffic (% total entering) Right turn / roadway direction Right-turn volume (vehicle/day) Roadway speed/ # lanes / ADT GDOT threshold (vehicle/day) Warrant met? Cedar Mountain Rd @ Veteran Hwy 15% Veterans Memorial Highway (EB) 67 (Total trips) ÷ 2 × 0.15 = (892) ÷ 2 x 0.15 = 67 35 mph / 2-lane/ >10,000 100 No A&R Engineering Inc. 6.4 Future Traffic Operations The future “No-Build” and “Build” traffic operations were analyzed using the volumes in Figure 6 and Figure 7, respectively. The results of the future traffic operations analysis are shown below in Table 7. Recommendations on traffic control and lane geometry are shown graphically in Figure 8a and 8b. Table 7 – Future Intersection Operations Intersection Future Condition: LOS (Delay) NO-BUILD BUILD AM Peak PM Peak AM Peak PM Peak 1 West Strickland Street @ Cedar Mountain Road -Eastbound Approach -Westbound Approach -Northbound Approach -Southbound Approach A (8.1) A (7.6) A (8.2) A (7.8) A (8.4) A (9.0) A (8.3) A (9.0) A (9.4) A (8.8) A (8.1) A (7.6) A (8.2) A (7.8) A (8.4) A (9.1) A (8.4) A (9.1) A (9.5) A (8.8) 2 Veterans Memorial Highway @ Cedar Mountain Road / Site Driveway -Eastbound Left -Westbound Left -Northbound Approach -Southbound Approach A (8.0) - - C (20.5) A (9.2) - - F (71.2) A (8.0) A (8.1) B (13.2) D (30.6) A (9.2) A (8.3) C (21.5) F (212.4) 3 Veterans Memorial Highway @ Whitley Drive -Westbound Left -Northbound Approach A (8.4) B (14.8) A (8.6) C (22.4) A (8.5) C (15.6) A (8.6) C (24.5) 4 Pinecrest Drive @ Whitley Drive -Eastbound Approach -Westbound Approach -Southbound Approach A (7.5) A (7.3) A (6.8) A (7.8) A (7.2) A (7.3) A (6.8) A (7.6) A (7.5) A (7.3) A (6.8) A (7.8) A (7.2) A (7.3) A (6.8) A (7.6) The “Build” condition traffic operations analysis indicates that all the unsignalized study intersections will continue to operate at level of service “C” or better in both the AM and PM peak hours, except the southbound approach of the intersection West Strickland Street at Cedar Mountain Road which will operate at level of service “F” in the PM peak hour. The amount of delay for the southbound approach increases significantly after the addition of a fourth leg and site traffic. Due to the proximity of the railroad and delays experienced by the southbound movement, we recommend considering installation of traffic signal if signal warrants are met. Therefore, we have also evaluated this intersection with a traffic signal and the results of the analysis as given in Table 8 below show that the signalized intersection will operate at a satisfactory LOS “C” in both the AM and PM peak hours. A&R Engineering Inc. Table 8 – Future Operations – At Site Driveway – With Traffic Signal Intersection Future Condition: LOS (Delay) BUILD – No Signal BUILD with Signal AM Peak PM Peak AM Peak PM Peak 2 Veterans Memorial Highway @ Cedar Mountain Road / Site Driveway -Eastbound Approach -Westbound Approach -Northbound Approach -Southbound Approach A (8.0) A (8.1) B (13.2) D (30.6) A (9.2) A (8.3) C (21.5) F (212.4) B (16.4) A (7.6) A (6.1) C (31.9) D (41.3) B (14.8) B (10.3) A (6.3) C (33.2) D (44.1) Pinecrest Dr Whitley Dr W.Strickland St W.Strickland St Cedar Mountain Rd Pinecrest Dr SITE 1 2 3 4 Veterans Memorial Way Veterans Memorial Way 21 FUTURE TRAFFIC CONTROL AND LANE GEOMETRY (Unsignalized) FIGURE 8a A&R Engineering Inc. Proposed Signed Approach Existing Lane Geometry Ex Existing Signed Approach LEGEND Proposed Lane Geometry STOP STOP STOP Ex STOP Ex STOP Ex STOP Ex STOP Ex STOP Ex STOP Ex STOP STOP Ex Pinecrest Dr Whitley Dr W.Strickland St W.Strickland St Cedar Mountain Rd Pinecrest Dr SITE 1 2 3 4 Veterans Memorial Way Veterans Memorial Way 22 FUTURE TRAFFIC CONTROL AND LANE GEOMETRY (Signalized) FIGURE 8b A&R Engineering Inc. Proposed Signed Approach Existing Lane Geometry Ex Existing Signed Approach LEGEND Proposed Lane Geometry STOP STOP STOP Ex STOP Ex STOP Ex STOP Ex STOP Ex STOP Ex STOP Ex Ex A&R Engineering Inc. 7 . 0 C O N C L U S I O N S A N D R E C O M M E N D A T I O N S Traffic impacts were evaluated for the proposed retail development on Veterans Memorial Highway in Douglasville, Georgia. The development will consist of: • Single-Family Attached Housing: 55 units • Single-Family Detached Housing: 49 units The development proposes access at the following location: • Site Driveway 1: Full-access driveway on Veterans Memorial Highway at Cedar Mountain Road Existing and future operations after completion of the project were analyzed at the following intersections: • West Strickland Street at Cedar Mountain Road • Veterans Memorial Highway at Cedar Mountain Road / Site Driveway • Veterans Memorial Highway at Whitley Drive • Whitley Drive at Pinecrest Drive The analysis included the evaluation of future traffic operations for “No-Build” and “Build” conditions, the differences between “No-Build” and “Build” accounts for increase in traffic due to the proposed development. The results of future traffic operations analysis indicate that all the study intersections will operate at level of service “C” or better in both the AM and PM peak hours, except the southbound approach of the intersection West Strickland Street at Cedar Mountain Road that is operating at level of service “F” in the PM peak hour. It is not unusual for stop-controlled site-streets along arterial roadways to have elevated delays during peak periods as delays are caused by side-street wait times to turn left onto the mainline. Due to the proximity of the railroad and delays experienced by the minor street movement, we recommend considering installation of traffic signals if warrants are met. 7.1 Recommendation for Site Access Configuration The following improvements are recommended at the proposed site driveway intersection on Veterans Memorial Highway. o One entering and one exiting lane. o Signalized intersection. o Left turn lane for entering traffic. o Confirm adequate sight distance per AASHTO standards Appendix Existing Intersection Traffic Counts ................................................................................................................ Linear Regression of Daily Traffic.................................................................................................................... Existing Intersection Analysis.......................................................................................................................... Future “No-Build” Intersection Analysis......................................................................................................... Future “Build” Intersection Analysis............................................................................................................... Traffic Volume Worksheets ............................................................................................................................ E X I S T I N G I N T E R S E C T I O N T R A F F I C C O U N T S File Name : 20220044 Site Code : 20220044 Start Date : 2/10/2022 Page No : 1 TMC DATA Veterans Memorial Hwy @ Cedar Mountain Rd 7-9 am | 4-6 pm Groups Printed- Cars,Buses & Trucks Northbound Cedar Mountain Rd Southbound Veterans Memorial Hwy Eastbound Veterans Memorial Hwy Westbound Start Time Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Int. Total 07:00 AM 0 0 0 0 23 0 37 60 7 64 0 71 0 37 9 46 177 07:15 AM 0 0 0 0 28 0 34 62 13 81 0 94 0 45 6 51 207 07:30 AM 0 0 0 0 34 0 30 64 14 86 0 100 0 67 9 76 240 07:45 AM 0 0 0 0 29 0 21 50 10 93 0 103 0 62 4 66 219 Total 0 0 0 0 114 0 122 236 44 324 0 368 0 211 28 239 843 08:00 AM 0 0 0 0 29 0 16 45 6 77 0 83 0 60 10 70 198 08:15 AM 0 0 0 0 24 0 20 44 13 78 0 91 0 51 11 62 197 08:30 AM 0 0 0 0 15 0 24 39 7 86 0 93 0 59 5 64 196 08:45 AM 0 0 0 0 19 0 34 53 15 83 0 98 0 55 15 70 221 Total 0 0 0 0 87 0 94 181 41 324 0 365 0 225 41 266 812 *** BREAK *** 04:00 PM 0 0 0 0 10 0 35 45 16 97 0 113 0 111 21 132 290 04:15 PM 0 0 0 0 21 0 18 39 17 85 0 102 0 112 15 127 268 04:30 PM 0 0 0 0 23 0 31 54 23 72 0 95 0 120 20 140 289 04:45 PM 0 0 0 0 16 0 29 45 24 94 0 118 0 105 25 130 293 Total 0 0 0 0 70 0 113 183 80 348 0 428 0 448 81 529 1140 05:00 PM 0 0 0 0 26 0 35 61 32 96 0 128 0 104 21 125 314 05:15 PM 0 0 0 0 21 0 32 53 34 109 0 143 0 130 20 150 346 05:30 PM 0 0 0 0 35 0 24 59 24 85 0 109 0 105 20 125 293 05:45 PM 0 0 0 0 13 0 21 34 35 90 0 125 0 96 22 118 277 Total 0 0 0 0 95 0 112 207 125 380 0 505 0 435 83 518 1230 Grand Total 0 0 0 0 366 0 441 807 290 1376 0 1666 0 1319 233 1552 4025 Apprch % 0 0 0 45.4 0 54.6 17.4 82.6 0 0 85 15 Total % 0 0 0 0 9.1 0 11 20 7.2 34.2 0 41.4 0 32.8 5.8 38.6 A & R Engineering, Inc. 2160 Kingston Court, Suite 'O', Marietta, GA 30067 File Name : 20220044 Site Code : 20220044 Start Date : 2/10/2022 Page No : 2 TMC DATA Veterans Memorial Hwy @ Cedar Mountain Rd 7-9 am | 4-6 pm Northbound Cedar Mountain Rd Southbound Veterans Memorial Hwy Eastbound Veterans Memorial Hwy Westbound Start Time Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Int. Total Peak Hour Analysis From 07:00 AM to 08:45 AM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 07:15 AM 07:15 AM 0 0 0 0 28 0 34 62 13 81 0 94 0 45 6 51 207 07:30 AM 0 0 0 0 34 0 30 64 14 86 0 100 0 67 9 76 240 07:45 AM 0 0 0 0 29 0 21 50 10 93 0 103 0 62 4 66 219 08:00 AM 0 0 0 0 29 0 16 45 6 77 0 83 0 60 10 70 198 Total Volume 0 0 0 0 120 0 101 221 43 337 0 380 0 234 29 263 864 % App. Total 0 0 0 54.3 0 45.7 11.3 88.7 0 0 89 11 PHF .000 .000 .000 .000 .882 .000 .743 .863 .768 .906 .000 .922 .000 .873 .725 .865 .900 Cedar Mountain Rd Veterans Memorial Hwy Veterans Memorial Hwy Right 101 Thru 0 Left 120 Out In Total 72 221 293 Right 29 Thru 234 Left 0 Out Total In 457 263 720 Left 0 Thru 0 Right 0 Out In Total 0 0 0 Left 43 Thru 337 Right 0 Total Out In 335 380 715 Peak Hour Begins at 07:15 AM Cars,Buses & Trucks Peak Hour Data North A & R Engineering, Inc. 2160 Kingston Court, Suite 'O', Marietta, GA 30067 File Name : 20220044 Site Code : 20220044 Start Date : 2/10/2022 Page No : 3 TMC DATA Veterans Memorial Hwy @ Cedar Mountain Rd 7-9 am | 4-6 pm Northbound Cedar Mountain Rd Southbound Veterans Memorial Hwy Eastbound Veterans Memorial Hwy Westbound Start Time Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Int. Total Peak Hour Analysis From 04:00 PM to 05:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 04:45 PM 04:45 PM 0 0 0 0 16 0 29 45 24 94 0 118 0 105 25 130 293 05:00 PM 0 0 0 0 26 0 35 61 32 96 0 128 0 104 21 125 314 05:15 PM 0 0 0 0 21 0 32 53 34 109 0 143 0 130 20 150 346 05:30 PM 0 0 0 0 35 0 24 59 24 85 0 109 0 105 20 125 293 Total Volume 0 0 0 0 98 0 120 218 114 384 0 498 0 444 86 530 1246 % App. Total 0 0 0 45 0 55 22.9 77.1 0 0 83.8 16.2 PHF .000 .000 .000 .000 .700 .000 .857 .893 .838 .881 .000 .871 .000 .854 .860 .883 .900 Cedar Mountain Rd Veterans Memorial Hwy Veterans Memorial Hwy Right 120 Thru 0 Left 98 Out In Total 200 218 418 Right 86 Thru 444 Left 0 Out Total In 482 530 1012 Left 0 Thru 0 Right 0 Out In Total 0 0 0 Left 114 Thru 384 Right 0 Total Out In 564 498 1062 Peak Hour Begins at 04:45 PM Cars,Buses & Trucks Peak Hour Data North A & R Engineering, Inc. 2160 Kingston Court, Suite 'O', Marietta, GA 30067 File Name : 20220045 Site Code : 20220045 Start Date : 2/10/2022 Page No : 1 TMC DATA Veterans Memorial Hwy @ Whitley Dr 7-9 am | 4-6 pm Groups Printed- Cars,Buses & Trucks Whitley Dr Northbound Southbound Veterans Memorial Hwy Eastbound Veterans Memorial Hwy Westbound Start Time Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Int. Total 07:00 AM 4 0 1 5 0 0 0 0 0 81 6 87 0 42 0 42 134 07:15 AM 5 0 1 6 0 0 0 0 0 98 11 109 0 46 0 46 161 07:30 AM 10 0 0 10 0 0 0 0 0 100 20 120 1 66 0 67 197 07:45 AM 8 0 3 11 0 0 0 0 0 100 22 122 0 58 0 58 191 Total 27 0 5 32 0 0 0 0 0 379 59 438 1 212 0 213 683 08:00 AM 11 0 1 12 0 0 0 0 0 87 19 106 0 59 0 59 177 08:15 AM 7 0 1 8 0 0 0 0 0 89 13 102 1 55 0 56 166 08:30 AM 5 0 2 7 0 0 0 0 0 97 4 101 1 59 0 60 168 08:45 AM 5 0 2 7 0 0 0 0 0 93 9 102 1 65 0 66 175 Total 28 0 6 34 0 0 0 0 0 366 45 411 3 238 0 241 686 *** BREAK *** 04:00 PM 8 0 1 9 0 0 0 0 0 104 3 107 0 124 0 124 240 04:15 PM 5 0 1 6 0 0 0 0 0 99 7 106 3 122 0 125 237 04:30 PM 12 0 2 14 0 0 0 0 0 88 7 95 2 128 0 130 239 04:45 PM 16 0 1 17 0 0 0 0 0 102 8 110 1 114 0 115 242 Total 41 0 5 46 0 0 0 0 0 393 25 418 6 488 0 494 958 05:00 PM 7 0 3 10 0 0 0 0 0 110 12 122 1 118 0 119 251 05:15 PM 7 0 4 11 0 0 0 0 0 113 17 130 2 143 0 145 286 05:30 PM 11 0 1 12 0 0 0 0 0 103 17 120 3 114 0 117 249 05:45 PM 8 0 0 8 0 0 0 0 0 99 4 103 0 110 0 110 221 Total 33 0 8 41 0 0 0 0 0 425 50 475 6 485 0 491 1007 Grand Total 129 0 24 153 0 0 0 0 0 1563 179 1742 16 1423 0 1439 3334 Apprch % 84.3 0 15.7 0 0 0 0 89.7 10.3 1.1 98.9 0 Total % 3.9 0 0.7 4.6 0 0 0 0 0 46.9 5.4 52.2 0.5 42.7 0 43.2 A & R Engineering, Inc. 2160 Kingston Court, Suite 'O', Marietta, GA 30067 File Name : 20220045 Site Code : 20220045 Start Date : 2/10/2022 Page No : 2 TMC DATA Veterans Memorial Hwy @ Whitley Dr 7-9 am | 4-6 pm Whitley Dr Northbound Southbound Veterans Memorial Hwy Eastbound Veterans Memorial Hwy Westbound Start Time Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Int. Total Peak Hour Analysis From 07:00 AM to 08:45 AM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 07:30 AM 07:30 AM 10 0 0 10 0 0 0 0 0 100 20 120 1 66 0 67 197 07:45 AM 8 0 3 11 0 0 0 0 0 100 22 122 0 58 0 58 191 08:00 AM 11 0 1 12 0 0 0 0 0 87 19 106 0 59 0 59 177 08:15 AM 7 0 1 8 0 0 0 0 0 89 13 102 1 55 0 56 166 Total Volume 36 0 5 41 0 0 0 0 0 376 74 450 2 238 0 240 731 % App. Total 87.8 0 12.2 0 0 0 0 83.6 16.4 0.8 99.2 0 PHF .818 .000 .417 .854 .000 .000 .000 .000 .000 .940 .841 .922 .500 .902 .000 .896 .928 Veterans Memorial Hwy Veterans Memorial Hwy Whitley Dr Right 0 Thru 0 Left 0 Out In Total 0 0 0 Right 0 Thru 238 Left 2 Out Total In 381 240 621 Left 36 Thru 0 Right 5 Out In Total 76 41 117 Left 0 Thru 376 Right 74 Total Out In 274 450 724 Peak Hour Begins at 07:30 AM Cars,Buses & Trucks Peak Hour Data North A & R Engineering, Inc. 2160 Kingston Court, Suite 'O', Marietta, GA 30067 File Name : 20220045 Site Code : 20220045 Start Date : 2/10/2022 Page No : 3 TMC DATA Veterans Memorial Hwy @ Whitley Dr 7-9 am | 4-6 pm Whitley Dr Northbound Southbound Veterans Memorial Hwy Eastbound Veterans Memorial Hwy Westbound Start Time Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Int. Total Peak Hour Analysis From 04:00 PM to 05:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 04:45 PM 04:45 PM 16 0 1 17 0 0 0 0 0 102 8 110 1 114 0 115 242 05:00 PM 7 0 3 10 0 0 0 0 0 110 12 122 1 118 0 119 251 05:15 PM 7 0 4 11 0 0 0 0 0 113 17 130 2 143 0 145 286 05:30 PM 11 0 1 12 0 0 0 0 0 103 17 120 3 114 0 117 249 Total Volume 41 0 9 50 0 0 0 0 0 428 54 482 7 489 0 496 1028 % App. Total 82 0 18 0 0 0 0 88.8 11.2 1.4 98.6 0 PHF .641 .000 .563 .735 .000 .000 .000 .000 .000 .947 .794 .927 .583 .855 .000 .855 .899 Veterans Memorial Hwy Veterans Memorial Hwy Whitley Dr Right 0 Thru 0 Left 0 Out In Total 0 0 0 Right 0 Thru 489 Left 7 Out Total In 437 496 933 Left 41 Thru 0 Right 9 Out In Total 61 50 111 Left 0 Thru 428 Right 54 Total Out In 530 482 1012 Peak Hour Begins at 04:45 PM Cars,Buses & Trucks Peak Hour Data North A & R Engineering, Inc. 2160 Kingston Court, Suite 'O', Marietta, GA 30067 File Name : 20220046 Site Code : 20220046 Start Date : 2/10/2022 Page No : 1 TMC DATA W. Strickland St @ Cedar Mountain Rd 7-9 am | 4-6 pm Groups Printed- Cars,Buses & Trucks Cedar Mountain Rd Northbound Cedar Mountain Rd Southbound W. Strickland St Eastbound W. Strickland St Westbound Start Time Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Int. Total 07:00 AM 2 6 8 16 0 34 3 37 1 5 9 15 17 4 1 22 90 07:15 AM 4 9 6 19 2 39 2 43 2 4 8 14 15 3 2 20 96 07:30 AM 5 10 8 23 0 33 0 33 1 6 20 27 11 3 1 15 98 07:45 AM 2 7 5 14 3 23 3 29 0 5 16 21 11 7 2 20 84 Total 13 32 27 72 5 129 8 142 4 20 53 77 54 17 6 77 368 08:00 AM 4 8 4 16 1 22 0 23 3 4 13 20 10 1 2 13 72 08:15 AM 8 11 5 24 0 19 1 20 3 2 13 18 12 3 1 16 78 08:30 AM 3 5 4 12 1 22 0 23 0 4 9 13 8 3 4 15 63 08:45 AM 9 11 10 30 0 25 0 25 2 2 13 17 15 4 0 19 91 Total 24 35 23 82 2 88 1 91 8 12 48 68 45 11 7 63 304 *** BREAK *** 04:00 PM 10 17 10 37 1 21 1 23 1 2 10 13 14 8 1 23 96 04:15 PM 3 18 11 32 3 18 3 24 1 4 11 16 10 9 3 22 94 04:30 PM 6 29 8 43 2 28 2 32 1 1 10 12 16 7 4 27 114 04:45 PM 8 26 15 49 3 18 0 21 3 5 9 17 18 3 2 23 110 Total 27 90 44 161 9 85 6 100 6 12 40 58 58 27 10 95 414 05:00 PM 11 24 18 53 1 28 4 33 4 7 13 24 20 11 3 34 144 05:15 PM 12 26 16 54 1 24 2 27 1 4 12 17 17 2 0 19 117 05:30 PM 7 23 14 44 3 31 1 35 5 4 16 25 12 9 2 23 127 05:45 PM 11 29 17 57 0 12 1 13 4 6 11 21 11 4 1 16 107 Total 41 102 65 208 5 95 8 108 14 21 52 87 60 26 6 92 495 Grand Total 105 259 159 523 21 397 23 441 32 65 193 290 217 81 29 327 1581 Apprch % 20.1 49.5 30.4 4.8 90 5.2 11 22.4 66.6 66.4 24.8 8.9 Total % 6.6 16.4 10.1 33.1 1.3 25.1 1.5 27.9 2 4.1 12.2 18.3 13.7 5.1 1.8 20.7 A & R Engineering, Inc. 2160 Kingston Court, Suite 'O', Marietta, GA 30067 File Name : 20220046 Site Code : 20220046 Start Date : 2/10/2022 Page No : 2 TMC DATA W. Strickland St @ Cedar Mountain Rd 7-9 am | 4-6 pm Cedar Mountain Rd Northbound Cedar Mountain Rd Southbound W. Strickland St Eastbound W. Strickland St Westbound Start Time Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Int. Total Peak Hour Analysis From 07:00 AM to 08:45 AM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 07:00 AM 07:00 AM 2 6 8 16 0 34 3 37 1 5 9 15 17 4 1 22 90 07:15 AM 4 9 6 19 2 39 2 43 2 4 8 14 15 3 2 20 96 07:30 AM 5 10 8 23 0 33 0 33 1 6 20 27 11 3 1 15 98 07:45 AM 2 7 5 14 3 23 3 29 0 5 16 21 11 7 2 20 84 Total Volume 13 32 27 72 5 129 8 142 4 20 53 77 54 17 6 77 368 % App. Total 18.1 44.4 37.5 3.5 90.8 5.6 5.2 26 68.8 70.1 22.1 7.8 PHF .650 .800 .844 .783 .417 .827 .667 .826 .500 .833 .663 .713 .794 .607 .750 .875 .939 Cedar Mountain Rd W. Strickland St W. Strickland St Cedar Mountain Rd Right 8 Thru 129 Left 5 Out In Total 42 142 184 Right 6 Thru 17 Left 54 Out Total In 52 77 129 Left 13 Thru 32 Right 27 Out In Total 236 72 308 Left 4 Thru 20 Right 53 Total Out In 38 77 115 Peak Hour Begins at 07:00 AM Cars,Buses & Trucks Peak Hour Data North A & R Engineering, Inc. 2160 Kingston Court, Suite 'O', Marietta, GA 30067 File Name : 20220046 Site Code : 20220046 Start Date : 2/10/2022 Page No : 3 TMC DATA W. Strickland St @ Cedar Mountain Rd 7-9 am | 4-6 pm Cedar Mountain Rd Northbound Cedar Mountain Rd Southbound W. Strickland St Eastbound W. Strickland St Westbound Start Time Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Int. Total Peak Hour Analysis From 04:00 PM to 05:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 04:45 PM 04:45 PM 8 26 15 49 3 18 0 21 3 5 9 17 18 3 2 23 110 05:00 PM 11 24 18 53 1 28 4 33 4 7 13 24 20 11 3 34 144 05:15 PM 12 26 16 54 1 24 2 27 1 4 12 17 17 2 0 19 117 05:30 PM 7 23 14 44 3 31 1 35 5 4 16 25 12 9 2 23 127 Total Volume 38 99 63 200 8 101 7 116 13 20 50 83 67 25 7 99 498 % App. Total 19 49.5 31.5 6.9 87.1 6 15.7 24.1 60.2 67.7 25.3 7.1 PHF .792 .952 .875 .926 .667 .815 .438 .829 .650 .714 .781 .830 .838 .568 .583 .728 .865 Cedar Mountain Rd W. Strickland St W. Strickland St Cedar Mountain Rd Right 7 Thru 101 Left 8 Out In Total 119 116 235 Right 7 Thru 25 Left 67 Out Total In 91 99 190 Left 38 Thru 99 Right 63 Out In Total 218 200 418 Left 13 Thru 20 Right 50 Total Out In 70 83 153 Peak Hour Begins at 04:45 PM Cars,Buses & Trucks Peak Hour Data North A & R Engineering, Inc. 2160 Kingston Court, Suite 'O', Marietta, GA 30067 File Name : 20220047 Site Code : 20220047 Start Date : 2/10/2022 Page No : 1 TMC DATA Whitley Dr @ Pinecrest Dr 7-9 am | 4-6 pm Groups Printed- Cars,Buses & Trucks Northbound Whitley Dr Southbound Pinecrest Dr Eastbound Pinecrest Dr Westbound Start Time Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Int. Total 07:00 AM 0 0 0 0 5 0 0 5 0 3 0 3 0 0 2 2 10 07:15 AM 0 0 0 0 7 0 0 7 2 0 0 2 0 0 4 4 13 07:30 AM 0 0 0 0 13 0 0 13 2 0 0 2 0 0 2 2 17 07:45 AM 0 0 0 0 23 0 1 24 0 1 0 1 0 0 8 8 33 Total 0 0 0 0 48 0 1 49 4 4 0 8 0 0 16 16 73 08:00 AM 0 0 0 0 23 0 0 23 1 0 0 1 0 0 12 12 36 08:15 AM 0 0 0 0 17 0 1 18 0 3 0 3 0 1 10 11 32 08:30 AM 0 0 0 0 13 0 2 15 0 0 0 0 0 1 7 8 23 08:45 AM 0 0 0 0 5 0 0 5 1 0 0 1 0 2 5 7 13 Total 0 0 0 0 58 0 3 61 2 3 0 5 0 4 34 38 104 *** BREAK *** 04:00 PM 0 0 0 0 5 0 0 5 0 2 0 2 0 0 16 16 23 04:15 PM 0 0 0 0 2 0 1 3 0 0 0 0 0 0 9 9 12 04:30 PM 0 0 0 0 9 0 0 9 0 0 0 0 0 0 8 8 17 04:45 PM 0 0 0 0 8 0 1 9 0 1 0 1 0 2 17 19 29 Total 0 0 0 0 24 0 2 26 0 3 0 3 0 2 50 52 81 05:00 PM 0 0 0 0 8 0 0 8 1 0 0 1 0 0 15 15 24 05:15 PM 0 0 0 0 11 0 0 11 1 0 0 1 0 2 8 10 22 05:30 PM 0 0 0 0 21 0 0 21 1 1 0 2 0 0 11 11 34 05:45 PM 0 0 0 0 13 0 1 14 0 0 0 0 0 2 9 11 25 Total 0 0 0 0 53 0 1 54 3 1 0 4 0 4 43 47 105 Grand Total 0 0 0 0 183 0 7 190 9 11 0 20 0 10 143 153 363 Apprch % 0 0 0 96.3 0 3.7 45 55 0 0 6.5 93.5 Total % 0 0 0 0 50.4 0 1.9 52.3 2.5 3 0 5.5 0 2.8 39.4 42.1 A & R Engineering, Inc. 2160 Kingston Court, Suite 'O', Marietta, GA 30067 File Name : 20220047 Site Code : 20220047 Start Date : 2/10/2022 Page No : 2 TMC DATA Whitley Dr @ Pinecrest Dr 7-9 am | 4-6 pm Northbound Whitley Dr Southbound Pinecrest Dr Eastbound Pinecrest Dr Westbound Start Time Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Int. Total Peak Hour Analysis From 07:00 AM to 08:45 AM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 07:45 AM 07:45 AM 0 0 0 0 23 0 1 24 0 1 0 1 0 0 8 8 33 08:00 AM 0 0 0 0 23 0 0 23 1 0 0 1 0 0 12 12 36 08:15 AM 0 0 0 0 17 0 1 18 0 3 0 3 0 1 10 11 32 08:30 AM 0 0 0 0 13 0 2 15 0 0 0 0 0 1 7 8 23 Total Volume 0 0 0 0 76 0 4 80 1 4 0 5 0 2 37 39 124 % App. Total 0 0 0 95 0 5 20 80 0 0 5.1 94.9 PHF .000 .000 .000 .000 .826 .000 .500 .833 .250 .333 .000 .417 .000 .500 .771 .813 .861 Whitley Dr Pinecrest Dr Pinecrest Dr Right 4 Thru 0 Left 76 Out In Total 38 80 118 Right 37 Thru 2 Left 0 Out Total In 80 39 119 Left 0 Thru 0 Right 0 Out In Total 0 0 0 Left 1 Thru 4 Right 0 Total Out In 6 5 11 Peak Hour Begins at 07:45 AM Cars,Buses & Trucks Peak Hour Data North A & R Engineering, Inc. 2160 Kingston Court, Suite 'O', Marietta, GA 30067 File Name : 20220047 Site Code : 20220047 Start Date : 2/10/2022 Page No : 3 TMC DATA Whitley Dr @ Pinecrest Dr 7-9 am | 4-6 pm Northbound Whitley Dr Southbound Pinecrest Dr Eastbound Pinecrest Dr Westbound Start Time Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Int. Total Peak Hour Analysis From 04:00 PM to 05:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 04:45 PM 04:45 PM 0 0 0 0 8 0 1 9 0 1 0 1 0 2 17 19 29 05:00 PM 0 0 0 0 8 0 0 8 1 0 0 1 0 0 15 15 24 05:15 PM 0 0 0 0 11 0 0 11 1 0 0 1 0 2 8 10 22 05:30 PM 0 0 0 0 21 0 0 21 1 1 0 2 0 0 11 11 34 Total Volume 0 0 0 0 48 0 1 49 3 2 0 5 0 4 51 55 109 % App. Total 0 0 0 98 0 2 60 40 0 0 7.3 92.7 PHF .000 .000 .000 .000 .571 .000 .250 .583 .750 .500 .000 .625 .000 .500 .750 .724 .801 Whitley Dr Pinecrest Dr Pinecrest Dr Right 1 Thru 0 Left 48 Out In Total 54 49 103 Right 51 Thru 4 Left 0 Out Total In 50 55 105 Left 0 Thru 0 Right 0 Out In Total 0 0 0 Left 3 Thru 2 Right 0 Total Out In 5 5 10 Peak Hour Begins at 04:45 PM Cars,Buses & Trucks Peak Hour Data North A & R Engineering, Inc. 2160 Kingston Court, Suite 'O', Marietta, GA 30067 L I N E A R R E G R E S S I O N O F D A I L Y T R A F F I C Location Growth Rate R Squared Station ID Route 2017 2018 2019 Veterans Memorial Hwy (US78) 1.9% 0.75 097‐0021 00000500 10,700 10,700 11,100 Chicago Ave (N of W Strickland S 0.1% 0.01 097‐0209 00081300 8,330 8,180 8,350 Rose Ave (S of Veterans Memor ‐2.0% 0.42 097‐0229 00057303 8,570 8,070 8,240 SR 8 (Bill Arp Rd)(SE of Gurley Rd ‐2.3% 0.60 097‐0016 00000500 11,300 10,700 10,800 Veterans Memorial Hwy (US78) ‐2.4% 0.75 097‐0023 00000500 12,900 12,300 12,300 Weighted Average ‐1.0% 0.30 51,800 49,950 50,790 Traffic Counter RCLINK 2017 2018 2019 097‐0021 00000500 10,700 10,700 11,100 1.9% Intercept ‐392,767 Slope 200.00 10,633 10,833 11,033 Traffic Counter RCLINK 2017 2018 2019 097‐0209 00081300 8,330 8,180 8,350 0.1% Intercept ‐11,893 Slope 10.00 8,277 8,287 8,297 Traffic Counter RCLINK 2017 2018 2019 097‐0229 00057303 8,570 8,070 8,240 ‐2.0% Intercept 341,263 Slope ‐165.00 8,458 8,293 8,128 Traffic Counter RCLINK 2017 2018 2019 097‐0016 00000500 11,300 10,700 10,800 ‐2.3% Intercept 515,433 Slope ‐250.00 11,183 10,933 10,683 Traffic Counter RCLINK 2017 2018 2019 097‐0023 00000500 12,900 12,300 12,300 ‐2.4% Intercept 617,900 Slope ‐300.00 12,800 12,500 12,200 2017 2018 2019 51,800 49,950 50,790 ‐1.0% Intercept 1,069,937 Slope ‐505.00 51,352 50,847 50,342 Weighted Average Sum of Count Stations Veterans Memorial Hwy (US78) (E of Whitley Dr Location Location Trend Line Trend Line Growth Rate Sum of Count Stations = Location Veterans Memorial Hwy (US78) (W of Pray St) Growth Rate Trend Line Trend Line Growth Rate Growth Rate Trend Line Location Rose Ave (S of Veterans Memorial Hwy (US78)) Location Chicago Ave (N of W Strickland St) SR 8 (Bill Arp Rd)(SE of Gurley Rd) Growth Rate Growth Rate Trend Line 10,200 10,400 10,600 10,800 11,000 11,200 2017 2018 2019 Axis Title Trend Line 8,000 8,100 8,200 8,300 8,400 2017 2018 2019 Axis Title Trend Line 7,800 8,000 8,200 8,400 8,600 8,800 2017 2018 2019 Axis Title Trend Line 10,000 10,500 11,000 11,500 2017 2018 2019 Axis Title Trend Line 11,500 12,000 12,500 13,000 2017 2018 2019 Axis Title Trend Line 49,000 50,000 51,000 52,000 2017 2018 2019 Axis Title Trend Line E X I S T I N G I N T E R S E C T I O N A N A L Y S I S HCM 6th AWSC Existing AM 1: Cedar Mountain Rd & W.Strickland St 02/28/2022 A & R Engineering. Inc Synchro 11 Report Page 1 Intersection Intersection Delay, s/veh 8.1 Intersection LOS A Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 4 20 53 54 17 6 13 32 27 5 129 8 Future Vol, veh/h 4 20 53 54 17 6 13 32 27 5 129 8 Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2 Mvmt Flow 4 21 56 57 18 6 14 34 29 5 137 9 Number of Lanes 0 1 0 0 1 0 0 1 0 0 1 0 Approach EB WB NB SB Opposing Approach WB EB SB NB Opposing Lanes 1 1 1 1 Conflicting Approach Left SB NB EB WB Conflicting Lanes Left 1 1 1 1 Conflicting Approach Right NB SB WB EB Conflicting Lanes Right 1 1 1 1 HCM Control Delay 7.6 8.2 7.7 8.4 HCM LOS A A A A Lane NBLn1 EBLn1 WBLn1 SBLn1 Vol Left, % 18% 5% 70% 4% Vol Thru, % 44% 26% 22% 91% Vol Right, % 38% 69% 8% 6% Sign Control Stop Stop Stop Stop Traffic Vol by Lane 72 77 77 142 LT Vol 13 4 54 5 Through Vol 32 20 17 129 RT Vol 27 53 6 8 Lane Flow Rate 77 82 82 151 Geometry Grp 1 1 1 1 Degree of Util (X) 0.091 0.094 0.105 0.183 Departure Headway (Hd) 4.281 4.138 4.626 4.361 Convergence, Y/N Yes Yes Yes Yes Cap 839 867 777 825 Service Time 2.297 2.156 2.645 2.375 HCM Lane V/C Ratio 0.092 0.095 0.106 0.183 HCM Control Delay 7.7 7.6 8.2 8.4 HCM Lane LOS A A A A HCM 95th-tile Q 0.3 0.3 0.4 0.7 HCM 6th TWSC Existing AM 2: Veteran Memorial Highway & Cedar Mountain Rd 02/28/2022 A & R Engineering. Inc Synchro 11 Report Page 2 Intersection Int Delay, s/veh 5.4 Movement EBL EBT WBT WBR SBL SBR Lane Configurations Traffic Vol, veh/h 43 337 234 29 120 101 Future Vol, veh/h 43 337 234 29 120 101 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - - 160 0 - Veh in Median Storage, # - 0 0 - 0 - Grade, % - 0 0 - 0 - Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 48 374 260 32 133 112 Major/Minor Major1 Major2 Minor2 Conflicting Flow All 292 0 - 0 730 260 Stage 1 - - - - 260 - Stage 2 - - - - 470 - Critical Hdwy 4.12 - - - 6.42 6.22 Critical Hdwy Stg 1 - - - - 5.42 - Critical Hdwy Stg 2 - - - - 5.42 - Follow-up Hdwy 2.218 - - - 3.518 3.318 Pot Cap-1 Maneuver 1270 - - - 389 779 Stage 1 - - - - 783 - Stage 2 - - - - 629 - Platoon blocked, % - - - Mov Cap-1 Maneuver 1270 - - - 370 779 Mov Cap-2 Maneuver - - - - 370 - Stage 1 - - - - 745 - Stage 2 - - - - 629 - Approach EB WB SB HCM Control Delay, s 0.9 0 19.7 HCM LOS C Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1 Capacity (veh/h) 1270 - - - 487 HCM Lane V/C Ratio 0.038 - - - 0.504 HCM Control Delay (s) 7.9 0 - - 19.7 HCM Lane LOS A A - - C HCM 95th %tile Q(veh) 0.1 - - - 2.8 HCM 6th TWSC Existing AM 3: Whitley Dr & Veteran Memorial Highway 02/28/2022 A & R Engineering. Inc Synchro 11 Report Page 3 Intersection Int Delay, s/veh 0.9 Movement EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Vol, veh/h 376 74 2 238 36 5 Future Vol, veh/h 376 74 2 238 36 5 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - - - 0 - Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 93 93 93 93 93 93 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 404 80 2 256 39 5 Major/Minor Major1 Major2 Minor1 Conflicting Flow All 0 0 484 0 704 444 Stage 1 - - - - 444 - Stage 2 - - - - 260 - Critical Hdwy - - 4.12 - 6.42 6.22 Critical Hdwy Stg 1 - - - - 5.42 - Critical Hdwy Stg 2 - - - - 5.42 - Follow-up Hdwy - - 2.218 - 3.518 3.318 Pot Cap-1 Maneuver - - 1079 - 403 614 Stage 1 - - - - 646 - Stage 2 - - - - 783 - Platoon blocked, % - - - Mov Cap-1 Maneuver - - 1079 - 402 614 Mov Cap-2 Maneuver - - - - 402 - Stage 1 - - - - 646 - Stage 2 - - - - 781 - Approach EB WB NB HCM Control Delay, s 0 0.1 14.6 HCM LOS B Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT Capacity (veh/h) 420 - - 1079 - HCM Lane V/C Ratio 0.105 - - 0.002 - HCM Control Delay (s) 14.6 - - 8.3 0 HCM Lane LOS B - - A A HCM 95th %tile Q(veh) 0.3 - - 0 - HCM 6th AWSC Existing AM 4: Pinecrest Dr & Whitley Dr 02/28/2022 A & R Engineering. Inc Synchro 11 Report Page 4 Intersection Intersection Delay, s/veh 7.4 Intersection LOS A Movement EBL EBT WBT WBR SBL SBR Lane Configurations Traffic Vol, veh/h 1 4 2 37 76 4 Future Vol, veh/h 1 4 2 37 76 4 Peak Hour Factor 0.81 0.81 0.81 0.81 0.81 0.81 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 1 5 2 46 94 5 Number of Lanes 0 1 1 0 1 0 Approach EB WB SB Opposing Approach WB EB Opposing Lanes 1 1 0 Conflicting Approach Left SB WB Conflicting Lanes Left 1 0 1 Conflicting Approach Right SB EB Conflicting Lanes Right 0 1 1 HCM Control Delay 7.3 6.8 7.7 HCM LOS A A A Lane EBLn1 WBLn1 SBLn1 Vol Left, % 20% 0% 95% Vol Thru, % 80% 5% 0% Vol Right, % 0% 95% 5% Sign Control Stop Stop Stop Traffic Vol by Lane 5 39 80 LT Vol 1 0 76 Through Vol 4 2 0 RT Vol 0 37 4 Lane Flow Rate 6 48 99 Geometry Grp 1 1 1 Degree of Util (X) 0.007 0.047 0.115 Departure Headway (Hd) 4.185 3.542 4.188 Convergence, Y/N Yes Yes Yes Cap 849 1001 859 Service Time 2.242 1.597 2.199 HCM Lane V/C Ratio 0.007 0.048 0.115 HCM Control Delay 7.3 6.8 7.7 HCM Lane LOS A A A HCM 95th-tile Q 0 0.1 0.4 HCM 6th AWSC Existing PM 1: Cedar Mountain Rd & W.Strickland St 02/28/2022 A & R Engineering. Inc Synchro 11 Report Page 1 Intersection Intersection Delay, s/veh 8.9 Intersection LOS A Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 13 20 50 67 25 7 38 99 63 8 101 7 Future Vol, veh/h 13 20 50 67 25 7 38 99 63 8 101 7 Peak Hour Factor 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2 Mvmt Flow 15 23 58 78 29 8 44 115 73 9 117 8 Number of Lanes 0 1 0 0 1 0 0 1 0 0 1 0 Approach EB WB NB SB Opposing Approach WB EB SB NB Opposing Lanes 1 1 1 1 Conflicting Approach Left SB NB EB WB Conflicting Lanes Left 1 1 1 1 Conflicting Approach Right NB SB WB EB Conflicting Lanes Right 1 1 1 1 HCM Control Delay 8.3 9 9.3 8.7 HCM LOS A A A A Lane NBLn1 EBLn1 WBLn1 SBLn1 Vol Left, % 19% 16% 68% 7% Vol Thru, % 49% 24% 25% 87% Vol Right, % 32% 60% 7% 6% Sign Control Stop Stop Stop Stop Traffic Vol by Lane 200 83 99 116 LT Vol 38 13 67 8 Through Vol 99 20 25 101 RT Vol 63 50 7 7 Lane Flow Rate 233 97 115 135 Geometry Grp 1 1 1 1 Degree of Util (X) 0.288 0.123 0.159 0.176 Departure Headway (Hd) 4.455 4.597 4.987 4.689 Convergence, Y/N Yes Yes Yes Yes Cap 805 776 716 763 Service Time 2.493 2.648 3.036 2.732 HCM Lane V/C Ratio 0.289 0.125 0.161 0.177 HCM Control Delay 9.3 8.3 9 8.7 HCM Lane LOS A A A A HCM 95th-tile Q 1.2 0.4 0.6 0.6 HCM 6th TWSC Existing PM 2: Veteran Memorial Highway & Cedar Mountain Rd 02/28/2022 A & R Engineering. Inc Synchro 11 Report Page 2 Intersection Int Delay, s/veh 11.5 Movement EBL EBT WBT WBR SBL SBR Lane Configurations Traffic Vol, veh/h 114 384 444 86 98 120 Future Vol, veh/h 114 384 444 86 98 120 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - - 160 0 - Veh in Median Storage, # - 0 0 - 0 - Grade, % - 0 0 - 0 - Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 127 427 493 96 109 133 Major/Minor Major1 Major2 Minor2 Conflicting Flow All 589 0 - 0 1174 493 Stage 1 - - - - 493 - Stage 2 - - - - 681 - Critical Hdwy 4.12 - - - 6.42 6.22 Critical Hdwy Stg 1 - - - - 5.42 - Critical Hdwy Stg 2 - - - - 5.42 - Follow-up Hdwy 2.218 - - - 3.518 3.318 Pot Cap-1 Maneuver 986 - - - 212 576 Stage 1 - - - - 614 - Stage 2 - - - - 503 - Platoon blocked, % - - - Mov Cap-1 Maneuver 986 - - - 176 576 Mov Cap-2 Maneuver - - - - 176 - Stage 1 - - - - 510 - Stage 2 - - - - 503 - Approach EB WB SB HCM Control Delay, s 2.1 0 61.1 HCM LOS F Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1 Capacity (veh/h) 986 - - - 285 HCM Lane V/C Ratio 0.128 - - - 0.85 HCM Control Delay (s) 9.2 0 - - 61.1 HCM Lane LOS A A - - F HCM 95th %tile Q(veh) 0.4 - - - 7.2 HCM 6th TWSC Existing PM 3: Whitley Dr & Veteran Memorial Highway 02/28/2022 A & R Engineering. Inc Synchro 11 Report Page 3 Intersection Int Delay, s/veh 1.1 Movement EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Vol, veh/h 428 54 7 489 41 9 Future Vol, veh/h 428 54 7 489 41 9 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - - - 0 - Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 476 60 8 543 46 10 Major/Minor Major1 Major2 Minor1 Conflicting Flow All 0 0 536 0 1065 506 Stage 1 - - - - 506 - Stage 2 - - - - 559 - Critical Hdwy - - 4.12 - 6.42 6.22 Critical Hdwy Stg 1 - - - - 5.42 - Critical Hdwy Stg 2 - - - - 5.42 - Follow-up Hdwy - - 2.218 - 3.518 3.318 Pot Cap-1 Maneuver - - 1032 - 246 566 Stage 1 - - - - 606 - Stage 2 - - - - 572 - Platoon blocked, % - - - Mov Cap-1 Maneuver - - 1032 - 243 566 Mov Cap-2 Maneuver - - - - 243 - Stage 1 - - - - 606 - Stage 2 - - - - 566 - Approach EB WB NB HCM Control Delay, s 0 0.1 21.7 HCM LOS C Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT Capacity (veh/h) 271 - - 1032 - HCM Lane V/C Ratio 0.205 - - 0.008 - HCM Control Delay (s) 21.7 - - 8.5 0 HCM Lane LOS C - - A A HCM 95th %tile Q(veh) 0.8 - - 0 - HCM 6th AWSC Existing PM 4: Pinecrest Dr & Whitley Dr 02/28/2022 A & R Engineering. Inc Synchro 11 Report Page 4 Intersection Intersection Delay, s/veh 7.2 Intersection LOS A Movement EBL EBT WBT WBR SBL SBR Lane Configurations Traffic Vol, veh/h 3 2 4 51 48 1 Future Vol, veh/h 3 2 4 51 48 1 Peak Hour Factor 0.80 0.80 0.80 0.80 0.80 0.80 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 4 3 5 64 60 1 Number of Lanes 0 1 1 0 1 0 Approach EB WB SB Opposing Approach WB EB Opposing Lanes 1 1 0 Conflicting Approach Left SB WB Conflicting Lanes Left 1 0 1 Conflicting Approach Right SB EB Conflicting Lanes Right 0 1 1 HCM Control Delay 7.3 6.8 7.6 HCM LOS A A A Lane EBLn1 WBLn1 SBLn1 Vol Left, % 60% 0% 98% Vol Thru, % 40% 7% 0% Vol Right, % 0% 93% 2% Sign Control Stop Stop Stop Traffic Vol by Lane 5 55 49 LT Vol 3 0 48 Through Vol 2 4 0 RT Vol 0 51 1 Lane Flow Rate 6 69 61 Geometry Grp 1 1 1 Degree of Util (X) 0.007 0.067 0.072 Departure Headway (Hd) 4.213 3.489 4.249 Convergence, Y/N Yes Yes Yes Cap 846 1022 846 Service Time 2.254 1.525 2.262 HCM Lane V/C Ratio 0.007 0.068 0.072 HCM Control Delay 7.3 6.8 7.6 HCM Lane LOS A A A HCM 95th-tile Q 0 0.2 0.2 F U T U R E “N O - B U I L D ” I N T E R S E C T I O N A N A L Y S I S HCM 6th AWSC No Build AM 1: Cedar Mountain Rd & W.Strickland St 02/28/2022 A & R Engineering. Inc Synchro 11 Report Page 1 Intersection Intersection Delay, s/veh 8.1 Intersection LOS A Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 4 20 54 55 17 6 13 33 28 5 132 8 Future Vol, veh/h 4 20 54 55 17 6 13 33 28 5 132 8 Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2 Mvmt Flow 4 21 57 59 18 6 14 35 30 5 140 9 Number of Lanes 0 1 0 0 1 0 0 1 0 0 1 0 Approach EB WB NB SB Opposing Approach WB EB SB NB Opposing Lanes 1 1 1 1 Conflicting Approach Left SB NB EB WB Conflicting Lanes Left 1 1 1 1 Conflicting Approach Right NB SB WB EB Conflicting Lanes Right 1 1 1 1 HCM Control Delay 7.6 8.2 7.8 8.4 HCM LOS A A A A Lane NBLn1 EBLn1 WBLn1 SBLn1 Vol Left, % 18% 5% 71% 3% Vol Thru, % 45% 26% 22% 91% Vol Right, % 38% 69% 8% 6% Sign Control Stop Stop Stop Stop Traffic Vol by Lane 74 78 78 145 LT Vol 13 4 55 5 Through Vol 33 20 17 132 RT Vol 28 54 6 8 Lane Flow Rate 79 83 83 154 Geometry Grp 1 1 1 1 Degree of Util (X) 0.094 0.096 0.107 0.187 Departure Headway (Hd) 4.288 4.151 4.642 4.37 Convergence, Y/N Yes Yes Yes Yes Cap 838 865 773 824 Service Time 2.306 2.169 2.662 2.386 HCM Lane V/C Ratio 0.094 0.096 0.107 0.187 HCM Control Delay 7.8 7.6 8.2 8.4 HCM Lane LOS A A A A HCM 95th-tile Q 0.3 0.3 0.4 0.7 HCM 6th TWSC No Build AM 2: Veteran Memorial Highway & Cedar Mountain Rd 02/28/2022 A & R Engineering. Inc Synchro 11 Report Page 2 Intersection Int Delay, s/veh 5.6 Movement EBL EBT WBT WBR SBL SBR Lane Configurations Traffic Vol, veh/h 44 344 239 30 122 103 Future Vol, veh/h 44 344 239 30 122 103 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - - 160 0 - Veh in Median Storage, # - 0 0 - 0 - Grade, % - 0 0 - 0 - Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 49 382 266 33 136 114 Major/Minor Major1 Major2 Minor2 Conflicting Flow All 299 0 - 0 746 266 Stage 1 - - - - 266 - Stage 2 - - - - 480 - Critical Hdwy 4.12 - - - 6.42 6.22 Critical Hdwy Stg 1 - - - - 5.42 - Critical Hdwy Stg 2 - - - - 5.42 - Follow-up Hdwy 2.218 - - - 3.518 3.318 Pot Cap-1 Maneuver 1262 - - - 381 773 Stage 1 - - - - 779 - Stage 2 - - - - 622 - Platoon blocked, % - - - Mov Cap-1 Maneuver 1262 - - - 362 773 Mov Cap-2 Maneuver - - - - 362 - Stage 1 - - - - 741 - Stage 2 - - - - 622 - Approach EB WB SB HCM Control Delay, s 0.9 0 20.5 HCM LOS C Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1 Capacity (veh/h) 1262 - - - 478 HCM Lane V/C Ratio 0.039 - - - 0.523 HCM Control Delay (s) 8 0 - - 20.5 HCM Lane LOS A A - - C HCM 95th %tile Q(veh) 0.1 - - - 3 HCM 6th TWSC No Build AM 3: Whitley Dr & Veteran Memorial Highway 02/28/2022 A & R Engineering. Inc Synchro 11 Report Page 3 Intersection Int Delay, s/veh 0.9 Movement EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Vol, veh/h 384 75 2 243 37 5 Future Vol, veh/h 384 75 2 243 37 5 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - - - 0 - Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 93 93 93 93 93 93 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 413 81 2 261 40 5 Major/Minor Major1 Major2 Minor1 Conflicting Flow All 0 0 494 0 719 454 Stage 1 - - - - 454 - Stage 2 - - - - 265 - Critical Hdwy - - 4.12 - 6.42 6.22 Critical Hdwy Stg 1 - - - - 5.42 - Critical Hdwy Stg 2 - - - - 5.42 - Follow-up Hdwy - - 2.218 - 3.518 3.318 Pot Cap-1 Maneuver - - 1070 - 395 606 Stage 1 - - - - 640 - Stage 2 - - - - 779 - Platoon blocked, % - - - Mov Cap-1 Maneuver - - 1070 - 394 606 Mov Cap-2 Maneuver - - - - 394 - Stage 1 - - - - 640 - Stage 2 - - - - 777 - Approach EB WB NB HCM Control Delay, s 0 0.1 14.8 HCM LOS B Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT Capacity (veh/h) 411 - - 1070 - HCM Lane V/C Ratio 0.11 - - 0.002 - HCM Control Delay (s) 14.8 - - 8.4 0 HCM Lane LOS B - - A A HCM 95th %tile Q(veh) 0.4 - - 0 - HCM 6th AWSC No Build AM 4: Pinecrest Dr & Whitley Dr 02/28/2022 A & R Engineering. Inc Synchro 11 Report Page 4 Intersection Intersection Delay, s/veh 7.5 Intersection LOS A Movement EBL EBT WBT WBR SBL SBR Lane Configurations Traffic Vol, veh/h 1 4 2 38 78 4 Future Vol, veh/h 1 4 2 38 78 4 Peak Hour Factor 0.81 0.81 0.81 0.81 0.81 0.81 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 1 5 2 47 96 5 Number of Lanes 0 1 1 0 1 0 Approach EB WB SB Opposing Approach WB EB Opposing Lanes 1 1 0 Conflicting Approach Left SB WB Conflicting Lanes Left 1 0 1 Conflicting Approach Right SB EB Conflicting Lanes Right 0 1 1 HCM Control Delay 7.3 6.8 7.8 HCM LOS A A A Lane EBLn1 WBLn1 SBLn1 Vol Left, % 20% 0% 95% Vol Thru, % 80% 5% 0% Vol Right, % 0% 95% 5% Sign Control Stop Stop Stop Traffic Vol by Lane 5 40 82 LT Vol 1 0 78 Through Vol 4 2 0 RT Vol 0 38 4 Lane Flow Rate 6 49 101 Geometry Grp 1 1 1 Degree of Util (X) 0.007 0.049 0.118 Departure Headway (Hd) 4.19 3.545 4.191 Convergence, Y/N Yes Yes Yes Cap 847 1000 857 Service Time 2.25 1.602 2.204 HCM Lane V/C Ratio 0.007 0.049 0.118 HCM Control Delay 7.3 6.8 7.8 HCM Lane LOS A A A HCM 95th-tile Q 0 0.2 0.4 HCM 6th AWSC No Build PM 1: Cedar Mountain Rd & W.Strickland St 02/28/2022 A & R Engineering. Inc Synchro 11 Report Page 1 Intersection Intersection Delay, s/veh 9 Intersection LOS A Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 13 20 51 68 26 7 39 101 64 8 103 7 Future Vol, veh/h 13 20 51 68 26 7 39 101 64 8 103 7 Peak Hour Factor 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2 Mvmt Flow 15 23 59 79 30 8 45 117 74 9 120 8 Number of Lanes 0 1 0 0 1 0 0 1 0 0 1 0 Approach EB WB NB SB Opposing Approach WB EB SB NB Opposing Lanes 1 1 1 1 Conflicting Approach Left SB NB EB WB Conflicting Lanes Left 1 1 1 1 Conflicting Approach Right NB SB WB EB Conflicting Lanes Right 1 1 1 1 HCM Control Delay 8.3 9 9.4 8.8 HCM LOS A A A A Lane NBLn1 EBLn1 WBLn1 SBLn1 Vol Left, % 19% 15% 67% 7% Vol Thru, % 50% 24% 26% 87% Vol Right, % 31% 61% 7% 6% Sign Control Stop Stop Stop Stop Traffic Vol by Lane 204 84 101 118 LT Vol 39 13 68 8 Through Vol 101 20 26 103 RT Vol 64 51 7 7 Lane Flow Rate 237 98 117 137 Geometry Grp 1 1 1 1 Degree of Util (X) 0.295 0.125 0.163 0.179 Departure Headway (Hd) 4.471 4.617 5.008 4.707 Convergence, Y/N Yes Yes Yes Yes Cap 802 773 714 760 Service Time 2.509 2.668 3.057 2.751 HCM Lane V/C Ratio 0.296 0.127 0.164 0.18 HCM Control Delay 9.4 8.3 9 8.8 HCM Lane LOS A A A A HCM 95th-tile Q 1.2 0.4 0.6 0.6 HCM 6th TWSC No Build PM 2: Veteran Memorial Highway & Cedar Mountain Rd 02/28/2022 A & R Engineering. Inc Synchro 11 Report Page 2 Intersection Int Delay, s/veh 13.3 Movement EBL EBT WBT WBR SBL SBR Lane Configurations Traffic Vol, veh/h 116 392 453 88 100 122 Future Vol, veh/h 116 392 453 88 100 122 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - - 160 0 - Veh in Median Storage, # - 0 0 - 0 - Grade, % - 0 0 - 0 - Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 129 436 503 98 111 136 Major/Minor Major1 Major2 Minor2 Conflicting Flow All 601 0 - 0 1197 503 Stage 1 - - - - 503 - Stage 2 - - - - 694 - Critical Hdwy 4.12 - - - 6.42 6.22 Critical Hdwy Stg 1 - - - - 5.42 - Critical Hdwy Stg 2 - - - - 5.42 - Follow-up Hdwy 2.218 - - - 3.518 3.318 Pot Cap-1 Maneuver 976 - - - 205 569 Stage 1 - - - - 607 - Stage 2 - - - - 496 - Platoon blocked, % - - - Mov Cap-1 Maneuver 976 - - - 169 569 Mov Cap-2 Maneuver - - - - 169 - Stage 1 - - - - 501 - Stage 2 - - - - 496 - Approach EB WB SB HCM Control Delay, s 2.1 0 71.2 HCM LOS F Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1 Capacity (veh/h) 976 - - - 275 HCM Lane V/C Ratio 0.132 - - - 0.897 HCM Control Delay (s) 9.2 0 - - 71.2 HCM Lane LOS A A - - F HCM 95th %tile Q(veh) 0.5 - - - 8 HCM 6th TWSC No Build PM 3: Whitley Dr & Veteran Memorial Highway 02/28/2022 A & R Engineering. Inc Synchro 11 Report Page 3 Intersection Int Delay, s/veh 1.1 Movement EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Vol, veh/h 437 55 7 499 42 9 Future Vol, veh/h 437 55 7 499 42 9 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - - - 0 - Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 486 61 8 554 47 10 Major/Minor Major1 Major2 Minor1 Conflicting Flow All 0 0 547 0 1087 517 Stage 1 - - - - 517 - Stage 2 - - - - 570 - Critical Hdwy - - 4.12 - 6.42 6.22 Critical Hdwy Stg 1 - - - - 5.42 - Critical Hdwy Stg 2 - - - - 5.42 - Follow-up Hdwy - - 2.218 - 3.518 3.318 Pot Cap-1 Maneuver - - 1022 - 239 558 Stage 1 - - - - 598 - Stage 2 - - - - 566 - Platoon blocked, % - - - Mov Cap-1 Maneuver - - 1022 - 236 558 Mov Cap-2 Maneuver - - - - 236 - Stage 1 - - - - 598 - Stage 2 - - - - 560 - Approach EB WB NB HCM Control Delay, s 0 0.1 22.4 HCM LOS C Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT Capacity (veh/h) 263 - - 1022 - HCM Lane V/C Ratio 0.215 - - 0.008 - HCM Control Delay (s) 22.4 - - 8.6 0 HCM Lane LOS C - - A A HCM 95th %tile Q(veh) 0.8 - - 0 - HCM 6th AWSC No Build PM 4: Pinecrest Dr & Whitley Dr 02/28/2022 A & R Engineering. Inc Synchro 11 Report Page 4 Intersection Intersection Delay, s/veh 7.2 Intersection LOS A Movement EBL EBT WBT WBR SBL SBR Lane Configurations Traffic Vol, veh/h 3 2 4 52 49 1 Future Vol, veh/h 3 2 4 52 49 1 Peak Hour Factor 0.80 0.80 0.80 0.80 0.80 0.80 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 4 3 5 65 61 1 Number of Lanes 0 1 1 0 1 0 Approach EB WB SB Opposing Approach WB EB Opposing Lanes 1 1 0 Conflicting Approach Left SB WB Conflicting Lanes Left 1 0 1 Conflicting Approach Right SB EB Conflicting Lanes Right 0 1 1 HCM Control Delay 7.3 6.8 7.6 HCM LOS A A A Lane EBLn1 WBLn1 SBLn1 Vol Left, % 60% 0% 98% Vol Thru, % 40% 7% 0% Vol Right, % 0% 93% 2% Sign Control Stop Stop Stop Traffic Vol by Lane 5 56 50 LT Vol 3 0 49 Through Vol 2 4 0 RT Vol 0 52 1 Lane Flow Rate 6 70 62 Geometry Grp 1 1 1 Degree of Util (X) 0.007 0.068 0.074 Departure Headway (Hd) 4.218 3.492 4.251 Convergence, Y/N Yes Yes Yes Cap 845 1021 845 Service Time 2.259 1.528 2.264 HCM Lane V/C Ratio 0.007 0.069 0.073 HCM Control Delay 7.3 6.8 7.6 HCM Lane LOS A A A HCM 95th-tile Q 0 0.2 0.2 F U T U R E “B U I L D ” I N T E R S E C T I O N A N A L Y S I S HCM 6th AWSC Future Build AM 1: Cedar Mountain Rd & W.Strickland St 03/10/2022 A&R Engineering. Inc Synchro 11 Report Page 1 Intersection Intersection Delay, s/veh 8.1 Intersection LOS A Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 4 20 55 56 17 6 14 34 30 5 132 8 Future Vol, veh/h 4 20 55 56 17 6 14 34 30 5 132 8 Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 Heavy Vehicles, % 222222222222 Mvmt Flow 4 21 59 60 18 6 15 36 32 5 140 9 Number of Lanes 010010010010 Approach EB WB NB SB Opposing Approach WB EB SB NB Opposing Lanes 1111 Conflicting Approach Left SB NB EB WB Conflicting Lanes Left 1111 Conflicting Approach Right NB SB WB EB Conflicting Lanes Right 1111 HCM Control Delay 7.6 8.2 7.8 8.4 HCM LOS AAAA Lane NBLn1 EBLn1 WBLn1 SBLn1 Vol Left, % 18% 5% 71% 3% Vol Thru, % 44% 25% 22% 91% Vol Right, % 38% 70% 8% 6% Sign Control Stop Stop Stop Stop Traffic Vol by Lane 78 79 79 145 LT Vol 14 4 56 5 Through Vol 34 20 17 132 RT Vol 30 55 6 8 Lane Flow Rate 83 84 84 154 Geometry Grp 1111 Degree of Util (X) 0.099 0.097 0.109 0.188 Departure Headway (Hd) 4.289 4.161 4.656 4.378 Convergence, Y/N Yes Yes Yes Yes Cap 836 862 772 821 Service Time 2.31 2.18 2.675 2.397 HCM Lane V/C Ratio 0.099 0.097 0.109 0.188 HCM Control Delay 7.8 7.6 8.2 8.4 HCM Lane LOS AAAA HCM 95th-tile Q 0.3 0.3 0.4 0.7 HCM 6th TWSC Future Build AM 2: Site Driveway/Cedar Mountain Rd & Veteran Memorial Highway 03/10/2022 A&R Engineering. Inc Synchro 11 Report Page 2 Intersection Int Delay, s/veh 8.5 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 44 344 3 13 239 30 7 5 34 122 2 103 Future Vol, veh/h 44 344 3 13 239 30 7 5 34 122 2 103 Conflicting Peds, #/hr 0 00000000000 Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized - - None - - None - - None - - None Storage Length - - - 125 - 160 - - 0 - - - Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 90 90 90 90 90 90 90 90 90 90 90 90 Heavy Vehicles, % 2 22222222222 Mvmt Flow 49 382 3 14 266 33 8 6 38 136 2 114 Major/Minor Major1 Major2 Minor1 Minor2 Conflicting Flow All 299 0 0 385 0 0 851 809 384 798 777 266 Stage 1 - - - - - - 482 482 - 294 294 - Stage 2 - - - - - - 369 327 - 504 483 - Critical Hdwy 4.12 - - 4.12 - - 7.12 6.52 6.22 7.12 6.52 6.22 Critical Hdwy Stg 1 - ----- 6.12 5.52 - 6.12 5.52 - Critical Hdwy Stg 2 - ----- 6.12 5.52 - 6.12 5.52 - Follow-up Hdwy 2.218 - - 2.218 - - 3.518 4.018 3.318 3.518 4.018 3.318 Pot Cap-1 Maneuver 1262 - - 1173 - - 280 314 664 304 328 773 Stage 1 - - - - - - 565 553 - 714 670 - Stage 2 - - - - - - 651 648 - 550 553 - Platoon blocked, % - - - - Mov Cap-1 Maneuver 1262 - - 1173 - - 226 295 664 270 308 773 Mov Cap-2 Maneuver - - - - - - 226 295 - 270 308 - Stage 1 - - - - - - 537 526 - 679 662 - Stage 2 - - - - - - 546 640 - 488 526 - Approach EB WB NB SB HCM Control Delay, s 0.9 0.4 13.2 30.6 HCM LOS B D Minor Lane/Major Mvmt NBLn1 NBLn2 EBL EBT EBR WBL WBT WBR SBLn1 Capacity (veh/h) 250 664 1262 - - 1173 - - 384 HCM Lane V/C Ratio 0.053 0.057 0.039 - - 0.012 - - 0.657 HCM Control Delay (s) 20.2 10.7 8 0 - 8.1 - - 30.6 HCM Lane LOS C B A A - A - - D HCM 95th %tile Q(veh) 0.2 0.2 0.1 - - 0 - - 4.5 HCM 6th TWSC Future Build AM 3: Whitley Dr & Veteran Memorial Highway 03/10/2022 A&R Engineering. Inc Synchro 11 Report Page 3 Intersection Int Delay, s/veh 0.9 Movement EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Vol, veh/h 418 75 2 256 37 5 Future Vol, veh/h 418 75 2 256 37 5 Conflicting Peds, #/hr 0 00000 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - - - 0 - Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 93 93 93 93 93 93 Heavy Vehicles, % 2 22222 Mvmt Flow 449 81 2 275 40 5 Major/Minor Major1 Major2 Minor1 Conflicting Flow All 0 0 530 0 769 490 Stage 1 - - - - 490 - Stage 2 - - - - 279 - Critical Hdwy - - 4.12 - 6.42 6.22 Critical Hdwy Stg 1 - - - - 5.42 - Critical Hdwy Stg 2 - - - - 5.42 - Follow-up Hdwy - - 2.218 - 3.518 3.318 Pot Cap-1 Maneuver - - 1037 - 369 578 Stage 1 - - - - 616 - Stage 2 - - - - 768 - Platoon blocked, % - - - Mov Cap-1 Maneuver - - 1037 - 368 578 Mov Cap-2 Maneuver - - - - 368 - Stage 1 - - - - 616 - Stage 2 - - - - 766 - Approach EB WB NB HCM Control Delay, s 0 0.1 15.6 HCM LOS C Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT Capacity (veh/h) 385 - - 1037 - HCM Lane V/C Ratio 0.117 - - 0.002 - HCM Control Delay (s) 15.6 - - 8.5 0 HCM Lane LOS C - - A A HCM 95th %tile Q(veh) 0.4 - - 0 - HCM 6th AWSC Future Build AM 4: Pinecrest Dr & Whitley Dr 03/10/2022 A&R Engineering. Inc Synchro 11 Report Page 4 Intersection Intersection Delay, s/veh 7.5 Intersection LOS A Movement EBL EBT WBT WBR SBL SBR Lane Configurations Traffic Vol, veh/h 1 4 2 38 78 4 Future Vol, veh/h 1 4 2 38 78 4 Peak Hour Factor 0.81 0.81 0.81 0.81 0.81 0.81 Heavy Vehicles, % 222222 Mvmt Flow 1 5 2 47 96 5 Number of Lanes 011010 Approach EB WB SB Opposing Approach WB EB Opposing Lanes 1 1 0 Conflicting Approach Left SB WB Conflicting Lanes Left 1 0 1 Conflicting Approach Right SB EB Conflicting Lanes Right 0 1 1 HCM Control Delay 7.3 6.8 7.8 HCM LOS A A A Lane EBLn1 WBLn1 SBLn1 Vol Left, % 20% 0% 95% Vol Thru, % 80% 5% 0% Vol Right, % 0% 95% 5% Sign Control Stop Stop Stop Traffic Vol by Lane 5 40 82 LT Vol 1 0 78 Through Vol 4 2 0 RT Vol 0 38 4 Lane Flow Rate 6 49 101 Geometry Grp 1 1 1 Degree of Util (X) 0.007 0.049 0.118 Departure Headway (Hd) 4.19 3.545 4.191 Convergence, Y/N Yes Yes Yes Cap 847 1000 857 Service Time 2.25 1.602 2.204 HCM Lane V/C Ratio 0.007 0.049 0.118 HCM Control Delay 7.3 6.8 7.8 HCM Lane LOS A A A HCM 95th-tile Q 0 0.2 0.4 HCM 6th AWSC Future Build PM 1: Cedar Mountain Rd & W.Strickland St 03/10/2022 A&R Engineering. Inc Synchro 11 Report Page 1 Intersection Intersection Delay, s/veh 9.1 Intersection LOS A Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 13 20 52 70 26 7 40 102 66 8 104 7 Future Vol, veh/h 13 20 52 70 26 7 40 102 66 8 104 7 Peak Hour Factor 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 Heavy Vehicles, % 222222222222 Mvmt Flow 15 23 60 81 30 8 47 119 77 9 121 8 Number of Lanes 010010010010 Approach EB WB NB SB Opposing Approach WB EB SB NB Opposing Lanes 1111 Conflicting Approach Left SB NB EB WB Conflicting Lanes Left 1111 Conflicting Approach Right NB SB WB EB Conflicting Lanes Right 1111 HCM Control Delay 8.4 9.1 9.5 8.8 HCM LOS AAAA Lane NBLn1 EBLn1 WBLn1 SBLn1 Vol Left, % 19% 15% 68% 7% Vol Thru, % 49% 24% 25% 87% Vol Right, % 32% 61% 7% 6% Sign Control Stop Stop Stop Stop Traffic Vol by Lane 208 85 103 119 LT Vol 40 13 70 8 Through Vol 102 20 26 104 RT Vol 66 52 7 7 Lane Flow Rate 242 99 120 138 Geometry Grp 1111 Degree of Util (X) 0.301 0.127 0.167 0.181 Departure Headway (Hd) 4.478 4.631 5.024 4.721 Convergence, Y/N Yes Yes Yes Yes Cap 801 770 711 757 Service Time 2.52 2.684 3.077 2.769 HCM Lane V/C Ratio 0.302 0.129 0.169 0.182 HCM Control Delay 9.5 8.4 9.1 8.8 HCM Lane LOS AAAA HCM 95th-tile Q 1.3 0.4 0.6 0.7 HCM 6th TWSC Future Build PM 2: Site Driveway/Cedar Mountain Rd & Veteran Memorial Highway 03/10/2022 A&R Engineering. Inc Synchro 11 Report Page 2 Intersection Int Delay, s/veh 37.2 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 116 392 7 36 453 88 5 3 24 100 5 122 Future Vol, veh/h 116 392 7 36 453 88 5 3 24 100 5 122 Conflicting Peds, #/hr 0 00000000000 Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized - - None - - None - - None - - None Storage Length - - - 125 - 160 - - 0 - - - Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 90 90 90 90 90 90 90 90 90 90 90 90 Heavy Vehicles, % 2 22222222222 Mvmt Flow 129 436 8 40 503 98 6 3 27 111 6 136 Major/Minor Major1 Major2 Minor1 Minor2 Conflicting Flow All 601 0 0 444 0 0 1401 1379 440 1296 1285 503 Stage 1 - - - - - - 698 698 - 583 583 - Stage 2 - - - - - - 703 681 - 713 702 - Critical Hdwy 4.12 - - 4.12 - - 7.12 6.52 6.22 7.12 6.52 6.22 Critical Hdwy Stg 1 - ----- 6.12 5.52 - 6.12 5.52 - Critical Hdwy Stg 2 - ----- 6.12 5.52 - 6.12 5.52 - Follow-up Hdwy 2.218 - - 2.218 - - 3.518 4.018 3.318 3.518 4.018 3.318 Pot Cap-1 Maneuver 976 - - 1116 - - 118 144 617 139 165 569 Stage 1 - - - - - - 431 442 - 498 499 - Stage 2 - - - - - - 428 450 - 423 440 - Platoon blocked, % - - - - Mov Cap-1 Maneuver 976 - - 1116 - - 73 114 617 ~ 110 131 569 Mov Cap-2 Maneuver - - - - - - 73 114 - ~ 110 131 - Stage 1 - - - - - - 355 364 - 410 481 - Stage 2 - - - - - - 311 434 - 330 363 - Approach EB WB NB SB HCM Control Delay, s 2.1 0.5 21.5 212.4 HCM LOS C F Minor Lane/Major Mvmt NBLn1 NBLn2 EBL EBT EBR WBL WBT WBR SBLn1 Capacity (veh/h) 84 617 976 - - 1116 - - 195 HCM Lane V/C Ratio 0.106 0.043 0.132 - - 0.036 - - 1.293 HCM Control Delay (s) 52.9 11.1 9.2 0 - 8.3 - - 212.4 HCM Lane LOS F B A A - A - - F HCM 95th %tile Q(veh) 0.3 0.1 0.5 - - 0.1 - - 13.9 Notes ~: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon HCM 6th TWSC Future Build PM 3: Whitley Dr & Veteran Memorial Highway 03/10/2022 A&R Engineering. Inc Synchro 11 Report Page 3 Intersection Int Delay, s/veh 1.2 Movement EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Vol, veh/h 461 55 7 535 42 9 Future Vol, veh/h 461 55 7 535 42 9 Conflicting Peds, #/hr 0 00000 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - - - 0 - Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 2 22222 Mvmt Flow 512 61 8 594 47 10 Major/Minor Major1 Major2 Minor1 Conflicting Flow All 0 0 573 0 1153 543 Stage 1 - - - - 543 - Stage 2 - - - - 610 - Critical Hdwy - - 4.12 - 6.42 6.22 Critical Hdwy Stg 1 - - - - 5.42 - Critical Hdwy Stg 2 - - - - 5.42 - Follow-up Hdwy - - 2.218 - 3.518 3.318 Pot Cap-1 Maneuver - - 1000 - 218 540 Stage 1 - - - - 582 - Stage 2 - - - - 542 - Platoon blocked, % - - - Mov Cap-1 Maneuver - - 1000 - 215 540 Mov Cap-2 Maneuver - - - - 215 - Stage 1 - - - - 582 - Stage 2 - - - - 535 - Approach EB WB NB HCM Control Delay, s 0 0.1 24.5 HCM LOS C Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT Capacity (veh/h) 241 - - 1000 - HCM Lane V/C Ratio 0.235 - - 0.008 - HCM Control Delay (s) 24.5 - - 8.6 0 HCM Lane LOS C - - A A HCM 95th %tile Q(veh) 0.9 - - 0 - HCM 6th AWSC Future Build PM 4: Pinecrest Dr & Whitley Dr 03/10/2022 A&R Engineering. Inc Synchro 11 Report Page 4 Intersection Intersection Delay, s/veh 7.2 Intersection LOS A Movement EBL EBT WBT WBR SBL SBR Lane Configurations Traffic Vol, veh/h 3 2 4 52 49 1 Future Vol, veh/h 3 2 4 52 49 1 Peak Hour Factor 0.80 0.80 0.80 0.80 0.80 0.80 Heavy Vehicles, % 222222 Mvmt Flow 4 3 5 65 61 1 Number of Lanes 011010 Approach EB WB SB Opposing Approach WB EB Opposing Lanes 1 1 0 Conflicting Approach Left SB WB Conflicting Lanes Left 1 0 1 Conflicting Approach Right SB EB Conflicting Lanes Right 0 1 1 HCM Control Delay 7.3 6.8 7.6 HCM LOS A A A Lane EBLn1 WBLn1 SBLn1 Vol Left, % 60% 0% 98% Vol Thru, % 40% 7% 0% Vol Right, % 0% 93% 2% Sign Control Stop Stop Stop Traffic Vol by Lane 5 56 50 LT Vol 3 0 49 Through Vol 2 4 0 RT Vol 0 52 1 Lane Flow Rate 6 70 62 Geometry Grp 1 1 1 Degree of Util (X) 0.007 0.068 0.074 Departure Headway (Hd) 4.218 3.492 4.251 Convergence, Y/N Yes Yes Yes Cap 845 1021 845 Service Time 2.259 1.528 2.264 HCM Lane V/C Ratio 0.007 0.069 0.073 HCM Control Delay 7.3 6.8 7.6 HCM Lane LOS A A A HCM 95th-tile Q 0 0.2 0.2 F U T U R E “B U I L D W I T H I M P R O V E M E N T S ” I N T E R S E C T I O N A N A L Y S I S HCM 6th AWSC Future Build AM 1: Cedar Mountain Rd & W.Strickland St 03/10/2022 A&R Engineering. Inc Synchro 11 Report Page 1 Intersection Intersection Delay, s/veh 8.1 Intersection LOS A Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 4 20 55 56 17 6 14 34 30 5 132 8 Future Vol, veh/h 4 20 55 56 17 6 14 34 30 5 132 8 Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 Heavy Vehicles, % 222222222222 Mvmt Flow 4 21 59 60 18 6 15 36 32 5 140 9 Number of Lanes 010010010010 Approach EB WB NB SB Opposing Approach WB EB SB NB Opposing Lanes 1111 Conflicting Approach Left SB NB EB WB Conflicting Lanes Left 1111 Conflicting Approach Right NB SB WB EB Conflicting Lanes Right 1111 HCM Control Delay 7.6 8.2 7.8 8.4 HCM LOS AAAA Lane NBLn1 EBLn1 WBLn1 SBLn1 Vol Left, % 18% 5% 71% 3% Vol Thru, % 44% 25% 22% 91% Vol Right, % 38% 70% 8% 6% Sign Control Stop Stop Stop Stop Traffic Vol by Lane 78 79 79 145 LT Vol 14 4 56 5 Through Vol 34 20 17 132 RT Vol 30 55 6 8 Lane Flow Rate 83 84 84 154 Geometry Grp 1111 Degree of Util (X) 0.099 0.097 0.109 0.188 Departure Headway (Hd) 4.289 4.161 4.656 4.378 Convergence, Y/N Yes Yes Yes Yes Cap 836 862 772 821 Service Time 2.31 2.18 2.675 2.397 HCM Lane V/C Ratio 0.099 0.097 0.109 0.188 HCM Control Delay 7.8 7.6 8.2 8.4 HCM Lane LOS AAAA HCM 95th-tile Q 0.3 0.3 0.4 0.7 HCM 6th Signalized Intersection Summary Future Build AM 2: Site Driveway/Cedar Mountain Rd & Veteran Memorial Highway 03/10/2022 A&R Engineering. Inc Synchro 11 Report Page 2 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 44 344 3 13 239 30 7 5 34 122 2 103 Future Volume (veh/h) 44 344 3 13 239 30 7 5 34 122 2 103 Initial Q (Qb), veh 0 00000000000 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 49 382 3 14 266 33 8 6 38 136 2 114 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Percent Heavy Veh, % 2 22222222222 Cap, veh/h 142 1081 8 726 1268 1074 299 47 297 205 11 133 Arrive On Green 0.68 0.68 0.68 0.68 0.68 0.68 0.21 0.21 0.21 0.21 0.21 0.21 Sat Flow, veh/h 150 1596 12 998 1870 1585 1276 221 1398 705 51 625 Grp Volume(v), veh/h 434 0 0 14 266 33 8 0 44 252 0 0 Grp Sat Flow(s),veh/h/ln1758 0 0 998 1870 1585 1276 0 1619 1382 0 0 Q Serve(g_s), s 0.0 0.0 0.0 0.0 5.3 0.7 0.0 0.0 2.2 15.6 0.0 0.0 Cycle Q Clear(g_c), s 9.8 0.0 0.0 0.6 5.3 0.7 0.6 0.0 2.2 17.8 0.0 0.0 Prop In Lane 0.11 0.01 1.00 1.00 1.00 0.86 0.54 0.45 Lane Grp Cap(c), veh/h 1232 0 0 726 1268 1074 299 0 344 349 0 0 V/C Ratio(X) 0.35 0.00 0.00 0.02 0.21 0.03 0.03 0.00 0.13 0.72 0.00 0.00 Avail Cap(c_a), veh/h 1232 0 0 726 1268 1074 494 0 591 571 0 0 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 0.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00 0.00 Uniform Delay (d), s/veh 6.8 0.0 0.0 5.3 6.1 5.3 31.3 0.0 31.9 38.5 0.0 0.0 Incr Delay (d2), s/veh 0.8 0.0 0.0 0.0 0.2 0.0 0.0 0.0 0.2 2.8 0.0 0.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln3.3 0.0 0.0 0.1 1.7 0.2 0.2 0.0 0.9 6.2 0.0 0.0 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 7.6 0.0 0.0 5.3 6.2 5.3 31.3 0.0 32.1 41.3 0.0 0.0 LnGrp LOS A AAAAACACDAA Approach Vol, veh/h 434 313 52 252 Approach Delay, s/veh 7.6 6.1 31.9 41.3 Approach LOS A A C D Timer - Assigned Phs 2468 Phs Duration (G+Y+Rc), s 73.3 26.7 73.3 26.7 Change Period (Y+Rc), s 5.5 5.5 5.5 5.5 Max Green Setting (Gmax), s 52.5 36.5 52.5 36.5 Max Q Clear Time (g_c+I1), s 11.8 19.8 7.3 4.2 Green Ext Time (p_c), s 5.7 1.4 3.6 0.2 Intersection Summary HCM 6th Ctrl Delay 16.4 HCM 6th LOS B HCM 6th TWSC Future Build AM 3: Whitley Dr & Veteran Memorial Highway 03/10/2022 A&R Engineering. Inc Synchro 11 Report Page 3 Intersection Int Delay, s/veh 0.9 Movement EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Vol, veh/h 418 75 2 256 37 5 Future Vol, veh/h 418 75 2 256 37 5 Conflicting Peds, #/hr 0 00000 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - - - 0 - Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 93 93 93 93 93 93 Heavy Vehicles, % 2 22222 Mvmt Flow 449 81 2 275 40 5 Major/Minor Major1 Major2 Minor1 Conflicting Flow All 0 0 530 0 769 490 Stage 1 - - - - 490 - Stage 2 - - - - 279 - Critical Hdwy - - 4.12 - 6.42 6.22 Critical Hdwy Stg 1 - - - - 5.42 - Critical Hdwy Stg 2 - - - - 5.42 - Follow-up Hdwy - - 2.218 - 3.518 3.318 Pot Cap-1 Maneuver - - 1037 - 369 578 Stage 1 - - - - 616 - Stage 2 - - - - 768 - Platoon blocked, % - - - Mov Cap-1 Maneuver - - 1037 - 368 578 Mov Cap-2 Maneuver - - - - 368 - Stage 1 - - - - 616 - Stage 2 - - - - 766 - Approach EB WB NB HCM Control Delay, s 0 0.1 15.6 HCM LOS C Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT Capacity (veh/h) 385 - - 1037 - HCM Lane V/C Ratio 0.117 - - 0.002 - HCM Control Delay (s) 15.6 - - 8.5 0 HCM Lane LOS C - - A A HCM 95th %tile Q(veh) 0.4 - - 0 - HCM 6th AWSC Future Build AM 4: Pinecrest Dr & Whitley Dr 03/10/2022 A&R Engineering. Inc Synchro 11 Report Page 4 Intersection Intersection Delay, s/veh 7.5 Intersection LOS A Movement EBL EBT WBT WBR SBL SBR Lane Configurations Traffic Vol, veh/h 1 4 2 38 78 4 Future Vol, veh/h 1 4 2 38 78 4 Peak Hour Factor 0.81 0.81 0.81 0.81 0.81 0.81 Heavy Vehicles, % 222222 Mvmt Flow 1 5 2 47 96 5 Number of Lanes 011010 Approach EB WB SB Opposing Approach WB EB Opposing Lanes 1 1 0 Conflicting Approach Left SB WB Conflicting Lanes Left 1 0 1 Conflicting Approach Right SB EB Conflicting Lanes Right 0 1 1 HCM Control Delay 7.3 6.8 7.8 HCM LOS A A A Lane EBLn1 WBLn1 SBLn1 Vol Left, % 20% 0% 95% Vol Thru, % 80% 5% 0% Vol Right, % 0% 95% 5% Sign Control Stop Stop Stop Traffic Vol by Lane 5 40 82 LT Vol 1 0 78 Through Vol 4 2 0 RT Vol 0 38 4 Lane Flow Rate 6 49 101 Geometry Grp 1 1 1 Degree of Util (X) 0.007 0.049 0.118 Departure Headway (Hd) 4.19 3.545 4.191 Convergence, Y/N Yes Yes Yes Cap 847 1000 857 Service Time 2.25 1.602 2.204 HCM Lane V/C Ratio 0.007 0.049 0.118 HCM Control Delay 7.3 6.8 7.8 HCM Lane LOS A A A HCM 95th-tile Q 0 0.2 0.4 HCM 6th TWSC Future Build PM 1: Cedar Mountain Rd & W.Strickland St 03/10/2022 A&R Engineering. Inc Synchro 11 Report Page 1 Intersection Int Delay, s/veh 9.9 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 13 20 52 70 26 7 40 102 66 8 104 7 Future Vol, veh/h 13 20 52 70 26 7 40 102 66 8 104 7 Conflicting Peds, #/hr 0 00000000000 Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized - - None - - None - - None - - None Storage Length - ----------- Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 86 86 86 86 86 86 86 86 86 86 86 86 Heavy Vehicles, % 2 22222222222 Mvmt Flow 15 23 60 81 30 8 47 119 77 9 121 8 Major/Minor Major1 Major2 Minor1 Minor2 Conflicting Flow All 38 0 0 83 0 0 344 283 53 377 309 34 Stage 1 - - - - - - 83 83 - 196 196 - Stage 2 - - - - - - 261 200 - 181 113 - Critical Hdwy 4.12 - - 4.12 - - 7.12 6.52 6.22 7.12 6.52 6.22 Critical Hdwy Stg 1 - ----- 6.12 5.52 - 6.12 5.52 - Critical Hdwy Stg 2 - ----- 6.12 5.52 - 6.12 5.52 - Follow-up Hdwy 2.218 - - 2.218 - - 3.518 4.018 3.318 3.518 4.018 3.318 Pot Cap-1 Maneuver 1572 - - 1514 - - 610 626 1014 580 605 1039 Stage 1 - - - - - - 925 826 - 806 739 - Stage 2 - - - - - - 744 736 - 821 802 - Platoon blocked, % - - - - Mov Cap-1 Maneuver 1572 - - 1514 - - 482 586 1014 431 566 1039 Mov Cap-2 Maneuver - - - - - - 482 586 - 431 566 - Stage 1 - - - - - - 916 818 - 798 698 - Stage 2 - - - - - - 577 696 - 642 794 - Approach EB WB NB SB HCM Control Delay, s 1.1 5.1 13.9 13.3 HCM LOS B B Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1 Capacity (veh/h) 646 1572 - - 1514 - - 569 HCM Lane V/C Ratio 0.374 0.01 - - 0.054 - - 0.243 HCM Control Delay (s) 13.9 7.3 0 - 7.5 0 - 13.3 HCM Lane LOS B A A - A A - B HCM 95th %tile Q(veh) 1.7 0 - - 0.2 - - 0.9 HCM 6th Signalized Intersection Summary Future Build PM 2: Site Driveway/Cedar Mountain Rd & Veteran Memorial Highway 03/10/2022 A&R Engineering. Inc Synchro 11 Report Page 2 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 116 392 7 36 453 88 5 3 24 100 5 122 Future Volume (veh/h) 116 392 7 36 453 88 5 3 24 100 5 122 Initial Q (Qb), veh 000000000000 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 129 436 8 40 503 98 6 3 27 111 6 136 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Percent Heavy Veh, % 222222222222 Cap, veh/h 235 771 14 630 1304 1105 253 31 280 168 17 155 Arrive On Green 0.70 0.70 0.70 0.70 0.70 0.70 0.19 0.19 0.19 0.19 0.19 0.19 Sat Flow, veh/h 274 1107 20 946 1870 1585 1246 161 1449 603 88 804 Grp Volume(v), veh/h 573 0 0 40 503 98 6 0 30 253 0 0 Grp Sat Flow(s),veh/h/ln 1400 0 0 946 1870 1585 1246 0 1610 1495 0 0 Q Serve(g_s), s 12.5 0.0 0.0 0.0 11.1 2.0 0.0 0.0 1.5 14.9 0.0 0.0 Cycle Q Clear(g_c), s 23.6 0.0 0.0 2.5 11.1 2.0 0.6 0.0 1.5 16.4 0.0 0.0 Prop In Lane 0.23 0.01 1.00 1.00 1.00 0.90 0.44 0.54 Lane Grp Cap(c), veh/h 1020 0 0 630 1304 1105 253 0 311 340 0 0 V/C Ratio(X) 0.56 0.00 0.00 0.06 0.39 0.09 0.02 0.00 0.10 0.74 0.00 0.00 Avail Cap(c_a), veh/h 1020 0 0 630 1304 1105 334 0 415 437 0 0 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 0.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00 0.00 Uniform Delay (d), s/veh 8.1 0.0 0.0 5.0 6.3 4.9 32.8 0.0 33.2 39.2 0.0 0.0 Incr Delay (d2), s/veh 2.2 0.0 0.0 0.1 0.4 0.1 0.0 0.0 0.1 5.0 0.0 0.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 5.9 0.0 0.0 0.2 3.5 0.5 0.1 0.0 0.6 6.5 0.0 0.0 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 10.3 0.0 0.0 5.1 6.7 5.0 32.8 0.0 33.3 44.1 0.0 0.0 LnGrp LOS BAAAAACACDAA Approach Vol, veh/h 573 641 36 253 Approach Delay, s/veh 10.3 6.3 33.2 44.1 Approach LOS B A C D Timer - Assigned Phs 2468 Phs Duration (G+Y+Rc), s 75.2 24.8 75.2 24.8 Change Period (Y+Rc), s 5.5 5.5 5.5 5.5 Max Green Setting (Gmax), s 63.2 25.8 63.2 25.8 Max Q Clear Time (g_c+I1), s 25.6 18.4 13.1 3.5 Green Ext Time (p_c), s 9.0 0.9 8.5 0.1 Intersection Summary HCM 6th Ctrl Delay 14.8 HCM 6th LOS B Notes User approved pedestrian interval to be less than phase max green. HCM 6th TWSC Future Build PM 3: Whitley Dr & Veteran Memorial Highway 03/10/2022 A&R Engineering. Inc Synchro 11 Report Page 3 Intersection Int Delay, s/veh 1.2 Movement EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Vol, veh/h 461 55 7 535 42 9 Future Vol, veh/h 461 55 7 535 42 9 Conflicting Peds, #/hr 0 00000 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - - - 0 - Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 2 22222 Mvmt Flow 512 61 8 594 47 10 Major/Minor Major1 Major2 Minor1 Conflicting Flow All 0 0 573 0 1153 543 Stage 1 - - - - 543 - Stage 2 - - - - 610 - Critical Hdwy - - 4.12 - 6.42 6.22 Critical Hdwy Stg 1 - - - - 5.42 - Critical Hdwy Stg 2 - - - - 5.42 - Follow-up Hdwy - - 2.218 - 3.518 3.318 Pot Cap-1 Maneuver - - 1000 - 218 540 Stage 1 - - - - 582 - Stage 2 - - - - 542 - Platoon blocked, % - - - Mov Cap-1 Maneuver - - 1000 - 215 540 Mov Cap-2 Maneuver - - - - 215 - Stage 1 - - - - 582 - Stage 2 - - - - 535 - Approach EB WB NB HCM Control Delay, s 0 0.1 24.5 HCM LOS C Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT Capacity (veh/h) 241 - - 1000 - HCM Lane V/C Ratio 0.235 - - 0.008 - HCM Control Delay (s) 24.5 - - 8.6 0 HCM Lane LOS C - - A A HCM 95th %tile Q(veh) 0.9 - - 0 - HCM 6th AWSC Future Build PM 4: Pinecrest Dr & Whitley Dr 03/10/2022 A&R Engineering. Inc Synchro 11 Report Page 4 Intersection Intersection Delay, s/veh 7.2 Intersection LOS A Movement EBL EBT WBT WBR SBL SBR Lane Configurations Traffic Vol, veh/h 3 2 4 52 49 1 Future Vol, veh/h 3 2 4 52 49 1 Peak Hour Factor 0.80 0.80 0.80 0.80 0.80 0.80 Heavy Vehicles, % 222222 Mvmt Flow 4 3 5 65 61 1 Number of Lanes 011010 Approach EB WB SB Opposing Approach WB EB Opposing Lanes 1 1 0 Conflicting Approach Left SB WB Conflicting Lanes Left 1 0 1 Conflicting Approach Right SB EB Conflicting Lanes Right 0 1 1 HCM Control Delay 7.3 6.8 7.6 HCM LOS A A A Lane EBLn1 WBLn1 SBLn1 Vol Left, % 60% 0% 98% Vol Thru, % 40% 7% 0% Vol Right, % 0% 93% 2% Sign Control Stop Stop Stop Traffic Vol by Lane 5 56 50 LT Vol 3 0 49 Through Vol 2 4 0 RT Vol 0 52 1 Lane Flow Rate 6 70 62 Geometry Grp 1 1 1 Degree of Util (X) 0.007 0.068 0.074 Departure Headway (Hd) 4.218 3.492 4.251 Convergence, Y/N Yes Yes Yes Cap 845 1021 845 Service Time 2.259 1.528 2.264 HCM Lane V/C Ratio 0.007 0.069 0.073 HCM Control Delay 7.3 6.8 7.6 HCM Lane LOS A A A HCM 95th-tile Q 0 0.2 0.2 T R A F F I C V O L U M E W O R K S H E E T S 22-025 - Development, Veterans Memorial Highway in Douglasville, Georgia A&R Engineering Traffic Volumes 1.Cedar Mout Rd@W.Strickland Rd A.M. Peak Hour Condition L T R Tot L T R Tot L T R Tot L T R Tot Existing 2022 Traffic Counts: 13 32 27 72 5 129 8 142 4 20 53 77 54 17 6 77 Growth Factor (%): 1 1 1 1 1 1 1 1 1 1 1 1 No-Build 2024 Volumes: 13 33 28 74 5 132 8 145 4 20 54 78 55 17 6 78 Total New Trips: 1124 0000 0011 1001 Future 2024 Traffic Volumes: 14 34 30 78 5 132 8 145 4 20 55 79 56 17 6 79 P.M. Peak Hour Condition L T R Tot L T R Tot L T R Tot L T R Tot Existing 2022 Traffic Counts: 38 99 63 200 8 101 7 116 13 20 50 83 67 25 7 99 Growth Factor (%): 1 1 1 1 1 1 1 1 1 1 1 1 No-Build 2024 Volumes: 39 101 64 204 8 103 7 118 13 20 51 84 68 26 7 101 Total New Trips: 1124 0101 0011 2002 Future 2024 Traffic Volumes: 40 102 66 208 8 104 7 119 13 20 52 85 70 26 7 103 Cedar Mountain Road Cedar Mountain Road W Strick Land Street W Strick Land Street Northbound Southbound Eastbound Westbound March 2022 Northbound Cedar Mountain Road Cedar Mountain Road Southbound W Strick Land Street Eastbound W Strick Land Street Westbound 22-025 - Development, Veterans Memorial Highway in Douglasville, Georgia A&R Engineering Traffic Volumes 2.Cedar Mout Rd @ Veteran Hwy A.M. Peak Hour Condition L T R Tot L T R Tot L T R Tot L T R Tot Existing 2022 Traffic Counts: 0 0 0 0 120 0 101 221 43 337 0 380 0 234 29 263 Growth Factor (%): 1 1 1 1 1 1 1 1 1 1 1 1 No-Build 2024 Volumes: 0 0 0 0 122 0 103 225 44 344 0 388 0 239 30 269 Total New Trips: 7 5 34 46 0 2 0 2 0 0 3 3 13 0 0 13 Future 2024 Traffic Volumes: 7 5 34 46 122 2 103 227 44 344 3 391 13 239 30 282 P.M. Peak Hour Condition L T R Tot L T R Tot L T R Tot L T R Tot Existing 2022 Traffic Counts: 0 0 0 0 98 0 120 218 114 384 0 498 0 444 86 530 Growth Factor (%): 1 1 1 1 1 1 1 1 1 1 1 1 No-Build 2024 Volumes: 0 0 0 0 100 0 122 222 116 392 0 508 0 453 88 541 Total New Trips: 5 3 24 32 0 5 0 5 0 0 7 7 36 0 0 36 Future 2024 Traffic Volumes: 5 3 24 32 100 5 122 227 116 392 7 515 36 453 88 577 Cedar Mountain Road Cedar Mountain Road Veteran Memorial Highway Veteran Memorial Highway Northbound Southbound Eastbound Westbound March 2022 Northbound Cedar Mountain Road Cedar Mountain Road Southbound Veteran Memorial Highway Eastbound Veteran Memorial Highway Westbound 22-025 - Development, Veterans Memorial Highway in Douglasville, Georgia A&R Engineering Traffic Volumes 3.Veteran Hwy @Whitley Dr A.M. Peak Hour Condition L T R Tot L T R Tot L T R Tot L T R Tot Existing 2022 Traffic Counts: 36 0 5 41 0 0 0 0 0 376 74 450 2 238 0 240 Growth Factor (%): 1 1 1 1 1 1 1 1 1 1 1 1 No-Build 2024 Volumes: 37 0 5 42 0 0 0 0 0 384 75 459 2 243 0 245 Total New Trips: 0 0 0 0 0 0 0 0 0 34 0 34 0 13 0 13 Future 2024 Traffic Volumes: 37 0 5 42 0 0 0 0 0 418 75 493 2 256 0 258 P.M. Peak Hour Condition L T R Tot L T R Tot L T R Tot L T R Tot Existing 2022 Traffic Counts: 41 0 9 50 0 0 0 0 0 428 54 482 7 489 0 496 Growth Factor (%): 1 1 1 1 1 1 1 1 1 1 1 1 No-Build 2024 Volumes: 42 0 9 51 0 0 0 0 0 437 55 492 7 499 0 506 Total New Trips: 0 0 0 0 0 0 0 0 0 24 0 24 0 36 0 36 Future 2024 Traffic Volumes: 42 0 9 51 0 0 0 0 0 461 55 516 7 535 0 542 Whitley Drive - Veteran Memorial Highway Veteran Memorial Highway Northbound Southbound Eastbound Westbound Northbound Southbound Eastbound Westbound March 2022 Whitley Drive - Veteran Memorial Highway Veteran Memorial Highway 22-025 - Development, Veterans Memorial Highway in Douglasville, Georgia A&R Engineering Traffic Volumes 4. Whitley Dr @ Pinecrest Dr A.M. Peak Hour Condition L T R Tot L T R Tot L T R Tot L T R Tot Existing 2022 Traffic Counts: 0 0 0 0 76 0 4 80 1 4 0 5 0 2 37 39 Growth Factor (%): 1 1 1 1 1 1 1 1 1 1 1 1 No-Build 2024 Volumes: 0 0 0 0 78 0 4 82 1 4 0 5 0 2 38 40 Total New Trips: 0000 0000 0000 0000 Future 2024 Traffic Volumes: 0 0 0 0 78 0 4 82 1 4 0 5 0 2 38 40 P.M. Peak Hour Condition L T R Tot L T R Tot L T R Tot L T R Tot Existing 2022 Traffic Counts: 0 0 0 0 48 0 1 49 3 2 0 5 0 4 51 55 Growth Factor (%): 1 1 1 1 1 1 1 1 1 1 1 1 No-Build 2024 Volumes: 0 0 0 0 49 0 1 50 3 2 0 5 0 4 52 56 Total New Trips: 0000 0000 0000 0000 Future 2024 Traffic Volumes: 0 0 0 0 49 0 1 50 3 2 0 5 0 4 52 56 Northbound Southbound Eastbound Westbound March 2022 - Whitley Drive Pinecrest Drive Pinecrest Drive - Whitley Drive Pinecrest Drive Pinecrest Drive Northbound Southbound Eastbound Westbound 350 Research Ct, Ste. 200, Peachtree Corners, Georgia 30092  48 Atlanta Street, Marietta, Georgia 30060 Main: (770) 451-2741  Fax: (770) 451-3915 www.pecatl.com 3/27/2022 Re: Question and Answer Memo Veterans Memorial Highway at Pinecrest Drive – Rezoning Planned Unit Development 16.43 Acres – 3/24/2022 Community Meeting Follow Up PEC+ Project No. 20273.00A Dear Community Members: Thank you for all your time the past three meetings. The following is a question and answer to items that were brought up during the outdoor meeting on Thursday March 24th. These are the questions that we needed to review and get back to everyone with. Questions and Answers: 1. Please review and see if there is a possibility to provide more single family detached homes and less townhomes to be able to have more than 50% detached and less than 50% towns where now its more towns. a. Answer: We have reviewed the plans and were able to provide more single-family homes on the site. We are now providing 56 single family homes and 43 townhomes. We lost 5 additional lots from the previous plan to 99 total lots. We are at 57% detached on latest. 2. Please provide a fence along the 30’ replanted landscape strip to the east against the single-family homes as well as the southern property line where the stormwater management pond is located. a. We have updated the plan and the zoning conditions to provide a 5’ black vinyl chain link fence or 6’ privacy fence at the property line against the R-2 to the east. The stormwater pond will have a fence along the southern section by code. 3. Please send other communities that may have similar feel and layout. a. The following are locations/names/ and address for similar communities. They may have different architecture depending on if located in downtown area or not. i. South on Main in Downtown Duluth: This is going to be the most similar feel, but its very new so they are just installing finishing landscape. Address is 3300 N Star Blvd, Duluth, GA 30096 ii. 118 Green Street – Downtown Lawrenceville. This has both towns and detached homes in 2 story to get feel for the ideas. Address: 118 Green Street, Lawrenceville, Ga e S iii. Carver Hills: Has both detached and attached townhomes, towns are 3 stories, ours will only be 2 story. Address: 4215 N Carver Dr, Doraville, GA 30360 iv. Willowcrest: Has both detached and townhomes. Address: Southwest intersection of GLore Road and Floyd Road, Mabelton, Ga 30126 v. Marietta Walk: The architecture here is not as nice and these are front loads, where we are doing rear loads, but gives good feel of the layout of roads. 60 Marietta Walk Trace, Marietta, Ga.60 4. Look at replacing the sidewalk along Whitley Drive, its broken and overgrown a. We have added to the zoning stipulations that we will replace the sidewalk along Whitley Drive that exists today back to a new 4’ concrete sidewalk. 5. Can we work with the city to figure out how to make Whitley Drive a one-way road or add speed humps along it? a. We are committing in the conditions that we will work and guide the city on best practices for slowing down traffic. Many community members indicated they were not in favor of the one-way Project No. 20273.00A Community Question/Answer 4/29/2022 2 drive but wanted the traffic calming. We would work with the public works department to help determine the best location for speed hump. 6. Will stormwater be provided to help with backyard flooding for homes along Whitley and down Pinecrest? a. We are committing to comply with all City of Douglasville latest stormwater standards for the entire project. We are aware and were able to visually see the existing rainwater issues and can take those into account in design. 7. How can you get this many homes on 16.5 acres? a. We just reduced the townhomes and the overall homes and added more single family detached. The density we are proposing is not considered high for a downtown area along Veterans or other downtown projects we have worked on. Typically, in a downtown area you may see very high density and taller units for rent, we are not trying to propose anything like this. 8. How can we ensure that it won’t turn into rental? a. Rental restrictions need to be placed in zoning conditions to be reinforced by the local jurisdiction. If rental restrictions are only part of a HOA then they can be voted and changed. We are proposing to place zoning restrictions in the zoning conditions so that it will stay with the property and the HOA would not be able to change those unless they went back through the full zoning process with the City Council. We added a restriction in the conditions. 9. What are the price points of the homes? a. The homes are to start in the 300’s and go into the low 400’s. 10. What is the square footage of the homes? a. The townhomes would range from 1,600 to 2,000 sf b. The detached homes would range from 2,000 sf to over 3,000 sf with basement. 11. How many stories are the homes? a. Both the townhomes and the single family detached homes are two story. 12. Will I be able to see the stormwater pond from homes on Pinecrest? a. The stormwater pond will set in the ground and not above the ground and will be fenced around the perimeter to ensure its not visible. In addition, the pond sets back away from Pinecrest Drive. 13. What will be planted in the 30’ and 25’ landscape strips on the east and west? a. The plantings are intended to be mostly evergreen so that they provide year-round screening from the property. 14. Will we comply with the trail project the city is doing? a. Yes, we are providing the multi-use trail along the frontage to the entrance per the trail map. 15. Is there a vehicle connection to Pinecrest Drive? a. No, there is only a fire department access road with gate to Pinecrest, no vehicles will come through. 16. Is there enough guest parking inside the development? We have problems with parking along Whitley from the funeral home. a. Yes, we are providing a large amount of guest parking for the site. In addition, we are committed to working with the city on signage along Whitley for “no parking” signs. 350 Research Ct, Ste 200, Peachtree Corners, Georgia 30092  Main: (770) 451-2741  Fax: (770) 451-3915 www.pecatl.com 2/16/2022 Re: Neighborhood Meeting – Meeting Minutes 12691, 12701 Veterans Memorial Highway Douglasville, Georgia Planners and Engineers Collaborative, Inc. Project No. 20273.00A Dear Neighbors, A neighborhood meeting was held on Tuesday, February 8th at 6:00PM to 7:00PM via Zoom webinar to discuss the possibilities of a development at the above-referenced site. At the meeting, representatives from PEC+, the engineering and design team, were able to interact with neighbors to discuss concerns and ideas for development. The meeting was extremely productive, thanks to the neighbors that participated! Below is a summary of notes taken at the meeting. Attached to this email is a transcript of the Zoom chat. I will also send out a Leapfile link to download the large video file of the meeting. Community Comments:  Desire expressed to see homeownership as opposed to rentals  Desire expressed to have luxury homes as opposed to starter homes  Rosewood and Independence (former PEC+ project currently underway) cited as a ‘nice’ comp example  Many traffic issues surrounding the site: o Whitley is a cut through route – traffic is bad at all times during the day o Pinecrest tends to get a lot of traffic o Issues with ‘drag racing’ and ‘burnouts’ o There is a lot of traffic from funerals o Overflow parking from funerals occurs along Whitley. There are no ‘no parking’ signs to discourage this. o The City of Douglasville has told residents that they must finance traffic calming measures such as speed tables and speed bumps  The railroad crossing also makes traffic more complicated—when the gates come down, traffic is backed up in both directions.  Desire expressed to see sidewalks and pedestrian connectivity  Density complimentary to homes on Morningside/Newborn, Roselake  Single-family structures preferred  Interested in high-quality development since many of the residents have lived in area for long period of time. Would like to build and maintain that community. We are committed to keeping the public informed during the process of this application. If you have any questions, comments, or concerns, please feel free to reach out to us at 770-451-2741. Sincerely, Planners and Engineers Collaborative, Inc. AGENDA ITEM REPORT Item Number: Meeting: Staff Contact: 24-157 05-20-2024 - City Council Regular Meeting (6:00 PM) James Gordon, Sr. Project Manager Consider a request for final plat approval for the purpose of consolidating four lots, for 41.430 acres at Preston Boulevard and Bob Arnold Boulevard in Land Lot 677, District 18, Section 2, Parcels 2 and 5, Land Lot 678, District 18, Section 2, Parcel 10 and Land Lot 709, District 18, Section 2, Parcel 2. Application by Kaylee Murtagh. (James Gordon) Attachments: 2024 -- Greystar Sweetwater - Staff Memo 2024 -- Greystar Sweetwater - Application 2024 -- Preston Blvd Combination Plat - Updated 2021 -- Staff Memo (PPR21-0012) 2021 -- Plat Application for Consolidation 2021 -- Old Plat Never Signed (SKM_C30821042613150) Recommendation(s): RES-2024-24 (NOTE: Formerly 5-3-21 RES-2021-27; Reason for going before Council again: The physical Final Plat lacked a required signature.) Budget Impact: Is this an Agreement or Contract: No If YES, check one: ☐ Original Agreement ☐ Change Order, Change Order # Is it budgeted? No If so, what Account #? PURPOSE: 2021 Final Plat was approved but lacked the Mayor’s signature and thus not Recorded. Consider a request for final plat approval for the purpose of consolidating four lots, for 41.430 acres at Preston Boulevard and Bob Arnold Boulevard in Land Lot 677, District 18, Section 2, Parcels 2 and 5, Land Lot 678, District 18, Section 2, Parcel 10 and Land Lot 709, District 18, Section 2, Parcel 2. Application by Jared McKinnon (James Gordon) The Final Plat application was reviewed by the listed departments/agencies and the findings were as follows: Water & Sewer Authority (WSA) – No concerns found Douglas County Fire and Rescue – No concerns found Douglas County School Board – No concerns found Douglas County Environmental Health – No concerns found Douglasville Community Development – No concerns found Douglasville Permits/Inspections – No concerns found Douglasville Public Services – No concerns found Douglasville Engineering – No concerns found City Staff has reviewed the application and attachments. It has been determined that the proposed plat meets the requirements of the UDO, as stated in Section 11.02.E.1. Therefore, staff recommends approval of this Final Plat. TO: Mayor and Council, City of Douglasville FROM: James F. Gordon, Senior Project Manager DATE: May 09, 2024 SUBJECT: STAFF MEMO Final Plat for Greystar Sweetwater WARD: 5 ITEM NUMBER: 24-157 ENGINEERING DEPARTMENT 6701 Church Street, Douglasville, GA 30134 • 770-920-3000 • DOUGLASVILLEGA.GOV DOUGLASVILLE GEORGIA Final Plat Application Checklist City of Douglasville | Community Development Department | 6701 Church St, Douglasville, GA 30134 | Final Plat Application Packet | 6/07/22 ( Page 1 Completed Application Form $100.00 Fee + $50.00/Subsequent Page 2 copies of the plat (sheet size 18x24, scale of 100 feet to one inch or larger) A final plat of a subdivision is presented as an accurate depiction of the layout of the subdivision that has been constructed so that it can be properly recorded and then used as a permanent reference for the sale of the property included within the subdivision. Sec. 11.07 of the Unified Development Code outlines all standards and requirements for submitting a final plat. The following items need to be submitted in order to process this application. Once all items have been received by the City of Douglasville’s Community Development Department, the plat may be placed on the agenda for approval. Name of the subdivision and unit or phase number Names, addresses, and telephone numbers of the property owner of record and the developer or subdivider Name, address, and telephone number each professional firm associated with the portion of the subdivision depicted on the final plat Date of plat and survey, north arrow and graphic scale Subdivision location including land lot(s) and land district(s), area in acres, internal and abutting zoning, proposed number of lots and area represented in tabular format showing associated square footage A location sketch or vicinity map positioning the subdivision in relation to the surrounding area Field-run boundary survey of the subdivision property perimeter showing actual bearings in degrees, minutes and seconds and distances in feet and hundredths of a foot along all lines and the bearing and distances to an existing street intersection or other recognized permanent landmark Municipal or county jurisdictional lines Locations, widths, and names of all streets within and immediately adjoining the plat and all other public or utilities easements or rights-of-way Street centerlines Lot lines with complete dimensions Building setback lines with dimensions Lots numbered in numerical order, blocks lettered alphabetically, and addresses as established by the city Location, material and size of all drainage pipes, location and type of all drainage system appurtenances, location and extent of detention ponds with 100-year event level noted, the location, material and size of all water and sewer mains and appurtenances, the location of all fire hydrants, and the location, width and purpose of any easements, including slope easements Location of any areas to be reserved, donated, or dedicated to public use with notes stating their purpose and limitations. Location of any areas to be reserved by private deed covenant for common use of all property owners or dedicated to a homeowner's association A statement of restrictive covenants or conservation easements Accurate location, material, and description of property corner or line monuments or markers. All monuments and markers shall be in place prior to approval of the final plat Extent and elevation of the regulated floodplain within the subdivision Individual lots, which are deemed by the community development department as requiring site plans, shall be designated in a readily identifiable manner. No part of any lot shall contain state waters, conservation easements or other permanently protected areas, or the required undisturbed buffers for those areas. Certificates and statements specified in these regulations DOUGLASVILLE GEORGIA Final Plat Application Applicant Name Mailing Address City State Zip Telephone # E-mail Address Owner Name Mailing Address City State Zip Telephone # E-mail Address Project Project Name Project Address City State Zip Land Lot(s) District Section Parcel #(s) Property Size in Acres Number of Lots □Application Rejected Zoning Administrator Date City of Douglasville | Community Development Department | 6701 Church St, Douglasville, GA 30134 | Final Plat Application Packet | 6/07/22 | Page 2 Case No. Project Owner □ Application Approved for Staff Review N/F DCT DOUGLAS HILL, LLC DB-3554 PG-841 N/F MITCHELL M. HESTER DB-947 PG-155 N/F RUSSELL WALLACE, LLLP DB-2062 PG-784 N/F BREIT TA MF SWEETWATER CREEK, LLC. DB-3692 PG-1 TRAE LANE (80' R/W) PUBLICLY DEDICATED N/F IHFC GEORGIA, LLC DB-3540 PG-562 N/F VW SHAKEL TRUST DB-1155 PG-516 N/F PALDOR PROPERTIES, LLC DB-3702 PG-219 DOUGLAS COUNTY PARCEL 06771820005 P.B.-21 PG-196 DOUGLAS COUNTY PARCEL 06781820010 P.B.-31 PG-134 N/F LANDMARK WEST, LLC DB-3244 PG-507 S60°03'12"W 246.23' S29°39'48"E 302.81' N01°42'43"E 437.14' S89°02'45"E 419.15' S01°54'42"W 298.65' L1 L3 L2 L4 L5 RAD:300.00' ARC:168.29' S86°26'52"W CH:166.09' RAD:550.00' ARC:312.51' N53°13'01"E CH:308.32' N87°26'13"E 114.05' RAD:450.00' ARC:421.35' N60°49'45"E CH:406.12' RAD:550.00' ARC:176.80' N78°42'12"E CH:176.04' L6 P.O.B. P.O.C. PRESTON BOULEVARD (VARIABLE R/W) PUBLICLY DEDICATED PRESTON BOULEVARD (VARIABLE R/W) PUBLICLY DEDICATED BOB ARNOLD BOULEVARD (70' R/W) PUBLICLY DEDICATED S88°17'22"E 121.93' S87°53'59"E 523.52' L8 S33°54'12"W 285.08' N53°47'35"W 124.68' S31°29'30"W 617.60' S47°25'16"E 19.32' ARC:321.29' RAD:445.00' S68°06'19"E CH:314.36' S88°47'23"E 56.15' C2 L10 L11 L12 L13 L14L15 L16 L17 L18 L19 L20 L21 L22 L23 L24 L25 N01°14'06"E 625.17' L26 L27 L28 L29 L32L31 L30 L34 L33 L35 L36 L37 L38 L39 L40 L41 L42 L43 L44 L45 L46 L48 L47 L49 L50 L51 L52 L53 L54 L56 L55 L57 L58 L59 L61 L60 L62 L63 L64 L65 L66 L67 L68 L69 L70 L72L71 L73 L74 L76 L75 L77 L78 L79 L80 L81 L82 L83 L84 L85 N/F CORPORATE RIDGE ASSOCIATES, LLC DB-3638 PG-998 N/F CORPORATE RIDGE ASSOCIATES, LLC DB-3638 PG-994 S89°02'45"E 108.63' N01°57'28"E 78.38' DOUGLAS COUNTY PARCEL 06771820002 DOUGLAS COUNTY PARCEL 07091820002 L9 L86 C1 C3 C4 CURVE TABLE LINE TABLE PROPERTY LINE TO BE ABANDONED PROPERTY LINE TO BE ABANDONED PROPERTY LINE TO BE ABANDONED COMBINED SITE AREA 41.430 ACRES 1,804,708 SQUARE FEET REVISIONS DATE: DESCRIPTION DATE: FEBRUARY 11, 2021 JOB #: 203101 SCALE: 1"=100' DRAWN BY: H. FISHER LOWERY & ASSOCIATES LAND SURVEYING, LLC 317 GRASSDALE ROAD CARTERSVILLE, GA 30121 770$33+$8186 WWW.LOWERYLANDSURVEYS.COM INFO7LOWERYLANDSURVEYS.COM GEORGIA C.O.A.: LSF$001102 SURVEY NOTES VICINITY MAP COMBINATION PLAT OF: DOUGLAS COUNTY PARCELS 06781820010; 06771820002; 06771820005 (TRACT 1); AND 07091820002 (TRACT 3) STATE: GEORGIA LAND LOTS: 677, 678, 708, & 709 SECTION: 2 DISTRICT: 18 COUNTY: DOUGLAS PREPARED FOR: GREYSTAR DEVELOPMENT EAST, LLC SURVEY REFERENCES ZONING GRID NORTH (GA WEST) (SURVEY NOTE 6) CERTIFICATE OF FINAL PLAT APPROVAL OWNER(S) CERTIFICATE SURVEYOR'S CERTIFICATION LEGEND CERTIFICATE OF FINAL PLAT APPROVAL GS DOUGLASVILLE OWNER, LLC DocuSign Envelope ID: 6B42A651-961F-4BC9-A98D-DAE28FC10D04 John Roberson Vice President To: Mayor & City Council CC: Patrice R. Williams, Community Development Director Ryan Anderson, Zoning Administrator From: Maya Jackson, Planner I Date: April 29, 2021 Subject: Final Plat Review, Case No. PPR21-0012 The applicant, Jared McKinnon, is requesting final plat approval for the purpose of consolidating four lots, for 41.430 acres at Preston Boulevard and Bob Arnold Boulevard in Land Lot 677, District 18, Section 2, Parcels 2 and 5, Land Lot 678, District 18, Section 2, Parcel 10 and Land Lot 709, District 18, Section 2, Parcel 2. Greystar Sweetwater, a multifamily development currently under building review, will be developed on the tract. Please find attached the proposed final plat. City Staff has reviewed the application and attachments and has determined that the proposed plan meets the requirements of the UDO. Staff recommends approval of this Final Plat. City of Douglasville | Community Development Department | 6701 Church St, Douglasville, GA 30134 | Final Plat Application Packet | 1/20/21 | Page 1 Final Plat Application Checklist A final plat of a subdivision is presents an accurate depiction of the layout of the subdivision that has been constructed so that it can be properly recorded and then used as a permanent reference for the sale of the property included within the subdivision. Sec. 11.07 of the Unified Development Code outlines all standards and requirements for submitting a final plat. The following items need to be submitted in order to process this application. Once all items have been received by the City of Douglasville’s Community Development Department, the plat may be placed on the agenda for approval. Completed Application Form $100.00 Fee + $50.00/Subsequent Page 2 copies of the plat (sheet size 18x24, scale of 100 feet to one inch or larger)  Name of the subdivision and unit or phase number  Names, addresses, and telephone numbers of the property owner of record and the developer or subdivider  Name, address, and telephone number each professional firm associated with the portion of the subdivision depicted on the final plat  Date of plat and survey, north arrow and graphic scale  Subdivision location including land lot(s) and land district(s), area in acres, internal and abutting zoning, proposed number of lots and area represented in tabular format showing associated square footage  A location sketch or vicinity map positioning the subdivision in relation to the surrounding area  Field-run boundary survey of the subdivision property perimeter showing actual bearings in degrees, minutes and seconds and distances in feet and hundredths of a foot along all lines and the bearing and distances to an existing street intersection or other recognized permanent landmark  Municipal or county jurisdictional lines  Locations, widths, and names of all streets within and immediately adjoining the plat and all other public or utilities easements or rights-of-way  Street centerlines  Lot lines with complete dimensions  Building setback lines with dimensions  Lots numbered in numerical order, blocks lettered alphabetically, and addresses as established by the city  Location, material and size of all drainage pipes, location and type of all drainage system appurtenances, location and extent of detention ponds with 100-year event level noted, the location, material and size of all water and sewer mains and appurtenances, the location of all fire hydrants, and the location, width and purpose of any easements, including slope easements  Location of any areas to be reserved, donated, or dedicated to public use with notes stating their purpose and limitations. Location of any areas to be reserved by private deed covenant for common use of all property owners or dedicated to a homeowner's association  A statement of restrictive covenants or conservation easements  Accurate location, material, and description of property corner or line monuments or markers. All monuments and markers shall be in place prior to approval of the final plat  Extent and elevation of the regulated floodplain within the subdivision  Individual lots, which are deemed by the community development department as requiring site plans, shall be designated in a readily identifiable manner. No part of any lot shall contain state waters, conservation easements or other permanently protected areas, or the required undisturbed buffers for those areas.  Certificates and statements specified in these regulations City of Douglasville | Community Development Department | 6701 Church St, Douglasville, GA 30134 | Final Plat Application Packet | 1/20/21 | Page 2 Final Plat Application Case No. Applicant _______________________________________________________________________________________________ Name _______________________________________________________________________________________________ Mailing Address City State Zip _______________________________________________________________________________________________ Telephone # _______________________________________________________________________________________________ E-mail Address Owner _______________________________________________________________________________________________ Name _______________________________________________________________________________________________ Mailing Address City State Zip _______________________________________________________________________________________________ Telephone # _______________________________________________________________________________________________ E-mail Address Project ___________________________________________________________________________________________ Project Name _______________________________________________________________________________________________ Project Address City State Zip _______________________________________________________________________________________________ Land Lot(s) District Section ____________________________________________________________________________________________________ Parcel #(s) _______________________________________________________________________________________________ Property Size in Acres Number of Lots _______________________________________________________________________________________________ Project Owner  Application Approved for Staff Review Application Rejected ________________________________________________________________ ____________________ Zoning Administrator Date PPR21-0012 ‘v . ~ -.:1.525‘. .. 5P'E§;s:1:;s;;:;* * raw:sgsgg-§*1:<§:::ga;' E , 1 —. ,. ,3 3 .. ._ ,_ . . 7. , a L P 33 3; .1..L ' “E orb -.:_,....§ AGENDA ITEM REPORT Item Number: Meeting: Staff Contact: 24-174 05-20-2024 - City Council Regular Meeting (6:00 PM) James Gordon, Sr. Project Manager Consider a request for Revised Final Plat approval for Silverman Phase 4 to correct a line dimension along Tract IV, on +/- 57.99 acres at 7600 Wood Road in Land Lot 162, District 2, Section 5, Parcel ID 01620250001. Application by SL Douglas Place II, LLC c/o Steven Moon. (James Gordon) Attachments: Silverman Phase 4 REV 1 - Staff Memo Silverman Ph 4 Rev 1 - Application H16314.11P6_FP_UPDATED1 Recommendation(s): RES-2024-25 Budget Impact: Is this an Agreement or Contract: No If YES, check one: ☐ Original Agreement ☐ Change Order, Change Order # Is it budgeted? No If so, what Account #? PURPOSE: Consider a request for Revised Final Plat approval for Silverman Phase 4 to correct a line dimension along Tract IV, on +/- 57.99 acres at 7600 Wood Road in Land Lot 162, District 2, Section 5, Parcel ID 01620250001. Application by SL Douglas Place II, LLC c/o Steven Moon. The Revised Final Plat application was reviewed by the listed departments/agencies and the findings were as follows: Water & Sewer Authority (WSA) – No concerns found Douglas County Fire and Rescue – No concerns found Douglas County School Board – No concerns found Douglas County Environmental Health – No concerns found Douglasville Community Development – No concerns found Douglasville Permits/Inspections – No concerns found Douglasville Public Services – No concerns found Douglasville Engineering – No concerns found City Staff has reviewed the application and attachments. It has been determined that the proposed plat meets the requirements of the UDO, as stated in Section 11.02.E.1. Therefore, staff recommends approval of this Revised Final Plat. TO: Mayor and Council, City of Douglasville FROM: James F. Gordon, Senior Project Manager DATE: May 09, 2024 SUBJECT: STAFF MEMO Revised Final Plat for Silverman Phase 4 (Rev 1) WARD: 2 ITEM NUMBER: 24-174 ENGINEERING DEPARTMENT 6701 Church Street, Douglasville, GA 30134 • 770-920-3000 • DOUGLASVILLEGA.GOV {'1 DOUGL s LLE WWW!) net {867‘ 999-5899 Te‘laphona MensabMS?uemaagme-t Zip E—mailAddress 162 2nd 5th Land .99 Pro ‘ ores Projec Owner D Ap Staff Review DApplIca?on Zoning Date Applicant SL Douglas Place ll, LLC Name 195 Morristown Road Baskina Ridae NJ 07920 MailingAddress City State Zip (562) 222—5399 Telephone # E-mailAddress Owner SL Douglas Place II, LLC Name MailingAddress State # Project Silverman Phase 4 Project Name Wood Road Doualasville GA 30135 Project Address City State Zip Lot(s) District Section 01620250001 Parcel #(s) 57 4 Number of Lots plication Approved for Rejected Administrator City of Douglasville | Community Development Departmentl 6701 Church St, Douglasville, GA 30134 | Final PlatApplicatlon Packetl1/20/21 IPage 2 1 ['1 POUGLASVILLE GEORGIA inal Plat App ication Check ist A final plat of a subdivision is presents an accurate. depiction of the layout of the subdivision that has been constructed so that it can be properly recorded and then used as a permanent reference for the sale of the property included withinthe subdivision. Sec. 11.07 of the Unified Development Code outlines all standards and requirements for submitting a final plat. The following items need to be submitted in order to process this application. Once all items have been received by the City of Douglasville’s Community Development Department, the plat may be placed on the agenda for approval. El Completed Application Form El $100.00 Fee + $50.0018ubsequent Page El 2 copies of the plat (sheet size 18x24, scale of 100 feet to one inch or larger) El Name of the subdivision and unit or phase number El Names, addresses, and telephone numbers of the property owner of record and the developer or subdivider E Name, address, and telephone number each professional firmassociated with the portion of the subdivision depicted on the final plat El Date of plat and survey, north arrow and graphic scale El Subdivision location including land lot(s) and land district(s), area in acres, internal and abutting zoning, proposed number of lots and area represented in tabular format showing associated square footage I] A location sketch or vicinity map positioning the subdivision in relation to the surrounding area Cl Field-run boundary survey of the subdivision property perimeter showing actual bearings in degrees, minutes and seconds and distances in feet and hundredths of a foot along all lines and the bearing and distances to an existing street intersection or other recognized permanent landmark El Municipal or county jurisdictional lines 2! Locations, widths.and names of allstreets within and immediatelyadjoining the plat and all other public or utilitieseasements or rights-of-way :l Street centerlines El Lot lines with complete dimensions _ Building setback lines with dimensions El Lots numbered in numerical order, blocks lettered alphabetically, and addresses as established by the city _ Location, material and size of all drainage pipes, location and type of all drainage system appurtenances, location and extent of detention ponds with 100-year event level noted, the location, material and size of all water and sewer mains and appurtenances, the location of all fire hydrants, and the location, width and purpose of any easements, including slope easements III Location of any areas to be reserved, donated, or dedicated to public use with notes stating their purpose and limitations. Location of any areas to be reserved by private deed covenant for common use of all property owners or dedicated to a homeowner‘s association A statement of restrictive covenants or conservation easements Accurate location.material, and description of property corner or line monuments or markers. All monuments and markers shall be in place prior to approval of the final plat Extent and elevation of the regulated floodplain within the subdivision Individuallots, which are deemed by the community development department as requiring site plans, shall be designated in a readily identi?able manner. No part of any lotshall contain state waters, conservation easements or other permanently protected areas, or the required undisturbed buffers for those areas. :l Certificates and statements specified in these regulations [:ILJ l—ll_l City of Douglasville | Community Development Department | 6701 Church St, Douglasville. GA 30134 | Final Plat ApplicationPacket| 1120/21 | Page FINAL PLAT FOR SILVERMAN PHASE 4 LOCATED IN LAND LOT 162, 2ND DISTRICT, 5TH SECTION CITY OF DOUGLASVILL, DOUGLAS COUNTY, GEORGIA RECORDATION AREA AD RO N TA I N UOM AR CED S F LAT ROC K ROAD VETERANS MEMOR I AL H I GHWAY UE EN AV OGA I C HC 2 9 Y WH T ROAD WES HN JO DAOR RAT S T H GI RB I NTERSTATE 2 0 ARP ROAD B I L DOUGL AS BOULEVARD 1) THIS SURVEY HAS BEEN PREPARED FOR THE EXCLUSIVE USE OF THE PERSON OR ENTITIES NAMED HEREON. NO EXPRESS OR IMPLIED WARRANTIES WITH RESPECT TO THE INFORMATION SHOWN HEREON IS TO BE EXTENDED TO ANY PERSONS OR ENTITIES OTHER THAN THOSE SHOWN HEREON. 2) FLOOD STATEMENT: AS PER OFFICIAL FIRM MAP 13097C0132D DATED 3/4/2013 A PORTION OF THIS PROPERTY IS LOCATED IN A DESIGNATED FLOOD HAZARD AREA. 3) HUGHES-RAY COMPANY, INC. AND THE LAND SURVEYOR WHOSE SEAL IS AFFIXED HERETO DO NOT GUARANTEE THAT ALL EASEMENTS, CLAIMS, PRESCRIPTIONS, SUBSURFACE CONDITIONS OR ANY OTHER MATTER WHICH MAY AFFECT THE PROPERTY ARE SHOWN HEREON. 4) THIS SURVEY WAS PREPARED IN CONFORMITY WITH THE TECHNICAL STANDARDS FOR PROPERTY SURVEY IN GEORGIA AS SET FORTH IN CHAPTER 180-7 OF THE RULES OF THE GEORGIA BOARD OF REGISTRATION FOR PROFESSIONAL ENGINEERS AND LAND SURVEYORS AND AS SET FORTH IN THE GEORGIA PLAT ACT O.C.G.A. 15-6-67. THE FIELD DATA UPON WHICH THIS PLAT IS BASED WAS PERFORMED USING AN CLOSED TRAVERSE AND WAS NOT ADJUSTED. THIS PLAT HAS BEEN CALCULATED FOR CLOSURE AND IS FOUND TO BE ACCURATE WITHIN ONE FOOT IN 309,317 FEET. THE FOLLOWING TYPE OF EQUIPMENT WAS USED TO OBTAIN THE LINEAR AND ANGULAR MEASUREMENTS USED IN THE PREPARATION OF THIS PLAT: TRIMBLE S6 ROBOTIC TOTAL STATION AND DATA COLLECTOR THE FOLLOWING CERTIFICATION STATEMENT FROM THE COMMUNITY DEVELOPMENT DIRECTOR SHALL APPEAR IN THE APPROVED FINAL PLAT PACKAGE: THIS FINAL PLAT HAS BEEN PREPARED IN ACCORDANCE WITH THE APPROVED SKETCH PLAN, THE APPROVED PRELIMINARY PLAT, THE APPROVED CONSTRUCTION PLANS, AND THE OTHER APPLICABLE DEVELOPMENT CODES AND ORDINANCES, AND HAS BEEN APPROVED BY THE CITY OF DOUGLASVILLE FOR RECORDING IN THE OFFICE OF THE CLERK OF THE SUPERIOR COURT OF DOUGLAS COUNTY. ENGINEER DATE CITY CLERK DATE COMMUNITY DEVELOPMENT DIRECTOR DATE THE FOLLOWING CERTIFICATION STATEMENT FROM THE SURVEYOR OF RECORD SHALL APPEAR IN THE APPROVED FINAL PLAT PACKAGE: IT IS HEREBY CERTIFIED THAT THIS PLAT IS TRUE AND CORRECT AND WAS PREPARED FROM AN ACTUAL SURVEY OF THE PROPERTY MADE BY ME OR UNDER MY SUPERVISION; THAT ALL MONUMENTS SHOWN HEREON ACTUALLY EXIST OR ARE MARKED AS “FUTURE” AND THEIR LOCATION, SIZE, TYPE, AND MATERIAL ARE CORRECTLY SHOWN: THIS PLAT CONFORMS TO ALL REQUIREMENTS OF THE GEORGIA PLAT ACT. BY: SIGNATURE OF REGISTERED GEORGIA LAND SURVEYOR DATE NAME (PRINTED) NO. (SEAL) As required by subsection (d) of O.C.G.A. Section 15-6-67 this plat has been prepared by a land surveyor and approved by all applicable local jurisdictions for recording as evidenced by approval certificates, signatures, stamps, or statements hereon. Such approvals or affirmations should be confirmed with the appropriate governmental bodies by any purchaser or user of this plat as to intended use of any parcel. Furthermore, the undersigned land surveyor certifies that this plat complies with the minimum technical standards for property surveys in Georgia as set forth in the rules and regulations of the Georgia Board of Registration for Professional Engineers and Land Surveyors and as set forth in O.C.G.A. Section 15-6-67. Aaron M. McCullough (Ga. R.L.S. #2990) DATE No. 2990 L A N D S U R V E Y O R GEO R GIA REGISTERED PROFESSIONAL A RON M. McCULLOUGH THE FOLLOWING CERTIFICATION STATEMENT FROM THE ENGINEER OF RECORD SHALL APPEAR IN THE APPROVED FINAL PLAT PACKAGE: I HEREBY CERTIFY THAT THIS SUBDIVISION WAS CONSTRUCTED IN ACCORDANCE WITH THE CONSTRUCTION PLANS AND SPECIFICATIONS WHICH WERE APPROVED BY THE CITY OF DOUGLASVILLE COMMUNITY DEVELOPMENT DIRECTOR, AS WELL AS ANY APPROVED REVISIONS THERETO, AND THAT ALL APPLICABLE ENGINEERING REQUIREMENTS OF THE APPLICABLE DEVELOPMENT AND ZONING ORDINANCES HAVE BEEN FULFILLED, EXCEPT AS NOTED BELOW: SIGNATURE OF ENGINEER OF RECORD DATE NAME (PRINTED) NO. (SEAL) SITE NARRATIVE ZONING & SETBACKS: AREA SUMMARY: TRACT I AREA: 40.70 ACRES TRACT II AREA: 8.63ACRES TRACT III AREA: 0.25 ACRES OWNER/DEVELOPER SL DOUGLAS PLACE II, LLC 195 MORRISTOWN ROAD BASKING RIDGE, N.J. 07920 24 hr. CONTACT: JAKE ROLLINS PH: 404-710-0009 TRACT IV AREA: 8.41 ACRES PREPARED BY: ENGINEERS SURVEYORS LANDSCAPE ARCHITECTS HRC ENGINEERS 6554 EAST CHURCH STREET DOUGLASVILLE, GEORGIA 30134 p 770.942.0196 f 770.942.0152 www.hrcengineers.com STATE OF GEORGIA CERTIFICATE OF AUTHORIZATION FOR LAND SURVEYING HUGHES-RAY COMPANY, INC. LSF# 000462 EXPIRES 06/30/24 LOCATION MAP GRID NORTH GA WEST N W E SHRC THIS PLAT SUPERCEDES PLAT BOOK 42, PAGE 20 PURPOSE NOTE THE PURPOSE OF THIS PLAT IS TO CORRECT TYPOS ON BOUNDARY CALLS ON TRACT IV. REVISED BOUNDARY CALL STATE OF GEORGIA COUNTY OF DOUGLAS THE UNDERSIGNED CERTIFIES THAT HE OR SHE IS THE OWNER OF THE LAND SHOWN ON THIS PLAT AND THAT THE PLAT AND THE PUBLIC IMPROVEMENTS CONTAINED THEREIN OR ASSOCIATED THEREWITH MEET ALL APPLICABLE REQUIREMENTS AND STANDARDS OF THE DOUGLASVILLE DEVELOPMENT CODE. THE OWNER FURTHER ACKNOWLEDGES THIS PLAT ALLOTMENT TO BE HIS FREE ACT AND DEED, AND DEDICATES TO THE PUBLIC FOREVER ALL AREAS SHOWN OR INDICATED ON THIS PLAT AS STREETS, EASEMENTS OR OTHER PUBLIC USE AREAS. BY: 4/29/2024 DATE NAME: HOLDEN SABATO CURVE TABLE CURVE LENGTH RADIUS CHORD CH. BEARING C1 37.01 185.49 36.95 S05°46'50"E C2 51.93 570.53 51.92 S14°06'15"E C3 49.24 45.00 46.82 N14°38'03"E C4 365.67 75.00 97.07 N86°18'20"E C5 25.41 45.00 25.07 S37°11'42"E C6 70.70 510.53 70.65 S17°03'12"E C7 213.07 2141.13 212.99 S16°42'34"E 77.89 170.00 77.21 S00°02'24"W C9 C10 125.77 240.00 124.33 N76°52'17"W C11 42.35 71.38 41.73 N59°52'24"W C12 225.58 235.00 217.02 N70°22'40"W C13 20.90 45.80 20.71 N27°14'17"W C14 85.03 850.11 84.99 S15°59'43"E C15 87.84 1003.02 87.81 N16°21'06"W C16 334.65 6060.00 334.61 S84°36'19"W C17 57.92 470.00 57.89 N03°26'46"W C18 40.30 45.00 38.97 N25°44'36"E C19 216.10 75.00 148.73 N31°08'29"W C8 137.44 162.02 133.36 S63°12'59"W LINE TABLE LINE BEARING DISTANCE L1 N 82° 07' 21" E 8.53' L2 N 83° 35' 04" E 64.42' L3 N 06° 24' 56" W 44.50' L4 N 85° 01' 53" E 46.54' L5 N 68° 11' 33" E 91.12' L6 S 80° 47' 45" E 36.00' L7 N 33° 44' 06" E 17.68' L8 N 87° 46' 07" E 64.94' L9 S 61° 37' 31" E 74.80' L10 N 71° 30' 00" E 69.29' P:\2016 PROJECTS\H16314.11P6\DWG\H16314.11P6_FP_UPDATED.dwg, 4/30/2024 1:21:06 PM, _AutoCAD PDF (General Documentation).pc3 Page 178 of 334 FINAL PLAT FOR SILVERMAN PHASE 4 LOCATED IN LAND LOT 162, 2ND DISTRICT, 5TH SECTION CITY OF DOUGLASVILL, DOUGLAS COUNTY, GEORGIA RECORDATION AREA PREPARED BY: ENGINEERS SURVEYORS LANDSCAPE ARCHITECTS HRC ENGINEERS 6554 EAST CHURCH STREET DOUGLASVILLE, GEORGIA 30134 p 770.942.0196 f 770.942.0152 www.hrcengineers.com STATE OF GEORGIA CERTIFICATE OF AUTHORIZATION FOR LAND SURVEYING HUGHES-RAY COMPANY, INC. LSF# 000462 EXPIRES 06/30/24 GRID NORTH GA WEST N W E SHRC As required by subsection (d) of O.C.G.A. Section 15-6-67 this plat has been prepared by a land surveyor and approved by all applicable local jurisdictions for recording as evidenced by approval certificates, signatures, stamps, or statements hereon. Such approvals or affirmations should be confirmed with the appropriate governmental bodies by any purchaser or user of this plat as to intended use of any parcel. Furthermore, the undersigned land surveyor certifies that this plat complies with the minimum technical standards for property surveys in Georgia as set forth in the rules and regulations of the Georgia Board of Registration for Professional Engineers and Land Surveyors and as set forth in O.C.G.A. Section 15-6-67. Aaron M. McCullough (Ga. R.L.S. #2990) DATE No. 2990 L A N D S U R V E Y O R GEO R GIA REGISTERED PROFESSIONAL A RON M. McCULLOUGH SHEET 3 SHEET 4 SHEET 6 SHEET 5 GURLEY ROAD (R/W VARIES) YIELD YIELD YIELD YIELD YIELD YIELD 66.45' GRANITE DRIVE 50' R/W EXISTING BUIDING FFE=1176.63 ±247,500 SF EXISTING BUILDING BRIGHT STAR CONNECTOR (R/W VARIES) BUILDING (UNDER CONSTRUCTION) S 88°19'46" E 138.47' BRIGHT STAR CONNECTOR (R/W VARIES) BRIGHT STAR CONNECTOR (R/W VARIES) EXISTING BUILDING 500,400 Sq. Ft. F.F.E.=1176.00 TRACT II 8.63 ACRES TRACT I 40.70 ACRES S83°01'23"W 893.74' 76.98' N13°09'58"E 5.13' S76°50'02"E N17°22'11"E 9.94' N37°15'17"E S37°36'38"W 10.05' 15.00' S38°37'21"W N38°37'21"E 15.00' 192.10' S51°22'39"E N83°01'23"E 161.97' 5 C 6 C 5 1 C 7 C 8 C C9 0 1 C C12 3 1 C C1 4 C1 6 TRACT III 0.25 ACRES GEORGIA STATE ROUTE 5 (R/W VARIES) WOOD ROAD (60' R/W) GURLEY ROAD (R/W VARIES) 113.26' 64.13' 88.14' N 00°05'04" E 995.76' 907.62' S09°06'53"E 121.10' N32°04'06"W N06°58'37"W 7 1 C C18 9 1 C TRACT IV 8.41 ACRES N 06° 24' 56" W 342.28' L1 L2 L3 L4 L5 L6 L7 L8 L9 L10 N07°11'48"W N77°20'02"E N17°29'40"W S89°07'34"E N74°51'17"E N01°19'48"W N82°51'05"E 103.82' 345.75' 169.34' 157.14' 156.08' 91.34' 26.32' N02°50'47"E 48.18' 23.56' 511.81' 96.48' 60.66' N06°52'47"W N38°07'13"E 67.83' 23.09' N83°07'13"E 281.21' 67.83' S51°52'47"E 23.09' N88°04'13"E 308.79' 208.45' 208.45' S00°08'09"W N00°08'09"E S06°52'47"E 198.32' S82°07'21"W 49.94' S49°41'30"W 468.09' S13°07'48"E 121.17' S18°51'37"E 221.80' S13°51'02"E 111.49' 110.31' 81.29' S19°33'37"E 1036.19' S78°39'50"W 669.65' N00°02'55"W N89°57'03"E 257.35' 120.56' 210.50' S51°24'30"E 409.60' S51°44'35"E 535.62' S51°22'39"E 200.00' S51°22'39"E 243.07' N42°52'39"W 97.11' S26°30'26"W 21.58' S06°58'37"E 60.00' S83°01'23"W 113.42' N32°14'13"W 305.95' S51°22'39"E C1 1 GEORGIA STATE ROUTE 5 (R/W VARIES) C4 C2 C1 S38° 34' 54"W 159.50' S 02° 11' 16" E 79.93' REVISED BOUNDARY CALL P:\2016 PROJECTS\H16314.11P6\DWG\H16314.11P6_FP_UPDATED.dwg, 4/30/2024 1:21:11 PM, _AutoCAD PDF (General Documentation).pc3 Page 179 of 334 FINAL PLAT FOR SILVERMAN PHASE 4 LOCATED IN LAND LOT 162, 2ND DISTRICT, 5TH SECTION CITY OF DOUGLASVILL, DOUGLAS COUNTY, GEORGIA SCALE : 1" = 100' RECORDATION AREA As required by subsection (d) of O.C.G.A. Section 15-6-67 this plat has been prepared by a land surveyor and approved by all applicable local jurisdictions for recording as evidenced by approval certificates, signatures, stamps, or statements hereon. Such approvals or affirmations should be confirmed with the appropriate governmental bodies by any purchaser or user of this plat as to intended use of any parcel. Furthermore, the undersigned land surveyor certifies that this plat complies with the minimum technical standards for property surveys in Georgia as set forth in the rules and regulations of the Georgia Board of Registration for Professional Engineers and Land Surveyors and as set forth in O.C.G.A. Section 15-6-67. Aaron M. McCullough (Ga. R.L.S. #2990) DATE No. 2990 L A N D S U R V E Y O R GEO R GIA REGISTERED PROFESSIONAL A RON M. McCULLOUGH PREPARED BY: ENGINEERS SURVEYORS LANDSCAPE ARCHITECTS HRC ENGINEERS 6554 EAST CHURCH STREET DOUGLASVILLE, GEORGIA 30134 p 770.942.0196 f 770.942.0152 www.hrcengineers.com STATE OF GEORGIA CERTIFICATE OF AUTHORIZATION FOR LAND SURVEYING HUGHES-RAY COMPANY, INC. LSF# 000462 EXPIRES 06/30/24 GRID NORTH GA WEST N W E SHRC CURVE TABLE CURVE LENGTH RADIUS CHORD CH. BEARING C1 37.01 185.49 36.95 S05°46'50"E C2 51.93 570.53 51.92 S14°06'15"E C3 49.24 45.00 46.82 N14°38'03"E C4 365.67 75.00 97.07 N86°18'20"E C5 25.41 45.00 25.07 S37°11'42"E C6 70.70 510.53 70.65 S17°03'12"E C7 213.07 2141.13 212.99 S16°42'34"E 77.89 170.00 77.21 S00°02'24"W C9 C10 125.77 240.00 124.33 N76°52'17"W C11 42.35 71.38 41.73 N59°52'24"W C12 225.58 235.00 217.02 N70°22'40"W C13 20.90 45.80 20.71 N27°14'17"W C14 85.03 850.11 84.99 S15°59'43"E C15 87.84 1003.02 87.81 N16°21'06"W C16 334.65 6060.00 334.61 S84°36'19"W C17 57.92 470.00 57.89 N03°26'46"W C18 40.30 45.00 38.97 N25°44'36"E C19 216.10 75.00 148.73 N31°08'29"W C8 137.44 162.02 133.36 S63°12'59"W LINE TABLE LINE BEARING DISTANCE L1 N 82° 07' 21" E 8.53' L2 N 83° 35' 04" E 64.42' L3 N 06° 24' 56" W 44.50' L4 N 85° 01' 53" E 46.54' L5 N 68° 11' 33" E 91.12' L6 S 80° 47' 45" E 36.00' L7 N 33° 44' 06" E 17.68' L8 N 87° 46' 07" E 64.94' L9 S 61° 37' 31" E 74.80' L10 N 71° 30' 00" E 69.29' YIELD YIELD YIELD YIELDYIELD YIELD EXISTING BUILDING BRIGHT STAR CONNECTOR (R/W VARIES) BRIGHT STAR CONNECTOR TRACT II 8.63 ACRES TRACT I 40.70 ACRES S83°01'23"W 893.74' N83°01'23"E 161.97' 5 1 C 3 1 C C1 4 C1 6 TRACT III 0.25 ACRES WOOD ROAD (60' R/W) GURLEY ROAD (R/W VARIES) 113.26' 64.13' 88.14' N 00°05'04" E 995.76' 907.62' S09°06'53"E 121.10' N32°04'06"W N06°58'37"W 7 1 C 468.09' 121.17' S18°51'37"E 221.80' S13°51'02"E 111.49' 110.31' 81.29' S19°33'37"E 1036.19' S78°39'50"W 97.11' S26°30'26"W 21.58' S06°58'37"E 60.00' S83°01'23"W 113.42' N32°14'13"W P:\2016 PROJECTS\H16314.11P6\DWG\H16314.11P6_FP_UPDATED.dwg, 4/30/2024 1:21:16 PM, _AutoCAD PDF (General Documentation).pc3 Page 180 of 334 FINAL PLAT FOR SILVERMAN PHASE 4 LOCATED IN LAND LOT 162, 2ND DISTRICT, 5TH SECTION CITY OF DOUGLASVILL, DOUGLAS COUNTY, GEORGIA SCALE : 1" = 100' RECORDATION AREA As required by subsection (d) of O.C.G.A. Section 15-6-67 this plat has been prepared by a land surveyor and approved by all applicable local jurisdictions for recording as evidenced by approval certificates, signatures, stamps, or statements hereon. Such approvals or affirmations should be confirmed with the appropriate governmental bodies by any purchaser or user of this plat as to intended use of any parcel. Furthermore, the undersigned land surveyor certifies that this plat complies with the minimum technical standards for property surveys in Georgia as set forth in the rules and regulations of the Georgia Board of Registration for Professional Engineers and Land Surveyors and as set forth in O.C.G.A. Section 15-6-67. Aaron M. McCullough (Ga. R.L.S. #2990) DATE No. 2990 L A N D S U R V E Y O R GEO R GIA REGISTERED PROFESSIONAL A RON M. McCULLOUGH PREPARED BY: ENGINEERS SURVEYORS LANDSCAPE ARCHITECTS HRC ENGINEERS 6554 EAST CHURCH STREET DOUGLASVILLE, GEORGIA 30134 p 770.942.0196 f 770.942.0152 www.hrcengineers.com STATE OF GEORGIA CERTIFICATE OF AUTHORIZATION FOR LAND SURVEYING HUGHES-RAY COMPANY, INC. LSF# 000462 EXPIRES 06/30/24 GRID NORTH GA WEST N W E SHRC CURVE TABLE CURVE LENGTH RADIUS CHORD CH. BEARING C1 37.01 185.49 36.95 S05°46'50"E C2 51.93 570.53 51.92 S14°06'15"E C3 49.24 45.00 46.82 N14°38'03"E C4 365.67 75.00 97.07 N86°18'20"E C5 25.41 45.00 25.07 S37°11'42"E C6 70.70 510.53 70.65 S17°03'12"E C7 213.07 2141.13 212.99 S16°42'34"E 77.89 170.00 77.21 S00°02'24"W C9 C10 125.77 240.00 124.33 N76°52'17"W C11 42.35 71.38 41.73 N59°52'24"W C12 225.58 235.00 217.02 N70°22'40"W C13 20.90 45.80 20.71 N27°14'17"W C14 85.03 850.11 84.99 S15°59'43"E C15 87.84 1003.02 87.81 N16°21'06"W C16 334.65 6060.00 334.61 S84°36'19"W C17 57.92 470.00 57.89 N03°26'46"W C18 40.30 45.00 38.97 N25°44'36"E C19 216.10 75.00 148.73 N31°08'29"W C8 137.44 162.02 133.36 S63°12'59"W LINE TABLE LINE BEARING DISTANCE L1 N 82° 07' 21" E 8.53' L2 N 83° 35' 04" E 64.42' L3 N 06° 24' 56" W 44.50' L4 N 85° 01' 53" E 46.54' L5 N 68° 11' 33" E 91.12' L6 S 80° 47' 45" E 36.00' L7 N 33° 44' 06" E 17.68' L8 N 87° 46' 07" E 64.94' L9 S 61° 37' 31" E 74.80' L10 N 71° 30' 00" E 69.29' GURLEY ROAD (R/W VARIES) EXISTING BUILDING 500,400 Sq. Ft. F.F.E.=1176.00 N13°09'58"E 9.94' N37°15'17"E 5 C 6 C 7 C C12 GEORGIA STATE ROUTE 5 (R/W VARIES) C18 9 1 C TRACT IV 8.41 ACRES N 06° 24' 56" W 342.28' L1 L2 L3 L4 L5 L6 L7 L8 L9 L10 198.32' S82°07'21"W 49.94' S49°41'30"W 468.09' S13°07'48"E 669.65' N00°02'55"W N89°57'03"E 257.35' 409.60' S51°44'35"E 535.62' S51°22'39"E N42°52'39"W S51°22'39"E C1 1 C4 C2 C1 50' UNDISTURBED DOUGLAS COUNTY STREAM BUFFER (AS MEASURED FROM EDGE OF WRESTED VEGETATION) 25' UNDISTURBED STATE WATER BUFFER (AS MEASURED FROM EDGE OF WRESTED VEGETATION) 75' IMPERVIOUS SURFACE SETBACK (AS MEASURED FROM EDGE OF WRESTED VEGETATION) FINAL PLAT FOR SILVERMAN PHASE 4 LOCATED IN LAND LOT 162, 2ND DISTRICT, 5TH SECTION CITY OF DOUGLASVILL, DOUGLAS COUNTY, GEORGIA SCALE : 1" = 100' RECORDATION AREA As required by subsection (d) of O.C.G.A. Section 15-6-67 this plat has been prepared by a land surveyor and approved by all applicable local jurisdictions for recording as evidenced by approval certificates, signatures, stamps, or statements hereon. Such approvals or affirmations should be confirmed with the appropriate governmental bodies by any purchaser or user of this plat as to intended use of any parcel. Furthermore, the undersigned land surveyor certifies that this plat complies with the minimum technical standards for property surveys in Georgia as set forth in the rules and regulations of the Georgia Board of Registration for Professional Engineers and Land Surveyors and as set forth in O.C.G.A. Section 15-6-67. Aaron M. McCullough (Ga. R.L.S. #2990) DATE No. 2990 L A N D S U R V E Y O R GEO R GIA REGISTERED PROFESSIONAL A RON M. McCULLOUGH PREPARED BY: ENGINEERS SURVEYORS LANDSCAPE ARCHITECTS HRC ENGINEERS 6554 EAST CHURCH STREET DOUGLASVILLE, GEORGIA 30134 p 770.942.0196 f 770.942.0152 www.hrcengineers.com STATE OF GEORGIA CERTIFICATE OF AUTHORIZATION FOR LAND SURVEYING HUGHES-RAY COMPANY, INC. LSF# 000462 EXPIRES 06/30/24 GRID NORTH GA WEST N W E SHRC CURVE TABLE CURVE LENGTH RADIUS CHORD CH. BEARING C1 37.01 185.49 36.95 S05°46'50"E C2 51.93 570.53 51.92 S14°06'15"E C3 49.24 45.00 46.82 N14°38'03"E C4 365.67 75.00 97.07 N86°18'20"E C5 25.41 45.00 25.07 S37°11'42"E C6 70.70 510.53 70.65 S17°03'12"E C7 213.07 2141.13 212.99 S16°42'34"E 77.89 170.00 77.21 S00°02'24"W C9 C10 125.77 240.00 124.33 N76°52'17"W C11 42.35 71.38 41.73 N59°52'24"W C12 225.58 235.00 217.02 N70°22'40"W C13 20.90 45.80 20.71 N27°14'17"W C14 85.03 850.11 84.99 S15°59'43"E C15 87.84 1003.02 87.81 N16°21'06"W C16 334.65 6060.00 334.61 S84°36'19"W C17 57.92 470.00 57.89 N03°26'46"W C18 40.30 45.00 38.97 N25°44'36"E C19 216.10 75.00 148.73 N31°08'29"W C8 137.44 162.02 133.36 S63°12'59"W LINE TABLE LINE BEARING DISTANCE L1 N 82° 07' 21" E 8.53' L2 N 83° 35' 04" E 64.42' L3 N 06° 24' 56" W 44.50' L4 N 85° 01' 53" E 46.54' L5 N 68° 11' 33" E 91.12' L6 S 80° 47' 45" E 36.00' L7 N 33° 44' 06" E 17.68' L8 N 87° 46' 07" E 64.94' L9 S 61° 37' 31" E 74.80' L10 N 71° 30' 00" E 69.29' 50' UNDISTURBED DOUGLAS COUNTY STREAM BUFFER (AS MEASURED FROM EDGE OF WRESTED VEGETATION) 25' UNDISTURBED STATE WATER BUFFER (AS MEASURED FROM EDGE OF WRESTED VEGETATION) 75' IMPERVIOUS SURFACE SETBACK (AS MEASURED FROM EDGE OF WRESTED VEGETATION) GURLEY ROAD (R/W VARIES) 76.98' N13°09'58"E 5.13' S76°50'02"E N17°22'11"E 9.94' N37°15'17"E S37°36'38"W 10.05' 15.00' S38°37'21"W 5 C 6 C 7 C C12 GEORGIA STATE ROUTE 5 (R/W VARIES) TRACT IV 8.41 ACRES N 06° 24' 56" W 342.28' L1 L2 L3 L4 L5 L6 L7 L8 L9 L10 198.32' S82°07'21"W 49.94' S49°41'30"W N89°57'03"E 257.35' 120.56' 210.50' S51°24'30"E 409.60' S51°44'35"E 535.62' S51°22'39"E 200.00' S51°22'39"E 305.95' S51°22'39"E C1 1 GEORGIA STATE ROUTE 5 (R/W VARIES) C4 C2 C1 Page 182 of 334 FINAL PLAT FOR SILVERMAN PHASE 4 LOCATED IN LAND LOT 162, 2ND DISTRICT, 5TH SECTION CITY OF DOUGLASVILL, DOUGLAS COUNTY, GEORGIA SCALE : 1" = 100' RECORDATION AREA As required by subsection (d) of O.C.G.A. Section 15-6-67 this plat has been prepared by a land surveyor and approved by all applicable local jurisdictions for recording as evidenced by approval certificates, signatures, stamps, or statements hereon. Such approvals or affirmations should be confirmed with the appropriate governmental bodies by any purchaser or user of this plat as to intended use of any parcel. Furthermore, the undersigned land surveyor certifies that this plat complies with the minimum technical standards for property surveys in Georgia as set forth in the rules and regulations of the Georgia Board of Registration for Professional Engineers and Land Surveyors and as set forth in O.C.G.A. Section 15-6-67. Aaron M. McCullough (Ga. R.L.S. #2990) DATE No. 2990 L A N D S U R V E Y O R GEO R GIA REGISTERED PROFESSIONAL A RON M. McCULLOUGH PREPARED BY: ENGINEERS SURVEYORS LANDSCAPE ARCHITECTS HRC ENGINEERS 6554 EAST CHURCH STREET DOUGLASVILLE, GEORGIA 30134 p 770.942.0196 f 770.942.0152 www.hrcengineers.com STATE OF GEORGIA CERTIFICATE OF AUTHORIZATION FOR LAND SURVEYING HUGHES-RAY COMPANY, INC. LSF# 000462 EXPIRES 06/30/24 GRID NORTH GA WEST N W E SHRC CURVE TABLE CURVE LENGTH RADIUS CHORD CH. BEARING C1 37.01 185.49 36.95 S05°46'50"E C2 51.93 570.53 51.92 S14°06'15"E C3 49.24 45.00 46.82 N14°38'03"E C4 365.67 75.00 97.07 N86°18'20"E C5 25.41 45.00 25.07 S37°11'42"E C6 70.70 510.53 70.65 S17°03'12"E C7 213.07 2141.13 212.99 S16°42'34"E 77.89 170.00 77.21 S00°02'24"W C9 C10 125.77 240.00 124.33 N76°52'17"W C11 42.35 71.38 41.73 N59°52'24"W C12 225.58 235.00 217.02 N70°22'40"W C13 20.90 45.80 20.71 N27°14'17"W C14 85.03 850.11 84.99 S15°59'43"E C15 87.84 1003.02 87.81 N16°21'06"W C16 334.65 6060.00 334.61 S84°36'19"W C17 57.92 470.00 57.89 N03°26'46"W C18 40.30 45.00 38.97 N25°44'36"E C19 216.10 75.00 148.73 N31°08'29"W C8 137.44 162.02 133.36 S63°12'59"W LINE TABLE LINE BEARING DISTANCE L1 N 82° 07' 21" E 8.53' L2 N 83° 35' 04" E 64.42' L3 N 06° 24' 56" W 44.50' L4 N 85° 01' 53" E 46.54' L5 N 68° 11' 33" E 91.12' L6 S 80° 47' 45" E 36.00' L7 N 33° 44' 06" E 17.68' L8 N 87° 46' 07" E 64.94' L9 S 61° 37' 31" E 74.80' L10 N 71° 30' 00" E 69.29' 50' UNDISTURBED DOUGLAS COUNTY STREAM BUFFER (AS MEASURED FROM EDGE OF WRESTED VEGETATION) 25' UNDISTURBED STATE WATER BUFFER (AS MEASURED FROM EDGE OF WRESTED VEGETATION) 75' IMPERVIOUS SURFACE SETBACK (AS MEASURED FROM EDGE OF WRESTED VEGETATION) GURLEY ROAD (R/W VARIES) EXISTING BUILDING 500,400 Sq. Ft. F.F.E.=1176.00 9.94' N37°15'17"E 15.00' S38°37'21"W N38°37'21"E 15.00' 192.10' S51°22'39"E 5 C 6 C 7 C 8 C C9 0 1 C C12 GEORGIA STATE ROUTE 5 (R/W VARIES) TRACT IV 8.41 ACRES N 06° 24' 56" W 342.28' L1 L2 L3 L4 L5 L6 L7 L8 L9 L10 198.32' S82°07'21"W 49.94' S49°41'30"W 468.09' S13°07'48"E 257.35' 409.60' S51°44'35"E 535.62' S51°22'39"E 200.00' S51°22'39"E 243.07' N42°52'39"W 305.95' S51°22'39"E C1 1 GEORGIA STATE ROUTE 5 (R/W VARIES) C4 C2 C1 S38° 34' 54"W 159.50' S 02° 11' 16" E 79.93' REVISED BOUNDARY CALL AGENDA ITEM REPORT Item Number: Meeting: Staff Contact: 24-162 05-20-2024 - City Council Regular Meeting (6:00 PM) Gary Sparks, Chief of Police Authorize the Douglasville Police Department to apply for the 2024 Bullet Proof Vest Grant from the U.S. Department of Justice (DOJ) Bureau of Justice Assistance, in the amount of $36,330 for ½ the cost of 42 bulletproof vests. (Chf. Gary Sparks) Attachments: 2024 BVP Grant BVP Program & Application Requirement Highlights Legal Approval 24-162 Recommendation(s): ACT-2024-66 Budget Impact: Is this an Agreement or Contract: No If YES, check one: ☐ Original Agreement ☐ Change Order, Change Order # Is it budgeted? No If so, what Account #? Jewell, Tammy From: Bureau of Justice Assistance Sent: Wednesday, April24, 2024 11:47 AM To: Jewell,Tammy Subject: BJAPatrick LeahyBulletproofVest Partnership (BVP) Follow Up Flag: Follow up Flag Status: Completed lPlease be cautious , _ lThisemailoriginatedfromoutside ofthe organization. Do not clicklinksor openattachments unlessyou.recognize the lsenderandknowthe content is safe. , View as a webpage / Share Kurhlton 1%Moore. Diruvtur NEWS from BJA Dear BVP Participant, The Bureau of Justice Assistance BJA is pleased to announce that the Fiscal Year (FY) 2024 Patrick Leahy Bulletproof Vest Partnership (BVP) Program application period opens today, Wednesday April 24, 2024. All applications must be submitted online at Patrick Leahv Bulletproof Vest Partnership: Loqin (usdoi.gov) by 6:00 pm Eastern Time on Monday, June 10, 2024. The purpose of the BVP Program is to reimburse states, units of local government, and federally recognized Indian tribes, i.e., jurisdictions, for up to 50 percent of the cost of body armor vests purchased for law enforcement of?cers. Please see the new BVP Fact Sheet for detailed information on the BVPProgram. In addition, updated BVP Frequently Asked Questions (FAQs) can be found at https://www.ojp.govlproqram/bulletproof—vest— partnership/fags, and detailed guides and training materials for the BVP application process and the payment request process can be found at BVP Program Resources. FY 2024 BVP Program and Application Requirement Highlights Detailed information can be found in the BVP FAQs. - Eligibility: States, units of local government, and federally recognized Indian tribes, i.e., jurisdictions, that employ eligible law enforcement of?cers are eligible to apply for BVP funds. Multiple law enforcement agencies (LEAs) withinthe same jurisdiction must submit their own application information and vest needs to the jurisdiction. The jurisdiction willthen submit the LEAapplications in one submission to BJA. This includes colleges and universities. All public colleges and universities are considered LEAs under their respective jurisdiction. System for Award Management (SAM) Registration Requirement: An active registration in SAMis required to receive funds. Jurisdictions not registered with SAMare strongly encouraged to access the SAMwebsite at SAM.gov as soon as possible in order to obtain information on and complete the online SAM registration process. Applicants should ensure that current bank routing and bank account information is included in the SAMgov profile, as the banking information in the SAM at the time of application willbe used to transfer reimbursement funds to yourjurisdiction. For more information about renewing and updating your existing SAM registration, or registering in SAM as a new entity, please access the SAM support materials here SAM Help. The SAM Helpdesk can be reached at (866) 606-8220. Body Armor Vest Requirements: Body armor vests purchased with BVP funds must have been tested through the National Institute of Justice (NIJ) Compliance Testing Program (CTP) and found to comply with the most current NIJ body armor standards, appear on the NIJ Compliant Products List as of the date the body armor was ordered, be uniquely fitted, and be made in the United States. NIJ has started adding vests to the compliant products listfor the new 0101.07 Standard. FY2024 BVP funds may be used towards the purchase of eligible vests listed on the 101.06 Standard and the 0101.06 Standard. In addition, applicants must have a written mandatory wear policy for uniformed patrol of?cers in place at the time of application. Detailed information on the mandatory wear requirement can be found in the Mandatory Wear FAQs. DIAMDRegistration Requirement: The ?rst step to obtain access to the BVP system is onboarding to OJP’s Digital identity and Access Management Directory (DIAMD),which replaced the former BVP access control system in January 2023. DIAMDis a modern single—sign-on gateway service with multi-factor authentication. Ifyou are an OJP grant program applicant or recipient, you may already have an account registration with DIAMD,and your BVP user account will be added to the OJP systems you access through DIAMD.Please see the BVP login page for details: httpszllvests.bia.oigqov/bvp/login/externalAccess.isp. Detailed instructions can be found in the User Account Activation Guide and in the BVP FAQs. Items to Review: To ensure that program participants are submitting applications that accurately re?ect their vest needs for the next two years, please review the program guidance below. Prior to submitting an application for FY 2024 BVP funds: 0 Verify that the number of vests indicated on the application does not exceed actual agency needs. Review all currently deployed vests for those that willneed to be replaced during the next two years, according to the replacement cycle indicated on your BVP system pro?le. Applications for funds should re?ect the number of vests your agency needs to replace within the next two years, and vests for of?cers your agency anticipates hiring in the next two years. (New hires can be anticipated based on the average number of of?cers hired over the most recent three years.) 0 Ensure that the application accurately re?ects the current market cost for the vests identi?ed on the application. 0 Review previous year(s) BVP funding to identify any unspent funds that might currently be available for BVP needs. Your careful attention to actual vest needs will help ensure that all eligible jurisdictions submitting requests willreceive the maximum award allowable based on the appropriation and distribution guidelines. For questions regarding this email or for assistance with the onlineapplication process, please do not hesitate to call the BVP Help Desk at 1-877-758—3787, or email vests@usdo'.gov. In addition, please visit BJA’s Officer Robert Wilson ”I Preventing Violence Against Law Enforcement Of?cers and Ensuring Of?cer Resilience and Survivability (VALOR) Initiative website to obtain other information regarding of?cer safety: VALOR Of?cer Safety and Wellness Initiative Overview Bureau of Justice Assistance (oipgov). The VALOR Initiativeis a comprehensive set of programs that deliver no-cost of?cer safety, wellness, resilience training, resources, and technical assistance to law enforcement throughout the country. VALOR brings together the latest research and practices to address current and emerging of?cer safety and wellness issues/threats. Please see the BJA VALOR Initiative booklet for a detailed synopsis of this important initiative. Sincerely, BVP Program Team Bureau of Justice Assistance $8» PUBLIC SAFETY OFFICERS' BENEFITS (PSOB) PROGRAM Enacted in 1976, the PSOB Program provides death, disability, and education bene?ts to those eligible for the program. For details regarding these federal bene?ts for law enforcement of?cers, fire?ghters, and other first responders who have died or become catastrophically injured in the line of duty, call the PSOB Of?ce at 888-744-6513 or visit us online at online. BJA offers many resources, training and technical assistance, and policy development services to support local, state, and tribal governments in achieving safer communities. Ifyou haven’t already, subscribe to the News From BJA subscription list to stay up to date on the latest information and news from BJA. Ifyou are already a subscriber, update your subscription preferences to receive information that is most relevant to you. Connect With max » www bja.ojp gov if you no lur ‘ ' want lo ’ we email notificallons from vsmeB A. you can unsubscn This email was sent in jewellt@douglasvillegaigov using GovDelivery Communications Cloud on behalf of Department of Justice , y Washinglon, DC gWDELIVERY Jewell, Tammy From: Jackson, Chelsea Sent: Friday,May 3, 2024 4:59 PM To: Jewell, Tammy; Hampton, Marcia; Callan, Karin Cc: CityClerk's Office; Campbell,Heather Subject: RE:2024 BulletproofVest Grant Approved. Chelsea Chelsea Jackson Deputy City Manager City Manager's Of?ce Main:(770) 920-3000 Direct:678-449-15184 From: Jewell, Tammy Sent: Friday, May 3, 2024 4:45 PM To: Hampton, Marcia ;Jackson, Chelsea ;Callan, Karin Cc: City Clerk'sOf?ce ; Campbell, Heather Subject: Fwd:2024 Bulletproof Vest Grant Good afternoon, Could I please place this item on the May 16th agenda? Thank you, Tammy Sent from my iPhone Begin forwarded message: From: "Jordan, Miranda" Date: May 3, 2024 at 4:38:16 PM EDT To: "Jewell, Tammy" Cc: "Davidson, JR" , "Sparks, Gary" Subject: RE: 2024 Bulletproof Vest Grant HiTammy, This is approved, Thanks! Page 189 of 334 Miranda Miranda Jordan StaffAttorney Legal Main:(770) 920-3000 Direct:(678) 449-3024 From: Jewell, Tammy <'ewellt@douglasvillega.gov> Sent: Wednesday, May 1, 2024 1:04 PM To: Jordan, Miranda <'ordanm@douglasvillega.gcv> Cc: Davidson, .lR; Sparks.Gary Subject: 2024 Bulletproof Vest Grant Good afternoon, It is time for us to apply for the 2024 Bulletproof Vest Grant. I have attached the email from OJP. Could you please review / approve this language? The deadline to apply is June 10, 2024, so I would like to add this to the May 16th agenda, if possible. Authorize the Douglasville Police Department to apply for the 2024 Bullet Proof Vest Grant from the U5. Department of Justice (DOJ) Bureau of Justice Assistance, in the amount of $36,330 for V2the cost of 42 bulletproof vests. Thank you, Tammy Tammy Jewell Operations Coordinator PoliceAdministration DouglasvillePolice Department Main:(770) 920-3010 Direct: 678 2934793 Fax: 678 293-1794 AGENDA ITEM REPORT Item Number: Meeting: Staff Contact: 24-166 05-20-2024 - City Council Regular Meeting (6:00 PM) Samantha Rosado, Tourism Program Manager Adopt a resolution declaring May 19-25, 2024 as National Travel and Tourism Week in the City of Douglasville. (Samantha Rosado) Attachments: NTTW National Travel & Tourism Week 2024 RES rev vla (RES-2024-__ Item 24-166- FINAL 5-20) Recommendation(s): RES-2024-26 Budget Impact: Is this an Agreement or Contract: No If YES, check one: ☐ Original Agreement ☐ Change Order, Change Order # Is it budgeted? N/A If so, what Account #? Resolution Number RES-2024- RESOLUTION WHEREAS the travel industry is essential to the success of every industry and will continue to be a critical part of Douglasville’s economy, development, and workforce. WHEREAS travel is an economic powerhouse for every state and destination across the country, with an economic output of $2.8 trillion, supporting 15 million American jobs. WHEREAS travel spending supports vibrant and safe communities in Douglasville and across the United States by generating $89 billion in state and local tax revenue in 2023 to support essential services, such as education, emergency response, public safety and more. WHEREAS travel enables success for all industries—including manufacturing, agriculture, defense, healthcare and more—by driving sales growth, innovation, education, and operations that power our economy, our nation, and Douglasville. WHEREAS America’s travel industry cannot be globally competitive without maximizing growth in leisure, business, and international inbound travelers; increasing travel to and within the United States drives our economy to a more prosperous future and connects America. WHEREAS Small businesses account for more than 60% of leisure and hospitality employment. WHEREAS travel is an essential industry, and we must continue to communicate that growing travel leads to economic growth, benefits businesses, fosters mutual understanding, and connects the nation. Resolution Number RES-2024- NOW THEREFORE, IT IS HEREBY RESOLVED by the Douglasville Mayor and City Council that the week of May 19-25, 2024, be designated as National Travel and Tourism Week for 2024 in the City of Douglasville. SO, RESOLVED this the 20th day of May, 2024. ___________________________________________ _________________________________________ Rochelle Robinson, Mayor Terry Miller, Mayor Pro Tem ___________________________________________ _________________________________________ Dr. LaShun B. Danley, Councilmember Sam Davis, Councilmember ___________________________________________ _________________________________________ Howard M. Estes, Councilmember Elena Hudson, Councilmember ___________________________________________ _________________________________________ Nycole N. Miller, Councilmember Chris “Coach” Watts, Councilmember Attest: ___________________________________________ Vicki L. Acker, City Clerk AGENDA ITEM REPORT Item Number: Meeting: Staff Contact: 24-134 05-20-2024 - City Council Regular Meeting (6:00 PM) Todd Dresdow, Maintenance Supervisor Authorize the Mayor to sign the Georgia Department of Transportation 2024 Supplemental LMIG (LRA) grant application for a grant for road maintenance in the amount of $482,755.53. (Todd Dresdow) Attachments: 2024 Supplemental LMIG (LRA) Packet rev 5-9-24 Legal Approval 24-134 (Supplemental LMIG_May 16-20) 5-9-24 Recommendation(s): ACT-2024-67 Budget Impact: Is this an Agreement or Contract: No If YES, check one: ☐ Original Agreement ☐ Change Order, Change Order # Is it budgeted? Yes If so, what Account #? ackerv@douglasvillega.gov Dresdow, Todd From: Wright, William Sent: Tuesday, April 23, 2024 1:08 PM Subject: Local Road Assistance Administration (LRA) Funding Please be cautious This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. Dear Local Government: The Department is excited to announce that the Governor and the Legislature included $250 million in Local Road Assistance Administration funds (LRA) in the amended fiscal year 2024 budget. The LRA funds will be administered and distributed using our GRANTS (LMIG) Application System. Eligible activities/projects for LRA funds will be the same as the LMIG program. LRA funds will require NO match. To see your formula amount, please visit the Department’s website at https://www.dot.ga.gov/GDOT/Pages/LMIG.aspx . The Department began accepting applications for LRA funds on March 15, 2024. All electronic applications must be received no later than June 15, 2024. If a local government has not applied yet, please apply as soon as possible. To begin your application, please visit the Department’s website at https://www.dot.ga.gov/GDOT/Pages/LMIG.aspx . The site provides a link to the LMIG Application, the LMIG Application Tutorial (Manual), and the General Guidelines. Your project list will be entered directly into the LMIG Application System. Please contact your District State Aid Coordinator for assistance with the online application process. The coordinators’ contact information is below. For an application to be processed, the following requirements must be met:  A local government must be in audit compliance with the Department of Audits and Accounts (DOAA). A local government must also be in compliance with the Department of Community Affairs (DCA) minimum standards under the Georgia Planning Act, related to immigration and the Service Delivery Strategy law. (A non-compliant local government may start a draft application and then submit it once the local government is compliant.)  A signed cover letter must be attached that includes a completion status of the last three fiscal years’ LMIG Grants.  A signature page must include both the local government seal and the notary seal. The application website provides a blank signature page for you to download, complete and upload as an attachment. The Department wants to ensure these funds are deployed to address your infrastructure needs quickly. The Department will start the Fiscal Year 2025 LMIG Program in July, so please submit your LRA applications as soon as possible. If you have any questions regarding the LMIG Program, please contact your District State Aid Coordinator, the Local Grants Office in Atlanta (404-347-0240), or email questions to LocalGrantsProgram@dot.ga.gov. Sincerely, Bill Wright Local Grants Administrator District State Aid Coordinator Contacts: If you have any questions about the program, please contact your District State Aid Coordinator. District Coordinator Number District One – Gainesville Charles 'Skip' Arnhart (770) 519-0118 District Two – Tennille Matthew Sammons (478) 553-3383 District Three – Thomaston Brandy Spillers (706) 646-7505 District Four – Tifton Shannon Bradford (229) 391-5438 District Five – Jesup Jeremy Barwick (912) 530-4396 District Six – Cartersville Joe Ciavarro (678) 721-5293 District Seven – Chamblee Chartrae 'Trae' Kent (770) 216-3880 Bill Wright Local Grants Administrator Local Grants One Georgia Center 600 West Peachtree Street NW, 17th Floor Atlanta, GA, 30308 404-347-0231 Office 404-694-6564 Cell Human trafficking impacts every corner of the globe, including our state and local communities. Georgia DOT is committed to end human trafficking in Georgia through education enabling its employees and the public to recognize the signs of human trafficking and how to react in order to help make a change. To learn more about the warning signs of human trafficking, visit https://doas.ga.gov/human-resources-administration/human-trafficking-awareness/trafficking-in-georgia. To report any suspicious activity, call the Georgia Human Trafficking Hotline at 866-363-4842. Let’s band together to end human trafficking in Georgia. GDOT District County City Total Mileage* Population** FY 2022 LMIG Formula Amount FY 2023 LMIG Formula Amount FY 2024 LMIG Formula Amount Required LMIG Match for Previous Grants FY 2024 LRA Formula Amount Required FY 2024 LRA Match 2 DODGE (UNINCORPORATED) 717.72 12,717 $ 875,578.95 $ 891,629.32 $ 955,104.12 10% $ 1,182,973.68 0% 2 DODGE CHAUNCEY 4.31 290 $ 6,303.20 $ 6,776.44 $ 7,039.80 10% $ 8,718.82 0% 2 DODGE CHESTER 4.72 520 $ 14,426.22 $ 14,389.23 $ 8,945.25 10% $ 11,078.31 0% 2 DODGE EASTMAN 54.22 5,595 $ 88,863.52 $ 90,824.29 $ 100,446.53 10% $ 124,399.42 0% 2 DODGE RHINE 5.95 294 $ 8,809.41 $ 8,921.69 $ 9,069.24 10% $ 11,232.50 0% 2 DODGE / TELFAIR MILAN 13.20 631 $ 18,206.73 $ 18,782.74 $ 19,990.34 10% $ 24,758.64 0% 3 DOOLY (UNINCORPORATED) 567.42 4,224 $ 660,899.93 $ 673,960.43 $ 719,499.98 10% $ 891,173.67 0% 3 DOOLY BYROMVILLE 6.42 409 $ 9,517.07 $ 10,177.07 $ 10,345.94 10% $ 12,813.54 0% 3 DOOLY DOOLING 3.64 65 $ 5,227.56 $ 4,918.69 $ 4,847.00 10% $ 6,003.40 0% 3 DOOLY LILLY 2.94 131 $ 4,458.49 $ 4,475.95 $ 4,394.14 10% $ 5,442.30 0% 3 DOOLY PINEHURST 5.93 297 $ 8,696.19 $ 8,783.52 $ 9,063.10 10% $ 11,224.90 0% 3 DOOLY UNADILLA 24.97 2,847 $ 47,816.07 $ 48,706.09 $ 47,909.17 10% $ 59,333.30 0% 3 DOOLY VIENNA 28.08 2,912 $ 51,295.16 $ 52,376.33 $ 52,108.21 10% $ 64,534.12 0% 4 DOUGHERTY (UNINCORPORATED) 289.96 15,796 $ 412,773.00 $ 420,641.51 $ 450,934.89 30% $ 558,492.34 0% 4 DOUGHERTY ALBANY 438.22 69,048 $ 896,455.89 $ 914,056.81 $ 957,308.50 30% $ 1,185,548.84 0% 7 DOUGLAS (UNINCORPORATED) 704.15 102,536 $ 1,383,462.68 $ 1,410,465.79 $ 1,486,878.55 30% $ 1,841,391.31 0% 7 DOUGLAS DOUGLASVILLE 141.28 35,561 $ 349,568.40 $ 356,314.38 $ 389,832.62 30% $ 482,755.53 0% 4 EARLY (UNINCORPORATED) 503.16 4,725 $ 588,151.21 $ 599,532.67 $ 643,996.25 30% $ 797,652.05 0% 4 EARLY BLAKELY 43.94 5,252 $ 74,911.47 $ 76,286.95 $ 85,784.41 30% $ 106,239.60 0% 4 EARLY DAMASCUS 4.44 206 $ 5,725.75 $ 5,835.55 $ 6,685.89 30% $ 8,280.70 0% 4 EARLY JAKIN 6.06 128 $ 7,512.99 $ 7,656.41 $ 8,190.25 30% $ 10,144.24 0% 4 ECHOLS (UNINCORPORATED) 157.57 3,699 $ 198,755.33 $ 202,062.01 $ 215,223.80 10% $ 266,569.79 0% 5 EFFINGHAM (UNINCORPORATED) 657.05 50,175 $ 988,409.52 $ 1,021,188.12 $ 1,109,620.02 30% $ 1,374,256.57 0% 5 EFFINGHAM GUYTON 25.18 2,557 $ 37,118.89 $ 41,445.21 $ 46,395.40 30% $ 57,459.11 0% 5 EFFINGHAM RINCON 56.96 11,016 $ 122,177.36 $ 124,499.00 $ 136,892.77 30% $ 169,527.44 0% 5 EFFINGHAM SPRINGFIELD 20.64 2,993 $ 44,294.26 $ 46,618.74 $ 43,506.80 30% $ 53,880.04 0% 1 ELBERT (UNINCORPORATED) 538.26 14,041 $ 680,245.75 $ 692,395.37 $ 743,784.74 30% $ 921,226.15 0% 1 ELBERT BOWMAN 11.59 860 $ 17,947.17 $ 17,826.20 $ 19,420.09 30% $ 24,051.70 0% 1 ELBERT ELBERTON 36.85 4,678 $ 65,740.60 $ 66,838.52 $ 73,611.98 30% $ 91,164.20 0% 2 EMANUEL (UNINCORPORATED) 891.55 11,921 $ 1,059,806.86 $ 1,079,500.65 $ 1,162,763.97 10% $ 1,440,187.02 0% 2 EMANUEL GARFIELD 4.31 254 $ 5,595.54 $ 6,054.79 $ 6,820.01 10% $ 8,446.68 0% 2 EMANUEL NUNEZ 3.67 132 $ 5,278.51 $ 5,004.72 $ 5,292.73 10% $ 6,555.30 0% 2 EMANUEL OAK PARK 13.27 502 $ 17,148.08 $ 17,782.65 $ 19,288.34 10% $ 23,889.50 0% 2 EMANUEL STILLMORE 12.16 437 $ 16,305.41 $ 16,799.26 $ 17,534.45 10% $ 21,717.27 0% 2 EMANUEL SUMMERTOWN 3.53 118 $ 5,352.11 $ 4,920.79 $ 5,036.09 10% $ 6,237.47 0% 2 EMANUEL SWAINSBORO 84.67 7,438 $ 137,421.73 $ 139,691.57 $ 148,925.76 10% $ 184,441.56 0% 2 EMANUEL TWIN CITY 19.74 1,685 $ 31,917.92 $ 32,236.69 $ 34,420.86 10% $ 42,629.63 0% 5 EVANS (UNINCORPORATED) 265.70 6,861 $ 337,340.54 $ 343,579.09 $ 366,725.17 10% $ 454,213.32 0% 5 EVANS BELLVILLE 1.95 125 $ 2,896.84 $ 2,895.63 $ 3,147.17 10% $ 3,897.79 0% 5 EVANS CLAXTON 24.74 2,580 $ 40,337.57 $ 40,818.54 $ 45,997.89 10% $ 56,966.68 0% Revised 03/6/2024 GEORGIA DEPARTMENT OF TRANSPORTATION LOCAL MAINTENANCE & IMPROVEMENT GRANT (LMIG) APPLICATION FOR FISCAL YEAR 2024 SUPPLEMENTAL TYPE OR PRINT LEGIBLY. ALL SECTIONS MUST BE COMPLETED. LOCAL GOVERNMENT AFFIDAVIT AND CERTIFICATION I, _________________________________________(Name), the_______________________________________(Title), on behalf of __________________________________________________ (Local Government), who being duly sworn do swear that the information given herein is true to the best of his/her knowledge and belief. Local Government swears and certifies that it has read and understands the LMIG General Guidelines and Rules and that it has complied with and will comply with the same. Local government further swears and certifies that it has read and understands the regulations for the Georgia Planning Act (O.C.G.A. § 45-12-200, et seq.), Service Delivery Strategy Act (O.C.G.A. § 36-70-20, et seq.), Immigration Sanctuary Policies; prohibition; penalties (O.C.G.A. § 36-80-23), and the Local Government Budgets and Audits Act (O.C.G.A. § 36-81-7 et seq.) and will comply in full with said provisions. Local government further swears and certifies that the roads or sections of roads described and shown on the local government’s Project List are dedicated public roads and are part of the Public Road System in said county/city. Local government further swears and certifies that it complied with federal and/or state environmental protection laws and at the completion of the project(s), it met the match requirements as stated in the Transportation Investment Act (TIA) (O.C.G.A. § 48-8- 240). Further, the local government shall be responsible for any claim, damage, loss or expense that is attributable to negligent acts, errors, or omissions related to the designs, drawings, specifications, work and other services furnished by or on behalf of the local government pursuant to this Application (“Loss”). To the extent provided by law, the local government further agrees to hold harmless and indemnify the DEPARTMENT and the State of Georgia from all suits or claims that may arise from said Loss. If the local government fails to comply with these General Guidelines and Rules, or fails to comply with its Application and Certification, or fails to cooperate with the auditor(s) or fails to maintain and retain sufficient records, the DEPARTMENT may, at its discretion, prohibit the local government from participating in the LMIG program in the future and may pursue any available legal remedy to obtain reimbursement of the LMIG funds. Furthermore, if in the estimation of the DEPARTMENT, a project shows evidence of failure(s) due to poor workmanship, the use of substandard materials, or the failure to follow the required design and construction guidelines as set forth herein, the Department may pursue any available legal remedy to obtain reimbursement of the allocated LMIG funds or prohibit local government from participating in the LMIG program until such time as corrections are made to address the deficiencies or reimbursement is made. All projects identified on the Project list shall be constructed in accordance with the Department’s Standard Specifications of Transportation Systems (Current Edition), Supplemental Specifications (Current Edition), and Special Provisions. Local Government: ______________________________ E-Verify Number ____________________________ (Signature) Sworn to and subscribed before me, ____________________________ (Print) This _____ day of_________, 20____. Mayor / Commission Chairperson In the presence of: ____________________________ (Date) NOTARY PUBLIC LOCAL GOVERNMENT SEAL: ______________________________ My Commission Expires: NOTARY PUBLIC SEAL: 2024 Supplemental LMIG (LRA) - Proposed Streets List # Street Name From To Neighborhood Ward L (ft) PCI Cost 1 Stewart Parkway Hwy 5 Douglas Blvd Hwy 5 1 3578 45.3 $762,358 2 Summerlin Pkwy Lee Rd new pavement Kensington Park 2 4200 72.1 $357,955 3 Woodrow Avenue Bowden St Campbellton St Downtown - West 2 750 50 $63,920 4 North Anna Way Woodrow Ave Culdesac Downtown - West 2 287 33.4 $24,460 5 Cherokee Drive Cherokee Blvd end Pinebrook MHP 2 950 48.8 $80,966 6 Somerset Way Cherokee Blvd Somer Mill Rd Somerset 2 950 48.4 $80,966 7 Somer Ridge Court Somerset Way culdesac Somerset 2 282 54 $24,011 8 Mountain Creek Way Linecrest Dr Linecrest Dr Willow Bend 3 2860 50.3 $243,750 9 Linecrest Drive Malone Rd End (west) Willow Bend 3 1871 44.6 $159,460 10 Willow Cove Court Mountain Creek Way culdesac Willow Bend 3 279 31.8 $23,807 11 Crystal Creek Place Chicago Ave culdesac Crystal Creek 3 1530 40.8 $130,398 12 Branch Crossing Way Crystal Creek Pl culdesac Crystal Creek 3 1361 42.3 $115,994 13 Ramblin Court Branch Xing Way culdesac Crystal Creek 3 412 47.3 $35,097 14 Carten Street Lincoln St End (north) Upshaw Mill 3 1925 58.2 $164,063 15 Lincoln Street Dallas Hwy Thompson St Upshaw Mill 3 558 64.3 $47,557 16 Thompson Street Upshaw Mill culdesac Upshaw Mill 3 2025 60.3 $172,585 17 Upshaw Mill Road Hwy 92 End (west) Upshaw Mill 3 1825 58.6 $155,540 18 Parkwood Avenue Charlton Pl culdesac Charlton Crossing 4 2345 52.7 $199,858 19 Camden Court Wembley Dr culdesac Kensington 4 709 24.1 $60,456 20 Brixton Court Wembley Dr culdesac Kensington 4 276 52.7 $23,551 5.49 miles $2,926,751 Total Estimated Project Cost: $2,926,751.00 2024 LRA Program Amount: $482,755.53 City of Douglasville Match: $0.00 (No matching funds required for grant) City of Douglasville 2024 LRA Requested Projects May 9th, 2024 1. Stewart Parkway Length: 0.6776 miles From: Douglas Blvd to Hwy 5 Type of work: Resurfacing Estimated Project Cost: $762,358.00 Time Schedule: Completion by May 1st, 2025 2. Summerlin Parkway Length: 0.7955 miles From: Lee Rd to new pavement Type of work: Resurfacing Estimated Project Cost: $357,955.00 Time Schedule: Completion by May 1st, 2025 3. Woodrow Avenue Length: 0.1420 miles From: Bowden St. to Campbellton St. Type of work: Resurfacing Estimated Project Cost: $63,920.00 Time Schedule: Completion by May 1st, 2025 4. North Anna Way Length: .0544 miles From: Woodrow Ave. to cul-de-sac Type of work: Resurfacing Estimated Project Cost: $24,460.00 Time Schedule: Completion by May 1st, 2025 5. Cherokee Drive Length: 0.1799 miles From: Cherokee Blvd to end Type of work: Resurfacing Estimated Project Cost: $80,966.00 Time Schedule: Completion by May 1st, 2025 6. Somerset Way Length: 0.1799 miles From: Cherokee Blvd to Somer Mill Rd. Type of work: Resurfacing Estimated Project Cost: $80,966.00 Time Schedule: Completion by May 1st, 2025 7. Somer Ridge Court Length: 0.0534 miles From: Somerset Way to cul-de-sac Type of work: Resurfacing Estimated Project Cost: $24,011.00 Time Schedule: Completion by May 1st, 2025 8. Mountain Creek Way Length: 0.5417 miles From: Linecrest Dr. to Linecrest Dr. Type of work: Resurfacing Estimated Project Cost: $243,750.00 Time Schedule: Completion by May 1st, 2025 9. Linecrest Drive Length: 0.3543 miles From: Malone Rd to end Type of work: Resurfacing Estimated Project Cost: $159,460.00 Time Schedule: Completion by May 1st, 2025 10. Willow Cove Court Length: 0.0528 miles From: Mountain Creek Way to cul-de-sac Type of work: Resurfacing Estimated Project Cost: $23,807.00 Time Schedule: Completion by May 1st, 2025 11. Crystal Creek Place Length: 0.2898 miles From: Chicago Ave. to cul-de-sac Type of work: Resurfacing Estimated Project Cost: $130,398.00 Time Schedule: Completion by May 1st, 2025 12. Branch Crossing Way Length: 0.2578 miles From: Crystal Creek Pl. to cul-de-sac Type of work: Resurfacing Estimated Project Cost: $115,994.00 Time Schedule: Completion by May 1st, 2025 13. Ramblin Court Length: 0.0780 miles From: Branch Crossing Way to cul-de-sac Type of work: Resurfacing Estimated Project Cost: $35,097.00 Time Schedule: Completion by May 1st, 2025 14. Carten Street Length: 0.3646 miles From: Lincoln St to end Type of work: Resurfacing Estimated Project Cost: $164,063.00 Time Schedule: Completion by May 1st, 2025 15. Lincoln Street Length: 0.1057 miles From: Dallas Hwy to Thompson St Type of work: Resurfacing Estimated Project Cost: $47,557.00 Time Schedule: Completion by May 1st, 2025 16. Thompson Street Length: 0.3835 miles From: Upshaw Mill to cul-de-sac Type of work: Resurfacing Estimated Project Cost: $172,585.00 Time Schedule: Completion by May 1st, 2025 17. Upshaw Mill Road Length: 0.3456 miles From: Dallas Hwy to end Type of work: Resurfacing Estimated Project Cost: $155,540.00 Time Schedule: Completion by May 1st, 2025 18. Parkwood Avenue Length: 0.4441 miles From: Charlton Pl. to cul-de-sac Type of work: Resurfacing Estimated Project Cost: $199,858.00 Time Schedule: Completion by May 1st, 2025 19. Camden Court Length: 0.1343 miles From: Wembley Dr. to cul-de-sac Type of work: Resurfacing Estimated Project Cost: $60,456.00 Time Schedule: Completion by May 1st, 2025 20. Brixton Court Length: .0523 miles From: Wembley Dr. to cul-de-sac Type of work: Resurfacing Estimated Project Cost: $23,551.00 Time Schedule: Completion by May 1st, 2025 Total Estimated Project Cost: $2,926,751.00 2024 LRA Program Amount: $482,755.53 City of Douglasville Match: $0.00 (0% match) Acker, Vicki From: Jordan, Miranda Sent: Thursday, May 9, 2024 9:37 AM To: Dresdow, Todd; Roberts, Greg; City Clerk's Office Cc: Dickinson, Melissa; Taylor, Krista Subject: Re: Supplemental LMIG for Council Round of May 16-20 That’s fine to update. Get Outlook for iOS From: Dresdow, Todd Sent: Thursday, May 9, 2024 9:27:53 AM To: Jordan, Miranda ; Roberts, Greg ; City Clerk's Office Cc: Dickinson, Melissa ; Taylor, Krista Subject: RE: Supplemental LMIG for Council Round of May 16-20 Good morning, Miranda, There’s been a last-minute addition to this item. The grant amount remains the same, but we’ve added 4 streets to the project list. Can we get a quick review and get these updated documents on the agenda, please? Thanks, From: Jordan, Miranda Sent: Thursday, May 2, 2024 10:21 AM To: Dresdow, Todd ; Roberts, Greg ; City Clerk's Office Cc: Dickinson, Melissa ; Taylor, Krista Subject: Re: Supplemental LMIG for Council Round of May 16-20 This is approved for May 16/20. You don’t have to include Greg’s letter. Agenda language: “Authorize the Mayor to sign the Georgia Department of Transportation 2024 Supplemental LMIG (LRA) grant application for a grant for road maintenance in the amount of $482,755.53.” Get Outlook for iOS Miranda Jordan Staff Attorney Legal Main: (770) 920-3000 Direct: (678) 449-3024 From: Dresdow, Todd Sent: Thursday, May 2, 2024 9:59:42 AM To: Roberts, Greg ; Jordan, Miranda ; City Clerk's Office Cc: Dickinson, Melissa ; Taylor, Krista Subject: RE: Supplemental LMIG for Council Round of May 16-20 I apologize. I sent the wrong packet to Greg. Attached is the full item for your review, Miranda. We have not previously included the application cover letter as part of the presentation. As an unsigned draft, I would not include it, but I’ll leave that to your discretion. Todd Dresdow Operations Manager Public Services Main: (770) 920-3000 Direct: (678) 449-3234 From: Roberts, Greg Sent: Thursday, May 2, 2024 8:41 AM To: Jordan, Miranda ; City Clerk's Office Cc: Dickinson, Melissa ; Taylor, Krista ; Dresdow, Todd Subject: Supplemental LMIG for Council Round of May 16-20 Miranda, If approved by Council, the items attached will be submitted to GDOT by June 15, 2024, for their approval. With the expectation that this item gets on the May 16-20 Agenda, Todd Dresdow will present the item. Let us know if there are questions. Thank You Greg Roberts Public Services Director Public Services Main: (770) 920-3005 Direct: (678) 449-3140 AGENDA ITEM REPORT Item Number: Meeting: Staff Contact: 24-168 05-20-2024 - City Council Regular Meeting (6:00 PM) Candyce James, Vicki Acker, Motion to remove from the table Item 24-114. Budget Impact: Is this an Agreement or Contract: N/A If YES, check one: ☐ Original Agreement ☐ Change Order, Change Order # Is it budgeted? N/A If so, what Account #? AGENDA ITEM REPORT Item Number: Meeting: Staff Contact: 24-114 06-03-2024 - City Council Regular Meeting Marissa Jackson, Planning and Zoning Administrator Tabled from May 20, 2024 - Consider a request to amend Exhibit C of ORD-2021-56 to amend condition 14 regarding camera systems throughout the community to require instead “Vehicular tag reader system to be installed at the entrance to development” for +/- 13.83 acres on Vansant Road in Land Lot 902, District 18, Section 2, Parcel ID 09021820018. Application by Starlight Homes Georgia, LLC c/o Joe Ingram. (Marissa Jackson) Attachments: PRZ24-0003– STAFF REPORT Chestnut Grove 4.11.24 Vansant Road Rezoning- O-21-56 PRZ24-0003 Vansant Road - Chestunut Grove Rezoning Application-Only Chestnut Grove -Vansant Road Land Site Plan Chestnut Grove -Vansant Road Land Survey PRZ24-0003 Vansant Road - Chestunut Grove Letter of Intent PRZ24-0003 Vansant Road - Chestunut Grove Legal Description PRZ24-0003 Vansant Road - Chestunut Grove Property Tax Statement Recommendation(s): ORD-2024-12 Budget Impact: Is this an Agreement or Contract: No If YES, check one: ☐ Original Agreement ☐ Change Order, Change Order # Is it budgeted? No If so, what Account #? MEMORANDUM TO: City of Douglasville’s Mayor and Council FROM: Shayla Reed, Community Development Director DATE: April 11, 2024 SUBJECT: PRZ24-0003– STAFF REPORT-Chestnut Grove at Vansant Road Item Number: 24-114 PURPOSE: A request to amend condition number 14 from ORD-21-56 which requires “Camera system throughout the community” for +/- 13.83 acres located on Chestnut Grove at Vansant Road in Lot 902, District 18, Section 02, (Parcel ID 09021820018). Application by Joe Ingram for Starlight Homes Georgia, LLC. Proposed Development: Proposed Townhomes Ward 2 – Councilwoman Nycole Miller and Councilwoman Elena Hudson Site Address: Chestnut Grove at Vansant Road Parcel Identification: Land Lot 902, District 18, Section 02, Parcel ID 09021820018 Parcel Acreage: + / - 13.83 acres Owner(s): Starlight Homes Georgia LLC Applicant Joe Ingram Historic District: No Quality Growth Overlay District: No Current Zoning: PRD (Planned Residential Development) Proposed Zoning: No zoning change Proposed Current Use: Vacant Character Area Light Industrial Land Use Compatible No, PRD is not a recommended use in the Light Industrial Character Area Surrounding Zoning: North – R-LD (Residential Low Density) – Douglas County East – R-LD (Residential Low Density) – Douglas County South – C-H (Heavy Commercial) – Douglas County West – LI (Light Industrial) - City PRZ24-0003– Chestnut Grove at Vansant Road Aerial View Location of the site on Vansant Road and the closest intersection is Midway Road PRZ24-0003– Chestnut Grove at Vansant Road Site Location Location of the site surrounded by Light Industrial, General Commercial and Douglas County PSP: Public Semi Public GC: General Commercial PUD: Planned Unit Development LI: Light Industrial R-4: Single Family Residential Detached PUD PSP GC Douglas County Douglas County PUD GC Douglas County PRZ24-0003– Chestnut Grove at Vansant Road Proposed Site Plans Entrance for the site and location of the license tag reader indicated by the arrow. For a larger site plan see attachments. PRZ24-0003– Chestnut Grove at Vansant Road Subject Parcel in Character Area Map The site is located in the Light Industrial Character Area CAC: Community Activity Center (Blue) LI: Light Industrial (Gray) LDR: Low Density Residential (Yellow) TN: Traditional Neighborhood (Purple) Fairburn Road PRZ24-0003– Chestnut Grove at Vansant Road Project Description The rezoning ordinance, ORD-21-56, which allows the referenced parcel for townhome development included a list of items as conditions for approval. Condition number 14 stated, “Camera systems throughout community” as a requirement. The current request for consideration is an amendment to condition number 14 to provide clarity and update the camera requirement. New verbiage for the condition will be amended to read as follows: A surveillance camera and Flock Automated License Plate Readers (FALR) Device shall be required at the entrance of the development The request for amendment has been reviewed by the City’s development review team, including the police department. The camera system, once put in place, will contribute to the safety of those residing in the townhome community and the surrounding areas. The townhome development is already in the development phase. Street outlines and utility connections have been put in place. Character Area Compliance The parcel is zoned Planned Residential Development (PRD), and does not comply with the Light Industrial Character Area. PRD is not a recommended zoning district for the Light Industrial Area. An amendment to the Character Area Map may be considered for harmony. Light Industrial Character Area Use(s): LI (Light Industrial), OD (Office Distribution), PUD (Planned Unit Development. PRZ24-0003– Chestnut Grove at Vansant Road Applicant’s Request The applicant requests a Rezoning under the City of Douglasville Unified Development Ordinance (UDO) Section 12.08.05. Section 12.08.05 The Planning Commission and the City Council shall consider the following standards in considering any proposal that would result in a change to the text or map of this UDO, giving due weight or priority to those factors that are appropriate to the circumstances of each proposal: a. Is the proposed amendment consistent with the purpose and intent of this UDO as stated under Article I, Introductory Provisions? Yes. The applicant requested rezoning to consider an amendment to Exhibit C of ORD-2021-56 condition number 14 regarding camera systems throughout the community to require instead “Vehicular tag reader system to be installed at entrance to development”. b. Does the proposed amendment further or is it compatible with the purpose and intent of the most recent Comprehensive Plan? The proposal has been approved and the applicant has received a Land Disturbance Permit. The site zoned PRD does not align with the character area. c. Is the proposed amendment required to adequately address new or changing conditions or to properly implement the most recent Comprehensive Plan? With the proposed rezoning, the applicant should be required to make all site adjustments that would adequately address new or changing conditions in the area. The areas to the south are zoned as residential. d. Does the proposed amendment reasonably promote public health, safety, or general welfare? The applicant seeks to develop a residential site that complements the surrounding commercial and industrial area. To increase the safety for the community, the applicant has proposed surveillance cameras at the entrance of the development. PRZ24-0003– Chestnut Grove at Vansant Road Standards of Approval for Rezoning and Map Amendments 1. Will the proposed use cause an unsafe increase in traffic congestion in the surrounding area? It is anticipated that the proposed 144-unit townhouse development will not result in a significant uptick in traffic due to its close proximity to Interstate 20, and the existing transportation network is anticipated to be able to absorb the additional traffic flow in a safe manner. The existing infrastructure can support a project of this scale and scope. 2. Are nearby railroad crossings adequate to safely handle any resulting increases in trucks and heavy equipment? No, there are no railroad crossings to this development. 3. Will the proposed use generate unreasonable pollution or negative environmental effects, including but not limited to dust, noise, contamination of surface water or water table, or unreasonable level of light at night? Based on the provided information, it is not anticipated that the proposed project will result in any negative environmental effects. 4. Will the proposed use generate unreasonable levels of vibration which may damage structures or business operations in the surrounding area? No. The use is not expected to generate unreasonable levels of vibration. 5. Will the effects of proposed use cause or contribute to devaluation of property in the surrounding area for future use of the property as currently zoned or used? There is no anticipated devaluation of property values in the surrounding area for future use of the property as currently zoned or used. 6. Will the effects of proposed use cause or contribute to devaluation of existing businesses in the surrounding area? No, the effects of the proposed use will not contribute to a devaluation of existing businesses due to the rezoning of the subject property. The community will provide customers to support the local economy. PRZ24-0003– Chestnut Grove at Vansant Road 7. Is the proposed use consistent with existing uses and zoning of nearby property? The proposed rezoning is congruent with adjacent and nearby properties. Townhomes will serve as a good transition from single-family to commercial and industrial land use. 8. The extent to which property values are diminished by the existing zoning restrictions. The current zoning restrictions do not appear to diminish property values of the surrounding areas. 9. The relative gain to the public, as compared to the hardship imposed upon the individual property owner. The gain to the public would be beneficial because the applicant’s proposal is to develop a vacant tract of land with a proposed townhome development thereby increasing the tax base for the city. 10.The suitability of the subject property for the zoned purposes? The subject property is suitable for the proposed development. The proximity to I-20, shops, restaurants, and places of employment make this parcel highly suitable for a new townhouse community. 11. The length of time the property has been vacant as zoned considered in the context of land development in the area in the vicinity of the property; The property has been vacant for many years. The property will provide the City with potential new residents who will contribute to the tax base of the City. 12. Are public services, public facilities, and utilities adequate to serve the proposed use? Yes, public facilities and services are readily available and have the capacity to handle the proposed use. 13. Will the proposed use result in an over-concentration of the subject use type within the area of the proposed use? The proposed development would not result in an overconcentration of the subject type of use within the area. PRZ24-0003– Chestnut Grove at Vansant Road 14.Will the aesthetic and architectural design of the site be compatible with the intent and requirements of the comprehensive plan, the character area study, and all applicable zoning ordinance regulations? The aesthetic and architectural design will be acceptable and will meet all the City’s development plan requirements as the applicant states that they will comply with the City’s development standards. 15. Will the proposed use be compatible with adjacent properties and land uses, based on consideration of the size, scale and massing of proposed buildings and the overall site design? Yes, the proposed development will be compatible with the surrounding community. Staff Comments The request for rezoning is a minor amendment to zoning condition number 14 of ORD-21-56. The amendment will provide clarity on the city’s request for a surveillance system. The request for amendment has been reviewed in conjunction with the police department, and it is expected to enhance ongoing safety efforts. The proposed updated language for condition number 14 is: “A surveillance camera and Flock Automated License Plate Readers (FALR) Device shall be required at the entrance of the development” Planning Commission On April 2, 2024, the Planning Commission voted to recommend approval. Related Ordinances City of Douglasville’s 2023 Comprehensive Plan PRD Planned Residential District Ordinance Number ORD- 2021- 56 AN ORDINANCE ALLOWINGREZONING Itis hereby ordained by the City Council ofDouglasviile, Georgia asfollows: WHEREAS, SA Land Group, do Adam Baker, has duly filed an application for rezoning of certain property being 13. 83 acres zoned R- LD (Residential Low Density, County) in the Highway Overlay District to PRD (Planned Residential District, City) on Vansant Road in Land Lot 902, District 18, Section 2, Parcel 18, lying and being within the boundaries ofDouglasviile, Georgia; and WHEREAS, the Douglasviile Planning Commission duly considered and investigated said application and held a public hearing thereon. NOW, THEREFORE, it is hereby ordained that the aforementioned property described on the attached Exhibit A be duly rezoned to PRD (Planned Residential Development District). The PRD plan attached as Exhibit B is made a special stipulation ofthis zoning. In addition to the requirements of PRD zoning established by the City of Douglasviile Unified Development Ordinance, the following special conditions are imposed upon the property as additional conditions ofrezoning: See ExhibitCforlistofconditions. Itis hereby directed that the Official Zoning Map ofthe City ofDouglasviile be amended to reflectthis rezoning. 4- t Ordinance Number ORD- 2021- 56 Page 2 Enacted this the 6**^ day ofDecember, 2021, l^^helle RoDinson, h^yor Mark Adams, Councilmember Sam Davis, Councilmember flWYAv^ Nycole N. Miller, Councilmember Terry Miller, MayorPro Tem r. KaShun B. Danley, Councilmember Howard M. Estes, Councilmember Chris "Coach" Watts, Councilmember Attest: Vicki L. Acker, Cityj^erk EXHIBIT "A" Legal Oescripiion AH that tractorparcel ofland lyingand being iit original Land F- ots902, 909and 910ofthe 18"' District. 2"" Section, ofDouglas County, Georgia, and more particularlydescribed as follows: BEGINNING at an iron pin comer marking the originalsouthwest comerofsaid Land Lot902, runningthence north 02degrees25minuteseastalong Land Lotlinea distanceof476feelto lliecenterofOld Douglasville-Factory Shoals Road; tliencenortheasterly alonglitecenteriine ofsaid road 637. 2feettoanestablished comer; thencesouth0degrees 10 minutes east 1084 feel to an iron pin comer; thence north 75 degrees 20 minutes west 1090 feet to an iron pin comer; thencesouth 0degrees20minutesMst218 feet toan Iron pin comer; thence north 75degrees west207. 5feet toaniron pin comer; thence north01 degree west245feet toan iron pin comeron theoriginal noilhlineofsaid Land Lot909; thence north 88 degrees 30 minutes east 640 feet to (he northeast comer ofsaid Land Lot 909 (southwest comerofsaid Land Lot 902) and the point ofbeginning, containing 15. 1 acres according to plat ofsur\' ey by W. P. Johnson, surveyor, dated April 20, 1966, recorded in Plat Book4, page 106, DouglasCounty records. ORD- 2021- 56 EXHIBIT B - PRD Concept Plan ioe a Woe YD ALhAOD S¥TSNOG ITIASY IMO 40 ALD io" CONCEPTUAL LAYOUT 2 SCALE: }"eG0" o7 LIVUL Ge LNVYSNVA [SAT Je DETENTION AREA 200: 20" BETWEEN SrRvC TURES FOP romeroue auensons = 2240" (mare29" 2601) Page 221 of 334 wart apna, paaloy joe ORD-2021-56 EXHIBIT C FINAL PROPOSED CONDITIONS VansantRoad Re- Zoning (Item 21- 510) 1. Mandatory Homeowners' Association (HOA); 2. A maximum of124townhomes constructed with a density rate notto exceed 9units per acre; 3. Provide at least 10% oftotal area for greenspace; 4. Border south/ southeastern portion ofsubject property with above minimum code landscaping; 5. Provide fencing along contiguous orders; 6. A mix ofone and two- car garage units with atleast a minimum ofthirty-five percent (35%) ofthe units to be developed with two- car garages notless than 400square feet; 7. Percentage ofrental units capped at 10% ofthe total numberofunits; 8. Staggerfronts oftownhousesa minimum of3feet; 9. Provide pedestrian inner connectivity ofinternal sidewalks and trails; 10. Utilize high quality materials on both external and interior ofunits; frontage ofunits shall be 100 percent brick, stone or cementitious fiber; each side shall be at least40% brick, stone or cementitious siding; vinyl and metal siding prohibited; 11. Targetprice pointsoftownhomesfrom $250, 000 and up; 12. Identify mail kiosk & required parking on site; 13. Alltownhome units will be required to follow code as it pertains to fire sprinkler systems; 14. Camera system throughoutcommunity; and 15. Develop with afire pit, and additional amenities should include trails and/ ora dog park. ORD- 2021- 56 rw k= DOUGLASVILLE GEORGIA Rezoning Application Checklist Pre-Application Conference (See page 2) Date: March ui 4 An Y Scheduled by: an S M Tubbs iV Completed Application Form Response to standards for approval The names and addresses of the owners of the subject property and their agents if any Notarized consent of owner if applicant is not owner Present and proposed zoning classification for the subject property Campaign contribution disclosure report by the applicant and the applicant's attorney, if applicable, in accordance with 0.C.G.A. 36-67A oOoooo0od Oo Required Documentation & Supplemental Information OQ Letter of Request O Legal Description of the property © Amap of the property sought to be rezoned showing its location and the City and its relationship to abutting properties, public facilities, and public services including the zoning classification of all abutting properties O Arecent survey plat showing the dimensions and location of the subject property prepared by a land surveyor whose state registration is current and valid and whose seal is affixed to the plat (see page 9 for survey requirements) O Proof that all City, County, and State ad valorem taxes due upon the property have been paid in full C Information regarding the demand that will be placed on public facilities and services by any contemplated development, including but not limited to increased population density, traffic volume (see page 9 for traffic study requirements), school enrollment, drainage, traffic, and utility facilities City of Douglasville | Community Development Department | 6701 Church St, Douglasville, GA 30134 | Rezoning Application Packet Rev 5/10/29 | Page 1 rs LL. DOUGLASVILLE GEORGIA = Rezoning Application | Project Chestnut Grove ' | Project Name | | 13.83 Acres Vansant Road, Douglasville, GA 30135 | Property Address/Location City State Zip | 902 18 2 18 09021820018 13.83 pores | Land Lot District Section Parcel Property ID Property Size | | PRD to N/A Adjacent Zoning: Ceane C-H R-LD LI Current Zoning Proposed Zoning North South East West | Overlay District: (Historic Overlay District (ClQuality Growth Development Overlay WiNone | Applicant/Representative ' Joe Ingram ' Applicant/ Agent or Attorney 1 Starlight Homes Georgia L.L.C joe.ingram@ashtonwoods.com 770.652.2512 Company E-mail Address Phone 3820 Mansell Road Suite 150, Alpharetta GA 30022 Mailing Address City State Zip Owner , Joe Ingram (Applicant) Property Owner Starlight Homes Georgia L.L.C. joe.ingram@ashtonwoods.com 770.652.2512 Company E-mail Address Phone 3820 Mansell Road Suite 150, Alpharetta GA 30022 Mailing Address City State Zip Applicant Signature | hereby certify that all information provided herein is true and correct. Vd { fi BLOW March 3, 2024 . Applicant/Owner or Répresentative Signature Date | (+Kpplication Approved for Staff Review DiApplication Rejected Fee: $._ ] j O CG 0.06 | | Zoning Administrator Date City of Douglasville | Community Development Department | 6701 Church St, Douglasville, GA 30134 | Rezoning Application Packet Rev 7/23/19 | Page 5 rw L.A DOUGLASVILLE Rezoning Application GEORGIA : Consent of Owner Property Owner The property owner shall read the following carefully and complete the consent form below: { understand that failure to supply all required information per the rezoning checklist provided and requirements of the City of Douglasville Unified Development Ordinance will result in rejection of application | understand that preliminary approval of my plans does not authorize final approval of my rezoning request, and all subsequent applications and permits, including but not limited to land disturbance, building, sanitary sewer, and signs, may not be issued until rezoning approval is obtained | understand that representation associated with this application on behalf of the property owner (i.e. project coordinator, potential property owner, agent, or other such representative) shall be binding j j | have read the provisions of O.C.G.A. 36-67A as required regarding Campaign Disclosures; my signed Campaign Disclosure report is included with this application j, Joe Ingram . aS property owner, respectfully petition that this property as described in this application be considered for a change in zoning from PRD to N/A . lacknowledge and fully understand all above statements made by the City of Douglasville. | hereby certify that all information provided herein is true and correct. February 26, 2024 Date 3820 Mansell Road Suite 150, Alpharetta GA 30022 770.652.2512 Address _ 7 _ _ City State Zip Phone Representative (if applicable) Attorey/Agent Signature Date _ Address City wu ‘ Wiig, 7, Phone > Ws DRO, My S) A Coat < e. DS DAGSSION Sper A SG SS “nm nS Sworn and subscribed before me = iS sor St 22 Thig-7 A lday of Fete , 20.2Y = aie -— } © = = Cs © v2 ae a Sg VO HOS 1 Dine Le % OySuser we Ws Notary Publi ante Ee otary Public “%, Counts AY 4} City of Douglasville | Community Development Department | 6701 Church St, Dolhayeg erent) Rezoning Application Packet Rev 7/23/19 | Page 6 ru L. 4 DOUGLASVILLE Rezoning Application GEORGIA - Standards for Approval Applicants are required to respond to the following criteria pursuant to the Unified Development Ordinance Section 12.08.A.5. 1. Is the proposed amendment consistent with the purpose and intent of this UDO as stated under Article |, Introductory Provisions? Yes, the proposed amendment is sonsistent with the purpose and intent of this UDO as stated under Article |, Introductory Provisions. 2. Does the proposed amendment further or is it compatible with the purpose and intent of the most recent Comprehensive Plan? Yes, the proposed amendment furthers or is compatible with the purpose and intent of the most recent Comprehensive Plan. 3. Is the proposed amendment required to adequately address new or changing conditions or to properly implement the most recent Comprehensive Plan? Yes, the proposed amendment is required to adequately address new or changing conditions or to properly implement the most recent Comprehensive Plan. 4. Does the proposed amendment reasonably promote the public health, safety, or general welfare? Yes, the proposed amendment reasonably promotes the public health, safety and general welfare. 5. Will the proposed use cause an unsafe increase in traffic congestion in the surrounding area: No, the proposed amendment will not cause an unsafe increase in traffic congestion in the surrounding area. 6. Are nearby railroad crossings adequate to safely handle any resulting increases in heavy trucks and heavy equipment: N/A City of Douglasville | Community Development Department | 6701 Church St, Douglasville, GA 30134 | Rezoning Application Packet Rev 7/23/19 | Page 7 7. Will the proposed use generate unreasonable pollution or negative environmental effects, including but not limited to dust, noise, contamination of surface water or water table, or unreasonable level of light at night? No, the proposed use will not generate unreasonable pollution or negative environmental effects, including but not limited to dust, noise, contamination of surface water or water table, or unreasonable level of light at night. 8. Will the proposed use generate unreasonable levels of vibration which may damage structures or business operations in the surrounding area? No, the proposed amendment does not propose a use that will generate unreasonable levels of vibration which may damage structures or business operations in the surrounding area. 9. Will the effects of proposed use cause or contribute to devaluation of property in the surrounding area for future use of the property as currently zoned or used? No, the effects of the proposed use will not cause or contribute to devaluation of property in the surrounding area for future use of the property as currently zoned or used. 10. Will the effects of proposed use cause or contribute to devaluation of existing businesses in the surrounding area? No, the effects of the proposed use will not cause or contribute to devaluation of existing businesses in the surrounding area. 11. Is the proposed use consistent with existing uses and zoning of nearby property; Yes, the proposed use is consistent with existing uses and zoning of nearby property. 12. The extent to which property values are diminished by the existing zoning restrictions; Applicant is requesting a change to zoning condition 14. Applicant proposes revising condition 14 to state, "Vehicular tag reader system to be installed at entrance to development." 13. The relative gain to the public, as compared to the hardship imposed upon the individual property owner; Applicant is requesting a change to zoning condition 14. Applicant proposes revising condition 14 to state, "Vehicular tag reader system to be installed at entrance to development." City of Douglasville | Community Development Department | 6701 Church St, Douglasville, GA 30134 | Rezoning Application Packet Rev. 7/23/19 | Page 8 14. The suitability of the subject property for the zoned purposes; Applicant is requesting a change to zoning condition 14. Applicant proposes revising condition 14 to state, "Vehicular tag reader system to be installed at entrance to development." 15. The length of time the property has been vacant as zoned considered in the context of land development in the area in the vicinity of the property; Property was rezoned to PRD December 6, 2021. Applicant does not seek a change to zoning classification. 16. Are public services, public facilities and utilities adequate to serve the proposed use; Yes, public services, public facilities and utilities are adequate to serve the proposed use. 17. Will the proposed use result in an over-concentration of the subject use type within the area of the proposed use; No, the proposed use will not result in an over-concentration of the subject use type within the area of the proposed use. 18. Will the aesthetic and architectural design of the site be compatible with the intent and requirements of the comprehensive plan, the character area study, and all applicable zoning ordinance regulations; Yes, the aesthetic and architectural design of the site will be compatible with the intent and requirements of the comprehensive plan, the character area study and all applicable zoning ordinance regulations. 19. Will the proposed use be compatible with adjacent properties and land uses, based on consideration of the size, scale and massing of proposed buildings and the overall site design Yes, the proposed use will be compatible with adjacent properties and land uses, based on consideration of the size, scale and massing of proposed buildings and the overall site design. City of Douglasville | Community Development Department | 6701 Church St, Douglasville, GA 30134 | Rezoning Application Packet Rev 7/23/19 ] Page 9 rw aes DOUGLASVILLE Campaign Contribution GEORGIA Disclosure Report Have you made, within 2 years immediately preceding the hearing for rezoning, campaign contributions aggregating $250 or more or made gifts having an aggregate value of $250 or more to the Douglasville Mayor or member of the City Council or Planning Commission who will consider the application? 0 YES CXNO If YES, you and the attorney representing you must file this disclosure report with the Zoning Division at least five (5) days prior to the scheduled public hearing. Please supply the following information, which will be considered as the required disclosure: Date Government Official Position Description Amount IWe certify that the foregoing information is true and correct, this_2day of ©, 20K 2024 Leer Applicant Signature? Attomey City of Douglasville | Community Development Department | 6701 Church St, Douglasville, GA 30134 | Rezoning Application Packet Rev 7/23H9| Page 10 PROJECT DESCRIPTION: THE PROJECT CONSISTS OF THE DEVELOPMENT OF | 22 TOWNHOUSE UNITS AREA AND ASSOCIATED INFRASTRUCTURE. THERE |S A PROPOSED SEWER MAIN OUTFALL ALONG VANSANT ROAD THAT WILL TIE INTO THE EXISTING SEWER LOCATED AT THE INTERSECTION BETWEEN VANSANT RD AND FAIRBURN RD. THERE IS AN EXISTING WATER MAIN LOCATED ALONG THE VANSNAT ROAD FRONTAGE, STORMWATER DETENTION WILL BE REQUIRED AND PROVIDED ON-SITE. PROPERTY DESCRIPTION: THE PROPERTY (S LOCATED ALONG VANSANT ROAD. THE SITE IS BORDERED BY A SINGLE HOUSE SUBDIVISION TO THE EAST. COMMERCIAL TO THE SOUTH AND INDUSTRIAL TO THE WEST. THE SITE IS DOMINATED BY 2% TO 10% SLOPES GENERALY SLOPED TOWARD AN EXISTING STREAM WHICH CROSSES THE MIDDLE PORTION OF THE PROPERTY. STATE WATERS # WETLANDS THERE ARE STATE WATERS ON THIS SITE REQUIRING A 25' STATE UNDISTURBED BUTTER, 50’ COUNTY UNDISTURBED BUFFER AND 75' IMPERVIOUS SETBACK MEASURED FROM THE. TOP OF BANK. FLOODPLAIN: PART OF THIS PROPERTY UES WITHIN A SPECIAL FLOOD HAZARD AREA (SFHA) PER FEMA PIRM PANEL 13097C0064D DATED MARCH 4, 2013. _. cr SURVEY: ‘THE BOUNDARY AND TOPOGRAPHIC INFORMATION SHOWN IS FROM GIS SYSTEM. UTILITIES: WATER AND SEWER WILL BE PROVIDED BY DOUGLASVILLE- DOUGLAS COUNTY WATER AND SEWER AUTHORITY. EXISTING WATER LINE IS LOCATED ALONG VANSANT RDAD. EXISTING SANITARY SEWER UNE IS APPROX, 1,220 LF WEST FROM THE SITE. AREAS: TOTAL SITE AREA = 13.293 ACRES TOTAL DISTURBED AREA = 11.5 ACRES 24 HOUR CONTACT STARLIGHT HOMES XX xX Know what's below, Call before you dig. WARNING: Bubcontractors, venders and suppiers DOUGLASVILLE - DOUGALS COUNTY WSA NOTES: STORMWATER MANAGEMENT STRUCTURES ON PRIVATE PROPERTY MUST BE MAINTAINED BY THE PROPERTY OWNER. ALL SUBSEQUENT OWNERS MUST BE INFORMED OF OPERATIONS AND MAINTENANCE REQUIREMENTS. FAILURE TO MAINTAIN STORMWATER INFRASTRUCTURE MAY RESULT IN ENFORCEMENT ACTION CHANGES AND MODIFICATIONS TO STORMWATER INFRASTRUCTURE (PUBLIC AND PRIVATE) MUST BE APPROVED BY THE DOUGLASVILLE - DOUGLAS COUNTY WATER AND SEWER AUTHORITY, DOWNSTREAM IMPACTS OF DEVELOPMENT ARE THE RESPONSIBILITY OF THE OWNER. DEVELOPMENT MAY NOT CAUSE DOWNSTREAM IMPACTS SUCH AS INCREASED FLOOD HAZARD, EROSION OF OFF-SITE SOILS AND STREAM CHANNELS, OR IMPAIRMENT OF WATER QUALITY OF RECEIVING WATERS APPROVAL (5 BASED ON INFORMATION SUPPLIED ON THESE DRAWINGS. IF UNKNOWN CONDITIONS ARE ENCOUNTERED, OR SITE CONDMONS CHANGE, OR THESE PLANS ARE OTHERWISE FOUND TO BE NOT REPRESENTATIVE OF SITE CONDITIONS, CONTACT THE DOUGLASVILLE ~ DOUGLAS COUNTY WATER AND SEWER AUTHORITY ENGINEERING DEPARTMENT, DESIGN REVISION AND RE-SUBMITTAL MAY BE (QUIRED. CONSTRUCTION, WHICH IMPACTS STREAMS, WETLANDS, OR OTHER ENVIRONMENTALLY SENSITIVE AREAS, SHALL COMPLY WITH APPLICABLE LOCAL, STATE, AND FEDERAL LAWS. PLAN APPROVAL BY WSA DOES NOT RELIEVE THE OWNER, DEVELOPER, AND CONTRACTOR OF THE OBLIGATION TO APPLY FOR AND OBTAIN REQUIRED PERMITS AND COMPLY WITH CURRENT REGULATIONS, DEVELOPMENT MAY NOT OCCUR IN FLOOD PRONE ARFAS AS DEFINED BY THE DOUGLASVILLE - DOUGLAS COUNTY WATER AND SEWER AUTHORITY. UNAUTHORIZED DEVELOPMENT WILL BE ORDERED REMOVED AND RESTORATION OF THE SITE REQUIRED, BOTH AT THE EXPENSE OF THE DEVELOPER. APPROVAL OF THESE PLANS IS BASED CN SUBMITTED INFORMATION REGARDING EXTENTS OF SOIL DISTURBANCE, SCHEDULE OF ACTIVITIES, AND PROPOSED MEASURES TO CONTROL EROSION AND SEDIMENT CONTROL. SIGNIFICANT CHANGES TO PROJECT DESIGN OR SCHEDULE ELEMENTS MUST BE APPROVED BY THE AUTHORITY, PLAN APPROVAL DOES NOT RELEASE ANY PARTY FROM DUTY TO COMPLY WITH LOCAL, STATE, AND FEDERAL LAW. IT IS UNLAWFUL TO INCREASE TURBIDITY IN RECEIVING WATERS MORE THAN 25 ‘THE DOUGLASVILLE - DOUGLAS COUNTY WATER AND SEWER AUTHORITY REQUIRES THAT EVERY SERVICE CONNECTION BE EQUIPPED WITH A BACKFLOW PREVENTION DEVICE, FACILITIES THAT, IN THE OPINION OF THE AUTHORITY, MAY POTENTIALLY INTRODUCE HAZARDOUS OR TOXIC SUBSTANCES INTO THE WATER SUPPLY WILL BE REQUIRED TO INSTALL A REDUCED PRESSURE ASSEMBLY THAT VENTS TO THE ATMOSPHERE DOUGLASVILLE - DOUGLAS COUNTY WSA APPROVAL OF THESE PLANS DOES NOT CONSTITUTE A GUARANTEE OF WATER OR SEWERAGE CAPACITY, CAPACITY IS NOT ALLOCATED UNTIL IT 1S PURCHASED THROUGH THE SALE OF A WATER METER. ANY MODIFICATIONS/CHANGES TO AN EXISTING OR ADDITIONS TO A PORTION OF THE WATER, SEWER, OR STORMWATER SYSTEMS IS REQUIRED TO BE INSPECTED AND OR REVIEWED BY WSA (WSA ENG. DEPT. PHONE # 770-949-761 7) «PLAN APPROVAL DOES NOT RELEASE THE OWNER, DEVELOPER, OR CONTRACTOR FROM RESPONSIBILITY FOR ENVIRONMENTAL DAMAGE, PROPERTY DAMAGE, OR ENDANGERMENT OF PUBUC HEALTH, RESPONSIBLE PARTIES SHALL MITIGATE IMPACTS, REPAIR DAMAGE, AND COMPENSATE AFFECTED PARTIES AS REQUIRED BY LOCAL AND STATE LAW. ALL CONSTRUCTION AND MATERIALS SHALL BE IN’ FULL ACCORDANCE WITH CURRENT RULES ANDREGULATIONS AND DESIGN STANDARDS AND SPECIFICATIONS PUBLISHED BY THE DOUGLASVILLE DOUGLAS COUNTY WATER AND SEWER AUTHORITY, IT IS THE RESPONSIBILTY OF EACH DEVELOPER AND CONTRACTOR TO FAMILIARIZE HIMSELF WITH ALL CURRENT WSA RULES AND STANDARDS. . THE DOUGLASVILLE - DOUGLAS COUNTY WATER AND SEWER AUTHORITY WILL OBTAIN ROAD BORE PERMITS AND ROAD CUT PERMITS AT THE COUNTY AND STATE LEVELS FOR ALL APPROVED PROJECTS. ROAD BOREICUT WORK SHALL NOT BEGIN UNTIL PERMITS ARE OBTAINED. PLEASE NOTIFY W.S.A, ENGINEERING DEFT, 72 HOURS BEFORE CONSTRUCTION AT PRELIMINARY CONSTRUCTION PLANS VANSANT RD. TRACT VANSANT ROAD DOUGLAS COUNTY (TO BE ANNEXED INTO DOUGLASVILLE) LAND LOT 902 DISTRICT 18 PARCEL NO 09021820018 ZONING: R-LD (DOUGLAS COUNTY) PROPOSED ZONING: PRD (CITY OF DOUGLASVILLE) OVERLAY DISTRICT - NONE APPROVAL APPLICATION NUMBERS NWA DRAWING INDEX 03/24/2022 COVER SHEET cod ZONING CONDITIONS ~ EXISTING CONDITIONSYDEMOLITION PLAN SITE PLAN SIGHT DISTANCE PLAN AND PROFILE ENTRANCE PLAN GRADING # DRAINAGE PLAN MICROPOOL EXTENDED DETENTION POND DETAILS: SEWER PLAN WATER PLAN MCFARLAND-DYER. FIRE FLOW TEST & ASSOCIAIES, INC. AIF4 SLWIR PEAK PARK Ny EROSION, SEDIMENTATION # POLLUTION CONTROL NOTES: Suwand, Crorteaa 30024 PyOWE. (770) 992-6550 TAN 7703 9326551 EROSION, SEDIMENTATION 4 POLLUTION CONTROL PHASE | WWA\N.COMDANCT EROSION, SEDIMENTATION & POLLUTION CONTROL PriASE II EROSION, SEDIMENTATION POLLUTION CONTROL PHASE III C-5.4-C57 EROSION, SEDIMENTATION ¢ POLLUTION CONTROL DETAILS C60 TREE SURVEY TREE CONSERVATION PLAN ROAD PROFILES STORM SEWER TABLE CH.1-C83 STORM SEWER PROFILES: SUITE 100 C9.0-9.2 SANITARY SEWER PROFILES C-10.0-C-10.3 DETAILS STARLIGHTHOMES 3780 MANSELL RD. PANEL 00640 FIRM FLOOD INSURANCE RATE MAP DOUGLAS COUNTY, GEORGIA AND INCORPORATED AREAS ROGRAN p Colonial Estates PANEL 64 OF 281 OLE WAP OE COM ms rane, Laut) NG fearetrl sap BYCENS 2) * YR burn Rd I unset Hill Brown Su Fairy m Ra Shawnee Lake (92 Estates NATIONAL ROOD) INSU Federa) Emergeacy Mesagemeet Serery why on ney cf ae ee {OF DOUGLASVILLE ALPHARETTA, GA 30022 VANSANT ROAD TRACT V2ND DISTRICT iF DESCHIPLION g bE SUBAUDLAL FLOOD PLAN KOTE: VICINITY MAP SCALE P=lQ00' OWNER/DEVELOPER/PRIMARY PERMITEE: ENGINEER/SURVEYOR: SITE VISIT CERTIFICATION: MCFARLAND-DYER 4 ASSOCIATES, INC. 4174 SILVER PEAK PARKWAY SUWANEE, GEORGIA 30024 PH: 770-932-6550 FX: 770-932-655 | ENGINEER CONTACT: JOHN E, NAGY, PE EMAIL: JNagy@bowman com STARLIGHTHOMES: 3760 MANSELL RD SUITE 100 ALPHARETTA, GA 30022 PHONE: 914-338-6034 CONTACT: CHRISTIAN WITTER 9 OORT PY UNO 28 PENALTY OF LAW THAT THIS PLAN WAS PROPARED AFTORA SITE YT TO The LOCATIONS DESCRIBED rEREIN By YYSELF O2 M47 ALTHORWZED ACERT, UNDER Mr SLPERVi51ON, PART OF THIS PROJECT LIES WITH'N A MINIMAL FLOOD HAZARD AREA (ZONE X) PER FEMA FIRM PAEL }3097C00S4D DATED MARCH 4. 2013 COMRKNIT 204 MCTARLAND-DYTR & ASSOCIATES INC. p\2021\ 1001\ coke Sih? O€T wd... Apr 27, 2022 — 1:43pm 770-949-7617. SURVEY CONTACT: J. CHRIS WHITLEY, P.LS. EMAIL: CWhitley@bowman.com Fri WOVE CHL EVEL CP POTN TE OP BODE EMAIL: CHRISTIAN. WRITTER@STARLIGHTHOMES COM shat contrect ond 60 not the the contract docunenta. contrector, subcontrector, vendors, and supplers ara solely responsible for verification that [iemmases waned In dd, covsopmen ef shep crowing end contruction of focty oe p:\2021\ 1001\ cK £1 dP I¢c wed, May 09, 2022 — 4:16pm NOTES: SITE AREA = 13.293 ACRES PRO?OSED ZONING = PRD TOTAL UNITS = 122 DENSITY = 122/13.293 = 9.18 UNITSACRE UNITS 1-64 # 71-86 ARE I-CAR GARAGE UNITS AND ARE 65.0% UNITS 65-70 ¢ 87-122 ARE 2-CAR GARAGE UNITS AND ARE 35.0% SETBACKS: EXTERIOR SETBACK = 30° FRONT SETBACK = 20' TO CURB SIDE = 20° BETWEEN BUILDINGS ON STREET PARKING PROVIDED = 20 SPACES CURS ¢ GUTTER TO BE MOUNTABLE UNLESS OTHERWISE NOTED ALL ROADS ARE PRIVATE WITH A 44! UTILITY/ACCESS EASEMENT ALL WALLS TO BE DESIGNED AND PERMITTED BY OTHERS, . ALL DIMENSIONS TO BACK OF CURB UNLESS OTHERWISE NOTED LEVEL 0 R&S CERT.#0176 25° UNDISTURBED STATE EXP. DATE. 09-01 - WATER BUFFER (50) 50° UNDISTURBED COUNTY STREAM BUFFER 75° IMPERVIOUS SURFACE SETBACK MAX WIX & JUANITA G. WIX DB 3384, PG 736 MCFARLAND-DYER. & ASSOCIATES, INC. AI74 Sa VER PEA PARK AT SUWWANIL, Gt OHCs 3002+ PLeNL (770) 9326550 Tax (770) 932-6551 \WWW,GOMDANCT a BARC JON -~—§i N/F VANSANT ROAD, LLC DB 1747, PG 521 STARLIGHT HOMES ALPHARETTA, GEORGIA 30022 3780 MANSCLL RD. SUITE 100 PB 2, PG 329 N/F VANSANT ROAD, LLC . . ST DB 1747, PG 521 . 5 ° . * - APPROXIMATE FLOOD LIMIT PER DEVAL a — LF hrcneee DATED 03-04-2013 7 Si ee —. * G SUBDIVIDED AS: SUNSET HILLS SUBDIVISION. FITAID VAONDYA, CHESTNUT GROVE (FKA VANSANT ROAD TRACT) S BS- N/F QUIKTRIP_ CORPORATION OB 1636, PG 394 181M DISIRICI,2ND DISIRICI LL 902, 903, 909, & 910 DOUGLAS COUNTY, GA DATE DESCRITTION N/F QUIKTRIP CORPORATION DB 1704, PG 677 N/F GARY L. ROWE, SR, DB 1114, PG 730 VELOX INSURANCE, INC OB 2980, PG 871 _——————— ——_— E es EEESTA ROIS? : : rs : a - J - ——| _——_ N/F GARY L, ROWE, SR. DB 1114, PG 730 ne veaee 24 HOUR CONTACT es ae ie ee STARLIGHT HOMES ‘ JEFF FOSTER 678-471-2853 Noa TENCE FNCRCACIIWENT , N/F Se JOB Ne: 21001 UU'S REALTY, INC ee DRAWN BY: KT OB 1947, PG 35 CHECKED BY: JN Know what's below. COPYRIGHT 2021 , Call before you alg. | SASSOCIATES IN ‘GRID NORTH GA WISI ZONL GRAPHIC SCALE PB 37, PG 52 N/F PAINTERS SUPPLY AND EQUIPMENRT CO, DB 3871, PG 440 RODNEY W, ELROD DB 1145, PG 12 porties other than format sholl not be considered part of the provisions of the controct Gocuments. The +, wendera, and suppliers ore solely responeinie for verification that (IN FEET ) bidding, development of shop Grewings end construction of fociity cre uments. J INCH = 6O FT. = PEE JO TET asVg SURVEYOR'S CERTIFICATION BOX This plat is o retracement of on existing parcel or parcels of land ond does not subdivide or create o new porcel or make any changes to ony reol propert TME EXCEPTION FROM FIRST AMERICAN TITLE INSURANCE COMPANY, COMMITMENT NUMBER 33229.11, EFFECTWE DATE: 1, 2021 boundaries. The recording Inf ion of the mops, 2 plots, or other CHS EIR HA inetronnetite, which orscied tae porcal or, Rorode, are Salad Haren SnooneeyON CA WEST ZONC 10, FACTS AND MATTERS SHOWN ON THAT CERTAIN PLAT OF SURVEY FOR FRED T. ALLEN, DATED APRIL 20, 1958, RECORDED AVAILABILITY OF PERMITS, COMPLIANCE WITH LOCAL REGULATIONS OR REQUIREMENTS, IN PLAT BOOK 4, PAGE 106, DOUGLAS COUNTY, GEORGIA RECORDS. (USED AS A REFERENCE) OR SUITABILITY FOR ANY USE OR PURPOSE OF THE LAND. Furthermore, the GRAPHIC SCALE undersigned fond da for 6 certifies that this plot complies with the minimum 60 0 60 20 for tt dod in Georgio os set forth in the rules and regulations of the Georgio Board o for | Engineers ond es Lond Surveyors and as sal forth 4 byt GA. Section '15-6~67. 3 cE IN ITIT i I >< NCH = 60 TT, | nh ers s en 9* am | X35. CURRENT ZONING: &. | 2s Pa : ! R-LD (LOW DENSITY SINGLE-FAMILY) / i Se LEGEND ABBREVIATIONS TO: STARUGHT HOMES GEORGIA LLC. A DELAWARE UMITED UABRITY COMPANY & FIRST = “1G — Are cam, a c UTILITY POLE (PP) | INV INVERT ELEVATION (MERON TILE GISURE, COMPANY awh ane 4 > a raw | f - ¥ , & =) joann MP CORRUGATED METAL PIPE “ He ~~ ; Ue (BENT) ze H cP REINFORCED CONCRETE PIPE THS 1S TO CERTIFY THAT THES MAP Of PLAT ANO THE SURVEY ON WHOCH IT IS BASED WERE . ros He 2.38 xx AAS. POLE & rE FINISHED FLOOR. ELEVATION AIA/MSPS LO TILE SURVEYS, JOMTLY ESTADLSHED ANO ADOPTED BY ALTA AND NSPS, AND A= 283.93’ & / I _ 258 23 £5 7 FIRE HYDRANT (FH) TEM TEMPORARY BENCHMARK INCLUDES ros 2. 3 4:,8, 8, 13, AND 16 OF TABLE A THEREOF, THE FIELD WORK WAS % 4 - ~~ eS R-4809.30' t Pa * ‘ie ce 28 5: SIGN $ / : 22 52 25 ER OPTIC B _ 77 : B22 aa © JUNCTION BOX (JB) | GIM GAS LINE. MARKER pate_03/1 6/22 ee ae NY ¢ ied } / 258 G2 a5 Q DROP INLET (Di) WLM WATER LINE MARKER en | LE om N67°05 O2E { S eee 2¢ sz oa @ — WATER VALVE (Wv) | PB PLAT BOOK wt logs ‘ } abo 2237 ¢ ® — ROOF DRAIN (RD) | 9B DEED BOOK Rr Pod Brey ¢ ' ees 3432 & © CLEAN our (coy) | NAF NOW OR FORMERLY t yo Ff AS ESS 523 32 SSMH SANITARY SEWER MANHOLE of SAM OS i uso 7322 3 © WATER METER (WM) | DWCB = DOUBLE WING CATCH BASIN / Pr aN eo y z2~ 2252 2 © — SANITARY MANHOLE |SWCB SINGLE WING CATCH BASIN — & yo ( dig & 5 zoe 2322 & @ IRON PIN FOUND Roe EOINTAORSEESINNING ia ae as) we AREA: yt S56 25 ae S . 2 sin y < CONCRETE OHP OVERHEAD POWER NOTES: \t @« ye 13.293 AC ¢ 7 Byes ee S222 7 WAL re : = j S275 22 £25 = er J / gEs 35 255 2 == HEAD WALL (HW) REFERENCES: — THERE ARE NO STRIPED PARKING SPACES ON SUBVECT HS | At Y # sdbz 22 222 3 —X— FENCE LINE PROPERTY. “Te ‘a / 7 Z 7 Feng 23 <25 5 nee 1, DEED BOOK 1636, PAGE 387 N/F x o¢ f I a y — THERE IS NO EVIDENCE OF RECENT EARTH MOVING WORK, VANSANT ROAD, LLC ¥ / vaio 7 on pie / 2) _— HANDICAP RAMP 2. DEED BOOK 3911, PAGE 334 BUILDING CONSTRUCTION, OR BUILDING ADDITIONS OBSERVED DB 1747, PG 521 44 a CURB AND GUTTER IN THE PROCESS OF CONDUCTING THE FIELDWORK, rom _ an se 3. PLAT BOOK 4, PAGE 106 Spree ass / — THERE IS NO EVIDENCE OF CEMETERIES, GRAVESITES, es a = Z > D aig ae ts GROUND OBSERVED IN THE PROCESS OF CONDUCTING Poa) = 3 i \ % ELDWORK. ho} z z|F ’ a o oly ee — RECORDED LEGAL DESCRIPTION AND SURVEYED LEGAL ES ® 8 z\3 G R DESCRIPTION DESCRIBED THE SAME PROPERTY. i 2 Sa Oh iS) BOR 212 4 S Y =e Sls See 2n Zz one) J oment Jones 3 F-—8ye Z haa arh 4 a= > - be 1171, PC 306 1s wr TR NF i ae . ba] BE 2 i 2 oes nT ~~~ VANSANT ROAD, LLO “9 2---=5_ wee Seer PY oe 3m oe a aoe ~S 08 1747, PG S21 / e Sa Se 7 abe : “Se! - “EB - (6) Z F aac ing ga @ 2 IL “ur Fee, 5 — s - } : ‘ EE ae ! 432.37". NEY 34" ks = se eee ’ Br ers Se Bat] /, MAT LO} US —_— a 3 oz ? Pe e Nit & = 53a PRES OP eee 227 * ~—7 Nem -- i B85 ——— CONCRETE. OERRS io | we @ Use EEE iis! N< ae» 5 ps = ~-- / Zz iin, N/F i en + sermim pl = 5 = Se J 2030 FAIRBURN R | i 420 ee N/F QUIKTRIP_ CORPORATION | "es aronrt / BILLY wi MARTIN . 1 6 I DB 1636, PG 394 xo ~ 2 10" sou i zVUO DB 3533, PG - ed | ; os o wr z wv . — 2% | QUIKTRIP_ CORPORATION ——~S 43 t= VELOX NeORAaice iwc 2 5 FE: I DB 1704, PG 677 & <= : ! i Swan SEE z ~—s|._~—SCs«iDB 2980, PG 871 : {is't t27 # I ; go l PB 37, PG 52 N/F i] +89 Fd Eas os N LOCATIONMAP _ , | ; LAMAR HAYGOOD BeeS | May; Ges Es Kssiat Desciiees 1 DB 2787, PG 835 aoee | on “— “Al zZ z2 #3 eg lescription | PB 37, PG 52 ee Sa oJ B ~ Te ra] t i 22 aa): ua 2 u oF Ro 5 vA | 3 ; ALL, THAT TRACT OR PARCEL OF land lying and being in Land Lozs 902, 903, 909 and 910, 18th : Li k=. t N/F - 2 ral 7s a] District, 2nd Section, Douglas County, Georgia, being more particularly described as follows: | 5a%™®, =. 2 LIU'S. REALTY, INC. Oy. joe E e} $93¢03" Eau a dutance of 43737 fee to pia, being the PONT OF BEGINNING. Sai act cootins and. ore the act. property t McForiond- Dyer nasccloes, te. aniaee therein ogrond = = REGISTRATIC@N FOR § Oz 13.293 Acre sid EE a tae RR ee FLOOD HAZARD NOTE: | [rarest orcas m0 HZa : . a an , . from ond due bd Dyer & ‘oten, Inc. 04—: ' FORTH IN THE GEORGIA PLAT meoooé Date created: 2/27/2024 Last Data Uploaded: 2/27/2024 4:21:47 AM Douglas County, GA Owner Physical Address Assessed Value ELECTRICALFIBERSYSTEMS, INC. 1435 MUNICIPAL PKWY DOUGLASVILLE,GA30134 1435 MUNICIPAL PKWY $2399300 Last 2 Sales Date 3/30/2020 n/a Overview Price Reason 0 0 GOVERNMENT(HUD, VA, ETC) n/a Qua lU n/a City Limits Flood_Map A - 100 Year Flood Area - Areas of 1% annual chance ?ood also known as the base ?ood. Base Flood Elevations (BFE) have not been determined. AE-100 Year Flood Area - Areas of 1% annual chance ?ood also known as the base ?ood. Determined by detailed methods with Base Flood Elevations (BFE). X:500 Year Flood - Areas of 0.2% annual chance ?ood County Outlines D Douglas Parcel ID Real Key / Acct Class Code Taxing District Acres 07351820017 5586349 l4 - Industrial Small Tracts (03) DOUGLASVILL E 2.53 (Note: Not to be used on legal documents) Developed by 0' Dwugiasvsi ‘~ - Lana Research Application (3 784.721 33.768 Degrees u . 21.4.15;th Inicjnal?lkmm dnoun X EsriCommquEyM C 533’ '. ('I of 4) Parcel: 07351820017 Legal Description BLDG/2.526 AC, LOT#5, MUNICIPALPARKWAYS/D Subdivision MUNICIPALPARKWAY Zoning Code city Split Zoning Code Future Land Use Code city PIN 07351820017 ADDRESS 1435 MUNICIPALPKWY CITY DOUG LASVILLE ZIPCODE 30134 NOTES GIS ACREAGE_GIS 2.51238466 Douglasville Zoning Code PSP Douglasville Zoning Description Public - Semi Public DouglasvilIe Zoning Notes DouglasviIIe Future Land Use Code HI Douglasville Future Land Use Description Heavy Industrial Douglasville Split Zone Code Douglasville Split Zone Description Area (sq ft) 109,439.04 Owner Info ELECTRICALFIBERSYSTEMS,INC. Zoom to LIMITED WARRANTY DEED ‘Gmntee‘ Type: WD Recorded: 2/23/2024 4:32:00 PM Fee Amt: $3,025.00 Page 1 of4 Transfer Tax: $3,000.00 Douglas County Georgia ANNETTA D STEMBRIDGE Clerk Superior Participant ID: 6405611605 After recording return to: Calloway Title &Escrow, LLC BK 431 1 PG 749 ' 752 2100 Riveredge Parkway, Suite 1025 Atlanta, GA 303 "(3065’ STATE OF GEORGIA COUNTY OF COWETA THIS INDENTURE, made and entered into this 23rd day of February, 2024 by and between Electrical Fiber Systems, Inc., a Georgia corporation (herein referred to as “Grantor”), and Craig Wire Products LLC, a Georgia limited liability company (herein referred to as ). WITNESSETH THAT, the said Grantor, for and in consideration of the sum of Ten and no/100 ($10.00) Dollars, and other good and valuable consideration, in hand paid at or before the delivery of this deed,the receipt and suf?ciency of which are hereby acknowledged, and pursuant to proper authority, has granted, bargained, sold and conveyed and by these presents does hereby grant, bargain, sell and convey to the said Grantee, and its successors and assigns, the following described property: ALL THAT TRACT OR PARCEL OF LAND LYING AND BEING in Land Lots 735 of the 18th District, Douglas County, Georgia being more particularly described on Exhibit .f‘A?’ attached hereto and incorporated herein by this reference. TOGETHER WITH all ?xtures, structures and improvements located on such property and the easements, rights, members and appurtenances thereunto appertaining. TO HAVE AND TO HOLD the said bargained premises, together with all and singular the rights, privileges, easements, members and appurtenances belonging or thereunto appertaining, to the only proper use and bene?t of the Grantee and its successors and assigns forever in FEE SIMPLE. AND EXCEPT for those matters set forth on Exhibit “B” attached hereto and incorporated herein by reference, Grantor will warrant and defend the title to saidpremisesagainst the claims of all persons claiming by, through or under Grantor, but not otherwise. IN WITNESS WHEREOF, the Grantor has caused this instrument to be duly execute sealedand delivered by its duly authorized of?cer on the date above written. d, Signed, sealed and delivered Electrical Fiber Systems, Inc. in the presence of: a Georgia corporation My commission (Notary Seal) EXHIBIT A divided LEGAL DESCRIPTION All that tract or parcel of land lying and being in Land Lot 735 of the 18thDistrict,2nd Section of Douglas County, Georgia, being Sub Lot 5 as shown upon the ?nal plat of Municipal Parkway, as more particularly depicted on a plat recorded in Plat Book 24, Page 197,records of Douglas County, Georgia, which plat is incorporated herein by reference hereto. EXHIBIT B PERMITTED EXCEPTIONS Taxes and assessments for the calendar year 2024 and subsequent years not yet due and payable. Easement from Mrs. J.M. Hatchett to Georgia Power Company, dated August 8, 1936, ?led for record August 20, 1986 at 8:00 am, recorded in Deed Book 2, Page 438, records of Douglas County, Georgia. Easement ?'om J.P. Head to Georgia Power Company, dated January 25, 1950, ?led for recor April 21, 1950 at 8:00 a.m., recorded in Deed Book 17,Page 76, aforesaid records. d Right of Way Deed from William W. Hyatt and Mrs. Virginia Douglas Hyatt to Douglas County, Georgia, dated July 12, 1977,?led for record August 8, 1977at 4:56 p.n1., recorded in Deed Boo 316, Page 266, aforesaid records. k Right of Way Deed from William W. Hyatt and Agnes Hyatt to Douglas County, Georgia, date July 8, 1980, ?led for record August 7, 1980 at 3:56 pm. recorded in Deed Book 371, Paged641 , aforesaid records. All those matters seen on that certain plat recorded in Plat Book 24, Page 197, aforesaid records. 203 e t mum 411mm cum: um IJILHMI mum _m GREGORY BAKER Douglas County Tax Commissioner 6200 Fairburn Rd Douglasville, GA 30134 MAKE CHECK OR MONEY ORDER PAYABLE TO: Douglas County Tax Commissioner ELECTRICAL FIBER SYSTEMS, INC 1435 MUNICIPAL PKWY DOUGLASVILLE, GA 30134 RETURN THIS PORTION WITH ENT (Interest will be added per month if not paid by due date) GREGORY BAKER Douglas County Tax Commissioner 6200 Fairburn Rd Douglasville, GA 30134 Phone: (770) 920-7272, Fax: (678) 449-3932 Building Value Land Value Acres 2,226,400.00 172,900.00 2.5300 Entity F‘s/ft,“ CITY OF DOUGLASVILLE $2,399,300 COUNTY TAX $2,399,300 DOUGLASVILLE BOND $2,399,300 SALES TAX CREDIT - CITY $2,399,300 SALES TAX CREDIT — COUNTY $2,399,300 SCHOOL BOND $2,399,300 SCHOOLTAX $2,399,300 TOTALS Fair Market Value . Current Prior Back *Total B111No. Due Date Due P ent Taxes Due* 2023-1029414 12/04/2023 $0.00 $39170.01 $0.00 Paid Map: 07351820017 Location: 1435 MUNICIPAL PKWY - Appraisal 770920-7228 determines ownership/value - Commissioners (770)920-7266 sets COUNTY tax rate - Bd of Education 770-651-2000 sets SCHOOL tax rate - City of Douglasville 770-920-3000 sets CITY tax rate ' City of Villa Rica 770-459-3656 sets the CITY tax rate Printed: 02/27/2024 - Tax Commissioner 770-920-7272 bills for authorities above/dishurses/maintainsrecords - A gradual reduction of state property taxes began in 2012 and has now phased away as ofjanuary 1, 2016 This reduction is the result of property tax relief passed by the Governor and the House of Representatives and the Georgia State Senate - Payment good through date is CURRENT YEARONLY Tax Payer: ELECTRICAL FIBER SYSTEMS, INC. Map Code: 07351820017 Descriptlon: PARKWAY S/D Real BLDG/2.526 AC, LOT #5, MUNICIPAL Location: 1435 MUNICIPAL PKWY Bill No: 2023-1029414 District: 03 - DOUGLASVILLE Due Date Billing Date P Residents of Douglas County who own and occupy their permanent residence as ofJanuary 1 of the taxable year are entitled to a HOMESTEAD EXEMPTION. This can be filed over the internet at www douglastax.org. Applications may be filed any time after purchase and before April 1 of qualifying year. There are ADDITIONAL exemptions for homeowners 62 or older & 100% disabled persons, WHICH MUST BE MADE IN PERSON in the TAX OFFICE with proof of age/disability by APRIL 1. 770-920—7272 GREGORY BAKER, Douglas County Tax Commissioner ent Good through Exemptions Credit $0.00 $0.00 $0.00 $4,241.96 $3,441.56 $0.00 $0.00 437,683.52 Net Tax $11,642.36 $15,258 59 $1,247.64 $0.00 $0.00 $479.86 $18,225.08 $39,170.01 $39,170.01 $0.00 $0.00 $0.00 $39,170.01 $0.00 $0.00 $2,399,300.00 $959,720 $959,720 $959,720 $959,720 $959,720 $959,720 $959,720 $0 $0 $0 $0 $0 $0 $0 12/04/2023 02/27/2024 $959,720 $959,720 $959,720 $959,720 $959,720 $959,720 $959,720 12.131000 15.899000 1.300000 0.500000 18.990000 40.814000 $11,642.36 $15,258 59 $1,247 64 $0.00 $0.00 $479.86 $18,225.08 $46,853.53 4.420000 3.586000 Current Due Penalty Interest Other Fees Previous Payments Back Taxes AGENDA ITEM REPORT Item Number: Meeting: Staff Contact: 24-148 05-20-2024 - City Council Regular Meeting (6:00 PM) Marissa Jackson, Planning and Zoning Administrator Consider a request for a variance from section 5.05(B) of the Unified Development Ordinance to increase the maximum principal building height from 50 feet to 60 feet on a lot of +/- 2.526 acres at 1435 Municipal Parkway in Land Lot 735, District 18, Section 2, Parcel ID 07351820017. Application by Craig Wire Products, LLC. (Marissa Jackson) Attachments: PCCV24-0004 Council Craig Wire Staff Report PCCV24-0004 1435 Municipal Pkwy Variance Application PCCV24-0004 1435 Municipal Pkwy Project Plan PCCV24-0004 Craig Wire Letter of Intent 1435 Municipal Pkwy Renderings PCCV24-0004 1435 Municipal Pkwy Map PCCV24-0004 Craig Wire Legal Description PCCV24-0004 Craig Wire Property Tax Statement Recommendation(s): RES-2024-22 Budget Impact: Is this an Agreement or Contract: No If YES, check one: ☐ Original Agreement ☐ Change Order, Change Order # Is it budgeted? No If so, what Account #? MEMORANDUM TO: City of Douglasville’s Mayor and Council FROM: Shayla Reed, Community Development Director DATE: May 16, 2024 SUBJECT: PCCV24-0004 (1435 Municipal Parkway) Item Number: 24-148 PURPOSE: Hold a public hearing to consider a request for a variance from section 5.05(B) of the Unified Development Ordinance to increase the maximum principal building height from 50 feet to 60 feet for +/- 2.526 acres located on 1435 Municipal Parkway in Land Lot 735, District 18, Section 2, Parcel ID 07351820017. Application by Craig Wire. (Marissa Jackson) Proposed Development: Manufacturing Ward: 2 – Councilwoman Nycole Miller and Councilwoman Elena Hudson Site Address: 1435 Municipal Parkway Parcel Identification: Land Lot: 735, District: 18, Section: 02 Parcel Number: 07351820017 Parcel Acreage: + / - 2.526 Acres Applicant: Craig Wire Owner(s): Craig Wire Historic District: No Quality Growth Development Overlay: No Zoning History: None Current Zoning: PSP (Public-Semi-Public District) Comp Plan Compatibility: Yes Land Use Character Area: Heavy Industrial Current Use: Vacant Surrounding Land Uses: North - HI - (Heavy Industrial City) South - LI (Light Industrial County) East – HI - (Heavy Industrial City) West – LI (Light Industrial County) PCCV24-0004 (1435 Municipal Parkway) Aerial Map The site is located on Municipal Pkwy. near the intersection of Veterans Memorial Highway. and Municipal Parkway. Municip al Pkw y. PCCV24-0004 (1435 Municipal Parkway) Proposed Site Plan For a larger site plan, see attachments. Parking Area Parking Area Parking Area Entrance Municip al Pkw y Existing Warehouse Space PCCV24-0004 (1435 Municipal Parkway) City of Douglasville Zoning Map This is the site zoned PSP and is surrounded by Industrial zoning in both the City and County. HI (Heavy Industrial): Dark Blue LI (Light Industrial): Light Blue PSP (Public Semi-Public): Green Douglas County Parcels: Yellow PCCV24-0004 (1435 Municipal Parkway) City of Douglasville Character Area Map This is the site is part of the Heavy Industrial Character Area HI: Heavy Industrial (Dark Grey) LI: Light Industrial (Light Grey) PCCV24-0004 (1435 Municipal Parkway) Applicant’s Request Craig Wire requests a variance from section 5.05(B) of the Unified Development Ordinance to increase the maximum principal building height from 50 feet to 60 feet. Standards for Approval of Variance Request per 12.08.B.4 In granting a variance, the city council or the community development director, or their designees may impose such conditions as may be necessary to comply with the factors herein to reduce or minimize potential injurious effects of such variance upon neighboring properties and to carry out the general purpose and intent of this UDO. a. In making such determination, the city council or the community development director shall consider all of the following factors whether: 1. The subject property will yield a reasonable return or whether there can be any beneficial use of the property without a variance. The applicant’s operations include wire manufacturing and include tall machinery. Without the variance, the applicant will not be able complete their system of production of the wires. 2. The essential character of the neighborhood would be substantially altered or whether adjoining properties would suffer a substantial detriment as a result of the variance. No, the character of the neighborhood would not be substantially altered due to this proposal as a result of the variance. This is an existing building located on Municipal Parkway surrounded by like uses. 3. The variance would adversely affect the delivery of government services (i.e., water, sewer, garbage; The variance is not expected to adversely affect the delivery of government services. 4. The property owner's predicament feasibly can be obviated through some method other than a variance; No, the variance will help achieve the applicant’s proposal. They would like to increase the required maximum height by 10-foot to achieve their production process. PCCV24-0004 (1435 Municipal Parkway) 5. The spirit and intent behind the UDO requirement would be observed and substantial justice done by granting the variance; The intent of the UDO is to promote orderly development, prevent overcrowding, and preserve the aesthetic appearance of the city. If approved the project will continue and is expected to provide a service to the community. 6. Any other relevant factor to assist the board of adjustments and appeals in weighing and balancing the public and private benefits and harms of the requested relief is necessary. The proposal is not expected to create any discomfort for the adjoining properties. This is an existing building located in an already established industrial area. b. No nonconforming use of neighboring lands, structures, or buildings in the same district, and no permitted or nonconforming use of lands, structures, or buildings on other districts shall be considered grounds for the issuance of a variance. Based on the variance criteria provided in the UDO, the city council should not use cases of other non-conformities as grounds to approve variance request. c. Financial hardship alone is not a valid reason for requesting and receiving approval of any variance. Based on the variance criteria provided in the UDO, the city council should not use financial hardship to approve variance request. PCCV24-0004 (1435 Municipal Parkway) Staff Comments The request for variance is compliant with the Unified Development Ordinance. The applicant, Craig Wire Products, is currently operating at a different site. In expanding efforts, they have acquired an existing building at 1435 Municipal Pkwy to use for its wire production. The City of Douglasville’s UDO allows a maximum building height of 50 feet in the Heavy Industrial District. As part of their manufacturing process, the applicant uses tall machinery that will not fit within the 50-foot height limit. Therefore, they are requesting an extra 10 feet on their proposed vertical addition which would bring the maximum height to 60 feet. The applicant has also requested a rezoning to be heard concurrently with the variance request. The site is currently zoned PSP (Public-Semi-Public District), and the applicant is seeking a rezoning to HI (Heavy Industrial). Planning Commission On May 7, 2024, the Planning Commission recommended approval of the variance to increase the maximum height allowance from 50-feet to 60-feet. Related Ordinance Sec. 5.05 -HI - Heavy Industrial City of Douglasville’s 2023 Comprehensive Plan 1 ['1 |_D_OUGLs ILL_F: GEORGIA AV Variance Application Completed Application Form The names and addresses of the owners of the subject property and their agents if any Responses to each of the questions pertaining to the variance request Notarized consent of owner if applicant is not owner Present and proposed zoning classification for the subject property Campaign contribution disclosure report by the applicant and the applicant’s attorney, if applicable, in accordance with O.C.G.A. 36-67A Required Documentation & Supplemental lnfonnation Letter of Request Legal Description of the property A map of the property where variance is being sought showing its location and the City and its relationship to abutting properties, public facilities, and public A recent survey plat showing the dimensions and location of the subject property prepared by a land surveyor whose state registration is current and valid and whose seal is affixed to the plat (see page 9 for survey requirements) Proof that all City, County, and State ad valorem taxes due upon the property have been paid in full Applicable Fees Commercial: $250/lot + $100/variance Residential: $150/lot + $100/variance Administrative: $150/lot + $100/variance City of Douglasville | Community Development Department | 6701 Church St, Douglasville. GA 30134 | Rezoning Application Packet Rev 5/10/29 | Page 1 GEORG'A DO GLASV LL Variance Procedures Variance Applications are reviewed based on the City of Douglasville Unified Development Ordinance Section 12.083. Dimensional and Locational Variances. Please note that UDO Section 7.12 prohibits variances from sign regulations as established in Article 7. 1. The Board of Adjustments and Appeals may authorize variance from the terms of this UDO that are not contrary to the public interest where, due to special conditions and not to the intentional conduct of the applicant, the literal enforcement of the provisions of this UDO would result in an unnecessary hardship. 2. A variance from the terms of this UDO shall not be granted by the Board of Adjustments and Appeals unless and until: a. A complete application for a variance is submitted demonstrating that: 1) Special conditions and circumstances exist which are peculiar to the land, structure, or building involved and which are not applicable to other lands, structures, or buildings in the same district. 2) The special conditions and circumstances did not result from the actions of the applicant. b. No nonconforming use of neighboring lands, structures, or buildings in the same district, and no permitted or nonconforming use of lands, structures, or buildings on other districts shall be considered grounds for the issuance of a variance; 3. Notice of a public hearing shall be given as required in Section 12.05, Public Hearing. 4. Where the strict application or literal enforcement of the requirements of this UDO would result in the applicant suffering practical difficulties, the Board of Adjustments and Appeals shall have power to authorize a variance from the terms of this UDO so as to relieve such difficulties. 5. In granting a variance, the Board of Adjustments and Appeals may impose such conditions as may be necessary to comply with the factors herein to reduce or minimize potential injurious effects of such variance upon neighboring properties and to carry out the general purpose and intent of this UDO. In making such determination, the Board of Adjustments and Appeals shall consider all of the following factors whether: a. The property in question willyield a reasonable return or whether there can be any beneficial use of the property without a variance; b. The variance is substantial; c. The essential character ofthe neighborhood would be substantially altered or whether adjoining properties would suffer a substantial detriment as a result of the variance; d. The variance would adversely affect the delivery of government seNices (i.e., water, sewer, garbage); e. The property owner purchased the property with knowledge of the zoning restriction; f. The property owner's predicament feasibly can be obviated through some method other than a vanance; g. The spirit and intent behind the zoning requirement would be observed and substantial justice done by granting the variance; and h. Any other relevant factor to assist the Board of Adjustments and Appeals in weighing and balancing the public and private benefits and harms of the requested relief is necessary. City of Douglasville | Community Development Department | 6701 Church St, Douglasville, GA 30134 [ Rezoning Application Packet Rev 7/23/19 | ' wm?? *m=:mmr'" ' I- I — —r|II--—'I-II-'Iu--IIII—-I—II-Imggan_-.E_-.. ”:1. -.I ‘-‘--II -_ I. ._ _-_.qli_.__l.l_?__.g_| in granting any variance, the Board of Adjustments and Appeals may prescribe appropriate conditions and safeguards in conformity with the intent of this UDO. In granting any variance, the Board of Adjustments and Appeals shall only authorize the minimum variance that it deems necessary and adequate that will provide adequate relief. Financial hardship is not a valid reason for requesting and receiving approval of any variance. Violations of such conditions and safeguards, when made a part of the terms under which the variance is granted, shall be deemed a violation of this UDO and punishable under the provisions of this UDO. . Under no circumstances shall the Board of Adjustments and Appeals grant a variance to allow a use not permitted under the terms of this UDO in the district involved, or any use expressly, or by implication, prohibited by the terms of this UDO in the district where the variance is being City of Douglasville | Community Development Department | 6701 Church St, Douglasvilie, GA 30134 | Rezoning Application Packet Rev 7/23/19 [-1 D L | GEORGIA tative ‘CWC ‘ ‘ - ~ 2—27—2024 kp?lioanthwnerRepresentative Signature LBRE-‘l?‘JOR’LWOODJLANT—MNAGER. _ _ _ — 7 7 V 7—. ‘ _ __ . . W ,7 — _ OUG ASV LL Var ance App icat on Subject Property 1435 Municipal Parkway. Douglasville, GA 30134 Property Address/Location City State Zip 735 18th 2nd 17 07351820017 2.526 Acres/SF Land Lot District Section Parcel Property ID Property Size P3P Adjacent Zoning: HI LI HI LI Current Zoning North South East West Overlay District: Historic Overlay District Quality Growth Development Overlay None Appl er Craig Vl?reProducts, LLC Applicant Craig Wire Products, LLC cfo@craigwire.com 404-422—1506 Company E-mail Address Phone 1055 Shadix Industrial Parkway, Douglasville GA 30134 Mailing Address City State Zip Represen Joseph H. Fowler, Esq. Agent or Attorney Name Hartley, Rowe & Fowler, P.C jfowler@hr?egal.com 770-920-2001 Company E-mail Address Phone PO. Box 489, Douglasville, GA 30133-0489 Mailing Address City State Zip Applicant Signature I hereby certify that all information provided herein is true and correct. PRODUCTS, or Date Application Approved for Staff Review Application Rejected Fee: 3‘ Zoning Administrator Date City of Douglasville | Community Development Department | 6701 Church St, Douglasville, GA 30134 | Rezoning Application Packet Rev. 7/23/19 | Page 4 Case No. J I_)_UL |L_E_ GEORGIA CRAIGWIREiF’RODUCTé. LL c G REPRODUC'lg‘L $4)“ P?party BRETI' 1055 Shadix Industrial Parkway Douglasville y/A 'en Signs . WLE Sworn and subscribed afore me ThisZ‘deay of , 2024 ta"I Variance Application Property Owner The property owner shall read the following carefully and complete the consent form below: Initial X I understand that failure to supply all required information per the variance checklist provided and requirements of the City of Douglasville Unified Development Ordinance willresult in rejection of application X I understand that preliminary approval of my plans does not authorize final approval of my variance request. X I understand that representation associated with this application on behalf of the property owner (i.e. project coordinator, potential property owner, agent, or other such representative) shall be binding X l have read the provisions of O.C.G.A. 36-67A as required regarding Campaign Disclosures; my signed Campaign Disclosure report is included with this application I, , as property owner, respectfully petition that this property as described in this application be considered for variance approval. [acknowledge and fully understand all above statements made by the City of Douglasville. I hereby certify that all information provided herein is true and correct. LLC Owner Signature Date PORTWOOD,PLANT MANAGER GA 30134 404-422-1506 Address State Phone Representative (if applicable) Attorne ture Date JOSEP R, ESQ. P n an 420 nnnolacville GA 10121-0429 770-070-7001 Address City State Zip Phone Public City of Douglasville | Community Development Department | 6701 Church St, Douglasville, GA 30134 | Rezoning Application Packet Rev 7/23/19 | Page 5 GHK Z~ZQ~ZOZ4 z«z€«zoz4 ['3 u | L_E_ GEORGIA DO GLASV L Variance Application Questionnaire Please address the following to guide City Staff in their evaluation of your application: 1. Please explain an extraordinary and exceptional condition pertaining to the specific piece of property in question in terms of its shape, size, ortopography. The heavy industrial use proposed by the Applicant (production of wire) requires that a frame structure 60 feet in height be constructed in order to dry the wire in certain production circumstances. A 10 foot variance is requested to permit the wire production as described, and the request is not inconsistent with the provisions of Section 12.08(B)(1)(h). 2. Explain how the application of the Unified Development Ordinance or recorded plat results in a practical hardship. The 50 foot height limitation imposed in the HI ordinance would prohibt the manufacture of certain wire which requires a 60 foot drying tower. 3. Explain why the granting of this variance is necessary for the protection of a property right and does not merely serve as a convenience to the applicant. The production method described above cannot be performed in the building now owned by the Applicant, the requested variance is not inconsistent with the public health safety and welfare. 4. Did the condition for which the variance is sought result from an action by the applicant? No. City of Douglasville | Community Development Department | 6701 Church St, Douglasville, GA 30134 | Rezoning Application Packet Rev 7/23/19 | Page 6 D L E GEORGIA h l/We certify that the foregoing information is true and correc1.thistLtiay M3942024. PRODUCTSQLC5/ Atto?isy’ OUG ASVILL Date Government Official Position Description Amount Campaign Contribution Disclosure Report Have you made, within 2 years immediately preceding the variance hearing, campaign contributions aggregating $250 or more or made gifts having an aggregate value of $250 or more to the Douglasville Mayor or member of the City Council or Board of Adjustments and Appeals who willconsider the application? YES INNO IfYES, you and the attorney representing you must file this disclosure report with the Zoning Division at least five (5) days prior to the scheduled public hearing. Please supply the following information, which will be considered as the required disclosure: CRAIG WIRE Applicant Signature BRETT PORTWOOD,PLANT MANAGER JOSEPH I—I.FOWLER, ESQ. City of Douglasville | Community Development Department | 6701 Church St, Douglasville, GA 30134 | Rezoning Application Packet Rev 7/23/19 [ Page 7 r1I." PUL ILE GEORGIA Variance Applicat on Supplementa Informat on Sunrey Requirements Survey of the complete site done by a professional surveyor 0 Minimum size of 8.5x1‘l, but no larger than 11x17 0 Must include: Date of survey North point Graphic scale Source of datum Date of plan drawings Existing streets and rights-of-way Locations of any easements Existing streams OO OO OO OO City of Douglasville | Community Development Department | 6701 Church St, Douglasville, GA 30134 | Rezoning Application Packet Rev 7/23/19 | Page 8 FOUND 1/2" REBAR FOUND 5/8" REBAR FOUND 5/8" REBAR SET 5/8" REBAR W/ CAP "BLEW & ASSOC GA LSF001258" SET 5/8" REBAR W/ CAP "BLEW & ASSOC GA LSF001258" N 00°36'54" W 185.59'(M) FOUND 1" IRON PIPE 1-STORY METAL WAREHOUSE 37,551 SQ. FEET± 24' HEIGHT± 275.6' 125.3' 68.0' 30.0' 100.6' 30.0' 107.0' 125.3' 1 LOADING DOCK BAY Y D H Y D H Y D H D D D D D D D D WV WV W W WV 4 LOADING DOCK BAYS ASPHALT ASPHALT ASPHALT ASPHALT ASPHALT ASPHALT SIDEWALK SIDEWALK WALL GATE RAMP SIDEWALK CONCRETE N/G N/G N/G N/G N/G N/G N/G N/G N/G N/G N/G N/G N/G N/G N/G N/G N/G N/G N/G N/G N/G 5 PS 17 PS 4 PS 3 PS 3 PS 4 PS 8 PS ACCESS S 01°13'46" E 270.77'(M) S 89°32'40" W 412.00'(M) N 00°37'03" W 265.22'(M) N 00°36'54" W 213.55'(M) N 88°46'14" E 406.84'(M) S 01°13'46" E 213.54'(M) N 88°46'14" E 409.13'(M) S 01°45'42" E 270.77'(R) S 89°00'44" W 412.00'(R) N 01°08'59" W 265.22'(R) N 88°14'18" E 409.13'(R) LOT 5 OF PLAT OF MUNICIPAL PARKWAY PER BK 24 PG 197 110,025 SQ FT± 2.526 ACRES± APN: 07351820017 LOT 4 OF PLAT OF MUNICIPAL PARKWAY PER BK 24 PG 197 87,121 SQ FT± 2.000 ACRES± 82.8' 15.1' 52.3' 95.4' R/W R/W N/F BARLA PROPERTIES INC. 1445 MUNICIPAL PKWY DOUGLASVILLE, GA APN: 07351820008 N/F T-21 HOLDINGS LLC 1460 MCINTOSH RD DOUGLASVILLE, GA APN: 07351820006 N/F ELECTRICAL FIBER SYSTEMS 1425 MUNICIPAL PKWY DOUGLASVILLE, GA APN: 07351820016 35' BUILDING LINE EASEMENT PER BK 24 PG 197 J 80' WIDTH PUBLIC RIGHT-OF-WAY VARIABLE WIDTH ASPHALT PAVED MUNICIPAL PARKWAY AS SHOWN PER BK 24 PG 197 C/L C/L BASIS OF BEARING 4.1' 2.1' WV BHL X SIDEWALK N 01°08'50" W 213.55'(R) N 88°14'18" E 406.84'(R) S 01°45'42" E 213.54'(R) WALL KEYPAD N 01°08'50" W 185.59'(R) RAMP HANDICAP PARKING SET MONUMENT AS NOTED FOUND MONUMENT AS NOTED FIRE HYDRANT R/W (M) MEASURED/CALCULATED DIMENSION (R) RECORD DIMENSION N/F NOW OR FORMERLY BHL BUILDING HEIGHT LOCATION P.O.B. D ELECTRIC BOX WATER METER WATER VALVE STORM MANHOLE LEGEND & SYMBOLS POINT OF BEGINNING BOUNDARY LINE EASEMENT LINE RIGHT-OF-WAY LINE CENTERLINE FENCE LINE COMPUTED POINT Y D H C/L W ELECTRIC METER WV IRRIGATION CONTROL VALVE FLARED END SECTION FIBER OPTIC VAULT POWER POLE OVERHEAD POWER LINE FIRE DEPARTMENT CONNECTION N/G NATURAL GROUND TO: CHICAGO TITLE INSURANCE COMPANY, CRAIG WIRE PRODUCTS, LLC; KILPATRICK TOWNSEND & STOCKTON LLP; CALLOWAY TITLE AND ESCROW, LLC: THIS IS TO CERTIFY THAT THIS MAP OR PLAT AND THE SURVEY ON WHICH IT IS BASED WERE MADE IN ACCORDANCE WITH THE 2021 MINIMUM STANDARD DETAIL REQUIREMENTS FOR ALTA/NSPS LAND TITLE SURVEYS, JOINTLY ESTABLISHED AND ADOPTED BY ALTA AND NSPS, AND INCLUDES ITEMS 2, 3, 4, 6(A), 6(B), 7(A), 7(B)(1), 7(C), 8, 9, 10, 11(A), 13, 14, 16, 17, 18, AND 19 OF TABLE A THEREOF. THE FIELD WORK WAS COMPLETED ON 11/15/2023. DATE OF PLAT OR MAP: 11/29/2023 THIS PLAT IS A RETRACEMENT OF AN EXISTING PARCEL OR PARCELS OF LAND AND DOES NOT SUBDIVIDE OR CREATE A NEW PARCEL OR MAKE ANY CHANGES TO ANY REAL PROPERTY BOUNDARIES. THE RECORDING INFORMATION OF THE DOCUMENTS, MAPS, PLATS, OR OTHER INSTRUMENTS WHICH CREATED THE PARCEL OR PARCELS ARE STATED HEREON. RECORDATION OF THIS PLAT DOES NOT IMPLY APPROVAL OF ANY LOCAL JURISDICTION, AVAILABILITY OF PERMITS, COMPLIANCE WITH LOCAL REGULATIONS OR REQUIREMENTS, OR SUITABILITY FOR ANY USE OR PURPOSE OF THE LAND. FURTHERMORE, THE UNDERSIGNED LAND SURVEYOR CERTIFIES THAT THIS PLAT COMPLIES WITH THE MINIMUM TECHNICAL STANDARDS FOR PROPERTY SURVEYS IN GEORGIA AS SET FORTH IN THE RULES AND REGULATIONS OF THE GEORGIA BOARD OF REGISTRATION FOR PROFESSIONAL ENGINEERS AND LAND SURVEYORS AND AS SET FORTH IN O.C.G.A. SECTION 15-6-67. JEREMIAH DAVID O'DEAN REGISTERED LAND SURVEYOR NO. 003447 STATE OF GEORGIA GEORGIA C.O.A. LSF001258 NOT TO SCALE BY GRAPHIC PLOTTING ONLY, THIS PROPERTY IS IN ZONE "X" OF THE FLOOD INSURANCE RATE MAP, COMMUNITY PANEL NO. X, WHICH BEARS AN EFFECTIVE DATE OF 13097C0063D AND IS NOT IN A SPECIAL FLOOD HAZARD AREA. ZONE "X" - AREA OF MINIMAL FLOOD HAZARD, USUALLY DEPICTED ON FIRMS AS ABOVE THE 500-YEAR FLOOD LEVEL. ZONE "X" IS THE AREA DETERMINED TO BE OUTSIDE THE 500-YEAR FLOOD AND PROTECTED BY LEVEE FROM 100-YEAR FLOOD. SURVEYOR'S CERTIFICATE VICINITY MAP ALTA/NSPS LAND TITLE SURVEY REGULAR= 44 HANDICAP= 3 TOTAL= 47 SURVEYOR JOB NUMBER: 23-7651 SITE PARKING INFORMATION FLOOD ZONE INFORMATION BASIS OF BEARING SURVEY REVIEWED BY: KF SURVEY DRAWN BY: MFD - 11/29/2023 SHEET: 1 OF 1 NOTES CORRESPONDING TO SCHEDULE B SCHEDULE A DESCRIPTION THE PROPERTY HEREON DESCRIBED IS THE SAME AS THE PERTINENT PROPERTY AS DESCRIBED IN CHICAGO TITLE INSURANCE COMPANY, TITLE COMMITMENT #2-43068, DATED OCTOBER 16, 2023 AT 5:00 PM. TITLE COMMITMENT INFORMATION W E N S W E N S THE LAND REFFERED TO IN THIS COMMITMENT IS LOCATED IN THE COUNTY OF DOUGLAS, STATE OF GEORGIA, AND DESCRIBED AS FOLLOWS: ALL THAT TRACT OR PARCEL OF LAND LYING AND BEING IN LAND LOT 735 OF THE 18TH DISTRICT, 2ND SECTION OF DOUGLAS COUNTY, GEORGIA, BEING SUBDIVIDED LOT 5 AS SHOWN UPON THE FINAL PLAT OF MUNICIPAL PARKWAY, AS MORE PARTICULARLY DEPICTED ON A PLAT RECORDED IN PLAT BOOK 24, PAGE 197, RECORD OF DOUGLAS COUNTY, GEORGIA, WHICH PLAT IS INCORPORATED HEREIN BY REFERENCE HERETO. PARKING INFORMATION: 1 SPACE PER 1,000 SQUARE FEET OF FLOOR AREA 37,499 SQUARE FEET / 1,000 = 37.49 OR 38 SPACES PERMITTED USE ITEM REQUIRED OBSERVED MANUFACTUING MIN. SETBACKS FRONT MAX. BUILDING HEIGHT PARKING REGULAR PARKING HANDICAP PARKING TOTAL MIN. SETBACKS SIDE MIN. SETBACKS REAR 82.8'± 15.1'± 52.3'± 24'± 110,025 SQ FT± 270.7'± 34% 44 3 47 PROPERTY IS CURRENTLY ZONED: "PSP" PUBLIC-SEMI-PUBLIC COMMERCIAL AND MIXED-USE DISTRICT MIN. LOT AREA MIN. LOT WIDTH MAX. BLDG COVERAGE 1. SOME FEATURES SHOWN ON THIS PLAT MAY BE SHOWN OUT OF SCALE FOR CLARITY. 2. DIMENSIONS ON THIS PLAT ARE EXPRESSED IN FEET AND DECIMAL PARTS THEREOF UNLESS OTHERWISE NOTED. MONUMENTS WERE FOUND AT POINTS WHERE INDICATED. 3. IN REGARD TO ALTA/NSPS TABLE A ITEM 16, THERE WAS NO OBSERVABLE EVIDENCE OF RECENT EARTH MOVING WORK, BUILDING CONSTRUCTION OR ADDITIONS EXCEPT AS SHOWN HEREON. 4. IN REGARD TO ALTA/NSPS TABLE A ITEM 17, THERE WERE NO KNOWN PROPOSED CHANGES IN RIGHT OF WAY LINES, RECENT STREET OR SIDEWALK CONSTRUCTION OR REPAIRS EXCEPT AS SHOWN HEREON. 5. AT THE TIME OF THE ALTA/NSPS SURVEY, THERE WAS NO OBSERVABLE EVIDENCE OF SITE USE AS A SOLID WASTE DUMP, SUMP, OR SANITARY LANDFILL. 6. AT THE TIME OF THE ALTA/NSPS SURVEY, THERE WAS NO OBSERVABLE EVIDENCE OF SITE USE AS A CEMETERY, ISOLATED GRAVE SITE OR BURIAL GROUNDS. 7. COMPLETED FIELD WORK WAS NOVEMBER 15, 2023. 8. THE DISTANCES SHOWN HEREON ARE UNITS OF GROUND MEASUREMENT. 9. THE NEAREST INTERSECTING STREET IS THE INTERSECTION OF MUNICIPAL PARKWAY AND STITCHER COURT, WHICH IS APPROXIMATELY 472' FROM THE NE CORNER OF THE SUBJECT PROPERTY. 10. THE SUBJECT PROPERTY HAS DIRECT PHYSICAL ACCESS TO MUNICIPAL PARKWAY, BEING A PUBLICLY DEDICATED RIGHT-OF-WAY. 11. EXCEPT AS SPECIFICALLY STATED OR SHOWN ON THIS PLAT, THIS SURVEY DOES NOT PURPORT TO REFLECT ANY OF THE FOLLOWING WHICH MAY BE APPLICABLE TO THE SUBJECT PROPERTY: EASEMENTS, OTHER THAN POSSIBLE EASEMENTS WHICH WERE VISIBLE AT THE TIME OF SURVEY; RESTRICTIVE COVENANTS; SUBDIVISION RESTRICTIONS OR OTHER LAND USE REGULATIONS; AND ANY OTHER FACTS WHICH AN ACCURATE TITLE SEARCH MAY DISCLOSE. 12. NO SURVEYOR OR ANY OTHER PERSON OTHER THAN A LICENSED GEORGIA ATTORNEY MAY PROVIDE LEGAL ADVICE CONCERNING THE STATUS OF TITLE TO THE PROPERTY DESCRIBED IN THIS SURVEY ("THE SUBJECT PROPERTY"). THE PURPOSE OF THIS SURVEY, AND THE COMMENTS RELATED TO THE SCHEDULE B-II EXCEPTIONS, IS ONLY TO SHOW THE LOCATION OF BOUNDARIES AND PHYSICAL OBJECTIONS IN RELATION THERETO. TO THE EXTENT THAT THE SURVEY INDICATES THAT THE LEGAL INSTRUMENT "AFFECTS" THE SUBJECT PROPERTY, SUCH STATEMENT IS ONLY INTENDED TO INDICATE THAT PROPERTY BOUNDARIES INCLUDED IN SUCH INSTRUMENT INCLUDE SOME OR ALL OF THE SUBJECT PROPERTY. THE SURVEYOR DOES NOT PURPORT TO DESCRIBE HOW SUCH INSTRUMENT AFFECTS THE SUBJECT PROPERTY OR THE ENFORCEABILITY OR LEGAL CONSEQUENCES OF SUCH INSTRUMENT. 13. NAMES AND ADDRESSES OF ADJOINING PROPERTY OWNERS WERE TAKEN FROM DOUGLAS COUNTY GIS. 14. THE SUBJECT PROPERTY SHOWN HEREON FORMS A MATHEMATICALLY CLOSED FIGURE AND IS CONTIGUOUS WITH THE ADJOINING PUBLIC RIGHT-OF-WAY AND/OR ADJOINING PARCELS WITH NO GAPS OR OVERLAPS. 15. IN REGARD TO ALTA/NSPS TABLE A ITEM 10, NO VISIBLE DIVISION OR PARTY WALLS WITH RESPECT TO ADJOINING PROPERTIES WERE OBSERVED AT THE TIME THE FIELD SURVEY WAS PERFORMED, NOR WERE ANY DESIGNATED BY THE CLIENT. 16. IN REGARD TO ALTA/NSPS TABLE A ITEM 18, ANY PLOTTABLE OFFSITE (I.E., APPURTENANT) EASEMENTS DISCLOSED IN DOCUMENTS PROVIDED TO OR OBTAINED BY THE SURVEYOR HAVE BEEN SHOWN AND/OR NOTED HEREON. 17. THE TERM "CERTIFICATION" AS USED IN RULE M180-6-.09(2) AND (3)" AND RELATING TO PROFESSIONAL ENGINEERING OR LAND SURVEYING SERVICES, AS DEFINED IN O.C.G.A 43-15-2(6) AND (11), SHALL MEAN A SIGNED STATEMENT BASED UPON FACTS AND KNOWLEDGE KNOWN TO THE REGISTRANT AND IS NOT A GUARANTEE OR WARRANTY, EITHER EXPRESSED OR IMPLIED. 18. THIS SURVEY COMPLIES WITH BOTH THE RULES OF THE GEORGIA BOARD OF REGISTRATION FOR PROFESSIONAL ENGINEERS AND LAND SURVEYORS AND THE OFFICIAL CODE OF GEORGIA ANNOTATED (OCGA) 15-6-67, IN THAT WHERE A CONFLICT EXISTS BETWEEN THOSE TWO SETS OF SPECIFICATIONS, THE REQUIREMENTS OF LAW PREVAIL. 19. THIS MAP OR PLAT HAS BEEN CALCULATED FOR CLOSURE AND IS FOUND TO BE ACCURATE WITHIN 1:2760058.6 FEET. 20. PORTIONS OF THIS SURVEY WERE PERFORMED USING GPS EQUIPMENT. GPS EQUIPMENT USED: CARLSON BRX7 USING REAL TIME KINEMATIC (RTK) METHODS RELATIVE TO THE TOPCON "TOPNET" VRS NETWORK. LOCATIONS GENERATED USING RTK VECTORS HAD A ROOT MEAN SQUARE (RMS) OF NO MORE THAN 0.04’ HORIZONTAL. NONE OBSERVED AT THE TIME OF THE ALTA/NSPS SURVEY. THE UTILITIES SHOWN ON THIS DRAWING HEREON HAVE BEEN LOCATED BY FIELD MEASUREMENTS. BLEW & ASSOCIATES MAKES NO WARRANTY TO THE EXACT LOCATION OF ANY UNDERGROUND UTILITIES SHOWN OR NOT SHOWN ON THIS DRAWING. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY ANY AND ALL UTILITIES PRIOR TO CONSTRUCTION. CALL GEORGIA ONE-CALL AT 800.282.7411 FOR FIELD LOCATIONS (REQUEST FOR GROUND MARKINGS) OF UNDERGROUND UTILITY LINES BEFORE DIGGING. THE BASIS OF BEARING OF THIS SURVEY IS GRID NORTH BASED ON THE WEST R/W LINE OF MUNICIPAL PARKWAY. THE BEARING IS DENOTED AS S01°13'46"E PER GPS COORDINATE OBSERVATIONS GEORGIA STATE PLANE, WEST ZONE NAD83. LATITUDE = 33°45'59.1910" LONGITUDE = -84°43'21.4884" CONVERGENCE ANGLE = 0°18'32.4693" SIGNIFICANT OBSERVATIONS UTILITY INFORMATION ZONING INFORMATION GENERAL NOTES N/F: ELECTRICAL FIBER SYSTEMS INC. 1435 MUNICIPAL PARKWAY APN: 07351820017 110,025 ± SQUARE FEET, OR 2.526 ± ACRES SITE INFORMATION 1435 MUNICIPAL PKWY DOUGLASVILLE, GA 30134 COUNTY OF DOUGLAS GRAPHIC SCALE 0 SCALE: 1" = 30' 15' 30' 60' DATE REVISION HISTORY BY 12/01/2023 ZONING REPORT MFD 3825 N. SHILOH DRIVE - FAYETTEVILLE, AR 72703 EMAIL: SURVEY@BLEWINC.COM OFFICE: 479.443.4506 FAX: 479.582.1883 WWW.BLEWINC.COM F G H I J VETERANS MEMORIAL HWY MUNICIPAL PKWY MCINTOSH RD STITCHER CT EASEMENT FROM MRS. J.M. HATCHETT TO GEORGIA POWER COMPANY, DATED AUGUST 8, 1936, FILED FOR RECORD AUGUST 20, 1986 AT 8:00 A.M., RECORDED IN DEED BOOK 2, PAGE 438, RECORDS OF DOUGLAS COUNTY, GEORGIA. (UNABLE TO DETERMINE, DOCUMENT IS VAGUE IN DESCRIPTION) EASEMENT FROM J.P. HEAD TO GEORGIA POWER COMPANY, DATED JANUARY 25, 1950, FILED FOR RECORD APRIL 21, 1950 AT 8:00A.M., RECORDED IN DEED BOOK 17, PAGE 76, AFORESAID RECORDS. (UNABLE TO DETERMINE, DOCUMENT IS VAGUE IN DESCRIPTION) RIGHT OF WAY DEED FROM WILLIAM W. HYATT AND MRS. VIRGINIA DOUGLAS HYATT TO DOUGLAS COUNTY, GEORGIA, DATED JULY 12, 1977, FILED FOR RECORD AUGUST 8, 1977 AT 4:56 P.M., RECORDED IN DEED BOOK 316, PAGE 266, AFORESAID RECORDS. (DOES NOT AFFECT, EFFECTS LIE WITHIN R/W OF HIGHWAY 76) RIGHT OF WAY DEED FROM WILLIAM W. HYATT AND AGNES HYATT TO DOUGLAS COUNTY, GEORGIA, DATED JULY 8, 1980, FILED FOR RECORD AUGUST 7, 1980 AT 3:56 P.M., RECORDED IN DEED BOOK 371, PAGE 641, AFORESAID RECORDS. (DOES NOT AFFECT, EFFECTS LIE WITHIN R/W OF MACINTOSH RD) ALL THOSE MATTERS AS DISCLOSED BY THAT CERTAIN PLAT RECORDED IN PLAT BOOK 24, PAGE 197, AFORESAID RECORDS. (AFFECTS, PLOTTED AS SHOWN) ZONING PROVIDED BY: BLEW & ASSOCIATES, P.A. CONTACT: JENNETTE BARRIOS ZONING@BLEWINC.COM ZONING JOB #: 23-7651.01 DATED: 11/30/2023 ZONING NOTES: EXEMPT; SUBJECT TO CONCEPT PLAN APPROVAL-NONE ON FILE MANUFACTURING EXEMPT EXEMPT EXEMPT EXEMPT EXEMPT 50' EXEMPT 38 NONE 38 12/03/2023 CLIENT COMMENTS DR E O R E G No. 3447 I G A REGISTERED LAND SURVEYOR J REMIAH DAVID O' DEAN Page 284 of 334 reeds@douglasvillega.gov HARTLEY, ROWE & FOWLER, P.C. ATTORNEYS AT LAW JOSEPH H. FOWLER DIRECT DIAL: 770/ 920-2001 12301 VETERANS MEMORIAL HIGHWAY TELEPHONE: 770/920-2000 POST OFFICE Box 489 FA": 770/920'9119 DOUGLASVILLE, GEORGIA 30133-0489 February 29, 2024 BY EMAIL MS. Shayla Reed Community Development Director City of Douglasville 6701 Church Street Douglasville, Georgia 30134 RE: Application for Rezoning of Tax Parcel 07351820017 located on Municipal Parkway by Craig Wire Products, LLC LETTER OF REQUEST Dear Ms. Reed: Craig Wire Products, LLC (the “Applicant”) would like to request a rezoning of 2.526 acres on Municipal Parkway (parcel 07351820017) ?om PSP to H1 to allow the property to be used for wire production activities. A height variance is ?led concurrently with this application to allow the Applicant to construct a drying frame. Respectfully, HARTLEY, ROWE & FOWLER, P.C. J H. Fowler EMAIL: JFOWLER@HRFLEGAL. COM (00940461-1; ) EXTERIOR FINISH LEGEND PATTERN TAG MATERIAL STANDING SEAM METAL ROOFING SYSTEM; MATCH EXISTING COLOR R-04 MP-01 METAL WALL PANEL; MATCH EXISTING COLOR EXTERIOR FINISH KEYNOTES TAG MATERIAL DS-01 PREFINISHED ALUMINUM GUTTER AND DOWNSPOUT COLOR TO MATCH EXISTING RT-01 PREFINISHED RAKE TRIM COLOR TO MATCH EXISTING LEVEL 01 0' - 0" A B C D E F G RIDGE HEIGHT 60' - 0" T/ STEEL 2 54' - 7" 1" 12" 1" 12" 8" 8" MP-01 RT -01 DS -01 LEVEL 01 0' - 0" G F E D C B A RIDGE HEIGHT 60' - 0" T/ STEEL 2 54' - 7" 1" 12" 1" 12" 8" 8" MP-01 RT -01 DS -01 LEVEL 01 0' - 0" 1 2 3 4 5 6 7 8 9 10 11 RIDGE HEIGHT 60' - 0" T/ STEEL 2 54' - 7" EXISTING BUILDING NEW CONSTRUCTION R-04 MP-01 DS -01 TR -01 LEVEL 01 0' - 0" 11 10 9 8 7 6 5 4 3 2 1 RIDGE HEIGHT 60' - 0" T/ STEEL 2 54' - 7" NEW CONSTRUCTION EXISTING BUILDING R-04 MP-01 RT -01 DS -01 Phone: (770) 345-2579 135 P RICKMAN INDUSTRIAL DR. SUITE 100 CANTON, GA 30115 © 2023, CSC Design. These drawings are protected by the copyright laws of the United States. These drawings or any part thereof may not be used for any purpose or reproduced in any form or by any means without the written consent of CSC Design. CSC DESIGN, INC. ARCHITECTS & ENGINEERS PROJECT NUMBER: REVISIONS 3/21/2024 1:21:43 PM P:\24-020 1435 Municipal Parkway Building Modifications_City of Douglasville, GA\Arch\Revit\24-020_1435 Municipal Pkwy Renderings.rvt A -301 CONCEPT EXTERIOR ELEVATIONS CSC.2023.01.012 24-020 CRAIG WIRE PRODUCTS, LLC 1435 MUNICIPAL PKWY, DOUGLASVILLE, GA 30134 NO: DATE: ISSUE: 2 A-301 | 1/16" = 1'-0" RIGHT SIDE ELEVATION 1 A-301 | 1/16" = 1'-0" LEFT SIDE ELEVATION 4 A-301 | 1/16" = 1'-0" FRONT ELEVATION 3 A-301 | 1/16" = 1'-0" REAR ELEVATION Qunblicmet‘” (3 55539554 07351820011 073518200 a.“ 07351820012 007 07351320004 07351870015 07341820 20006 Date created: 2/27/2024 Last Data Uploaded: 2/27/2024 4:21:47 AM Douglas County, GA Owner Physical Address Assessed Value Last 2 Sales Date 3/30/2020 0 ELECTRICALFIBERSYSTEMS. 1435 MUNICIPAL PKWY DOUGLASVILLE,GA30134 1435 MUNICIPAL PKWY $2399300 Overview Area - Areas of 1% annual chance ?ood also known as the base ?ood. Determined by detailed methods with Base Flood Elevations (BFE). X2500 Year Flood - Areas of 0.2% annual chance ?ood County Outlines U Douglas E Price Reason Qual GOVERNMENT(HUD, U VA, ETC) n/a n/a City Limits Flood_Map A - 100 Year Flood Area - Areas of 1% annual chance ?ood also known as the base ?ood. Base Flood Elevations (BFE) have not been determined. AE-100 Year Flood Parcel ID Real Key/ Acct Class Code Taxing District Acres 07351820017 5586349 l4 - Industrial Small Tracts (03) DOUGLASVILL E 2.53 (Note: Not to be used on legal documents) Developed by Douglasville Land Research Applicatio n 434.721 33.768 Degrees (1 of 4) Parcel: 07351 820017 Legal Description Subdivision Zoning Code Split Zoning Code Future Land Use Code PIN ADDRESS CITY ZIPCODE NOTES GIS ACREAGE GIS Douglasville Zoning Code Douglasville Zoning Description Douglasville Zoning Notes Douglasville Future Land Use Code Douglasville Future Land Use Description Douglasville Split Zone Code Douglasville Split Zone Description Area (sq ft) Owner Info BLDG/2.526 AC, LOT#5, MUNICIPALPARKWAYS/D MUNICIPALPARKWAY city city 07351820017 1435 MUNICIPALPKWY DOUGLASVILLE 30134 251238466 PSP Public - Semi Public HI Heavy Industrial 109,439.04 ELECTRICALFIBERSYSTEMS,INC. Esri Commu Zoom to LIMITED WARRANTY DEED ‘Gramee’ Exhibit “B” Type: WD Recorded: 2/23/2024 4:32:00 PM Fee Amt: $3,025.00 Page 1 of 4 Transfer Tax: $3,000.00 Douglas County Georgia ANNETTA D STEMBRIDGE Clerk Superior Participant ID: 6405611605 After recording return to: Galloway Title &Escrow, LLC BK 431 1 PG 749 - 752 2100 Riveredge Parkway, Suite 1025 Atlanta, GA 30 ”1306?! STATE OF GEORGIA COUNTY OF COWETA THIS INDENTURE, madeand entered into this 23rd day of February, 2024 by and between Electrical Fiber Systems;Inc., a Georgia corporation (herein referred to as “Grantor”), and Craig Wire Products LLC, a Georgia limited liability company (herein referred to as C 9). WITNESSETH THAT, the said Grantor, for and in consideration of the sum of Ten and no/100 ($10.00) Dollars, and other good and valuable consideration, in hand paid at or before the delivery of this deed,the receipt and suf?ciency of which are hereby acknowledged, and pursuant to proper authority, has granted, bargained, sold and conveyed and by these presents does hereby grant, bargain, sell and convey to the said Grantee, and its successors and assigns, the following described property: ALL THAT TRACT OR PARCEL OF LAND LYING AND BEING in Land Lots 735 of the 18th District, Douglas County, Georgia being more particularly described on Exhibit f‘A?.’ attached hereto and incorporated herein by this reference. TOGETHER WITH all ?xtures, structures and improvementslocated on such property and the easements, rights, members and appurtenances thereunto appertaining. TO HAVE AND TO HOLD the said bargained premises, together with all and singular the rights, privileges, easements, members and appurtenances belonging or thereunto appertaining, to the only proper use and bene?t of the Grantee and its successors and assigns forever in FEE SIMPLE. AND EXCEPT for those matters set forth on J attached hereto and incorporated herein by reference, Grantor will warrant and defend the title to said premisesagainst the claims of all persons claiming by, through or under Grantor, but not otherwise. By: (SEAL) oe avnson, General Manager ' IN WITNESS WHEREOF, the Grantor has caused this instrument to be duly executed sealed and deliveredby its duly authorized of?cer on the date above written. , Signed, sealed and Electrical Fiber Systems, Inc. in the presence of: a Georgia corp My commission (Notary Seal) f’? EXHIBIT A LEGAL DESCRIPTION All that tract or parcel of land lying and being in Land Lot 735 of the 18thDistrict,2nd Section of Douglas County, Georgia,being SubdividedLot 5 as shown upon the ?nal plat of Municipal Parkway, as more particularly depictedon a plat recorded in Plat Book 24, Page 197,records of Douglas County, Georgia, which plat is incorporated herein by reference hereto. EXHIBIT B PERMITTED EXCEPTIONS Taxes and assessments for the calendar year 2024 and subsequent years not yet due and payable. Easement from Mrs. J.M. Hatchett to Georgia Power Company, dated August 8, 1936, ?led for record August 20, 1986 at 8:00 a.m., recorded in Deed Book 2, Page 438, records of Douglas County, Georgia. Easement ?'om J.P. Head to Georgia Power Company, dated January 25, 1950, ?led for record April 21, 1950 at 8:00 a.m., recorded in Deed Book 17, Page 76, aforesaid records. Right of Way Deed from William W. Hyatt and Mrs. Virginia Douglas Hyatt to Douglas County, Georgia, dated July 12, 1977, ?led for record August 8, 1977at 4:56 p.m., recorded in Deed Book 316, Page 266, aforesaid records. Right of Way Deed from William W. Hyatt and Agnes Hyatt to Douglas County, Georgia, dated July 8, 1980, ?led for record August 7, 1980 at 3:56 pm. recorded in Deed Book 371, Page 641, aforesaid records. All those matters seen on that certain plat recorded in Plat Book 24, Page 197, aforesaid records. “TUE: TEE E‘ixm'l'h W?!“ PM Marx-q \mu I-? ht- ' Total Due $0.00 GREGORY BAKER Douglas County Tax Commissioner 6200 Fairburn Rd Douglasville, GA 30134 MAKE CHECK OR MONEY ORDER PAYABLE TO: Douglas County Tax Commissioner ELECTRICAL FIBER SYSTEMS, INC. 1435 MUNICIPAL PKWY DOUGLASVILLE, GA 30134 RETURN THIS PORTION WITH PAYMENT (Interest will be added per month if not paid by due date) GREGORY BAKER Douglas County Tax Commissioner 6200 Fairburn Rd Douglasville, GA 30134 Phone: (770) 920-7272, Fax: (678) 449-3932 Current Prior Back *Total B111No. Due Date Due Payment Taxes Due* 2023-1029414 12/04/2023 $0.00 $39170.01 $0.00 Paid Map: 07351820017 Printed: 02/27/ 2024 Location: 1435 MUNICIPAL PKWY - Appraisal 770-920-7228 determines ownership/value - Commissioners (770)920-7266 sets COUNTY tax rate - Bd of Education 770-651-2000 sets SCHOOL tax rate - City of Douglasville 770-920-3000 sets CITY tax rate - City of Villa Rica 770-459-3656 sets the CITY tax rate - Tax Commissioner 770-920-7272 bills for authorities above/disburses/maintains records. - A gradual reduction of state property taxes began in 2012 and has now phased away as ofjanuary 1, 2016. This reduction is the result of property tax relief passed by the Governor and the House of Representatives and the Georgia State Senate. - Payment good through date is CURRENT YEAR ONLY Tax Payer: ELECTRICAL FIBER SYSTEMS, INC. Map Code: 07351820017 Real BLDG/2.526AC, LOT #5, MUNICIPAL PARKWAY S/D Location: 1435 MUNICIPAL PKWY Bill No: 2023-1029414 District: 03 — DOUGLASVILLE Description: P ent Good Building Value Land Value Acres Fair Market Value Due Date Billing Date Exe tions 2,226,400.00 172,900.00 2.5300 Entity Adg‘?‘tfd CITYOF DOUGLASVILLE $2,399,300 COUNTY TAX $2,399,300 DOUGLASVILLE BOND $2,399,300 SALES TAX CREDIT - CITY $2,399,300 SALES TAX CREDIT - COUNTY $2,399,300 SCHOOL BOND $2,399,300 SCHOOL TAX $2,399,300 TOTALS through Credit Net Tax $11,642.36 $15,258.59 $1,247.64 $0.00 $0.00 $479.86 $18,225.08 $39,170.01 Residents of Douglas County who own and occupy their permanent residence as ofJanuary 1 of the taxable year are entitled to a HOMESTEAD EXEMPTION. This can be filed over the internet at www.doug1astax.org. Applications may be filed any time after purchase and before April 1 of qualifying year. There are ADDITIONALexemptions for homeowners 62 or older 6: 100% disabled persons, WHICH MUST BE MADE IN PERSON in the TAX OFFICE with proof of age/disability by APRIL 1. 770-920-7272 GREGORYBAKER, Douglas County Tax Commissioner $2,399,300.00 $959,720 $959,720 $959,720 $959,720 $959,720 $959,720 $959,720 $0 $0 $0 $0 $0 $0 $0 12/04/2023 $959,720 $959,720 $959,720 $959,720 $959,720 $959,720 $959,720 02/27/2024 12.131000 15.899000 1.300000 0.500000 18.990000 40.814000 $11,642 36 $15,258.59 $1,247.64 $0.00 $0.00 $479.86 $18,225.08 $46,853.53 4.420000 3.586000 Current Due Penalty Interest Other Fees Previous Payments Back Taxes $0.00 $0.00 $0.00 $4,241.96 $3,441.56 $0.00 $0.00 $7,683.52 $39,170.01 $0.00 $0.00 $0.00 $39,170.01 $0.00 $0.00 AGENDA ITEM REPORT Item Number: Meeting: Staff Contact: 24-163 05-20-2024 - City Council Regular Meeting (6:00 PM) Marissa Jackson, Planning and Zoning Administrator Consider a request for a variance from section 8.01(E) of the Unified Development Ordinance to reduce the required parking spaces from 750 to 125 parking spaces and a variance from section 8.03(C) to increase the maximum light mounting height from 20 feet to 40 feet on a lot of +/- 55.37 acres at 1701 North River Road in Land Lot 173, District 1, Section 5, Parcel ID 01730150012. Application by DC Blox, Inc., c/o Chip Scaglione and Dillon Callaham. (Marissa Jackson) Attachments: Staff Report PCCV24-0001 1701 N River Road (DC Blox) PCCV24-0001 DC Blox Variance Application DC BLOX Site Plan DC BLOX Survey DC BLOX Light Fixtures PCCV24-0001 DC Blox Letter of Intent PCCV24-0001 DC Blox Legal Description PCCV24-0001 DC Blox Warranty Deed PCCV24-0001 DC Blox Property Tax Statements DCB ALT1 - Variance Presentation_2024.05.16 Recommendation(s): RES-2024-23 Budget Impact: Is this an Agreement or Contract: No If YES, check one: ☐ Original Agreement ☐ Change Order, Change Order # Is it budgeted? No If so, what Account #? MEMORANDUM TO: City of Douglasville’s Mayor and Council FROM: Shayla Reed, Community Development Director DATE: May 16, 2024 SUBJECT: PCCV24-0001 (1701 N River Road- DC Blox) Item Number: 24-163 PURPOSE: Hold a public hearing and consider a request for a variance from sections 8.01(E) of the Unified Development Ordinance to reduce the required parking spaces from 750 to 125 parking spaces and a variance from section 8.03(C) to increase the maximum light mounting height from 20-feet to 40-feet. The site consists of +/- 55.37 acres located on North River Road in Land Lot 173, District 1, Section 5, Parcel ID 01730150012. Application by DC Blox, Inc., c/o Dillon Callaham. (Marissa Jackson) Proposed Development Data Center Ward 5 – Councilman – Howard M. Estes Site Address 1701 N River Road Parcel Identification Land Lot: 173, District: 15, Section: 1 Parcel Number: 01730150012 Parcel Acreage + / - 55.37 Acres Applicant Dillon Callaham Owner Chip Scaglione Historic District No Quality Growth Development Overlay No Zoning History O-05-17, and O-08-062 Current Zoning LI (Light Industrial) Comp Plan Compatibility Yes Land Use Character Area Light Industrial Current Use Vacant Surrounding Land Uses North - R-A - (Residential-Agriculture) South - LI - (Light Industrial City) East – LI - (Light Industrial City) West – LI - (Light Industrial City) PCCV24-0001 (1701 N River Road) Aerial Map Aerial view of the project site DC Blox Project Site N River Road PCCV24-0001 (1701 N River Road) Proposed Site Plan For a larger site plan, see the attachments. N River Road PCCV24-0001 (1701 N River Road) City of Douglasville Zoning Map This is the site adjacent to Light Industrial (LI) and Douglas County zoning designations PRD- Planned Residential Development (City) PUD – Planned Unit Development R-A – Residential Agriculture (Douglas County) DC Blox Project Site Site LI MUD Douglas County MUD PUD R-A PCCV24-0001 (1701 N River Road) Character Area Map This site is located in the Light Industrial Character Area Recreation Character Area Light Industrial Character Area Mixed-Use Design Street Names DC Blox Project Site Douglas County Mixed-Use Design PCCV24-0001 (1701 N River Road) City Council’s Request Chip Scaglione requests a variance from section 8.01(E) of the Unified Development Ordinance to reduce the required parking spaces from 750 to 125 parking spaces, and a variance from section 8.03(C) to increase the maximum light mounting height from 20 feet to 40 feet. Standards for Approval of Variance Request per 12.08.B.4 In granting a variance, the city council or the community development director, or their designees may impose such conditions as may be necessary to comply with the factors herein to reduce or minimize potential injurious effects of such variance upon neighboring properties and to carry out the general purpose and intent of this UDO. a. In making such determination, the city council or the community development director shall consider all of the following factors whether: 1. The subject property will yield a reasonable return or whether there can be any beneficial use of the property without a variance. The UDO’s requirement of 750 parking spaces is beyond what is needed for the data center based on the number of employees (80 – 125) and daily operations. The additional parking spaces will result in lost areas of approximately 4 acres. Additionally, without the variance for the light height, the applicant will not have sufficient illumination for the campus to ensure safety and security. 2. The essential character of the neighborhood would be substantially altered or whether adjoining properties would suffer a substantial detriment as a result of the variance. No, the character of the neighborhood would not be substantially altered due to this proposal as a result of the variance. 3. The variance would adversely affect the delivery of government services (i.e., water, sewer, garbage; The variance is not expected to adversely affect the delivery of government services. PCCV24-0001 (1701 N River Road) 4. The property owner's predicament feasibly can be obviated through some method other than a variance; No, the variance will help achieve the applicant’s proposal. The applicant would have an excess of parking spaces that are not needed for their daily operations. The applicant will also have the opportunity to achieve their security needs with cameras and sufficient lighting. 5. The spirit and intent behind the UDO requirement would be observed and substantial justice done by granting the variance; The UDO intends to promote orderly development, prevent overcrowding, and preserve the aesthetic appearance of the city. If approved the project will continue and is expected to provide a service to the community. 6. Any other relevant factor to assist the board of adjustments and appeals in weighing and balancing the public and private benefits and harms of the requested relief is necessary. The proposal is not expected to create harm to the adjoining properties. The adjoining properties are zoned Light Industrial. There will be less disturbance to the site as a result of reducing the impervious surface with fewer parking spaces and providing a more efficient lighting system that supports the proper height for security cameras. b. No nonconforming use of neighboring lands, structures, or buildings in the same district, and no permitted or nonconforming use of lands, structures, or buildings on other districts shall be considered grounds for the issuance of a variance. Based on the variance criteria provided in the UDO, the city council should not use cases of other non-conformities as grounds to approve a variance request. c. Financial hardship alone is not a valid reason for requesting and receiving approval of any variance. Based on the variance criteria provided in the UDO, the city council should not use financial hardship to approve a variance request. PCCV24-0001 (1701 N River Road) Staff Comments The request for a variance complies with the Unified Development Ordinance. Parking Request The applicant is proposing a data center consisting of two buildings in the LI (Light Industrial) Zoning District. According to the City of Douglasville’s UDO, a data center requires 1 parking space per 1,000 gross floor area. The proposed data center is 750,000 square feet across two buildings, which results in 750 required parking spaces. However, the applicant expects to have only 80-120 employees for the data center. If the variance were not approved, there would be an excess of 625 parking spaces which would result in an additional 170,000 square feet of asphalt, tree islands, drive aisles, and impervious surfaces that would not be utilized. Lighting Request Per the UDO the maximum height for any light, canopy, pole, or wall-mounted light shall not exceed 20 feet above the adjacent grade. The 20-foot maximum height is not sufficient to adequately illuminate the data campus for adequate security. The 20-foot requirement will also affect cameras for security which need to be above the lights and at a higher elevation for proper surveillance and coverage of the campus. Related Ordinance Sec. 8.01(E) Parking Requirements Sec. 8.03(C) Site Lighting City of Douglasville’s 2023 Comprehensive Plan r1 I.'J DQ_U_GLASVILL_F: GEORGlA— Variance Application Checklist Completed Application Form Page 4 The names and addresses of the owners of the subject property and their agents if any Page 6 & 7 Responses to each of the questions pertaining to the variance request N/A Notarized consent of owner ifapplicant is not owner Page 4 Present and proposed zoning classification for the subject property Page 8 Campaign contribution disclosure report by the applicant and the applicant’s attorney, if applicable, in accordance with O.C.G.A. 36-67A Required Documentation & Supplemental Information Page 10-11 Letter of Request Page 20 Legal Description of the property Page 12 A map of the property where variance is being sought showing its location and the City and its relationship to abutting properties, public facilities, and public Page 13 A recent survey plat showing the dimensions and location of the subject property prepared by a land surveyor whose state registration is current and valid and whose seal is affixed to the plat (see page 9 for survey requirements) Page 16 8. 17 Proof that all City, County, and State ad valorem taxes due upon the property have been paid in full Applicable Fees Commercial: $250/lot + $100/variance Residential: $150/lot + $100/variance Administrative: $150/lot + $100/variance Page 14 Site Layout Exhibit Page 15 Site Lighting Exhibit Page 23-27 Pre-Appllcation Comment Responses from 12/7/2023 meeting. Page 28-32 Pre-Application Comment Responses from 1/25/2024 meeting. City of Douglasville | Community Development Department | 6701 Church St. Douglasville, GA 30134 | Rezoning Application Packet Rev. 5/10/29 [ Page 1 Page 303 of 334 r1L'J PO_UGLA5V'_LE_E_ s 50 R G | A Variance Procedures Variance Applications are reviewed based on the City of Douglasville Unified Development Ordinance Section 12.08.B. Dimensionaland LocationalVariances. Please note that UDO Section 7.12 prohibitsvariances from sign regulations as established in Article 7. 1. The Board of Adjustments and Appeals may authorize variance from the terms of this UDOthat are not contrary to the public interest where, due to special conditions and not to the intentional conduct of the applicant, the literal enforcement of the provisions of this UDOwould result in an unnecessary hardship. 2. A variance from the terms of this UDOshall not be granted by the Board ofAdjustments and Appeals unless and until: a. A complete application for a variance is submitted demonstrating that: 1) Special conditions and circumstances exist which are peculiar to the land, structure, or building involved and which are not applicable to other lands, structures, or buildings in the same district. 2) The special conditions and circumstances did not result from the actions of the applicant. b. No nonconforming use of neighboring lands, structures, or buildings in the same district, and no permitted or nonconforming use of lands, structures, or buildings on other districts shall be considered grounds for the issuance of a variance; 3. Notice of a public hearing shall be given as required in Section 12.05, Public Hearing. Where the strict application or literal enforcement of the requirements of this UDO would result in the applicant suffering practical dif?culties, the Board of Adjustments and Appeals shall have power to authorize a variance from the terms of this UDOso as to relieve such difficulties. 5. in granting a variance, the Board of Adjustments and Appeals may impose such conditions as may be necessary to comply with the factors herein to reduce or minimize potential injurious effects of such variance upon neighboring properties and to carry out the general purpose and intent of this UDO. In making such determination, the Board of Adjustments and Appeals shall consider all of the following factors whether: a. The property in question willyield a reasonable return or whether there can be any beneficial use of the property without a variance; b. The variance is substantial; c. The essential character of the neighborhood would be substantially altered or whether adjoining properties would suffer a substantial detriment as a result of the variance; d. The variance would adversely affect the delivery of government services (i.e., water, sewer, garbage); f. The property owner's predicamentfeasibly can be obviated through some method other than a variance; 9. The spirit and intent behind the zoning requirement would be observed and substantial justice done by granting the variance; and h. Any other relevant factor to assist the Board of Adjustments and Appeals in weighing and balancing the public and private bene?ts and harms of the requested relief is necessary. City of Douglasvil|e| Community Development Department | 6701 Church St, Douglasville, GA 30134 | Rezoning Application Packet Rev. 7/23/19 | Page 2 6. In granting any variance, the Board of Adjustments and Appeals may prescribe appropriate conditions and safeguards in conformity with the intent of this UDO. 7. In granting any variance, the Board of Adjustments and Appeals shall only authorize the minimum variance that it deems necessary and adequate that will provide adequate relief. Financial hardship is not a valid reason for requesting and receiving approval of any variance. 9. Violations of such conditions and safeguards, when made a part of the terms under which the variance is granted, shall be deemed a violation of this UDO and punishable under the provisions of this UDO. 10. Under no circumstances shall the Board of Adjustments and Appeals grant a variance to allow a use not permitted under the terms of this UDO in the district involved, or any use expressly, or by implication, prohibited by the terms of this UDO in the district where the variance is being considered. City of Douglasville | Community Development Department | 6701 Church St, Douglasville, GA 30134 | Rezoning Application Packet Rev. 7/23/19 | Page 3 Page 305 of 334 n1 __ _ G Eo RG .A _ _ _ Variance Application Subject Property 170 1 NORTH RIVER ROAD DOUGLASVILLE GA 30 122 Property Address/Location City State Zip 0166, 0173,0174 01 05 0012 01730150012 55.37 Acres/SF Land Lot District Section Parcel Property ID Property Size LI - LIGHT INDUSTRIAL Adjacent Zoning: R-A LI ,PSP LI LI Current Zoning North South East West Overlay District: DHiston'cOverlay District IXlQualityGrowth Development Overlay ClNone Applicantiawner . . . w _.. . ........ _ _ _ . . ......... _ ..... ___ _ _ CHIP SCAGLIONE Applicant DCB Atlanta West, LLC chip .scaglioneedcblox. com 770—827—4733 Company E-mailAddress Phone 1 4 R WN P INT PARKWAY ITE ATLANTA GA 30338 MailingAddress City State Zip “Representative m I -1. _ ' m ''''''' I _ mm DILLON CALLAHAM Agent or Attorney Name THOMAS & HUTTON callaham.d@tandh. com 864-412-2229 Company E-mailAddress Phone 50 1 RIVER STREET SUITE 2 0 0 GREENVILLE SC 2 9 601 MailingAddress City State Zip ApplicantSignature ________ _ __ _____ _ NM I hereby certify that all informationprovided herein is true and correct. W 02 .11 .20% Applican wner or epresentative Signature Date [I Application Approved for Staff Review ElApplication Rejected Fee: 5 Zoning Administrator Date City of Douglasvllle | Community Development Department | 6701 Church St, Douglasvllle, GA 30134 | Rezoning Application Packet Rev. 7/23/19 | Page 4 r1L'J DOUGLASV| |_|_E Variance Application G E o R G | A Consent OfOwner Property Owner The property owner shall read the following carefully and complete the consent form below: Initial (%I understand that failure to supply all required informationper the variance checklist provided and requirements of the City of Douglasville Unified Development Ordinance willresult in rejection of application i understand that preliminary approval of my plans does not authorize ?nal approval of my variance request. i understand that representation associated with this application on behalf of the property owner (i.e. project coordinator, potential property owner, agent, or other such representative) shall be binding K I have read the provisions of O.C.G.A. 36-67A as required regarding Campaign Disclosures; my signed Campaign Disclosure report is included with this application I,(BMW , as property owner, respectfully petition that this property as described in this application be considered for variance approval. I acknowledge and fully understand all above statements made by the City of Douglasville. I hereby certify that all informationprovided herein is true Property wner Sign l0 CO 9 Q 3 7-2. Attorney/Agent Signature Date Address _ City State Zip _ Phone Sw0rn and subscribed before me .‘ QVZ'SC‘E’QON 5%)..0/0”, T 's 71"} day of32, 20A . .\ , ,, I ~ ' lihH \ ,, ’2' t 0 City of Douglasville | Community Development Department | 6701 Church St, Douglasville, GA 30134 Rezonlifg'lam N &v 19 ] Page 5 I I \\\\ Hi Il Iu r1L'J DOUGLASVILLE Variance Application 6 E o R G I A —— Questionnaire Questionnaire for Parking Variance Request Reference UDO Section 8.01 Please address the following to guide City Staff in their evaluation of your application: 1. Please explain an extraordinary and exceptional condition pertaining to the speci?c piece of property in question in terms of its shape, size, or topography. The following conditions make this an exceptional property to develop: 1. Itisat a higher elevation relative to the public way. 2. Topography on the site ranges from lows in the 830‘sto peaks exceeding 960' in elevation. 3. Itis primarily bounded by Light Industrialzoning with residential county areas to the North. 2. Explain howthe application ofthe Unified Development Ordinance or recorded plat results in a practical hardship. Within the Douglasville Unified Development Standards, Section 8.01, Table 8-1 "Number of Parking Spaces Required" requires a ratio of 1 parking stall per 1,000 gross floor area for data processing. Forthe proposed ATL West Data Center at approximately 750,000 SF between two buildings, thistable requires 750 parking spaces. Per Owner standards, their expected required parking for operations of this facility are 125 spaces (80-120 employees). The resulting 625 space difference would require the Owner to accommodate additional 170,000+ SFof parking, islands and drive aisles that would not be utilized, realizing lost acreage for the campus. 3. Explain why the granting of this variance is necessary for the protection of a property right and does not merelyserveas a convenience to the applicant. _ Requrnng parking counts beyond that needed for facility operations and employees willlimit the Owner's ability to use and bene?t from the property efficiently, thereby impinging on their property rights. Thisdisparity between Owner's need and City requirements for parking would result in an excess of 4 acres of lost area, hence the Owner willnot be able to employ the property in an effective manner based on conditions noted in Item 1. 4. Did the condition for which the variance is sought result from an action by the applicant? No, it did not. City of Douglasville 1Community Development Department [ 6701 Church St, Douglasville, GA 30134 | Rezoning Application Packet Rev. 7/23/19 | Page 6 pou {-1 GLASVILLE Variance Application 5 a o Ro uA Questionnaire Questionnaire for Site Lighting Variance Request Reference UDOSection 8.03. Please address the following to guide City Staff in their evaluation of your application: 1. Please explain an extraordinary and exceptional condition pertaining to the speci?c piece of property in question in terms of its shape, size, or topography. The following conditions make this an exceptional property to develop: 1. Itisat a higher elevation relative to the public way. 2. Topography on the site ranges from lows in the 830's to peaks exceeding 960' in elevation. 3. Itis primarily bounded by Light Industrial zoning with residential county areas to the North. Explain how the application ofthe Unified Development Ordinance or recorded plat results in a practical hardship. Within the Douglasville Uni?ed Development Standards, Section 8.03.C.l states "The maximum height of any light, canopy, pole or wall mounted, shall not exceed 20 feet above the adjacent grade." This limitation for the proposed data center campus willresult in a lighting plan that is not ef?cient to adequately illuminate the site to achieve desire site lighting levels. Thislimitation willgreatly increase the count of poles and ?xturesrequired. Similarly,this limitation impacts the site's security needs as cameras are required across the site with sufficient height to provide adequate surveillance and coverage. Site lighting to support security requires fixtures to be placed above these cameras. Explain why the granting of this variance is necessary for the protection of a property right and does not merely serve as a convenienceto the applicant. The maximum light height Withthe UDOlimitsthe Owner's ability to use and benefit from their property efficiently, thereby impinging on their property rights. Thislimitation willrequire great increases to the overall ?xture and camera counts and security complexities to meet the needs of the facility. We are requesting that a variance be granted for this Project to allow lighting located at 40 feet in height. Did the condition for which the variance is sought result from an action by the applicant? No, it did not. City of Douglasvllle | Community Development Department | 6701 Church St, Douglasvllle. GA 30134 | Rezoning Application Packet Rev. 7/23/19 | Page 6 r1L'J pouGLASVILLE GEORG l A Campaign Contribution Disclosure Report Have you made, within 2 years immediately preceding the variance hearing, campaign contributions aggregating $250 or more or made gifts having an aggregate value of $250 or more to the Douglasvilie Mayor or member of the City Council or Board of Adjustments and Appeals who willconsider the application? I: YES IXNO lf YES, you and the attorney representing you must file this disclosure report withthe Zoning Division at least ?ve (5) days prior to the scheduled public hearing. Please supply the following information, which willbe considered as the required disclosure: J2EE _. , .?gw?mntomgi 4195““ ,, ._ swims..-“ rm AMEJLLWTW,. - _ “‘WMT.» _., 4___ i._#__‘_ .mw,‘_..- JA-_, *na |/We that the foregoing informationis true and correct, this of?, Applicant Signatu Attorney City of Douglasvilie | Community Development Department | 6701 Church St, Douglasvilie, GA 30134 | Rezoning Application Packet Rev. 7/23/19 | Page 7 S MASS GRADED PAD 12.08 ACRES WQ POND SUMMER LAKE ROAD (RESTRICTED TO CONSTRUCTION TRAFFIC) This drawing was prepared solely for the use of Evans Contractors and DC Blox and must only be used by employees, contractors, and vendors while performing the work shown on this drawing. Any other use of this drawing is forbidden. Experience Structural Expertise Atlanta, Georgia Boca Raton, Florida Charlotte, North Carolina Chattanooga, Tennessee 47 Perimeter Center East, Suite 500 Atlanta, Georgia 30346 Tel. 678 990 8700 Fax. 678 990 8701 Copyright 2018 Bennett & Pless, Inc. All Rights Reserved JT JACOBS, AIA, Associate Principal D — 407 627 1581 M — 225 341 2186 20 N Orange Ave, Suite 1300 Orlando FL 32801 1701 NORTH RIVER ROAD DOUGLASVILLE, GA 30122 ATL WEST BRAD SANDERSON, PE | Principal/Civil Department Manager P:803-451-6782 M:803-429-7561 E:sanderson.b@tandh.com A: 1501 Main St.; Suite 400 | Columbia, SC 29201 COMPANY STAMP REV DESCRIPTION DATE DC BLOX SUBMITTALS DATE SCHEMATIC DESIGN CAB SET 60% SUBMISSION ISSUE FOR PERMIT ISSUE FOR CONSTRUCTION PROJECT NO: 100829 STAMP T&H PROJECT NO: DESIGNED BY: DRAWN BY: CHECKED BY: COPYRIGHT: 2023 SHEET TITLE SHEET NUMBER (732) 774-2000 David Quirk DLB Project ID: 100829 Phone: Questions For dlb Call: 3600 Route 66, Suite 150 - #5981 Neptune, NJ 07753 CONSULTING ENGINEERS, P.C. dlb associates Last Saved: Z:\31070\31070.0001\Engineering\Drawings\Construction Plans\Site Improvements Package\31070.0001 - OV - ST - PL.dwg, 2/1/24 at 8:53 AM By MEDEIROS.A - Last Printed: 2/2/24 at 2:09 PM By Callaham, Dillon This Drawing Is The Property Of DLB Associates Consulting Engineers, PC. It Was Prepared Exclusively For This Particular Project And Is Limited To This Project Only. Unauthorized Reproduction Or Other Use Of These Drawings Or Ideas Is Prohibited. 31070.0001 DHC DHC MBS GSWCC LEVEL II DESIGN PROFESSIONAL MARCUS B SANDERSON CERT. # 0000095606 EXPIRES: 09/30/2024 FULL SITE IMPROVEMENTS 0 90% DD - ISSUED FOR PERMIT 2/02/2024 C1.0 OVERALL SITE PLAN 2/2/2024 PERMIT SET - FOR REVIEW PURPOSES ONLY Page 311 of 334 NORTH RIVER ROAD (60' R/W) S S S S S S 1701 P.O.B. ROOKER RIVERSIDE LLC. N/F LOT 1 SITE AREA = 55.370 acres (2,411,909 sf) N/F ROOKER RIVERSIDE LLC. (PB 41,PG 197) SUMMER LAKE ROAD (40' R/W) N/F DEVELOPMENT AUTHORITY OF CITY OF DOUGLASVILLE (DB 3908, PG 84) S80° 55' 50"W - 660.59' ARC=293.03' RAD=450.00' CHD=287.88' S62°16'33"W S43° 37' 16"W - 741.71' ARC=140.91' RAD=550.00' CHD=140.53' S36°16'53"W N61°04'58"W 60.10' N01°31'24"E 53.66' N03°56'49"E 185.35' N19°18'46"E 299.12' N07° 50' 02"E - 145.33' N14°21'07"W 138.71' N15° 29' 34"W - 976.27' N76°54'37"E 119.81' N77° 51' 19"E - 843.74' N01°33'59"E 41.79' S85°44'37"E 30.26' ARC=128.21' RAD=310.98' CHD=127.30' N81°49'41"E ARC=263.92' RAD=761.15' CHD=262.60' N60°07'31"E ARC=222.55' RAD=882.53' CHD=221.96' N41°51'50"E N36°02'51"E 150.04' S06° 01' 32"W - 358.46' N78°31'15"E 86.37' S16°58'49"E 161.88' S46° 23' 48"E - 274.86' S29° 16' 15"E - 488.33' S15° 21' 53"W - 251.84' S03°13'01"E 142.11' S73°59'10"W 62.48' ARC=92.72' RAD=1000.00' CHD=92.68' S76°38'32"WARC=170.31' RAD=80.00' CHD=139.92' S87°36'15"W ARC=37.92' RAD=40.00' CHD=36.51' S53°46'24"W SCALE: 1" = 80' 0 40' 80' 160' 240' U:\Rooker\u22204j4 - North River Road - 4 Surveys\1701 North River Road_Lot 1- ALTA\1701 North River Road - ALTA.dwg 3/30/2023 8:57 AM ALTA/NSPS LAND TITLE SURVEY FOR: DC BLOX, INC. FIRST AMERICAN TITLE INSURANCE COMPANY LAND LOTS 165, 173, & 174; 1st DISTRICT; 5th SECTION LAND LOTS 997, 998 & 1024; 18th DISTRICT; 2nd SECTION CITY OF DOUGLASVILLE DOUGLAS COUNTY, GEORGIA URBAN ENGINEERS, INC. 1904 MONROE DRIVE, N.E. SUITE 150 ATLANTA, GEORGIA 30324 PHONE: (404) 873-5874 www.urbanengineers.net (LSF2500) SCALE: 1" = 80' DATE: 04/29/22 SHEET 2 OF 2 CAM FRON T FRON T FRON T FRON T FRON T FRON T FRON T FRON T FRON T FRON T FRON T FRON T FRON T FRON T FRON T FRON T FRON T FRON T FRON T FRON T FR ONT FRON T FR ONT FRON T FR ONT FRON T FR ONT FRON T FR ONT FRON T FR ONT FRON T FR ONT FRON TFR ONT FRON T FR ONT FRON T FR ONT FRON T FR ONT FRON T FR ONT FRON T FR ONT FRON T FR ONT FRON T FR ONTFRON T FRON T FRON T FRON T FRON T FRON T FR ONT FRON T FR ONT FRON T FR ONT FRON T FR ONT FRON T FR ONT FRON T FR ONT FRON T FR ONT FRON TFR ONT FRON T FR ONT FRON T FR ONT FRON T FR ONT FRON T FR ONT FRON T FR ONT FRON T FR ONT FRON T FR ONTFRON T FR ONT FRON T FR ONT FRON T FR ONT FRON T FR ONT FRON T FR ONT FRON T FR ONT FRON T FR ONT FRON TFR ONT FRON T FR ONT FRON T FR ONT FRON T FR ONT FRON T FR ONT FRON T FR ONT FRON T FR ONT FRON T FR ONTFRON T FR ONT FRON T FR ONT FRON T FR ONT FRON T FR ONT FRON T FR ONT FRON T FR ONT FRON T FR ONT FRON TFR ONT FRON T FR ONT FRON T FR ONT FRON T FR ONT FRON T FR ONT FRON T FR ONT FRON T FR ONT FRON T FR ONTFRON T 2 R 1 A B C D NEW BUILDING S3 PNL-OH4.01#9,11 S1 PNL-OH4.01#9,11 S1 PNL-OH4.01#9,11 S2 PNL-OH4.01#9,11 S1 PNL-OH4.01#9,11 S1 PNL-OH4.01#9,11 S1 PNL-OH4.01#9,11 S2 PNL-OH4.01#12,14 S1 PNL-OH4.01#13,15 S1 PNL-OH4.01#13,15 S1 PNL-OH4.01#13,15 S2 PNL-OH4.01#13,15 S2 PNL-OH4.01#13,15 S1 PNL-OH4.01#13,15 S1 PNL-OH4.01#13,15 S1 PNL-OH4.01#13,15 S1 PNL-OH4.01#13,15 S1 PNL-OH4.01#12,14 S1 PNL-OH4.01#12,14 S1 PNL-OH4.01#12,14 S1 PNL-OH4.01#12,14 S1 PNL-OH4.01#8,10 S1 PNL-OH4.01#9,11 S1 PNL-OH4.01#12,14 S1 PNL-OH4.01#12,14 S1 PNL-OH4.01#12,14 S1 PNL-OH4.01#12,14 S1 PNL-OH4.01#8,10 S2 PNL-OH4.01#8,10 S1 PNL-OH4.01#8,10 S1 PNL-OH4.01#8,10 S1 PNL-OH4.01#8,10 GUARD BOOTH PROPERTY LINE SECURITY GATES FUTURE BUILDING FUTURE ELECTRICAL SUBSTATION PROPERTY LINE PROPERTY LINE PROPERTY LINE PRIMARY SITE ENTRANCE CONSTRUCTION SITE ENTRANCE SECONDARY SITE ENTRANCE SW LINV03#3 F1 SW LINV01#4 LINV03#3 F1 LINV01#4 F1 LINV01#4 F1 LINV01#4 F1 LINV01#4 F1 LINV01#4 F1 LINV01#4 F1 LINV01#4 F1 LINV01#4 F1 LINV01#4 SW SW LINV03#3 LINV03#3 F1 LINV01#4 SW LINV03#3 SW LINV03#3 F1 LINV01#4 F1 LINV01#4 S3 PNL-OH4.01#8,10 PRIVATE ROADWAY 3 E120 S1 PNL-OH4.01#9,11 S1 PNL-OH4.01#9,11 S1 PNL-OH4.01#9,11 S1 PNL-OH4.01#13,15 F1 LINV01#4 PNL-OH4.01 LINV01 GENERATOR (TYP) COORDINATE WITH SECURITY DRAWINGS FOR SECURITY CAMERA LOCATIONS ON LIGHT POLES (TYP). DRILLED AND TAPPED # 10-32 THREADED HOLE (TYPICAL OF 6) DRILLED AND TAPPED 1/4-20 THREADED HOLE (TYPICAL OF 8) 1-1/2" TRADE SIZE KO (1-15/16" HOLE) FACTORY-DRILLED IN FACE OF LIGHT POLE (BEHIND) SQUARE OR ROUND LIGHT POLE DETAIL NOTES: 1. LIGHT POLE STANDARDS PREPPED AT FACTORY WITH CAMERA MOUNTING PLATE, 1-1/2" KO CABLE ACCESS HOLE BEHIND PLATE, GROUNDING LUG, CONDUIT STRAP SUPPORT, AND HANDHOLD AS SHOWN IN DETAILS. 2. CAMERA MOUNTING PLATE SHALL BE FACTORY-PAINTED TO MATCH THE REMAINDER OF LIGHT POLE. 3. CONDUIT BODY, FLEXIBLE CONDUIT, AND OTHER RACEWAY COMPONENTS INSTALLED BY ELECTRICAL CONTRACTOR IN FIELD AS POLES ARE SET. ELECTRICAL CONTRACTOR SHALL PROVIDE JETLINE OR SIMILAR PULL STRING FROM IN-GROUND JUNCTION BOX TO OUTSIDE OF CAMERA PLATE. 4. DO NOT FIELD-DRILL, CUT, OR MODIFY LIGHT POLE IN ANY WAY THAT WOULD VIOLATE THE MANUFACTURER'S WARRANTY OR DAMAGE THE POLE'S PAINT FINISH. 5. CONDUIT BODY IS INTENTIONALLY SPECIFIED LARGER THAN FLEX CONDUIT WITHIN POLE TO ALLOW FOR LARGER CABLE BEND RADIUS AT TRANSITION OUT OF POLE. DO NOT DEVIATE FROM SPECIFIED PRODUCTS UNLESS APPROVED IN WRITING BY ARCHITECT. 6. SUGGESTED LIGHT POLE MANUFACTURER: UNITED LIGHTING STANDARDS www.unitedlightingstandards.com CONTACT: JOE GUIDA (586) 774-5350 SPECIFIED LUMINAIRE FIXTURE ROUND OR SQUARE LIGHT POLE BOND #6 BARE COPPER GROUNDING CONDUCTOR TO FACTORY-INSTALLED GROUNDING LUG QTY (2) - MINIMUM 3"X5" REINFORCED HANDHOLE 1/4"-20 TPI THREADED GROUNDING LUG FACTORY-WELDED TO INTERIOR OF POLE 1-1/2" LB-STYLE THREADED RIGID CONDUIT BODY CONDUIT BOX CONNECTOR AND THREADED 1-1/2" TO 1" REDUCER BUSHING CONDUIT SUPPORT STRAP 1/4" STEEL CAMERA MOUNTING PLATE WITH SQUARE CABLE ACCESS OPENING CUT IN CENTER FACTORY-WELDED TO POLE, SPACED OFF OF POLE MINIMUM 1/4" ROUND OR SQUARE LIGHT POLE SECURE CONDUIT BODY TO INTERIOR OF POLE WITH 1-1/2" THREADED CHASE NIPPLE 1-1/2" TRADE SIZE KO (1-15/16" HOLE) FACTORY-DRILLED IN FACE OF POLE 5/16" FACTORY-DRILLED HOLE FOR CONDUIT SUPPORT SCREW CAMERA MOUNTING PLATE SQUARE CABLE ACCESS CUTOUT 10" 2 3/4" GROUNDING ROD - REFER TO ELECTRICAL LOW-VOLTAGE CONDUIT TO BUILDING AS SHOWN ON SECURITY SITE PLAN DRAWINGS 1" CONDUIT TO LIGHT POLE FOR LOW-VOLTAGE SECURITY CABLING CONDUIT FOR LIGHTING BRANCH CIRCUIT CONDUCTORS - REFER TO ELECTRICAL UNISTRUT FRAME ASSEMBLY FOR EQUIPMENT ENCLOSURE SUPPORT LOCKABLE STEEL CONTINUOUS HINGE-COVER NEMA4 EQUIPMENT ENCLOSURE WITH EQUIPMENT MOUNTING BACKPLANE - HOFFMAN OR EQUAL - REFER TO SITE PLAN DRAWINGS FOR SIZE ALL CONDUCTIVE COMPONENTS, INCLUDING CABINET AND MOUNTING FRAME BONDED TO #6 BARE COPPER GROUNDING CONDUCTOR AND TO LIGHT POLE GROUND ROD FORM CONCRETE PAD UP MINIMUM 4" ABOVE FINISHED GRADE SECTION / ELEVATION ENCLOSURE INSTALLED WITHIN 6' OF LIGHT POLE CONCRETE PAD POURED TO A DEPTH OF 36" BELOW GRADE, OR 6" BELOW FROST LINE CAMERA PLATE LOCATED 5' NOMINAL BELOW LUMINAIRE FIXTURE Detail Shown For Reference. Refer To Security Drawings For Additional Requirements. F1 LINV01#4 F1 LINV01#4 F1 LINV01#4 F1 LINV01#4 F1 LINV01#4 F1 LINV01#4 DATE JOB SHEET This Document was produced by or under the authority of Registered Architect: Date of issue: REVISIONS ISSUES 2/1/2024 6:40:16 PM E120 ELECTRICAL Lighting Site Plan DC BLOX ATL1-A 02/16/23 100829.00 E120 ELECTRICAL Lighting Site Plan 1701 NORTH RIVER ROAD DOUGLASVILLE, GA 30122 2 11/22/2023 60% DD - PROGRESS PRINT 1 09/22/2023 SCHEMATIC DESIGN 3 12/15/2023 60% DD 4 02/02/2024 ISSUED FOR PERMIT GENERAL NOTES 1. Coordinate Final Locations Of Pole Mounted Lights With Underground Utilities. 2. All Site Lighting Fixtures and Controls Shall Be In Accordance With Local Codes / Ordinances. 3. Site Lighting (Poles And Wall Mounted) Shall Have Integral Controls Including: Photocell That Turns Lighting On At Dusk / Off At Dawn; Occupancy Sensor That Dims Lighting To 50% Illumination When No One Is Present. 4. Provide Lightning Protection For All Light Poles Per NFPA 780 To Achieve UL Master Label. Provide Ground Rods (Electrodes) And Air Terminals As Required. 5. New Wall Mounted Lighting Fixtures Are Served By A Central Emergency Lighting Inverter Battery System That Eliminates The Need For Remote Heads At Egress Doors. 6. Additional Lighting Fixtures Are Provided Mounted To Generator Enclosure As A Part Of The Generator Package. 7. Coordinate Site Light Pole And Security Camera Assembly Integration With Security Drawings. Site Pole With Security Cameras Shall Be Prepped At The Manufacturer's Factory With Security Camera Mounting Plate. Refer To Electrical Detail On Sheet E120 For Further Infromation. LIGHTING FIXTURE SCHEDULE - EXTERIOR Type Load Description Voltage Lamp Type Manufacturer Model Mounting F1 20 VA Exterior Wall Pack w/ Integral Button Photocell 120/277 V LED Cooper McGraw-Edison IST-SA1A-740-U-T3-BPC-SPB2 Wall Mounted 9'-0" AFF R1 33 VA Pole Lighting Fixture 120/277 V LED Cooper McGraw-Edison GALN-SA1A-740-U-T3-BPC-SPB2 Pole Mounted 12'-0" AFF R2 66 VA Pole Lighting Fixture 120/277 V LED Cooper McGraw-Edison GALN-SA1A-740-U-T3-BPC-SPB2 Pole Mounted 12'-0" AFF S1 552 VA Roadway LED Site Lighting Fixture, Single Head, Type 3 Distribution, Finish Chosen By Architect. Provide 5 Square, 40' Steel Pole. 480 LED Cooper McGraw-Edison GALN-SA9D-740-DV-T3-BPC-SPB4 Pole Mounted 40'-0" AFF S2 552 VA Roadway LED Site Lighting Fixture, Single Head, Type 4 Distribution, Finish Chosen By Architect. Provide 5 Square, 40' Steel Pole. 480 LED Cooper McGraw-Edison GALN-SA9D-740-DV-T4FT-BPC-SPB4 Pole Mounted 40'-0" AFF S3 552 VA Roadway LED Site Lighting Fixture, Single Head, 90 Degree Spill Eliminator Right Distribution, Finish Chosen By Architect. Provide 5 Square, 40' Steel Pole. 480 LED Cooper McGraw-Edison GALN-SA9D-740-DV-SLL-BPC-SPB4 Pole Mounted 40'-0" AFF SW 552 VA Exterior Wall Site Lighting Fixture w/ Integral Button Photocell 120/277 V LED Cooper McGraw-Edison GALN-SA9D-740-U-T3-BPC-SPB4 Wall Mounted 40'-0" AFF FIXTURE TYPE F1 FIXTURE TYPE S1/S2/S3 N Drawing: Detail: Scale: E120 1" = 80'-0" 1 SITE LIGHTING PLAN Drawing: Detail: Scale: NTS E120 2 SITE POLE DETAIL N Drawing: Detail: Scale: E120 1/16" = 1'-0" 3 LOADING DOCK LIGHITNG PLAN Phasing Note: Site Lighting Shown Includes Construction Phase 1, Which Involves Some Site Roadways And The West Half Of The New Building. Additional Site Lighting Will Be Provided On The Eastern Portion Of The Site And Around Future Buildings As Subsequent Construction Phases Occur. 02/02/2024 02/02/2024 Page 313 of 334 |".!'.| THOMAS & HUTTON 501 RIVER STREET, SUITE 200 GREENVILLE, sc 29601 i 864.412.2222 WWW.THOMASANDHUTTON.COM January 23, 2023 Planning and Zoning City of Douglasville 6701 Church St Douglasville, GA 30134 Re: ATL— West UDO Variances Application 1701 North River Road Douglasville, GA T&HJ — 3i 070.0001 Dear City of Douglasville: On behalf of DCB Atlanta West, LLC, Thomas and Hutton is submitting the enclosed Variance Application to request variance to the Douglasville Unified Development Ordinance (UDO)sections listed below: . Section 8.01 — Off—streetparking and loading requirements. a Section 8.03 — Site Lighting Regarding Section 8.01 — Off-street parking and loading requirements: The UDO requires 1 parking space for every 1,000 SF of gross floor area within data processing facilities. Thisrequirement is listed in Section 8.01 (Off-street parking and loading), Table 8-1 of the UDO. For the ATLWest campus, this requirement would result in approximately 750 parking spaces to support two buildings totaling approximately 750,000 SF. We are requesting that a variance from the above requirements be provided for the following reasons: 1. Owner's experience with data centers elsewhere support reduced loading requirements. 2. Parking requirements of similar facilities within the industry result in loading ratios smaller than the City required 1,000 GFA. 3. The proposed facilities are private facilities, not accessible to the public and the primary space isused to house computer servers. 4. Employee counts expected are much less than the UDO required parking count due to the nature of operation for facilities of this type (small administrative space with the majority of building ?oor area dedicated to computer equipment). A proposed parking count of T25 spaces isrequested as the new minimum requirement for the campus. Thiscount is chosen to upport an employee count of 80 to 120. ~ The UDO requires a maximum light mounting height of 20 feet above adjacent grade in Section 8.03.01. For the ATLWest campus, this requirement would result in a larger count of light fixtures and poles across the site and directly impact security needs and camera counts by creating height limitation to cameras (need to be mounted below light fixtures). We are requesting that at a variance from the above requirements be provided for the following reasons: i. Owner's need for site lighting and security for a data center facility are greater than a typical distribution/warehousing facility. The UDO's maximum height limitation willresult in an inefficient lighting layout requiring a larger number of fixtures to achieve the required lighting levels on site. 2. Owner's security needs require surveillance cameras mounted at a sufficient height with associated lighting fixtures mounted above. Limitation to lighting height in the UDO will also limit camera heights and increase overall camera counts to achieve appropriate coverage of the site. A proposed site lighting maximum height of 40 feet is requested as the new maximum height for the campus. Thisheight is chosen to support an efficient site lighting plan and allow camera placement for adequate security plan. Should you have any questions, please feel free to contact me at sanderson.b@tandh.com . Very truly yours, THOMAS & HUTI'ONENGINEERINGCO. Brad Sanderson, P.E. Project Manager EXHIBIT “A” (Legal Description) ALL THAT TRACT OR PARCEL of land lying and being in Land Lots 165, 173 and 174, 1St District, 5“1Section; and Land Lots 997, 998 & 1024, 18thDistrict, 2ndSection; City of Douglasville, Douglas County, Georgia and being designated as “Lot 1” containing 55.370 acres (2,411,909 sq.ft.) and more particularly described on that certain “REVISED FINAL PLAT OP RIVERSIDE WEST PHASE II - TRACT C” prepared by Urban Engineers, Inc. dated January 10, 2021, last revised September 27, 2022 and recorded November 22, 2022 in Book 41 Page 585, of the Douglas County, Georgia Public Records (the “Plat”), said Plat and the record thereof are incorporatedherein by this express reference. Type: WD Recorded: 10/16/2023 5:20:00 PM Fee Amt: $38,784.00 Page 1 of 5 Transfer Tax: $38,759.00 Douglas County Georgia ANNETTA D STEMBRlDGE Clerk Superior Participant ID: 6405611605 BK4279 PG 953 — 957 After recording return to: Calloway Title & Escrow, LLC 2100 Riveredge Parkway, Suite 1025 .— Atlanta, GA 30328 'Z‘QLL’VSH _ 1 Tax Parcel: 01730150012 LIMITED WARRANTY DEED THIS INDENTURE, made the 1’5 day of October, 2023, between ROOKER RIVERSIDE LLC, a Georgia limited liabilitycompany (hereinafter referred to as “Grantor”) and DC BLOX INC, a Georgia corporation (hereinafter referred to as “Grantee”), (“Grant0r” and “Grantee” to include their respective successors, legal representatives and assigns where the context requires or permits). WITNESSETH: That Grantor for and in consideration of the sum of TEN AND 00/100 DOLLARS ($10.00) and other good and valuable consideration, in hand paid at and before the sealing and delivery of this deed, the receipt and suf?ciency of which are hereby acknowledged, has granted, bargained, sold, aliened, conveyed and continued, and by these presents does grant, bargain, sell, alien, convey and con?rm unto the said Grantee, all that tract or parcel of land lying and being in Douglasville, Georgia, being more particularly described on Exhibit “A” attached hereto and by this reference incorporated herein (hereinafter, the “Land”). TO HAVE AND TO HOLD the Land, together with all and singular the rights, members and appurtenances thereof, to the same being, belonging, or in anywise appertaining, to the only proper use, bene?t and behoove of Grantee forever in FEE SIMPLE, subject to those matters set forth on Exhibit “B” attached hereto and by this reference incorporated herein (hereinafter the “Permitted Exceptions”) and the terms and conditions set forth in that certain right of ?rst offer set forth on Exhibit “C” attached hereto and by this reference incorporatedherein (hereinafter the “ROFO”). AND GRANTOR WILL WARRANT and forever defend the right and title to the Land unto Grantee against the claims of any persons owning, holding or claiming by, through or under Grantor, subject to the Permitted [REMAINDER OF PAGE INTENTIONALLY LEFT BLANK] IN WITNESS WHEREOF, the Grantor has signed and sealed this deed the day and year above written. SIGNED, SEALED AND DELIVERED GRANTOR: IN T PRESENCE OF: ROCKER RIVERSIDE LLC, a Georgia limited liability company 2001 WinstonManagement Company, LLC a Georgia limitedliability company its Manager By: By: , ., «- A My commission expiies: E. Murray R ‘avisg.1., Pre?ident ?xgaaae (SEAL) [A323 wen/m EXHIBIT “A” (Legal Description) ALL THAT TRACT OR PARCEL of land lying and being in Land Lots 165, 173 and 174, 1St District, 5“1Section; and Land Lots 997, 998 & 1024, 18thDistrict, 2ndSection; City of Douglasville, Douglas County, Georgia and being designated as “Lot 1” containing 55.370 acres (2,411,909 sq.ft.) and more particularly described on that certain “REVISED FINAL PLAT OP RIVERSIDE WEST PHASE II - TRACT C” prepared by Urban Engineers, Inc. dated January 10, 2021, last revised September 27, 2022 and recorded November 22, 2022 in Book 41 Page 585, of the Douglas County, Georgia Public Records (the “Plat”), said Plat and the record thereof are incorporatedherein by this express reference. ll. EXHIBIT “B” (Permitted Exceptions) All taxes for the year 2023 and subsequent years. Right of Way Easement from Charles R. Wood to Douglas County Electric Membership Corporation, a corporation, dated November 9, 1979, ?led for record January 24, 1980 in Deed Book 364, Page 236, Douglas County Records. Right of Way Easement from Michael B. Jackson to Douglas County Electric Membership Corporation, a corporation, dated April 27, 1984, ?led for record October 1, 1984 in Deed Book 455, Page 514, Douglas County Records. Right of Way Easement from Mike Jackson to Greystone Power Corporation, a corporation, dated March 11, 1990 and ?led for record August 6, 1990 in Deed Book 691, Page 248, Douglas County Records. Declaration of Restrictive Covenants for Riverside West by Rooker Riverside LLC, a Georgia limited liability company, dated September 27, 2013, ?led for record September 30, 2013 in Deed Book 3168, Page 612, Douglas County Records; as thereafter amended and supplemented. Declaration of Easements and Agreement for Common Area Maintenance for Riverside West by Rocker Riverside LLC, a Georgia limited liability company, dated September 27, 2013, ?led for record September 30, 2013 in Deed Book 3168, Page 649, Douglas County Records;as thereafter amended and supplemented. Right of Way from Rooker Riverside LLC to GreyStone Power Corporation, an Electric Membership Corporation, dated as of September 29, 2020 and ?led for record March 30, 2022 in Deed Book 4122, Page 555, Douglas County Records. Those matters as disclosed by that certain survey entitled “ALTA/NSPS Land Title Survey To: DC Blox, Inc., a Georgia corporation, First American Title Insurance Company”, prepared by Urban Engineers, Inc., bearing the seal and certi?cation of Pablo M. Garcia, Georgia Registered Land Surveyor No. 3104, dated April 29, 2022, last revised March 7, 2023, as follows: Intentionally deleted; b. Creek crossing the easterly and westerly boundary lines of subject property; 0. Fifty foot (50’) City of Douglasville Buffer and twenty—fivefoot (25’) State Water Buffer running along the westerly boundary line of subject property; and d. Drainage pipe crossing the southwest corner of subject property. of Rooker LLC, dated of even date hereof and recorded immediatelypreceding this Limited Warranty Deed. Memorandum of Agreement by and between Grantor and Grantee dated of even date hereof and recorded immediately after this Limited Warranty Deed. EXHiBrr“c" (Right of First Offer) Grantor shall have the Right of First Offer (the “ROFO”) to repurchase the Land or portion thereof on the following terms and conditions: a. If, prior to the ROFO Expiration Date (as hereinafter de?ned), Grantee desires to sell the Land or any portion thereof to any unaf?liated third-party purchaser, Grantee shall provide written notice to Grantor of the terms and conditions upon which Grantee would be willing to sell the Land or portion thereof (“Grantee’s Notice”). Grantee’s Notice shall set forth the material economic terms and conditions under which Grantee is willing to sell the Land or portion thereof (“Material Terms”), but shall not constitute an agreement between the parties or an offer to sell such Land. b. Grantor shall have thirty (30) days after receipt of Grantee’s Notice (the “Grantor Response Period”) to notify Grantee in writing whether or not Grantor desires to purchase the applicable Land on the terms stated in Grantee’s Notice (the “Grantor’s Notice”). If Grantor noti?es the Grantee within the Grantor’s Response Period of Grantor’s desire to purchase the Land or portion thereof, Grantee and Grantor shall promptly enter into a purchase and sale agreement for the Land or portion thereof on the terms and conditions of Grantee’s Notice. c. In the event that (i) Grantor either (A) elects not to purchase the Land or portion thereof on the terms and conditions stated in Grantee’s Notice; or (B) fails to deliver Grantor’s Notice to Grantee within the Grantor Response Period (time being of the essence; or (ii) if Grantor delivers a Grantor’s Notice but Grantee and Grantor, after good faith negotiation by both Grantee and Grantor, fail to agree on and execute a purchase and sale agreement within thirty (30) days after the date of Grantee’s receipt of Grantor’s Notice, time being of the essence, then Grantor shall be deemed to have waived its right of ?rst offer to purchase the Land or portion thereof,and Grantee shall have the right thereafter to offer the Land for sale, and to sell the Land, to any party for a purchase price not less than ninety percent (90%) of the purchase price stated inthe Grantee’s Notice, free and clear of the Grantor’s right of ?rst offer. If Grantee has not executed a purchase and sale agreement with a third party within six (6) months after the date of the expiration of the Grantor Response Period and close on the sale within nine (9) months after the effective date of the purchase and sale agreement, or if Grantee desires to sell Land or portion thereof for a price less than ninety percent (90%) of the purchase price stated in Grantee’s Notice, then Grantor’s right of ?rst offer shall restart and Grantee shall first offer the Land or portion thereof to Grantor in accordance with the terms set forth herein. This right of ?rst offer is personal to Rocker Riverside LLC, a Georgia limited liability company. d. As used herein, the term “ROFO Expiration Date” shall mean the earlier of (a) the date upon which vertical construction of improvements on the Land has commenced, or (b) the 6. Upon the termination or expiration of Grantor’s right of ?rst offer, Grantor agrees to execute a recordable release/terminationthereof. GREGORYBAKER 2023-1071023 12/04/2023 $0.00 $80742.34 $0.00 Paid Douglas County Tax Commissioner 6200 Fairburn Rd . Douglasville, GA 30134 Map: 01730150012 Printed: 12/20/2023 Location: 1701 N RIVERRD MAKE CHECK OR MONEY ORDER PAYABLE TO' . . - Appraisal 770-920-7228 determines ownership/value Douglas COUDtYTax Commisswner - Commissioners (770)920-7266 sets COUNTYtax rate ' Bd of Education 770651-2000 sets SCHOOLtax rate - City of Douglasville 770-920-3000 sets CITYtax rate ROOKER RIVERSIDE, LLC C/OFELLERS, - City of Villa Rica 770-459-3656 sets the CITYtax rate - Tax Commissioner 770-920-7272 bills for authorities above/dishurses/maintainsrecords. SCHEWE’SCOTT & ROBERTS INC - A gradual reduction of state property taxes began in 2012 and has now phased away as ofJanuary P-O- BOX 450233 1, 2016. This reduction is the result of property tax relief passed by the Governor and the House of ATLANTA,GA 31145 Representatives and the Georgia State Senate. ' Payment good through date is CURRENTYEARONLY (Interest willbe added per month if not paid by due date) GREGORYBAKER Tax Payer: ROOKERRIVERSIDE, LLC C/OFELLERS, Douglas County Tax Commissioner COUN7), SCHEWE, SCOTT & ROBERTS INC 6200 Fairburn Rd é: * 0 Map Code: 01730150012 Real Douglaswue' GA30134 H ‘3 . . V/TRC/ 55.495 AC RIVERSIDE WEST PH 2, U ,2 Description: LOT 1 Phone: (770) 920-7272, Fax: (678) 449-3932 9 0 , 09 4? Location: 1701 N RIVERRD ’4‘1370 4 Bill No: 2023-1071023 District: 03 - DOUGLASVILLE 0.00 4,945,750.00 55.5000 $4,945,750.00 12/04/2023 12/20/2023 CITYOF DOUGLASVILLE $4,945,750 $1,978,300 $0 $1,978,300 12.131000 $23,998.76 $0.00 $23,998.76 COUNTYTAX $4,945,750 $1,978,300 $0 $1,978,300 15.899000 $31,452.99 $0.00 $31,452.99 DOUGLASVILLEBOND $4,945,750 $1,978,300 $0 $1,978,300 1.300000 $2,571.79 $0.00 $2,571.79 SALES TAXCREDIT - CITY $4,945,750 $1,978,300 $0 $1,978,300 4420000 $0.00 $8,744.09 $0.00 SALESTAXCREDIT — COUNTY $4,945,750 $1,978,300 $0 $1,978,300 3.586000 $0.00 $7,094.18 $0.00 SCHOOL BOND $4,945,750 $1,978,300 $0 $1,978,300 0.500000 $989.15 $0.00 $989.15 SCHOOLTAX $4,945,750 $1,978,300 $0 $1,978,300 18.990000 $37,567.92 $0.00 $37,567.92 Residents of Douglas County who own and occupy their permanent residence Current Due $80,742.34 as ofJanuary 1 of the taxable year are entitled to a HOMESTEAD Penalty $000 EXEMPTION. This can be ?led over the intemet at www.douglastax.org. older & 100% disabled persons, WHICH MUST BE MADEIN PERSON in the Previous Payments $80,742.34 TAXOFFICE with proof of age/disability by APRIL 1. 770-920-7272 GREGORY Back Taxes $0 00 BAKER,Douglas County Tax Commissioner Printed: 12/19/202311:43:42AM Of?cial Tax Receipt Phone: 770-920-7272 Douglas County, GA 8700 Hospital Drive Douglasville, 30134 --Online Receipt-- Trans No Map Property ID & Original Interest & Amount Amount Transaction Code District Description Due Penalty Due Paid Balance V/TRC/ 55.495 AC 2023— 01730150 1071023 012 $80,742.34 $0.00 $80,742.34 $0.00 Totals: $80,742.34 $0.00 $0.00 $80,742.34 $0.00 Charge Amount: $80,742.34 ROOKER RIVERSIDE, LLC C/OFELLERS, SCHEWE, SCOTT & ROBERTS INC PO. BOX 450233 Scan this code with your ATLANTA, GA 31145 mobile phone to Viewthis bill VARIANCE APPLICATION 5/16/2024 DC BLOX ATL WEST DATA CENTER PRESENTED BY: DILLON CALLAHAM, PE THOMAS & HUTTON CIVIL ENGINEER PURPOSE TWO VARIANCE REQUESTS: PARKING VARIANCE To reduce the Douglasville Unified Development Ordinance (UDO) requirement for off-street parking and loading. SITE LIGHTING VARIANCE To increase the UDO maximum height limitation for site lighting poles. VICINITY MAP Page 326 of 334 PROPERTY INFORMATION Applicant/Owner: DCB Atlanta West, LLC Location: 1701 North River Road Douglasville, GA 30122 Land Lot District Section Parcel Property ID 0173 01 05 0012 01730150012 Current Zoning: LI – Light Industrial Adjacent Zonings: North South East West R-A LI, PSP LI LI ATL WEST CAMPUS INFORMATION Two (2) Data Center Buildings on-site with one (1) Substation. ~ 761,000 SF in total building areas. DRI Process completed April 10, 2024 Mass Grading is currently on-going for the site. DOUGLASVILLE UNIFIED DEVELOPMENT ORDINANCE PARKING REQUIREMENT: Section 8.01 – Off-street parking and loading. Loading of 1 space per 1,000 SF. SITE LIGHTING REQUIREMENT: Section 8.03 – Site Lighting. Maximum height of any light shall not exceed 20 feet. REQUESTED VARIANCES TO PARKING COUNTS UDO requires 762 spaces for the ATL West Data Center. Request a reduction in parking to 125 spaces total. Based on Owner’s expected employee count of approximately 80 personnel across multiple shifts. REQUESTED VARIANCES TO SITE LIGHTING UDO requires 20ft. max height for the ATL West site. Request an increase in site lighting to 40ft. max height. Improved efficiency to site lighting (less fixtures on-site) Improved security by greater site camera coverage. SITE IMPACTS WITHOUT VARIANCES PARKING IMPACTS Requires 630+ additional parking spaces beyond that required by the Owner. Requires additional 172,000 SF (4 Acres) of parking lots. UDO required parking will: • Increased development area. • Increased paved surfaces. • Increased stormwater impacts. • Create unnecessary & unused parking lots. SITE LIGHTING IMPACTS Requires approximately double the lighting poles and fixtures to meet Owner’s target lighting levels for security & safety. Reduces overall site security coverage via pole-mounted cameras at a reduced height. UDO required limit will: • Increase fixture counts. • Increase site pole counts. • Decrease camera coverages. • Create inefficiencies for lighting + security. CONCLUSION REDUCING SITE PARKING REQUIREMENT TO 125 TOTAL SPACES WILL: • Maintain adequate parking for Owner’s needs. • Decrease the need for development area. • Prevent unnecessary development which will impact the environment. INCREASING SITE LIGHTING HEIGHT LIMITATION TO 40 FEET WILL: • Decrease site pole and lighting fixture counts. • Increase site security and safety via cameras. • Increase the site’s efficiency to meet Owner’s requirements for a secure and safe campus. Questions 5/16/2024