CITY OF THOMASTON MEETING OF THE MAYOR AND CITY COUNCIL JUNE 3, 2025 — 7:00 P.M. CITY-COUNTY MEETING ROOM — MAIN FLOOR THOMASTON-UPSON GOVERNMENT COMPLEX Minutes A meeting of the Thomaston Mayor and City Council was held on Tuesday, June 3, 2025, at 7:00 pm on the main floor in the City-County meeting room in the Thomaston-Upson Government Complex. This meeting was advertised and open to the public. Attendance: Mayor — John David “J.D.” Stallings Police Chief — Mike Richardson Mayor Pro Tem/Councilmember — Troy Chaney (At Fire Chief — Jeremy Walker Large) Councilmember — Lakeitha Reeves (District 1) Economic Development Director — Taylor Smith Councilmember — Jeff Middlebrooks (District 2) IDA Executive Director — Slade Gulledge Councilmember — Ryan Tucker (District 3) The Bridge Solution — Crystal York Councilmember — Don Greathouse (District 4) ESG Engineering — Charlie Bridges City Manager — Russell Thompson ; The Upson Beacon — Bridge Turner City Attorney - DeAnn Wheeler WTGA Fun 101FM — Dave Piper City Clerk — Taylor White Zoning Commission Member — Priscilla McCoy A. Call Meeting to Order / Invocation / Pledge of Allegiance - Mayor Stallings opened the meeting at 7:00 pm and asked Councilmember Greathouse to lead the prayer and the pledge of allegiance. B. Approval of Minutes for May 20° Regular City Council Meeting Result: The meeting minutes were approved as presented. First Motion: Councilmember Greathouse (District 4) Second Motion: Councilmember Chaney (At Large) Vote: Unanimous C. Adoption of Agenda Result: The agenda was amended to add item 5. Discussion and Potential Approval of IT Equipment Expenditure, item 6. Discussion and Potential Award of Bid for Pickleball Lighting Project, and item 7. Discussion and Potential Approval of Electric Department Vehicle Expenditure. First Motion: Councilmember Middlebrooks (District 2) Second Motion: Councilmember Greathouse (District 4) Vote: Unanimous D. City Attorney's Report Nothing at this time. E. City Clerk’s Report Nothing at this time. F, City Manager’s Report 1. Second Read & Vote - Rezoning Request of 213 Park Lane (Parcel No. 131 161) from R-1 Low Density Residential to PD Planned Development to Establish an Urban Farm Result: A motion was made to approve the rezoning with the conditions that a detailed zoning plan be submitted to the city prior to the start of the project, and the exterior architecture be consistent with the existing character of the surrounding neighborhood. First Motion: Councilmember Reeves (District 1) Second Motion: Councilmember Tucker (District 3) Vote: Unanimous 2. Discussion and Potential Award of Bid for Downtown Multi Use Facility Result: Charlie Bridges of ESG Engineering gave a presentation on the changes to the project and the bids provided. Result: A motion was made to award the bid to ICB Construction Group for the alternative bid of $1.786 million dollars with the condition that staff and engineers work with the contractor to ensure the quality of the project. First Motion: Councilmember Greathouse (District 4) Second Motion: Councilmember Chaney (At Large) Vote: Unanimous 3. Discussion and Potential Approval of Housing Needs Assessment Result: A motion was made to approve the proposed assessment for $60k dollars from SPLOST funds. First Motion: Councilmember Reeves (District 1) Second Motion: Councilmember Middlebrooks (District 2) Vote: Unanimous 4. Discussion and Potential Approval of Expenditure at Wastewater Plant Result: A motion was made to approve the expenditure for the bar screen. First Motion: Councilmember Tucker (District 3) Second Motion: Councilmember Middlebrooks (District 2) Vote: Unanimous 5. Discussion and Potential Approval of IT Equipment Expenditure Result: A motion was made to approve the expenditure of $16,808.80 from SPLOST. First Motion: Councilmember Greathouse (District 4) Second Motion: Councilmember Chaney (At Large) Vote: Unanimous 6. Discussion and Potential Award of Bid for Pickleball Lighting Project Result: A motion was made to award the bid to PSG Energy Services in the amount of $82,002.50. First Motion: Councilmember Reeves (District 1) Second Motion: Councilmember Tucker (District 3) Vote: Unanimous 7. Discussion and Potential Approval of Electric Department Vehicle Expenditure Result: A motion was made to approve the expenditure of the bucket truck for $310,138.07. First Motion: Councilmember Tucker (District 3) Second Motion: Councilmember Greathouse (District 4) Vote: Unanimous Other Business City Manager Russell Thompson gave an update on issues with public restrooms at city parks and urged citizens to report any issues. The City Manager and Mayor Stallings gave a brief update on FLOST negotiations with the County Board of Commissioners. Meetings for the month of June and July were discussed and rescheduled. Result: A motion was made to reschedule the regularly scheduled meeting on June 17, 2025 to June 26, 2025, and the regularly scheduled meeting on July 15, 2025, to July 17, 2025. First Motion: Councilmember Greathouse (District 4) Second Motion: Councilmember Middlebrooks (District 2) Vote: Unanimous Executive Session and Discussion No executive session was held. Adjournment Result: A motion was made to adjourn at 7:57 First Motion: Councilmember Greathouse (District 4) Second Motion: Councilmember Tucker (District 3) Vote: Unanimous Respectfully Submitted, jk | ‘te. City Clerk VE aylo ite, City Cler » ot Tho m My, Sah westeeeteey, I “% oN As =O. O43 = . 12s = ; Officias » = : zm: Seal f= Approved as written, 2% ° fee 2% Georgia es 4 ‘ 7 teniggcgets Cre ‘ty ve D at Ss e \ earth CITY OF THOMASTON MEETING OF THE MAYOR AND CITY COUNCIL JUNE 3, 2025 — 7:00 P.M. CITY-COUNTY MEETING ROOM — MAIN FLOOR THOMASTON-UPSON GOVERNMENT COMPLEX AGENDA A. Call Meeting to Order / Invocation / Pledge of Allegiance B. Approval of Minutes for May 20" Regular City Council Meeting C. Adoption of Agenda D. City Attorney's Report E. City Clerk’s Report F. City Manager’s Report 1. Second Read & Vote - Rezoning Request of 213 Park Lane (Parcel No. T31 161) from R-1 Low Density Residential to PD Planned Development to Establish an Urban Farm Discussion and Potential Award of Bid for Downtown Multi Use Facility Discussion and Potential Approval of Housing Needs Assessment Discussion and Potential Approval of Expenditure at Wastewater Plant G Other Business H. Executive Session and Discussion I Adjournment The City of Thomaston is committed to providing equal access to all of its programs, services and activities regardless of race, color, national origin, religion, sex, familial status, disability or age. Any individual who needs an accommodation because of disability should contact the City Manager’s Office at (706) 647-4242 at least 72 hours prior to the meeting. APPLICATION FOR REZONING Date: _03/27/2025 Applicant’s Name: Chavtal Yor 4 Property Owner Engineer Architect Applicant's Address: Telephone #: Location Address of Property Subject to Rezone: 213 Park Lane, Thomaston GA 30286 (A plat or tax map of the property must be attached to this application.) Tax Map _!31 161 Block Lot Number Total Acreage: 7.83 acres Present Zoning: R1 Requested Zoning: _ PUD Please state the reason for the requested rezoning of the property: Rezoning is to establish an urban farm that will provide fresh, locally grown produce to the community. This farm will promote sustainability, support local food security, and create educational and economic opportunities while enhancing the surrounding area. Cc Ee 03/87/2095 Signature of Propefty Owner(s) Date Rezoning Application Fee: The applicant for the rezoning of any property shall, pay the application fee in full at the time the application is submitted. A check, money order, or cash is accepted by the city. All payments need to be made out to The City of Thomaston, include the property address, and application number The rezoning fee must be paid at the time of submission of the application. The rezoning fee is non-refundable whether an approval or denial vote is made. *Acknowledgment that the applicant has read and understands the rezoning application fee section. Applicant Initials : Application Fee Amount: Check__ s/s Cash ___ Application received by City Manager’s Office: Thomaston Zoning Commission Recommendation: Thomaston-Upson Commission Recommendation (HB489 - If property is located within 300 feet of county limits): Public Hearing and Approval by the Thomaston City Council: Pil. OWNER’S AUTHORIZATION This shall certify that Unnyst | Vork is the Owner J (Name of Applicant) or Representative of the Owner holding interest in the property that is the subject of the attached Rezoning Application. If the Applicant is not the Owner of the property, by execution of this form, authorization is given to the person named as “Applicant” to act on behalf of the Owner, to file for and pursue for approval the rezoning of said subject property. Applicant: (‘hy ruta) York Telephone: po Address: a al p3/a7Ja0a5 ATE SIGNATURE OF OWNER Lent VLE Notary Public i otary Public Commission expires: 11/16/2025 : Clay Wallace _— My Commission Expires 11/1 (SEAL) SIGNATURE OF OWNER DATE Notary Public Commission expires: (SEAL) CONFLICT OF INTEREST DISCLOSURE Have you, within two (2) years immediately preceding the filing of this application, made campaign contributions aggregating $250.00 or more to a member of the City Council or any other ar official who will consider this application? Yes No If yes, please complete the following section: Name and Official Position of Government Official: Please list the date and amount of contribution(s). (List all which aggregate $250.00 or more) CS J" 03/47/4035 DATE SIGNATURE OF APPAICANT SIGNATURE OF REPRESENTATIVE DATE REZONING QUESETIONNAIRE Date submitted: 7 Ok 5 Applicant’s Name: Costa York Location of Property Subject to Rezone: Al Yok Lane Thamastm, 6A-30586 Pursuant to O.C.G.A. §36-67-5, the applicant is required to file with the City of Thomaston a written, documented analysis of the impact of the proposed zoning with respect to each of the matters set forth below, together with any supporting materials required by the City of Thomaston. This analysis and supporting material are required to be submitted to the City of Thomaston at least seven (7) business days before any hearing or meeting of the governing authority at which the zoning proposal will be under consideration. 1, Whether the zoning proposal will permit a use that is suitable in view of the use and development of adjacent and nearby property; fs Whether the zoning proposal will adversely affect the existing use or usability of adjacent or nearby property; 3. Whether the property to be affected by the zoning proposal has a reasonable economic use as currently zoned; 4. Whether the zoning proposal will result in a use which will or could cause an excessive or burdensome use of existing streets, transportation facilities, utilities, or schools; 5. Whether the zoning proposal is in conformity with the policy and intent of the land use plan of the City of Thomaston; 6. Whether there are other existing or changing conditions affecting the use and development of the property which give supporting grounds for either approval or disapproval of the zoning proposal; and y 5 What is the relative gain to the public as compared to the hardship imposed upon the individual property owner by maintaining the current zoning? *Acknowledgment that the applicant has been provided a copy of and read the City of Thomaston Zoning Ordinance: Sec. 98-14.10. Standards of review. You can find Sec. 98-14.10. Standards of review at the following link: https:/ / www .cityofthomaston.com/DocumentCenter/ View /1951 / City-of-Thomaston-Zoning-Ordinance---Adopted-4-5-22 (Applicant Initials): ON, * Acknowledgment that of applicant has been provided a copy of and read through the City of Thomaston Zoning Ordinance: ARTICLE 98-14. PROCEDURES FOR ZONING DECISIONS You can find ARTICLE 98-14. PROCEDURES FOR ZONING DECISIONS at the following link: https:/ / www.cityofthomaston.com/DocumentCenter/ View /1951/City-of-Thomaston-Zoning-Ordinance---Adopted-4-5-22 (Applicant Initials): Page 6o0f6 J E F F E RSO N_ The Bridge Solution Letter of Intent for Proposed Development Plan — Rezoning to PUD Dear Planning & Zoning Department, On behalf of The Bridge Solution, we respectfully submit this Letter of Intent for the rezoning and development of property currently owned by Marvelous Light Holiness Church, located in Thomaston, GA 30286. The subject property is currently zoned as R-1 Low Density Residential District. Our proposal seeks to rezone the property to a Planned Unit Development (PUD) to facilitate a two-phase community-focused initiative. 1. Present and Proposed Ownership The land is presently owned by Marvelous Light Holiness Church and is zoned R-1 Low Density Residential District. The Bridge Solution intends to acquire the property and transition it into a Planned Unit Development (PUD) that will serve as a catalyst for community enrichment and sustainable living. 2. Character of the Proposed Development The proposed development will be executed in two phases: e Phase 1: Alternative Farm o Establishment of a sustainable farm providing fresh, locally grown produce to the community. o Promotion of food security, economic opportunities, and environmental sustainability. o Creation of educational programs on sustainable agriculture and nutrition. o The proposed development will create an improved pedestrian connection to the proposed ChordR trail, which links directly to downtown Thomaston. This connectivity will encourage walkability and accessibility for residents. o The expansion of the farm will include additional farm space and a café that features products sourced from the alternative farm. e Phase 2: Affordable Housing o Development of residential units to enhance access to affordable housing. o Integration of community-driven design principles to ensure a livable and inclusive neighborhood. o Approximate density and lot size details will be finalized during the planning process. JEFFERSON BROWNE ARCHITECTURE, INC. ARCHITECTURE | INTERIOR DESIGN | MASTER PLANNING | DEVELOPMENT SERVICES 150 HUDDLESTON ROAD, SUITE 1000, PEACHTREE CITY GEORGIA 30269 JEFFERSONARCHITECTURE.COM | 770-632-9545 JEFFERSON_ The Bridge Solution The nonresidential components of this development will be limited to agricultural use and community spaces, ensuring harmony with the surrounding area. Architectural renderings and development standards, including building heights and lot configurations, will be provided in subsequent submissions. 3. Proposed Development Schedule e Second Quarter 2025: Completion of project design and closing on property. ¢ Third/ Fourth Quarter 2025 - 2026: Implementation of Phase 1 (alternative farm development). e 2027-2028: Development of Phase 2. 4. Agreements, Provisions, and Covenants The development will be governed by a comprehensive set of agreements to ensure responsible land use, maintenance, and protection of common areas and open spaces. Key provisions include: ¢ Designation of community-managed agricultural areas with sustainability guidelines. e Compliance with all city planning and environmental standards. We believe this project aligns with the city’s vision for sustainable growth and community empowerment. We appreciate your consideration and look forward to discussing our proposal further. JEFFERSON BROWNE ARCHITECTURE, INC. ARCHITECTURE | INTERIOR DESIGN | MASTER PLANNING | DEVELOPMENT SERVICES 150 HUDDLESTON ROAD, SUITE 1000, PEACHTREE CITY GEORGIA 30269 JEFFERSONARCHITECTURE.COM | 770-632-9545 NAMPTON, GA 30269 CONTACT. CHRYSTAL YORK PHONE912-658-4258 PR SETBACKS AND BUFFERS, ‘JO FEET (FRONT BONDING GETRACK) TO FEET (SIDE AUILDING SETBACK) 20 FEET (REAR BURDING SETBACK) 10 FOOT LANDSCAPE STRIP (ALL SIDES) BUILDING AREA PHASE {A 11.280 SF (ALTERNATIVE FARM WITH OFFICE, TRAINING & MARKET FACKITIES) PHASE 18 11,280 GF (ALTERNATIVE FARM EXPANGION WITH CAFE) PHASE 2. 30 TOTAL RESIOENTIAL UNITS * 21 TOWNHOUSES AND § COTTAGES: KIOSK, COMMUNITY PARK, PARDONS SUMMARY. | SPACE PER 300 SF OFFICE AT 3,000 SF = 10 SPACES: 1 SPACE PER 2000 GF FARM AT 7,000 GF = 4 SPACES: 1 SPACES PER 250 SF MARKET AT 1,250 SF = 5 SPACES >FARM (PHASE 18) + SPACE PER 2000 GF FARM AT 11,250 SF = 6 SPACES: > TOWNHOUSE (PHASE 2) 2 SPACES PER UNIT + 48 SPACES: 1AND2 + 25. SPACES 10BE PERUNT SPACES ANOIOR GARAGES NOTE: ALL PARKING SPACES ARE 9 FT BY 18 FT, ALL PARKING LOT LANDSCAPE ISLANDS ARE 10] FEET MinNiMMUM WIDTH. ALL DRIVE ISLES ARE 24 FEET MINIMUM WIDTH, UNLESS OTHERWISE NOTED. FLOODPLAIN: ue INSURANCE RATE MAW, 2008. ECOLOGY: WETLANDS AND STATE WATERS ARE NOT PRESENT ON SITE, OF WITHIN 200 FEET OF THE PROPOSED DEVELOPMENT. ILmes: THE CITY OF WATERIWASTEWEATER DEPARTMENT, AND ARE READILY AVARABLE TOT WE IMMAEDIATE SITE AREA. BB s.. sromwaren wanaceuent nannarnve: Toe 1 " TWO NEW STORMWATER MANAGEMENT FACKITIES TO PROVIDE STORMWATER EROSION CONTROL FACILITIES TO BE OF Has. 3 12. REFUSE COLLECTION: TRASH COLLECTION TO BE PROVIDED BY ONSITE DUMPSTER TO BE PLACED IN A FENCE ENCLOSURE. 8 BASIS. as [sw |W” g oo =, = CONCEPT PLAN PLANNED DEVELOPMENT| DISTRICT Jour raw THOMASTON ENGINEERED CONCEPT PLAN FOR THE BRIDGE SOLUTION - LAND LOTS 193 OF THE 10TH DISTRICT, UPSON COUNTY, GEORGIA nm SSL ee a ee ene eT me HE TDN NE ICT Fo J E F F E RSON _ ar Pa Pa ALTERNATIVE FARIA Ga AEA 125)-0" THE BRIDGE SOLUTION PROPOSED FLOOR PLAN - CONCEPTUAL ONLY 213 PARK LANE, THOMASTON GA 30286 SCALE : 1/8" = 1-0" March 24, 2025 ~- —_____— ET Done ane ANENSTHC TONE CICTETECTONG Fac, 4S CCLMEDC) AS AN RSTAIMERT CF SEPVILL MAB THE PRCRERTY OF AHTEISORY RBOWNE AIR ATECTUNE #8. ANE J E F F E RSON — Serta? SHERECH sna’ We AEDOCELIID Ps APY POD WATER! RETIN PUIG REM STEN HACIA ARCPTECTUME WA THE BRIDGE SOLUTION SCHEMATIC RENDERING - CONCEPUTUAL ONLY 213 PARK LANE, THOMASTON GA 30286 March 24, 2025 JEFFERSON ee Tene ae mE MOTTE ART TTCTUMG AG eT CNET AS Ae PCMDI OF SUPACT BOWSEGS HE ROMESTY OF RIVTISCRYSRCUNE APSTEC FUME, AND “ TERSes BCH AR HTEC MK. — Sse = tN \ SCHEMATIC RENDERING - CONCEPUTUAL ONLY THE BRIDGE SOLUTION March 24, 2025 913 PARK LANE, THOMASTON GA 30286 —— JEFFERSON_ SCHEMATIC RENDERING - CONCEPUTUAL ONLY THE BRIDGE SOLUTION March 24, 2025 213 PARK LANE, THOMASTON GA 30286 City of Thomaston Department of Building Safety 106 East Lee Street, Thomaston GA 30286 706-647-4242 Ext 3 Rezone Request Applicant: The Bridge Solution Property Address: 213 Park Lane, Thomaston, GA 30286 Current Zoning: R-1 — Low Density Residential Requested Zoning: Planned Development (PD) BUILDING OFFICIAL REVIEW The applicant has submitted a request to rezone the subject property from R-1 Low Density Residential to PD Planned Development. The Planned Development (PD) zoning designation allows for flexible land use, including mixed-use projects that incorporate residential, agricultural, and community functions. The subject property is currently undeveloped and is surrounded by a mix of residential and commercial uses. Adjacent land uses include: e Arecently rezoned multifamily development to the north, ¢ Achurch to the east, e« Commercial property to the south, and e Multifamily and medium-density residential to the west. According to the comprehensive plan, the area’s future land use is designated for residential development. The intent is to preserve established neighborhoods and promote quality infill development that respects the prevailing single-family character, traditional building materials, and site design. The proposed development by the applicant would occur in two phases: e Phase 1 involves the creation of an alternative farm. This phase aims to establish a sustainable agricultural operation that promotes food security, economic opportunities, environmental sustainability, and educational programming. It also includes plans for pedestrian connectivity and the future addition of a café featuring products from the farm. e Phase 2 proposes the construction of affordable housing. While no specific density information has been provided at this time, this phase aligns with the comprehensive plan’s objectives by supporting the city’s goal of providing diverse housing options for a range of income levels. Although the alternative farm in Phase | is not a traditional residential use, it is considered a complementary land use that supports the residential transition of the area by introducing a productive and low-impact activity. A detailed development plan will be required for review and approval prior to any construction. Building Official Recommendation: Approval of the rezoning request to Planned Development (PD), subject to the following condition: 1. The exterior architecture of the homes must be consistent with the character of the surrounding neighborhood. John Baxter he B alr 05/12/2025 Chief Building Official 1) MEMORANDUM DATE: May 20, 2025 TO: The Mayor and City Council FROM: Thomaston Zoning Commission SUBJECT: Rezoning Recommendations for May 20, 2025 City Council Meeting *Zoning Commission Members Charles (Sandy) Kersey, Richard Hollstrom, Robert Chatman, and Priscilla McCoy were in attendance. Commission Chair Steve Short was not present* The following items were discussed: Discussion and Potential Recommendation for the Rezoning Request of 213 Park Lane (Parcel No. T31 161) from R-1 Low Density Residential to PD Planned Development to Establish an Urban Farm Result: The motion was made to recommend approval of the request with the condition that the housing development meet the exterior standards set forth in the building official’s recommendation First Motion: Commission member McCoy Second Motion: Commission member Chatman Vote: Unanimous Seolutia The Bridge Solution: Roots to Rise Project MAY 20, 2025 Mission Our mission is to transform lives by providing innovative solutions, programs and resources that bridge the gap between rural populations and their need for affordable housing, access to nutritionally dense foods and employment to promote economic development. , » Awarded $1.5M by SCRC and USDA to provide food access Roots to Rise $1.5M by P Pp roj ect - Located in Thomaston's Urban Redevelopment Authority's j designated target area. Overview - Will serve as a food hub for Upson County and as a source of fresh, healthy food for Census Tract 105, where over 100 households have no access to a vehicle and are nearly a mile to the nearest supermarket. - Provide the resources to complete Phase 1 that include the purchase of the 7 acre-property to build out indoor farm facility and market that will focus on the production of nutrient dense microgreens while raising fish for consumption. - Access to STEM-based learning apprenticeships for ages 16 to 24, seniors, field trips, summer camps, and an afterschool program. Job training opportunities that will expose students and other participants to career paths in agriculture and STEM © 1asvHd -+—_——-> t 3S¥He oO MdlAJ3A 213 Park Lane Property Food - Housing - Economic Development - a Community Integration I ins bilan 22a, beclahicaat sheatetaeteteeci aaa Key Partners « The Bridge Solution Board « The Bridge Builders Volunteer Group * Citizens and dignitaries of the City of Thomaston ¢ Alo Farm ¢ Jefferson Architecture « Three River Regional Commission « Three Rivers Workforce Development Board 3 -_— : Bridge Builders Kick-off Event on 05/07/25 SSSR a Sa BE EU RMI IP II ST PES eT Pz. BID TABULATION FOR ALL BIDS RECEIVED AT THE CITY OF THOMASTON ON FRIDAY, MAY 23, 2025 AT 2:00 PM. PROJ! ECT: Downtown Multi-Use Facility Project #: T3000.134 BIDDERS: ICB Construction Group Inc 577 Mulberry Street Macon, GA 31201 Coggins Construction Company 1415 Hwy 19 South Thomaston, GA 30286 Quality Construction by McleRoy 200 Plaza Drive Zebulon, GA 30295 Pound Clark General Contractors 1130 15th Street Columbus, GA 31901 ESG Engineering 6400 Peake Road Macon, Georiga 31210 Helix Grading & Utility LLC 30 Industrial Drive Zebulon, GA 30295 SECTION 200: MULTI-USE FACILITY é z ne (3 z THR oF avEs ete ee wis in) EN wien eat Sati Fed 101 | 1 [_ ts [Demolition Complete per Sheet C1.1 $ 16,148.74 | $ 16,148.74 | $ 90,952.50 | $ 90,952.50 | $ 55,557.90 | $ 55,557.90 | $ 44,725.69 | $ 44,725.69 | $ 218,730.00 | $ 218,730.00 ‘SITE IMPROVEMENTS wits r sis habs Fe a ; ere 102 350 LF _|Saw Cut Straight Edge - Asphalt or Concrete $ 2.731$ 955.50 | $ 8.751$ 3,062.50 | $ 5.94 | $ 2,079.00 | $ 11.76 [$ 4,116.00 | $ 3.02 | $ 1,057.00 TON 103], 190 [ig [Standard Duty Aepnen $ 228.15 |$ 34,222.50 | $ 243.00 | $ 36,450.00 | $ 234.48|$ 35,172.00 $ 260.16 | $ 39,024.00 | $ 240.00 | $ 36,000.00 TON TOA) 490. if ig Aan Buty Rape 228.15 29,659.50 243.00 31,590.00 204.37 568.10 243.99 31,718.70 250.06 32,500.00 105] 1,300 SY |Standard Duty Concrete 32.34 1,003.00 76.23 99,099.00 67.87 00 135.74 176, 00 100.06 130,000.00 106 45 SY_|Heavy Duty Concrete 4.73 0,835.85 1. 13,311.00 111,14 30 132.87 19, 15 260.06 37,700.00 107 165 CY |6" Graded regate Base 160. 58,732.15 127. 46,373.25 a4. 994.70 92.97 33,934.05 220.06 80,300.06 [408] 135 CY re 160. 21,722.85 129. 17; 122.95 598.25 101.30 13,675.50 280.06 37,800.06 109 80 LF_|24" Header Curb - Hightower St 0.08 1,606.4 4.98 1,998.4 26. 138.40 36.45, 16.00 40,00 200.00 | + 782 LF |24" Curb & Gutter - Parking Lot .08 15,702.5' 4 19,534.3€ 26.9) 21,090.54 36.45 28,503.90 40.06 31,2: 1 45 LF |30" Curb & Gutter 31 3,089.9: 7.68 4,013.6( 37.69 5,465.05 49.39 7,161.55 40.00 800,00 1 00 LF _|Paver Sidewalk Inlay (Running Bond) 74 5,374.01 40.50 4,050.00 11.88 1,188.00 - - 40.00 4,000.00 1 30 LF [5° White Parking Strip; Paint 15 1,784.50 2.50 2,075.00 59 489.70 1.69 1,402.70 67 556.10 4 37 SY_|5" White Gore Striping: Paint 34 863.58 13.52 500.24 41,58 538.46 18,38 680.06 OC 370.00 1 EA |Crosswaik Thermoplastic (5'x1.5' Stripes) 3,072.47 3,072.47 2,700.00 2,700.00 2,376.06 2,376.00 940.68 940.68 100.06 100.00 1 EA |Crosswalk White Paint (5' x 1.5") 2 2 279.32 675.00 675.00 2,376.06 2,376.00 823.09 823.09 130.06 130.06 4 EA [Directional Traffic Arrows - White Paint 284.4 135.00 540.06 297.06 188.00 7169.03, 676.12 50.06 200.06 EA _|ADA Parking Sign Affixed to Buildin: 660. 660.2 472.50 472.56 222. 222.75 308,66 308.66 190.06 190.01 9 EA [ADA Warning Pads (Paver Basket Weave w/ Running Bond Frame) 660.20 3,961.2 1,350.00 8,100.06 1,782.00 10,692.00 529.13 3,174.78 780.06 4,680.00 | 120 EA iE jue ADA Striping Graphic 57 203.14 02.50 405.06 712.80 1,425.60 198.42 396.84 3,020.00 6,040.00 21 EA |Stop Si 60.20 660.20 4,012.50 1,012.50 415.80 415.80 1,250.81 1,250.i 360.00 360.00 | 122 EA |24* White Stop Bar; Paint 50.79 50.79 36.25 25 66.32 166.32 288.08 288. 70,00 70.06 123 LS_|Masonry Sign 36,219.23 36,219.23 34,269.89 34, 89 458.26 11,458.26 29,396.17 29,396. 33,380.00 33,380. 4 LS |Seat Wall 13,582.74 13,582.74 7,607.25 7,607.25 830.70 10,830.70 9,994.70 9,994.70 410,00 7,410.00 5 1 LS |Stairs 784.86 784.86 3,047.56 3,047.56 253.63 13,253.63 - - 970.00 2,970.00 6 1 LS [Pavilion per Renegade Steel Specifications 389,417.70 389,417.70 253,952.48 253,952.48 607,846.14 607,846.14 319,446.68 319,446.68 256,400.00 256,400.00 6 A | 3 | 6S |Pletoater:Canerucion 27,299.01 27,299.01 20,493.00 20,493.00 14 4.19 100,000.00 400,000.00 5,500.00 5. 1 1 LS [Masonry & Wood Boxed Columnn 38,861.13 38,861.13 42. 42,223.34 14 1.19 79,020.44 79,020.44 41,130.00 41,130.06 1 7 EA _|Downspouts : - 621.00 4,347.00 GF | 8.33 - : 600.00 4,200, 00 | 129 z EA |Splash blocks 263.68 1,845.76 95.25 1,086.75 89.1) 623.70 : : 50.00 1,050.06 Restroom Facility per Public Company Sp: and 130. 1 LS |Amenities (including, but not limited to, kitchen amenities, restroom amenities, utility room requirements, and water fountains) $ 731,390.29 | $ 731,390.29 | $ 899,617.35 | $ 899,617.35 | $ 4,070,110.01 |] $ _1,070,110.01 | $ 834,666.72 | $ 834,666.72 | $ 954,130.00 | $ 954,130.00 1317] _4;_| EA |Raleed Planter Boxes (12%353)) 7,321.00 29,284.00 6,000.41 24,001.64 9,116.59 36,466.36 5. 20,000.00 5,840.00 23,360.00 132 1 LS _|6'H_ Wooden Privacy Fence with Gates-Dumpster 10,139.88 10,139.88 28,361.14 28,361.14 13,365.00 13,365.00 9413.8: 9,413.83 27,620.00 27,620.00 133 22 LF a Powder Coated Aluminum HVAC Fence & Double Gate 288.08 6,337.76 69 4,679.18 210.16 4,623.52 304.4 6,690.20 210.00 4,620.00 134 1 LS |Road Sinage _ 711,00 711,00 9. 00 9,900.00 4,158.00 4,158.00 7,391.6 7,391.67 6,080.00 6,080.00 135 1 LS | 5" White Handicapped Stall/Loading Area Striping 253.92 253.92 50 337.50 594.00 594.00 779.0 779.00 910.00 910.00 UTILITIES. LA bw SS Ea ee ee ee ae afin Seaiie . # bs ee ok 1 ee RA 136. LS [2" Polytubing Water Service Incl. Connection to Main 15,492.37 15,492.37 7,704.10 7,704. 8,947.93 947.93 16,017.39 16,890.00 16,890.00 137 EA |2" Water Meter 236.79 10,473.58 6,506.45 43,012.94 §,113.99 10,227.98 334.70 10,700.00 21,400.00 138 EA |2" Backflow Preventer 703.06 3,406.12 4,196.95 8,393.9 1,366.30 732.60 93.48 4,170.00 8,340.00 139 1 Ls Landscape Irrigation - 2" Main Line to Work in a Looped System Including Connection to Main, heads, sprays, valves, etc. 9,848.37 9,848.37 12,420.00 12,420.00 5,702.40 5,702.40 18,000.00 18,000.00 12,100.00 12,100.00 14 198 LF }6" SCH 40 PVC Sanitary Sewer Service 33. 7,589.34 46.68 9,242.64 71.05 14,067.90 73.58 14,568.84 10.00 21,780.00 14 83 LF |6' CIPP Imp to Existing SS 6" Main 570.37 47,340. 729.00 60,507.06 107.35 8,910.0 52.7! 29,278.25 70.00 47,310.00 14 1 EA |SS MH 1011A (No Dog-House) 4,093.99 4,093.99 4,653.08 4,653.08 7,833.32 7,833.3 8,542.5: 8,542.53 18,360.00 360.00 14 3 EA |6" Sanitary Sewer C 1,013.99 3,041.97 1,520.05 4,560. 2,569.10 7,707.31 87.87 2,063.61 2,090.00 6,270.00 144 NIA N/A [Electrical Service and Meter Provided by Owner : : : : : : - - : - 145 1 ts Electrical for Pavilion (Including but not limited to fans, recepticles, lighting, wiring, fittings, ect.) per Axia Sheets $ 51,020.12 | $ 51,020.12 | $ 63,272.14 | $ 63,272.14 | $ 59,775.41 | $ 59,775.41 | $ 82,309.29 | $ 82,309.29 | $ 105,030.00 | $ 105,030.00 146 1 ts Electrical for Restroom Facility per Axia Sheets (including, but not limited to, lighting, recepticles, wiring, panels, etc.) $ = $ = $ 24,063.75 | $ 24,063.75 | $ 81,764.10 | $ 81,764.10 | $ = $ = $ 22,680.00 | $ 22,680.00 147 1 Ls Electrical for Site (including bollard lighting and wiring) per Axia Sheets Parking lot lighting to be performed by Owner) 21,866.68 21,866.68 27,564.64 27,564.64 25,619.22 25,619.22 82,309.29 82,309.29 89,460.00 89,460.00 148 1 LS_ [HVAC Restroom Facili : : 7,762.50 7,762.5 95,047.13 95,047.13 : : 7,560.00 7,560.00 | 149 1 : : 3,881.25 3,881. 73,582.34 73,582.34 4,115.46 4,115.46 3,780.00 3,780.0 150 365 20.81 7,595.65 25.58 9,336. 50.73 1 45 10.05 3,668.25 20.00 7,300.06 SECTION 100: MULTI-USE FACILITY SUBTOTAL, 1,761,768.99 1,974,981.03 2,504,863.03 2,098, 17. 2,388,083.10 | SECTION 200: 5. HIGHTOWER FROM E. GORDON ST, TO E. LEE ST. qe ae . ees pith Sa \ PINT = 7 201 21 CY {South Hightower Mill $ 946.35 | $ 19,873.35 | $ 1,208.59 | $ 25,380.39 | $ 1,108.80 | $ 23,284.80 | $ 1,433.06, 30,094.26 | $ 650.00 | $ 11,550.00 202 85 TON|OGI & 9.5MM SuperPave Overlay (30 TONS OGI & 55 Tons 9.5 MM S_|SuperPAVE) 281.84 23,956.40 243.00 20,655.00 269.95 22,945.75 323.36 27,485.60 410.00 34,850.00 | 3 4 LS |Signal Loop System Reintegration 8,872.4 8,872.41 8,775.00 775.00 8,910.06 8,910.00 11,758.47 11,758.47 4,660.00 4,660.00 4 240 LF [Dashed Traffic Stripe, 5" Painted Yellow Dashed Line 7 62.40 0.80 592.00 77 184.80 8.82 2,116.80 0. 400.00 5, 28 LF_|Stop Bar, 24" White (Thermoplastic 32.66 14.4¢ 54.00 512.00 11, 332.64 24.26 679.28 0. 0 6 2 EA |Pedestrian Crosswalk (The! lastic) 3,808.85 7,617. 2,700.00 400.06 2,376.00 4,752. 793.70 1,587, 2,120.00 00 07 60 LF |Saw Cut Straight Edge - Asphalt or Concrete 27 96.21 8. 25.04 94 356.4 11.76 705.60 .00. 08 1 LS [Pavement Marking Arrow Type 2 White _and "ONLY" (Thermoplastic, 1,010.62 1,010.62 1,215.01 1,215.06 297.00 297.00 676.11 676.11 1,810.00 [209 1 LS |Road Signage 710,97 10.97 2,200.0€ 2,200. 1,782.00 1,782.00 176.38 176.38 6,0: SECTION 200: S. HIGHTOWER FROM E, GORDON ST. TO E. LEE ST. SUBTOTAL $ 63,814.53 $ 68,254.39 $ 62,845.39 $ $ SECTION 300; GENERAL ITEMS AEH als ows Poe fa SS, pe ese ee Timea boo 2 ard! SS =tli 101 1 LS _|Mobilization / Demobilization 132,793.46 132,793.4 40,936.80 40,936.80 55,529.33 55,529.33 171,867.00 171,867.00 18,150.00 (02 1 LS |Site Grading 64,085.01 64,085.0 114,927.40 114,927.40 117,074.93 117,074.93 62,896.05 62,896.05 149,310.00 0: 1 L' impr 54,180.15 54,18) 77,455.59 77,455.59 10,636.99 90,636.99 85,107.80 85,107.80 107,260.00 104 1 LS [Landscape Improvements (planting material, 35,261.4 35,261.48 25,724.93 25,724.93 1,983.94 21,983.94 61,163.89 61,163.8 25,060.00 | 305 1 LS [Erosion, Sediment, and Pollution Control BMPS per sheets C11.1-C11.3 15,590.08 590,08 16,381.68 16,381.68 9,187.11 187. §,325.40 15,325.4 19,840.00 19,840.00 06 L taffic Control 25,349.7. 25,349.73 56,250.00 56,250.00 5,940.00 .9.40.00 0,771.29 70,771. 45,240.00 45,240.00 10 LS |Supplemental Work Allowance 50,000.00 50,000.00 50,000.00 $0,000.00 50,000.00 50,000.00 50,000.00 50,000.06 50,000.00 50,000.00 30) LS _|Testing Allowance 5,000.00 000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000. 5,000.00 5,000.00 SECTION 300: GENERAL ITEMS SUBTOTAL 382,259.91 386,676.40 355,352.30 522,131.43 419,860.00 TOTAL BASE BID (SECTION 100-SECTION 300) $ 2,207,843.43 $ 4.82 $__2,923,060.72 $ $ 2,875,263.10 | SECTION 400: ALTERNATE STRUCTURE PRICING _ Sey) ahi aT; a = F eR SP es PEL eee ESE LST Leas ras RMT 401" 1 Ls Construction of a pavilion of like quality and character by a different manufactuer and/or different means & method to the Renegade Steel product) ¢ 339,000.00 $ __330,000.00|$ _—-253,952.48|$ __ 253,952.48 | $ 494,911.30|$ 494,911.30 | $ (13,422.00) $ (13,422.00)| $ 256,400.00 | $ 256,400.00 Ce ion of a & stand facility of like quality and 402 1 LS |character by a different manufacturer and/or different means & method to the Public Restroom facility product $ 369,000.00 | $ 369,000.00 | $ 436,309.94 | $ 436,309.94 | $ 272,826.58 | $ 272,826.58 | $ $ $ = $ 422,930.00 | $ 422,930.00 403" 4 ts [Construction of four (4) planter boxes out of landscape timbers fastened together by threaded rod, nuts, and washers $ 21,000.00 | $ 84,000.00 | $ 3,105.00 | $ 12,420.00 | $ 5,643.00 | $ 22,572.00 | $ 5,000.00 | $ 20,000.00 | $ 12,900.00 | $ 51,600.00 SECTION 400: ALTERNATE PRICING STRUCTURE SUBTOTAL $ 783,000.00 $ AZ $ 790,309.88 $ 6,578.00 $ 730,930.00 *Due to errors, Coggins C is base bid changed from $2,430,882.23 to $4,429,911.82 and their total for Alternate line item 403 changed from $3105.00 to $12,420.0¢ *Due to multiplication errors, Pound Clark's base bid changed from $2,510,906,00 to $2,695,585.37 | hereby certify that is ‘accurate Bid Tabulation of all bids received on May 23, 2025 ) Charlie Bridge, Project Manager Community Housing Needs Assessment STATEMENT OF WORK IES Tes Sor Se CITY OF THOMASTON Georgia Tech Enterprise Innovation Institute Center for Economic Development Research COPYRIGHT © 2025 | ALL RIGHTS RESERVED | GEORGIA TECH RESEARCH INSTITUTE | ATLANTA, GA 30332 NO Introduction The Center for Economic Development Research (CEDR) within the Enterprise Innovation Institute (ElI2) at Georgia Tech is pleased to present this proposal to the City of Thomaston for a Community Housing Needs Assessment. This proposal request will provide a general overview of the tasks involved. Georgia Tech supports economic and community development efforts in Georgia, including research, facilitation, technical, analytical, and management expertise. As a designated U.S. Economic Development Administration University Center, El2 provides these services through its headquarters in Atlanta and a network of regional offices throughout Georgia. The City of Thomaston, Georgia, like many small and mid-sized communities across the United States, is at a pivotal moment in its growth and development. Thomaston serves as a regional commercial, retail, and healthcare hub for many of its rural neighbors. As the city seeks to attract and retain a skilled workforce, support local industry, and enhance quality of life for residents, the availability of adequate and attainable housing has emerged as a critical concern. This Housing Needs Assessment is designed to provide a comprehensive understanding of Thomaston’s current housing landscape, with a particular focus on workforce housing— defined as housing attainable to households earning between 80% and 120% of the Area Median Income (AMI). These are the teachers, healthcare workers, first responders, and skilled tradespeople who form the backbone of the localeconomy yet often face challenges finding suitable housing within the community they serve. Guided by the themes of Reinvest, Redevelop, and Revitalize, this assessment aims to: - Identify gaps between housing supply and demand, * Evaluate the condition and distribution of existing housing stock, * Understand barriers to housing access and attainablity, and * Recommend actionable strategies to strengthen Thomaston’s housing ecosystem. By grounding this work in data, community input, and best practices, the City of Thomaston can chart a path forward that ensures housing is not a barrier—but a foundation—for sustainable economic growth and community well-being. Following is CEDR’s proposed scope of work for the project, along with biographical information for each member of the project team, a timeline, and a budget. HOUSING MARKET NEEDS ASSESSMENT & PLANNING SERVICES: CITY OF THOMASTON, GEORGIA May 19, 2025 Ww Project Summary CEDR will work closely with the locally designated team to collect and review essential documents and data related to the current housing landscape in the City of Thomaston. The project will be divided into four task areas: (1) Kickoff Meeting with key stakeholders, (2) Targeted public engagement through listening and visioning sessions, (3) Housing Market Needs Assessment, (4) Community Design Standards Analysis, and (5) Location Recommendations. The study will conclude with a final report and presentation of findings to stakeholders. The report will feature detailed results from the analysis, key findings, and actionable recommendations for future initiatives. The final report will be presented to stakeholders and community leaders. This presentation serves as a platform for community education and engagement, fostering awareness and dialog around housing-related topics. The Assessment is anticipated to be completed within six (6) months of the initial stakeholder kickoff meeting and will cost $60,000. Scope of Work 1. Project Stakeholder Kickoff: The project will begin with a kickoff meeting of key community stakeholders. This phase will focus on identifying specific concerns and issues to address during the study. CEDR will facilitate a discussion with the group to gather initial perceptions of the local housing market and assess strengths, weaknesses, opportunities, and threats (SWOT) to housing development that meets the needs of all community residents. 2. Targeted Public Engagement: CEDR will conduct 2 = 3 community-wide listening and visioning sessions to engage community members in meaningful discussions to gather insights, identify housing needs, and foster participation in the study activities. CEDR will.collaborate with local organizations, community leaders, and advocacy groups. CEDR’s experienced team will facilitate sessions, encouraging open dialog about specific housing challenges, including affordability, barriers to finding quality housing, redevelopment opportunities, and other issues identified by the stakeholder SWOT analysis. 3. Housing Needs Assessment: CEDR will collect and analyze community profile data covering population characteristics, commuting patterns, wages, household incomes, owner-occupied and rental characteristics, home values, vacancy. rates, and more. This phase includes collaboration with local governments to obtain GIS data, building permit records, and other locally held information critical to the study. Timely responses from government staff regarding data requests are essential to avoid delays in completing the project. 4. Community Development Standards: CEDR will conduct a comprehensive review of the existing municipal zoning code. Identify sections of the zoning code that directly impact housing development, Identify specific areas where changes are needed to support housing goals and develop a set of sample amendments to the zoning code that address identified gaps and align with the housing strategy. HOUSING MARKET NEEDS ASSESSMENT & PLANNING SERVICES: CITY OF THOMASTON, GEORGIA May 19, 2025 Scope of Work Continued 5. Location Recommendations: Utilizing the earlier elements of the plan, provide broad location recommendations for future development including residential, commercial, and mixed use. 6. Development Attraction Strategy: Develop strategies to engage with and attract market-rate residential developers and provide recommendations for incentives and programs to establish proof-of-concept investment and encourage additional development of market rate products aligned with community incomes. 7. Final Report & Presentation of Findings: CEDR will deliver a comprehensive final report formally presenting findings at the end of the contract period. The report will include detailed analysis results, best practice recommendations for increasing the workforce and attainable housing supply, and actionable next steps. The presentation will also serve as an opportunity to educate and engage the public on housing-related topics. HOUSING MARKET NEEDS ASSESSMENT & PLANNING SERVICES: CITY OF THOMASTON, GEORGIA May 19, 2025 ol PROJECT TEAM The Georgia Institute of Technology has provided research, management, and technical assistance to support economic development in Georgia for decades. Today, these services are provided by the Enterprise Innovation Institute and its statewide network of regional offices. Under El2’s umbrella of services to support the state, the CEDR group extends their nationally renowned experts in economic analysis and planning to communities and local governments. Betsy McGriff will serve as Principal Investigator for this project. Betsy McGriff Betsy McGriff serves as an Associate Project Manager at the Center for Economic Development Research (CEDR) at Georgia Tech. Prior to joining CEDR, Betsy worked in the public, private, and utility sectors in a variety of economic and community development roles. Betsy is an expert in rural development with deep relationships throughout Georgia. During her time as the Economic Development Director for Dawson County, Betsy successfully applied for several grants including funding from the Appalachian Regional Commission to initiate the county's first economic development strategic plan and from Georgia's Rural Center to develop a county-wide comprehensive trail plan. While serving the University of Georgia's Archway Partnership, Betsy assisted communities with projects on a range of community development issues including workforce and education, tourism, infrastructure, downtown development, and marketing and branding. Betsy is an active member of the Georgia Economic Developers Association (GEDA) and a Fellow of the Appalachian Leadership Institute. Betsy holds a bachelor’sdegree in Chemistry and a Master of Business Administration from Georgia Southern University. Grace Barrett, AICP Grace Barrett is an Associate Project Manager with:Georgia Tech’s Enterprise Innovation Institute (El?) in the Center for Economic.Development Research (CEDR). Grace is an urban planner specializing in housing and community development. While at CEDR, Grace has helped expand the teams housing work, blending data analysis and meaningful community engagement into action-oriented plans to jumpstart implementation. Outside of housing work, Grace is assisting with a statewide Artificial Intelligence Strategic Plan, and a downtown strategic assessment for a small community in Georgia. Before joining CEDR, Grace worked as an urban planner in the private sector, managing neighborhood plans, and small redevelopment projects, with a focus on guiding community driven positive change in disinvested communities. Grace graduated from The University of Georgia, obtaining a Bachelor of Arts in Geography. She also holds a Master of City and Regional Planning (MCRP) and a Master of Real Estate Development (MRED) from the Georgia Institute of Technology. HOUSING MARKET NEEDS ASSESSMENT & PLANNING SERVICES: CITY OF THOMASTON, GEORGIA May 19, 2025 o PROJECT TEAM Claire Breeden, AICP Claire Breeden is an Associate Project Manager at Georgia Tech's Center for Economic Development Research (CEDR) within the Enterprise Innovation Institute (El2). With a background in urban planning, GIS analysis, and economic development, Claire brings expertise in housing policy, community development, and data visualization to support informed decision-making and sustainable growth strategies. Her academic research focuses on the spatial implications of housing policy across Georgia. A member of both the American Planning Association and the Urban Land Institute, she remains engaged in industry advancements and thought leadership. Claire has a dual Master of City and Regional Planning and a Master of Science in Geographic Information Systems and Technology (M.S. GIST) from Georgia Tech along with a certificate in Higher Education Teaching. She holds a Bachelor of Science in Economics from the University of Tampa. Emily Lasser, AICP Emily Lasser is an Associate Project Manager at the Center for Economic Development Research (CEDR). Emily is a planner that specializes in community and economic development. She is passionate about mapping and visualizing data in a meaningful way that can be easily understood by all. Through her use of data analysis, mapping, community engagement, and storytelling, Emily strives to create equitable, sustainable places that reflect the needsyof the community. Prior to joining Georgia Tech, Emily worked as a Land Planning Analyst’at Kimley-Horn where she worked on various land use and transportation projects across the metro Atlanta region. Emily is an active member of the American Planning “Association (APA)/Georgia Planning Association (GPA) and currently serves ag¢the Chair On the Emerging Planners of Georgia (EPG) Board. She also holds an American Institute of @éftified Planners (AICP) certification. Emily holds a Bachelor's degree in Urban Studies from Wayne, State University and a Master's degree from the University of Michigan in Urban and Regional Planning. HOUSING MARKET NEEDS ASSESSMENT & PLANNING SERVICES: CITY OF THOMASTON, GEORGIA May 19, 2025 TIMELINE The project is anticipated to commence around August 2025, with the official start date contingent on the initiation of the contract. The estimated timeline for completion is six months, concluding in March 2026. Upon request, partners may receive incremental updates and draft components of the final plan prior to the project's completion. TASKS AUG 2025 SEPT2025 OCT2025 NOV2025 DEC2025 JAN2026 -FEB2026 MAR 2026 Project Kickoff Public Engagement Housing Needs Assessment Community Development Standards Location Recommendations Final Presentation BUDGET The total estimated cost (personal services, fringe benefits, overhead, travel, and M&S) to complete the work outlined in this proposal is $60,000. Because this project benefits the public sector, we have made every effort to keep costs to a minimum. Georgia Tech will use its public sector overhead rate, which is substantially less than the rate applied to private-sector contracts. The final project timeline depends on the response time from the client for data requests and may extend beyond the end date anticipated due to delays in responses. HOUSING MARKET NEEDS ASSESSMENT & PLANNING SERVICES: CITY OF THOMASTON, GEORGIA May 19, 2025 “J Cornerstone H20, LLC. PO Box 3095 Peachtree City, GA 30269 US +17707423321 andrea@cornerstoneh2o0.com cornerstoneh20.com EY 120 Estimate ADDRESS SHIP TO ESTIMATE # 3011 Trey Gavin Inframark LLC DATE 02/11/2025 Inframark LLC 250 Industrial Park Blvd 250 Industrial Park Blvd Warner Robins, GA 31088 Warner Robins, GA 31088 Cornerstone=— PRODUCT Sales Esmil Field Service DESCRIPTION QTY Back raked screen 1 For channel 23 1/4" x 54" Discharge Height 4’ Model: RP 0518 Quantity: 1 pe. Inclination angle: 75 Gear motor Nominal power: 0.5 HP Manufacturer: NORD or analog Ingress protection IP: 55 Note: 1. Running new electrical service to our panel is not included in this proposal. 2. Any necessary concrete repairs are not included in this proposal. 3. Unloading of screen not included. Installation of screen 1 Installation of new electrical service, with power being pulled from the existing electrical supply at the existing screen. New disconnect supplied and electrical connections made between panel and new screen. Freight will be prepaid and added. SUBTOTAL All prices above require net 30 days payment terms. TAX Taxes are not included in pricing. TOTAL Quickbooks now has a function, that we cannot turn off, that asks you if you want to "accept" the estimate. Please know that accepting our estimate is not the same as placing an order. Please contact us with a PO if you want to place an order. RATE 69,500.00 8,500.00 AMOUNT 69,500.00 8,500.00 78,000.00 0.00 $78,000.00 A late payment charge of 1 1/2% per month (18% annually) will be applied to all past due accounts. Cornerstone terms and conditions can be found at the below link: http://(www.cornerstoneh20.com/uploads/8/9/5/5/8955381 5/terms_and_conditions.pdf Accepted By Accepted Date A late payment charge of 1 1/2% per month (18% annually) will be applied to all past due accounts. Corerstone terms and conditions can be found at the below link: http/Avww,cornerstoneh2o.com/uploads/8/9/5/5/89553811 S/terms_and_conditions.pdf