--- title: Meriwether County Board of Commissioners regular meeting minutes, July 7, 2025 collection: local-meetings id: minutes:2025-07-07/meriwether-county-board-of-commissioners cite_as: Meriwether County Board of Commissioners regular meeting minutes, July 7, 2025 canonical_url: https://georgiacommons.org/meetings/2025-07-07/meriwether-county-board-of-commissioners md_url: https://georgiacommons.org/meetings/2025-07-07/meriwether-county-board-of-commissioners.md text_url: https://georgiacommons.org/meetings/2025-07-07/meriwether-county-board-of-commissioners/text source_url: https://www.meriwethercountyga.gov/AgendaCenter/ViewFile/Minutes/_07072025-613 date: 2025-07-07 jurisdiction: county:meriwether jurisdiction_name: Meriwether County county_fips: "13199" license: Public record of Meriwether County Board of Commissioners, from its own website or meeting portal publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. version: Minutes as posted (read by OCR from a scan) version_id: minutes:2025-07-07/meriwether-county-board-of-commissioners@rdea1de91e742 retrieved: 2026-11-25T09:09:55.543348+00:00 --- # Meriwether County Board of Commissioners regular meeting minutes, July 7, 2025 - Body: Meriwether County Board of Commissioners - Date: July 7, 2025 ## Records of this meeting - Minutes: https://www.meriwethercountyga.gov/AgendaCenter/ViewFile/Minutes/_07072025-613 (in Georgia Commons as `minutes:2025-07-07/meriwether-county-board-of-commissioners`) ## Georgia Commons summary (AI-written) Written by AI from the record below. It is not the record and is never a source: cite the record's own words. Commissioners committed the full $1.6 million in road funds to Stovall Road paving and approved putting SPLOST on the November 2025 ballot. The commissioners acted on a long agenda. They authorized spending the full $1,597,597.68 in road funds (2025 LMIG and 2024 LRA) to keep paving Stovall Road and to have EMC Engineering assess all paved county roads. They approved placing a SPLOST referendum on the November 2025 ballot, a special use for a five-space RV campsite at 507 Dan Road with eight conditions, and the purchase and remounting of an ambulance chassis. They also approved a $115,000 reserve for bidding out the old Elections building and a Lifeline Billing contract for delinquent EMS accounts. The November Lane road request, the General Projects fund allocation and a Recreation Advisory Board appointment were tabled. After closed session, they waived penalties and interest on certain taxes and approved two Public Works positions. Topics: 2025 LMIG road paving; Stovall Road resurfacing; SPLOST referendum November 2025; RV campsite at 507 Dan Road; ambulance chassis and remount; Lifeline Billing EMS collections; Elections building bid; November Lane road request; General Projects fund allocation; courthouse renovation update; code enforcement procedures; County Line Road bridge application. Decisions the record states (each with the record's own sentence): - Use of $1,597,597.68 in LMIG and LRA funds to continue paving Stovall Road and assess all paved roads: Adopted, unanimous. The record: "A motion was made by Chairman Worsley to authorize the continuation of the full LMIG and LRA funding allocation totaling $1,597,597.68, directing that it be used to continue paving Stovall Road until funds are exhausted or the road is complete." - Referendum resolution to continue SPLOST on the November 2025 ballot and related agreements: Adopted, unanimous. The record: "After discussion, a motion was made by Commissioner Snelson to approve and sign the resolution for the continuation of SPLOST and to authorize the necessary agreements to place the referendum on the November 2025 ballot." - Special use for a 5-space RV campsite at 507 Dan Road, Woodbury (Case #P25-003), with eight conditions: Adopted, unanimous. The record: "After finalizing the conditions, a motion was made by Commissioner Snelson to approve the special use request with the following conditions:" - Purchase of ambulance chassis from John Megel Ford for $65,656.90: Adopted, unanimous. The record: "A motion was made by Vice Chairman Collins to approve the purchase of the ambulance chassis from John Megel Ford for $65,656.90." - Removal and remounting of ambulance box by Custom Body Works for $72,334: Adopted, unanimous. The record: "A motion was made by Chairman Worsley to approve the removal and remounting of the ambulance box by Custom Body Works at a total cost of $72,334, with funding to be provided by the insurance proceeds and up to $30,000 in SPLOST funds." - Lifeline Billing Services contract for EMS delinquent account collections: Adopted, unanimous. The record: "With no further discussion, a motion was made by Vice Chairman Collins to accept the contract with Lifeline Billing Services, authorize the Chair or Vice Chair to sign, and proceed with implementation." - Placing the Elections building at 137 South Court Square out for bid with a $115,000 reserve price: Adopted, unanimous. The record: "A motion was made by Commissioner King to place the building located at 137 South Court Square out for bid, with a reserve price of $115,000, and to" - County as applicant for County Line Road bridge replacement application: Adopted, unanimous. The record: "Following this discussion, a motion was made by Commissioner King to approve the application and authorize the Chair or Vice Chair to sign the associated documents." - Reappointment to the Pathways Community Service Board: Adopted, unanimous. The record: "A motion was made to reappoint Ms. Jones to the Pathways Community Service Board by Commissioner Snelson, and seconded by Vice Chairman Collins." - Waiver of penalties and interest on taxes discussed in executive session: Adopted, unanimous. The record: "A motion was made by Chairman Worsley to waive the penalties and interest on taxes as discussed in Executive Session." - Two new positions in Public Works: Adopted, unanimous. The record: "A motion was made by Chairman Worsley to approve two positions in Public Works." - Request to place November Lane in the County Road System: Tabled, unanimous. The record: "Commissioner King made a motion to table the item until the required documentation was received." - Allocation of funds in the General Projects line item: Tabled, unanimous. The record: "A motion was made by Commissioner Snelson to table the discussion until the August 4, 2025, Regular Meeting at 6:00 p.m., at which point the Board would expect a full proposal, including budgetary projections and infrastructure details from Dean's Communication." - Appointment to the Recreation Advisory Board, District 4: Tabled, unanimous. The record: "A motion was made by Vice Chairman Collins to table the appointment until the next Regular Meeting scheduled for July 22, 2025, at 6:00 p.m." ## Minutes MINUTES MERIWETHER COUNTY BOARD OF COMMISSIONERS JULY 7, 2025 6:00 PM Commissioners Present: Chairman Adam Worsley, Vice Chairman Emmett Collins, Commissioner Gene King, and Commissioner Jennifer Snelson Commissioners Absent: Commissioner Bryan Threadgill Staff Present: County Administrator John Gorton, County Clerk Allyson Stephens, Finance Director Jamie Tarleton, Administrative Assistant Hailee Palmer, and County Attorney Nathan Lee. Staff Absent: I. CALL TO ORDER The Meeting was Called to Order by Chairman Adam Worsley at 6:00 p.m. i. INVOCATION The Invocation was given by Pastor William Brown of the Cove Baptist Church. Il. PLEDGE TO THE FLAG All. IV. ADOPT AGENDA A motion was made to Adopt the Agenda by Commissioner Snelson and seconded by Vice Chairman Collins. All were in favor. V. PRESENTATIONS 1. Enrichment Services Program, Inc. - Mrs. Dorsey-Mott Mrs. Dorsey-Mott was not in attendance, but has made plans to reschedule with County Clerk Allyson Stephens. 2. EMC Engineering Services, Inc. - Discussion on Ongoing Projects - Christopher Brazell, PE, PLS Mr. Christopher Brazell, PE, PLS, with EMC Engineering Services, Inc., appeared before the Board to provide an update on the ongoing engineering projects for Meriwether County. He began with the status of the Meriwether County Courthouse renovation project, explaining that they are currently transitioning from the initial assessment phase into the design phase. The firm was under contract to prepare construction documents for both Phase One - roofing, flashing, and exterior repairs - and Phase Two, which focused on interior improvements to the second and third floors. EMC's team would be conducting on-site detailed measurements and assessments during the week to finalize data for the construction drawings. Mr. Brazell noted that the firm anticipates delivering 90% complete design documents within the next 60 days. He also recommended that the County consider utilizing a Construction Manager at Risk (CMAR) delivery method, which would allow the selection of a qualified contractor based on experience and qualifications rather than awarding the project to the lowest bidder. He cautioned that traditional low-bid procurement could result in challenges, especially for a historic building, such as extensive change orders due to unforeseen conditions. The CMAR approach offered a guaranteed maximum price and would help mitigate risks associated with hidden damage. Mr. Brazell cited the success of this method during a similar historic courthouse renovation in Harris County and encouraged the Board to consider pursuing this approach to ensure cost control and high-quality restoration work. Chairman Worsley inquired about the project's overall timeline and how to expedite the process. Mr. Brazell explained that if the CMAR method was approved and the process continued on schedule, the County could have a contractor selected within 90 days, and the project could reach completion within six months, barring weather delays. He emphasized the importance of dry weather for roofing work and estimated that by this time next year, the project should be fully completed. In closing, Mr. Brazell indicated he would remain for the meeting's duration to participate in the later agenda item concerning LMIG projects. He confirmed that cost assessments had been completed for roads identified in the previous LMIG application and that current estimates were under budget. He looked forward to discussing the potential to include additional roads in the program later in the meeting. VI. FINANCE REPORT Finance Director Jamie Tarleton presented the financial report to the Board, beginning with printed bank balance sheets that were run earlier that afternoon around 4:00 p.m. She noted that the General Fund remained steady, holding a balance of just over $930,000. Director Tarleton pointed out that LGIP figures had been updated to reflect the most recent month's interest earnings. Per Chairman Worsley's request, the report now included both month-to-date and year- to-date interest earnings accrued for all LGIP funds. Director Tarleton highlighted the Recreation Department's bank account, which had grown to over $29,000 - a notable increase of more than $4,500 since the previous month, reflecting strong revenue generation through concessions and related activities. She also noted that tipping and host fees were pending and expected to be received by July 15, with updated figures to be presented at the next meeting. At the bottom of the financial summary, she discussed LOST, SPLOST, and TSPLOST distributions. The line item for the 2020 TPLOST was removed, as those distributions had ended and been replaced by the 2025 TPLOST. She reviewed SPLOST commitments, stating that the culvert allocation had been reduced by $5,000 and a $75,000 payment had been made to Max Air for Jail plumbing repairs. That expense was now removed from the commitment list. Regarding the TPLOST account, Director Tarleton reported that the Alvaton Road and additional road widening project had been added with an estimated cost of $200,000. As a result, the remaining balance for the 2020 SPLOST stood at $67,289.89, while the combined 2020 and 2025 TSPLOST funds totaled $395,397.13. She also reviewed LRA (Local Road Assistance) funds, noting that the County had received $1.8 million in the latest allocation, with no commitments yet assigned. A summary of previously received LRA funds and their associated commitments was also provided. Chairman Worsley asked for clarification on a few points. County Administrator Gorton confirmed with Director Tarleton that, with the available TSPLOST and LRA funds, the County had approximately $1.4 million available for road and bridge projects. The $200,000 allocation for Alvaton Road was also confirmed as the limit approved during a previous motion. Additionally, it was verified that the $249,000 minimum local match for the 2025 LMIG program was based on the County's award of approximately $830,000 from the state and met the 30% match requirement. Director Tarleton concluded her report by stating all aspects of the County's finances appeared stable and there were no issues to report. VII. DEPARTMENT HEADS County Administrator Gorton delivered a report on behalf of Allan Fordham, the Director of the Recreation Department, who was unable to attend the meeting due to a doctor's appointment. County Administrator Gorton shared that the spring baseball and softball seasons had officially ended, and the department was very pleased with the performance of the All-Star teams. The 8U coach pitch baseball team had finished as district runner-up and then placed fifth in the GRPA State Tournament. Additionally, two 10U baseball teams participated in the Dizzy Dean State Tournament in Fort Oglethorpe. One of those teams defeated Bowden in the district tournament and, after weather delays, went on to finish third in the State Tournament. Meriwether County also hosted the 10U GRPA Class C State Baseball Tournament, which was deemed a success. The county received numerous compliments regarding its hospitality, and many visitors expressed a desire for the County to host future tournaments. The 10U GRPA team fought hard in the State Tournament and secured a third-place finish. In softball, the 10U team was runner- up in the GRPA district tournament and finished fifth in the state tournament. The 8U coach pitch softball team won their district tournament and went on to compete in the state tournament in Putnam County, where they were crowned state champions. A proclamation honoring the 8U girls' State Championship would be scheduled for the next meeting by Staff, as many participants were expected to be out of town during the Independence Day holiday. County Administrator Gorton further reported that registration for fall activities, including football and cheerleading, was ongoing. At the time of the meeting, approximately 80 participants had registered across divisions, including 7U, 8U, and 9U football, as well as CGYSA. The July 4th holiday events had also seen high attendance at the concession trailer during the baseball and softball tournaments, and the Recreation Department received positive feedback on the condition and appearance of the County's athletic facilities. In closing, Chairman Worsley stated that the Woodbury School was under contract to be purchased again, and the buyer wished to meet to discuss plans for the property. He asked County Administrator Gorton to provide his availability and Director Fordham's so that they could coordinate schedules and ensure that all existing recreational commitments and events would be considered during contract discussions. County Administrator Gorton stated that he was flexible and willing to meet even after regular hours, and that they would accommodate to Chairman Worsley's schedule. No other department heads had updates to present. VII. CITIZEN COMMENT None. IX. MINUTES 1. Minutes, June 24, 2025, Regular Meeting 6:00 p.m. Chairman Gene King arrived at 6:16 p.m. for the Meeting. Prior to seeking approval, it was noted by County Clerk Stephens that some corrections had been made to address minor typographical errors. Specifically, a section under November Lane had been revised to clarify language regarding a survey, and a pronoun reference under the comments about the Agenda Packet had been corrected from "she" to "he." Additionally, on page 12 of the minutes, under the discussion of Meadows Boone Road, the text had originally indicated that Mr. Scott Bowdon was the property owner along the roadway. It was clarified that Mr. Bowdon had actually been representing Mr. Crawford, and that correction was also approved for inclusion. There were no further changes noted. A motion was made to Approve the Minutes with the aforementioned corrections by Vice Chairman Collins, and seconded by Commissioner Snelson. All were in favor. X. PUBLIC HEARING None. XI. APPOINTMENTS 1, Appointment to the Pathways Community Service Board (3-year term that will begin on July 1, 2025, and expire June 30, 2030). Tabled on June 24, 2025. The Board revisited the appointment to the Pathways Community Service Board for a three-year term beginning July 1, 2025, and expiring on June 30, 2030. This item had been previously tabled at the June 24, 2025, meeting. During the discussion, Commissioner Snelson noted that Jennifer Jones had expressed her willingness to continue serving in this capacity. A motion was made to reappoint Ms. Jones to the Pathways Community Service Board by Commissioner Snelson, and seconded by Vice Chairman Collins. All were in favor. This is noted as a 3-year term, the correct expiration date is June 30, 2028. 2. Appointment to the Recreation Advisory Board, District 4. (This is a 1-year term that will begin on July 1, 2025, and expire on June 30, 2026). Tabled on June 24, 2025, This item was originally tabled during the June 24, 2025, meeting. At the July 7, 2025, Regular Meeting, the Board revisited the appointment for the Recreation Advisory Board representing District 4. However, Commissioner Threadgill was unable to attend the Meeting and submitted a request that the item be tabled again. A motion was made by Vice Chairman Collins to table the appointment until the next Regular Meeting scheduled for July 22, 2025, at 6:00 p.m. The motion was seconded by Commissioner King. All were in favor. XII. UNFINISHED BUSINESS 1. Request from Residents to Place November Lane in the County Road System The Board revisited the request from residents to place November Lane into the County Road Maintenance System. This item had been tabled from the Jun 24, 2025, Meeting to allow time for residents to be present and to provide additional documentation. County Staff reiterated their recommendation that November Lane could only be accepted into the maintenance system once two conditions were met: (1) submission of a professional survey of the roadways, and (2) receipt of property deeds conveying the necessary right-of-way, 60 feet wide, with 30 feet extending from each side of the road's centerline. Several residents, including Ms. Cynthia Dunlap, were present and expressed their frustrations. Ms. Cynthia Dunlap, 103 November Lane, disputed the characterization of November Lane as a private road, stating that the road had always been public and that no formal documentation existed showing it had been designated private. She challenged the County's requirement for a new survey and deed work, expressing that the County should already possess relevant documentation, and emphasized that the County had previously maintained the road. Ms. Dunlap also claimed that past County work had damaged her property, including contamination of her well water, and presented a sample of the water as evidence. Commissioners explained that while they understood the residents' frustrations, the current Board had found no records confirming November Lane was ever formally accepted into the County Road System. Finance Director Tarleton exited the Meeting at 6:24 p.m. and returned at 6:28 p.m. Instead, records showed that in a 2010 meeting, the Board granted a one-time right-of-entry for maintenance, which did not establish the road as public. The Board emphasized that a proper survey was needed to avoid inadvertently encroaching on private property and to protect both residents and the County from potential liability. Tensions rose during the exchange, with interruptions from both residents and Commissioners, but Chairman Worsley and other Board members attempted to clarify the legal necessity of the survey and deeds. Chairman Worsley further explained that taking the appropriate legal steps now would prevent future issues and allow Public Works to maintain the road in the long term. He also noted that the estimated cost to bring the road up to standard was relatively low, at approximately $10,000. Another resident, Ms. Tina Dunlap, 107 November Lane, raised concerns about the fairness of having to pay for a survey despite paying county taxes. She expressed frustration that residents were being asked to shoulder the financial burden to fix a problem not of their making. Chairman Worsley acknowledged her concerns and stated that while the county could not legally pay for the survey on a road not yet accepted into the system, the Board would be open to discussing assistance with those costs once documentation was in place. After continued discussion, Ms. Tina stated that the residents would look into getting the road surveyed and return with an update. Chairman Worsley emphasized that completing the survey and obtaining the quit claim deeds were essential to move forward and ensure that the County could legally maintain the road without further delay or risk. Commissioner King made a motion to table the item until the required documentation was received. This motion was seconded by Commissioner Snelson. All were in favor. 2. Acceptance of Contract for Lifeline Billing Services - EMS Services and allow Chair/Vice Chair to sign The Board resumed discussion on the acceptance of the contract with Lifeline Billing Services to manage EMS collections. County Administrator Gorton clarified that the service agreement with Lifeline would cover the collection of delinquent accounts only. Lifeline would collect a 20% fee on any net revenue it recovered from those past-due accounts. This was separate from the ongoing EMS billing contract, under which the current vendor charged 5.85% of net revenue for initial billing services. Chairman Worsley questioned the overall financial benefit of the change, noting that the County had recently switched EMS billing providers under the expectation of increased efficiency and reduced costs. He expressed concern about the necessity of engaging an additional collection agency and asked whether the County was still saving money compared to previous arrangements. County Administrator Gorton explained that the Lifeline contract was meant to recover revenue that the EMS billing vendor did not pursue. Prior to this new arrangement, the County had no formal collection agency in place for delinquent accounts, meaning those funds went uncollected. Legal counsel had reviewed the proposed contract with Lifeline, and Lifeline had accepted all requested changes. The Board further discussed the timing and thresholds for accounts to be deemed delinquent and eligible for collection. Staff noted that industry standards varied, but the EMS billing vendor would stop pursuing accounts once they reached a certain point, at which time Lifeline would step in. Vice Chairman Collins also noted that similar collection agencies typically charge even higher rates, sometimes up to 50%, and emphasized that this arrangement could improve overall collections. With no further discussion, a motion was made by Vice Chairman Collins to accept the contract with Lifeline Billing Services, authorize the Chair or Vice Chair to sign, and proceed with implementation. This motion was seconded by Commissioner Snelson. All were in favor. 3. Case #P25-003 - Request for Jacob Clare for the special use of Parcel 172 073 001, 507 Dan Road, Woodbury, for the proposed use of a 5-space RV campsite. The request involved the proposed development of a five-space RV campsite. The case had previously been tabled from the May 27, 2025, meeting, and the public hearing had been closed. The matter was brought forward for Board decision. Director Cassandra Jones presented the findings from an in-depth review of the property's history. She stated that a temporary electrical permit had been issued for a barn located on the site, and temporary power was being used to service the RV sites, A permitted septic system had also been installed for a bathroom in the barn three years prior under the previous property owner, Mr. Jones. Director Jones indicated that Mr. Clare, the current owner, had believed the property to be legally operating as a campground based on representations made during the purchase. It was later discovered that the site had not been legally recognized or permitted as such. Director Jones also noted that promotional materials had been found online advertising the property as "Country Girl Camp," indicating it had previously been operated as an unapproved campground. She confirmed that all electrical hookups were currently up to code and had been inspected by a certified electrician. The Health Department had confirmed the existing septic system was rated for a maximum of five RV sites. Mr. Clare was present and addressed the Board, stating he had refrained from further developing the site - including the placement of gravel pads - until he received approval from the Board. He expressed his willingness to meet all conditions and to make the site safe and compliant. He also stated he had no interest in over-occupying the RVs, as utility costs would rise, and he charged rates based on amp usage. Mr. Clare agreed to install fencing and a keypad-accessed gate for security and aesthetics. The Board discussed the Planning Commission's original recommendations, which included a 90-day maximum stay per camper with a mandatory 30-day vacancy period, no permanent fixtures such as decks, quiet hours posted on-site, and enforcement of occupancy limits per camper manufacturer specifications. Additional stipulations discussed and accepted included ensuring no camper exceeded manufacturer occupancy limits, meeting all County Code requirements, and installing the agreed-upon fencing and gated access. The previously recommended background check requirement was discussed but ultimately removed, as the Board agreed it was unnecessary. After finalizing the conditions, a motion was made by Commissioner Snelson to approve the special use request with the following conditions: (1) A code of conduct must be posted on-site at all times (2) No permanent fixtures (e.g., decks) are permitted (3) Quiet hours must be posted (4) No RV may remain on site for more than 90 consecutive days, with a required 30-day vacancy before returning (5) A maximum of five RVs may be present on the site at any time (6) No RV may house more individuals than permitted by the manufacturer's occupancy limit (7) The site must meet all applicable code requirements for campgrounds (8) A fence and keypad- accessed gate must be installed. This motion was seconded by Vice Chairman Collins. All were in favor. 4. Discussion on Allocating Funds in the General Projects Line Item The Board of Commissioners revisited a discussion regarding the allocation of funds in the General Projects line item. This item had been tabled from the June 9, 2025, Regular Meeting at 6:00 p.m. to allow County Administrator Gorton time to explore allocation options. County Administrator Gorton reported that the General Projects account currently held $30,268.74 in the First Peoples Bank account and $3,673,850.16 in the Local Government Investment Pool (LGIP), which was generating approximately $13,000 in monthly interest. The combined balance was slightly over $3.7 million. The original fund balance was $3,515,839.42, with accrued interest totaling $188,279.48. County Administrator Gorton proposed two separate funding recommendations. The first involved allocating accrued interest earnings - $333,655.58 in the General Fund and $121,042.98 in the General Fund project-related interest - for a total of $454,698.56 to initiate the development of a Public Safety Communication infrastructure. He explained that while additional funding would be necessary in the future, this initial allocation would serve as a critical first step toward building a dependable and monitored communications network for emergency services. County Administrator Gorton noted he had scheduled a meeting that week with Dean from Dean's Communications to receive preliminary cost estimates for the proposed upgrades. The second recommendation was to allocate $750,000 from the General Projects Fund toward the next phase of the courthouse renovation, specifically the HVAC system, which was estimated to cost $1.5 million. This allocation would represent 21.33% of the General Fund Project balance and leave approximately $2.76 million available for future building renovations, pending facility assessments and cost estimates. Chairman Worsley stated that while the proposed public safety infrastructure upgrades seemed necessary, he had concerns about initiating such a substantial investment without a clear understanding of the total project cost. He pointed out that Meriwether County had invested in public safety radio systems in the recent past and questioned why additional infrastructure was already needed. County Administrative Gorton explained that the existing system relied on radios that functioned via SIM cards and commercial cell service, which resulted in unreliable connectivity across the county's vast 500+ square mile area. He added that the newly installed equipment on the Forrest Road tower, expected to go online within days, would be an important step forward. He emphasized the goal of building a sustainable and expandable system over time rather than relying on short-term fixes. Chairman Worsley expressed general support for prioritizing public safety and acknowledged that interest earnings were a suitable source for funding this type of infrastructure project. However, Commissioners agreed that a firm financial commitment could not be made until accurate long-term cost estimates were available. County Administrator Gorton reiterated that Dean was working on engineering plans, equipment quotes, and tower access agreements, and confirmed that conversations were ongoing with tower owners, including the possibility of using Kudzu and LaGrange broadcasting towers. The Board also discussed past delays in restoring radio service following the tornado-damaged tower on Forrest Road. It was noted that the County did not own the tower itself - only the equipment placed on it, which contributed to the extended delay due to changes in engineering code requirements and rebuild timelines. Additionally, Commissioner King inquired about the possibility of pursuing state or federal grant funding. County Administrator Gorton indicated that the County had missed a recent funding window through Senator Warnock's office but would continue exploring other grant opportunities as they become available. Following further discussion, the Board agreed that no funding allocation should proceed until more detailed financial and engineering information was presented. A motion was made by Commissioner Snelson to table the discussion until the August 4, 2025, Regular Meeting at 6:00 p.m., at which point the Board would expect a full proposal, including budgetary projections and infrastructure details from Dean's Communication. The motion was seconded by Commissioner King. All were in favor. XHI. NEW BUSINESS 1. Purchase of Ambulance Chassis The Board considered the purchase of a replacement ambulance chassis to replace one declared a total loss, with funding supported by an insurance settlement. County Administrator Gorton informed the Board that the insurance company had valued the totaled chassis at $47,672. The insurance settlement totaled $120,600, with a $10,000 deductible, resulting in a net payout of $110,600 to the County. Two quotes were provided for the purchase of a new chassis, with John Megel Ford offering the lowest bid at $65,656.90 for a diesel model. County Administrator Gorton explained that this purchase would bring the entire fleet to diesel, ensuring consistency across vehicles. The expected delivery time for the chassis is approximately 120 days. Although the majority of the cost would be covered by insurance proceeds, approximately $20,000 would still be required from SPLOST funds due to depreciation on the original chassis. Commissioner discussion acknowledged the need for urgency in replacing the downed ambulance and the customary practice of using insurance proceeds to fund such purchases without initiating a bidding process. A motion was made by Vice Chairman Collins to approve the purchase of the ambulance chassis from John Megel Ford for $65,656.90. The motion was seconded by Commissioner King. All were in favor. 2. Approval to Remove Current Ambulance Box for Remounting Purposes The Board then addressed the second phase of the ambulance replacement process, which involved removing the existing ambulance box from the totaled unit and remounting it onto the newly purchased chassis. County Administrator Gorton explained that the estimated cost for this work, as provided by Custom Body Works, was $72,334. The estimate had also been used by the County's insurance provider during the claims process. County Administrator Gorton noted that while insurance proceeds would cover most of the remount costs, the County would still need to allocate additional funds - approximately $20,000 - from SPLOST to fully cover the replacement. However, due to rounding, potential contingency, and uncertainties such as whether the County would recoup the $10,000 deductible, he recommended setting aside up to $30,000 in SPLOST funds to ensure full coverage. It was further clarified that no bidding process was necessary for this work since it fell under insurance claims procedures, and Custom Body Works, a local and established provider, would be handling the remount. A motion was made by Chairman Worsley to approve the removal and remounting of the ambulance box by Custom Body Works at a total cost of $72,334, with funding to be provided by the insurance proceeds and up to $30,000 in SPLOST funds. Vice Chairman Collins seconded this motion. All were in favor. 3. Application for Bridge - County Line Road and allow Chair/Vice Chair to sign. The Board considered a request from Doug Smith of Seefried Industrial Properties for Meriwether County to serve as the official applicant for a bridge replacement project on County Line Road. The project is being pursued for the benefit of the County, and Mr. Smith requested that the County act as the applicant, with Rimkus designated as the agent overseeing the replacement. This request is consistent with the terms outlined in the agreement of understanding (AOU), which was included in the Commissioners' meeting materials. The County Attorney confirmed that he had reviewed the request and the supporting documentation and found no legal issues. County Attorney Nathan Lee was present to address any legal questions, and Mr. Jim Condon was also in attendance to represent the developer and respond to any inquiries. Staff recommended allowing the Chair or Vice Chair to sign the necessary agreements to move forward with the application process. It was clarified that although the County would act as the official applicant, the work itself would be completed by the developer's team. Following this discussion, a motion was made by Commissioner King to approve the application and authorize the Chair or Vice Chair to sign the associated documents. This motion was seconded by Vice Chairman Collins. All were in favor. 4. Update on Procedures for Code Enforcement Director Cassandra Jones provided a detailed overview of the current procedures and structure of Meriwether County's Code Enforcement operations. She explained that the County operates under a reactive enforcement model, meaning officers respond to complaints submitted by phone or email rather than patrolling proactively for violations. The department consists of one full-time and one part-time officer. Upon receiving a complaint, officers investigate the issue, assess the property, and engage with the property owner to resolve the violation collaboratively. Court citations are used only as a last resort when voluntary compliance fails. In 2024, the County handled 298 cases, with 296 resolved without citations. In 2025 to date, 80 cases have been handled, with 71 closed and one currently proceeding to court. Additionally, 83 cases within city jurisdictions like Woodbury, Luthersville, and Greenville were addressed. Code Enforcement also manages responsibilities such as timber compliance, erosion control inspections at construction sites, and address assignments. Director Jones emphasized that, due to the County's rural nature, many properties may technically be out of compliance, but priority is given to those posing safety or environmental risks. Commissioner Snelson requested clarification on the specific procedures used by Code Enforcement when responding to a complaint. Code Enforcement Officer Joel Cruse explained that after receiving a complaint, he visits the site, assesses the situation, and works with the property owner. As long as progress is being made, warnings are not typically issued. If progress halts, a warning and a deadline are issued before legal action is taken. Officer Cruse also noted that all actions and deadlines are logged in a computer system, accessible to both officers. Commissioners raised concerns about equitable enforcement and the limitations of a reactive-only approach. Chairman Worsley questioned whether obvious violations encountered during routine travel should also be addressed, even if not formally reported. Officer Cruse responded that such actions depend on severity and time availability, emphasizing the difficulty of managing a 500-square-mile county with only two officers. Commissioners acknowledged the need to balance enforcement with compassion for residents who may be financially constrained. County Attorney Nathan Lee advised that shifting to a proactive enforcement model would require significant changes to County Ordinances, a new fee schedule, consistent citation enforcement, and the hiring of additional personnel, including potentially two or three new officers, and the acquisition of vehicles. Chairman Worsley and others supported the idea of moving toward a more comprehensive enforcement strategy but stressed the importance of thoughtful planning, realistic budgeting, and public sensitivity. The Board ultimately agreed that more information was needed before making changes. They tasked Staff with developing a detailed budget proposal outlining what would be required to expand the Code Enforcement department and implement a proactive enforcement model. This proposal is expected to be considered during the upcoming fiscal year budget planning process. Commissioners emphasized the need for consistent, fair enforcement and the importance of maintaining ordinances that protect community standards, while also providing residents with opportunities to achieve compliance. 5. Consideration of Placing Elections Building out for Bid - 137 S. Court Square The Board of Commissioners considered the future of the county-owned building located at 137 South Court Square, previously used as the Elections building. Staff presented two options: placing the building out for public bid or exploring whether any internal County departments could make use of the facility. It was noted that the County is currently conducting a comprehensive assessment of all its owned buildings to determine which require restoration or upgrades, which could influence the decision on repurposing the space. During discussion, the Board favored placing the property out for bid but clarified the need to establish a reserve amount to protect the county's financial interest. Commissioners discussed potential reserve values, with suggestions ranging from $90,000 to $100,000. Ultimately, the Board agreed on a reserve price of $115,000, meaning the building would not be sold for less than that amount. A motion was made by Commissioner King to place the building located at 137 South Court Square out for bid, with a reserve price of $115,000, and to advertise the bid opportunity for a 30-day period or as soon as possible. This motion was seconded by Vice Chairman Collins. All were in favor. 6. Discussion on Additional Roads for 2025 LMIG During the discussion of additional roads to be included in the 2025 LMIG program, the Board of Commissioners heard an update from Mr. Chris Brazell of EMC Engineering Services, the firm contracted by the County for engineering services. Mr. Brazell provided updated cost estimates for two road resurfacing projects - Stovall Road and Melvin Harris Road. Stovall Road was estimated at $360,000, and Melvin Harris Road at $420,000, for a combined cost of approximately $780,000. The 2025 LMIG allocation from the state totaled $830,548.14, with the required 30% local match calculated at $249,164.44, bringing the minimum total required spending to $1,079,712.58. In addition to the LMIG funds, the County had previously committed $517,885.10 in remaining 2024 LRA funds, bringing the total available funding to approximately $1,597,597.68. Chairman Worsley expressed appreciation for the significantly lower-than-expected road project bids and the proactive work done by EMC to secure better value for the county. Several members emphasized that since the Board had already committed to spending the full amount, they were not in favor of holding back any of the allocated funds, Instead, they supported moving forward with spending the full $1.6 million to pave additional roads and maximize the benefit to the community. There was strong agreement that saving the funds was not in the best interest of the County, especially when the opportunity existed to complete more roadwork than originally anticipated. The conversation then turned to identifying which additional roads could be included to reach the full spending target. Stovall Road and Melvin Harris Road were already prepared for bid, and Public Works had previously compiled a list of roads with condition rankings. Chairman Worsley mentioned that additional stretches of Stovall Road, particularly from Harry Hardy Road to Oglethorpe Road, were in extremely poor condition and should be prioritized while contractors were already mobilized in the area. There was general consensus that continuing the resurfacing along Stovall Road would be a cost- effective approach, avoiding the added expenses of demobilization and re-mobilization for separate projects. EMC confirmed that extending the paving project would result in better unit pricing and could increase contractor interest in the bid. Mr. Brazell noted that a comprehensive countywide road assessment could help take the subjectivity out of road selection and give the County a data-driven benchmark for planning. He explained that EMC had experience doing such assessments in other counties and could apply a consistent scoring system to all paved roads in Meriwether County. This would aid staff and the Board in justifying road priorities and responding to public inquiries. He also clarified that EMC's compensation was based on a percentage of the construction cost and would scale accordingly, meaning that additional paving would not result in higher overhead or administrative fees. There was further discussion about whether to focus on completing one entire road, such as Coleman Creek Circle or Forrest Road, or to continue extending paving along Stovall Road. Commissioner Snelson expressed a preference for completing full roads where possible, rather than patching segments in different locations. The Board also noted that Stovall Road had previously been identified as one of the highest traffic corridors in the county, ranking just behind Luthersville Road, and continuing work there would maximize the benefit to residents and visitors. EMC advised that adding length to already-approved roads like Stovall while crews were mobilized would not only be more efficient but would also allow the County to stretch its LMIG funds even further. Commissioners ultimately agreed that EMC should move forward with finalizing the bid package for the existing work and additional miles on Stovall Road, bringing total project spending up to the full $1.6 million. They requested that EMC continue working closely with staff and Public Works to identify exact road segments and that staff and the County Administrator be authorized to direct the use of any remaining funds once the priority roads were completed. The Board also authorized EMC to conduct a full assessment of all paved roads in the county, including evaluation of both physical condition and traffic volume, to support future planning and transparency in infrastructure investments. A motion was made by Chairman Worsley to authorize the continuation of the full LMIG and LRA funding allocation totaling $1,597,597.68, directing that it be used to continue paving Stovall Road until funds are exhausted or the road is complete. The motion also allowed the County Administrator, Public Works, and Staff to determine the next roads to be addressed thereafter, and authorized EMC Engineering Services to perform a full assessment and scoring of all paved roads across Meriwether County. This motion was seconded by Commissioner King. All were in favor. 7. Consideration of a Referendum Resolution for the Continuation of Special Local Option Sales Tax (SPLOST) and the execution of agreements to place SPLOST on the November 2025 ballot. The Board of Commissioners considered a resolution to place a referendum for the continuation of the Special Local Option Sales Tax (SPLOST) on the November 2025 general election ballot. This referendum would allow the citizens of Meriwether County to vote on the continuation of the existing SPLOST, which funds essential capital outlay projects throughout the county and its municipalities. The resolution also included authorization for the execution of agreements needed to formally call the election and to include a project list, which must be submitted by both the County and each of the cities within its jurisdiction. It was explained that in order for the referendum to be properly submitted to the voters, all Commissioners would be required to sign the resolution. Additional signatures would also be necessary to execute the official call for the election. County Attorney Nathan Lee confirmed that it was not necessary to read the full resolution aloud during the meeting, as all Commissioners had been given adequate time to review the document prior to the meeting. After discussion, a motion was made by Commissioner Snelson to approve and sign the resolution for the continuation of SPLOST and to authorize the necessary agreements to place the referendum on the November 2025 ballot. This motion was seconded by Vice Chairman Collins. All were in favor. XIV. REPORT FROM COUNTY ADMINISTRATOR County Administrator Gorton provided an update to the Board, beginning with information on the ongoing budget process. He reported that he and Finance Director Tarleton had been working closely with Directors and Constitutional Officers. Meetings with those departments were scheduled to take place over the next few weeks, during which feedback and additional requests, such as the addition of personnel, could be considered. County Clerk Stephens exited the meeting at 7:42 p.m. and returned at 7:45 p.m. County Administrator Gorton stated that Staff presentations and further input may be addressed during a proposed Work Session before the next Regular Board Meeting to help guide the Board's recommendations as budget preparations move forward. County Administrator Gorton also shared highlights from the Lake Meriwether 4th of July celebration. He described the event as a success, noting that he arrived around 8:00 p.m. when the weather was comfortable. The fireworks show lasted approximately 25 minutes and was very well received. He commended County Staff for their hard work in preparing for the event and quickly cleaning the park both before and after. While a few minor hiccups occurred, Staff managed those effectively. County Administrator Gorton praised the band performance and expressed appreciation for everyone involved, noting he looked forward to next year's event. XV. REPORT FROM COUNTY COMMISSIONERS Commissioner Jennifer Snelson: Commissioner Snelson began by offering congratulations to all the Meriwether County Recreation teams that recently competed, noting that regardless of placement, their efforts were appreciated. She extended thanks to the coaches and parents for their involvement, as well as to the Recreation Department Staff, who she said often go unrecognized despite their exceptional work with the youth. Commissioner Snelson also expressed gratitude to everyone involved in organizing the 4th of July fireworks celebration. She complimented the smooth coordination of the event, particularly in terms of public safety and traffic flow, praising the ease of both entry and exit. Lastly, she thanked the department heads who regularly attend Commission Meetings and advocate on behalf of their departments, stating her appreciation for their presence and contributions. Commissioner Gene King: Commissioner King began his comments by expressing agreement with the statements made by Commissioner Snelson, stating "ditto on all that," and reiterating her appreciation for the efforts surrounding recent community events. He praised the success of the 4th of July celebration and expressed pride in the youth of Meriwether County. Commissioner King also highlighted the significant progress of the Meriwether County Recreation Department, noting that since its inception a year and a half to two years ago, the program has flourished. He commended the enthusiasm of the parents and expressed optimism for the continued growth and success of the department. Vice Chairman Emmett Collins: Vice Chairman Collins expressed his gratitude to the County Staff and employees for their continued hard work and dedication, noting that operations throughout the county appear to be progressing smoothly. He extended his thanks to the sponsors who contributed to the success of the recent fireworks event, as well as to the committee members who helped organize the celebration. Additionally, he recognized and thanked Meriwether County Fire and Rescue and the Meriwether County Sheriff's Office for their efforts in ensuring the event's safety and success. He concluded by stating he had no further comments. Chairman Adam Worsley: Chairman Worsley echoed the sentiments shared by his fellow commissioners, expressing gratitude to everyone who was involved in organizing and supporting the recent holiday celebrations. He acknowledged the time, effort, and financial contributions that went into making the events a success, noting that they were appreciated by the public. Chairman Worsley also extended his thanks to the County Staff for their continued work and expressed his appreciation for the independence the Board maintains in making decisions for the County. XVI. REPORT FROM COUNTY ATTORNEY County Attorney Nathan Lee had nothing to report. XVII. FUTURE MEETINGS & NOTICES Chairman Worsley read the Future Meetings and Notices before entering into Executive Session. XVIII. EXECUTIVE SESSION A motion was made to go into Executive Session for the purposes of Litigation, Personnel, Real Estate, and Tax Matters at 7:46 p.m. by Vice Chairman Collins and seconded by Commissioner Snelson. All were in favor. A motion was made to go out of Executive Session at 8:00 p.m. by Commissioner King and seconded by Commissioner Snelson. All were in favor. A motion was made to go back into Regular Session at 8:02 p.m. by Vice Chairman Collins and seconded by Commissioner Snelson. All were in favor. A motion was made by Chairman Worsley to waive the penalties and interest on taxes as discussed in Executive Session. This motion was seconded by Commissioner Snelson. All were in favor. A motion was made by Chairman Worsley to approve two positions in Public Works. This motion was seconded by Vice Chairman Collins. All were in favor. XIX. ADJOURNMENT With no further business, a motion was made to Adjourn the Meeting at 8:02 p.m. by Vice Chairman Collins. This motion was seconded by Commissioner Snelson. All were in favor. Approved by: Attest: Date: