--- title: Clayton County Board of Commissioners regular meeting minutes, September 2, 2025 collection: local-meetings id: minutes:2025-09-02/clayton-county-board-of-commissioners cite_as: Clayton County Board of Commissioners regular meeting minutes, September 2, 2025 canonical_url: https://georgiacommons.org/meetings/2025-09-02/clayton-county-board-of-commissioners md_url: https://georgiacommons.org/meetings/2025-09-02/clayton-county-board-of-commissioners.md text_url: https://georgiacommons.org/meetings/2025-09-02/clayton-county-board-of-commissioners/text source_url: https://claytoncountyga.iqm2.com/Citizens/FileOpen.aspx?Type=12&ID=1523&Inline=True date: 2025-09-02 jurisdiction: county:clayton jurisdiction_name: Clayton County county_fips: "13063" license: Public record of Clayton County Board of Commissioners, from its own website or meeting portal publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. version: Minutes as posted version_id: minutes:2025-09-02/clayton-county-board-of-commissioners@ref70dc772bcd retrieved: 2026-11-25T08:50:16.081580+00:00 --- # Clayton County Board of Commissioners regular meeting minutes, September 2, 2025 - Body: Clayton County Board of Commissioners - Date: September 2, 2025 - Time: 6:00 PM ## Records of this meeting - Minutes: https://claytoncountyga.iqm2.com/Citizens/FileOpen.aspx?Type=12&ID=1523&Inline=True (in Georgia Commons as `minutes:2025-09-02/clayton-county-board-of-commissioners`) - Video: https://claytoncountyga.iqm2.com/Citizens/SplitView.aspx?Mode=Video&MeetingID=1570 ## Georgia Commons summary (AI-written) Written by AI from the record below. It is not the record and is never a source: cite the record's own words. Commissioners approved a data center moratorium through December 31, 2025, opioid settlement agreements, and a merger-related reorganization of county development staff. The Board approved a consent agenda by unanimous vote that covered fire station contract change orders, a NetApp purchase of $226,272.50, five budget amendments, a marijuana possession ordinance, a moratorium on data center applications until December 31, 2025, and a resolution to start removing data centers from the Ellenwood Planned Unit Development. It separately approved personnel changes ahead of a merger of the Community Development and Economic Development departments, and set a December 16, 2025 zoning hearing. Several Sports and Entertainment Council appointments were made, while others were held. After a closed session, the Board approved opioid settlement agreements and named an interim Clerk of the Commission. Two items were removed from the agenda, and residents spoke on evictions, data centers and other concerns. Topics: data center moratorium; Ellenwood PUD data centers; opioid litigation settlements; Community and Economic Development merger; fire station change orders; marijuana possession ordinance; Sports and Entertainment Council appointments; eviction crisis public comment; December 16 zoning hearing; interim Clerk of the Commission. Decisions the record states (each with the record's own sentence): - Consent agenda including fire station change orders, NetApp purchase, budget amendments, marijuana ordinance, and data center moratorium: Adopted, unanimous. The record: "Motion made to approve consent agenda by Commissioner Hambrick, seconded by Commissioner Davis. Vote unanimous" - Opioid litigation settlement agreements (Purdue Pharma and National Prescription Opioid Litigation including Sandoz): Adopted, unanimous. The record: "Motion to approve settlement agreements moved by Chairwoman Anderson-Henry, seconded by Commissioner Allen. Vote unanimous." - Personnel and classification changes for merger of Community Development and Economic Development departments: Adopted, unanimous. The record: "Motion to approve moved by Commissioner Davis, seconded by Chairwoman Anderson-Henry. Vote unanimous." - Resolution 2025-189 to initiate text modification of the Ellenwood Planned Unit Development regarding data centers: Adopted, unanimous. The record: "Motion to approve BOC 2508-0543 moved by Vice Chair Reaves, seconded by Commissioner Allen. Vote unanimous." - Resolution 2025-195 setting a December 16, 2025 zoning hearing: Adopted, unanimous. The record: "Motion made to approve Resolution 2025-195 moved by Commissioner Davis, seconded by Chairwoman Anderson-Henry. Vote unanimous." - Appointment of Tahisha King as Interim Clerk of the Commission: Adopted, unanimous. The record: "Motion made to approve Tahisha King as Interim Clerk of Commission moved by Chairwoman Anderson, seconded by Commissioner Allen. Vote unanimous." - Request that Clayton County Housing Authority pay $200,000 to Calvary: Adopted, unanimous. The record: "Commissioner Hambrick made a motion to ask Clayton County Housing Authority to pay $200,000.00 to Calvary, seconded by Chairwoman Anderson-Henry. Vote unanimous." - Sports and Entertainment Council appointment of Gerald McClellan, 2-year term: Adopted, unanimous. The record: "Commissioner Davis to appoint Gerald McClellan 2-year term, seconded by Chairwoman Anderson-Henry. Vote unanimous." - Sports and Entertainment Council appointment of Dr. Ralph Simpson, 2-year term: Adopted, unanimous. The record: "Commissioner Davis second appointment is Dr. Ralph Simpson 2-year term, seconded" - Sports and Entertainment Council at-large appointment of Tameron Scott, 1-year term: Adopted, unanimous. The record: "Commissioner Allen to appoint Tameron Scott 1-year term, seconded by Vice Chair Reaves. Vote unanimous." ## Minutes CLAYTON COUNTY BOARD OF COMMISSIONERS Regular Business Meeting September 02, 2025 6:00 PM M I N U T E S I. CALL TO ORDER: Chairwoman Anderson-Henry called the meeting to order. II. ROLL CALL: Attendee Name Title Status Arrived Alieka Anderson-Henry Chairwoman Present Alaina Reaves Commissioner Present Tashe Allen Commissioner Present Gail Hambrick Commissioner Present DeMont Davis Commissioner Present III. INVOCATION AND PLEDGE OF ALLEGIANCE TO THE FLAG: The invocation was led by Pastor David Arnold of Anointed Vision of Hope at 8049 Webb Road, Riverdale, Georgia. The Pledge of Allegiance to the flag was led by Chairwoman Dr. Anderson-Henry. IV. ADOPTION OF THE AGENDA: Chairwoman made a motion to approve the August 19, 2025 minutes and add the August 28, 2025 minutes to the regular agenda, seconded by Commissioner Hambrick. Vote Unanimous. Motion made to add the proclamation for Mrs. Irene Wilson moved by Vice Chair Reaves, seconded by Chairwoman Anderson-Henry. Vote Unanimous. Commissioner Hambrick made a motion to ask Clayton County Housing Authority to pay $200,000.00 to Calvary, seconded by Chairwoman Anderson-Henry. Vote unanimous. Commissioner Davis to remove item #25 from the agenda, seconded by Vice Chair Reaves. Vote Unanimous. Madam Clerk made correction for item #12 from $100 to $110 for Tony Johnson. Vice Chair Reaves to move item #18 from the consent agenda to the regular agenda. Motion to adopt the agenda with all changes moved by Commissioner Davis, seconded by Chairwoman Anderson-Henry. Vote Unanimous. V. PRESENTATIONS & PROCLAMATIONS: 1. Presentation: "Veteran of the Month" (Senior Services/Veterans Advisory Board) - Chairwoman Dr. Alieka Anderson Henry Presented by Chairwoman Anderson-Henry Proclamation for: "Veteran of the Month" (Senior Services/Veterans Advisory Board) for Dr. Donald McCants. 2. Proclamation: “September is National Senior Center Month” (Chairwoman Dr. Alieka Anderson-Henry) Presented by Chairwoman Anderson-Henry Proclamation for: “September is National Senior Center Month”. 3. Proclamation: “National Kinship Care Month” (Chairwoman Dr. Alieka Anderson-Henry) Presented by Chairwoman Anderson-Henry Proclamation for: “National Kinship Care Month”. 4. Proclamation: Clayton County Recognizes September 2025 as National Preparedness Month (Commissioner Hambrick) September is National Preparedness Month, and the Clayton County Office of Emergency Management (EMA) and the Office of Resilience and Sustainability (ORS) will spotlight initiatives to educate and empower the community and Clayton County personnel on emergency planning. EMA and ORS recognize the importance of empowering the community with information and events to ensure all are properly equipped to address various crises effectively Presented by Commissioner Hambrick Proclamation for: Clayton County Recognizes September 2025 as National Preparedness Month. 5. Proclamation - Forest Park Youth Volleyball - (Commissioner Reaves) Presented by Vice Chair Reaves Proclamation for: Forest Park Youth Volleyball. 6. Added-Proclamation for Irene Wilson 102 Birthday Presented by Vice Chair Reaves Proclamation for: Irene Wilson 102nd Birthday. VI. PUBLIC COMMENT: Henry Anderson (District 3, Unincorporated Clayton County, Hampton, GA) Mr. Anderson addressed the Chairwoman, Vice Chair, and Commissioners, continuing his presentation of the Clayton County Board of Commissioners Citizens Evaluation. Category Four: Focused on the Clayton County Government Departmental Performance Review, led biannually by Chief Operating Officer Detrick Stanford and Executive Deputy COO Landry Merkison. *He noted the most recent sessions were held April 29-30, 2025, and October 15-16, 2024. *All 22 departments present key performance indicators, short- and long-term goals, challenges, solutions, and future initiatives. *Presentations are timed (7 minutes maximum) with deductions for exceeding the limit. *Departments provide data on whether goals are met, on target, or above target, along with numerical grades issued later. Category Five: Based on his 25 years of knowledge and experience as an active participant and regular attendee of BOC meetings. *He plans to provide a final wrap-up of his evaluation process, including a start date for the official citizen evaluation of the BOC. *This will begin during the public comment section at the next regular business meeting on Tuesday, September 16, 2025, at 6:00 p.m. Mr. Anderson concluded by wishing the Board continued productivity and success for the remainder of the meeting. 2. Mr. Gooden referenced the August 19th Board of Commissioners meeting, where concerns were raised about the new data center project. He noted: *A similar project, “Project Excalibur,” in Fayetteville occupies 615 acres with 6.6 million sq. ft. of data space. *For comparison, a 200,000 sq. ft. data center consumes more energy than 30,000 homes. *He asked what size data center the Board approved, pointing out that residents in Douglas and Fayette Counties objected to such projects due to infrastructure, property value, and quality-of-life impacts. Mr. Gooden also addressed youth housing issues raised during Chief Sweat’s press conference and Police Chief Robert’s report of over 200 incident calls: *He questioned how many times the Fire Chief was called, why citations were issued without time to correct violations, and when DFCS was contacted. *He explained the church in question was a temporary facility due to damage at the original location and emphasized that the church is clean, with security in place to protect against intruders rather than to restrain the youth. *He cited past issues with a youth center in Rex, where residents endured years of break-ins before closure. Mr. Gooden questioned who requested the Fire Chief’s and media’s involvement, responding to public comments made by Demetrius Collins. He suggested Collins’s perspective was influenced by his previous gestures of appreciation toward the Board. He concluded by acknowledging the Board’s fiscal responsibility, though remarking it was “a day late and $2 short.” 3. Mickey Garber (Unincorporated Rex, GA) Mr. Garber addressed the Board on the theme “Clayton County, where the world lands and opportunity takes off.” He stated that Georgia legislators may soon vote to place casino gambling on the ballot, and if approved, the next decision would be where to locate it. He argued that Clayton County is the best choice-near the airport and the State Farmers Market, which he envisioned being transformed into an international market with upscale shopping. Mr. Garber urged the Board to show leadership, courage, and vision in pursuing this opportunity. He also mentioned lobbyists, referring to “the Ohio River,” suggesting they should be advocating for Clayton County. Chairwoman Anderson-Henry clarified that Clayton County does not currently have lobbyists, and the Ohio River group does not represent the County. 4. Tamala LaShae, a resident of unincorporated Rex, spoke about the county’s eviction crisis, noting Clayton’s 8.5% eviction rate compared to 3.8% statewide and 1.6% nationally. She described long lines at magistrate court and stressed the impact on families, particularly single mothers, children, and seniors. LaShae questioned why residents are told rental assistance funds are unavailable when officials say otherwise, calling it a serious disconnect that leaves families homeless. Chairwoman Anderson-Henry responded that the Housing Authority has funding for qualified residents and asked LaShae to meet with a representative present. LaShae maintained that websites and nonprofits show no money available, pressing for better communication and access. Commissioners added that eviction mediation through magistrate court and coordinated entry resources exist to help tenants avoid eviction records, but LaShae emphasized that delays leave families without timely support. 5. Dr. Lawanda Folami of Clayton County spoke in support of Tamala LaShae’s concerns, sharing her own experiences assisting families facing eviction. She said many residents are not lazy but have fallen on hard times, yet they struggle to access promised resources. Folami described people being evicted while waiting for funding processes, or being required to attend classes when they urgently needed housing support, which she felt was unfair. She recounted seeing long eviction lines at the courthouse and questioned why they appeared to consist mostly of Caucasian residents, raising concerns about whether other communities had equal access to resources. She noted that residents calling the Housing Authority, CSA, or Hearts to Nourish Hope often report no help available, despite public claims otherwise. Folami urged the Board to review how resources are being handled and affirmed her solidarity with LaShae before yielding her time. 6. Miss Cheline Jules of Ellenwood requested expedited approval of a conditional use permit for her property at 5262 Bouldercrest Road. The building operated as an auto truck service center from 1974 to 2023, and after leasing it back to the prior operator, she planned to open a floral shop. However, the neighboring property was sold without notice to a halfway house for former prisoners and sex offenders, which she said disrupted her plans and influenced her decision to sell. Jules explained she has received multiple purchase offers, all from auto service operators, and her current buyer is an experienced business owner with funds to revitalize the property and create local jobs. She asked for fast approval to allow the buyer’s financing to move forward, noting she has been working with Planning staff and previously spoke with Commissioner Reaves and Chairwoman Anderson-Henry. The Chair directed her to continue discussions with Planning Director Patrick Ejike, who was present at the meeting. 7. Judith Cotton of District 4 raised several concerns. She followed up on her June 2024 request for the county to use HUD-VASH funds to support unhoused veterans, noting she has heard no updates. As a member of the Clayton County Veterans Advisory Board, she requested a budget line item to fund the board’s work. Cotton also criticized development delays, stating the planning department only meets twice a year, which discourages developers and has left some projects stalled for over a year. She further echoed concerns about the county’s high eviction rate, citing her own property management experience and overcrowded court dockets. She urged the county to use available HUD funding to better support residents facing eviction. Chairwoman Anderson-Henry responded that Cotton could speak with staff about the VASH program and noted that partnerships with local nonprofits are in place to assist residents. VII. CONSENT AGENDA: Motion made to approve consent agenda by Commissioner Hambrick, seconded by Commissioner Davis. Vote unanimous 1. Recommendation for Contract Amendment: RFP 21-04, Architectural, Engineering and Design Services for Clayton County, Georgia; Work Authorization Request (W.A.R.) #2021-05 Fire Station #9 & #15. This recommendation is to amend the contract with Pond & Company, Inc., located in Peachtree Corners, Georgia, for additional engineering drawings and details to support the new apron structure of Fire Station #1 and Emergency Services Head Quarters in the amount of $5,012.00. Funding is available through the SPLOST 2021 Fund. Pursuant to Section 2-136 of the Clayton County Code of Ordinances, General Purchasing Methods. Change orders and contract modifications. (a) General provisions. Except as hereinafter provided, any change order or shall be approved by the board of commissioners. Contract modifications that do not require a change order and are not in excess of $75,000 shall not need Board approval. Contract modifications include changes to terms other than scope of work and pricing. (b) Statement of policy. Clayton County is committed to a policy of open, nondiscriminatory, and competitive purchasing. When circumstances arise after award of a contract, requiring modification of that contract, such modification will be accomplished in accordance with the procedures established by the Chief Procurement Officer, to achieve the following goals: (1) Ensure that Clayton County does not pay more than is necessary to complete the contract; (2) Preclude a contractor from tendering the lowest bid and then increasing the cost of the contract through the change order process; (3) Ensure that the terms and conditions upon which the contract was awarded are met throughout the term of the contract, including any and all change orders; (4) Ensure that the change order procedure is not used to bypass the competitive bidding process; and (5) Ensure that change orders are not used for work that is independent of and outside the scope of the original contract. (c) Justification for change orders. Change orders are authorized only for the following reasons and must include a written summary detailing the justification: (1) Situations creating an immediate need to protect the public health, safety or welfare; (2 )Corrections of deficiencies in design or construction documents provided by architects or engineers other than the contractor; (3) Changes in applicable laws or regulations, or changes that result from public participation when such participation is mandated by laws or regulations; (4) Concealed conditions, differing site conditions or abnormal inclement weather; (d) Owner requested changes within the scope of the original contract. Such changes may include: Deductive change orders and accommodations of value engineering and administrative matters such as closeout change orders for unit price contracts, deductions for approved material substitutions and administrative no-cost change orders. (d) (1) Change order procedure. The ordinary sequence of a change order is as follows: a. Need for contract modification is identified; b. Contractor is requested to propose price for change and if necessary, schedule changes; c. Contractor and county negotiate price and scope of change; d. Agreement between county and contractor for change is clearly defined in a written modification; e. Contractor signs modification and returns it to the [county]; and f. Modification is submitted to the county manager or BOC for approval depending on the amount of the change order. (d2) Circumstances may alter this general description of the change order procedure. The administrative actions necessary to accomplish a change order are described in subsection (e) of this section. (e) Administrative actions. Chief Procurement Officer of Central Services has the primary responsibility for completion of the administrative steps necessary to complete a change order. Such responsibility may be exercised through designees and in consultation with other interested departments. (f) Authority of the chief operating officer. The chief operating officer or his/her designee shall have authority to approve all change orders to purchase orders and contracts up to an absolute value of ten percent of the original contract price, provided the total change order amount is less than $74,999.99. Change orders to any contract originally approved by the board of commissioners, chief operating officer or Chief Procurement Officer of Central Services, which amend the scope of work, term, time and/or total cost not exceeding $74,999.99 may be approved by the chief operating officer or his/her designee. Change orders shall not be artificially divided so as to remain under the ten percent threshold. (g) Authority of the Chief Procurement Officer of Central Services. The Chief Procurement Officer of Central Services and/or his/her designee shall have authority to approve all change orders to purchase orders and contracts up to an absolute value of $50,000.00. Change orders to any contract originally approved by the board of commissioners, chief operating officer or Chief Procurement Officer of Central Services, which amend the scope of work, term, time and/or total cost not exceeding $50,000.00 may be approved by the Chief Procurement Officer or his/his designee. Change orders shall not be artificially divided so as to remain under the $50,000.00 threshold. (h) Ratification. All change orders shall be ratified by official action of the Board of Commissioners at the second board of commissioners' meeting as part of the monthly report from the Chief Procurement Officer of Central Services and/or the chief operating officer. 2. Recommendation for Contract Amendment: ITB #24-76 Construction of Fire Station #1 and Emergency Services Head Quarters for Clayton County, Georgia. (Building and Maintenance). The recommendation is to amend the contract with Hogan Construction Group, located in Norcross, Georgia, for Change Order #1 and Change Order #2 for a total amount of $31,369.18. Funding is available through the Fire Fund and 2021 SPLOST Fund. Pursuant to Section 2-136 of the Clayton County Code of Ordinances, General Purchasing Methods. Change orders and contract modifications. (a) General provisions. Except as hereinafter provided, any change order or shall be approved by the board of commissioners. Contract modifications that do not require a change order and are not in excess of $75,000 shall not need Board approval. Contract modifications include changes to terms other than scope of work and pricing. (b) Statement of policy. Clayton County is committed to a policy of open, nondiscriminatory, and competitive purchasing. When circumstances arise after award of a contract, requiring modification of that contract, such modification will be accomplished in accordance with the procedures established by the Chief Procurement Officer, to achieve the following goals: (1) Ensure that Clayton County does not pay more than is necessary to complete the contract; (2) Preclude a contractor from tendering the lowest bid and then increasing the cost of the contract through the change order process; (3) Ensure that the terms and conditions upon which the contract was awarded are met throughout the term of the contract, including any and all change orders; (4) Ensure that the change order procedure is not used to bypass the competitive bidding process; and (5) Ensure that change orders are not used for work that is independent of and outside the scope of the original contract. (c) Justification for change orders. Change orders are authorized only for the following reasons and must include a written summary detailing the justification: (1) Situations creating an immediate need to protect the public health, safety or welfare; (2) Corrections of deficiencies in design or construction documents provided by architects or engineers other than the contractor; (3) Changes in applicable laws or regulations, or changes that result from public participation when such participation is mandated by laws or regulations; (4) Concealed conditions, differing site conditions or abnormal inclement weather; (d) Owner requested changes within the scope of the original contract. Such changes may include: Deductive change orders and accommodations of value engineering and administrative matters such as closeout change orders for unit price contracts, deductions for approved material substitutions and administrative no-cost change orders. (d) (1) Change order procedure. The ordinary sequence of a change order is as follows: a. Need for contract modification is identified; b. Contractor is requested to propose price for change and if necessary, schedule changes; c. Contractor and county negotiate price and scope of change; d. Agreement between county and contractor for change is clearly defined in a written modification; e. Contractor signs modification and returns it to the [county]; and f. Modification is submitted to the county manager or BOC for approval depending on the amount of the change order. (d2) Circumstances may alter this general description of the change order procedure. The administrative actions necessary to accomplish a change order are described in subsection (e) of this section. (e) Administrative actions. Chief Procurement Officer of Central Services has the primary responsibility for completion of the administrative steps necessary to complete a change order. Such responsibility may be exercised through designees and in consultation with other interested departments. (f) Authority of the chief operating officer. The chief operating officer or his/her designee shall have authority to approve all change orders to purchase orders and contracts up to an absolute value of ten percent of the original contract price, provided the total change order amount is less than $74,999.99. Change orders to any contract originally approved by the board of commissioners, chief operating officer or Chief Procurement Officer of Central Services, which amend the scope of work, term, time and/or total cost not exceeding $74,999.99 may be approved by the chief operating officer or his/her designee. Change orders shall not be artificially divided so as to remain under the ten percent threshold. (g) Authority of the Chief Procurement Officer of Central Services. The Chief Procurement Officer of Central Services and/or his/her designee shall have authority to approve all change orders to purchase orders and contracts up to an absolute value of $50,000.00. Change orders to any contract originally approved by the board of commissioners, chief operating officer or Chief Procurement Officer of Central Services, which amend the scope of work, term, time and/or total cost not exceeding $50,000.00 may be approved by the Chief Procurement Officer or his/his designee. Change orders shall not be artificially divided so as to remain under the $50,000.00 threshold. (h) Ratification. All change orders shall be ratified by official action of the Board of Commissioners at the second board of commissioners' meeting as part of the monthly report from the Chief Procurement Officer of Central Services and/or the chief operating officer. 3. Recommendation for Contract Amendment: ITB #24-79 Construction of Fire Station #9 for Clayton County, Georgia. (Building Maintenance). The recommendation is to amend the contract with Albion General Contractors, Inc., located in Sandy Springs, Georgia, for Change Order #3 for a total amount of $70,299.95. Funding is available through the 2004 SPLOST Fund. Pursuant to Section 2-136 of the Clayton County Code of Ordinances, General Purchasing Methods. Change orders and contract modifications. (a) General provisions. Except as hereinafter provided, any change order or shall be approved by the board of commissioners. Contract modifications that do not require a change order and are not in excess of $75,000 shall not need Board approval. Contract modifications include changes to terms other than scope of work and pricing. (b) Statement of policy. Clayton County is committed to a policy of open, nondiscriminatory, and competitive purchasing. When circumstances arise after award of a contract, requiring modification of that contract, such modification will be accomplished in accordance with the procedures established by the Chief Procurement Officer, to achieve the following goals: (1) Ensure that Clayton County does not pay more than is necessary to complete the contract; (2) Preclude a contractor from tendering the lowest bid and then increasing the cost of the contract through the change order process; (3) Ensure that the terms and conditions upon which the contract was awarded are met throughout the term of the contract, including any and all change orders; (4) Ensure that the change order procedure is not used to bypass the competitive bidding process; and (5) Ensure that change orders are not used for work that is independent of and outside the scope of the original contract. (c) Justification for change orders. Change orders are authorized only for the following reasons and must include a written summary detailing the justification: (1) Situations creating an immediate need to protect the public health, safety or welfare; (2 )Corrections of deficiencies in design or construction documents provided by architects or engineers other than the contractor; (3) Changes in applicable laws or regulations, or changes that result from public participation when such participation is mandated by laws or regulations; (4) Concealed conditions, differing site conditions or abnormal inclement weather; (d) Owner requested changes within the scope of the original contract. Such changes may include: Deductive change orders and accommodations of value engineering and administrative matters such as closeout change orders for unit price contracts, deductions for approved material substitutions and administrative no-cost change orders. (d) (1) Change order procedure. The ordinary sequence of a change order is as follows: a. Need for contract modification is identified; b. Contractor is requested to propose price for change and if necessary, schedule changes; c. Contractor and county negotiate price and scope of change; d. Agreement between county and contractor for change is clearly defined in a written modification; e. Contractor signs modification and returns it to the [county]; and f. Modification is submitted to the county manager or BOC for approval depending on the amount of the change order. (d2) Circumstances may alter this general description of the change order procedure. The administrative actions necessary to accomplish a change order are described in subsection (e) of this section. (e) Administrative actions. Chief Procurement Officer of Central Services has the primary responsibility for completion of the administrative steps necessary to complete a change order. Such responsibility may be exercised through designees and in consultation with other interested departments. (f) Authority of the chief operating officer. The chief operating officer or his/her designee shall have authority to approve all change orders to purchase orders and contracts up to an absolute value of ten percent of the original contract price, provided the total change order amount is less than $74,999.99. Change orders to any contract originally approved by the board of commissioners, chief operating officer or Chief Procurement Officer of Central Services, which amend the scope of work, term, time and/or total cost not exceeding $74,999.99 may be approved by the chief operating officer or his/her designee. Change orders shall not be artificially divided so as to remain under the ten percent threshold. (g) Authority of the Chief Procurement Officer of Central Services. The Chief Procurement Officer of Central Services and/or his/her designee shall have authority to approve all change orders to purchase orders and contracts up to an absolute value of $50,000.00. Change orders to any contract originally approved by the board of commissioners, chief operating officer or Chief Procurement Officer of Central Services, which amend the scope of work, term, time and/or total cost not exceeding $50,000.00 may be approved by the Chief Procurement Officer or his/his designee. Change orders shall not be artificially divided so as to remain under the $50,000.00 threshold. (h) Ratification. All change orders shall be ratified by official action of the Board of Commissioners at the second board of commissioners' meeting as part of the monthly report from the Chief Procurement Officer of Central Services and/or the chief operating officer. 4. Recommendation for Contract Amendment: ITB #24-113 Construction of Fire Station #15 for Clayton County, Georgia. (Building and Maintenance). The recommendation is to amend the contract with Brad Construction Company II, located in Fayetteville, Georgia, for Change Order #7, for a total amount of $22,003.26. Funding is available through the Fire Fund. Pursuant to Section 2-136 of the Clayton County Code of Ordinances, General Purchasing Methods. Change orders and contract modifications. (a) General provisions. Except as hereinafter provided, any change order or shall be approved by the board of commissioners. Contract modifications that do not require a change order and are not in excess of $75,000 shall not need Board approval. Contract modifications include changes to terms other than scope of work and pricing. (b) Statement of policy. Clayton County is committed to a policy of open, nondiscriminatory, and competitive purchasing. When circumstances arise after award of a contract, requiring modification of that contract, such modification will be accomplished in accordance with the procedures established by the Chief Procurement Officer, to achieve the following goals: (1) Ensure that Clayton County does not pay more than is necessary to complete the contract; (2) Preclude a contractor from tendering the lowest bid and then increasing the cost of the contract through the change order process; (3) Ensure that the terms and conditions upon which the contract was awarded are met throughout the term of the contract, including any and all change orders; (4) Ensure that the change order procedure is not used to bypass the competitive bidding process; and (5) Ensure that change orders are not used for work that is independent of and outside the scope of the original contract. (c) Justification for change orders. Change orders are authorized only for the following reasons and must include a written summary detailing the justification: (1) Situations creating an immediate need to protect the public health, safety or welfare; (2) Corrections of deficiencies in design or construction documents provided by architects or engineers other than the contractor; (3) Changes in applicable laws or regulations, or changes that result from public participation when such participation is mandated by laws or regulations; (4) Concealed conditions, differing site conditions or abnormal inclement weather; (d) Owner requested changes within the scope of the original contract. Such changes may include: Deductive change orders and accommodations of value engineering and administrative matters such as closeout change orders for unit price contracts, deductions for approved material substitutions and administrative no-cost change orders. (d) (1) Change order procedure. The ordinary sequence of a change order is as follows: a. Need for contract modification is identified; b. Contractor is requested to propose price for change and if necessary, schedule changes; c. Contractor and county negotiate price and scope of change; d. Agreement between county and contractor for change is clearly defined in a written modification; e. Contractor signs modification and returns it to the [county]; and f. Modification is submitted to the county manager or BOC for approval depending on the amount of the change order. (d2) Circumstances may alter this general description of the change order procedure. The administrative actions necessary to accomplish a change order are described in subsection (e) of this section. (e) Administrative actions. Chief Procurement Officer of Central Services has the primary responsibility for completion of the administrative steps necessary to complete a change order. Such responsibility may be exercised through designees and in consultation with other interested departments. (f) Authority of the chief operating officer. The chief operating officer or his/her designee shall have authority to approve all change orders to purchase orders and contracts up to an absolute value of ten percent of the original contract price, provided the total change order amount is less than $74,999.99. Change orders to any contract originally approved by the board of commissioners, chief operating officer or Chief Procurement Officer of Central Services, which amend the scope of work, term, time and/or total cost not exceeding $74,999.99 may be approved by the chief operating officer or his/her designee. Change orders shall not be artificially divided so as to remain under the ten percent threshold. (g) Authority of the Chief Procurement Officer of Central Services. The Chief Procurement Officer of Central Services and/or his/her designee shall have authority to approve all change orders to purchase orders and contracts up to an absolute value of $50,000.00. Change orders to any contract originally approved by the board of commissioners, chief operating officer or Chief Procurement Officer of Central Services, which amend the scope of work, term, time and/or total cost not exceeding $50,000.00 may be approved by the Chief Procurement Officer or his/his designee. Change orders shall not be artificially divided so as to remain under the $50,000.00 threshold. (h) Ratification. All change orders shall be ratified by official action of the Board of Commissioners at the second board of commissioners' meeting as part of the monthly report from the Chief Procurement Officer of Central Services and/or the chief operating officer. 5. Request to Rescind Recommendation to Award: PSA #25-33 Legal Services in Dependency Proceedings with Sheryle Dickens-Thomas, ESQ. (Juvenile Court). This recommendation is to rescind the contract awarded to Sheryle Dickens-Thomas, Esq., located in Lithonia, Georgia, due to the Supplier’s unwillingness to accept terms for execution of the County’s contract. The award was approved by the Clayton County Board of Commissioners on April 15, 2025. 6. Recommendation for Award: SWC #25-135 Purchase of NetApp Drives for 2700 and Cluster Switches for Clayton County, Georgia. (Information Technology Department). The recommendation is to utilize Statewide contract #99999-001-SPD0000139-0005 with NetApp, through authorized dealer Computacenter United States Inc., located in Norcross, Georgia for the purchase of NetApp Drives for 2700 and Cluster Switches in the total amount of $226,272.50. Funding is available through the Information Technology Department’s General Fund. Pursuant to Section 2-120 of the Clayton County Code of Ordinances, General Purchasing Methods. Governmental and affiliated entity purchase. The county may purchase services and incidental commodities from other federal and state or local governments when determined to be in the best interest of the county. Documentation to substantiate this decision will be maintained by the department of central services. Such purchases where cost is in excess of $74,999.99 or is expected to generate revenue greater than $74,999.99 shall be approved by the board of commissioners. 7. Budget Amendment 4-23 (Angela Jackson) To appropriate funds for the FY2025 SPLOST bond principal and interest payment and to transfer these funds to the Debt Service Fund. 8. Budget Amendment 4-24 (Angela Jackson) To amend the budget for the 2021 SPLOST Salaries and Benefits for SPLOST personnel through December 2026. 9. Budget Amendment 4-25 (Angela Jackson) To amend the budget for 2021 sales tax collections received from the Georgia Department of Revenue for the cities. 10. Budget Amendment 4-26 (Angela Jackson) To amend the budget for Forest Park, Jonesboro, Lake City, and Lovejoy for road repair and maintenance work performed by Transportation and Development based on the Service Delivery Agreement (SDA) for FY25. 11. Budget Amendment 4-27 (Angela Jackson) To appropriate matching funds for the FY2025 Aging Program. 12. Permit Refund The purpose of this request is to issue refund totaling $100 to Tony Johnson for a job cancelled before it started. 13. Street Light Addition Request - Peachtree Farms (Transportation & Development) To accept the Street Light Petition addition to existing Street Light District, Peachtree Farms. The request is to install six (6) additional street lights. (District 1) 14. Resolution 2025-184: A resolution authorizing Clayton County to enter into an Overhead/Underground Release for a Construction Agreement with Georgia Power Company for the installation of a transformer and utility power service for Clayton County Sheriff’s Office Electrical Vehicle Charging Station Project located at 9151 Tara Boulevard, Jonesboro, Georgia 30236; to authorize the Chairwoman or her designee to execute the agreement and otherwise to perform all other acts necessary to accomplish the intent of the resolution; to authorize the Chief Financial Officer to amend the budget where necessary to reflect an appropriate revenue source and expense, all as may be required under the terms of the agreement; to provide an effective date of this resolution; and for other purposes. (Building & Maintenance) Synopsis: This resolution authorizes Clayton County, on behalf of Clayton County Building and Maintenance Department, to enter into the Overhead/Underground Release for a Construction Agreement with Georgia Power for the installation of a transformer and utility power service for Clayton County Sheriff’s Office Electrical Vehicle Charging Station Project located at 9151 Tara Boulevard, Jonesboro, Georgia 30236. 15. Resolution 2025-185: A resolution granting an Utility Easement to Georgia Power to establish electrical power service for the new Fire Station No. 1 and Fire Headquarters Facilities at the parcel address of 6345 Garden Walk Boulevard, Riverdale, Georgia 30274; to authorize the Chairwoman or her designee to execute all documents necessary to carry out the same, and otherwise to perform all acts necessary to accomplish the intent of this resolution; to authorize the Chief Financial Officer to amend the budget where necessary to reflect an appropriate revenue source and expense; to provide an effective date of this resolution; to provide for severability; and for other purposes. (Building & Maintenance) Synopsis: This resolution authorizes Clayton County to grant a Utility Easement to Georgia Power for the new Fire Station No. 1 and Fire Headquarters Facilities at the property located at 6345 Garden Walk Boulevard, Riverdale, Georgia 30274 identified on the County’s Tax Map Parcel ID Number 13141A A002 in Land Lot 140, 141 of the 13th District of Clayton County, Georgia. 16. Ordinance 2025-187: An ordinance to amend the Code of Clayton County, Georgia, as amended, specifically to add, Part I, Chapter 62 “Offenses and Miscellaneous Provisions,” Article I “General,” Section 62-48 “Possession of less than one ounce of marijuana,” to make possession of less than one ounce of marijuana a civil violation with a fine and no jail time; to repeal conflicting laws, ordinances, and resolutions; to provide severability; to provide an effective date; and for other purposes. (Police Department) Synopsis: This ordinance amends the Code of Clayton County, Georgia, as amended, specifically to add, Part I, Chapter 62 “Offenses and Miscellaneous Provisions,” Article I “General,” Section 62-48 “Possession of less than one ounce of marijuana,” to make possession of less than one ounce of marijuana a civil violation with a fine and no jail time. 17. Resolution 2025-188: A resolution authorizing Clayton County, through the Office of Resilience & Sustainability and Emergency Management, to enter into a Facility Use Agreement with the American Red Cross to open congregate shelters during large-scale emergencies or disasters; to authorize the Chairwoman or her designee to execute the agreement and to carry out all duties as required under the terms of the agreement; to authorize the Chief Financial Officer to amend the budget where necessary to reflect an appropriate revenue source and expense all as may be required by the terms of the agreement; to provide an effective date of this resolution; and for other purposes. (Office of Resilience & Sustainability) Synopsis: This resolution authorizes the Office of Resilience and Sustainability and Emergency Management to enter into a Facility Use Agreement with the American Red Cross to open congregate shelters during large-scale emergencies or disasters, as requested by the Director of ORS/EMA. RESULT: APPROVED [UNANIMOUS] MOVER: Alaina Reaves, Commissioner SECONDER:Tashe Allen, Commissioner AYES: Anderson-Henry, Reaves, Allen, Hambrick, Davis 18. Resolution 2025-189: A resolution to initiate a text modification to the Ellenwood Planned Unit Development regarding Data Centers; to provide an effective date of this resolution; and for other purposes. (Community Development) Synopsis: This resolution directs appropriate staff to initiate text modifications to the Ellenwood Planned Unit Development (PUD) to remove Data Center as a permitted use from Ellenwood PUD MX Area. Staff Attorney Charles Reed read Resolution 2025-189: A resolution to initiate a text modification to the Ellenwood Planned Unit Development regarding Data Centers; to provide an effective date of this resolution; and for other purposes. Motion to approve BOC 2508-0543 moved by Vice Chair Reaves, seconded by Commissioner Allen. Vote unanimous. 19. Resolution 2025-190: A resolution to initiate amendments to Appendix A, Article 6, Section 6.34 - Landscaping Standards (LA) and Article 6, Section 6.53 - Tractor, Truck Parking and Tractor Trailer Storage; to modify the Zoning Ordinance regarding truck parking and landscape islands; to provide an effective date of this resolution; and for other purposes. (Community Development) Synopsis: A request for the Board of Commissioners to initiate a Zoning Ordinance text amendment for the modification of Section 6.34 – Landscaping standards and Section 6.53 - Tractor, Truck Parking; Tractor Trailer storage. 20. Resolution 2025-191: A resolution granting an Underground Utility Easement to Georgia Power to establish utility power service for the new Modular Restroom Concession Building at Rex Park located at the parcel address of 3499 Rex Road, Georgia 30273; to authorize the Chairwoman or her designee to execute all documents necessary to carry out the same, and otherwise to perform all acts necessary to accomplish the intent of this resolution; to authorize the Chief Financial Officer to amend the budget where necessary to reflect an appropriate revenue source and expense; to provide an effective date of this resolution; to provide for severability; and for other purposes. (Building & Maintenance) Synopsis: This resolution authorizes Clayton County to grant an Underground Utility Easement to Georgia Power for the new Modular Restroom Concession Building at Rex Park at the parcel address of 3499 Rex Road, Rex, Georgia 30273 identified on the County’s Tax Map Parcel ID Number 12137B A002 in Land Lot 137 of the 12th District of Clayton County, Georgia. 21. Resolution 2025-193: A resolution adopting a moratorium on the acceptance of applications for permits, licenses, or rezoning for review and consideration by the Clayton County Department of Community Development relating to the establishment or expansion of data centers; to provide for an effective date of this resolution; and for other purposes. (Commissioner Reaves) Synopsis: This resolution places a moratorium on the acceptance of applications for special land use permits, rezonings, land disturbance permits, building permits, business licenses, or certificates of occupancy for new data centers or the expansion of existing or under development data centers until December 31, 2025. 22. Resolution 2025-194: A resolution authorizing the Clayton County Board of Commissioners to order the removal of Demario Swain from the Clayton County Solid Waste Management Authority; to authorize the Chairwoman to perform all acts necessary to accomplish the intent of this resolution; to provide an effective date of this resolution; and for other purposes. (Board of Commissioners) Synopsis: This resolution authorizes the Board of Commissioners to remove Demario Swain from the Solid Waste Management Authority for cause due to inactivity. VIII. END OF CONSENT AGENDA: RESULT: APPROVED [UNANIMOUS] MOVER: DeMont Davis, Commissioner SECONDER:Alieka Anderson-Henry, Chairwoman AYES: Anderson-Henry, Reaves, Allen, Hambrick, Davis 23. Community Development Economic Development (Human Resources) On behalf of the Office of the Chief Operating Officer, in anticipation of a merger of Clayton County Community Development and Clayton County Economic Development Departments, Human Resources is presenting the following personnel/classification changes. GENERAL FUND IMPACT Add Planning and Zoning Chief Administrator, Grade 35/Step 12 Total Compensation $152,730 (112,081) Building Permits Chief Administrator, Grade 34/Step 1 Total Compensation $128,087 (93,027) Delete Director of Community Development, Step/Grade Total Compensation $245,067 (183,471) Assistant Director of Community Development, Grade 35/Step 12 Total Compensation $152,730 (112,081) Absent any other budgetary considerations, this request results in a $116,980 savings to the General Fund HOTEL/MOTEL FUND IMPACT Add Community & Economic Development Director, Grade/Step Total Compensation $256,931 (192,644) Economic Development Chief Administrator, Grade 34/Step 1 Total Compensation $128,087 (93,027) Economic Development Project Manager, Grade 30/Step 1 Total Compensation $106,398 (76,258) Delete Economic Development Officer, Grade 32/Step 15 Total Compensation $137,395 ($100,225) Absent any other budgetary considerations, the impact of this request results in a $354,000 Cost to the Hotel/Motel Fund Carol Lowe, HR Manager, presented on behalf of Human Resources Director Pamela Ambles regarding personnel classification changes in anticipation of a merger between the Clayton County Community Development and Economic Development Departments. For the General Fund: Add Planning and Zoning Chief Administrator - Grade 35, Step 12, total compensation $152,730. Add Building Permits Chief Administrator - Grade 34, Step 1, total compensation $128,087. Delete Director of Community Development - total compensation $245,067. Delete Assistant Director of Community Development - Grade 35, Step 12, total compensation $152,730. This results in a net savings to the General Fund of $116,980. For the Hotel-Motel Fund: Add Community and Economic Development Director - total compensation $256,931. Add Economic Development Chief Administrator - Grade 34, Step 1, total compensation $128,087. Add Economic Development Project Manager - Grade 30, Step 1, total compensation $106,398. Delete Economic Development Officer - Grade 32, Step 15, total compensation $137,395. This results in a net cost to the Hotel-Motel Fund of $354,000. Motion to approve moved by Commissioner Davis, seconded by Chairwoman Anderson-Henry. Vote unanimous. RESULT: APPROVED [UNANIMOUS] MOVER: Tashe Allen, Commissioner SECONDER:Alaina Reaves, Commissioner AYES: Anderson-Henry, Reaves, Allen, Hambrick, Davis 24. Resolution 2025-186: A resolution authorizing Clayton County to submit its Comprehensive Annual Performance and Evaluation Report to the United States Department of Housing and Urban Development; to authorize the Chairwoman or her designee to perform all acts necessary to accomplish the intent of this resolution; to authorize the Chief Financial Officer to amend the budget to reflect an appropriate revenue source and expense, as may be required; to provide an effective date of this resolution; and for other purposes. (Office of Grants Administration) Synopsis: This resolution authorizes Clayton County, through the Office of Grants Administration, to submit the Annual Clayton County HUD Programs Division Comprehensive Annual Performance and Evaluation Report and Amended PY 2024 Annual Action Plan to the United States Department of Housing and Urban Development by September 30, 2025. Staff Attorney Charles Reed read Resolution 2025-186: A resolution authorizing Clayton County to submit its Comprehensive Annual Performance and Evaluation Report to the United States Department of Housing and Urban Development; to authorize the Chairwoman or her designee to perform all acts necessary to accomplish the intent of this resolution; to authorize the Chief Financial Officer to amend the budget to reflect an appropriate revenue source and expense, as may be required; to provide an effective date of this resolution; and for other purposes. Motion to approve Resolution 2025-186 moved by Commissioner Allen, seconded by Vice Chair Reaves. Vote unanimous. RESULT: REMOVED FROM AGENDA 25. Resolution 2025-192: A resolution authorizing Clayton County to terminate the Intergovernmental Agreement with the Development Authority of Clayton County for the promotion of economic development in the County; to authorize the Chairwoman to otherwise perform all acts necessary to accomplish the intent of this resolution; to authorize the Chief Financial Officer to amend the budget where necessary to reflect an appropriate revenue source and expense relating thereto; to provide an effective date of this resolution; and for other purposes. (Board of Commissioners) Synopsis: This resolution authorizes the County to terminate the intergovernmental agreement with the Development Authority of Clayton County for promotion of economic development effective March 3, 2026. Commissioner Davis to remove from the agenda, seconded by Vice Chair Reaves. Vote unanimous. RESULT: APPROVED [UNANIMOUS] MOVER: Gail Hambrick, Commissioner SECONDER:Alieka Anderson-Henry, Chairwoman AYES: Anderson-Henry, Reaves, Allen, Hambrick, Davis 26. Resolution 2025-195: A resolution to provide for a hearing for zoning decisions as defined by State law on December 16, 2025; to authorize staff to provide notice of the Board of Commissioners’ consideration of submissions of applications for Future Land Use Map amendments, Rezonings, and Conditional Use Permits; to provide an effective date of this resolution; and for other purposes. (Community Development) Synopsis: This resolution authorizes the Board to hold a zoning hearing to consider Future Land Use Map amendments, rezoning requests and conditional use permits on December 16, 2025. Staff Attorney Charles Reed read Resolution 2025-195: A resolution to provide for a hearing for zoning decisions as defined by State law on December 16, 2025; to authorize staff to provide notice of the Board of Commissioners’ consideration of submissions of applications for Future Land Use Map amendments, Rezonings, and Conditional Use Permits; to provide an effective date of this resolution; and for other purposes. Staff Attorney Charles Reed explained that the item was placed on the agenda to allow the board to consider future land use map amendments before April, which is normally one of only two times per year (April and October) when such amendments are allowed. Since the board has authorized a review and potential rewrite of the zoning code, hearing these applications in December will help clear the backlog so the code update can begin with a clean slate. Motion made to approve Resolution 2025-195 moved by Commissioner Davis, seconded by Chairwoman Anderson-Henry. Vote unanimous. RESULT: APPROVED [UNANIMOUS] MOVER: Gail Hambrick, Commissioner SECONDER:Alieka Anderson-Henry, Chairwoman AYES: Anderson-Henry, Reaves, Allen, Hambrick, Davis 27. 2026 Benefits Year - Medical For Active Employees On August 19, 2025 Human Resources in collaboration with our broker/consultant Marsh McLennan Agency (MMA) presented recommendations to the Board of Commissioners for medical insurance for Benefits Year 2026. Human Resources is requesting approval of the recommendations. Open enrollment for active employees is targeted to start late-September or early-October. On behalf of the employees of Clayton County Board of Commissioners, we are seeking approval as follows: Continue Contract with Kaiser Permanente HMO Enhancements for Benefits Year 2026 include $175,000 Carrier Funded Wellness Budget; Omada DPP and Weight Management Program at no extra charge; and a rate cap not to exceed 8% over 2026 rates for Benefits Year 20227 County Annual Premium: $13,936,716 Continue Self-Funded strategy with UMR/UnitedHealthcare and Quantum Health as our Third Party Administrator. Enhancements for Benefits Year 2026 include $200,000 Carrier Funded Wellness Budget and Top-of-the-Line Premium Health Navigation System. The enhancements will allow Clayton County Board of Commissioners to continue our focus on prevention, which promotes quality of life for our employees while reducing cost. County Annual Premium: $19,037,606 Angela Wood, HR Manager for Benefits Administration, presented the 2026 medical insurance recommendations on behalf of Human Resources, in collaboration with broker Marsh McClennon Agency. For Kaiser Permanente HMO: *Enhancements include a $175,000 carrier-funded wellness budget, a diabetes prevention program (OMA), and a weight loss management program at no extra cost. *A rate cap not to exceed 8% over the 2026 rates for the 2027 benefits year. *County annual premium: $13,936,716. For the self-insured strategy with United Healthcare and Quantum Health as the third-party administrator: *Enhancements include a $200,000 carrier-funded wellness budget and a premium health navigation system with Quantum. *Focus on preventive care to improve employee quality of life and reduce costs. *County annual premium: $19,376,6 (likely $19,376,600, assuming a transcription error). Human Resources is requesting approval to continue these plans and begin open enrollment for active employees in late September or early October. Motion made to approve 2026 Benefits Year moved by Commissioner Hambrick, seconded by Chairwoman Anderson-Henry. Vote unanimous. RESULT: REMOVED FROM AGENDA 28. Board Appointment: Tourism Authority Myoshi Bourget resigned from the Tourism Authority Board. The term expired on December 31, 2024. The new term is for four (4) years (BOC Chairwoman). Chairwoman Anderson-Henry has already appointed a member previously. RESULT: HELD- CONSENSUS Next: 9/16/2025 6:00 PM 29. Board Appointment - Sports & Entertainment Council (Chairwoman Dr. Alieka Anderson-Henry) 1 year appointment. Chairwoman Dr. Anderson-Henry to hold until September 16th regular business meeting. RESULT: HELD- CONSENSUS Next: 10/7/2025 6:00 PM 30. Board Appointment: Sports & Entertainment Council - (Commissioner Hambrick) 2 Board Appointments. Commissioner Hambrick to hold until October 7th regular business meeting. RESULT: APPROVED [UNANIMOUS] MOVER: DeMont Davis, Commissioner SECONDER:Alieka Anderson-Henry, Chairwoman AYES: Anderson-Henry, Reaves, Allen, Hambrick, Davis 31. Board Appointment: Sports & Entertainment Council (Commissioner Davis) 2 Board Appointments. Commissioner Davis to appoint Gerald McClellan 2-year term, seconded by Chairwoman Anderson-Henry. Vote unanimous. Commissioner Davis second appointment is Dr. Ralph Simpson 2-year term, seconded by Chairwoman Anderson-Henry. Vote unanimous. RESULT: APPROVED [UNANIMOUS] MOVER: Tashe Allen, Commissioner SECONDER:Alaina Reaves, Commissioner AYES: Anderson-Henry, Reaves, Allen, Hambrick, Davis 32. Board Appointment: Sports & Entertainment Council (At-Large - 3 Appointments) Commissioner Allen to appoint Tameron Scott 1-year term, seconded by Vice Chair Reaves. Vote unanimous. IX. EXECUTIVE SESSION: Staff Attorney Charles Reed to address litigation and personnel. Motion made by Commissioner Davis, second by Chairwoman Anderson-Henry. Vote unanimous _________________________________________________________ Motion to reconvene made by Commissioner Davis, second by Commissioner Allen. Vote unanimous. Staff Attorney Charles Reed presented two items related to opioid litigation. The first is to enter into a participation agreement on behalf of Clayton County in the Purdue Pharma opioid litigation and to authorize the Chair to execute any necessary documents to finalize the settlement. The second pertains to the National Prescription Opioid Litigation (NRAY), including the Sandoz settlement, with authorization for the Chair to execute all documents needed to complete that agreement. Motion to approve settlement agreements moved by Chairwoman Anderson-Henry, seconded by Commissioner Allen. Vote unanimous. Carol Lowe stated that to ensure continuity of work and maintain outstanding services to citizens, Human Resources is requesting the Board’s consideration to appoint Tahisha King as Interim Clerk of the Commission. If approved, in accordance with Civil Service rules, Miss King’s salary would be Grade 20, Step 11, $52,533, plus a $10,300 supplement, for a total of $62,833. Motion made to approve Tahisha King as Interim Clerk of Commission moved by Chairwoman Anderson, seconded by Commissioner Allen. Vote unanimous. Motion to adjourn meeting moved by Commissioner Davis, seconded by Chairwoman Anderson-Henry. Vote unanimous CLAYTON COUNTY BOARD OF COMMISSIONERS ______________________________________________ DR. ALIEKA ANDERSON-HENRY, CHAIRWOMAN ______________________________________________ ALAINA REAVES, COMMISSIONER ______________________________________________ GAIL B. HAMBRICK, COMMISSIONER ______________________________________________ TASHE’ ALLEN, COMMISSIONER ______________________________________________ DEMONT DAVIS, COMMISSIONER ATTEST: _________________________________ TAHISHA KING, CLERK