Camilla City Council regular meeting, September 8, 2025

14 pages

These are the minutes as Camilla City Council posted them, read from the file on its own website. Georgia Commons is independent and is not affiliated with Camilla City Council.

This record was posted as scanned images, read here by OCR: a letter or a number may be misread. The file the body posted is linked below.

Copy for LLM, View as markdown, and Send to AI use the Markdown version: the summary Georgia Commons wrote, under a heading that names it, then the record as posted. View raw is the record alone.

Records of this meeting

Each link opens the body's own website or meeting portal.

  • MinutesMinutes (www.camillaga.net) · shown on this page

Summary

Written by an AI model (claude-sonnet-5-5) from the minutes below. It is not the record: the minutes are.

Council approved two pump station change orders, a $923,187 CDBG sewer contract award to KDUG Corporation, and MEAG and gas supply elections, all 6-0.

The council approved five items, each by a 6-0 vote. It approved two change orders on the Pump Station Rehabilitation Project. Change Order #1 removes six pump stations and cuts the cost by $617,133.78, to $1,566,501.30. Change Order #2 adds SCADA monitoring equipment at five stations, bringing the cost to $1,677,928.37 as stated in the minutes. It also chose Option V (sell excess capacity) in the Municipal Electric Authority of Georgia (MEAG) 2026 supplemental power supply subscription, approved a natural gas fixed swap trade confirmation with Alltech for October 2025, and awarded the 2024 Community Development Block Grant (CDBG) bid to KDUG Corporation at a negotiated $923,187. The agenda was amended to add the CDBG item. The minutes of the July 7 work session and August 11 meeting were approved. The assistant city manager reported on road and facility projects, and a second budget hearing is set for September 22.

Topics taken up: pump station rehabilitation change orders; SCADA monitoring at pump stations; MEAG supplemental power supply option; Alltech natural gas trade confirmation; 2024 CDBG bid award; KDUG Corporation contract; city manager's report on road projects; second budget hearing.

Decisions the minutes record (5)

Each decision is followed by the sentence of the minutes that records it, copied word for word.

  1. Change Order #1 to Pump Station Rehabilitation Project removing six pump stations, reducing cost by $617,133.78

    Adopted6-0

    The minutes: “A motion to approve Change Order #1 was made by Councilman Morgan and seconded by Councilman Maples.”

    Read this item in the minutes

  2. Change Order #2 to Pump Station Rehabilitation Project adding SCADA monitoring at five stations

    Adopted6-0

    The minutes: “A motion was made by Councilman Morgan and seconded by Councilman Maples to approve Change Order #2.”

    Read this item in the minutes

  3. 2024 Community Development Block Grant bid award to KDUG Corporation for $923,187

    Adopted6-0

    The minutes: “A motion was made by Councilman Morgan and seconded by Councilmember Vereen to approve the negotiated bid submitted by KDUG Corporation in the amount of $923,187.00.”

    Read this item in the minutes

  4. MEAG 2026 supplemental power supply selection of Option V: Sell Excess

    Adopted6-0

    The minutes: “A motion was made by Councilman Morgan and seconded by Councilman Maples to approve the selection of Option V.”

    Read this item in the minutes

  5. Municipal Gas Authority of Georgia trade confirmation with Alltech for October 2025

    Adopted6-0

    The minutes: “A motion was made by Councilman Palmer and seconded by Councilman Morgan to approve the Alltech trade confirmation for October 2025.”

    Read this item in the minutes

Agenda items (8)

Found in the minutes by their headings. Where an outcome is shown, it was read by rule from the item's own words: a guide to the text, not part of the record.

  1. MINUTES — REGULAR MEETING
  2. OPENING PRAYER AND PLEDGE
  3. APPROVAL OF AGENDAAdopted
  4. APPROVAL OF MINUTESAdopted
  5. ACTION ITEMSAdopted
  6. CITY MANAGER’S REPORTA presentation
  7. OTHER ANNOUNCEMENTS
  8. ADJOURNMENTA motion

Answers are written by AI from this document, and every quotation is checked against it. Not legal advice.

The minutes

As posted on www.camillaga.net, read November 12, 2026. Nothing below is written by Georgia Commons.

MINUTES — REGULAR MEETING

CITY OF CAMILLA, GEORGIA

SEPTEMBER 8, 2025

The regular meeting of the Mayor and City Council of the City of Camilla was called to order at 6:00 p.m. on Monday, September 8, 2025 by Mayor Pro Tem Burley in The Honorable Mary Jo Haywood Council Chambers.

Present at roll call: Councilmember Vereen, Mayor Pro Tem Burley, Councilman Morgan, Councilman Collins, Councilman Maples, and Councilman Palmer.

Others present included city attorney Wallace Washington (via Zoom), Clerk Ford and Public Works Supt./Asst. City Manager Luke White. Mayor Pro Tem Burley commented Chad Griffin with Still Waters Engineering and Julian Brown with MEAG are also in attendance via Zoom.

OPENING PRAYER AND PLEDGE

Reverend Bonita White gave the invocation and the Mayor and Council led the Pledge of Allegiance to the Flag.

APPROVAL OF AGENDA

Mayor Pro Tem Burley stated he would like to amend the agenda to add as an action item the bid award and contract for the 2024 Community Development Block Grant. A motion was made by Councilman Morgan and seconded by Councilmember Vereen to approve the agenda with the addition of the action item. The motion passed by a 6-0 vote.

CITIZENS AND GUESTS

Sign-in Sheet Attached.

APPROVAL OF MINUTES

A motion was made by Councilman Morgan and seconded by Councilman Maples to approve the minutes of the July 7, 2025 Work Session. The motion passed by a 6-0 vote. A motion was made by Councilman Morgan and seconded by Councilman Maples to approve the minutes from the August 11, 2025 Council Meeting. The motion passed by a 6-0 vote.

SPEAKER APPEARANCES

Martha Bateman, Venterra Pollard

ACTION ITEMS

PUMP STATION REHABILITATION PROJECT — CHANGE ORDER #1

The Council reviewed Change Order #1 for the Pump Station Rehabilitation Project at their

September 2" work session which deducts six pump stations from the project (Bennett Street, Andrew Drive, Tyson Hatchery, Royal Heights, Cochran Street, and Stadium Drive), reducing the project cost by $617,133.78 and bringing the project within budget at $1,566,501.30. The Council recommends approval of Change Order #1 and authorizes the Mayor Pro Tem to sign. A motion to approve Change Order #1 was made by Councilman Morgan and seconded by Councilman Maples. Chad Griffin, representing Still Waters Engineering and project manager

for the pump rehabilitation project, commented the six stations mentioned were pumps he identi-

PUMP STATION REHABILITATION PROJECT —- CHANGE ORDER #1 (cont.)

fied, along with city personnel, that had work already performed on them. Some of the stations are very small and did not need complete rehabilitation. The six stations eliminated from the project brought the project within the budgeted amount. The motion passed by a 6-0 vote.

PUMP STATION REHABILITATION PROJECT —- CHANGE ORDER #2

The Council reviewed Change Order #2 for the Pump Station Rehabilitation Project at their September 24 work session which provides for the installation of SCADA (Supervisory Control and Data Acquisition system) to collect data and allow 24/7 pump monitoring at Bennett Street, Andrew Drive, Royal Heights, Cochran Street and Stadium Drive, which currently are not SCADA equipped. The project remains under budget with the approval of Change Order #2 and upon completion of the Pump Station Rehabilitation Project, all pump stations inside the city limits will be SCADA equipped and monitored to assist in preventative maintenance, improve operational efficiency, and allow immediate response to issues or anomalies. The Council recommends approving Change Order #2 and authorizes the Mayor Pro Tem to sign. A motion was made by Councilman Morgan and seconded by Councilman Maples to approve Change Order #2. Chad Griffin commented Change Order #1 took out some of the monitoring and control equipment that needed to be put back in, which is in Change Order #2. The ultimate goal is to always be able to look at the stations, make sure they are operating properly, and immediately respond to pump station failures. The change order adds $100,000 back into the project, bringing the amount from $1.5 million to $1,677,928.37. The project remains within budget and it is an important need to be able to monitor the stations. The motion passed by a 6-0 vote.

MUNICIPAL ELECTRIC AUTHORITY OF GEORGIA (MEAG) — SUPPLEMENTAL

POWER SUPPLY POLICY

The City has received information from MEAG regarding the City’s annual subscription for the 2026 supplemental power/excess capacity. In accordance with the MEAG Supplemental Power Supply Policy, the Council recommends selecting Option V: Sell Excess — default option.

(allocate excess capacity to be sold to deficit Participants as supplemental at $59.40/kW-Yr plus the hourly energy market price or for reserves at $19.80/kW-Yr at DP. Supplemental will be allocated first, then any remaining amounts will be allocated to reserves). A motion was made by Councilman Morgan and seconded by Councilman Maples to approve the selection of Option V.

Julian Brown, MEAG district representative, commented every year they discuss the supplemental needs with cities. Supplemental needs make up the difference between the ownership that a city owns in generation whether it is Vogtle, SEPA or hydro, and is all resources owned by the city. Camilla has excess power it allows for sale whether on the market, another MEAG participant, or off system. In 2023 the City of Camilla sold power to the City of Blakely. MEAG will sell the power at the most economical, beneficial rate for Camilla. He has been asked what would happen if in 2026 Camilla got a new business. MEAG would stop selling the excess power so it could be used for the new business. If a new load comes in MEAG stops selling the excess. After additional comments and discussion, the motion passed by a 6-0 vote to select Option V.

MUNICIPAL GAS AUTHORITY OF GEORGIA -— TRADE CONFIRMATION -

ALLTECH — OCTOBER 2025

The City received a request from Alltech and the Municipal Gas Authority of Georgia (MGAG) to enter into an agreement to elect an alternative price (fixed swap) for natural gas. The election to choose an alternate price is pursuant to the Gas Supply Contract between MGAG and the City and does not alter or supersede the Gas Supply Contract. The agreement period is for October 2025. The Council recommends approval to execute the agreement as requested and authorizes the Mayor Pro Tem to sign. A motion was made by Councilman Palmer and seconded by Councilman Morgan to approve the Alltech trade confirmation for October 2025. The motion passed by a 6-0 vote.

2024 COMMUNITY DEVELOPMENT BLOCK GRANT (CDBG) — BID AWARD

Mayor Pro Tem Burley commented bids were opened on September 4, 2025 for the CDBG project. KDUG Corporation was low bidder with a base bid of $1,201,832 and an alternate bid of $1,132,992. Project Engineer Hofstadter and Associates negotiated a contract price of $923,187 to keep the project within budget and recommends awarding the bid to KDUG Corporation in the amount of $923,187. A motion was made by Councilman Morgan and seconded by Councilmember Vereen to approve the negotiated bid submitted by KDUG Corporation in the amount of $923,187.00. The motion passed by a 6-0 vote.

CITY MANAGER’S REPORT

Assistant City Manager Luke White commented the cemetery paving project is in progress, the pre-construction meeting for the gym is scheduled, and the LMIG/LRA bid opening is scheduled for September 25" at city hall. The project will cover thirteen roads. The 2026 LMIG application deadline is February 11" and he encouraged the Council to submit recommendations for road improvements in their district.

OTHER ANNOUNCEMENTS

After comments by members of Council, Mayor Pro Tem Burley thanked everyone for coming out for the Council meeting and the Council for taking care of the business of the city. September 22" is the second budget hearing and everyone is welcome to attend. He also thanked the city manager, assistant city manager, and staff for everything they do for the city.

ADJOURNMENT

The meeting adjourned at 6:40 p.m. on motion by Councilman Morgan.

ay: Oy arrest Ute. cl.

DEWAYNB BURLEY, MAYOR CHERYL FORD,CL

PRO TEM

CITY OF CAMILLA, GEORGIA ~ SIGN-IN SHEET

DATE: CEPT rs 20AD TIME: (, [ ] A.M. J

MEETING: [2Councn. [_] WORK SESSION [] OTHER:

SPEAKER

, NAME ADDRESS . NO ] YES ‘FOPIC OF DISCUSSION : ZA wy eves [C/ nw BA 1240 ey:

? Bontfe S. hee 17 Woe! Bennett S- x 3 LGua Sp a 20 Wb Aad WA “a 4 Noto olla | vo HAE Woy 19 5 uaette Waly: Ged. LS4 NV Sflic Sk ° [Lerey Pitkins LES oi lzon A ? End c “f\ec wobecey 437L. Main st L— 8 Sarneshine, DeDherd, _[S4n Mao St = 4 Gr Tacha | 174 Uw Varw 10 [Hees anarr teste JIS-~ Lia ¢e J “4 ince Oca Secheen LY, SMa ya On — 12 Venkerh Y o\\or® art De 4quod <> be 13 14 15

C-941 | 1

CHANGE ORDER

Change Order No. l Date of Issuance: 08/08/25 Effective Date:

Owner: City of Camilla Owner's Contract No.:

Contractor: H2O Techs Contractor’s Project No.:

Engineer: Still Waters Engineering Engineer's Project No.: C0113.010 Project: Pump Station Rehabilitation Contract Name:

The Contract is modified as follows upon execution of this Change Order:

Description: Deduction of the six pump stations : Including Bennett Street, Andrew Drive, Tyson Hatchery, Royal Heights, Cochran Street and Stadium Drive

Attachments: [List documents supporting change] Change Order #1 Spreadsheet

CHANGE IN CONTRACT PRICE CHANGE IN CONTRACT TIMES

[note changes in Milestones if applicable] Original Contract Price: Original Contract Times:

Substantial Completion:

$.2,183.635.08 Ready for Final Payment:

days or dates (Increase] [Decrease] from previously approved Change | [Increase] [Decrease] from previously approved Change Orders No.___ toNo.__: Orders No,___ toNo.__:

Substantial Completion:

$ Ready for Final Payment:

days Contract Price prior to this Change Order: Contract Times prior to this Change Order:

Substantial Completion:

5 2,183,635.08 Ready for Final Payment:

days or dates Decrease of this Change Order: [Increase] [Decrease] of this Change Order:

Substantial Completion:

$ 617,133.78 Ready for Final Payment:

days or dates Contract Price incorporating this Change Order: Contract Times with all approved Change Orders:

Substantial Completion:

S$ 1,566,501.30 Ready for Final Payment:

days or dates

RECOMMENDED: ACCEPTED?) F ACCEPTED:

By: By: sh a btuaaynnd’? Yells By:

Engineer (if required) Owner (AuthorizedSignature) Contractor (Authorized Signature) Title: Title ASTOR PAG Tem Title

Date: Date BAe th=—95=>)-= Date

04-99 -20a5

Approved by Funding Agency (if applicable)

By:

Title:

Date:

CITY OF CAMILLA

PUMP STATION REHABILITATION PROJECT #C0113.010

Pimms STILL WATERS

PROJECT: Pump Station Rehabilitation Project Number: CO0113.010 Change Order No.1

Deductions

External Station Piping: Installation of emergency

‘Submersible Pump Station: Install new submersible 2 pumps, level control system and conduit. £ ed s 53,368.49 $53,368.49 3 Di & ul Flow Meter 1 Ls $ 23,030.36 $23,030.36)

4 Bypass Pumping 1 Ls $ 7,727.27 $7,727.27 Electrical and Pump Station Control Panel (Includes: Unl- 5 Strut, Pump Station Control Panel, Manual Transfer 1 ts $ 31,792.21 $31,792.21 Switch and Generator Plug)

1 Stadium Drive Lift Station Deductions} $ 115,918.33 1 me £ $ 36,408.31 $36,408.34 External Station Plping: Installation of emergency 2 bypass piping, force main piping and fittings. # $ 45,484;55 $15,454.65) 4 D &t Flow Meter 1 Ls $ 23,030.36 $23,030.36

5 Bypass Pumping 1 LS $ 7,727.27 $7,727.27;

6 [Electrical (Includes: Uni-Strut) 1 is $ 15,454.55 $15,454.55]

4. Royal Heights Lift Station Deductions! $98,075.04, IbI Station: lt 1 Submersible Pump Station: Install new submersible 1 ts $ 53,368.49 $53,368.49 pumps, level control system and conduit.

3 Dogh &L Flow Meter 1 LS $ 23,030.36 $23,030.36 4 Bypass Pumping 4. LS $ 7,727.27 $7,727.27| 1 (Ui : Uni 4 fi 1, Electrical (Includes: Unl-Strut, Manual Transfer Switch, 1 Ls $ 23,184.82 $23,181.82 and Generator Plug)

8. Cochran Street Lift Station Deductions] $107,307.94] 1 Submersible Pump Statlon: Install new submersible 1 Ls $ 15,615.32 $15,615.32 pump, level control system and conduit.

2 External Station Piping: Installation of emergency 1 Ls $ 15,454.55 $15,454.55 bypass piping, force main piping and fittings.

3 ISCADA I (Mission Control Panel) 4. Ls $ 11,052.16 $11,052.16) 4 D Mi &L Flow Meter 1 Ls $ 23,030.36 $23,030.36

5 Bypass Pumping 1 Ls $ 7,727.27 $7,727.27 6 Electrical (Includes: Unl-Strut & Mission Control Panel) a LS $ 15,454.55 $15,454.55) 7 [Fencing 1 ts $0.00 $0.00

10. Andrew Drive Lift Station Deductions} $88,334.21

Submersible Pump Station: Install new submersible

11. Bennett Street Lift Statlon Deductions

454.55 5,454.55) bypass piping, force main piping and fittings. = 6 $ 15,454 $4 2 SCADA | (Mission Control Panel) 1 Ls $ 11,052.16 $11,052.16 3 D &L Flow Meter 1 Ls $ 23,030.36 $23,030.36

4 Bypass Pumping 1 Ls $ 7,727.27 $7,727.27 5 Electrical (Includes: Uni-Strut & Mission Control Panel) 1 Ls $ 15,454.55 $15,454.55) 6 ‘|Fencing a Ls $ 17,500.00 $17,500.00

$90,218.89

1 LS $ 33,272.28 $33,272.28 pumps, level control system and condult.

External Station Piping: Installation of emergency . 19,318.18) 2 bypass piping, force main plping and fittings. ‘ ts $ 19)/948:18 $19,3 4 D i & Flow Meter 1 Ls $ 24,007.09 $24,007.09}

5 Bypass Pumping 1 Ls $ 7,727.27 $7,727.27 6 [Electrical (Includes: Uni-Strut) a Ls $ 15,454.55, $15,454.55) w [Fencing 1 Ls $ 17,500.00 $17,500.00)

12. Tyson ry Lift Station Di $117,279.37 Total Deductions $ 617,133.78 Contract Price $ 2,183,635.08 Change Order #1 Deductions $ 617,133.78 New Contract Price $ 1,566,501.30

CHANGE ORDER

C-941 | 1

Change Order No. 2

Date of Issuance: 08/19/25

Owner: City of Camilla

Contractor: H2O Techs

Engineer: Still Waters Engineering Project: Pump Station Rehabilitation

Effective Date:

Owner's Contract No.:

Contractor’s Project No.:

Engineer's Project No.:

Contract Name:

C0113.010

The Contract is modified as follows upon execution of this Change Order:

Description: Addition of electrical and uni-strut on five of the pump stations deleted from the project to ensure we have SCADA at these sites as also. Including Bennett Street, Andrew Drive, Royal Heights, Cochran Street

and Stadium Drive

Attachments: [List documents supporting change] Change Order #2 Spreadsheet

CHANGE IN CONTRACT PRICE

Original Contract Price:

$_2,183.635.08

CHANGE IN CONTRACT TIMES

[note changes in Milestones if applicable] Original Contract Times:

Substantial Completion:

Ready for Final Payment:

days or dates

Decrease from previously approved Change Orders No. 0 to No. 1:

S$ 617,133.78

[Increase] [Decrease] from previously approved Change Orders No. toNo.___

Substantial Completion:

Ready for Final Payment:

days

Contract Price prior to this Change Order:

$ 1,566,501.30

Contract Times prior to this Change Order:

Substantial Completion:

Ready for Final Payment:

days or dates

Increase of this Change Order:

$ 101,427.07

[Increase] [Decrease] of this Change Order:

Substantial Completion:

Ready for Final Payment:

days or dates

Contract Price incorporating this Change Order:

$ 1,667,928.37

Contract Times with all approved Change Orders:

Substantial Completion:

Ready for Final Payment:

days or dates

ND NaN CCEPTED:

By: Lp 7 Za V- By: 5 Ninos By: V4 “— Epginees (if réquired) _Bomet awe Si nature) Contractor (Authorized Signature) Title: project Buarer Title AOR PRO Tk wy) Title Divino Date: 3) 19/257 = Date U0 F- DOD Date oY L2 f Approved by Funding Agency (if / ff

applicable) By: Date:

Title:

CITY OF CAMILLA

PUMP STATION REHABILITATION PROJECT #C0113.010

<a STILL WATERS

PROJECT: Pump Station Rehabilitation Project Number: CO113.010

Change Order No.2 Additions 5 Electrical (Includes: Uni-Strut) 1 LS 15,454.55 $15,454.55 6 SCADA (RTU Cabinet) 1 LS $ 2,050.00 $2,050.00

1. Stadium Drive Lift Station Deductions $17,504.55

Electrical (Includes: Uni-Strut)

15,454.55

$15,454.55

Electrical (Includes: Uni-Strut)

4. Royal Heights Lift Station Deductions

$15,454.55

15,454.55

$15,454.55

8. Cochran Street Lift Station Deductions

$15,454.55

3 SCADA (Mission Control Panel) 4 LS $ 11,052.16 $11,052.16 6 Electrical (Includes: Uni-Strut & Mission Control Panel) 1 LS $ 15,454.55 $15,454.55

10. Andrew Drive Lift Station Deductions $26,506.71

SCADA I (Mission Control Panel) 11,052.16 $11,052.16 5 Electrical (Includes: Uni-Strut & Mission Control Panel) 4 LS $ 15,454.55 $15,454.55

11. Bennett Street Lift Station Deductions $26,506.71 Total Additions 101,427.07

Contract Price After Change Order #1 1,566,501.30 Change Order #2 Additions 101,427.07 New Contract Price 1,667,928.37

AUTHORIZATION AGREEMENT

Year 2026 Annual Subscription Under Supplemental Power Supply Policy between Municipal Electric Authority of Georgia and

CAMILLA

(Participant)

In accordance with the MEAG Supplemental Power Supply Policy, the Undersigned Participant hereby elects to: (all Participants must elect one option and return)

(i) (Opt-out) Acquire the necessary resources for its Supplemental Power Supply Requirements itself;

(ii) (Annual Self Supply) Acquire the necessary resources for its Supplemental Power Supply Requirements for the Power Supply year itself through an Inter-Participant Transfer (IPT) Agreement or off system purchase power contract;

(iii) (Subscription) Subscribe to one or more of the power supply alternatives identified in the attached Nomination Form in specific amounts;

(iv) (Agent — default option) Designate MEAG as its agent to nominate and acquire any combination of resources to optimize their Supplemental Power Supply Requirements. Please specify agency limitations if any, ; (If no form is returned by specified

deadlines, this option will be used by default)

For Participants with excess capacity

(v) * (Sell Excess — default option) Allocate excess capacity to be sold to deficit Participants as supplemental at $59.40/kW-Yr plus the hourly energy market price or for reserves at $19.80/kW-Yr at DP. Supplemental will be allocated first, then any remaining amounts will be allocated to reserves.

(vi) (Opt-out of sales) Retain excess resources and not sell excess capacity through the Supplemental process.

By executing this Authorization Agreement, Participant understands that MEAG will aggregate all MEAG Participant nominations and attempt to contract for the total amount of Participant supplemental power supply requirements nominated under this Annual Subscription. Participant also understands that MEAG will purchase the capacity necessary to ensure that system planning reserve requirements are met and assign this capacity for one or more years to those Participants deemed capacity deficient. Participant agrees that these reserve capacity purchases may be made at “market” prices from other Participants.

BY aay of SEPT

f- Participant agrees to and accepts the above nomination, this ie) Oday of

Participant: (\\- \ ¥ OF CAI we UA

By: Wwe De

AOR _ PRO End

Mayor or other authorized representative

, 2025.

MEAGFORM080125

Municipal Gas Authority of Georgia

“TRADE CONFIRMATION”

Date of Trade: August 12, 2025

City Name: Camilla

Requesting Person:

End User Name: ALLTECH

Requesting Person: Kevin Perraut

Type of Hedge: Fixed Swap Type of Transaction: BUY Effective Date: October 1, 2025 Termination Date: October 31, 2025

Reference Price: SoNat LA Mo

Counterparty Confirmation: Contact: Victoria Lawther Ref No.: 7473392 Date:

Distribution to Requestor: Contact: Kevin Perraut Date:

Volume Price Month MMBtu MMBtu Oct-25 6,000 $3.230

The Member signor of this alternate price confirmation is an individual representing themselves to the Municipal Gas Authority of Georgia as having the capacity to enter into agreements to elect an alternate price on behalf of the Member and understands the implications of entering into an alternate price agreement made on behalf of the Member by the Municipal Gas Authority of Georgia. A Member's election to choose an alternate price is pursuant to the Gas Supply Contract between the Municipal Gas Authority of Georgia and the Member and does not in any way alter the terms or supersede the Gas Supply Contract. Please confirm that the foregoing correctly sets forth the terms of our agreement within three (3) business days by executing this confirmation and returning it to us. Failure to respond within such period shall not affect the validity or enforceability of this transaction, and shall be deemed to be an affirmation of the terms and

conditions contained herein, absent manifest error.

MUNICIPAL GAS AUTHORITY OF GEORGIA CITY OF CAMILLA

By: By: J Yom :

; : a} <= AS Its: President and CEO Aor ep WW | a | ate e

oa ot 02 Cwy, he y ( 74 _ \ / lan x pate: August 13, 2025 re Bc) ay, O BOAS

6 rd Ye NSORGI Ls <

LOB, Aaa

Municipal Gas Authority of Georgia

“TRADE CONFIRMATION”

Date of Trade: August 12, 2025

City Name: Camilla

Requesting Person:

End User Name: ALLTECH

Requesting Person: Kevin Perraut

Type of Hedge: Fixed Swap Type of Transaction:

Effective Date: October 1, 2025 Termination Date:

Reference Price: SoNat LA Mo

BUY

October 31, 2025

Distribution to Requestor: Contact: Kevin Perraut

Counterparty Confirmation: Contact: Victoria Lawther Ref No.: 7473392 Date:

Date:

Volume Price Month MMBtu MMBtu Oct-25 6,000 $3.230

The Member signor of this alternate price confirmation is an individual representing themselves to the Municipal Gas Authority of Georgia as having the capacity to enter into agreements to elect an alternate price on behalf of the Member

and understands the implications of entering into an alternate price agreement made on behalf of the Member by the Municipal Gas Authority of Georgia. A Member's election to choose an alternate price is pursuant to the Gas Supply Contract between the Municipal Gas Authority of Georgia and the Member and does not in any way alter the terms or supersede the Gas Supply Contract. Please confirm that the foregoing correctly sets forth the terms of our agreement within three (3) business days by executing this confirmation and returning it to us. Failure to respond within such period shall not affect the validity or enforceability of this transaction, and shall be deemed to be an affirmation of the terms and

conditions contained herein, absent manifest error.

CITY OF CAMILLA

__ 9 Cl ts

Its:

7 ay

SEAL

,o? 20000, 2 @, . J ee aan

SAA,

<< a 2 )

4 ] y et Zé a

aw 09277900888, Pa

WS ORGS

“Yy SOO oe

ALLTECH

SEER, OF-08- DORE” oe

BID TABULATION SUMMARY

PROJECT:

2024 CDBG

Camilla, GA

H&A File No. Job #1509-015

ENGINEER:

BID OPENING:

Hofstadter and Associates, Inc.

4571 Arkwright Road Macon, GA 31210

September 4, 2025

BIDDER

BASE

BID

ALTERNATE

BID

CaJenn Construction & Rehabilitation Services, Inc.

$ 1,644,231.00

$ 1,540,971.00

Gulf Coast Underground

Hinterland Group, Inc.

HK Solutions Group

Inliner Solutions, LLC

Insituform Technologies

KDUG Corporation

$ 1,201,832.00

$ 1,132,992.00

Portland Utilities Construction Co.

RDJE, Inc.

$ 2,657,056.00

$ 2,237,132.00

RPI Underground

SAK

Scruggs Company

Southeast Pipe Survey

Xx

$ 1,871,949.60

$ 1,472,677.60

I hereby certify the foregoing as a true and accurate tabulation of bids received for the 2023 CDBG,

Camilla, Georgia, on September 4, 2025 at 11:00 A.M.

a,

Hayes Hofstadter, P.E. — Project Engineer

SE NEGOTIATED BID

$493, 187

PENS]

OFSTADTERs

SSOCIATES

September 4, 2025 Cheryl Ford, City Clerk City of Camilla 30 E Broad Street Camilla, Georgia 31730

RE: 2024 CDBG

Camilla, Georgia H&A File No. 1509-015

Dear Cheryl:

By this letter, Hofstadter and Associates, Inc. recommends award to KDUG

Corporation as the low bidder with a negotiated price of $923,187.00. Hofstadter and Associates, Inc. will prepare contracts upon notice that the project has been awarded and will recommend proceeding with the project upon receipt of the executed contracts containing Payment Bond,

Performance Bond and Proof of Insurance.

If you should have any questions or need additional information, please don't hesitate to

call.

Sincerely,

HOFSTADTER AND ASSOCIATES, INC.

Hayes Hofstadter, P.E.

Project Engineer Enclosures Ce:

HH/jlh

CONSULTING ENGINEERS |]WWW.HOFSTADTER.COM

43571 ARKWRIGHT RD, MACON GA 31210

27 TIPPINS ST BAXLEY, GA 31513

== Camilla, City of $1,000,000 The City of Camilla proposes to use $1,000,000 in CDBG funds for

~~ Sewer Improvements

\ "ts = <p, ns £O 20s (J “e aS

PEACHTREE ST

et oe oe «eS ee.

i 2 |

\ \ ] S

= Mt GEESE

=f

sewer Improvements in the Beacon Street area. The project will

benefit 201 persons, of wham 187 (93.03%) are low-to-moderate- ~ income persons. The total project cost is $1,122,362 with $122,362 in match, leverage, and in-kind services.

| Mu bert

NELLISST ==@ Q=eae

thine (to

EAST CHURCH ST

LEGEND

———— PROPOSED 8" SEWER MAIN

REHAB

@© PROPOSED MANHOLE

REHAB

—- = PROPOSED CIPP AREA

— — PROPOSED PIPE BURSTING

AREA

— FLOW DIRECTION

FIGURE V

PROPOSED IMPROVEMENTS

FY 2024 CDBG APPLICATION

SANITARY SEWER (MIPROVEMENTS

FOR TI

CITY OF CAMILLA, GEORGIA

HOFSTADTER AND ASSOCIAT

CIVIL/ENVIRONMENTAL/TRANSPORTATION CoN SULTI

Machine-readable https://georgiacommons.org/meetings/2025-09-08/camilla-city-council.md · https://georgiacommons.org/meetings/local/index.md · MCP https://mcp.georgiacommons.org/mcp