County: Heard County
Heard County Board of Commissioners regular meeting, October 22, 2025
2 pages
These are the minutes as Heard County Board of Commissioners posted them, read from the file on its own website. Georgia Commons is independent and is not affiliated with Heard County Board of Commissioners.
This record was posted as scanned images, read here by OCR: a letter or a number may be misread. The file the body posted is linked below.
Records of this meeting
Each link opens the body's own website or meeting portal.
- MinutesOct 22 (CM Minutes) (www.heardcountyga.com) · shown on this page
Summary
Written by an AI model (claude-sonnet-5-5) from the minutes below. It is not the record: the minutes are.
Commissioners unanimously awarded a $1,139,773.00 West Ferry Road repair contract to C.W. Mathews and authorized signing the Geo-Hydro engineer report.
At a called meeting, the Board took up repairs to West Ferry Road and Hollingsworth Ferry Road. The SPLOST manager recommended awarding the West Ferry Road repair contract to C.W. Mathews for $1,139,773.00, with work scheduled to begin November 3, 2025 and finish by January 2, 2026. The Board voted unanimously to award the contract. The Board also heard about the required Geo-Hydro engineer report, which covers soil analysis and construction guidelines for the West Ferry Road and Hollingsworth Ferry Road project, and voted unanimously to give the Chairman permission to sign it. The meeting adjourned at 11:16 a.m.
Topics taken up: West Ferry Road repair bid; C.W. Mathews contract; Geo-Hydro engineer report; Hollingsworth Ferry Road repairs; SPLOST project.
Decisions the minutes record (2)
Each decision is followed by the sentence of the minutes that records it, copied word for word.
West Ferry Road repair contract awarded to C.W. Mathews for $1,139,773.00
unanimous
The minutes: “On a motion (Perry) and a second (Hammond), the Board voted unanimously to award the contract to C.W. Mathews in the amount of $1,139,773.00.”
Geo-Hydro engineer report for West Ferry Road and Hollingsworth Ferry Road, Chairman authorized to sign
unanimous
The minutes: “On a motion (Perry) and a second (Walls), the Board voted unanimously to give the Chairman”
The minutes
As posted on www.heardcountyga.com, read November 25, 2026. Nothing below is written by Georgia Commons.
HEARD COUNTY BOARD OF COMMISSIONERS CALLED MEETING
October 22, 2025 — 11:00 A.M.
The Heard County Board of Commissioners held a Called Meeting on October 22, 2025, at 11:00 a.m. in the Commission Chamber of the Heard County Administration Building. In attendance at the meeting were Chairman Tracy McCormick, District 1 Commissioner Curtis Mock, District 2 Commissioner James Perry, District 3 Commissioner Iris Harris, District 4 Commissioner Larry Hammond, District 5 Commissioner David Walls, Finance Director Felicia Adams, and SPLOST Manager Kevin Hamby.
Chairman Tracy McCormick called the meeting to order.
Award Bid for West Ferry Road Repairs
A called meeting of the Board was held to award the bid for repairs to West Ferry Road. SPLOST Manager Hamby recommended that the Board award the contract to C.W. Mathews in the amount of $1,139,773.00. The contract specifies that work is scheduled to begin on November 3, 2025, with a projected completion date of January 2, 2026.
On a motion (Perry) and a second (Hammond), the Board voted unanimously to award the contract to C.W. Mathews in the amount of $1,139,773.00.
There being no further business, on a motion (Harris) and second (Hammond), the Board voted unanimously to adjourn the meeting.
Geo-Hydro Engineer Report for West Ferry Road and Hollingsworth Ferry Road
The Geo-Hydro engineer report is a required document that provides the geotechnical evaluation and ~ soil analysis necessary for the West Ferry Road and Hollingsworth Ferry Road repair project. This report outlines subsurface conditions, material recommendations, and construction guidelines to
ensure the road is rebuilt on a stable foundation and meets safety and engineering standards.
Approval of the report allows the project to proceed without delay and ensures that contractors have
the technical information needed for proper reconstruction.
On a motion (Perry) and a second (Walls), the Board voted unanimously to give the Chairman
permission to sign the document.
Adjourn
There being no further business, on a motion (Harris) and second (Mock), the Board voted
unanimously to adjourn the meeting.
Adjourned 11:16 a.m.
otic Aywtirgduy/
County Clerk
Date Nuiharas
ASabBway
EZOADS BY
Sateen Zoe “ey
rf Ot 2
A :
Legh