County: Madison County
Madison County Board of Commissioners retreat, November 14, 2025
3 pages
These are the minutes as Madison County Board of Commissioners posted them, read from the file on its own website. Georgia Commons is independent and is not affiliated with Madison County Board of Commissioners.
Records of this meeting
Each link opens the body's own website or meeting portal.
- MinutesMinutes (drive.google.com) · shown on this page
Summary
Written by an AI model (claude-sonnet-5-5) from the minutes below. It is not the record: the minutes are.
Commissioners held a building-needs retreat, naming the Health Department the first priority and asking staff for cost estimates; no votes were recorded.
The Board of Commissioners held a retreat to review county building needs. No motions or votes are recorded. The Board discussed priorities, naming the Health Department as the first priority build, with a proposal to build it on a crawl space next to City Hall. It reviewed active projects, including a Recreation Department office and courts funded under a Land and Water Conservation Fund grant ($500,000 allocated) and a Fire Training Facility classroom ($1,000,000 allocated). It discussed locations for a 911 Center and an EMS station, a geohydrology study near the previous landfill, a stormwater plan for the area north of the Historic Courthouse, and the courthouse restoration estimate of $5.5 million. A Sheriff's Office design proposal not to exceed $24,600 was discussed. Commissioners asked staff for written cost estimates, site preparation estimates, and a detailed breakdown of available SPLOST funds.
Topics taken up: Health Department building priority; Recreation Department offices and courts; Fire Training Facility classroom; 911 Center and EMS station locations; Stormwater Management Plan north of courthouse; Historic Courthouse restoration estimate; Sheriff's Office preliminary design proposal; Road Department relocation; SPLOST funding availability; Presbyterian Church future use.
Agenda items (7)
Found in the minutes by their headings. Where an outcome is shown, it was read by rule from the item's own words: a guide to the text, not part of the record.
- Item No. 1. Chairman-Call to order
- Item No. 2. Purpose: Review of current building needs
- Item No. 3. Approved Active Building Projects
- Item No. 4. Approved Building Projects with funding allocated (not active)
- Item No. 5. Approved Building Projects without funding allocated
- Item No. 6. Future Building Projects not approved and without funding allocated
- Item No. 7. Completed or Ongoing Building Projects since 2020
The minutes
As posted on drive.google.com, read November 25, 2026. Nothing below is written by Georgia Commons.
1
MEMBERS PRESENT:
Commission Chairman Todd Higdon District 1 Commissioners Dennis Adams District 2 Commissioner Terry Chandler District 5 Commissioner Derek Doster Government Complex Public Meeting Room November 14, 2025 9:00 a.m.
AGENDA MEETING MINUTES
Item No. 1. Chairman-Call to order
Chairman Higdon called the meeting to order at 9:02 a.m.
Item No. 2. Purpose: Review of current building needs
Chairman Higdon provided an overview of new building needs and proposed location sites.
The Board held discussion regarding the prioritization of building construction schedule noting the Health Department as the first priority building.
Item No. 3. Approved Active Building Projects
• Recreation Department-LWCF- allocated $500,000
• Fire Training Facility/classroom- allocated $1,000,000 Chairman Higdon presented a proposal for new Recreation Department offices, basketball and pickleball courts. The Board discussed building out the office space for possible future expansion on the second floor.
The Board also discussed meeting with other Government’s who have similar facilities to gage and provide feedback on the pros and cons to an open but covered facility concept.
The Board discussed funding for this project. Staff explained this would fall under the Land and Water Conservation Fund Grant the Recreation Department has been awarded.
Mr. Lapczynski provided an update on the Stormwater Management Plan project and grading needs.
Staff also provided an update on the Fire Training Facility classroom and available funding. Jackson Parham, Fire Association President has been heading this project.
Item No. 4. Approved Building Projects with funding allocated (not active)
• 911 Center-$1,000,000 (discussed proposed 911 and EMS combined facility)
• Health Department (2026 SPLOST)
MEMBERS ABSENT:
District 3 Commissioner Frank May District 4 Commissioner Brian Kirk MEDIA PRESENT: None
STAFF PRESENT:
Christina Baxter, County Clerk Alan Lapzynski, Public Works Director Paul Metz, Building Maintenance Supervisor Bobby Smith, EMS/EMS Director Susan Payne, Finance Director
2 The Board discussed proposed location sites for both buildings. Chairman Higdon stated the Health Department is a first priority build. Higdon recommended the facility be on a crawl space, the same floor plan the building is currently and constructed next to the City Hall building.
The Board discussed having updated and approved building plans and a cost estimate for site preparations and total building cost be provided for formal consideration.
The Board also discussed the 911 Center and proposed building locations. Chairman Higdon explained Captain Baird has stated the facility needed to be in close proximity to the 911 tower located on Highway
98. The Board discussed two possible building location and completing a geohydrology study in those areas to confirm these sites are clear of the previous landfill.
The Board discussed two options for a combined 911 and EMS facility as well as a separate structure for EMS. Chairman Higdon proposed two separate buildings and an EMS station located next to the current Buildings and Grounds Maintenance building. This is the location of the previous Tax Assessor’s Building.
Bobby Smith, EMS Director provided feedback to the Board regarding the proposed location and building needs.
The Board requested a complete Stormwater Management Plan for the area north of the Historic Courthouse to cover all government buildings in that area to include the proposed Health Department, current location and future demolition of the old jail, proposed EMS Station, current Buildings and Grounds Maintenance Shop and additional parking lots. Alan Lapzenski provided information of the current drainage system in place.
The Board agreed to needing a cost estimate provided for site preparation and construction cost for consideration for the proposed 911 Center and EMS Station as standalone structures.
Item No. 5. Approved Building Projects without funding allocated
• Relocation of Road Department
• Historic Courthouse- proposed $2,000,000 with grants The Board discussed the relocation of the Road Department office and future Maintenance Shop to be located at the current EMS facility in Danielsville with the Maintenance Shop and Equipment storage to be placed at the rear of the property.
The Board reviewed the cost estimate for the Historic Courthouse Restoration in the proposed amount of $5.5 million. This estimate did not include an elevator upgrade.
The Board held discussion of the future uses and needs of this building. The Board also discussed concerns with surrounding parking locations. Chairman Higdon stated additional research will need to be complete regarding the parking lot uses on the square.
Item No. 6. Future Building Projects not approved and without funding allocated
• Jail
3 The Board held discussion regarding the proposed Preliminary Design Proposal for the Sheriff’s Office. The Board held discussion regarding a conceptual Building Plan with a 20-year buildout. Staff noted the proposal was a not to exceed $24, 600.00. The proposal was provided by Precision Planning Inc.
Item No. 7. Completed or Ongoing Building Projects since 2020
• Board of Elections Renovation- completed
• Comer EMS Station- completed
• Live Fire Training Facility - completed
• Removal of Strickland House-completed
• Renovations to Presbyterian Church- ongoing
• Recreation Dept Facilities (concessions, restrooms, etc.)-ongoing
• Upgrades to Animal Control holding Facility-completed (dependent upon IGAs)
• Senior Center Art Barn renovations/upgrades- completed
• Extension Office upgrades- ongoing
• Old Danielsville Gym- ongoing Staff provided a brief update of completion for the listed projects above. Chairman Higdon requested Commissioner Comments.
Commissioner Doster requested staff contact the Historical Society to provide a future plan for the use of the Presbyterian Church and possible future uses. Commissioner Doster also requested the Recreation Department Staff and Building Maintenance staff have meetings with other County’s who currently have a facility similar to the office facility proposed to determine possible shortfalls or corrections to be made.
Commissioner Doster requested a determination from staff if staff felt they had the time and resources to over see the proposed projects and that not hinder daily operational tasks.
Commissioner Chandler also stated no concerns if projects were overseen in house versus contracted but requested a determination from staff of the comfortability of overseeing these projects simultaneously.
Commissioner Chandler also requested written cost estimates be provided for each project to determine for accurate funding allocation.
Commissioner Adams discussed the need and benefit for construction management to be on site and requesting each project be presented with a site preparation estimate and a cost to build estimate.
The Board also requested a more detailed breakdown of available SPLOST funds with projected project costs removed and future allocations to determine a more accurate availability of funding.
Chairman Higdon adjourned the meeting at 11:18 a.m.