--- title: Norcross Architectural Review Board meeting minutes, November 18, 2025 collection: local-meetings id: minutes:2025-11-18/norcross-architectural-review-board cite_as: Norcross Architectural Review Board meeting minutes, November 18, 2025 canonical_url: https://georgiacommons.org/meetings/2025-11-18/norcross-architectural-review-board md_url: https://georgiacommons.org/meetings/2025-11-18/norcross-architectural-review-board.md text_url: https://georgiacommons.org/meetings/2025-11-18/norcross-architectural-review-board/text source_url: https://norcrossga.api.civicclerk.com/v1/Meetings/GetMeetingFileStream(fileId=956,plainText=false) date: 2025-11-18 jurisdiction: city:norcross jurisdiction_name: Norcross place_fips: "1355776" license: Public record of Norcross Architectural Review Board, from its own website or meeting portal publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. version: Minutes as posted version_id: minutes:2025-11-18/norcross-architectural-review-board@r53f619f704b0 retrieved: 2026-11-12T13:48:03.544913+00:00 --- # Norcross Architectural Review Board meeting minutes, November 18, 2025 - Body: Norcross Architectural Review Board - Date: November 18, 2025 - Time: 18:00 ## Records of this meeting - Minutes: https://norcrossga.api.civicclerk.com/v1/Meetings/GetMeetingFileStream(fileId=956,plainText=false) (in Georgia Commons as `minutes:2025-11-18/norcross-architectural-review-board`) ## Georgia Commons summary (AI-written) Written by AI from the record below. It is not the record and is never a source: cite the record's own words. Architectural Review Board unanimously approved a two-story office warehouse on Goshen Springs Road and rooftop solar at 408 Autry Street. The Architectural Review Board approved two certificates of appropriateness and chose a vice chair. It approved construction of a two-story office warehouse at 5956 Goshen Springs Road, after brief discussion of the exterior finish system (EIFS), floor layout, multi-tenant use and landscaping, with four conditions. It also approved a roof-mounted solar panel system on a single-family home at 408 Autry Street, with conditions. Each approval was unanimous. The board appointed a member as Vice-Chair, also unanimously, and approved the minutes of the October 21, 2025 meeting. The minutes record no appointment of a secretary. Topics: 5956 Goshen Springs Road office warehouse; 408 Autry Street solar panels; EIFS exterior finish; Vice Chair appointment; certificate of appropriateness; October 21, 2025 minutes. Decisions the record states (each with the record's own sentence): - Construction of a two-story office warehouse at 5956 Goshen Springs Road with conditions: Adopted, unanimous. The record: "A motion to approve the construction of a two-story office warehouse at 5956 Goshen Springs Road, with the following conditions:" - Roof-mounted solar panel system on a single-family residence at 408 Autry Street with conditions: Adopted, unanimous. The record: "A motion to approve the addition of a roof-mounted photovoltaic/solar panel system to a single-family residence at 408 Autry Street, with the following conditions:" - Appointment of Barbara Grayson as Vice-Chair of the Architectural Review Board: Adopted, unanimous. The record: "A motion to appoint Barbara Grayson as Vice-Chair of the Architectural Review Board." ## Minutes City of Norcross 65 Lawrenceville Street Norcross, GA 30071 Meeting Minutes Tuesday, November 18, 2025 6:00 PM 2nd Floor Community Room Regular Meeting Jeff Hopper, Chair Cindy Flynn Naim Harrison Bill McLees Barbara Grayson Livestream Here: Regular Meeting Minutes November 18, 2025 City of Norcross Architectural Review Board (ARB) Page 2 of 3 B. Roll Call C. Approval of Previous Meetings Minutes 1. 2025-334: Presentation of Previous Minutes A motion to approve the minutes of the Architectural Review Board Meeting of October 21, 2025. RESULT: APPROVED [UNANIMOUS] MOVER: Jeff Hopper, Board Chair SECONDER: Hugh Cooper, Board member AYES: Hopper, Cooper, McLees, Grayson, Harrison D. Unfinished Business E. New Business 1. 2025-332: COA2025-047 5956 Goshen Springs Road • The Board Members briefly discussed the proposed EIFS (Exterior Insulation and Finish System) component to the new building, the floor layout and multi-tenant component, and landscaping. After a brief discussion, the ARB moved to vote on the request with staff’s recommendations listed below: A motion to approve the construction of a two-story office warehouse at 5956 Goshen Springs Road, with the following conditions: 1. The applicant is reminded that this approval assumes general conformance with the adopted City of Norcross Architectural and Site Design Standards and Unified Development Ordinance. The applicant and/or builder is responsible for conforming with any specific design standard or UDO code section not addressed in the staff report and Architectural Review Board approval. 2. The applicant will be required to install the tree density units as specified by the Arborist as well as all other landscaping and foundation plantings as required by the Architectural Design Standards and the Unified Development Ordinance, if applicable. 3. Any changes from the Architectural Review Board approved component shall require ARB approval at another public hearing. 4. An architectural inspection shall occur prior to release of the certificate of completion or occupancy to confirm compliance with the ARB’s approval. 2. 2025-331: RESULT: APPROVED [UNANIMOUS] MOVER: Barbara Grayson, Board member SECONDER: Bill McLees, Board member AYES: Hopper, Cooper, McLees, Grayson, Harrison COA2025-048 408 Autry Street • The Board discussed the supplemental use standards and permit review. • The applicant, Seth Gunning, discussed the location of the roof-mounted solar panel and the importance of the solar panel facing south year-round. A. Call to Order Regular Meeting Minutes November 18, 2025 City of Norcross Architectural Review Board (ARB) Page 3 of 3 • After a brief discussion, the ARB moved to vote on the request with staff’s recommendations below. A motion to approve the addition of a roof-mounted photovoltaic/solar panel system to a single-family residence at 408 Autry Street, with the following conditions: o The applicant is reminded that this approval assumes general conformance with the adopted City of Norcross Architectural and Site Design Standards and Unified Development Ordinance. The applicant and/or builder is responsible for conforming with any specific design standard or UDO code section not addressed in the staff report and Architectural Review Board approval. o Any changes from the Architectural Review Board-approved component shall require ARB approval at another public hearing. o An architectural inspection shall occur prior to release of the certificate of completion or occupancy to confirm compliance with the ARB’s approval. 3. 2025-333: RESULT: APPROVED [UNANIMOUS] MOVER: Bill McLees, Board member SECONDER: Barbara Grayson, Board member AYES: Hopper, Cooper, McLees, Grayson, Harrison Discussion and appointment of the Vice Chair and Secretary for the Architectural Review Board (ARB) A motion to appoint Barbara Grayson as Vice-Chair of the Architectural Review Board. RESULT: APPROVED [UNANIMOUS] MOVER: Jeff Hopper, Board Chair SECONDER: Hugh Cooper, Board member AYES: Hopper, Cooper, McLees, Grayson, Harrison F. ADDITIONAL INPUT AND/OR DISCUSSION NOT OTHERWISE ADDRESSED BY THIS AGENDA G. Adjourn