MINUTES MERIWETHER COUNTY BOARD OF COMMISSIONERS MARCH 9, 2026 6:00 PM Commissioners Present: Chairman Emmett Collins, Vice Chairman Jennifer Snelson, Commissioner Gene King, Commissioner Bryan Threadgill, and Commissioner Adam Worsley Commissioners Absent: None. Staff Present: County Administrator John Gorton, County Clerk Allyson Stephens, Deputy County Clerk Hailee Palmer, Finance Director Tammy Lackey, and County Attorney Nathan Lee Staff Absent: None. I. CALL TO ORDER The Meeting was Called to Order at 6:00 p.m. by Chairman Collins. II. INVOCATION The Invocation was given by Commissioner Adam Worsley. Il. PLEDGE TO THE FLAG All. IV. ADOPT AGENDA The Agenda was Amended with the following Amendments: Under Public Hearing, change Case #PC26-044 to Case #PC26-004. Add Under New Business #10 - Mulching Head for HX85 - TSPLOST. Add #11 Under New Business - Consideration of Work Session with the Airport Authority. After amending the Agenda, a motion was made by Commissioner Threadgill and seconded by Commissioner King to Adopt the Agenda. All were in favor. Vv. PRESENTATIONS There were no Presentations. VI. FINANCE REPORT Finance Director Lackey presented the Finance Report, stating that the first page reflected the bank balances as of that afternoon. She noted that an additional line item had been added for the 2026 SPLOST, as a new bank account had recently been opened. She further stated that the LOST, SPLOST, and TSPLOST distributions received for February were listed at the bottom of the page. Director Lackey continued by reviewing the second page, reporting that the SPLOST balance reflected a negative $70,000, while the TSPLOST balance was $1,128,000. She concluded her report and offered to answer any questions. County Administrator Gorton added that, following a recent Work Session, the Fire District bond account currently held a balance of $666,145.34. He stated that one additional interest payment of approximately $40,000 remained, after which the balance would be reduced to approximately $625,000, plus any additional funds received from the Tax Commissioner. He noted that this would position the County to begin the process of issuing a Request for Proposals (RFP) for the Primrose Fire Station. During discussion, Commissioner King inquired about the total tipping fees collected for the year. Commissioner Worsley referenced information previously provided by Ms. Jodi Sharpe with the Industrial Development Authority (IDA), stating that the total tipping fees for 2025 were approximately $1,739,465.21. Clarification followed between County Administrator Gorton, Commissioner King, and Commissioner Worsley regarding whether the figure represented the County's portion or total landfill revenue. It was confirmed that the $1.7 million figure represented the County's portion for 2025, with Water and Sewer receiving a separate portion. County Administrator Gorton noted that the fourth quarter payment of approximately $58,000 was the largest received during the year and offered to provide a precise breakdown if needed. VII. DEPARTMENT HEADS County Clerk Allyson Stephens, provided a couple of announcements to the Board. She stated that the County had received information from the Department of Family and Children Services in coordination with Family Connection regarding an upcoming Meriwether Child Safety Collaborative meeting. She advised that the meeting would be held on Tuesday, March 17th, from 10:00 a.m. to 12:00 p.m. at the Meriwether County Board of Education boardroom and would include information sharing from DFCS, Family Connection, Resilient West Georgia, Resilient Georgia, and the Handle with Care Initiative. She extended an invitation for members of the Board to attend. County Clerk Stephens also announced that the Greenville Senior Center had invited County and City officials to attend a "Coffee and Donuts with Seniors" event. She stated that the event would take place on April 7th from 10:00 a.m. to 11:00 a.m. at the Greenville Senior Center. Vice Chairman Snelson requested that the invitation be forwarded to her. County Clerk Stephens confirmed that she would send the email. VII. CITIZEN COMMENT There were no Citizen Comments. IX. MINUTES I. Minutes, February 24, 2026, Regular Meeting at 6:00 p.m. Before approval of the Minutes, County Clerk Stephens made note of a change that would need to be made. "Commissioner Adam Threadgill” in the title section of the Minutes would need to be changed to "Commissioner Adam Worsley.” A motion was made by Commissioner King and seconded by Vice Chairman Snelson to Approve the Minutes from the February 24, 2026, Regular Meeting at 6:00 p.m. All were in favor. X. PUBLIC HEARING l. Agenda was Amended to correct Case #PC26-044 to Case #PC26-004: Case #PC26- 004 - Request from Robert Williams to close approximately 4,144 feet of Dobson Road, beginning at the southern corner of 2171 Dobson Road and extending north to the corner of 969 Dobson Road. The Board considered Public Hearing Case #PC26-004, a request from Robert Williams to close approximately 4,144 feet of Dobson Road, beginning at the southern corner of 2171 Dobson Road and extending north to the corner of 969 Dobson Road. It was noted that the agenda had been amended to correct the case number from PC26-044 to PC26-004. A motion was made by Commissioner King and seconded by Commissioner Threadgill to enter into the Public Hearing at 6:07 p.m. All were in favor. Director of Building, Planning, and Community Development Cassandra Jones presented the request, stating that the Building and Zoning Department had received an application requesting to closure of a portion of Dobson Road totaling approximately 4,144 feet. Upon review of the submitted documentation and an on-site inspection, staff indicated that the concerns expressed by adjoining property owners appeared to be justified. It was stated that all relevant departments — including the Road Department, E911, Fire Department, and Sheriff's Office — had been contacted; however, only the Road Department had responded. Director Jones provided further details regarding the condition of the roadway. It was explained that there are large rocks protruding along the roadway, creating significant difficulty for routine maintenance. The road also contains steep grades that hinder proper compaction and long-term maintenance. During periods of heavy rainfall, the bridge located on this portion of the road becomes impassable. The bridge has been evaluated by the Georgia Department of Transportation and rates as SPM4, indicating it is structurally deficient. This condition presents safety concerns for vehicle traffic, particularly emergency vehicles such as fire trucks, which have reportedly not accessed the bridge in many years. Staff also stated that all affected property owners would continue to have reasonable access to their properties via the remaining open portions of the roadway. It was recommended that, if closed, the roadway be renamed North Dobson on the upper side and South Dobson on the lower side for E911 clarity. Staff noted that both the applicant and a representative from the Road Department were present to answer questions. During discussion, Commissioner Threadgill questioned whether the County's ordinance required responses from all relevant departments prior to moving forward with the Public Hearing. Director Jones confirmed that all departments had been contacted but acknowledged that only one had responded. Commissioner Threadgill raised concern about whether the ordinance required formal input from E911, the Sheriff's Office, Fire Department, and Public Works before consideration. County Clerk Stephens and Deputy County Clerk Palmer pulled the ordinance offline for review. County Clerk Stephens read the ordinance in Article VII, Section 22-162, Subsection (8): "The county shall request input from the county sheriff's office, all public safety departments, E-911, and public works, and consider any comments received from those departments in making the decision.” Further discussion followed regarding the ordinance language, specifically whether it required that those departments "shall" provide input or whether the County was only required to request input. Attorney Nathan Lee reviewed the Ordinance and advised that Director Jones had met the requirement by requesting input, but that it remained the Board's decision whether to proceed or continue the hearing. It was further stated that the Board could choose to continue the Public Hearing in order to obtain additional feedback from the departments. Commissioner Worsley expressed concern about moving forward without full departmental input, stating a preference to continue the Public Hearing to ensure all necessary feedback was received, particularly from Public Safety Departments, citing the importance of making a fully informed and legally sound decision. County Clerk Stephens asked the Board what meeting date that would like to table it to. A motion was made by Commissioner Worsley and seconded by Commissioner Threadgill to table the Public Hearing of Case #PC26-004 - Request from Robert Williams to close approximately 4,144 feet of Dobson Road, beginning at the southern corner of 2171 Dobson Road and extending north to the comer of 969 Dobson Road till the March 24, 2026, Regular Meeting at 6:00 p.m. All were in favor. Commissioner Threadgill asked Attorney Lee is they needed to come out of the Public Hearing. Attorney Lee confirmed that they should. Commissioner King inquired if they should make a motion to continue the Public Hearing. Attorney Lee stated that was a good point, and that they should make the motion to continue the Public Hearing. Attorney Lee clarified that continuing the Public Hearing would eliminate the need to re-advertise. Commissioner Worsley made a motion to continue the Public Hearing till the March 24, 2026, Regular Meeting at 6:00 p.m. This motion was seconded by Commissioner Threadgill. All were in favor. XI. APPOINTMENTS 1. Appointment for Camera Ready Liaison for Meriwether County County Clerk Stephens presented the appointment for the Camera Ready Liaison for Meriwether County. She explained that the County participates in the Georgia Department of Economic Development's Camera Ready program, which assists film and television productions in identifying potential filming locations throughout the state. She stated that each participating county designates a liaison to serve as the primary point of contact for the program and for film location scouts seeking information about the County. Clerk Stephens noted that former Commissioner Beth Neely-Hadley has served as the County's Camera Ready liaison for many years. However, Ms. Hadley has expressed that, since she has not served on the Board of Commissioners for several years, it would be more appropriate for someone currently connected with the County to serve in that role moving forward. She further explained that the Georgia Department of Economic Development recommends that the liaison be someone working with the County in an official capacity, such as tourism, economic development, or another county-related role. The liaison would be responsible for communication with the Department of Economic Development and assisting visiting film locations scouts with information about potential filming locations within the County. County Clerk Stephens stated that staff was requesting Board discussion and appointment of a Camera Ready Liaison and noted that Vice Chairman Snelson had expressed interest in serving in the role. A motion was made by Commissioner Threadgill and seconded by Commissioner King to appoint Vice Chairman Snelson as the Camera Ready Liaison. Voting in favor were Chairman Collins, Commissioner King, Commissioner Threadgill, and Commissioner Worsley. Vice Chairman Snelson abstained from the vote. The motion passed. XII. UNFINISHED BUSINESS 1. Approval of Grant Writing Proposal from Ms. Tara Coe — This item was tabled from the February 24, 2026, Regular Meeting The Board considered the approval of the grant writing proposal from Ms. Tara Coe, which had been tabled from the February 24, 2026, Regular Meeting. County Administrator Gorton requested that the item be tabled again until the March 24, 2026, Regular Meeting, stating that he had not received a response regarding the contract revisions provided by legal counsel. A motion was made by Commissioner Threadgill and seconded by Commissioner Worsley to table the item till the March 24, 2026, Regular Meeting at 6:00 p.m. All were in favor. During brief discussion, Commissioner Worsley asked whether the Board should consider moving on to a different grant writer. Vice Chairman Snelson responded that Ms. Coe had experienced a family emergency and had communicated with her that she was currently at the hospital, noting that the delay was due to unexpected circumstances. XIH. NEW BUSINESS l. Confirm Approval to Close Massengale Mill Road Bridge and only Allow Local Traffic County Administrator Gorton presented the item, stating that staff was requesting approval to close Massengale Mill Road Bridge to through traffic and limit access to local traffic only until Georgia Highway 362 reopens. He explained that the bridge is rated at three tons and that numerous dump trucks and fully loaded semi-trucks have been using it, placing additional strain on a structure that already has a reduced weight limit. He stated that Director Griffith was present to provide a plan to restrict through traffic. Director of Public Works Brian Griffith stated that "they are pounding that bridge to death," especially due to the closure of Highway 362. He requested permission to close the bridge and leave closed until construction is complete, explaining that staff would like to install gates on each end of the bridge to prevent individuals from moving barricades, noting that barricades had already been moved and thrown out. He described the intent as making it a semi- permanent closure. Commissioner Worsley asked if the bridge is closed during construction, what would prevent people from continuing to use it afterward. Director Griffith explained that the current traffic was due to Highway 362 being closed, and that drivers are using the bridge as the next available route to avoid traveling a significantly longer distance. Commissioner King stated that GPS systems are directing drivers into the road despite signage and that drivers are ignoring road closed signs. Commissioner King further explained that he had personally observed traffic and received complaints from homeowners, noting that multiple loaded dump trucks had crossed the bridge in a single day. He described an incident involving a lowboy trailer that had to be stopped by a homeowner after attempting to follow GPS directions onto the bridge. He emphasized that the bridge had been condemned approximately ten years ago and reduced to a three-ton limit, and that continued heavy traffic could cause failure. Commissioner King stated that if the bridge were lost, it could take up to two years and approximately $1 million to replace, potentially requiring the draining of the lake. Commissioner Worsley stated that it sounded like the County needed both a quick solution and a long-term plan, including evaluation of what it would take to improve the bridge. Additional discussion followed regarding possible methods to physically stop large trucks from accessing the bridge, including installing metal beams or barriers similar to those used at the covered bridge, implementing height restrictions, or placing concrete blocks. Concerns were raised about trucks entering the road and having no place to turn around. Director Griffith explained that due to state right-of-way limitations, barriers could not be placed directly at the highway entrance but could be installed further down the road. It was discussed that signage and barricades alone were not effective, as they were being ignored or moved. Further discussion concluded that a more effective approach would be to install physical barriers near the bridge with an opening wide enough, approximately eight feet, to allow passenger vehicles through while preventing larger trucks from crossing. It was noted that reflectors would be added and that the setup would allow local traffic access while restricting heavy vehicles. A motion was made by Commissioner Worsley and seconded by Commissioner Threadgill to proceed with installing barriers as discussed to restrict through traffic and protect the bridge with funding being used from TSPLOST. All were in favor. 2. Approval to Purchase a Riding Lawnmower — Recreation County Administrator Gorton presented the item, stating that the Recreation Department is requesting approval to purchase a new riding lawnmower. He advised that three quotes had been obtained for consideration: a 2026 John Deere from Sun South for $14,850; a 61-inch Cheetah, 38 horsepower mower from Advanced Power Equipment for 13,899; and a 61-inch Turf Tiger II, 38 horsepower mower from Advanced Power Equipment for $14,399. He further stated that Mr. Randy Carter with the Recreation Department recommended purchasing the 61-inch Turf Tiger II, 38 horsepower mower from Advanced Power Equipment for $14,399, to be funded through SPLOST. During discussion, Commissioner Worsley asked whether the County had purchased a lawnmower the previous year. It was clarified that the Board had approved the purchase of a trailer and a gator, but not a lawnmower. Vice Chairman Snelson asked a question regarding why the Turf Tiger was preferred over the John Deere. County Administrator Gorton stated that he had asked for a recommendation and was told the Turf Tiger was preferred, though no additional explanation was provided. A motion was made by Vice Chairman Snelson and seconded by Chairman Collins to approve the purchase of the 61-inch Turf Tiger II mower from Advanced Power Equipment in the amount of $14,399, funded through SPLOST. All were in favor. 3. Approval to Remove Landscape at Lake Meriwether for Youth Baseball Field — Recreation . ee County Administrator Gorton presented the item, stating that the Recreation Department is requesting approval to remove small diameter trees and shrubs at Lake Meriwether in the area where the layout for a youth baseball field has been marked. He explained that Public Works has assessed the site and confirmed that they are able to clear the necessary area to accommodate the outfield fencing for the proposed baseball field. He further stated that the property is owned by the County and will need to be cleared in order to proceed with the project. It was noted that the approximate area is around 200 feet by 30 feet, and that supporting materials were included in the agenda packet. During discussion, it was confirmed that Public Works would be completing the work. Director Griffith stated that they would work on preparing the infield and bases as much as possible this year, acknowledging that the season is already underway and that only limited work can be completed in the immediate timeframe. A motion was made by Commissioner Threadgill and seconded by Commissioner Worsley to approve the removal of the landscape as requested by doing it in-house. All were in favor. 4, Approval to use Recreation Funds in the Recreation Bank Account to Purchase Fencing for Baseball Field — Recreation County Administrator Gorton presented the item, stating that the Recreation Department is requesting approval to use funds from the Recreation bank account at United Bank to purchase either permanent or temporary fencing for the baseball field at Lake Meriwether, which had just been approved for clearing. He stated that the current balance in the Recreation account is approximately $44,493, noting that the recent lawnmower purchase did not come from this account, as it was funded through SPLOST. He added that the balance had increased by approximately $2,000 from what was reflected in the agenda packet. He further explained that staff is currently awaiting quotes for both permanent and temporary fencing, but estimated the cost to be between $15,000 and $20,000 in order to have the field ready for the current baseball season. During discussion, it was clarified that the estimated cost would for permanent fencing. County Administrator Gorton noted that temporary fencing could cost approximately $7,000 for a shorter-term solution. County Administrator Gorton stated that another option would be to utilize funds from the Lake Meriwether account, which has a balance of approximately $146,000, and that funding could be split between accounts if needed. He added that SPLOST could also be considered as an alternative funding source. Further discussion indicated that the fencing would primarily be used for 14U baseball, with the possibility of using temporary for softball as needed. A motion was made by Commissioner Worsley and seconded by Commissioner Threadgill to approve the purchase of fencing using Recreation funds to cover the full cost of the project. All were in favor. 5. Approval of Intergovernmental Agreement (IGA) for Development Plan Review, Permitting, Inspection, and Code Enforcement — Town of Lone Oak County Administrator Gorton presented the item, stating that staff is requesting approval to enter into a new Intergovernmental Agreement (IGA) between Meriwether County and the Town of Lone Oak for development plan review, permitting, inspection, and code enforcement services. He noted that this item had been contingent upon the execution of the fire station lease, which has now been received by the County, and that the original document is on file. He further explained that the anticipated volume of work associated with this agreement is not expected to have a significant impact on the current workload of the Planning and Zoning and Code Enforcement Department. He stated that legal counsel has reviewed the agreement and that staff recommends approval, along with authorization for the Chairman to execute the agreement. County Administrator Gorton added that the agreement will be for a term of one year, with automatic annual renewals unless terminated by either party. A motion was made by Commissioner Worsley and seconded by Vice Chairman Snelson to approve the Intergovernmental Agreement and authorize the Chairman to sign. All were in favor. 6. Approval to Reallocate TSPLOST Funds from the E911 Parking Lot to Road Striping County Administrator Gorton presented the item, stating that staff is requesting approval to reallocate the remaining balance from the E911 parking lot project to road striping. He explained that $66,656 had originally been allocated for the E911 parking lot project, and that project came in just under $20,000, with the County still awaiting the final invoice. He stated that this would leave a remaining balance of $46,656 available for reallocation. Director Griffith provided details on the proposed striping project, stating that the work would cover approximately 58 to 58.5 miles at a cost of $36,585 and would be completed by Two Rivers. During discussion, Commissioner Worsley asked whether the striping would include stop bars at railroad crossings. Director Griffith noted that stop bars would be included at stop signs and clarified that railroad crossings typically do not include stop bars. County Administrator Gorton stated that he would reconfirm that detail with the appropriate contact. Commissioner Worsley noted that, based on the available balance of $46,656 and the estimated striping cost of $36,585, approximately $10,000 would remain after completion of the project. County Administrator Gorton emphasized that this action was simply a reallocation of funds that had already been previously approved. A motion was made by Commissioner Worsley and seconded by Vice Chairman Snelson to approve the reallocation of TSPLOST funds as presented by staff. All were in favor. 7. Approval of Courthouse Roof Project Change Orders — River City Contracting a. Consideration and Approval of Change Order #3 or #4 — Annex County Administrator Gorton introduced the item and stated that Mr. Travis with River City Contracting was present to review the proposed change orders. He noted that Change Orders #3 and #4 relate to the annex and are "either/or," and that the Board is not required to approve either option. Mr. Travis explained that he was asked by the architect to obtain pricing for the annex roof, which is not included in the current scope of work. He stated that Change Order #3 is to install a metal standing seam roof at the annex and Change Order #4 is to install a 16-ounce copper standing seam roof. He reiterated that these are optional and were provided for consideration. During discussion, it was clarified that this item could be set aside and considered at a later time. The Board agreed to table Change Orders #3 and #4. A motion was made by Commissioner Worsley and seconded by Commissioner Threadgill to table this item till the March 24, 2026, Regular Meeting at 6 p.m. All were in favor. b. Consideration and Approval of Change Order #5 — Tuckpointing, Terracotta, and Quoin Repair Mr. Travis presented Change Order #5, explaining that it addresses masonry work at the top coping of the courthouse. He stated that the repointing of the masonry joints was not included in the original bid and that, upon inspection from the scaffolding, significant gaps and deterioration were discovered that were not visible from the ground. He noted that the current request only includes the north and west elevations where scaffolding is currently in place and that additional change orders would likely be needed for the remaining elevations once accessible. Mr. Travis emphasized that this work is being processed through contingency funds and is being passed through at cost with no overhead or profit markup applied. c. Consideration and Approval of Change Order #6 — Structural Repair Mr. Travis presented Change Order #6 and described it as the most significant item. He explained that during the removal of the existing roof panels, structural deficiencies were discovered in the roof decking. He stated that slats in the roof had deteriorated and were giving way under weight, exposing the felt paper and, in some areas, daylight. He explained that work was stopped, and a structural engineer was brought in to evaluate the condition. The engineer recommended reinforcing the roof structure by installing additional 2x12 supports in areas where spans exceeded five feet, followed by installation of half-inch OSB decking before rebuilding the roof system. Mr. Travis stated that the work is labor-intensive due to limited access, requiring both from the attic space and from above, including removal and reinstallation of roof components. He noted that this issue was unforeseen and is a primary reason for the high cost of the change order. d. Consideration and Approval of Change Order #7 — New Conduit for Rooftop Lighting Fixtures Mr. Travis presented Change Order #7, explaining that it involves removing existing rooftop conduit for lighting and relocating it into the attic space. He stated that the current conduit is exposed on the roof and that the proposed change would run the conduit internally and bring it up through the attic, which is the proper insta!lation method and will protect it from the elements. Following discussion, it was noted that the original contingency amount was $150,000 and that prior deductive change orders had added funds back into contingency. Mr. Travis stated that approval of Change Orders #5, #6, and #7 would largely exhaust the remaining contingency, leaving only a minimal balance, and that additional costs such as structural engineering fees had not yet been included. Discussion also included whether the Board should increase the contingency amount at a future meeting to avoid markup on additional work. Commissioner Threadgill stated that he didn't think the Board had a choice regarding the necessary repairs. A motion was made by Commissioner Threadgill and seconded by Commissioner King to approve Change Orders #5, #6, and #7 using contingency funds. All were in favor. 8. Approval to Issue RFP for LRA Projects County Administrator Gorton presented the item and stated that staff needed direction from the Board on whether to proceed with issuing Requests for Proposals (RFPs) for LRA projects or to table the item in order to further define the scope and prioritize projects discussed during the Work Session. During discussion, County Administrator Gorton noted that four roads had been identified: JW Dunn Bridge, John Brown Road, Pigeon Creek Road, and Dallas Mill Road. Commissioner Worsley stated that RFPs could be issued for all four projects while Public Work works concurrently to prioritize the projects based on need. County Clerk Stephens inquired whether the Board wanted to issue separate RFPs for each project or a single RFP covering all four. Commissioner Worsley and Commissioner Threadgill suggested that issuing one RFP including all our four projects would allow contractors to submit bids for individual roads or a combined price, which could result in cost savings. Commissioner Threadgill aloes noted that some contractors may choose to bid on only certain projects. A motion was made by Commissioner Threadgill and seconded by Vice Chairman Snelson to issue an RFP for all four identified LRA projects, allowing both individual and combined bids. Ail were in favor. 9. Consideration to Increase Credit Card Limit with Colony Bank County Administrator Gorton presented the item and stated that the County's current credit card limit with Elan Financial is $25,000, and the County is in the process of switching to Colony Bank. He explained that staff is requesting to increase the credit limit to $40,000, contingent upon Colony Bank approving that limit. He further stated that the account would be managed by the County Administrator and the Finance Director. County Administrator Gorton explained that the request is due to increased trave! costs, noting that even a two-day trip, such as to Savannah, can cost approximately $1,000, and that the current $25,000 limit is no longer sufficient. He stated that during the previous year's annual conference, the County had to overnight a payment because the credit card limit had been reached. Discussion followed regarding usage of the credit card, including travel and training expenses across multiple departments, and how balances are managed. Commissioner Worsley had a question regarding monitoring expenditures and reviewing credit card statements. It was discussed that expenses are budgets under administration and that statements could be included as part of the monthly finance report for Board review. Commissioner Threadgill expressed that while he had no issue with increasing the limit, he would like to receive monthly credit card statements to monitor usage. County Administrator Gorton and Finance Director Lackey confirmed that statements could be provided as part of the finance report. A motion was made by Commissioner Threadgill and seconded by Commissioner Worsley to approve increasing the credit card limit to $40,000 with Colony Bank, contingent upon approval by the bank, and with the condition that monthly statements be provided to the Board of review. All were in favor. County Administrator Gorton added that the Board retains the ability to adjust the credit limit in the future if needed. 10. Amended to add - Mulching Head for HX85 - TSPLOST County Administrator Gorton presented the item and stated that this was a request to purchase a mulching head for the HX85 for Public Works, to be funded with TSPLOST funds. He noted that this item had been discussed during the Work Session. Commissioner Threadgill noted that the estimated cost of the mulching head would be $30,000. County Administrator Gorton confirmed that was correct. A motion was made by Commissioner Threadgill and seconded by Vice Chairman Snelson to approve the purchase of the HX85 mulching head in the amount of $30,000 using TSPLOST funds. All were in favor. If. Amended to add — Consideration of Work Session with the Airport Authority County Administrator Gorton presented the item and stated that the Airport Authority had met earlier that morning and requested a Work Session with the Board of Commissioners. He noted that the Airport Authority follows the same meeting schedule as the Board and that their next meeting would be April 13th, but they were also available to meet on March 24th if preferred. Discussion followed regarding scheduling, including the option to hold the Work Session prior to the Regular Meeting similar to previous Work Sessions. Deputy County Clerk Palmer stated that the Airport Authority was flexible and that a one-hour or shorter session could be accommodated. The Board discussed availability and agreed that March 24th would be suitable. A time of approximately 4:30 p.m. prior to the Regular Meeting was proposed and agreed upon. A motion was made by Commissioner Threadgill and seconded by Commissioner Worsley to schedule a Work Session with the Airport Authority on March 24th at 4:30 p.m. All were in favor. County Administrator Gorton stated that staff would notify the Airport Authority and coordinate the meeting. XIV. REPORT FROM ACCG LEGISLATIVE COORDINATOR Vice Chairman Snelson provided a report and stated that she attended the ACCG Legislative Conference in Atlanta the previous Wednesday and Thursday. She stated that she met the Governor, Lieutenant Governor Burt Jones, and the Speaker of the House, and that they discussed legislation currently under consideration. She noted that the conference coincided with Crossover Day, when legislation moves from one chamber to the other. Vice Chairman Snelson reported on several bills that had successfully crossed over. She stated that House Bill 275 revises the notice of assessment process to make property tax assessment notices more understandable for taxpayers by simplifying the information provided. She further reported that House Bill 961 and a corresponding Senate bill address out-of-network ambulance billing and would require insurance companies to reimburse counties for ambulance services at a rate between 300% and 325% of the Medicare reimbursement rate. Vice Chairman Snelson also discussed House Bill 1243, which proposes a constitutional amendment to allow the General Assembly to create a funding mechanism to assist counties with NextGen 91 I systems, noting that funding sources are still being determined. She stated that House Bill 587 would establish a statewide animal cruelty database, requiring prosecuting attorneys to maintain a searchable database by January 1, 2027, funded by the state. Additionally, she reported that Senate Bill 527 would require candidates for sheriff to be certified peace officers, which is not currently required. Lastly, she discussed Senate Bill 382, which proposes a mandatory statewide base-year homestead exemption and would remove the opt-out provision currently allowed under House Bill 581. She noted that this is being closely monitored as it may not be beneficial for the County. Vice Chairman Snelson concluded her report and thanked the Board. XV. REPORT FROM COUNTY ADMINISTRATOR County Administrator Gorton reported that Leadership Meriwether met on Thursday, March Sth at the County office and attended a Water & Sewer Authority work session. He stated that he has been conducting weekly update meetings with Mark III, the County’s new insurance provider, and that they are planning to conduct open enrollment earlier this year, potentially in May or June. He further reported that Public Works participated in a presentation call regarding upgrades to the Public Works iWorQ software system, which will allow for the input of street ratings completed by Director Griffin, with the goal of implementing that data into the system. County Administrator Gorton stated that he has been conducting interviews for the Deputy County Administrator position as well as Recreation Director interviews, which have taken a significant portion of his time over the past week. He also noted that he attended an Airport Authority meeting earlier that day. He reported that the Sheriff's Office will be sending three additional pickup trucks that will need to be painted white, and that the final vehicle from the previous batch is currently being painted. He added that the Code Enforcement truck is still awaiting an ABS part that is currently on backorder with no estimated delivery date. Lastly, County Administrator Gorton stated that a higher mileage administrative vehicle has been assigned for his use, and that he will be checking on departments utilizing the County vehicle. He concluded his report. XVI. REPORT FROM COUNTY COMMISSIONERS Commissioner Bryan Threadgill: Commissioner Threadgill stated he had nothing to add. Commissioner Adam Worsley: Commissioner Worsley expressed appreciation to staff and stated that he has received a lot of positive feedback from citizens regarding recent LMIG road projects and new paving completed by Public Works. He noted that citizens have been commenting positively on the work and encouraged everyone to keep moving forward. Vice Chairman Jennifer Snelson: Vice Chairman Snelson thanked the citizen for attending and supporting County efforts. She also highlighted recent youth achievements, stating that the County's 14U boys were state runner-up in GRPA and the 10U girls were state champions. She expressed pride in the County's youth and their accomplishments. Commissioner Gene King: Commissioner King thanked staff and Public Works, noting that he has seen many positive comments on social media regarding recent paving work. He specifically mentioned that multiple roads, including Beulah Evans and several subdivision roads, were completed within one week. He stated that citizens are beginning to see results from their tax dollars and expressed appreciation for the progress being made. Be Chairman Emmett Collins: Chairman Collins thanked staff, employees, and citizens, noting that roads are being paved and the courthouse project is progressing. He stated that the County is making noticeable progress and expressed appreciation for everyone’s efforts. XVII. REPORT FROM COUNTY ATTORNEY County Attorney Nathan Lee stated he had nothing to report, unless the Board had any questions. No questions were raised. XVIII. FUTURE MEETINGS & NOTICES Chairman Collins read off the Future Meetings and Notices before entering into Executive Session. XIX. EXECUTIVE SESSION A motion was made by Commissioner Worsley to enter Executive Session at 6:59 p.m. for the purposes of Litigation, Tax Matters, Personnel, and Real Estate. This motion was seconded by Commissioner Threadgill. All were in favor. A motion was made by Commissioner Threadgill and seconded by Commissioner Worsley to exit Executive Session at 7:43 p.m. All were in favor. A motion was made by Commissioner King and seconded by Commissioner Worsley to go back into Regular Session at 7:46 p.m. All were in favor. After returning from Executive Session, Chairman Collins stated that during Executive Session they had decided to have a joint Special-Called Meeting with the City of Greenville on March 23, 2026, at 4:00 p.m. A motion was made to approve this meeting by Commissioner Threadgill and seconded by Commissioner Worsley. All were in favor. XX. ADJOURNMENT With no further discussion, a motion was made to Adjourn the Meeting at 7:46 p.m. by Commissioner Threadgill and seconded by Vice Chairman Snelson. All were in favor. Approved by: flajony Vole of Ye Board Of Conmissionas, Attest: Wy Date: