City: Alpharetta
Alpharetta Design Review Board meeting, March 20, 2026
8:30 AM · 5 pages
These are the minutes as Alpharetta Design Review Board posted them, read from the file on its own website. Georgia Commons is independent and is not affiliated with Alpharetta Design Review Board.
Records of this meeting
Each link opens the body's own website or meeting portal.
- MinutesDesign Review Board Official Minutes 3-20-26 (alpharettaga.api.civicclerk.com) · shown on this page
- Video recordingDesign Review Board March 2026 (cpmedia.azureedge.net)
Summary
Written by an AI model (claude-sonnet-5-5) from the minutes below. It is not the record: the minutes are.
Design Review Board approved exterior improvements for One Day in Paris and Portman Residential's north facade, and deferred the Mayfair at Haynes Bridge elevations.
The Design Review Board approved the minutes of its February 20, 2026 meeting and took up three applications. For One Day in Paris at 35 Milton Ave, it approved exterior improvements 6-0 with conditions: staff will give final approval of the faux vines, awning, fabric umbrellas, sunshade furniture, fabric, rug and sconces, possibly after a site review, and staff will review those items annually. For Portman Residential at 3625 Brookside Pkwy, it approved the north facade elevation of materials and the proposed venting solution 6-0. For Mayfair at Haynes Bridge, 340 Jon Scott, the board discussed elevations and materials details, then voted 6-0 to defer the application.
Topics taken up: One Day in Paris exterior improvements; Portman Residential north elevation; Brookside Village multi-family venting; Mayfair at Haynes Bridge elevations; awnings, umbrellas and sconces; annual staff review.
Decisions the minutes record (3)
Each decision is followed by the sentence of the minutes that records it, copied word for word.
Exterior improvements at One Day in Paris, 35 Milton Ave, with staff review conditions and annual review
6-0
The minutes: “Vice-Chair Schwing offered a motion to approve the exterior improvements as presented today with the following conditions:”
North facade elevation of materials and venting solution for Portman Residential, 3625 Brookside Pkwy
6-0
The minutes: “Vice- Chair Schwing offered a motion to approve the North façade elevation of materials and the proposed venting solution as presented in the motion.”
Exterior elevations for Mayfair at Haynes Bridge, 340 Jon Scott
6-0
The minutes: “Board Member Palmer offered a motion to defer.”
Agenda items (10)
Found in the minutes by their headings. Where an outcome is shown, it was read by rule from the item's own words: a guide to the text, not part of the record.
- 1. MEETING ANNOUNCEMENTS
- 2. WORK SESSION ITEMS
- 3. CALL TO ORDER
- 4. ROLL CALL
- A. Board Members Present
- B. Staff Members Present
- 7. ITEMS FROM BOARD MEMBERS
- 8. PUBLIC HEARING
- 9. DRB250039 Portman Residential 3625 Brookside
- 10. DRB260002 Mayfair at Haynes Bridge 340 Jon Scott Applicant presented review of exterior elevations.
- 11. ADJOURNMENT
The minutes
As posted on alpharettaga.api.civicclerk.com, read November 12, 2026. Nothing below is written by Georgia Commons.
DESIGN REVIEW BOARD
OFFICIAL MINUTES
MARCH 20, 2026
ALPHARETTA CITY HALL
COUNCIL CHAMBERS
2 PARK PLAZA
8:30 AM
1. MEETING ANNOUNCEMENTS
Today’s Design Review Board meeting will commence at 8:30 a.m. and a break is scheduled at 12:00
p.m. The meeting will resume at 12:30 p.m.
2. WORK SESSION ITEMS
Chair Kramer called the workshop to order at 8:31 a.m.
Chair Kramer adjourned the workshop at 9:00 a.m..
3. CALL TO ORDER
Chair Kramer called the meeting to order at 9:00 a.m.
4. ROLL CALL
A. Board Members Present
• Richard Kramer ( Chair)
• Frank Schwing (Vice- Chair)
• Pat Corkill
• Holly Palmer
• Richard Owens
• Kim Matherly
B. Staff Members Present
• Bret Schroeder, Code Enforcement Manager
• Joel Carnow, GIS Specialist , Special Projects Planner
• Elle Taylor. Planning & Zoning Coordinator
5. PLEDGE TO THE FLAG
6. ITEMS FROM STAFF
7. ITEMS FROM BOARD MEMBERS
1. DRB Meeting Minutes of February 20. 2026 Board Member Palmer offered a motion to approve.
Board Member Owens seconded the motion.
Motion carried (6-0).
8. PUBLIC HEARING
1. Public Hearing Procedure Elle Taylor, Planning & Zoning Coordinator read procedure.
2. DRB260003 One Day in Paris 35 Milton Ave Applicant presented review of exterior improvements.
• Accordion Windows.
• Existing main entrance.
• Soft seating outside.
• Shade sail system.
• Umbrellas.
• System of planters and plants.
• Clearance of 5 ‘ path.
• Furniture in Alley way to courtyard.
• Location of planters and bollards.
• Presented rendering.
• Accordion doors will match color of existing doors.
• Faux plants against the hostess stand doors.
• Did not have a location plan or samples.
• Lighting.
• Size of Wall Sconces.
• Tan/Beige Awnings.
• Location and maintenance of awnings.
• Blade Sign.
• Gold address letters.
• Evergreen real plants
• Birdcage lantern.
• Consistency in colors of umbrellas and awnings.
• Color pallet.
• Safety of the site.
There was no public comment.
There was discussion from the Board that they liked concept.
Vice-Chair Schwing offered a motion to approve the exterior improvements as presented today with the following conditions:
The faux vines, awning, fabric umbrellas, sunshade furniture, fabric, rug and sconces will be reviewed and approved with final approval by Staff, potentially a site review, including a couple of Board Members, at the discretion of Staff.
Board Member Corkill seconded the motion.
Board Member Palmer offered a Friendly Amendment that items mentioned in the motion get an annual review by Staff, all the items that were mentioned in the motion as well as faux vines.
Vice-Chair Schwing Board Member Corkill accepted the Friendly Amendment.
Motion carried with the Friendly Amendment (6-0).
9. DRB250039 Portman Residential 3625 Brookside
Pkwy Applicant presented review of exterior updates
• Brookside Village Multi-family Building.
• Previously presented on 12.19.25.
• Seeking Final Approval on the North Elevation as well as design for the multi-family unit dryer and bathroom vents.
• Renderings.
• Scaled down and broke up buildings.
• 3 bay smaller scale row house facades.
• Still using larger length of the building on Brookside Pkwy side.
• Using materials that have already been presented and approved.
• Recessed theme similar to Townhomes.
• Industrial feel windows.
• Active Balconies.
• Proposed intake and Exhaust Vent locations.
• Intake and Exhaust Vent Visualization.
• Vent Color Matching Information and Examples.
There was no public comment.
After discussion from the Board:
Vice- Chair Schwing offered a motion to approve the North façade elevation of materials and the proposed venting solution as presented in the motion.
Board Member Corkill seconded the motion.
Motion carried (6-0).
Chair Kramer called a 5 minute recess at 10:20 a.m.
Chair Kramer reconvened the meeting at 10:25 a.m. .
10. DRB260002 Mayfair at Haynes Bridge 340 Jon Scott Applicant presented review of exterior elevations.
• Site Plan.
• Google Maps Location.
• Color Selections.
• Perspective Rendering.
• Lots 1-17 Proposed Materials.
• Material Palette.
• Showed different Plans & Elevations.
There was discussion:
• City Council required 8 elevations.
• Condition # 27
• 4 difference elevations on Lots 1-6.
• Locations of different elevations.
• Focus on the homes on the Devore Haynes corner.
• Topography.
• Entrance at Jon Scott Drive.
• All four sides of Elevations.
• “Oddball plan” is different shaped lot.
• Materials Board.
• Need more details and specifics.
• Materials should be identified on Elevations.
• Chimneys.
Board Member Palmer offered a motion to defer.
Board Member Owens seconded the motion.
Motion carried (6-0).
11. ADJOURNMENT
Chair Kramer adjourned the meeting at 11:31 a.m.