Voting Members Mr. Randy Sirmans, Board Chairman Mr. Phillip Connell, Board Member Mr. Denny Fender, Vice Chair Mr. Erlish Locklear, Board Member Mr. John W. Strickland, Jr., Board Member Non-Voting Members Mr. Gene Culpepper, Superintendent Ms Jill Braddy, Admin Asst 1. Call to Order, Invocation, & Pledge The meeting was called to order at 7:00pm by Chairman Randy Sirmans. The Invocation was given by Mr. Denny Fender. 2. Approval of Agenda A motion was made to approve the agenda. Motion made by: Mr. Phillip Connell Motion seconded by: Mr. John W. Strickland, Jr. 3. Superintendent Information Superintendent Gene Culpepper reviewed each of the following items under Superintendent information. a. Safety Updates Centegix The new safety alert system is fully operational, along with the visitor management system. Minor process adjustments are still being addressed regarding visitor procedures; however, the system is functioning effectively. All visitors to any school campus are required to check in through the front office. Regulation EBB-R: Safety This regulation is currently being developed to meet legislative requirements and to support the district’s application for the Ready Georgia Seal of Preparedness. SRO Position A qualified applicant has been identified and will be interviewed, with a potential recommendation to be presented at Monday night’s Board of Education meeting. b. Projects Update LCS Baseball/Softball Athletic Complex Upcoming phases of the project include completion of irrigation, installation of field lighting, placement of infield clay, and construction of backstop walls. Total expenditures to date are $17,641 for FY25 and $1,156,559.50 for FY26, compared to a total contract price of $3,979,578. The contract does not include storm drain piping being added between the two parks or additional fill material needed to prevent standing water in the borrow pit. Also excluded from the contract are a well, field house, flagpole, and perimeter fencing. The county will provide irrigation water from its well and will partner with the district to install a shared flagpole at the main entrance serving both parks. Elementary School Car Rider Driveway The driveway fill material has been brought to grade. Total expenditures to date are $207,430.97, which includes fill material, grading and compaction, and initial earthwork. Complaints were filed with the U.S. Army Corps of Engineers and the Georgia Environmental Protection Division. The district has submitted responses addressing each concern. The EPD complaint has been officially closed, and the Army Corps complaint remains under review. LCHS Head House & Shelter The structure is nearing completion. Remaining work includes electrical, plumbing, and insulation. The building may serve as a temporary bus barn/maintenance facility until a permanent location is established. The facility can be relocated during a school break. Board of Education/Central Office Renovation (Badcock Building) A final floor plan for the new Board of Education offices is nearing completion. Once finalized, detailed specifications for each phase of work—including framing, sheetrock, flooring, plumbing, electrical, ceiling, and HVAC—will be developed, and requests for quotes/proposals will be posted on the district website. The anticipated timeline for relocation is approximately six months from the start of renovation. c. Georgia Heart Hospital Program The program allows businesses or individuals to direct their state income taxes to the SGMC Lanier Campus Hospital for future construction. Through the Georgia HEART Hospital Program you can direct a portion of your state income tax liability toward strengthening SGMC Health's rural hospital in Lanier. Participation in the program requires no contribution above and beyond your regular tax liability. d. Christmas Club Christmas Club Certified staff will receive their teaching supplement prior to Christmas Break as a separate payment. Classified staff will have the option to participate by electing to have a designated amount withheld from their monthly paycheck, to be distributed as a separate payment prior to Christmas Break. e. AFY 2026 Retention Supplement Lanier County Schools total active employee count = 238. 17 employees are paid directly by either Pre-K funds or Federal funds. The retention supplement for those employees would come from those sources. The total estimated retention cost for the remaining 221 employees, including $2,000 per employee supplement, plus benefits costs to the district would be around $467,029 with the state grant covering $361,000. This would leave an estimated $106,028 to be covered by local funds. I will be recommending that we provide the $2,000 retention supplement to all active LCS employees. If approved, this would come in a separate payroll/check run on Friday, April 17th. f. Pre-K Update YTD, there are 62 students enrolled in Pre-K for the 2026-27 school year. We are on track to keep all 5 Pre-K classrooms next year. g. FY26 Field Trips Reviewed the FY26 Field Trips. h. FY26 Fundraisers Reviewed the FY26 Fundraisers. i. Staff Attendance - March March attendance data shows a positive trend compared to the same period last year. j. Bus Purchase Reviewed the upcoming purchase of a bus. 4. Executive Session A motion was made to enter into Executive Session at 7:42pm Motion made by: Mr. Phillip Connell Motion seconded by: Mr. Erlish Locklear Motion seconded by: Mr. John W. Strickland, Jr. 5. Adjournment A motion was made at 8:09pm to adjourn the meeting.