School district: Liberty County School District
Liberty County Board of Education regular meeting, April 12, 2026
15 pages
These are the minutes as Liberty County Board of Education posted them, read from the file on its own website. Georgia Commons is independent and is not affiliated with Liberty County Board of Education.
Records of this meeting
Each link opens the body's own website or meeting portal.
- Minutes45_April_12_2026 (www.libertyschools.org) · shown on this page
Summary
Written by an AI model (claude-sonnet-5-5) from the minutes below. It is not the record: the minutes are.
Board approved a consent agenda including school repair projects, plus a $318,307.47 technology refresh, and unanimously approved personnel recommendations after closed session.
The board met, heard student and staff recognitions, and took no audience comments. It approved the consent agenda unanimously, which covered an office machine lease item for information, a public library data-sharing agreement, out-of-state travel requests, a $264,000 exterior repair at LCHS and a $140,000 gym floor replacement at Taylors Creek Elementary. It also unanimously approved the February 2026 financial reports, 2026 assessment notices, and a $318,307.47 refresh of the virtual environment and storage network with a contingency of up to $35,000. Information items included summer programs, a roof replacement at Midway Middle School, Bradwell Institute interior renovations, canopy repairs, classroom cameras and a network switch refresh, with several to return for a vote at the next meeting. After a closed session, the board unanimously approved the personnel recommendations.
Topics taken up: student and team recognitions; consent agenda; LCHS exterior envelope repair; Taylors Creek gym floor replacement; virtual environment and SAN refresh; February 2026 financials; summer school programs; Midway Middle School roof replacement; Bradwell Institute interior renovations; classroom camera refresh; network switch refresh; personnel approvals.
Decisions the minutes record (5)
Each decision is followed by the sentence of the minutes that records it, copied word for word.
Consent agenda: library data agreement, out-of-state travel, LCHS envelope repair, Taylors Creek gym floor replacement
unanimous
The minutes: “On recommendation by Mrs. Debra B. Frazier, on motion by Mrs. Donita Strickland, seconded by Mrs. Lavonia LeCounte, the board voted to approve the Consent Agenda as presented with a unanimous vote.”
Refresh of the virtual environment and storage network by Entre' Solutions for $318,307.47 with contingency up to $35,000
unanimous
The minutes: “On recommendation by Mrs. Debra B. Frazier, on motion by Mrs. Donita Strickland, seconded by Ms. Natalie Hines, the Board voted to approve the refresh of the Virtual Environment and SAN to Entre’ Solutions for $318,307.47 with a contingency amount not to exceed $35,000.”
February 2026 financial reports
unanimous
The minutes: “On recommendation by Mrs. Debra B. Frazier, on motion by Mrs. Donita Strickland, seconded by Mrs. Lavonia LeCounte, the board voted to approve the Financial from February 2026 as presented with a unanimous vote.”
2026 assessment notices
unanimous
The minutes: “On recommendation by Mrs. Debra B. Frazier, on motion by Dr. Chante Baker Martin, seconded by Mrs. Donita Strickland, the Board voted to approve the Assessment Notices from 2026 with a unanimous vote.”
Personnel recommendations for classified, certified, resignations and transfers
unanimous
The minutes: “Motion to approve personnel as presented was made by Mrs. Lavonia LeCounte, seconded by Ms. Natalie Hines, with a unanimous vote.”
The minutes
As posted on www.libertyschools.org, read November 17, 2026. Nothing below is written by Georgia Commons.
LIBERTY COUNTY BOARD OF EDUCATION
The Liberty County Board of Education met for a Board Meeting on Tuesday April 14, 2026, at 5:30 p.m. with the following members in attendance:
Verdell Jones, Chair Debra B. Frazier, Superintendent Lavonia LeCounte, Vice Chair Dr. Marcus Scott IV Natalie Hines Carol Guyett - teleconference Dr. Chante Baker Martin Donita Strickland
Call to Order.
Mrs. Verdell Jones called the meeting to order.
Pledge to Flag and Moment of Silence.
The Board and the audience recited the Pledge of Allegiance to the American flag and paused for a brief moment of silence.
Inspiration.
BI Choir Certificate of Compliance.
Mrs. Debra B. Frazier certified that we complied with the Georgia Open Meetings Act.
Approve the Agenda.
On recommendation by Mrs. Debra B. Frazier, on motion by Mrs. Donita Strickland and seconded by Ms. Natalie Hines, the Board voted to approve the agenda as presented with a unanimous vote.
Approval of Minutes.
On recommendation by Mrs. Debra B. Frazier, on motion Dr. Chante Baker Martin, and seconded by Mrs. Donita Strickland, the Board voted to approve the minutes from March 10, 2026, Board Meeting and the March 24, 2026, Called Board Meeting with a unanimous vote.
Recognitions.
BGE Reading Bowl Team BGE earned 1st Place in the LCSS Helen Ruffin Reading Bowl Competition BGE Eagles won1st Place at the Regional Reading Bowl Competition in Valdosta BGE Eagles went to University of Georgia for the State Competition, achieved 4th Place in their first - ever appearance at this level
GaDOE 2026 Georgia Scholar The Georgia Department of Education is recognizing 162 graduating seniors across the state as 2026 Georgia Scholars. BI Senior, Faith Ryan has been selected as one of only 162 students statewide to receive this prestigious honor.
Young Georgia Authors Writing Contest LCSS had 12 district - level winners in the 2026 Young Georgia Authors Writing Contest All of their outstanding entries advanced to the First District RESA competition, where Madison Villa, an 11th grade student at BI, earned an Honorable Mention.
BI FCCLA Parliamentary Procedure Team BI Family, FCCLA Parliamentary Procedure team competed at the Region 9 STAR Events Competition February 2026, at Screven County High School, earning a Silver Rating The team went to State Leadership Conference, held March 25–27 in Columbus, where they placed third and received a silver rating.
LCCA CW Matthews Contracting Golden Ticket Winner Sonny Young, a Senior at BI a Carpenter student at LCCA earned a employement offer from CW Matthews Contracting Company.
TAP Educators Day Knowledge Bowl LCSS Early Childhood Education &Teaching as a Profession students Savannah State University Future Educators Day Knowledge Bowl, sponsored by the Professional Association of Georgia Educators.
Third Place Savannah Simmons, Leilani Myers, & Destiny Deigh
LCCA
Second Place Saniya Harley, Ruby Eaves, & Florence Maddison
LCHS
First Place Kira Barnes, Faith Ryan, & Kennedie James
LCCA
FCCLA State Leadership Conference Winner FCCLA Jordan James, Chapter President, earned a Gold Medal at the FCCLA State Leadership Conference in Columbus for her project, “Spring into Pollination: Teaching Strategies.”
BI Allstar Coaches The first time since 1959, both teams captured Regional Championships Coaches were selected as Head Coaches for the Georgia Athletic Coaches Association All - Star Basketball Game
Coach Baker & Coach Randolph BI Basketball Regional Champs BI Boys Basketball Team advanced to the Sweet Sixteen and finished with an impressive 20 – 6.
Jaylin Sweat – Signed to play at University of West Georgia Christopher Perry – Signed to play at University of North Florida
BI Girls Basketball Regional Champs BI Lady Tigers Regional Championships, advanced to the Elite Eight, and finished with an outstanding 28–1.
LCSS Student Advisory Council
• Naomi Campbell – BI
• Alexia Escarcega – BI
• Larissa Jones – BI
• Ahmiya Raby – BI
• Tyler Reed – BI
• My’Son Benjamin – LCHS
• Timara McMillian – LCHS
• Amelia Wiser – LCHS Audience Participation.
None
THE BUSINESS AGENDA
Consent Agenda.
Multifunctional Office Machine Lease Background Information: The current five - year Multifunction Office Machine lease expired February 28, 2026. Our current vendor, Digital Office Equipment, agreed to extend the lease in order that we could lessen the impact on schools by waiting to replace the current devices over the summer. This presentation will show the process used to select the next copier supplier for 26
- 31.
Recommendation: For Information Only: At the next board meeting, it will be the recommendation of the superintendent to award Digital Office Equipment the Multifunction Office Machine Lease for the next five years.
Fiscal Impact:
Lease Cost: $528,364.20 for all five years Estimated Copy Cost: $962,598.00 for all five years Funding Source: General Budget Operations Public Library MOU Background Information: April of 2020, LCSS signed a Memorandum of Understanding with the Live Oak Public Libraries to institute the Student Play Program. The Student Play Program, or PLAY for short, allows students to check out library books from the public library using their student number as a library card. In addition, students are never charged a late fee through this program. As part of this program, LCSS sends a limited amount of student data to the Live Oak Public Libraries (LOPL). This data is never sold or released outside of LOPL and LOPL is required to follow all FERPA guidelines and safeguards. In addition, LCSS and LOPL permit families to op into sharing reading data through Beanstack our county wide program that provides incentives for students to read. This program provides another avenue for students to increase literacy through reading.
Recommendation: Approve Fiscal Impact: N / A
Out of State Travel Background Information: National Association of Secondary School Principal Conference in Washington, D.C. on April 15 - 18, 2026.
Recommendation: Approve Fiscal Impact: $1,950.00 Funding Source: National Association of Secondary School Principals Background Information: Visit Jacksonville Zoo to see different animals in their habitats in Jacksonville, Florida on April 23, 2026.
Recommendation: Approve Fiscal Impact: $439.70 Funding Source: Parents & fundraising Background Information: Lift Summer Institute in Houston, Texas on June 22 - 26, 2026.
Recommendation: Approve Fiscal Impact: $4,148.80 Funding Source: Title I Background Information: Get Your Teach National Conference in Orlando, Florida on July 5 - 8, 2026.
Recommendation: Approve Fiscal Impact: $4,148.80 Funding Source: Title I Background Information: The National School Public Relations Association Annual Conference in New Orleans, Louisiana on July 5-8, 2026.
Recommendation: Approve Fiscal Impact: $2,269.00 Funding Source: Communications Account LCHS Envelope Repair The district completed phase I of the exterior envelope repairs at LCHS last year to address structural movement on the exterior envelope. Phase II of the exterior envelope repair will recondition and provide preventive maintenance on the outer shell to prevent water intrusion, air leakage and structural damage. These repairs will include the following:
● Removal and replacement of all existing brick expansion joints
● Anchoring all precast concrete and repairing damaged joints
● Repoint damage bricks
● Remove and replace sealant around windows, PTAC louvers, wall scuppers
● Strip and repaint all brick lintels
The bid opening for the exterior envelope repair at LCHS was held on February 17, 2026. Five firms submitted proposals and each bid was evaluated. Dabbs Williams Contractors had the best overall value and lowest bid.
Company Name Total Cost Dabbs Williams Contractors $ 264,000.00 Midwest Maintenance, Inc $ 383,024.00 Suncoast Restoration & Waterproof $ 385,250.00 Watertight Systems, Inc. $ 397,823.00 Founder’s Facility Services $1,016,97.00 Recommendation: Approve Fiscal Impact: $264,000.00 Funding Source: Esplost TCES Gym Floor Replacement Background Information: The original rubberized flooring in the gymnasium at Taylors Creek Elementary School is beyond service life and is in very poor condition. This project will remove the existing rubberized flooring and replace it with poured polynrethane surface. In addition, this project will install a school logo, court and games lines on new the court and replace vinyl baseboard. The bid opening for the gymnasium floor replacement for Taylors Creek was held on February 17, 2026. Two firms submitted proposals for this project and each bid was evaluated.
Dabbs Williams Contractors had the best overall value and lowest bid.
Recommendation: Approve Fiscal Impact: $140,000.00 Funding Source: Esplost On recommendation by Mrs. Debra B. Frazier, on motion by Mrs. Donita Strickland, seconded by Mrs. Lavonia LeCounte, the board voted to approve the Consent Agenda as presented with a unanimous vote.
Company Name Total Cost Dabbs Williams Contractors $140,000.00 Founder’s Facility Servies $166,753.10
Action Items.
Financials February 2026 Background Information: The February 2026 financial reports presented for review:
- Cash reports for the General Operating, LGIP General, LGIP Esplost & School Nutrition account.
Recommendation: Approve Fiscal Impact: Information only Funding Source: N/A On recommendation by Mrs. Debra B. Frazier, on motion by Mrs. Donita Strickland, seconded by Mrs. Lavonia LeCounte, the board voted to approve the Financial from February 2026 as presented with a unanimous vote.
Assessment Notices 2026 On recommendation by Mrs. Debra B. Frazier, on motion by Dr. Chante Baker Martin, seconded by Mrs. Donita Strickland, the Board voted to approve the Assessment Notices from 2026 with a unanimous vote.
Virtual Environment & SAN Refresh Background Information: Last refreshed in 2020, the virtual environment and storage area network (SAN) is the primary processing and data storage backbone of the Liberty County School System. This environment uses a very large amount of memory, totaling 46 Terabytes.
The price of memory has surged over the past year, primarily to the construction of new AI data centers. The average price of memory increased by 25% in February alone. Most forecasts show this trend increase until 2028 when new memory construction facilities may come online.
An RFP was released with a mandatory pre-bid meeting on March 3, 2026 to go over specifications and to answer questions. Two vendors attended the pre-bid conference. The bid opening was held on March 19, 2026 with one vendor submitting a bid.
Vendor Total Entre’ Solutions 298,455.02 This bid however, was constrained in that the memory portion of the bid was based on the price of the memory on the shipping date, not the order date and there was no way to get a guaranteed price based on the lead time we would need for the normal board cycle. From March 19 to March 25, the total project cost had increased to $318,307.47.
Recommendation: It is the recommendation of the superintendent to award the refresh of the Virtual Environment and SAN to Entre’ Solutions for $318,307.47 with a contingency amount not to exceed $35,000. Should any of the contingency amount be used, Entre Solutions would need to provide documentation from their vendor showing the increase in direct cost.
Fiscal Impact: Total with Contingency: $353,307.47 Funding Source: Esplost
On recommendation by Mrs. Debra B. Frazier, on motion by Mrs. Donita Strickland, seconded by Ms. Natalie Hines, the Board voted to approve the refresh of the Virtual Environment and SAN to Entre’ Solutions for $318,307.47 with a contingency amount not to exceed $35,000.
with a unanimous vote.
Information Items.
Summer School Programs Background Information: The LCSS will provide several summer opportunities for students in June. Camps will be held Monday - Thursday on designated weeks. Each school will host their own camp and the primary focus is ELA and mathematics supports. Registration for most of the student programs will be completed in PowerSchool using the Parent Portal. Parents may register, as well as, the school recommendations based on student identified needs. Registration for Credit Recovery & Kindergarten Camps will be done on each school campus.
● June 1 - 4: LCCA Electives for Middle Grades
● June 1 - 25: Summer Innovation Camps K-8 & Credit Recovery High School
● July 21: Kindergarten Day Camp
● Extended School Year (ESY) will be provided throughout June based on student IEP needs.
Registration in Powerschool is now open to parents through May 2 so that all planning and resources can be prepared. Registration and information went out to parents March 9 and weekly reminders are being sent out on social media. Registration closed on May 6 for finalizing transportation, meals and staff.
Staff who wish to work in the summer programs must be currently employed by LCSS and will be selected by the building principal. Transportation and meals will be provided for all students attending the summer programs.
Recommendation: Information Fiscal Impact: TBD based on student enrollment Funding Source: Title I & Charter Funds Out of State Travel Background Information: Family, Career and Community Leaders of America, National Leadership Conference, Washington D.C., July 5-11, 2026.
Recommendation: Information Fiscal Impact: $11,055.00 Funding Source: Students, Parents & Fundraising.
MMS Roof Replacement Background Information: The original roof at Midway Middle School is beyond the service life and is in very poor condition. This project has been approved by GaDOE and will remove the existing PVC (polyvinyl chloride) roofing, replace all suppers, gutters and downspouts. In addition, the project replace the low sloped roofing system which includes the following: PVC membrane, insulation, flashing and fascia. This project is scheduled to start at the end of the school year and will be completed by July 29th.
The bid opening for the roof replacement was held on March 30, 2026. Nine firms submitted proposals for this project and each bid was evaluated. Roofing Professionals Inc. had the best overall value, lowest bid and met all bid requirements.
Company Name Years Exp.
10Min Office within 200 miles from
MMS
Exp. installing roofing systems of similar size, scope, complexity Did firm provide a list of 10 similar roofing projects Total Cost Dusty Greer Roofing Yes No Yes Yes $875,000.00 Chandler Roofing No Yes No No $982,700.00 Justice & Sons No Yes No No $985,785.00 Rycars Construction Yes No Yes Yes $998,800.00 Roofing Professionals Inc.
Yes Yes Yes Yes $1,007,600.00 Bonitz of Ga. Yes Yes Yes Yes $1,017,309.00 Old World Craftsmen Yes No Yes Yes $1,070,972.00 AAR of NC Yes No Yes No $1,421,600.00 Skyline Const.
Services Yes No Yes Yes $1,482,290.00 Recommendation: Information Fiscal Impact: $1,007,600.00 Funding Source: Esplost BI Interior Renovations Phase 1 of 2 Background Information: The interior fixtures are beyond service life at Bradwell Institute. This project has been approved by GaDOE and the scope of services for this project includes painting interior walls, removing carpeting in the classrooms with LVT flooring, install trophy cases to display student achievements and modernization the circulation concourse near the front of the school. This is scheduled to start at the end of the school year and will be completed by July 29th.
The bid opening for the interior renovation project was held on March 30, 2026. Seven firms attended the pre-bid meeting on February 27, 2024 and the District received responses from six vendors and Rhowe Design Build had the best overall value and lowest bid.
Company Name Total Cost Rhowe Design Build $1,120,409.00 Paul S. Akins Co., Inc $1,208,000.00
Dabbs Williams Contractors $1,226,000.00 Beam Team Construction $1,281,178.00 Mid Atlantic Construction $1,296,500.00 UGMS, Inc. $1,378,000.00 Recommendation: Information Fiscal Impact: $1,120,409.00 Funding Source: Esplost Canopy Repairs at BGE, LHE & WPE Background Information: September 27, 2024, Hurricane Helene brought damaging winds and heavy rainfall to much of our area. As a result of this storm, the District sustained wind damage at several school sites. Notably, there was significant canopy damage at BGES, WPES, and LHES, requiring partial canopy replacement at each location.
Our insurance carrier (GSBA) was notified immediately of the severe canopy damages to sites and portions of the canopy that were damage require total replacement. All of the new canopies will be updated to meet current code requirements and lighting under the canopy will be reinstalled.
GSBA will cover all eligible costs associated with the damages, and the District will be responsible only for the applicable insurance deductible.
The bid opening for Canopy Repair project was held on March 30, 2026. Two firms submitted proposals and each bid was evaluated. Dabbs Williams Contractors had the best overall value and lowest bid.
Company Name BGE Cost LHE Cost WPE Cost Total Cost Dabbs Williams Contractors $81,062.00 $52,055.00 $64,883.00 $198,000.00 Founder’s Facility Service $92,160.00 $51,200.00 $61,440.00 $204.800.00 Recommendation: Information
Fiscal Impact: GSBA - $184,059.72
LCSS - $ 13,940.28
Total Cost - $ 198,000.00 Funding Source: Esplost Classroom Camera Refresh Background Information: Our schools have utilized Kloud-12 classroom cameras for the last six years. This systems permits teachers to capture lessons to provide self-reflection in order to increase teaching performance as well as the ability to share lessons with students. In addition, this system permits video to be viewed for investigative reasons.
Kloud-12 is a fully on-premise solution that utilizes Network Video Recorders centralized in Technology and cameras located in each classroom.
An RFP was released on with a bid opening on March 25, 2026 with two vendors submitting bids.
Vendor Bid Bytes peed / Entre Solutions $967,632.90 Kloud - 12 LLC $578,864.00 The Byte Speed / Entre Solutions proposal includes a full replacement of all hardware with Verkada systems.
Recommendation: Information Only: It will be the recommendation of the superintendent to purchase 203 Kloud-12 replacement cameras with five-year license and support and an additional 379 five - year licenses and support extensions to Kloud -12 LLC for $578,864.00.
Fiscal Impact: Total Cost: $578,864.00 Funding Source: Esplost This will leave 130 Kloud - 12 cameras that will be up for renewal in 2029.
Network Switch Refresh Phase 2 Background Information: Through the E - Rate program, schools and libraries are able to affordably connect buildings to each other and the internet.
Services are broken down into two categories.
• Category 1 – Connections and equipment needed to connect buildings to the Internet and to each other, often referred to as a Wide Area Network or WAN
• Category 2 – Connections and equipment needed to connect devices to the school network allowing the utilization of the services in Category One.
Currently, the Liberty County School System has qualified for the following contribution rates:
• Category 1 – E-Rate will pay 90 % of eligible costs.
• Category 2 – E-Rate will pay 85 % of eligible costs.
Eligible costs, in our case, is broadly defined as costs associated with schools with students.
Every five years, the LCSS refreshes the network backbone. Typically, this is done in phases. In 2024, technology refreshed the network access points and licensing for access points and switches. In 2025, the first phase of the refresh of network switches occurred to utilize remaining funds in the last E-Rate cycle. The second and final phase will be taking place this Summer.
Phase one will include replacing Meraki network switches and uninterruptible power supplies at BGE, LHE, JME, and SGMS for a total of 47 network switches and 27 UPS.
Phase two will replace the Meraki network switches and uninterruptible power supplies at all other LCSS locations.
Per E - Rate regulations, a request for proposals was posted and the system received three responses:
Provider Score Total Cloud 59* 50 $540,929.00 Entre Solutions 92 $850,241.87
MGT 85 $955,884.32
Cloud 59 submitted a proposal utilizing equipment not compatible with existing Meraki infrastructure and controls system.
E-Rate regulations require completing a grading sheet for bids received. For this proposal the following factors were taken into account:
• Price of E-Rate Eligible Service – 25 %
• Technical Sufficiency – 20 %
• Technical Support – 15 %
• Evidence of Prior Successful Experience – 15 %
• Other Cost Factors – 10 %
• Overall Suitability – 10 %
• Conformance of Proposals to Instructions – 5 % Recommendation: Entre Solutions had the best score and overall value. Entre is based out of Savannah and has successfully proven themselves in multiple projects in the system and has demonstrated to be a valuable partner and supporter of education in Liberty County.
For Information Only: At the next board meeting, it will be the recommendation of the superintendent to select Entre Solutions to replace and install Meraki Switches and Smart UPS at 11 E - Rate Eligible and 5 non-E - Rate Eligible locations for a total cost of $850,241.87.
Fiscal Impact:
Total costs will be split between Category 2 E - Rate & Esplost E - Rate Category 2 Funds: $641,507.41 Esplost: $208,734.46 Total: $850,241.87 Standing Reports.
Facilities Background Information: The Facilities report.
Recommendation: Information Fiscal Impact: Information Funding Source: N / A
Transportation update Month of January average on time Delivery Ft. Stewart on Time for January Current Number of Drivers Drivers in CDL Training Class 94 % 96 % 88 8 Vacant Positions 2 Purchasing Background Information: The February 2026 Purchasing Reports are attached for your review:
- Invoices greater than $5,000.00 per vendor
- Total vendor payments for each month, which include the invoices greater than $5,000.00 Recommendation: Information
Eslpost Background Information: The February 2026 Esplost Reports. The amounts listed are for actual expenditures only.
Recommendation: Review the information as presented Fiscal Impact: Information purposes only.
Funding Source: N / A Enrollment Background Information: Enrollment at the time of this executive summary is 10,448.
There are an additional 35 students who have indicated they will enroll but have not completed their enrollment packets.
Recommendation: Information Tribunals Background Information: The Tribunals for the month of March 2026 were presented to the Board for review.
Recommendation: None Fiscal Impact: None Horizons Background Information: Students currently being served virtually through Horizons.
Recommendation: None Fiscal Impact: None Funding Source: None
Motion to Enter Executive Session.
On motion Mrs. Donita Strickland and seconded by Mrs. Lavonia LeCounte, the Board voted unanimously to enter Executive Session.
● Classified The Superintendent recommended the Board approve the following recommendations for Classified.
Name Position / Location Brown, Sosa Secretary M & O Dawson, Dionna Para – Sub BI Fortune, Princess Paraprofessional FLE Johnson, Courtney School Nurse Pre - K
● Certified The Superintendent recommended the Board approve the following recommendations for Certified.
Name Position / Location Anderson, Deborah Science Teacher MMS Arthur, Paige Social Studies Teacher MMS Brady, Michelle Grade 2 Teacher FLE Coleman, Sheila Counselor MMS Crickmar, Victoria Grade 5 Teacher LHE Cruz, Nelson Grade 1 Teacher LHE Dorrian, Robert Special Ed Teacher - Gen Curr MMS Fuqua, Valerie Special Ed Teacher - Gen Curr LFMS Harren, Kia Literacy Coach WPE Hartwell, Tracy Academic Specialist BI Kuntz, Lea Special Ed Teacher - Gen Curr LFMS Lyons, Alaila Grade 1 Teacher BGE McGill, Mallory Grade 1 Teacher BGE Uriostigue, Lucy Kindergarten Teacher WPE
● Certified Resignations The Superintendent recommended the Board approve the following recommendations for Certified resignations.
Name Position / Location Anderson, Stanley Aaron School Psychologist LES Davis, Krissy Kindergarten Teacher FLE Franco, Maegan Social Studies Teacher LCHS Silinsky, Melissia Counselor HLC Zeigler, Edith Kellie Assistant Superintendent T & L CO
● Classified Resignations The Superintendent recommended the Board approve the following recommendations for Classified resignations.
Name Position / Location Evola, Christy SN Manager FLE Freeman, McKenzie Paraprofessional BGE Rivera, Wanda Custodian FLE
● Classified transfers The Superintendent recommended the Board approve the following recommendations for Classified transfers.
Name Position / Location Anderson, Keith Custodian/FLE Custodian / PAC Hallman, Yolanda Custodian/TCE Custodian / LHE Hargrove, Brian SN Cook/MMS SN Cook / WPE
● Certified transfers The Superintendent recommended the Board approve the following recommendations for Certified transfers.
Name Position / Location Donald, Pamela Science Teacher / BI HS Science/Math Teacher / HLC Okatcha, Nicole Grade 1 Teacher / LHE Grade 3 Teacher / FLE Stokes, Julian Math Teacher / LCHS Math Teacher / MMS Professional Recommendations
CO - Technology Flenner, Allen - Director BI Roneker, Carrie - Assistant Principal Adams, John
BGE
Smith, Lajefferica
FLE
Graham, Sylvia King, Charlene Quinlan, Suzanne
JME
Fennell, Susan Pre - K Humphrey, Aleen
Motion to come out of Executive Session On motion by Ms. Natalie Hines, and seconded by Mrs. Lavonia LeCounte, the Board voted to come out of Executive Session and enter Open Session with a unanimous vote.
Motion to approve personnel as presented was made by Mrs. Lavonia LeCounte, seconded by Ms. Natalie Hines, with a unanimous vote.
Motion to Adjourn Open Session There was no further business and on motion by Mrs. Lavonia LeCounte and seconded by Mrs. Donita Strickland, the Board voted to adjourn the meeting with a unanimous vote.
_____________________________ ______________________________ Secretary Board Chair