Camilla City Council regular meeting, April 13, 2026
52 pages
These are the minutes as Camilla City Council posted them, read from the file on its own website. Georgia Commons is independent and is not affiliated with Camilla City Council.
This record was posted as scanned images, read here by OCR: a letter or a number may be misread. The file the body posted is linked below.
Records of this meeting
Each link opens the body's own website or meeting portal.
- MinutesMinutes (www.camillaga.net) · shown on this page
Summary
Written by an AI model (claude-sonnet-5-5) from the minutes below. It is not the record: the minutes are.
Council approved airport consulting agreements and grant funds and a storm drainage bid, but could not select senior program or Juneteenth vendors.
The council approved airport projects, a construction bid, a spending allocation and an alcohol license, but failed to choose vendors for the senior citizens program and the Juneteenth festival. It approved two consulting agreements with Passero Associates and a resolution accepting Georgia Department of Transportation (GDOT) airport grant funds, 5-0. It awarded the baseball field storm drainage bid to US Infra Rehab Services LLC at $119,716.85, 5-0. It voted 4-1 to deposit a $499,031.02 MEAG year end settlement in the flexible operating account, and 5-0 to add $5,000 to the spay/neuter program. Southern Belle Collective failed 3-1 for both the senior program and Juneteenth because four votes are required. It also approved an on-premises beer and wine license for The Pickle Patch Deli and Grill, 5-0.
Topics taken up: airport consulting agreements with Passero; GDOT airport grant resolution; baseball field storm drainage bid; MEAG year end settlement; spay/neuter program funding; senior citizens program vendor; Juneteenth festival vendor; Pickle Patch Deli alcohol license; city manager report.
Decisions the minutes record (9)
Each decision is followed by the sentence of the minutes that records it, copied word for word.
Passero Associates consulting agreements for airport wildlife fencing and layout plan, and resolution accepting GDOT grant funds
5-0
The minutes: “A motion was made by Councilman Palmer and seconded by Councilmember Vereen to approve the two consulting agreements with Passero and the resolution to accept funds from GDOT.”
Baseball field storm drainage rehabilitation bid award to US Infra Rehab Services LLC for $119,716.85
5-0
The minutes: “On motion by Councilmember Vereen and seconded by Councilman Pollard, the motion to award the bid to US Infra Rehab Services LLC was approved by a 5-0 vote.”
Deposit of 2025 MEAG year end settlement of $499,031.02 into flexible operating account, short term portfolio
4-1
The minutes: “A motion was made by Councilman Palmer and seconded by Councilmember Vereen to deposit the 2025 year end settlement in the flexible operating account-short term portfolio.”
Additional $5,000 from general fund for the spay/neuter program
5-0
The minutes: “A motion was made by Councilmember Vereen and seconded by Councilman Pollard to allocate $5,000 to the program.”
On-premises beer and wine license for The Pickle Patch Deli and Grill at 54 West Broad Street
5-0
The minutes: “A motion was made by Councilmember Vereen and seconded by Councilman Pollard to approve an on premises alcohol license for beer and wine.”
Southern Belle Collective as vendor for the senior citizens program
3-1
The minutes: “A motion was made by Councilman Collins and seconded by Councilman Palmer to approve Southern Belle Collective for the senior citizens program.”
Southern Belle Collective, Inc. as Juneteenth Festival vendor
3-1
The minutes: “A motion was made by Councilmember Vereen and seconded by Councilman Collins to approve Southern Belle Collective, Inc. as the Juneteenth vendor.”
Southwest Georgia Moving Forward as senior citizens program vendor
The minutes: “A motion was made by Councilman Pollard to approve Southwest Georgia Moving Forward. The motion failed for lack of a second.”
Lavenia's Performing Arts Academy as Juneteenth Festival vendor
The minutes: “A motion was made by Councilman Pollard to approve Lavenia’s Performing Arts Academy as the vendor for the Juneteenth Festival.”
Agenda items (7)
Found in the minutes by their headings. Where an outcome is shown, it was read by rule from the item's own words: a guide to the text, not part of the record.
- 2.00 Checklist.
- 2.0 Planimetric Mapping and Contours
- 5.4 CCTV Inspection 1-year after installation Lump 1 5,000.00 5,000.00 7,458.00 7,458.00 8,000.00 8,000.00 Sum
- 3.2 GDOT 1019 A, TYPE A, DROP INLET GRATE AND EA 4 9,000.00 9,000.00 17,307.69 17,307.69 20,500.00 20,500.00
- 5.1 CCTV Inspection 1-year after installation Lump 1 6,000.00 6,000.00 3,955.20 3,955.20 7,200.00 7,200.00 Sum
- 5.1 CCTV Inspection 1-year after installation Lump 1 6,000.00 6,000.00 3,955.20 3,955.20 7,200.00 7,200.00 Sum
- A. DEPOSIT TO THE MUNICIPAL COMPETITIVE TRUST
- B. CREDIT TO MEAG POWER MONTHLY BILL:
The minutes
As posted on www.camillaga.net, read November 12, 2026. Nothing below is written by Georgia Commons.
MINUTES — REGULAR MEETING
CITY OF CAMILLA, GEORGIA
APRIL 13, 2026
The regular meeting of the Mayor and City Council of the City of Camilla was called to order at 6:00 p.m. on Monday, April 13, 2026 by Mayor Pro Tem Burley in the Council Chambers at City Hall.
Members present at roll call: Councilmember Vereen, Mayor Pro Tem Burley, Councilman Collins, Councilman Pollard, and Councilman Palmer.
Others present: City Attorney Earl Turner (via Zoom), Clerk Ford and Public Works Supt./Asst.
City Manager Luke White.
OPENING PRAYER AND PLEDGE
Mayor Pro Tem Burley gave the invocation and the Mayor Pro Tem and Council led the pledge of allegiance to the flag.
APPROVAL OF AGENDA
A motion was made by Councilmember Vereen and seconded by Councilman Pollard to approve the agenda. The motion passed by a 5-0 vote.
CITIZENS AND GUESTS
Sign-in Sheet Attached.
APPROVAL OF MINUTES
Mayor Pro Tem Burley asked for a motion to approve the minutes of the February 2, 2026 work session. A motion was made by Councilmember Vereen and seconded by Councilman Pollard to approve the minutes. The motion passed by a 5-0 vote. A motion was made by Councilmember Vereen and seconded by Councilman Pollard to approve the March 2, 2026 work session minutes. The motion passed by a 5-0 vote. A motion was made by Councilmember Vereen and seconded by Councilman Pollard to approve the March 9, 2026 council meeting. The motion passed by a 5-0 vote.
SPEAKER APPEARANCES
Scarlett Wimberly, LaQuita Toombs, Akeem Williams, Nia Hawkins, Autika Johnson, Kay Silas Logan, Faye Hill, Sharon Neal, and Julie Tucker.
ACTION ITEMS
CAMILLA-MITCHELL COUNTY AIRPORT:
*PASSERO ASSOCIATES-WILDLIFE PERIMETER FENCING PROJECT
CONSULTING AGREEMENT
*PASSERO ASSOCIATES-AIRPORT LAYOUT PLAN CONSULTING
AGREEMENT
*RESOLUTION NO. 2026-04-13-1-APPROVAL TO ACCEPT GRANT FUNDS
FROM GEORGIA DEPARTMENT OF TRANSPORTATION
Page | of 5
(Continued from Page I — Action Items)
The Council discussed two consulting agreements with Passero Associates for services to be provided for the wildlife perimeter fencing project and the airport layout plan update project. The City’s cost share for these projects is $104,180. The remaining funding for the projects are a combination of federal and state funding in the amount of $1,063,538.26.
As part of the acceptance of Georgia Department of Transportation (GDOT) aviation project funds, a resolution is required to accept the funds, certify the City has available local funding, and authorize a signer to execute the application, agreement, and subsequent amendments or reimbursement requests.
The Council recommends approval of the wildlife perimeter fencing project and the airport layout plan update consulting agreements with Passero and Resolution No. 2026-04-13-1 to accept the funds and for other purposes as outlined in the Resolution. A motion was made by Councilman Palmer and seconded by Councilmember Vereen to approve the two consulting agreements with Passero and the resolution to accept funds from GDOT. The motion passed by a 5-0 vote.
BID AWARD — BASEBALL FIELD STORM DRAINAGE PROJECT — US INFRA
REHAB SERVICES LLC
Bids were received and read aloud at a bid opening held March 19" for the baseball field storm drainage rehab. US Infra Rehab Services, LLC was identified as the lowest bidder in the amount of $119,716.85. Project engineer York & Associates recommends the bid be awarded to US Infra Rehab Services, LLC. On motion by Councilmember Vereen and seconded by Councilman Pollard, the motion to award the bid to US Infra Rehab Services LLC was approved by a 5-0 vote.
MUNICIPAL ELECTRIC AUTHORITY OF GEORGIA — YEAR END SETTLEMENT
DESIGNATION
The City of Camilla has received notice of a 2025 year end settlement in the amount of $499,031.02. The Council recommends depositing the refund in the municipal competitive trust-flexible operating account-short term portfolio. A motion was made by Councilman Palmer and seconded by Councilmember Vereen to deposit the 2025 year end settlement in the flexible operating account-short term portfolio. Councilman Pollard commented they raised the utility rates, scared customers they were on the verge of going broke, and pushed the narrative hard.
They know folks are already struggling to get by and now they are talking about a rebate. Are they going to go broke or are they comfortable putting the burden on the back of the people.
Families were making sacrifices and cutting back because of what the Council did. That is not leadership and is mismanagement at its best and misleading at its worse. Coming back now trying to clean it up with a rebate, with what people are going through, the citizens deserve better. Accountability is not optional. After additional comments, voting in favor of the motion:
Councilmember Vereen, Mayor Pro Tem Burley, and Councilmen Collins and Palmer.
Councilman Pollard did not vote. The motion passed by a 4-1 vote.
FUNDING ALLOCATION — SPAY/NEUTER PROGRAM
Animal control staff have requested additional funding to continue the City’s spay/neuter program in the amount of $5,000. The Council recommends allocating an additional $5,000 from the general fund to allow program continuance. A motion was made by Councilmember Vereen and seconded by Councilman Pollard to allocate $5,000 to the program. Voting in favor of the motion via roll call: Mayor Pro Tem Burley, Councilmember Vereen, and Councilmen Collins, Pollard and Palmer. The motion passed by a 5-0 vote.
CONTRACTOR/VENDOR SELECTION — SENIOR CITIZENS PROGRAM
Mayor Pro Tem Burley commented the Council has received a copy of the proposals and they had a total of three candidates for the seniors program and four candidates for Juneteenth. Under each vendors they will vote on their proposal. Councilman Pollard asked if anything needed to be disclosed before they started. Per the Charter, Section 2-8-3/Item (b): No city official shall, in any matter before the council or other city body, relating to a person or entity in which the official has a substantial interest, shall fail to disclose for the record such interest prior to any discussion or vote or fail to rescue himself/herself from such discussion or vote as applicable.
They are talking about a topic the Mayor Pro Tem has a personal interest in. Mayor Pro Tem Burley stated he has a conflict of interest for one of the candidates that made a proposal, Southern Belle Collective, Inc. It is a company his wife manages and he will not vote or have anything to do with it. Councilman Pollard commented he just wanted to make sure before they had discussion he disclosed that information to everyone.
The first proposal for the senior citizens program, Southwest Georgia Moving Forward, is a company managed by Ms. Scarlette Wimberly. A motion was made by Councilman Pollard to approve Southwest Georgia Moving Forward. The motion failed for lack of a second.
The second senior citizens program proposal, QT Studios Innovation Group, did not receive a motion.
A motion was made by Councilman Collins and seconded by Councilman Palmer to approve Southern Belle Collective for the senior citizens program. Councilman Pollard commented there is a personal interest in which one around the table cannot discuss or vote. Councilmember Vereen commented in reading the proposals the one by Southern Belle was very specific in dates and times of meetings. She is interested in the wellness screenings to be provided and attendance tracking and monitoring. Those were things that stood out to her and why she supports this initiative. Voting in favor of Southern Belle as the vendor for the senior citizens program via roll call: Councilmember Vereen and Councilmen Collins and Palmer. Voting in opposition:
Councilman Pollard. The motion failed by a 3-1 vote. [Clerk’s Note: four votes are required per the Charter for a motion to pass.]
CONTRACTOR/VENDOR SELECTION — JUNETEENTH FESTIVAL
Mayor Pro Tem Burley commented they have four proposals to provide the Juneteenth Festival:
Lavenia’s Performing Arts Academy, Adoskope, ELEV8 Media, and Southern Belle Collective, Inc.
CONTRACTOR/VENDOR SELECTION ~— JUNETEENTH FESTIVAL (cont.)
A motion was made by Councilman Pollard to approve Lavenia’s Performing Arts Academy as the vendor for the Juneteenth Festival. The motion failed due to lack of a second.
Adoskope and ELEV8 Media did not receive a motion for approval.
A motion was made by Councilmember Vereen and seconded by Councilman Collins to approve Southern Belle Collective, Inc. as the Juneteenth vendor. Councilmember Vereen commented what makes this particular application stand out is the other three are one day celebrations and Southern Belle is a week-long celebration, incorporating all of the community. It begins on Sunday and there is a proposal to incorporate the schools with an essay contest. A parade and celebration were in all the proposals. There were a couple of things that made this one stand out.
They partnered with the same organization last year and she thought it was a successful partnership and why she supports Southern Belle initiative for the Juneteenth celebration.
Councilman Pollard asked if the City of Camilla partnered with Southern Belle and Councilmember Vereen replied they did. Councilman Pollard asked if she was sure since there is another entity which is a part of the City of Camilla. It is called the URA and the one they defunded. Voting in favor of Southern Belle Collective via roll call: Councilmember Vereen and Councilmen Collins and Palmer. Voting in opposition: Councilman Pollard. The motion failed by a 3-1 vote.
ALCOHOL APPLICATIONS — PICKLE PATCH DELI & GRILL — 54 W. BROAD
STREET — ON PREMISES BEER AND WINE
The Council reviewed at their April work session alcohol license applications submitted on behalf of Pickle Patch Deli & Grill located at 54 W. Broad Street. Required background checks have been performed and Chief Hendricks has approved the applications. The Council recommends approval of an on-premises beer license and an on-premises wine license for Whitman Enterprises LLC doing business as The Pickle Patch Deli and Grill located at 54 West Broad Street. A motion was made by Councilmember Vereen and seconded by Councilman Pollard to approve an on premises alcohol license for beer and wine. The motion passed by a 5-0 vote.
CITY MANAGER’S REPORT
Interim City Manager Ford commented the Community Development Block Grant and the CHIP grant applications have both been successfully submitted. They should know around August to September if the City is chosen to receive the grant funds. A joint public meeting is scheduled for Tuesday to start discussing the comprehensive plan. It is open to the public and will be held at the County’s Governmental Complex starting at 2:00 PM. Councilman Pollard encouraged everyone to stay engaged in their community. Assistant City Manager White provided an update on the gym construction and the completion date is still on schedule for December 2026. He is in conversation with the railroad for upgrades to the tracks and will have more information.
Councilman Pollard asked for a cemetery update and it was reported that Phase III is in progress by the engineer.
OTHER ANNOUNCEMENTS/COMMENTS
Councilmember Vereen stated she is sorry they were unable to come to an agreement on the senior citizens program. She thanked Julie Tucker and wants everyone to know there is a senior citizens program on Tuesday’s at Cross Church located at 647 Georgia Hwy 3. Councilman Pollard asked everyone to please stay engaged. He understands that some cannot fathom unity.
When he hears people talk about inclusive, being included, that was the problem with Camilla for so long that people did not feel included. Not in the government or events, just not being included - the people have not been included for so long. Councilman Palmer commented on Mrs. Tucker’s program for senior citizens and her invitation for seniors to participate in their church program. They have been doing this for years and maybe the City might need to think about making a donation to them.
ADJOURNMENT
The meeting adjourned at 7:05 p.m. on motion by Councilman Pollard.
BY: 4 Joe dO, arrest. peru)
DEWAYNE BURLEY, MAYOR CHERYL FORD, GLHRK
PRO TEM OJ
City of Camilla, GA
Construction Phase Services
Perimeter Wildlife Fencing
for Camilla-Mitchell County Airport (CXU)
by Passero Associates, LLC (Passero Project No. 20223368.004R)
Work Order 26-04R
PASSERO
engineering architecture
Camilla-Mitchell County Airport (CXU) Camilla, GA
EXHIBIT A - SCOPE OF WORK
PERIMETER WILDLIFE FENCING
(CONSTRUCTION)
GDOT Project Number APXXX-XXXX-XX(XXX) Mitchell County
PID-TXXXXXX
The Airport Sponsor, the City of Camilla, GA, will provide construction phase services for the Perimeter Wildlife Fencing project at Camilla-Mitchell County Airport. The project primarily consists of the installation of approximately 18,500 LF of security/wildlife fencing around much of the airport boundary, several 6’-12' manual single-swing gates, and a 24’ motorized sliding cantilever gate with associated access keypad, loop detectors, and electrical improvements (see attached Exhibit C Project Layout Plan).
The fencing is necessary to help prevent unauthorized access to the airport and to deter wildlife. The airport has experienced an increase in wildlife activity on airport property, which presents a significant safety hazard. The US Department of Agriculture Wildlife Services (WS) was contracted by the City of Camilla to perform an Initial Consultation (IC) at the airport. Based on observations made during a two-day site visit (August 1-2, 2025), the WS provided wildlife hazard management recommendations that included the installation of a chain-link fence with three-strand barbed wire to reduce deer and other mammal populations on the airport.
A contract time of 120 days is accounted for in the construction administration and construction observation elements. More specifically, the construction phase services will include the following elements of work:
e Element 1 - Construction Administration is anticipated to consist of the following:
1. Prepare work scope and fees, including scoping meetings with GDOT, Sponsor, and Consultant.
2. Prepare a “released for construction” set of plans, including updating the bid documents to incorporate any revisions made by addenda issued during the bid process.
Prepare a conformed set of contract documents.
Coordinate securing of all required bonds by the Contractor.
Coordinate execution of the contract documents with the Sponsor and Contractor.
Prepare for and conduct a “pre-submittals meeting” to include representatives of the
Contractor, Consultant, and Subconsultants. Meeting will be held virtually via Microsoft Teams.
7. Prepare for and conduct a pre-construction meeting at the airport to include representatives of the Sponsor, Contractor, Consultant, GDOT Aviation, Subconsultants, and GDOT Area Office.
Prepare meeting minutes/notes.
8. Review shop drawings and/or material submittals for conformance with the construction set of plans and technical specifications. An initial review of each product/material submittal and a subsequent review of revised submittals for that product is accounted for.
. Provide responses to Contractor requests for information (RFis).
10. Review and monitor Contractor-provided schedule for conformance with the stated contract performance time.
11. Prepare for and conduct up to eight (8) progress meetings, to include representatives of the Sponsor, Contractor, Consultant, GDOT Aviation, and Subconsultants. Meetings are to be held virtually via Microsoft Teams. Prepare meeting minutes/notes.
au kw
EXHIBIT A-1
12. Perform up to two (2) site visits by one (1) team member during construction to observe work being performed.
13. Review and certify Contractor pay applications. Coordinate certification of pay applications with the Sponsor; and provide a certified copy to GDOT Aviation for inclusion in the next grant disbursement. This includes review of the Contractor pay applications with construction observation personnel and the Contractor's on-site representative prior to the Contractor submitting the pay application for review and certification by the Engineer.
14. Review draft grant disbursement request documents prior to Sponsor execution and submittal to GDOT Aviation.
15. Review Contractor requests for change orders up to two (2) requests; and coordinate review and approval process with the Sponsor and GDOT Aviation.
16. Prepare for and conduct a final inspection to include representatives of the Sponsor, Contractor, Consultant, GDOT Aviation, Subconsultants, and GDOT Area Office. Prepare a final inspection report and punch list (if necessary) based on the inspection. Attendance by two (2) Consultant representatives is included in this scope of work.
17. Prepare record drawings depicting the completed project. No topographic survey shall be performed by the Consultant as a part of this task. The record drawings shall be based on the construction set of plans and field notes to be provided by the Contractor.
18. Coordinate efforts with the Sponsor, GDOT Aviation, and the FAA to update the Airport Layout Drawing and Terminal Area Plan via “pen and ink" revision to reflect the newly installed fence, gates, and other associated project improvements.
19, Coordinate project closeout efforts with the Contractor, Consultant, Subconsultants, and GDOT Aviation. This includes compilation of all GDOT-required closeout documents (e.g. Contractor payroll records, Sponsor's project acceptance, materials certification letter, final Contractor pay application, final Consultant invoice) and submittal of said documents to GDOT Aviation.
e Element 2 - Construction Observation is anticipated to consist of the following:
1, Perform a thorough review of the “released for construction” plan set, contract documents, and technical specifications.
2. Prepare for and attend the pre-construction meeting.
3. Provide part-time observation of the construction operations over the 120-day contract time period. An average of 20 hours per week, including travel time, over the approximate 17-week contract time is accounted for in the scope of work. Completion of the following tasks is accounted for within the 20 hour per week allotment:
a. Document construction activities and progress with photos.
b. Prepare daily inspection reports detailing the job site conditions and work accomplished during the time which construction observation personnel were on-site.
c. Prepare weekly Construction Progress and Inspection Reports, using FAA Form 5370-1 ora form that provides equivalent information.
d. Perform wage rate interviews for contractor and subcontractor personnel. A minimum of one (1) interview of a prime contractor representative and one (1) interview of a representative from each subcontractor will be conducted each month by construction observation personnel.
e. Attend up to eight (8) progress meetings via Microsoft Teams.
f. Perform a “pre-final” inspection and prepare a punch list based on conditions observed during the inspection.
4. Coordinate construction observation efforts with field teams (by office staff).
5. Prepare for and attend a final inspection. Assist with the preparation of the inspection report
and punch list.
EXHIBIT A-2 (VE
Clarification of Consultant's Responsibility In accordance with the Contract Documents, the Contractor is solely responsible for the completion of the project in a quality and timely manner. The Consultant's construction phase work tasks for the project are limited to those specified in this Scope of Work. The Sponsor further clarifies that:
At no time will the Consultant’s or Subconsultant’s responsibilities include supervision or direction of the actual work by the Contractor or its employees, subcontractors, or suppliers.
The Contractor is aware that neither the approval of shop drawings and/or material submittals, nor the presence of the Consultant’s project manager or construction observation personnel, nor the observation of the work by the Consultant's representatives shall excuse the Contractor in any way from defects discovered in the work.
The Contractor is responsible for project site safety. The Consultant's staff will not control, direct, or otherwise be responsible for construction means, methods, techniques, sequencing, or procedures in connection with the Contractor's work (other than as specified in the Construction Safety and Phasing Plan).
Deliverables will consist of the following:
One (1) PDF copy of the executed Work Order agreement between the Sponsor and Consultant.
One (1) PDF copy of the “released for construction’ set of plans.
One (1} PDF copy of the fully executed contract documents.
One (1) PDF copy of the pre-construction meeting notes and sign-in sheet.
One (1} PDF copy of all shop drawing and/or material submittal reviews.
One (1) PDF copy of all responses to Contractor RFls.
One (1) PDF copy of all daily & weekly construction observation reports (incl. wage rate intvws.).
One (1) PDF copy of bi-weekly progress meeting notes.
One (1) PDF copy of all certified Contractor pay applications.
. One (1) PDF copy of all executed change orders.
. One (1) PDF copy of the final inspection report and punch list.
. One (1) PDF copy and one (1) DWG copy of the record drawings.
. One (1) PDF copy of the Airport Layout Drawing, modified via “pen and ink” revision.
. One (1) PDF copy of the applicable project closeout documents.
The following additional services may be added to the Scope of Work detailed above if requested in writing by the Sponsor:
OW AONAYW DS
Location and identification (via flagging) of the airport boundary by a Registered Land Surveyor.
_ Mid-project site visits in addition to those listed above.
Construction observation services associated with weekend and/or nighttime work, or that exceed the number of hours approved by GDOT (as described above in Element 2 and as shown on the Exhibit B Cost Summary).
Construction materials sampling and testing.
Additional inspections after the final inspection.
Any services during contractor “stop work periods” or after the stated contract time has elapsed.
As-built survey of the completed project.
Further evaluation and/or mitigation of wildlife hazards.
Preparation of a full Wildlife Hazard Assessment and/or Wildlife Hazard Management Plan.
Any task, service, or deliverable not expressly included in the Scope of Work described above is thereby excluded from the Scope of Work for the Perimeter Wildlife Fencing project.
End Exhibit A.
EXHIBIT A-3
Exhibit B Cost Summary Camilla-Mitchell County Airport (CXU) Perimeter Wildlife Fencing (Construction Phase)
TRU MIN Tl
Labor Subtotal $39,663.00 Direct Expenses $2,937.00 TOTAL {Lump Sum) [ $42,600.00]
ELEMENT 2. CONSTRUCTION OBSERVA
Labor Subtotal $57,323.00 Direct Expenses $16,477.00 TOTAL (Lump Sum) [ 373,800.00]
CONSTRUCTION PHASE TOTAL $116,400.00
CONSTRUCTION ADMINISTRATION
Hourly Breakdown Element 1 Principal Dept. Program | Sr. Proj. | Project {| Sr. Proj. rae Engineer | Engineer Planner 2 Admin. |Sr. Owner| Total Ladeor Gost Manager | Manager | Manager | Manager j Engineer | Engineer 2 1 Staff Rep. Man $ 299.00] $ 275.00] $ 250.00] $ 226.00] $ 203.00] $ 180.00] $ 157.00] $ 133.00] $ 110.00] $ 147.00} $ 100.00] $ 148.00] Hrs Prep const. phase SOW, cost summary 2 8 2 2 14 | $ 2,670.00 Prep "released for const.” plan set 1 2 2 8 13 | $ 1,827.00 Prep conformed contract documents 1 2 4 7 $ 1,081.00 Coord. securing bonds with contractor 1 2 3 $ 403.00 Coord. contract execution w/ all parties 1 2 3 15 403.00 Prep for & conduct pre-submittals mtg. 2 1 3 15 539.00 Prep for & conduct pre-construction mtg. 14 2 2 18 | $ 3,308.00 Rvw. shop dwgs & materials submittals 1 4 12 2 19 |S 2,883.00 Respond to contractor RFls 1 4 8 2 15 | $ 2,351.00
Review and monitor contractor schedule 17 17 | $ 3,451.00 Bi-weekly progress meetings (8) 4 8 4 16 | $ 3,124.00 Site visits (2 in 120-day contract time) 20 20 | $ 4,060.00 Review & certify contractor pay apps (5) 5 5 10 | $ 1,515.00 Grant administration 5 5 10 | $ 1,515.00
Rvw contractor change order requests (2) 2 4 2 8 S$ 1,562.00 Prep for & conduct final inspection 12 2 14 |$ 2,636.00 Prepare record drawings 1 2 2 8 1 14 | $ 1,927.00
Update ALD via “pen & ink” revision 1 2 8 11 | $ 1,857.00 Coordinate project closeout efforts 1 4 8 4 17 | $ 2,551.00 Subconsultant's Rates ----->
0 |$ -
LABOR TOTAL 0 15 0 0 117 0 0 35 16 8 39 2 232 | $ 39,663.00 Distance # of Trips Rate Time
Mileage $ 1,447.60 517 4 $ 0.70 8:00 (round trip travel time) Printing, Shipping, Misc. Project Costs $ 19.40
Lodging $ 858.00 6 $ 143.00
Per Diem (Travel Day) $ 612.00 12 § 51.00
Per Diem (Standard Day) $ 0 $ 68.00
Total Direct Expenses $ 2,937.00
CONSTRUCTION OBSERVATION
Hourly Breakdown
Element 2 rica [oer] eae | nore] wannes| gree ene] a [er [omen] ser [see] on] HPO $ 299.00} § 275.00| $ 250.00| $ 226.00] $ 203.00] $ 180.00] $ 157.00] $ 133.00] $ 110.00] $ 147.00 $ 100.00} $ 148.00} Hrs Review const. plan set, contract, specs 4 418 592.00
Pre-construction meeting 10 10 | $ 1,480.00 P-T const. obs. (avg. 20 hrs/wk x 17 wks) 340 340 | $ 50,320.00 Coord. const. observation w/ field team 17 17 | $ 3,451.00 Final inspection 10 10 | $ 1,480.00
Subconsultant's Rates ----- > ‘ 0 |$ - 0 {S$ -
LABOR TOTAL 0 0 0 0 17 0 0 0 0 0 i¢) 364 381 | $ 57,323.00 Distance # of Trips Rate Time
Mileage $ 6,876.10 517 19 $ 0.70 8:00 (round trip travel time) Mileage $ 1,727.88 73 34 $ 0.70 1:30 (daily commute)
Printing, Shipping, Misc. Project Costs $ 19.02 Lodging $ 4,862.00 34 $ 143.00 Per Diem (Travel Day) $ 1,836.00 36 $ 51.00 Per Diem (Standard Day) $ 1,156.00 17 $ 68.00
Total Direct Expenses $ 16,477.00
YEAR 2026
OVERHEAD %
BILLING HOURLY RATES PROFIT % | (2023 audited LABOR rate)
Principal $299.00 10.00% 174.67%| $ 99.10 |Dept. Manager $275.00 10.00% 174.67%| S$ 91.10 [eee Manager $250.00[ 10.00% 174.67%| $ __-82.90 Sr. Proj. Manager $226.00 10.00% 174.67%1 $ 74.90 {Project Manager $203.00] 10.00% 174.67%] $ 67.30 Sr. Proj. Engineer $180.00 10.00% 174.67%| $ 59.70 Project Engineer $157.00 10.00% 174.67%} $ 52.10 Engineer 2 $133.00 10.00% 174.67%| $ 44,10 Engineer 1 $110.00 10.00% 174.67%| $ 36.50 Planner 2 $147.00 10.00% 174.67%| $ 48.50 Admin. Staff $100.00 10.00% 174.67%) 5 33.00 Sr. Owner Rep. $148.00 10.00% 174.67%| $ 49.00
NOTE:
Insert labor, audited overhead, and profit. Spreadsheet will calculate billing rate.
81D DOCUMENTS - DO WOT USE
POR CONSTRUCTION
fremont: ©
N >
eee eee ee
tt) 300
a
GRAPHIC SCALE IN LINEAR FEET
ean
PERIMETER
WILDLIFE FENCING
SIFY OF CAMILLA
CAMILLA, GEORGIA
REVISIONS
Peres ret Corpersted © 224 pres SOE amt!) Caepbhe 89
PROJECT LAYOUT PLAN
cio1
202253568,0904
NOVEMRER 2025
Exhibit D Frank Bartanowitz Ren Besumnes
Owners Representative
Frank brings over 25 years of distinguished service in U.S. Navy aviation, with extensive experience both at sea and ashore, alongside 2 years of hands-on leadership as a General Aviation Airport Manager. In his role as Airport Manager, Frank successfully managed an aircraft ramp reconstruction project and oversaw the installation of fencing and gates,
‘5 aoe a ensuring complete security for the airport. As an Owner’s Representative for General Aviation ; Airports in Georgia and Florida, Frank combines his deep aviation expertise with a strong Education focus on customer service, teamwork, and efficient project management. He is committed AA, General Studies | to delivering the highest quality of work while maintaining excellent customer relations and American Military University ensuring timely project completion. Frank’s leadership style emphasizes safety, operational excellence, and the ability to manage complex projects with precision and care, ultimately enhancing the overall airport experience for both customers and staff.
Representative Experience
Cook County Airport - Terminal + Waycross-Ware County Airport - Entrance, Lighting, and Marking Ramp Reconstruction | Waycross, GA*
Improvements | Adel, GA : Waycross-Ware County Airport -
- Decatur County Industrial Air Park - Security Fence | Waycross, GA* Rehabilitate Runway 14-32 | Bainbridge, GA
+ Middle Georgia Regional Airport - Runway Extension | Macon, GA
Thomasville Regional Airport - Runway 4-22 Pavement and Lighting Rehabilitation | Thomasville, GA
- Vidalia Regional Airport - Rehabilitate/ Replace Runway 7-25 Lighting and Signage | Vidalia, GA
* Project experience prior to joining Passero Associates.
PASSERO
Education BS, Geology | New York State University at Cortland
Registrations Geologist: New York
Certifications
OSHA 29CFR 1910.120 -
HAZWOPER and Supervisor Training
PASSERO
Exhibit D Stephen DeMeo RPR Resumes
Construction Manager
Construction Manager for support of geotechnical, civil engineering, land development, and environmental services on a wide variety of transportation, commercial, municipal and private sector projects. Develops and negotiates scope of work, provides cost estimates and report deliverables for clients’ compliance during earthwork phases of construction and restoration projects. Responsible for all technical aspects and project budgets for large scale investigation/soil management/remediation projects with management of staff. Inactivated or closed over 100 petroleum spill sites that included turnkey services for underground storage tank removals, transportation and disposal of excavated soils.
Geotechnical experience includes characterization of soil and bedrock in support of design for roads, airports, bridges, tunnels, dams, and deep foundations for large scale infrastructure.
Monitored the installation of soil and pavement cover systems, controlled fill placement/ compaction and geotechnical drilling investigations.
Representative Experience
City of Palatka - Saint John’s Avenue + Walkway Over the Hudson & NYS Streetscape Resurfacing | Palatka, FL Parks - Soil Management Plan MGP
+ City of Rochester - Municipal Bond Site | Poughkeepsie, NY * Act - Groundwater Remediation | : Wal-Mart Stores, Inc. Northeast Rochester, NY * Region - Site Assessments and
- Decatur County Industrial Air Park - Remediation - Proposed = Rehabilitate Runway 14-32 | Developments | Various Locations * Bainbridge, GA - Xerox Corporation - Remedial Action HNTB Corporation & NYS Thruway Plan - Groundwater aaa Authority - The New NY Bridge, Treatment | Yukon, Oklahoma
Tappan Zee - Contaminated Materials Management | Rockland and Westchester Counties, NY *
Ultralife Batteries, Inc. - NYSDEC Voluntary Cleanup - Remedial Investigation | Newark, NY *
+ Volunteers of America - NYSDEC
Brownfield Cleanup - Former RG&E Ambrose Street Coal Yard | Rochester, NY *
* Project experience prior to joining Passero Associates.
PA Project No. 20223368.004R Work Order 26-04R
Construction Phase Services for Perimeter Wildlife Fencing Passero Associates (PA or Consultant) agrees to perform the following services, in accordance with the terms and conditions of this Work Order and the Master Consulting Services Agreement with the City of Camilla (Client or City), dated May 9,
2022, all of which terms and conditions are incorporated herein by reference:
Project Location: Camilla-Mitchell County Airport, Camilla, Georgia.
Project Description: Provide construction phase services for the proposed installation of perimeter wildlife fencing.
Scope of Basic Services: Construction Administration. See Exhibit A Scope of Work.
Scope of Special Services: Construction Observation. See Exhibit A Scope of Work.
Client Manager: Kelvin M. Owens, Mayor; Cherl Ford, City Clerk
Airport Manager: Jermaine Colson, Airport Manager
PA Program Manager: Brad Wente, P.E.
PA Project Manager: Logan Smith, P.E.
Basic Services Compensation and Method of Payment: Lump Sum Fee: $42,600.00. See Exhibit B Cost Summary.
Special Services Compensation and Method of Payment: Lump Sum Fee: $73,800.00. See Exhibit B Cost Summary.
Total Compensation and Method of Payment: Lump Sum Fee: $116,400.00. See Exhibit B Cost Summary.
Schedule: Services to begin upon receipt of fully executed Work Order and Notice to Proceed from GDOT Aviation Programs.
Meetings: See Exhibit A Scope of Work.
Deliverables: See Exhibit A Scope of Work.
"Client" “Consultant” City of illa, GA Passer ociates, LC
vy td / 46 ude,
BY: A . “% rN BY: 7
Dewayne Burley. Mayor pro tem Bradley J. Wente, P.E., Ke President/SE Services Director Typed Name & Title \J Typed Name & Title
Date: 4} | IS} ab Date: 4-19 Niy
ATTEST:
BY:
Chris Johnson, Sr. Aviation Planner Typed Name & Title
Date: U- lS - 26
OF
City of Camilla, GA
Planning Services
Airport Layout Plan
for Camilla-Mitchell County Airport (CXU)
by Passero Associates, LLC (Passero Project No. 20223368.0005)
Work Order 26-05
rPASSERO
engineering architecture
Camilla/Mitchell County Airport (CXU) Camilla, GA
EXHIBIT A - SCOPE OF WORK
AIRPORT LAYOUT PLAN UPDATE
GDOT Project No. APXXX-XXXX-XX(XXX) Mitchell County
PID-TXXXXXX
The Airport Sponsor, City of Camila, GA, will provide planning services for the Airport Layout Plan Update project at Camilla/Mitchell County Airport (CXU).
The project consists of updating the existing Airport Layout Plan (ALP) and Narrative Report, with the current ALP conditionally approved by GDOT in February of 2013. The ALP and Narrative Report will be the final products of this project and will identify recommended improvements for CXU during the 20- year planning period; thus, meeting FAA grant assurance requirements to maintain a current approved
ALP.
The Office of Aviation Programs of the Georgia Department of Transportation (GDOT) will review and conditionally approve the current and future critical aircraft determination and Airport Layout Drawing on behalf of the Federal Aviation Administration (FAA) under the State Block Grant Program.
Components and preparation for the ALP Plan Set and Narrative Report include items (as defined below) in the FAA's Standard Operating Procedures (SOPs) 2.00, Standard Procedure for FAA Review and Approval of Airport Layout Plans (ALPs), dated October 1, 2013; FAA SOP 3.00, Standard Operating Procedure for FAA Review of Exhibit ‘A’ Airport Property Inventory Maps, dated October 1, 2013; FAA Advisory Circular (AC) 150/5300-13B (latest change), Airport Design; FAA AC 150/5070-6B Airport Master Plans, and other applicable FAA Orders, Federal Aviation Regulations (FAR) and ACs, unless noted otherwise.
Additionally, the ALP update will be completed in accordance with applicable portions of the following (latest change):
¢ FAA Order 8260.3B, United States Standard for Terminal Instrument Procedures (TERPS);
* 14CFR Part 77, Objects Affecting Navigable Airspace;
* FAA Order 7400.2, Procedures for Handling Airspace Matters;
* FAA Order 5090.3C, Field Formulation of the National Plan of Integrated Airport Systems
(NPIAS);
FAA Order 5100.38D, Airport Improvement Program (AIP) Handbook;
« FAA Order 7031.2C, Airway Planning Standard Number One - Terminal Air Navigation Facilities and Air Traffic Control Standard;
« Other FAA Advisory Circulars, Orders and Regulations, as required.
The Sponsor will be responsible for submitting a completed copy of the ALP checklist(s) with ALP submittals to GDOT and the FAA as outlined in Element 4 below. The ALP will contain data (as required by FAA SOP 2.00) to obtain approval from GDOT and the FAA.
* Element 1 - Project Formulation shall include the following:
A. Prepare work scope and fees.
B. Prepare for and conduct scoping conference calls with GDOT, Sponsor, and Consultant.
EXHIBIT A-1 (VE
Element 2 - Narrative Report shail include the following:
A. Working Paper #1
1. introduction
a. Prepare a succinct introduction to the report that explains and identifies the purpose
and goals of the ALP Plan Set and Narrative Report update.
2. Inventory of Existing Conditions
a. Perform a site visit to the airport, supplemented by desktop research, to collect airport and community data from the Sponsor, airport management, GDOT, the FAA, and other available sources. This includes information related specifically to the airport, along with information related to the surrounding community, such as comprehensive plans, zoning regulations, etc.
b. Perform an inventory of physical facilities within the current airport boundary.
Buildings, runways, taxiways, aprons, access roads, lighting, signage, NAVAIDs, and other above-ground features will be inventoried and depicted on the ALP Plan Set. The inventory will be limited to a general documentation of site features; and will not include detailed information (e.g. signs will be identified, but a detailed sign schedule will not be provided).
c. Verify the airport's current number of based aircraft and approximate number of annual operations, utilizing the most recent and accurate data source (e.g. 5010 record, National Based Aircraft Inventory Program, FAA Traffic Flow Management System Counts, airport records). Coordinate efforts to update the airport’s number of based aircraft via basedaircraft.com with the Sponsor.
d. Examples of information and data to be collected and reviewed include, but are not limited to, the following:
i. 2005 ALP Set.
ii. 2023 Redline ALP Update.
ili. | 2018and 2002 Georgia Statewide Aviation System Plans.
iv. 2018, 2012, 2007, and 2001 Pavement Management Plans.
v. 2020 and 2011 GDOT Ecanomic Impact Reports.
vi. FAA 5010 Airport Master Record.
vii. | FAA Terminal Area Forecasts (TAF).
vill. | FAA Aerospace Forecasts.
ix. FAA Traffic Flow Management System Counts (TFMSC).
x. Recent wind data from National Weather Service.
xi. Based aircraft.
xii. Fuel records.
xill. Existing land uses and zoning laws.
xiv. _ Existing environmental documentation.
xv. Current ARFF equipment and building standards/requirements.
xvi, Inventory and condition of airport equipment (fuel trucks, ARFF, etc.).
xvii. Inventory and condition of visual aids, navigation equipment, beacon, etc.
xviii. Inventory non-aeronautical uses and through-the-fence operations.
xix. _ Inventory on-airport land use (tenants, type use, activity levels, etc,).
xx. Inventory perimeter security/wildlife fencing and gate locations.
2. Inventory airspace and nearby airports.
xxi. Inventory runways and taxiways.
xii. Inventory aircraft parking.
xxiv. Inventory auto parking facilities.
xxv. Inventory and condition of airport pavements based on visual evaluation, available reports, etc. (a pavement management study is not included).
xxvi. — Inventory fuel storage facilities and fueling equipment.
xxvii. Document runway utilization ratios.
EXHIBIT A-2
Ue
xxviii. Document traffic pattern for each runway (note standard vs. non-standard).
xxix. Document typical departure and arrival corridors.
2%. Document any existing Modifications to Standards (MOS).
3. Forecasts of Aviation Activity
a. On August 12, 2024, the Federal Aviation Administration (FAA) released a memorandum which changed the approval process for airport aeronautical forecasts and critical aircraft determination. Paragraph five of the FAA memorandum states that nor-towered airports with less than 90,000 annual operations would not warrant a forecast approval from the FAA. According to the most recent FAA TAF, CXU’s total operations are well below 90,000 operations; therefore, forecast approval for CXU is not required.
However, because the forecast is pivotal for performing the facility requirements portion of the narrative report, a more simplified forecast is still necessary. Therefore, for this reason and for planning purposes, a simplified forecast will be prepared to form the basis of the future development program at CXU.
Airport activity projections will be prepared for the short-term (0-5 years), intermediate (6-10 years), and long-term (11-20 years) planning phases. The analysis will result in either the re-validation of a prior forecast or the establishment of a new forecast that includes the following information:
i. Based aircraft by type and number.
il. Local, itinerant, and total operations.
iii, Operations by activity types.
b. In addition to the preparation of a simplified forecast, a critical aircraft analysis will be
completed. The critical aircraft recommendation will require approval from both the Sponsor and GDOT. This will include the current and future (proposed) critical aircraft.
B. Working Paper #2
4. Facility Requirements
a. The existing and future critical aircraft anticipated to utilize the airport over the 20-year planning period will be used to determine the airport design standards as defined in FAA AC 150/5300-13B, Airport Design, FAR Part 77, and other applicable FAA ACs and Orders. This taskis a critical step in the development of the ALP Plan Set; and will identify
the following design requirements:
i. Airport Reference Code (ARC).
ji. Runway length, width, strength.
ii. Taxiway width.
iv. Runway Design Code (RDC), Approach Reference Code (APRC), and Departure Reference Code (DPRC).
v. FAR Part 77 surfaces.
vi. Airfield geometry.
vii. Other applicable runway and taxiway design standards.
viii. Obstruction clearing.
ix. Instrument approaches.
x. Lighting, marking, and signage.
xi. Wind coverage.
xii. Access roads.
xiii. Perimeter/security fencing.
b. In addition to the previously mentioned FAA ACs, applicable Airport Cooperative Research Programs {ACRPs) will be used to determine the requirements for the following airport facilities:
EXHIBIT A-3
Us
i. T-hangar and box/corporate hangar space.
li. Tie-down and transient aircraft apron.
iii. Terminal building.
iv. Fuel storage.
v. Navigational aids.
vi. Weather reporting capabilities.
vii. Maintenance requirements.
vill. | Land/easement acquisition.
5. Alternatives Analysis
a. Produce up to three (3) alternative airport airside/landside development layouts (indusive of a ‘no-build’ alternative), based on the findings from the Facility Requirements study. The proposed alternatives will comply with applicable FAA design standards, unless noted otherwise.
b. Explain the merits and shortcomings for each alternative, and the rationale behind selection of the preferred alternative. The preferred alternative(s) will be depicted visually on the ALP Plan Set.
c. The following factors may be included in a matrix to evaluate the alternatives:
i. Airport design standards.
li, Environmenta! impacts.
iii, Facility requirements.
iv. Development costs (initial implementation and maintenance costs).
v. Obstruction analysis.
vi. Land acquisition.
vil. Implementation feasibility.
d. Document conditions that may require further analysis, such as declared distances, threshold displacements, or non-standard airport features that may require a Modification of Standards (MOS).
6. Implementation Plan
a. Summarize the airport’s ongoing capital improvement plan and how it is funded.
Prepare a financial plan (project cost estimates) for the recommended development program, divided into three planning phases: short-term (0-5 years), intermediate (6-10 years), and long-term (11-20 years).
b. Provide an explanation/brief justification for each project listed in the 5-year CIP.
. Capital Improvement Plan
a. Prepare a CIP table that lists the following information for each project:
i. Proposed fiscal year in which the project will commence.
ii. Sponsor's priority for development in a given fiscal year.
tii. Project name.
iv. Estimated total project cost, including federal, state, and local funding required.
b. Each project listed in the CIP will be depicted visually on the ALP Plan Set, wherever
possible, to facilitate the projects’ eligibility to receive federal and state funding.
Element 3 - Airport Layout Plans shall be prepared in digital drawing format. Shading, coloring,
notes, and other techniques will be used to indicate the phasing of airport improvement projects.
A. Survey planimetric data and orthorectified aerial imagery for the airport will be collected by a subconsultant (see Exhibit C attached with this Scope of Work) per the requirements provided for a full 188 survey on Table 2-1 of FAA AC 150/5300-18B, General Guidance and Specifications for Submission of Aeronautical Surveys to NGS: Field Data Collection and Geographic information Systems (GIS) Standards; and will serve as the basis for the ALP Plan Set.
The survey shal! be prepared in accordance with FAA AC 150/5300-168, General Guidance and Specifications for Aeronautical Surveys: Establishment of Geodetic Control and Submission to the
Us
EXHIBIT A-4
National Geodetic Survey, and FAA AC 150/5300-17C, Standards for Using Remote Sensing Technologies in Airport Surveys.
Survey parameters and features include the following:
1. Survey Planimetrics (mapping/topography).
2. Aerial ortho-imagery of Airport and surrounding area.
3. Horizontal controls shall be referenced to the appropriate Coordinate System in NAD 83 (2011), GEOID18, and vertical control shall be referenced to NAVD88.
4, Survey data will be tied to the PACS and SACS for the airport.
5. On-site ground control survey will include the following items/tasks:
a. Recover existing NGS monuments and tie surveys to these points.
b. SACs (Al6266, Al6267) have been identified at the airport. Field information will be collected and tied to these primary control points, where feasible.
c. Obtain the necessary ground control photo with identifiable checkpoints to validate the
ABSPS control.
Location and validation of the airport runway end positions.
Collection of the vertical profile for the runway(s) every 50 feet.
Collection of the position, elevation, and (where required) the appropriate navigational
aid perpendicular point of electronic and visual navigational aids (NAVAIDs) located on
the airport.
g. Control for any obstruction or airport planimetric features that cannot be coflected using photogrammetric methods.
h. Collection and preparation of fleld forms.
i. Collection and labeling of field photographs.
. The ALP Plan Set is anticipated to include the following plans:
1. Cover Sheet ~ Provide information including the airport name, airport sponsor contact information, grant number, location, and ALP preparer. An index of drawings, graphic representations of the airport location (Scale 1*=500,000" or aeronautical sectional chart), and airport vicinity (Scale 1°=24,000" or USGS quadrangle map) will also be shown.
2. Data Sheet — Provide vital information pertinent to the airport, such as runway and taxiway geometry information, safety critical information, wind information, etc. per the FAA SOP
2.00 Checklist.
3. Existing Airport Layout Drawing — Depict existing airport facilities and applicable FAA design standards. No proposed development will be shown.
4. Future Airport Layout Drawing (ALD) - Depict existing and future airport facilities, serving as the airport's 20-year development guide. The drawings will include existing and future airside and landside facility identifications, description labels, approach surfaces, and pertinent dimensions as set forth by FAA requirements.
5. Terminal Area Drawing - Depict existing and future airport facilities in the terminal area and other areas of significant existing or proposed development at a larger scale than the ALD to provide additional detail and clarity. Label existing and required separations between site features such as buildings, taxiways, taxilanes, and fixed objects.
6. Airport Airspace Drawing - Depict airport imaginary surfaces based on 14 CFR Part 77, Safe, Efficient Use, and Preservation of the Navigable Airspace, for the full extent of airport development. Show, in plan view over a USGS Quadrangle base map, all Part 77 surfaces based on the ultimate runway lengths. Provide profile views of the imaginary airspace surfaces. Provide disposition tables of obstructions outside of the inner portion of the approach surface.
7. Inner Portion of the Approach Surface Drawing - Depict the plan and profile view of the inner portion of the approach surface to each runway and provide a tabular listing of identified surface penetrations. The drawing will depict the airport imaginary airspace surfaces included in 14 CFR Part 77, Safe, Efficient Use, and Preservation of the Navigable
mo
EXHIBIT A-5
UF
Airspace. The drawing will also depict threshold siting surfaces associated with United States Standards for Instrument Procedures (TERPS) and reflect recent changes outlined in FAA Advisory Circular 150/5300-138, Airport Design. Plan sheets will show the area from the runway threshold to a point on the approach slope 100 feet above the runway threshold elevation. Obstruction data for the approach surfaces will be provided in data tables; and will include potential future obstructions located 13’ or less below the approach surface.
8. Runway Departure Surfaces Drawing — The drawings will depict departure surfaces for the runways in plan and profile, adhering to the requirements set forth by FAA AC 150/5300- 138, Airport Design. Obstruction data for departure surfaces will be provided in data tables.
9, Land Use Plan ~ The drawing will depict land uses (e.g. industrial, residential, commercial), both on and off the airport, to at least the 65 DNL contour, as created from the operations for this ALP; and will identify public facilities such as schools, parks, churches, etc.
10. Exhibit A Airport Property Map ~ Please note that any effort related to the update and/or preparation of an Exhibit ‘A’ Property inventory Map Is not included in this scope of work. It is the Sponsor's understanding that GDOT will be providing an Exhibit ‘A’ Property Inventory Map, using FAA ARP SOP 3.00 as guidance, and in accordance with FAA AC 150/5100-17, Land Acquisition and Relocation Assistance for Airport Improvement Program (AIP) Assisted Projects, as part of a statewide program. information to be shown/provided on the plans and/or data tables to be provided by GDOT include the following:
Property parcels that make up the dedicated airport property.
Other detached parcels owned by the Sponsor that are dedicated to airport purposes.
Parcels that were once, but are no longer, airport property.
Parcel information, including grantee (i.e. selling owner), type of interest acquired,
acreage, and public jand record references (e.g. book and page, date of recording).
How the land was acquired, including if the land was conveyed as Federal surplus land
or Government Property.
The funding source for the land, including FAA project number (if applicable).
g. The purpose of any proposed land/easement acquisition, and the current land use.
h. Runway protection zones, runway configurations, and building restriction lines,
anor
id
« Element 4~ Project Documentation shall include the following tasks/deliverables:
1. Submit Working Paper #1 in PDF format for Sponsor and GDOT review.
2. Submit revised Working Paper #1 in PDF format for Sponsor and GDOT review and approval after addressing any review comments received based on Submittal 1.
3. Submit Working Paper #2 in PDF format for Sponsor and GDOT review.
4. Submit revised Working Paper #2 in PDF format for Sponsor and GDOT review and approval after addressing any review comments received based on Submittal 3.
5. Submit draft Narrative Report (i.e. Working Papers #1 and #2) in PDF format for Sponsor and GDOT review.
6. Submit draft ALP Plan Set, including completed FAA checklist 2.00, for Sponsor and GDOT review. Submittals will be made electronically in PDF format to GDOT.
7. Submit revised draft ALP Plan Set, including completed FAA checklist 2.00, for Sponsor and GDOT review and approval after addressing any review comments received based on Submittal
6. Submittals will be made electronically in PDF format to GDOT,
8. Once review comments received in response to Submittal 6 have been addressed to the satisfaction of the Sponsor and GDOT, submit Narrative Report and Plan Set in PDF format and PDF copies of completed FAA checklist 2.00 to the GDOT Aviation Planning Manager for circularization of the documents through the FAA.
9, After Sponsor and GDOT Conditional Approval of the ALP, five (5) 24” x 36" ALP hard copies, and five (5) final ALP Narrative Reports will be prepared and sent out as follows:
a. The Sponsor will receive two (2} ALP copies, and two (2) final Narrative Report copies.
EXHIBIT A-6
(2
b. GDOT will receive one (1) ALP copy, and one (1) final Narrative Report copy.
c. The FAA will receive one (1) ALP copy, and one (1) final Narrative Report copy.
d. The Consultant will receive one (1) ALP copy, and one (1) final Narrative Report copy.
10. Provide a Microsoft OneDrive link to the Sponsor and GDOT so they may download a PDF and
DWG copy of the final Plan Set for their records.
® Element 5 - Meetings shall include the following meetings/tasks:
1.
Meeting #1 — Upon receipt of the Notice to Proceed from GDOT, a project kickoff meeting shall be held at the airport. Conference/video call options will be made available for project team members unable to attend in person. Anticipated attendees Include the Sponsor, GDOT Aviation Project Manager, GDOT Aviation Planning Manager, and Consultant. Topics of discussion will include the project scope of work, design altematives to investigate, and the tentative project schedule. The Inventory site assessment will occur directly after Meeting 1, or within two weeks after this meeting.
Meeting #2 - Prior to finalizing and submitting Working Paper #1 for GDOT review (see Element 4, tem 1), the Consultant will conduct a work session with the Sponsor via conference/video call to discuss the critical aircraft determination.
Meeting #3 ~ Prior to finalizing and submitting Working Paper #2 for GDOT review (see Element 4, tem 3), the Consultant will conduct an in-person work session with the Sponsor to discuss the various design altematives that were studied, the merits and shortcomings of each altemative, and to solicit Sponsor input on each altemative. Conference/video call options will be made available for project team members unable to attend in person.
Meeting #4 - Prior to finalizing and submitting the draft ALP Plan Set for GDOT review (see Element 4, Item 6), the Consultant will conduct a work session with the Sponsor via conference/video call to review an In-progress version of the Airport Layout Drawing(s) and Terminal Area Plan Drawing(s) and to solicit Sponsor Input on the development of the preferred alternative.
Meeting #5 — Once the Consultant has completed the draft ALP Plan Set, the Consultant will conduct a meeting via conference/video call to present the draft Plan Set to the Sponsor for review and comment. Once the Sponsor has approved the draft ALP Plan Set, the Consultant shall submit it to GDOT for review and comment (see Element 4, Itern 6).
Meeting #6 — After receiving ALP Pian Set review comments from GDOT, a meeting shall be held via conference/video call between GDOT Aviation and the Consultant to discuss the review comments and formulate a plan for addressing each comment.
Meeting #7 — Once the Consultant has addressed ALP Plan Set review comments received from GDOT, a meeting will be held for the Consultant to present the final Plan Set to the Sponsor for review and comment. Once the Airport Sponsor has approved the final Plan Set, the Consultant shall submit it to GDOT for FAA circularization (see Element 4, Items 7 & 8). Conference/video call options will be made available for project team members unable to attend in person.
EXHIBIT A-7
e Element 6 - Coordination, Review, and Comments will consist of the following:
1. Address comments received from Sponsor and GDOT re: Submittal 1 (Working Paper #1).
2, Address comments received from Sponsor and GDOT re: Submittal 3 (Working Paper #2).
3. Address comments received from Sponsor and GDOT re: Submittal 6 (draft ALP Pian Set).
4. Address comments received from FAA re: Submittal 8 (draft ALP Plan Set, Narrative Report).
5. Also included in this Element are efforts related to the management of the project, including periodic quality control (QQ) checks of the project documents, project status updates to the Sponsor and GDOT, grant administration, and other project management-telated tasks.
Please note that the Scope of Work included in Items 1-4 of this Element accounts for addressing one (1) set of review comments from the reviewing agencies (GDOT, FAA). Additional time required to address new/additional review comments may require an amendment to the original scope and fee documents.
Tentative Project Timeline Task Task Description Tentative Schedule A Meeting #1 — project kickoff meeting +4 weeks after NTP B Meeting #2 - Working Paper #1 work session w/ Sponsor +10 weeks after Task A C Submittal #1 - Working Paper #1 to GDOT +2 weeks after Task B
0 Submittal #2 - revised Working Paper #1 to GDOT +4 weeks after GDOT review E Meeting #3 - Working Paper #2 work session w/ Sponsor +20 weeks after Task D F Submittal #3 - Working Paper #2 to GDOT +4 weeks after Task £
G Submittal #4 ~ revised Working Paper #2 to GDOT +4 weeks after GDOT review H Submittal #5 - Narrative Report to GODOT +2 weeks after GDOT approval 1 Meeting #4 -~ ALP and TAP work session w/ Sponsor +4 weeks after Task H J Meeting #5 ~ draft Plan Set review w/ Sponsor +8 weeks after Task | K Submittal #6 ~ draft Plan Set to GDOT +4 weeks after Task J
L Meeting #6 — review comment discussion conf. call +2 weeks after GDOT review M Submittal #7 - revised draft Plan Set to GDOT +6 weeks after Task L N Meeting #7 — final Plan Set review w/ Sponsor +1 weeks after Task M o Submittal #8 - Plan Set & Narrative Report to GDOT for FAA +16 week after Task N circularization (est. 4 months for ALP circ)
p Submittal #9 ~ Plan Set & Narrative Report to GDOT for +4 weeks after Task O conditional approval
Q Submittal #10 - Plan Set & Narrative Report to OneDrive +4 weeks after Task P
EXHIBIT A-8
Please note that the project timeline above is an estimate of the progression of the project; and is subject to change based on various factors that neither the Sponsor nor the Consultant can control (e.g.
availability for meetings, agency review times).
Any task, service, or deliverable not expressly included in the Scope of Work described above is thereby excluded from the Scope of Work for the Airport Layout Pian Update project.
End Exhibit A.
EXHIBIT A-9
Exhibit B Cost Summary Camilla/Mitchell County Airport (CXU) Airport Layout Plan Update
ELEMENT 1. PROJECT FORMULATION
Labor Subtotal Direct Expenses TOTAL (Lump Sum)
ELEMENT 2. NARRATIVE REPORT
Labor Subtotal Direct Expenses TOTAL (Lump Sum)
ELEMENT 3. AIRPORT LAYOUT PLANS
Labor Subtotal Direct Expenses TOTAL (Lump Sum)
ELEMENT 4. PROJECT DOCUMENTATION
Labor Subtotal Direct Expenses TOTAL (Lump Sum}
ELEMENT 5. MEETINGS
Labor Subtotal Direct Expenses TOTAL (Lump Sum)
ELEMENT 6. COORDINATION, REVIEW, AND COMMENTS Labor Subtotal
Direct Expenses
TOTAL (Lump Sum)
$5,333.00 $20.00
$5,353.00]
$49,214.00 $799.20
O
$139,348.00 $140.00
#
$18,204.00 $400.00
+
$10,028.00 $1,122.20
S11, 150.20]
$16,277.00 $0.00
$16,277.00}
PLANNING PHASE TOTAL
$240,885.40
PROJECT FORMULATION
Hourly Breakdown Sr.
Dept. Program | Project Project | Engineer | Engine Sr. Admin. | Total Element 1 . a i Project I . “reer Planner 2] Planner 1 eH Labor Cost
Manager | Manager | Manager Engineer 2 1 Planner Staff Man
Engineer Hrs $ 275.00] $250.00] $ 203.00] $ 180.00] $ 157.00| $ 133.00} $ 110.00 $ 202.00| $ 147.00] $ 104.00] $ 100.00
Prepare work scope & fees 2 12 2 6 1 23 | $ 4,936.00 Scoping conf. calls & mtgs w/ GDOT, Sponsor 1 1 2 |S 397.00
Subconsultant's Rates
LABOR TOTAL
Mileage $ -
Printing, Shipping, Misc. Project Expenses $ 20.00
Lodging $ -
Per Diem (Travel Day) $ -
Per Diem (Standard Day) $ -
Total Direct Expenses $ 20.00
Distance 436
# of Trips 0
Rate § 0.725
§ 143.00 $ 51.00 $ 68.00
Time
NARRATIVE REPORT
Hourly Breakdown Sr.
Dept. Program | Project Project | Engineer | Engineer Sr. . | Total Element 2 ° . je Project y e ad Planner 2| Planner 1 niga Labor Cost Manager | Manager | Manager Engineer Engineer 2 1 Planner Staff | Man Hrs
$ 275.00] $250.00| $ 203.00} $ 180.00} $157.00] $ 133.00| $ 110.00] $ 202.00| $ 147.00| $ 104.00| $ 100.00 Working Paper #1: Introduction 1 4 2 10 8 2 27 | $ 4,181.00 Site Visit (2 team members) 10 4 10 24 |$ 4,778.00
Working Paper #1: Inventory of Ex. Conditions 2 2 4 10 10 1 29 | $ 4,468.00 Working Paper #1: Forecasts of Av Activity 2 2 2 10 8 1 25 | $ 3,856.00 Working Paper #2: Facility Requirements 2 4 8 8 10 1 33 | $ 5,482.00 Working Paper #2: Alternatives Analysis 2 8 8 20 40 1 79 | $ 11,366.00 Working Paper #2: Implementation Plan 2 4 8 8 20 1 43 | S$ 6,522.00 Working Paper #2: Capital Improvement Plan 2 8 8 8 10 1 37 | 5 6,482.00 Proposal coord., subcontractor admin./coord. 1 4 2 4 11 | $ 2,079.00 Subconsultant's Rates ----->
0
LABOR TOTAL 14 46 0 0 0 0 0 46 84 106 12 308 | $ 49,214.00 Distance # of Trips Rate Time
Mileage $ 632.20 436 2 $ 0.725 Printing, Shipping, Misc. Project Expenses $ 65.00
Lodging $ - (9) $ 143.00
Per Diem (Travel Day) $ 102.00 0 $ 51.00
Per Diem (Standard Day) $ - 0 $ 68.00
Total Direct Expenses $ 799.20
AIRPORT LAYOUT PLANS
Hourly Breakdown Sr.
Dept. Pi t . in. | Total Element 3 P mage | Prepee Project Regent | Sagem | Bataser sd Planner 2] Planner 1 Admin. | Tota Labor Cost Manager | Manager| Manager Engineer 2 1 Planner Staff Man Engineer Hrs
§ 275.00] $250.00] $203.00] $ 180.00] $157.00] $ 133.00| $ 110.00 $ 202.00| $ 147.00] $ 104.00] $ 100.00 Cover Sheet 2 2 4 6 8 22 |S 3,572.00
Data Sheet 2 4 4 6 12 28 |S 4,488.00 Existing Airport Layout Drawing 2 4 4 6 12 28 |$ 4,488.00 Future Airport Layout Drawing(s) 4 12 8 20 40 84 | S$ 12,816.00 Terminal Area Drawing(s) 2 8 4 20 24 58 | S$ 8,794.00 Airport Airspace Drawing(s) 2 4 8 10 24 48 |S 7,132.00 Inner Portion of Approach Surface Drawing(s) 2 4 8 8 24 46 |$ 6,838.00 Runway Departure Surfaces Drawing(s) 2 4 8 8 24 46 |S _ 6,838.00 Land Use Plan 2 4 4 8 10 28 |S 4,574.00
Proposal coord., subcontractor admin./coord. 2 4 4 8 18 |$ 3,158.00 Subconsultant's Rates ----- >
Aerial photogrammetry, mapping, topo (Woolpert) 0 S$ 76,650.00
LABOR TOTAL 22 50 0 0 0 0 0 56 92 178 8 406 | $ 139,348.00 Distance # of Trips Rate Time
Mileage $ : 436 0 S$ 0.725 Printing, Shipping, Misc. Project Expenses $ 140.00 Lodging $ - 0 S$ 143.00 Per Diem (Travel Day) $ - 0 $ 51.00 Per Diem (Standard Day) $ - 0 S$ 68.00
Total Direct Expenses $ 140.00
PROJECT DOCUMENTATION
Hourly Breakdown
LABOR TOTAL
Element 4 seragar [Manager| Manager| Easier | Engmeer| 2 | na | Ptnaer [anner2)Ptonner] “Sr |g tabor cos
$ 275.00] $250.00] $203.00] $ 180.00] $157.00] $ 133.00] $110.00] $ 202.00] $147.00} $104.00} $ 100.00 Hrs Submit Working Paper #1 2 1 4 4 11 |$ 1,706.00
Submit revised Working Paper #1 2 1 4 4 11 | $ 1,706.00 Submit Working Paper #2 a 1 6 6 17 | $ 2,708.00
Submit revised Working Paper #2 4 1 4 4 13 | $ 2,206.00 Submit draft Narrative Report 4 1 2 2 9 S 1,704.00 Submit draft ALP Plan Set 4 1 2 2 9 |$ 1,704.00
Submit revised draft ALP Plan Set J 1 2 4 11 | $ 1,912.00 Submit Plan Set, Narrative Report for FAA circ. 2 1 2 4 9 S 1,412.00 Submit 5S copies of Plan Set, Narrative Report 2 1 2 4 9 $ 1,412.00 Upload project documents to OneDrive 2 1 8 2 13 | $ 1,734.00
Subconsultant's Rates -----> os = 0
Mileage
Printing, Shipping, Misc. Project Expenses Lodging
Per Diem (Travel Day)
Per Diem (Standard Day)
Total Direct Expenses
Distance 436
Ht of Trips
Rate Time $ 0.725
$ 143.00 $ 51.00 $ 68.00
MEETINGS
Mileage $ 632.20
Printing, Shipping, Misc. Project Expenses S - Lodging $ 286.00 Per Diem (Travel Day) $ 204.00
Per Diem (Standard Day) $ -
Total Direct Expenses $ 1,122.20
436
2 $ 0.725
$ 143.00 $ 51.00 S$ 68.00
Hourly Breakdown S.
Dept. P ‘a Project ct | E Engl Sr. . | Total Element 5 - _—- ro} Project Proje nafner) Cagmnner r Planner 2| Planner 1 Adwie _ Labor Cost Manager | Manager | Manager Engineer Engineer 2 1 Planner Staff | Man Hrs
$ 275.00} $ 250.00| $ 203.00] $ 180.00| $ 157.00} $ 133.00] $ 110.00 $ 202.00| $ 147.00] $ 104.00] $ 100.00 1-proj kickoff at airport (2 team members) 10 2 4 16 | $ 3,320.00 2-WP #11 work session w/ Sponsor (via Teams) 2 1 4 7 $ 1,118.00 3-WP #2 work session w/ Sponsor (2 team members) 2 1 4 7 § 1,118.00 4-Plan Set work session w/ Sponsor (via Teams) 2 1 4 7 § 1,118.00 5-draft Plan Set rvw w/ Sponsor (via Teams) 2 1 4 7 S$ 1,118.00 6-Plan Set rvww comment conf. call (via Teams) 2 1 4 7 S$ 1,118.00 7-final Plan Set rvw w/ Sponsor (via Teams) 2 1 4 7 S$ 1,118.00 Subconsultant's Rates ----- > :
o ys -
LABOR TOTAL 0 22 0 0 0 0 0 8 0 28 0 58 | $10,028.00 Distance ofTrips Rate Time
COORDINATION, REVIEW, AND COMMENTS
Hourly Breakdown Sr.
Element 6 seamen | es | oe | ener sere) 5 Jrnmrz| ames] “S| Yan | Heo $ 275.00] $250.00] $ 203.00] $ 180.00] $ 157.00] $ 133.00] $110.00] $ 202.00 $ 147.00} $ 104.00} $ 100.00 Hrs Address Working Paper #1 rvw comments (GDOT) 2 4 4 10 2 22 S$ 4,036.00 Address Working Paper #2 rvw comments (GDOT) 2 4 4 10 2 22 $ 4,036.00 Address draft ALP Plan Set rvw comments (GDOT) 2 8 8 14 2 34 S$ 6,432.00 Address draft ALP Plan Set rvw comments (FAA) 1 2 1 4 2 10 S 1,773.00 0 1$ :
Subconsultant's Rates ----->
LABOR TOTAL $ 16,277.00
Distance H# of Trips Rate Time Mileage $ - 436 0 $ 0.725 Printing, Shipping, Misc. Project Expenses $ - Lodging $ - 0 $ 143.00 Per Diem (Travel Day) $ - $ 51.00 Per Diem (Standard Day) $ - 0 S$ 68.00 Total Direct Expenses $ -
YEAR 2025
BILUNG HOURLY RATES PROFIT % | OVERHEAD % LABOR Principal $299.00 10.00% 174.67%| $ -
Dept. Manager $275.00 10.00% 174.67%| $ - Program Manager $250.00 10.00% 174.67%]| $ - Sr. Proj. Manager $226.00 10.00% 174.67%] $ - Project Manager $203.00 10.00% 174.67%] $ - Sr. Project Engineer $180.00 10.00% 174.67%| S$ - Project Engineer $157.00 10.00% 174.67%] S$ - Engineer 2 $133.00 10.00% 174.67%| $ :
fees $110.00 10.00% 174.67%| $ - Sr. Proj. Architect $180.00 10.00% 174.67%| $ - |Proj. Architect/Job Captain $155.00 10.00% 174.67%| $ - Architect 2 $130.00 10.00% 174.67%] $ -
Architect 1 $105.00 10.00% 174.67%| 5 ~ Sr. Planner $202.00 10.00% 174.67%| $ - Planner 2 $147.00 10.00% 174.67%] $ - Planner 1 $104.00 10.00% 174.67%] $ - Admin. Staff $100.00 10.00% 174.67%| $ :
Sr. Owner Rep. $148.00 10.00% 174.67%] $ -
NOTE:
[ioe labor, audited overhead, and profit. Spreadsheet will calculate billing rate.
Exhibit C
January 9, 2026
Chris Johnson
Passero Associates
335 South Legacy Trail, Suite 8-102 St. Augustine, FL 32092 904.224.7084 cjohnson@passero.com
RE: Aerial Photography and Surveying Services at Camitla-Mitchell County Airport (CXU)
Thank you for the opportunity to provide you with our proposal for Geospatial Services at Camilla- Mitchell County Airport (CXU). Herewith is our SOW for your review. If there is anything you would like to discuss further on this project please do not hesitate to reach out.
Thank you again, and we look forward to working with you on this project.
Sincerely,
qweh—
Woolpert, Inc.
Justin Ness, PLS
Aviation Geospatial Practice Manager Senior Associate
Enclosure: Scope of Work dated 1/9/2026
Ur
Woolpert, inc.
42200 NW Ambassador Drive, Suite 610 Kansas City, MO 64163
816.895.9188
Exhibit C Camfla-~Mitchell County Airport (CXU)
ay a o Loot te Aeronautical Survey to Support ALP Development : January 3, 2026
SCOPE OF WORK
FOR
Camilla-Mitchell County Airport (CXU) Camilta, Georgia
Aeronautical Survey to Support ALP Development
DESCRIPTION
Woolpert will complete an aeronautical survey and airspace analysis to support the development of an Airport Layout Plan. This survey will follow the standards for an aeronautical survey and submission to the FAA Airports GIS (AGIS) through the FAAs Airport Data and Information Portal (ADIP) as outlined in the following guidance:
+ — FAA Advisory Circular 150/5300-16B, General Guidance and Specifications for Aeronautical Surveys: Establishment of Geodetic Control and Submission to the Nationa! Geodetic Survey.
>» FAA Advisory Circular 150/5300-17C, Standards for Using Remote Sensing Technologies in Airport Surveys.
+ FAA Advisory Circular 150/5300-188, General Guidance and Specifications for Submission of Aeronautical Surveys to NGS: Field Data Collection and Geographic Information System (GIS) Standards.
This project will consist of completing an aeronautical survey and data collection project following the Alrport Layout Plan Column from Table 2-1 of the FAA AC -18B, a Vertically Guided Runway airspace analysis for all contracted runways, as well as FAR Part 77 surface analysis for each contracted runway.
PROJECT COORDINATION AND MANAGEMENT
Woolpert will provide Project Management and Coordination services to ensure timely completion of this project using the following project management best practices:
Meetings with the Client and the project stakeholders as required will be completed at the beginning of the project to determine critical path project dates and establish the proposed deliverable schedule.
Various meetings during this project will also be conducted to review the progress and discuss any potential deviations from the plan.
Woolpert will provide the Client with a monthly Project Status Report (PSR) outlining progress and any problems that may arise while performing the work. The PSR must include an update of the project schedule, as described in this section, when schedule changes are expected.
Woolpert will create and maintain a Quality Control Checklist (QCC) for the project. The QCC shall include personnel, project milestone checking and peer review procedures at each phase of the project.
1.0 utical Sui Dat lection a ion ana r AC 150/5300-. Vi ided ch ion I ification
Ur
of 2 Me.
Be,
a
Exhibit C Camilla-Mitchell County Airport (CXU) Aeronautical Sucvey to Support ALP Development January 9, 2026
Woolpert will collect and submit the necessary data for an airspace analysis based on existing airfield conditions. All necessary existing data will be submitted through the Airport Data and Information Portal {ADIP) as required by the aforementioned Advisory Circulars (AC). The following items will be performed as a part of this survey:
+
> >
+++*
initiate and complete an AGIS Project within the Airport Data and Information Portal (ADIP).
A Safety-Critical Data Collection, Not Including Design Data survey project will be created.
o Develop and submit the Project SOW Prepare Airport Manager/Operator interviews Establish or validate airport Geodetic Control. If the airfield has existing PACS and SACS, Woolpert will validate according to the requirements in the applicable advisory circulars. If the airfield does not have PACS and SACS, or if it is determined the PACS and SACS are last and/or disturbed, Temporary Survey Marks (TSMs) will be established in accordance with AC- 16B and utilized as the basis of contro! for this project.
© Perform, document, and report the tie to National Spatial Reference System (NSRS)
co Document control features requiring digital photographs
o Document control features requiring sketches
Establish photogrammetric contro! and collect stereo imagery covering the surface area defined by the -18B Vertically guided (VG) surfaces and FAR Part 77 surfaces, as shown in Exhibit No. 1.
o Estimated 18 control points and 5 check points.
o Collect imagery with a 6” ground sample distance (GSD), flight layout will be provided.
0 Collected with leaf-on conditions.
Geo-referencing of aerial photography Perform or validate and document an airport airspace analysis based on existing airfield conditions for objects penetrating the Vertically Guided surfaces.
oO Woolpert will request existing obstacle data from the FAA for review of the O15. As a value-added service, Woolpert will validate and update existing obstacles as necessary ta reduce the number of duplicated obstacles within the FAA obstacle database.
© Woolpert will collect objects penetrating the O15 using the Object Density Selection Criteria (ODSC) as specified in Section 2.7.1.6 of FAA AC 150/5300-18B.
Field verify a sampling of critical existing obstacle data currently in the FAA Obstacle Authoritative Source
Survey, monument, and document runway critical points (ends, thresholds, blast pads, stopways)
© Determine runway length and width.
o Determine runway profile on all runways using 50-foot stations. (10-foot stations and
10-foot offset left and right for all Part 139 airports)
Determine the touchdown zone elevation.
Determine the runway true azimuth.
Document runway critical features requiring digital photographs.
o Document runway critical features requiring sketches.
Determine or validate and document the position of navigational aids (NAVAID) and runway abeam points.
oo 0
Page 2 af 9
ne
ax! call 1%
Exhibit C Camilla-Mitchell County Airport (CKU} Aeronautical Survey to Support ALP Development January 9, 2026
o Document NAVAID features requiring digital photographs.
o Document NAVAID critical features requiring sketches.
Collect major landmark features within imagery coverage.
Populate calculable and required attributes.
Develop an AGIS-compliant data file containing the safety critical data required to achieve instrument approach procedure development.
Prepare a 6” pixel resolution ortho-rectified aerial photo from collected imagery covering the full extent of the AC 150/5300-188 VG Surfaces as shown on Exhibit No. 1.
Develop and submit an imagery acquisition report.
Develop and submit a final project report.
¥¥ ¥ FH
2.0 Planimetric Mapping and Contours
Woolpert will Complete 1”=100’ scale airport planimetric mapping and 2-foot contour interval DEM of the area shown in Exhibit No, 2, consisting of approximately 180 Acres
> Mapping will include the defined Runway Protection Zones (RPZ) at each end of all runways, whether they are inside or outside of the airport property boundary
+» Mapping will include features required for standard Airport Layout Plan (ALP) base mapping, as shown in Exhibit No. 4.
+ Airport planimetric mapping will be delivered in AutoCAD format
Woolpert will complete additional analysis covering the FAR Part 77 surfaces for each contracted runway, as applicable. The following surfaces will be analyzed for obstacles using the imagery collected as part of task item 1.0. The analysis will be compiled and delivered in Spreadsheet and AutoCAD format and incorporated into the ALP. Groups of trees or heavily wooded areas that are obstructions wilt be represented with polyline boundaries depicting the extent of the surface penetration.
+> Woolpert will collect all obstacles within the analyzed approach and departure surfaces.
> Representative tree top elevations will also be reported within each area.
Obstacle analysis will be completed to show potential obstacles within 12.5’ feet of the approach surfaces to account for future vegetation growth.
Woolpert will develop and deliver a Microsoft Excel file containing information to all Obstacles that were collected within 12.5 feet of the Obstruction identification Surfaces
> This spreadsheet will contain Northing, Easting, Elevation, Penetration
> Depth, Station, and Offset information
Runway 08 - Existing
> Part 77 Non-Precision Type C (34:1) Runway 26 - Existing
> Part 77 Non-Precision Type C (34:1)
Areas of terrain that penetrate the specified OIS surface shall be contoured at 2-foot intervals.
va
¥ ¥ a ac gt pete Carnilla-Mitchell County Airport (CXU) beer a Ge) oF Aeronautical Survey to Support ALP Development Coe, January 9, 2026
Spot elevations will be provided on a 200-foot grid inside the specified Part 77 approach surface > This grid will not be provided in obscured areas
>} Areas of ground penetration will be captured at a 100-foot grid interval +> The outline of the limits of the ground penetrating the OIS surface is to be identified
All railroad and road centerlines will have a spot elevation where they cross the extended runway centerline and the exterior limits of the OIS surfaces.
The Part 77 imaginary Surfaces shall show 50 foot interval contours which are labeled.
Woolpert will deliver the final deliverables for this project no later than 180 calendar days from the date of a notice to proceed or the ability to acquire leaf-on imagery, if NTP is issued during leaf-off season. It is assumed that the notice to proceed is received in a timely manner to facility collection of imagery during leaf-on conditions. A formal project delivery schedule will be compiled based on project needs and negotiated prior to starting this project.
The fee breakdown shown in the following table is based on Lump Sum progress billing. These fees are valid for project NTP in 2025. If NTP is delayed beyond 2025, Woolpert may require adjustments to this fee estimate to account for cost escalations.
Fee Breakdown ~ Lump Sum Task Description Fee
1.0 — Aeronautical Survey and AGIS Data Submittal $59,150
2.0 ~ Planimetric Mapping, Contours $13,400
3.0 ~ Obstruction Analysis Part 77, AC 150/5300-13B and PAPI OCS/LSCS $4,100 fLump Sum Fee Total $76,650
(FE Page 4 of 9
Exhibit C Camilla-Mitchell County Airport (CXU) Aeronautical Survey to Support ALP Development January 9, 2026
Exhibit No. 1 Surface Analysis AOI and Imagery Limits
S *.
*% 4
ra
J bm
va
Exhibit C
Camilla-Mitchell County Airport (CXU) Aeronautical Survey to Support ALP Development January 9, 2026
Exhibit No. 2 Planimetric Mapping Limits
(£ Page 6 of 9
Pro We i] 4th
Exhibit C
Camilla-Mitchell County Airport (CXU) Aeronautical Survey to Support ALP Development
January 9, 2026 Exhibit No. 3 Table 2-1 Survey Requirements Matrix from AC 150/5300-18B Intended End Use of the Data AC Reference Airport Instrument Comments Required Tasks V Layout | Procedure
Plan Development
(ALP)
Provide a Survey and Quality Contro! Plan 150/5300- * .
16/17/18 Establish or validate Airport Geodetic Control 150/5300-16 ° ° Perform, document and report the tie to National | 150/5300-16 * * Spatial Reference System (NSRS)
Survey runway end(s)/threshoid(s) 150/5300-18 ° * Monument runway end(s)threshold(s) 150/5300-18 * ° Document runway end(s)threshold location(s) 150/5300-18 e “| Identify and survey any displaced threshold(s) 150/5300-18 * ° Monument displaced threshold(s) 150/5300-18 7] .
Document displaced threshold(s) location 150/5300-18 . ‘ Determine or validate runway length 150/5300-18 * ° Determine or validate runway width 150/5300-18 . ‘ Determine runway profile using 50 foot stations | 150/5300-1 8 2 .
Determine runway profile using 10 foot stations 150/$300-18 “2 .
Determine the touchdown zone elevation (TDZE) | 150/5300-18 . " Determine and document the intersection point of | 150/5300-18 * all specially prepared hard surface (SPHS)
runways Determine and document the horizontal extents 150/5300-18 . .
of any Stopways Determine any Stopway profiles 150/5300-18 bd * Determine if the runway has an associated 150/5300-18 * clearway
Survey clearway to determine objects penetrating | 150/5300-18 . ° the slope
Determine and document the taxiway intersection | 150/5300-18 ° to threshold distance
Determine runway true azimuth 150/5300-18 * ° Determine or validate and document the position | 150/5300-18 ° .
of navigational aids Determine or validate and document the position | 150/5300-18 .
of runway abeam points of navigational aids Determine potential navigational aid screening 150/5300-18 objects
Collect and document VOR receiver checkpoint | 150/5300-18 location and associated data
ve
Fy Exhibit C ee Camilla-Mitchell County Airport (CXU) Sa ee Ba . Aeronautical Survey to Support ALP Development ott January 9, 2026
Perform or validate and document an airport 150/5300-18 . ‘ airspace analysis
Collect and document helicopter touchdown lift 150/5300-18 ° .
off area (TLOF) Collect and document helicopter final approach 150/5300-18 * ° and takeoff area (FATO)
Collect or validate and document airport 150/5300-18 ° planimetric data
Determine or validate the elevation of the Air 150/5300-18 * Traffic Control Tower Cab Floor (if one is on the
airport) Perform or validate a topographic survey 150/5300-18 * “4 Collect and document runway and taxiway 150/5$300-18 .
lighting Collect and document parking stand coordinates | 150/5300-18 Collect cultural and natural features of landmark | 150/5300-18 * value
Determine elevation of roadways at the 150/5300-18 °
intersecting point of the Runway Protection Zone (RPZ) or the runway centerline extended
Determine all Land Use to 65 DNL contour 1$0/S300-18 . Not provided by Woolpert
Document features requiring digital photographs | 150/5300-18 . * Document features requiring sketches 150/5300-18 * id Collect position and type of runway markings 150/5300-18 ° Collect position and type taxiway markings 150/5300-18 Locate, collect, and document photo [D points 150/5300-17 Identify collect, and document wetlands or 150/5300-18 . Not provided by environmentally sensitive areas Woolpert
Collect imagery 150/5300-17 ° .
Provide a final Project Report 150/5300- . .
16/18
‘Only when runway construction is involved.
2All 14 CER Part 139 airports require 10-foot stations. At all other airports the distance between stations is between 10 and 50 feet to meet local requirements
JOnly required for the identified Category II and III special topographic survey”
‘For Cat Il and II] radar altimeter area or if specifically requested
Uk
Exhibit C Camilla-Mitchell County Airport (CXU) Aeronautical Survey to Support ALP Development January 9, 2026
Exhibit No. 4 AC 150/5300-18B Required Feature Collection Table (when applicable)
Satety Critical Nor-sarety Critical vies $e | |rscrsooo s|.§ ia Features 6B 5 # 1 Features 6 2 5 2 Section al ie Section +) * 1_| 5.8. |AimportControlPoints X_| xX] 1 [5.44 JAirietdiight x 2 5.8.9, [CoordinateGridArea x x 2 5.4.15. |AimortSign Xx 3 | 5.4.19, 4.19, |MarkingArea (Runway only) ».4 3 | 5.41. |AircraftGateStand ».4 4 5.4.20. |MarkingLine (Runway only) ».4 4 5.4.2. _|AircraftNonMovementArea |_X 5 5.10. i t X_ | X 5 | 5.4.16. |Apron xX
6 5.5.2. |Obstacle x x 6 5.4.5, |ArestingGear ».4 7 5.5.3. _|ObstructionArea X |X 7 | 5.13.1. |B X | xX 8 5.5.4. _|ObstructionIDSurface x Xx 8 5.9.1. {Building ».4 x 9 5.4.22. |Runwa' x 9 | 5.13.2. |DrivewayArea x
10 5.4.25. _|RunwayBlastPad ».4 10 } 5.8.10. |ElevationContour ».4 X 11 5.4.8. _|RunwayCenterline ».4 41 5.9.4, _|Fence ».4 12 | 5.4.12. [RunwayElement_ X 12 | 5.9.5. |Gate X
13 |_ 5.4.26. |RunwayEnd Xx 13 | 5.8.11. |imageArea x | x 14 | 5.4.9. |RunwayHelipadDesignSurface| X | X | 114] 5.5.1. |LandmarkSegment X | xX 15_| 5.4.10, |Runwayintersection Xx 15 | 5.4.19. _|MarkingArea (Off Runway) |_X 16 5.4.27. Label x 16 | 5.4.20. |MarkingLine (Off Runway) |_X 17_| 5.4.11 |RunwayLAHSO X 18 | 5.13.4, |ParkingLot x | x 18 | 5.4.18. [TouchDownLitOf. x 19 | 5.4.7. _|P ingBrid x 20 | 5.13.5. _|RailroadCenterline XK
21 | 5.13.6. |RailroadYard ».4 Xx 22 | 5.13.7. |RoadCenterline Xx.
23 | 5.13.8. |RoadPoint X_| 2 24 | 5.13.9 xX |x 25 | 5.4.24. |RunwayArestingArea_ X 26 | 5.7.11, |Shoreline x 27 | 5.4.29. |Shoulder 4 28 | 5.6.10. |State ».4 ».4 29 | 5.14.1. |TankSite xX 30 | 5.4.31, |TaxiwayElement _ X 31 | 5.4.14. |Taxiwayholdi sition Xx 32 | 5.4.30. |Taxiwayintersection Xx 33 | 5.9.6. [Tower xX | X S7S. xX | xX
OF
PA Project No. 20223368.0005 Work Order 26-05
Planning Services for Airport Layout Plan Passero Associates (PA or Consultant) agrees to perform the following services, in accordance with the terms and conditions of this Work Order and the Master Consulting Services Agreement with the City of Camilla (Client or City), dated May 9,
2022, all of which terms and conditions are incorporated herein by reference:
Project Location: Camilla-Mitchell County Airport, Camilla, Georgia.
Project Description: Provide planning services for the preparation of an update to the current Airport Layout Plan set and narrative report.
Scope of Basic Services: Project Formulation; Narrative Report; Airport Layout Plans; Project Documentation; Meetings:
Coordination, Review, and Comments. See Exhibit A Scope of Work.
Scope of Special Services: Survey services are to be accomplished as a part of the Narrative Report and Airport Layout Plans elements noted above. See Exhibit A Scope of Work.
Client Manager: Kelvin M. Owens, Mayor; Cheryl Ford, City Clerk Airport Manager: Jermaine Colson, Airport Manager
PA Program Manager: Brad Wente, P.E.
PA Project Manager: Christopher “CJ” Johnson
Basic Services Compensation and Method of Payment: Lump Sum Fee: $164,235.40. See Exhibit B Cost Summary.
Special Services Compensation and Method of Payment: Lump Sum Fee: $76,650.00. See Exhibit B Cost Summary.
Total Compensation and Method of Payment: Lump Sum Fee: $240,885.40. See Exhibit B Cost Summary.
Schedule: Services to begin upon receipt of fully executed Work Order and Notice to Proceed from GDOT Aviation Programs.
Meetings: Pre-design/scoping meeting and conference calls, project kickoff, work sessions, and plan review sessions. See Exhibit A Scope of Work.
Deliverables: See “Element 4 — Project Documentation” in the attached Exhibit A Scope of Work.
City of Camilla, GA
Dewayne Burley, Mayor pro tem Bradley J. Wente, P.E.. Vice President/SE Services Director
Typed Name & Title Typed Name & Fitle Date: 4 | 5194, 44 1G
Date:
ATTEST:
BY:
Chris Johnson, Sr. Aviation Planner Typed Name & Title
nae. 4 ~I1S-26
UE
CITY OF CAMILLA
RESOLUTION NO. 2026-04-13-1
A RESOLUTION AUTHORIZING THE ACCEPTANCE OF GDOT AVIATION PROJECT
T009008, CONSTRUCT PERIMETER FENCE/ALP UPDATE FUNDS AND
DESIGNATING AN AUTHORIZED REPRESENTATIVE TO EXECUTE ALL
NECESSARY DOCUMENTS.
WHEREAS, the City of Camilla, Georgia is eligible to receive grant funding from Georgia Department of Transportation (GDOT) Aviation Programs for the purpose of improvements to the Camilla-Mitchell County Airport; and
WHEREAS, the City Council finds that the project is in the best interest of the community and aligns with current strategic goals; and
WHEREAS, GDOT Aviation Programs requires a formal resolution designating an authorized official to act on behalf of the City in all matters related to the grant.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
CAMILLA, GEORGIA:
1. Acceptance: The City Council hereby authorizes the acceptance of the GDOT
PROJECT T009008, CONSTRUCT PERIMETER FENCE/ALP UPDATE at the
CAMILLA-MITCHELL COUNTY AIRPORT in an amount up to $1,143,519.07.
2. Matching Funds: The City hereby certifies that it has the available local matching funds required to fulfill its obligations under the grant agreement.
3. Authorized Signer: The Mayor Pro Tem and their successors in office are hereby designated as the Authorized Representative(s) to execute and file the application, the grant agreement, and any subsequent amendments or reimbursement requests.
4. Assurances: The Authorized Representative is directed to provide any additional information and furnish such documentation as may be required by GDOT Aviation
Programs.
ADOPTED this.43'.day of April, 2026.
Peele Gs Ape ky _ - PR orreac,s ket / * q aM N gos “VS 4
Np IN a E SEAL GG VO
DEWAYNEBURLEY \\ 4% % # # CHERYL RORD/
MAYORPROTEM —%seeneaut* CLERK
NOTICE OF AWARD
TO: US Infra Rehab Services, LLC 9210 Arboretum Parkway, Suite 150 North Chesterfield, VA 23236
Project Description:
City of Camilla, Georgia Baseball Field Storm Drainage Rehabilitation
The OWNER has considered the Bid submitted by you for the above described WORK in response to its Advertisement for Bids and has decided to award you the Contract.
You are hereby notified that your Bid has been accepted for the Contract Price of $119,716.85 for which is based on the Unit Prices shown on the Bid Form (Section 00300).
You are required by the Information for Bidders to execute the Agreement and furnish the required CONTRACTOR's Performance Bond, Payment Bond and Certificates of Insurance within ten (10) calendar days from the date of this Notice.
If you fail to execute said Agreement and to furnish said Bonds within ten (10) calendar days from the date of this Notice, said OWNER will be entitled to consider all your rights arising out of the OWNER's acceptance of your Bid as abandoned and as a forfeiture of your BID BOND. The OWNER will be entitled to such other rights as may be granted by law.
You are required to return an acknowledged copy of this Notice of Award to the OWNER.
TY OF ate BY: f Ses ‘
Dated this 21 day of April, 2026.
*
ACCEPTANCE OF NOTICE
Receipt of the above NOTICE OF AWARD is hereby acknowledged by
, this the day of , 2026.
By:
Title:
END OF SECTION
GAPROJECT\2023\2023-05 Ballfield Storm Rchab\SPEC\SEC00500.wpd (Notice of Award) 00500-1
BID TAB
Prepared For:
CITY OF CAMILLA
York & Associates Engineering, Inc.
Time: 11:30 AM Date: March 19, 2026 By:
: Ci illa, ia - City Hall : A :
Place: City of Camilla, Georgia - City Contractor CAJENN Construction Insituform NGI Trenchless Pipe & Title of Job: & Rehab Services, Inc. Technologies, LLC Sewer Repair, Inc.
BASEBALL FIELD STORM DRAINAGE ;
Bid Bond Merchants National Travelers Casualty and FCCI Insurance Company
REHABILITATION .
Bonding, Inc. Surety Company of America item Description Units Est Unit item Total Unit item Total Unit Item Total No. No. Price Price Price Units 1 MOBILIZATION Lump 1 25,000.00 25,000.00 | 10,000.00 10,000.00 | 18,000.00 48,000.00 Sum
2 LINING OF EXISTING STORM PIPE INCLUDES PRE- 0.00 0.00 0.00
CLEANING, CLEANING, CAMERA WORK, CURED-IN-
PLACE LINE, DROP INLETS REINSTATEMENTS.
COMPLETE
2.1 | 15" DIA. CORRUGATED METAL PIPE, 0.3' TO 3.8' LF 163 180.00 29,340.00 121.00 19,723.00 150.00 24,450.00
DEPTH ABOVE PIPE. LIGHT CLEANING
2.2 18" DIA. CORRUGATED METAL PIPE, 20.1-24' DEPTH LF 434 200.00 86,800.00 261.00 113,274.00 140.00 60,760.00
ABOVE PIPE. LIGHT CLEANING
2.3 18" DIA. CORRUGATED METAL PIPE, 3.8' TO 5.5' LF. 56 400.00 22,400.00 307.00 17,192.00 14.00 784.00
DEPTH ABOVE PIPE. HEAVY CLEANING.
3.1 | REMOVAL OF EXISTING DROP INLET STRUCTURE EA 1 5,000.00 5,000.00 2,487.00 2,487.00 1,800.00 1,800.00
3.2 | GDOT 1019 A, TYPE A, DROP INLET GRATE AND EA 1 10,000.00 10,000.00 | 12,910.00 12,910.00 | 15,000.00 15,000.00
FRAME ON A DOGHOUSE MANHOLE. DEPTH TO PIPE
INVERT IS 0' TO 6.0". COMPLETE
4.4 Permanent Grassing, Bermuda Seed SF 80 50.00 4,000.00 1.80 144.00 13.50 1,080.00
5.4 CCTV Inspection 1-year after installation Lump 1 5,000.00 5,000.00 7,458.00 7,458.00 8,000.00 8,000.00 Sum
TOTAL BID COMPLETE CONTRACT 187,540.00 183,188.00 129,874.00
G:\PROJECT\2023\2023-05 Ballfield Storm Rehab\BIDDING\BIDTAB.wpd Page | of 2
BID TAB
Prepared For:
CITY OF CAMILLA
York & Associates Engineering, Inc.
Time: 11:30 AM Date: March 19, 2026 By:
: Cit i rgia - City Hall . 3 . .
Place: City of Comilla..Georgia ~ City Ha Contractor Southeast Pipe Survey, US Infra Rehab Services, | Video Industrial Title of Job: Inc. LLC Services, Inc.
BASEBALL FIELD STORM DRAINAGE
Bid Bond Markel Insurance Developers Surety and Travelers
REHABILITATION :
Company. Indemnity Company Item Description Units Est Unit Item Total Unit Item Total Unit Item Total No. No. Price Price Price Units 1 MOBILIZATION Lump 4 10,650.00 10,650.00 23,000.00 23,000.00 30,000.00 30,000.00 Sum
2 LINING OF EXISTING STORM PIPE INCLUDES PRE- 0.00 0.00 0.00
CLEANING, CLEANING, CAMERA WORK, CURED-IN-
PLACE LINE, DROP INLETS REINSTATEMENTS.
COMPLETE
2.4 15" DIA. CORRUGATED METAL PIPE, 0.3' TO 3.8' LF 163 128.00 20,864.00 92.15 15,020.45 68.00 11,084.00
DEPTH ABOVE PIPE. LIGHT CLEANING
2.2 18" DIA. CORRUGATED METAL PIPE, 20.1-24' DEPTH LF 434 161.00 69,874.00 101.99 44,263.66 100.00 43,400.00
ABOVE PIPE. LIGHT CLEANING
2.3 18" DIA. CORRUGATED METAL PIPE, 3.8' TO 5.5' LF. 56 193.00 10,808.00 125.95 7,053.20 100.00 5,600.00
DEPTH ABOVE PIPE. HEAVY CLEANING.
31 REMOVAL OF EXISTING DROP INLET STRUCTURE EA 1 5,200.00 5,200.00 4,545.45 4,545.45 7,800.00 7,800.00
3.2 GDOT 1019 A, TYPE A, DROP INLET GRATE AND EA 4 9,000.00 9,000.00 17,307.69 17,307.69 20,500.00 20,500.00
FRAME ON A DOGHOUSE MANHOLE. DEPTH TO PIPE
INVERT IS 0' TO 6.0'. COMPLETE
4.1 Permanent Grassing, Bermuda Seed SF 80 14.25 1,140.00 57.14 4,571.20 35.00 2,800.00
5.1 CCTV Inspection 1-year after installation Lump 1 6,000.00 6,000.00 3,955.20 3,955.20 7,200.00 7,200.00 Sum
TOTAL BID COMPLETE CONTRACT 133,536.00 119,716.85 128,384.00
G:\PROJECT\2023\2023-05 Ballfield Storm Rehab\BIDDING\BIDTAB.wpd
City of Camilla
MEAG POWER PROJECTS 2025 YEAR-END SETTLEMENT ELECTION FORM
The 2025 year-end settlement refund from MEAG Power applicable to your City/Utility Commission is:
Year-end Settlement Refund $499,031.02
Please complete the following form with respect to the distribution of the above refunds. This election form is to be completed by the City’s designated officer(s) authorized to direct the utilization of funds in the Municipal Competitive Trust.
We hereby direct that the following amount of funds available from the 2025 Year-end Settlement from MEAG Power be distributed as follows:
A. DEPOSIT TO THE MUNICIPAL COMPETITIVE TRUST
1. Flexible Operating Account—Short Term Portfolio | 00 % $ 444 03] : 0
2. Flexible Operating Account—Intermediate Term Portfolio % $
3. Flexible Operating Account, Intermediate Extended Maturity Portfolio* % $
4. New Generation and Capacity Funding Account—Short Term Portfolio % $
5. New Generation and Capacity Funding Account—Intermediate Term Portfolio % $
6. New Generation and Capacity Funding Account —Intermediate Extended Maturity Portfolio” % $
7. Flexible - MEAG Fund 1 — Ultra Short and Stable Investment Fund % $
8. New Generation - MEAG Fund 1 — Ultra Short and Stable Investment Fund % $
Subtotal of Dollars into Municipal Competitive Trust $
B. CREDIT TO MEAG POWER MONTHLY BILL:
Credit $ dollars evenly over number of month(s) ; So Subtotal of Dollars to be Credited to Monthly Bill
TOTAL YES REFUND $499,031.02
If you would like the selection(s) you made above to be permanent, until you notify us in writing otherwise, please check this box. This permanent selection will apply only to your MEAG Core Projects year-end settlement over-recovery.
* By authorizing the transfer into the new Intermediate Extended Maturity Portfolio, the undersigned acknowledges the following
potential liquidity restrictions:
Under normal circumstances there will be no restrictions on investment purchases into or sales of shares from the Intermediate Extended Maturity Portfolio. On the occurrence of an event that has a material impact on liquidity or operations of the Intermediate Extended Maturity Portfolio, as determined by MEAG Power in its role providing direction to the Municipal Competitive Trust Trustee, MEAG Staff may limit purchases into or sales from the Intermediate Extended Portfolio for a period not to exceed 120 days. Restrictions on investments or sales beyond 120 days would require authorization from the MEAG Board. Such restrictions shall be immediately disclosed to all beneficiaries investing in the Intermediate Extended Maturity Portfolio of the Municipal Competitive Trust as well as the Trustee of the Municipal Competitive Trust (US Bank or its successor).
City of Camilla
MEAG POWER PROJECTS 2025 YEAR-END SETTLEMENT ELECTION FORM For the election form to be complete, both of the signatures listed below are required.
aa, a
\ / ‘ "i _ =i ue) By: Vales. f \ l L| 1,2 eG A sh “ ox = Date: oe eee
Dewayne Burley
Mayor Pro. Tem \ NS By: A KoA A L) . j2. ;
Date: q 3 Ab Lisa Hosford , ae
CFO
To be included on your next bill, the form must be returned no later than May 15, 2026 to:
MEAG Power
c/o Stephannie Alexis
1470 Riveredge Parkway NW Atlanta, GA 30328 salexis@meagpower.org Phone: 770-563-0402