County: Meriwether County
Meriwether County Board of Commissioners work session, April 13, 2026
12 pages
These are the minutes as Meriwether County Board of Commissioners posted them, read from the file on its own website. Georgia Commons is independent and is not affiliated with Meriwether County Board of Commissioners.
This record was posted as scanned images, read here by OCR: a letter or a number may be misread. The file the body posted is linked below.
Records of this meeting
Each link opens the body's own website or meeting portal.
- MinutesAgenda April 13, 2026, Work Session 4:30 p.m. (www.meriwethercountyga.gov) · shown on this page
Summary
Written by an AI model (claude-sonnet-5-5) from the minutes below. It is not the record: the minutes are.
Commissioners and the Water Authority discussed northern county water supply, a Lake Meriwether withdrawal permit, and a Roosevelt Institute system, with no votes taken.
The county commissioners held a work session with the Water and Sewerage Authority about future water supply, especially for the northern part of the county. The Authority and its engineer described limits on water from Hogansville, Luthersville's failing wells, and possible connections to Coweta County. A commissioner urged the county to apply to the state Environmental Protection Division (EPD) for a withdrawal permit from Lake Meriwether, noting that Woodbury holds a 750,000 gallon per day permit and that no written agreement with Woodbury was found. Another commissioner asked for cost, demand and revenue figures before committing. The Authority also raised a possible takeover of the Roosevelt Institute water system. No votes were taken on these matters, and the Authority said it sought no funding. The board adopted the agenda and adjourned.
Topics taken up: northern county water supply; Lake Meriwether withdrawal permit; Woodbury water permit; Luthersville water shortage; Coweta County water connection; Hogansville water capacity; Roosevelt Institute water system; growth and lot size zoning.
Decisions the minutes record (1)
Each decision is followed by the sentence of the minutes that records it, copied word for word.
Adoption of the work session agenda
unanimous
The minutes: “A motion was made by Commissioner Worsley and seconded by Vice Chairman Snelson to Adopt the Agenda. All were in favor.”
Agenda items (4)
Found in the minutes by their headings. Where an outcome is shown, it was read by rule from the item's own words: a guide to the text, not part of the record.
The minutes
As posted on www.meriwethercountyga.gov, read November 25, 2026. Nothing below is written by Georgia Commons.
MINUTES
MERIWETHER COUNTY BOARD OF COMMISSIONERS
WORK SESSION
APRIL 13, 2026
4:30 PM
Commissioners Present: Chairman Emmett Collins, Vice Chairman Jennifer Snelson, Commissioner Gene King, and Commissioner Adam Worsley
Commissioners Absent: Commissioner Bryan Threadgill
Staff Present: County Administrator John Gorton, County Clerk Allyson Stephens, and County Attorney Nathan Lee
Staff Absent:
In attendance from the Meriwether County Water and Sewerage Authority: Chairman Kenneth Murphy, Vice Chairman Bill Rollins, Treasurer Larry Dunaway, Authority Member Tracy Thigpen, Authority Member Cody Crooks, and Secretary Doris Flournoy. Also in attendance was Engineer John Stover with Carter and Sloope.
I. CALL TO ORDER
The Work Session was Called to Order by Chairman Emmett Collins at 4:30 p.m.
Il. INVOCATION
Chairman Kenneth Murphy of the Meriwether County Water and Sewerage Authority gave the Invocation.
Ill. PLEDGE TO THE FLAG
All
IV. ADOPT AGENDA
A motion was made by Commissioner Worsley and seconded by Vice Chairman Snelson to Adopt the Agenda. All were in favor.
Vv. NEW BUSINESS
1. Discussion regarding the Water and Sewerage Authority's Direction on Infrastructure Development within Meriwether County
Mr. Kenneth Murphy, Chairman of the Water and Sewerage Authority, thanked everyone for having them. He stated that they wanted to look into the future and determine what direction Meriwether County needed to take with the Water Authority. He explained that, when looking at the municipalities within the County, the southern end had a reliable source of water.
Manchester, Gay, and Woodbury all had sources, but the northern end of the County was lacking, and water needed to be extended there. He noted that Luthersville had been purchasing water from them on an emergency basis, while they, in turn, had been purchasing water from the City of Hogansville. He stated that they presented plans they believed would help supply water to that area and improve distribution throughout the County. He added that several potential sources for obtaining this water had been discussed, and those would be detailed in the engineer’s drawings. One of those sources was Woodbury, which received its water from Lake Meriwether. He stated that they had a legal question regarding whether Meriwether County had already been awarded the water rights or whether that authority belonged to the City of Woodbury. He noted that this was something they needed to determine. Commissioner Gene King stated that he could answer the question. He explained that Meriwether County owned the property and the lake but did not own the water. He noted that, in past years, this issue had not
been fully addressed, and it was something he had been researching. He added that he had discussed it with Commissioner Snelson and had intended to bring it up during the meeting. He stated that either the Water and Sewerage Authority or the County needed to coordinate with the Environmental Protection Division (EPD) to apply for a water withdrawal permit. He explained that the City of Woodbury currently held a withdrawal permit and had previously increased it, during former Mayor Ron’s tenure, to 750,000 gallons per day, even though the city was only using approximately 150,000 gallons per day. However, their permit allowed them to withdraw up to 750,000 gallons daily. He emphasized that the Water and Sewerage Authority needed to determine the maximum volume of water that could be withdrawn from Lake Meriwether. He gave an example, stating that if Woodbury was permitted for 750,000 gallons per day but not using the full amount, and additional capacity existed, the County should apply for that remaining allocation as soon as possible. Otherwise, he warned that the City of Woodbury could apply to increase its withdrawal amount again, even without utilizing its current allocation. He explained that obtaining a withdrawal permit would not require immediate use but would establish the County’s rights and provide two key benefits. First, it would allow the Water and Sewerage Authority to understand how much water could be withdrawn for future needs.
Second, it would ensure that, in the event of major development, the County retained access to water resources from the lake. He further noted that if structural issues arose with the dam, or if the U.S. Army Corps of Engineers required repairs or upgrades, the financial responsibility would fall on the County and its taxpayers—not the City of Woodbury. He pointed out that Woodbury was not currently paying the County for the water, despite being permitted to withdraw up to 750,000 gallons per day, while also operating the water treatment plant. He concluded by recommending that the Authority begin the application process immediately, either independently or in coordination with the County and legal counsel. He specifically suggested applying to the EPD for withdrawal permits from both the Flint River and Lake Meriwether. Chairman Kenneth Murphy acknowledged the comments and stated that they had been in discussions with both Coweta County Water Authority (COWETA) and the City of Griffin, which sources water from the Flint River to a reservoir in Pike County. He noted that their engineer, John, would explain several different points from which additional water could be obtained for the northern part of the County. He stated that he only intended to provide a brief introduction of their plans and would then turn the presentation over to John, who would provide more detailed information. Commissioner King added that, even as the County explored obtaining water from other reservoirs or external sources, it was still important to apply for a withdrawal permit. He emphasized that, even if the permit was not immediately used, it should be secured and retained by the County. He noted that circumstances could change, and there could come a time when other entities might not be willing or able to supply water. He also stated that, in the future, the County might pursue development of its own water treatment plant and reservoir, and having a withdrawal permit in place would support those efforts. Water and Sewerage Authority Member Tracy Thigpen asked who supplied the fish to the Lake.
Commissioner King stated that the County does and also maintains Lake Meriwether through the Lake Meriwether Advisory Board. Member Thigpen asked what type of fish were put into the lake. Chairman Emmett Collins stated that someone needs to find out about the original agreement from when the lake was built. County Attorney Nathan Lee stated that it was the first time that was brought to him. He stated that he knows the County owns the lake but has no idea of what waters are drawn from it. Commissioner King explained that water in a large lake, regardless of the County, is generally considered a shared or regulated resource at the state level rather than being owned outright by a single entity. He stated that any municipality, such as the City of Newnan, could apply to the Environmental Protection Division (EPD) for a withdrawal permit to draw water from a major lake, and if approved, they would be authorized to do so. He
emphasized that this was why the County needed to focus on securing its own withdrawal permit. Chairman Kenneth Murphy introduced John Stover with Carter and Sloope.
John Stover, Engineer (Carter & Sloope) introduced himself and stated that his firm had been performing engineering work for the Water and Sewerage Authority. He noted that discussions on this issue had begun during previous meetings. He explained that Luthersville had experienced challenges meeting water demand due to expansion beyond its municipal limits. He stated that subdivisions had been allowed to connect to the system, but the city’s wells were not producing enough water to meet current demand. He added that his firm was assisting with short-term solutions to address those needs. He stated that Hogansville was currently supplying water to the County Water and Sewerage Authority but was also experiencing increased demand and planning for future expansion due to growth and industrial activity, including projects such as Amazon. He noted that surrounding areas, including LaGrange and the southern portion of the County, had some available water sources, including springs. He explained that the City of Griffin operates the Shoal Creek (Stone Branch) Reservoir, located near the County line, which supplies water to municipalities in Pike County, Griffin, and other systems through intergovernmental agreements. He stated that, based on information he had requested but had not yet reviewed, Meriwether County may also have a water purchase agreement associated with that reservoir. He described how some agreements, such as those involving Coweta County, operate on a “take-or-pay” basis, meaning a minimum daily purchase is required regardless of actual usage. He noted that, in some cases, entities are required to pay for several million gallons per day whether they use that volume or not, and attempts to renegotiate such agreements have not always been successful. He further stated that Griffin had recently updated its wholesale water rates to the County. He emphasized that growth is occurring throughout the region and that the key issue for the County is determining future demand. He stated that determining the desired level of growth and water needs was ultimately a policy decision for the Board of Commissioners. Mr. Stover stated that having the ability to install infrastructure is only one part of the issue, noting that while it is possible to instal] pipelines, the more critical factor is ensuring there is sufficient water to supply those lines——-whether produced locally or purchased from another system. He explained that the maps presented were conceptual and intended only to illustrate potential options for moving water from available sources throughout the northern portion of the County. He noted that one map was overlaid on a Georgia Department of Transportation basis for clarity, while another was aligned with the County’s comprehensive pian and land use mapping through approximately 2043. He commented that, in his experience, comprehensive plans vary in how closely they are followed, with some jurisdictions adhering strictly to them and others making frequent zoning changes. He stated that neither he nor the Water and Sewerage Authority could determine the County’s growth direction and emphasized that this decision ultimately rests with the Board of Commissioners.
He stated that he had specifically asked the Authority to consider the Board’s “appetite for growth,” including how the County intends to plan for future development, particularly in the northern portion, where water access is more limited. He clarified that, while that area lacks direct supply, it does have access to nearby systems that could potentially provide water. He clarified that, while the northern portion of the County lacks a direct water source, it does have access to other systems that could supply water. He stated that two potential connection points with the Coweta County Water and Sewerage Authority had been identified, and that Coweta had indicated a willingness to provide water. However, he noted that, based on his discussions, Coweta would likely operate similarly to the City of Griffin in that they would not want to serve merely as a backup source for Luthersville or the County. Instead, they would expect a commitment to actively use the water, likely to include a minimum monthly purchase
requirement. He added that while such requirements may not be as substantial as existing agreements between other jurisdictions, they would still be a factor to consider. He stated that both he and the Authority were seeking direction from the Board of Commissioners regarding how to proceed. He explained that if the Board determined that current conditions were sufficient and no action was needed, that was acceptable. However, he emphasized the importance of beginning long-term planning now for needs that ideally should have been addressed earlier. He stated that this discussion provided an opportunity for elected officials to consider the County’s future direction, particularly regarding growth and infrastructure. He added that he was not expecting immediate decisions but encouraged ongoing discussion to move the process forward. He noted that two potential connection points to the Coweta County Water and Sewerage Authority had been identified, and that Coweta had indicated a willingness to supply water. However, based on his discussions, he explained that Coweta would likely require a firm commitment to purchase water and would not be interested in serving solely as a backup supplier, similar to the approach taken by Griffin. Commissioner King stated that the County needed water to support restaurants, industry, and shopping centers so that residents would not have to travel to other counties for those services. He acknowledged that growth is necessary to attract that type of development. He also stated that, based on feedback from his district, residents were not in favor of extending water infrastructure in a way that would result in continuous subdivision development. He expressed concern about the northern portion of the County losing its rural character and becoming similar to more heavily developed areas such as Peachtree City or Coweta County. He stated that while water is necessary, he did not see a clear way to extend water for commercial and economic development without also creating the opportunity for residential subdivision growth. Commissioner King added that this is where planning comes in. Mr. Stover stated that development can be controlled through proper planning and zoning. He said that, based on his past experience working with developers before moving into the municipal side, developers typically look for the least amount of infrastructure they can install while maximizing the number of lots they can sell. He stated that if zoning does not allow that level of density, it can control development, but it has to be established up front.
He explained that if developers know there is a major water line running along a state route between two towns, and there is accessible land, they will pursue that opportunity. He added that developers are not going to be concerned with whether the intent was to support commercial growth in places like Luthersville or other areas. Instead, they will see it as an opportunity for residential development. He stated that once that occurs, residential growth will follow, and commercial development will expand as the population increases. Commissioner King stated that he had mentioned previously that the County had not pushed planning and zoning discussions, and the Board had not fully addressed it, but emphasized the importance of planning ahead and zoning accordingly. He stated that he would like to see minimum lot sizes remain at the current two acres or possibly increase to three acres. He explained that even if water infrastructure is extended, developers should still be limited in density so that lots cannot be reduced below that size. He stated that maintaining larger lot sizes would preserve greenery and trees and prevent areas from being overdeveloped with continuous rooftops. He added that he did not mind stating his position and would not support high-density development in his district. He stated that he would not vote in favor of developments consisting of “rooftop after rooftop.” He further stated that he would prefer development designs that include controlled entrances, with homes set back and green space and trees preserved in front, noting that other counties have implemented similar approaches. He explained that in those developments, structures are not immediately visible from the road, which he described as preferable. He contrasted that with developments where land is clear-cut, removing all trees, resulting in dense housing where only rooftops and siding are visible. He reiterated that, as long as he serves in his
position, he would not support that type of development. Commissioner King stated that he does want the water and questioned how to solve that. Mr. Stover stated that this was why he had raised the question of how to approach initial discussions. He explained that Luthersville had been a primary driver of the issue, noting that both the Water and Sewerage Authority and LaGrange had worked to provide an emergency connection to supply water to Luthersville in the short term. He added that even at the industrial park, when new prospects are brought in— whether within the park or in adjacent areas identified in the comprehensive plan as potential growth areas along Highway 54—the primary limitation is water and sewer availability. He stated that the County is currently limited to approximately 250,000 gallons per day from Hogansville, and that a single industrial user could quickly consume that capacity. He noted that the County had been both fortunate and unfortunate—fortunate in that demand had not yet exceeded capacity, but unfortunate because increased demand would also generate needed revenue. He further stated that Hogansville has experienced its own capacity challenges and, at times, has requested that water usage be reduced due to high demand associated with projects such as Amazon during construction, with continued demand expected afterward. Chairman Murphy stated that Hogansville can't supply 250,000 gallons today, even though the agreement is there. Commissioner King stated that the County was trying to look ahead and acknowledged that more industry was needed in the northern part of the County. He stated that the County needed more jobs and an increased tax base, and that water would be necessary to support that growth. He agreed with the previous discussion and then referenced the map being presented, noting the connection point at Woodbury. He stated that the plan appeared to assume pulling water from Woodbury and distributing it outward from that source. Mr. Stover stated that there are multiple options and emphasized that the map being presented was only a starting point. He clarified that it was not tied to a specific line size or exact connection point within the Woodbury system. He explained that the map generally reflects approximate locations, such as potential connections near Lake Meriwether or areas where water is already accessible, including near Griffin’s system along Flat Shoals Road, extending toward Concord and surrounding areas. He stated that, for simplicity, the map shows connections based on central points between communities to illustrate distances, rather than exact infrastructure layouts. He added that actual connections would likely involve master meters tied into existing systems, and that implementation would depend on whether those systems are willing to connect.
Commissioner King stated that the reason he raised the question was because he wanted the Water and Sewerage Authority Board to look into the issue further. He referenced the earlier discussion regarding how much water the City of Woodbury is permitted to withdraw, noting that Woodbury currently holds a withdrawal permit. He stated that it would be problematic if the County were to run a water line from Woodbury through the County and then have to pay Woodbury for water that is being drawn from a lake owned by the County. He emphasized that this issue needed to be addressed in advance. He stated that, while it may not become an issue immediately, it could arise in the future, whether in five, ten, or twenty years. He expressed concern that the County could be placed in a position where Woodbury increases its withdrawal permit to the maximum allowed, while the County does not secure its own permit. He added that, in that scenario, the County could end up purchasing water from Woodbury at a set rate, while also potentially contributing to infrastructure costs such as a water treatment plant. He stated that, under those circumstances, Woodbury would be charging the County per gallon under a contract, while having no responsibility for the lake itself. He stated that this was an issue the Water and Sewerage Authority needed to work on with its engineer or other appropriate parties. Authority Member Tracy Thigpen asked if there was any way they could look into any type of agreement from the past. Commissioner King stated there is not one.
Chairman Collins stated that he was sure there would be something when the lake was built.
Member Thigpen stated that they may be able to get a permit, but she doesn't know how much that reservoir will even yield, 750,000 gallons, as it is kind of shallow. Commissioner King stated that they would have to get with the EPD first and find out what the maximum would be to pull off of Lake Meriwether. Commissioner King stated that someone would need to handle the paperwork required to move forward with obtaining a withdrawal permit. Commissioner King stated that Theron was familiar with how to complete the paperwork required to obtain a withdrawal permit. He noted that Theron had previously planned to begin the process, but circumstances changed, and he later retired. Commissioner King stated that there should still be someone who could assist with preparing and submitting the necessary documentation to the state. He expressed confidence that the County would be able to obtain a permit, stating that it was not likely to be denied, but emphasized that someone needed to take the initiative to begin the process. He added that the next step would be to submit the paperwork and determine how much water could be withdrawn from Lake Meriwether. County Attorney Lee asked who the agreement was with, referring to the agreement being discussed. Commissioner King stated that the agreement would be between the State and EPD. Attorney Lee added that, in theory, the agreement should be reflected in the official minutes. Authority Member Larry Dunaway stated that the only one who would remember that would be Mr. Robert Lovett. County Attorney Lee stated that the agreement should be set, and it doesn't matter what somebody remembers about it.
Treasurer Dunaway stated that any water they buy would have to be processed through their plant. Commissioner King stated that he understood the previous point but emphasized that the County needed to ensure it was not paying top dollar for water without consideration of its position. He stated that any arrangement would need to be a give-and-take situation. He recalled that, since he had been on the Board, there had been prior discussions regarding potential required improvements to the dam, including possible concrete work or other structural upgrades. He noted that, at that time, the determination was made that the dam was sufficient, but he expressed concern that the County could later be required to spend significant funds— potentially between $800,000 and $1.5 million—on repairs or upgrades. Treasurer Dunaway stated that the discussion at that time involved the possibility of raising the water Jevel. He explained that doing so would have required raising the dam, along with a significant amount of additional work. He noted that the overflow spillway area beyond the dam would also have needed to be raised accordingly. Commissioner King stated that if those improvements were required, the cost would fall on the County rather than the City of Woodbury. He emphasized that this was his main concern, noting that the County could not invest significant funds into the lake or dam and then be required to pay the City of Woodbury for water drawn from it. He stated that there would need to be an agreement in place to ensure that the City of Woodbury would participate in the cost if such expenses were incurred in the future. County Attorney Lee stated that if no one could produce a copy of the agreement, then it could not be assumed that an agreement exists. He added that he would expect the Environmental Protection Division (EPD) to have a copy if one does exist, particularly if the County benefits from it. He stated that, if the County cannot locate the agreement, it should request it from EPD. He emphasized that an agreement cannot be established based on recollection alone and must be supported by actual documentation. Commissioner King stated that the last time Ron Garrett was in office, before leaving, he had the withdrawal permit increased to 750,000 gallons per day. He stated that the City of Woodbury has that permit on file with EPD, allowing withdrawal of up to 750,000 gallons per day. He clarified that the city already had a permit, but that Ron Garrett, while serving as mayor of Woodbury, completed the paperwork to increase the permitted amount.
Treasurer Dunaway stated that what they do not have is an agreement between the County and the City of Woodbury outlining responsibilities, including who pays for what. Commissioner Adam Worsley asked John if it had been noted for either County staff or the County attorney to
investigate and determine the answer to the issue. County Administrator John Gorton stated that he did have it in the notes. Commissioner King stated that staff were trying to locate that three years prior, when they came on board, and stated that they couldn't find anything. County Attorney Lee stated that if nobody has an agreement, then there is no agreement. Commissioner King stated that they need an agreement. County Attorney Lee stated that if neither the Environmental Protection Division (EPD) nor does the County have a copy of the agreement, then it does not exist. He added that if Woodbury or any other party cannot produce the agreement, then there is no agreement in place. Treasurer Dunaway stated that another issue is how much excess water the City of Woodbury is not using from Lake Meriwether, and that it would not have a significant impact on the needs in the northern part of the County. He stated that he was raising this as part of the current meeting for consideration. He added that when observing the lake and the water coming over the spillway, it does not appear that there isa substantial amount of excess water available. He stated that the County would need to carefully evaluate its options, noting that any effort to address the issue would require a significant financial commitment. He explained that the project could potentially be completed in phases, but would likely require funding assistance, such as grants from the U.S. Department of Agriculture. He added that, even with grant funding, which may cover approximately 50 percent, the County would still need to contribute a substantial amount, potentially between $8 million and $10 million to begin the project. Commissioner King asked whether the Authority had the ability to obtain some type of bond and inquired about the current revenue from existing sources, including the landfill. He asked how much revenue is received annually from the current bond and landfill operations. Treasurer Dunaway stated that the Authority receives approximately $250,000 per quarter, with about $174,000 of that amount going toward bond payments. He confirmed that there is already an existing bond payment and that the current bond is a revenue bond. He further explained that the revenue bond was made possible through an Intergovernmental Agreement between the Authority and the County, which outlines the portion of tipping fee revenue allocated to the Authority. A discussion was held regarding extending a line from Lone Oak to Luthersville. Chairman Murphy clarified that the current setup is an emergency connection, described as a temporary “patchwork,” to provide water from the industrial park to Luthersville. It was noted that the City of Hogansville had previously requested a reduction in water usage, as it was unable to meet full demand at certain times.
Commissioner Adam Worsley asked why Luthersville’s water tank was not maintaining capacity. It was stated that well production had decreased by approximately 50 percent. Efforts are underway to improve output, including working on an additional well. John Stover stated that Luthersville’s water infrastructure had previously received GEFA funding; however, water supply limitations were not fully addressed at that time. He stated that Luthersville would need to either improve its ability to produce water or secure additional supply sources. It was noted that Meriwether County currently purchases water for resale and does not own its own wells.
Discussion included Coweta County’s available capacity, with it being noted that Coweta is able and willing to sell water. Commissioner Worsley asked about the existing agreement between Hogansville and the Water Authority. Chairman Kenneth Murphy stated that once the Amazon project is complete, Hogansville is expected to return to providing approximately 250,000 gallons per day. Commissioner Worsley began to ask a question. Authority Member Larry Dunaway stated that, regardless, Hogansville cannot supply the long-term needs of the northern portion of the County, and that addressing the issue would require a significant financial commitment. Commissioner Worsley stated he would like to be able to finish his question and could not do that, stating he would just turn his microphone off. Chairman Murphy stated that this is one of many meetings that they need to have, and the Authority is not asking for a total commitment today. They want the Board to be aware of the possibilities of what they want to do.
Commissioner Worsley asked why a commitment was needed and whether it was based on current citizens. He asked to finish his question and stated that he had listened to everyone else finish what they were saying. He asked whether current citizens are asking to be put on city water, whether businesses are actively choosing not to come to the County because they cannot get enough water, and whether there is residential growth being requested in the northern end of the County that would justify the need. He then asked what the cost per mile would be to install pipeline to one of these locations, noting that the County would have to incur that cost and that this is what they are being asked to plan for. He also asked what level of tax revenue would need to be generated to offset that cost. He stated that the Board needs answers to all of those questions. He added that the County cannot simply plan for something without justification, especially when there is an existing plan in place to modernize County buildings and bring roads back to full condition within a five-year timeframe. He stated that the County does not want to enter into a project where there is not an urgent need while other priorities remain unfinished and asked if that made sense. Chairman Murphy stated that it makes sense. He explained that the reason they are present is to determine the figures being requested. He stated that further study is needed and that funding will be required to complete that study. He added that there is no need to move forward if the Board is not interested, and that the purpose of the meeting is to determine whether to proceed with additional study. Commissioner Worsley stated that without those answers, the Board does not know how aggressive it wants to be in the process. He stated that, without that information, he is not willing to be aggressive because he does not know the cost or how that cost would be recovered. Chairman Murphy agreed. Commissioner Worsley stated that if that is what is being requested, they can proceed in that direction. Chairman Murphy stated that they are seeking a preliminary agreement that the Board is willing to look into the matter, and that if additional funds are spent to develop more detailed figures, a final decision can be made at that point. Vice Chairman of the Water Authority, Mr. Bill Rollins, stated that they are not requesting any funding at this time. He noted that the Authority does have funds available to conduct some of the studies but does not want to spend that money unnecessarily. He stated that the purpose is to get a sense of the Commissioners’ position. He added that, in order to answer many of the questions raised, those studies will need to be completed, and that without them, the discussion is somewhat speculative. Chairman Collins stated that another concern is that the County already has a commitment with Hogansville, while Coweta would not want to serve only as a backup source, but instead as the primary supplier for Luthersville. He stated that if there is already a commitment with Hogansville and that commitment is not being honored in terms of gallons, then the County may need to consider obtaining all of its water from Coweta instead. Treasurer Dunaway stated that they would have to run a pipe. Chairman Collins stated that he understood, but that the line would
need to come through Luthersville. Treasurer Dunaway stated that it would be the first phase and would require a fair amount of money but would still be reasonable. Authority Member Thigpen stated that it wouldn't be a quick process. Chairman Collins stated it would be a lot better than running it from Lake Meriwether to that area. Commissioner Worsley asked what agreements are in place to ensure that, if the County spends $8 to $10 million on a pipeline into Coweta County to solve the issue, the City of Luthersville will not approve multiple subdivisions to connect to the system, resulting in the County facing the same problem again.
Mr. Paul Parker, Post 4, City of Luthersville, City Council, was in attendance. Commissioner King stated that someone had mentioned earlier that the City of Luthersville wanted to be in the water business and had extended water lines further and further out. He stated that whoever made those decisions, whether a previous board or administration, created the current problem if they did not understand that the system was dependent on wells. He stated that if the County begins discussing bringing a main line in from Coweta, it will require a significant financial
commitment from the City of Luthersville as well. He emphasized that County taxpayers should not bear the full cost of running a line to Luthersville to resolve issues that resulted from prior decisions. He stated that wells are not a permanent solution and can decline or run dry, unlike a larger water source such as a reservoir, which is more reliable unless impacted by external factors. He stated that subdivisions continued to expand outward based on that limited well system, contributing to the current situation. He stated that he does not want the issue to become the responsibility of the County solely, even though he is concerned about the residents of Luthersville. He stated that the city will need to participate in solving the problem, whether through securing grants or contributing financially, and that a collaborative approach between the County and municipalities will be necessary. Treasurer Dunaway asked if we should let Luthersville go ahead and run their own water line to Coweta County. Commissioner King stated that if Luthersville has the money to extend a line themselves, they should do so, and then the County could consider tying into it later. He referenced the landfill situation as an example, stating that previous boards were offered land for an industrial park and were told it would benefit the County. He stated that the County accepted the land but was then required to fund water and sewer infrastructure to serve it, while others later tied into that system. He stated that a similar situation could occur again, resulting in significant costs to the County. He stated that if Luthersville wants water from Coweta County, and the line is nearby past Luthersville and Moreland, they should begin extending that line themselves if they are able. He stated that once the infrastructure is in place, the County could then consider whether to connect to it and negotiate an agreement to extend service further into the County. He noted that this was his opinion based on past development experiences but acknowledged that he is only one member of the Board. He clarified that he did not mean to suggest that the issue is solely Luthersville’s responsibility, stating that it is ultimately a shared issue because the residents are County taxpayers and depend on water for their livelihoods. He stated that decisions made by previous boards are now creating challenges that must be addressed, and that the County must determine how to respond moving forward. Luthersville Council Member Paul Parker stated that on paper, the city was using approximately one-third of its capacity, but that in recent years, it became clear that was not the true capacity. He stated that actual usage had exceeded that level, and when problems began to occur, it highlighted the limitations of the system. Chairman Murphy stated that he agrees that Luthersville should have a cost share in the project but emphasized that Luthersville is part of Meriwether County. He stated that if the project brings in industry and commercial development, both Luthersville and Meriwether County will benefit. He stated that it should not be viewed as making Luthersville take on the project alone, but rather that all parties should work together to make it happen. He added that this is his opinion and reflects why he serves on the Water Authority. Commissioner Worsley stated that the County would need to act in coordination with the municipalities in the northern part of the County. He stated that the County cannot invest that level of funding and then have the City of Luthersville act independently in terms of growth. He stated that while Luthersville may have the greatest immediate need, the County cannot direct water there first and allow it to be heavily tapped, limiting the ability to extend service throughout the entire northern portion of the County.
County Attorney Lee stated that cities often approve annexations without considering how water will be supplied. He stated that those decisions are viewed positively at the time, but that the issue of water supply is not always fully considered. He stated that this is likely what occurred in this situation, where subdivisions were approved, and water service was extended without fully accounting for long-term capacity. He emphasized that this demonstrates the importance of proper planning. Chairman Murphy stated that there was one more item to discuss and asked Bill to speak on it. He stated that the Authority has been in discussions with the Roosevelt Institute about taking over their facility, including their water treatment plant. He stated that Bill has been
involved in those discussions and would provide additional details, noting that it could serve as another potential water source for Meriwether County. Vice Chairman Rollins explained that County Administrator Gorton had been approached by representatives from the Roosevelt Institute about the possibility of the Water Authority taking over their water system. He noted that one point raised in those discussions was the Institute’s recreational facilities, and that there could be a potential win-win arrangement if the County were able to use those facilities. Rollins said he had met with about five individuals, from local representatives up to the state level, to discuss the matter. According to him, the Institute is very interested in getting out of the water business, but the situation is complicated because several different entities use the system. He described the system as supplying water to the Institute, Roosevelt State Park, and the hospital through an interconnection backup. He added that the City of Warm Springs cannot supply water to the hospital. He went on to explain that the system underwent a major rehabilitation in 2006, including work on the mains and fire hydrants, and that the water tanks were rehabilitated again in 2021. The water comes from the Warm Springs and is about 80 degrees when treated and pumped into the system. A state facilities report, he said, found that the pump house, pumps, and treatment equipment are in poor condition and will likely require about $750,000 in work over the next ten years. Rollins also noted that the system permits 150,000 gallons per day, with a maximum of about 196,000 gallons per day. Historically, the spring has pumped around 650 gallons per minute, which works out to roughly one million gallons per day in potential capacity. Current usage is under 100,000 gallons per day. In his view, if the Authority took over that system, it could potentially provide an additional 300,000 to 400,000 gallons per day of available capacity to send elsewhere. He acknowledged that working with the state would still be necessary and that the area is already heavily developed but said it remains a possible additional water source. Vice Chairman Rollins pointed out that Warm Springs is farther south than Woodbury, so it may not directly solve northern County needs, but it could still serve as another available source. He raised the question as whether the County has any interest in the Authority taking over the system as part of its water operations and possibly negotiating use of the recreational facilities as part of a broader agreement. Recent conversations, he added, suggest the Institute remains interested in transferring the system because they want out of the water business. County Administrator Gorton noted that his conversation was similar, pointing out that the property includes camps, ball fields, and a significant amount of recreational facilities. He added that if the County were to take over management of the water system, it would likely need to be contracted out, which would result in an additional cost to the County. Treasurer Dunaway asked if they would turn that over to the County recreation department. Administrator Gorton noted that the facilities could potentially be used for summer camps and recreational purposes, as they are not currently being fully utilized. Treasurer Dunaway asked if this would include the old golf course. County Administrator Gorton stated it is no longer a golf course. Vice Chairman Rollins stated that the golf course actually has its own water supply. County Attorney Lee asked if this is the City of Warm Springs water system or the institution. Vice Chairman Rollins explained it was the institution. Treasurer Dunaway stated that they would have to go in and put meters in all the buildings. He stated that they would have to go in and build them for the water, and there are so many different entities in the institute. Vice Chairman Rollins noted that taking over the system would bring additional costs. He explained that approximately 20 meters would be needed, including both fire meters and building meters, and that each would need to be individually metered so users can be billed accordingly. He added that one benefit of taking over the system is that it could justify having dedicated personnel. He explained that the Authority currently relies on subcontractors for all operations, but having full-time staff would help address water system issues as they arise and provide ongoing monitoring. He noted that even with the current system in the northern part of the County, the Authority is approaching the point
where at least one part-time or full-time employee will be needed. He emphasized that the board only meets once a month, but a water system requires someone to be available on call. Treasurer Dunaway asked if there were some physical facilities at the institute that would be theirs. Vice Chairman Rollins stated that the system includes water tanks, infrastructure, and a full water treatment facility with its own treatment tanks. He added that managing all of it would require coordination. County Attorney Lee asked if the institute would sell it or if they wanted to take it over. Vice Chairman Rollins stated that is part of the conversation. County Administrator Gorton stated that the state wants to turn it over to either the Water Authority or the City of Warm Springs. County Attorney Lee explained it is a lot more complicated than that.
Commissioner King stated that it would be helpful to have more detailed information regarding the system, including the number of meters required, the amount of water being used, and the projected monthly revenue. He added that those figures are necessary to evaluate whether the investment would be justified. Vice Chairman Rollins explained that to obtain those numbers, the Authority would need to engage John and his firm to conduct a full assessment of the system. Commissioner King asked who was monitoring the water system. Vice Chairman Rollins stated that J&T services. Commissioner King asked if that was someone whom the Authority contracted. Treasurer Dunaway stated that whoever the Authority contracts with has to have a water license. Chairman Murphy noted that with the Roosevelt Institute property, if the Board is interested, a decision would need to be made regarding the recreational portion, as that would be the County’s benefit from the arrangement. He explained that the Water Authority would be taking over the water system, making it a two-sided arrangement, and that some type of agreement would need to be negotiated between the County, the Authority, and the Institute.
He suggested that it may be possible to negotiate terms where the Authority takes over the system while requiring the Institute to install meters at its own expense. He added that, regarding the recreational facilities such as ball fields, the County would need to determine what it wants—such as a long-term agreement and decide who would be responsible for maintenance and upkeep. He stated that both parties would need to work together to develop a plan outlining what each side expects to receive and provide in the agreement. Commissioner King stated that legal counsel should review the matter, stating that it is not a simple process. He said the Board needs to understand everything involved, including the terms and duration of any agreement. He questioned whether the arrangement would be long-term, such as a 50-year agreement, and emphasized that it is not something the County should take over only to have it reversed a few years later. County Attorney Lee stated he would like to see if there is an appetite for it.
Treasurer Dunaway stated that his question, when the discussion began, was that there needs to be some sort of commitment from the Roosevelt Institute that they are going to continue to be there. Commissioner King agreed and noted that if the County were to take over the system and the Roosevelt Institute later leaves, it raises the question of what the County would do with the system at that point. He noted that there are several issues that need to be addressed before moving forward. He stated that while the proposal looks and sounds good, and the recreational facilities could be useful, those should not be the primary factor in the decision. He emphasized that the water component is the main consideration and that the recreational aspects would only be an added benefit. He added that any agreement would need to be carefully worked out. Vice Chairman Rollins stated that if they took it over, there would have to be assurances that it would pay for itself. County Attorney Lee stated there has to be a reason they want them to take it over.
Treasurer Dunaway stated that “if they want to go out of business, they have to go to the local authority and can't just say," We don't want to do water. Commissioner King stated that it does not make sense for the Institute to say they are getting out of the water business when they still operate a facility that depends on water. He noted that there is an underlying issue that needs to be discussed and understood further. Chairman Collins stated that they are tired of fooling with
it. County Attorney Lee stated that it is similar to why counties do not want to be in that type of business, noting that there are limitations, including the inability to freely add customers.
Chairman Collins asked if the Authority could add customers. Chairman Murphy stated that if the Authority takes over, they can add customers and anything. Chairman Collins explained that they couldn't without running water lines. Chairman Murphy stated correct. He responded that the Authority could do so if it chose to. He stated that once the system is taken over and the water capacity is secured, the Authority would have the ability to determine how it is used moving forward. Chairman Collins noted that in order to add customers to the system, additional funding would be required to expand capacity and infrastructure. Treasurer Dunaway noted that the Authority would need to determine whether the existing customers would generate enough revenue to at least break even, otherwise it could result in a loss. He pointed out that the system currently supplies water to the Little White House and the State Park, and that those entities would continue to require water service. He added that those customers would likely continue purchasing water. Chairman Murphy asked if the Board had any more questions. Commissioner King stated that he thought it was a great meeting. Chairman Murphy stated that it is a starting point. Treasurer Dunaway stated that he would like to see them add the IDA to the same group to understand more about what's coming down the pipeline.
VI. EXECUTIVE SESSION
There was no need for an Executive Session.
Vil. ADJOURNMENT
The Water and Sewerage Authority Adjourned their meeting at 5:29 p.m.
A motion was made by Commissioner King and seconded by Vice Chairman Jennifer Snelson to Adjourn the meeting at 5:29 p.m. All were in favor.
Approved by:
Attest:
Date: