City: South Fulton
South Fulton Zoning Board of Appeals regular meeting, April 16, 2026
These are the minutes as South Fulton Zoning Board of Appeals posted them, read from the file on its own website. Georgia Commons is independent and is not affiliated with South Fulton Zoning Board of Appeals.
Records of this meeting
Each link opens the body's own website or meeting portal.
- MinutesMinutes (www.cityofsouthfultonga.gov) · shown on this page
Summary
Written by an AI model (claude-sonnet-5-5) from the minutes below. It is not the record: the minutes are.
Zoning Board of Appeals unanimously approved a variance allowing stormwater pond slope work within a 75-foot stream buffer near Fulton Industrial Boulevard.
The Zoning Board of Appeals met with five members present. It approved the agenda with a change that deferred the election of a Zoning Board of Appeals commissioner, and approved the minutes of the January 15 meeting. The main case was variance V26-002 for Alemax Development LLC, which asked to build a stormwater detention pond with grading and slope work inside the required 75-foot stream buffer at 0 Fulton Industrial Boulevard and 0 Commerce Drive, Rear. Staff recommended approval, and no opposition cards were submitted. The applicant's representative answered questions about drainage, slope, fencing, and long-term maintenance. The board approved the variance unanimously. Two new members and several existing members then introduced themselves, and the meeting adjourned.
Topics taken up: variance V26-002 stormwater pond; 75-foot stream buffer; Alemax Development LLC; 0 Fulton Industrial Boulevard; introduction of new board members; deferred commissioner election.
Decisions the minutes record (1)
Each decision is followed by the sentence of the minutes that records it, copied word for word.
Variance V26-002 for stormwater detention pond slope work within 75-foot stream buffer at 0 Fulton Industrial Boulevard
unanimous
The minutes: “Commissioner Malcolm made a motion was made to approve Case V26-002”
The minutes
As posted on www.cityofsouthfultonga.gov, read November 19, 2026. Nothing below is written by Georgia Commons.
CITY OF SOUTH FULTON, GEORGIA
Zoning Board of Appeals Meeting City Hall
Thursday, April 16, 2025, 6:00 PM
Zoning Board of Appeals Meeting Minutes
Meeting Called to Order at 6:07 pm by Vice Chairperson Toni Blackshear.
Roll Call
MEMBERS PRESENT: Dr. Toni Blackshear, Vice Chair (District 1) Present
Sonya Patterson (District 2) Present
DeAndre Mathis, Chair (District 3)
Brian O'Donnell (District 4)
Dedrah Pyles-Faraday (District 5) Present
Paulette DeVaughn (District 6) Present
Ersela Evans (District 7)
Mario Malcom (At-Large) Present
Vice chair Blackshear requested a motion to approve the agenda with a modification to defer the Zoning Board of Appeals Commissioner election.
A Commissioner made a motion to approve the agenda with the stated deferral.
A second was provided.
A vote was taken: All in favor (unanimous).
Result: Agenda approved as amended.
I. Consideration of meeting minutes from January 15, 2026.
Vice Chairperson Blackshear entertained a motion to approve the minutes. Commissioner Patterson moved to approve the minutes from January 15, 2025, Zoning Board of Appeals Meeting. Commissioner Pyles-Faraday seconded the motion. Motion carried.
Cases
V26-002 - An application by An application by Alemax Development LLC for property located at O Fulton Industrial Boulevard and 0 Commerce Drive, Rear, parcel numbers 14F0051 LL0632 & 14F0052 LL1076, South Fulton, GA, 30336, requesting a variance to Section 14-17007 Buffer and Setback Requirements to permit construction of a stormwater detention pond within the required 75-foot stream buffer.
Adriana Echols (Staff) presented the case, outlining the applicant’s requests for a variance:
Applicant: Alex Mech Development
Location: 0 Fulton Industrial Blvd / 0 Commerce Drive Rear
Request: Variance to buffer and setback requirements
Purpose: Construct a stormwater detention pond within a 75-ft stream buffer
Staff Recommendation: Approval
Comments included:
The detention pond itself will not be disturb the buffer
Only grading/slope work will occur within the buffer
Applicant Presentation
Alex Gillum (Applicant Representative) stated:
The pond will remain outside the 25-ft state buffer
The request is to:
Extend a slope into the buffer
Improve and stabilize the buffer area (~305 ft)
No structure will be placed directly within the buffer
The slope will be 2:1 ratio and comply with city code
The design improves water flow and drainage
Public Hearing
Vice chair Blackshear opened the public hearing
No opposition cards were submitted
Commissioner Blacksher entertained a motion to close public hearing:
Commissioner Patterson made a motion to close the public hearing and Commissioner Pyles-Faraday seconded the motion
Approved unanimously
Board Discussion (Key Questions & Responses)
Commissioner Malcolm asked whether the slope improves water flow
Applicant Response (Gillum):
Yes, grading will improve drainage and stability
Water discharge remains compliant with state standards
Commissioner Sonya Patterson (District 2)
Asked:
Whether slope goes up or down
Whether retaining structures are required
What materials will stabilize the soil
Distance from top of slope to stream
Safety measures
Applicant Response:
Slope goes upward from stream
No retaining wall needed (existing slope improved)
Vegetation (grass/trees) will stabilize soil
Distance ~50 feet
An 8-ft fence will be installed at top
Commissioner Blackshear (District 1 Representative)
Asked:
Whether the applicant would maintain the site long-term
Applicant Response:
Yes, maintained to Georgia EPD standards
Maintenance responsibility remains with property owner
Motion & Decision:
Commissioner Malcolm made a motion was made to approve Case V26-002
A second was provided by Commissioner Pyles-Faraday
Vote:
All in favor (unanimous)
No opposition
Final Decision: Application APPROVED
III. Introduction of New Board Members
Commissioner Paulette DeVaughn (District 6)
40+ year resident of South Fulton
Retired educator
Community advocate
Previously served 3 years on Planning Commission Board
Commissioner Mario Malcolm (At-Large)
Atlanta native
South Fulton resident since ~2020–2021
Former member of Code Enforcement Board
VIII. Existing Members Introductions
Commissioner Sonya Patterson (District 2)
4–5 years of service
Highlighted board’s reputation as one of the best in the city
Commissioner Dedrah Pyles-Faraday (District 5)
1 year of service (entering second year)
Dr. Toni Blackshear
~3 years of service
Emphasized:
Importance of facts over emotion
Collaboration among board members
Adjournment of Meeting
Commissioner Blackshear entertained a motion to adjourn. Commissioner Patterson made a motion to adjourn. Commissioner Pyles-Faraday seconded the motion. Motion carried unanimously.