--- title: Meriwether County Board of Commissioners work session minutes, May 11, 2026 collection: local-meetings id: minutes:2026-05-11/meriwether-county-board-of-commissioners-work-session cite_as: Meriwether County Board of Commissioners work session minutes, May 11, 2026 canonical_url: https://georgiacommons.org/meetings/2026-05-11/meriwether-county-board-of-commissioners-work-session md_url: https://georgiacommons.org/meetings/2026-05-11/meriwether-county-board-of-commissioners-work-session.md text_url: https://georgiacommons.org/meetings/2026-05-11/meriwether-county-board-of-commissioners-work-session/text source_url: https://www.meriwethercountyga.gov/AgendaCenter/ViewFile/Minutes/_05112026-643 date: 2026-05-11 jurisdiction: county:meriwether jurisdiction_name: Meriwether County county_fips: "13199" license: Public record of Meriwether County Board of Commissioners, from its own website or meeting portal publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. version: Minutes as posted (read by OCR from a scan) version_id: minutes:2026-05-11/meriwether-county-board-of-commissioners-work-session@r30e75ee685ad retrieved: 2026-11-25T07:34:49.291100+00:00 --- # Meriwether County Board of Commissioners work session minutes, May 11, 2026 - Body: Meriwether County Board of Commissioners - Date: May 11, 2026 ## Records of this meeting - Minutes: https://www.meriwethercountyga.gov/AgendaCenter/ViewFile/Minutes/_05112026-643 (in Georgia Commons as `minutes:2026-05-11/meriwether-county-board-of-commissioners-work-session`) ## Georgia Commons summary (AI-written) Written by AI from the record below. It is not the record and is never a source: cite the record's own words. Commissioners discussed surplus spending, E-911 radio needs, road funds and ambulance replacement, taking no formal action beyond adopting the agenda and adjourning. At a work session with no formal votes on the substantive items, commissioners discussed how to use the General Fund surplus and road funding. Staff reviewed repairs at several county buildings, including a proposed Fire Department move into Building A and remediation needed at Building C, which the coroner may use for a morgue. The board heard a request for radio dispatch console and infrastructure equipment of roughly $830,000 and asked staff to seek quotes for an independent review of the whole E-911 system. Members discussed using 2026 LRA road funds (about $1,018,607) for bridges and culverts and chip seal paving. The fire chief presented a draft ambulance replacement schedule for feedback. The only recorded votes were adopting the agenda and adjourning. Topics: General Fund surplus; Building C remediation; Fire Department move to Building A; coroner morgue cooler and generator; E-911 console and radio infrastructure; E-911 system audit; 2026 LRA road funds; bridges and culverts; chip seal paving; Alvaton Road paving; ambulance replacement schedule. ## Minutes MINUTES MERIWETHER COUNTY BOARD OF COMMISSIONERS WORK SESSION MAY 11, 2026 4:00 PM Commissioners Present: Chairman Emmett Collins, Vice Chairman Jennifer Snelson, Commissioner Gene King, Commissioner Bryan Threadgill, and Commissioner Adam Worsley Commissioners Absent: Staff Present: County Administrator John Gorton, County Clerk Allyson Stephens, Deputy County Administrator Jeff Fisher, Finance Director Tammy Lackey, and County Attorney Nathan Lee Staff Absent: I. CALL TO ORDER Chairman Emmett Collins called the Work Session to Order at 4:00 p.m. Il. INVOCATION The Invocation was given by Deputy County Administrator Jeff Fisher. Il. PLEDGE TO THE FLAG All. IV. ADOPT AGENDA A motion was made by Commissioner Threadgill and seconded by Vice Chairman Snelson to Adopt the Agenda. All were in favor. 1. NEW BUSINESS Discussion of General Fund Surplus a. Building Repairs and Renovations County Administrator Gorton stated that several county buildings had been reviewed, including 756 Woodbury Hwy, Building A, and Building C, which was formerly Pathways. Elections is currently located in Building B. The Board also reviewed 124 North Court Square, the Administration Building, and the E-911 Building, although the E-911 Building was not included on the discussion breakdown. Renovations are also needed at the E-911 Building. Regarding Building A, County Administrator Gorton stated that Fire Chief Stephens could speak further on that building. Concerning Building C, the building is approximately 9,200 square feet and requires remediation throughout the facility. The remediation report was received on Thursday, and remediation work must be completed before any scope of work can begin. A bid will be put out for the remediation work, and the results will be brought back before the Board. SPLOST funds may be used for the remediation. It was emphasized that remediation is definitely needed in the building. The building at North Court Square, referred to as the old Tax Assessor building, formerly housed the Tax Assessor, Tax Commissioner, and Building and Zoning offices. The building is approximately 4,720 square feet. Deputy County Administrator Fisher inspected the building and identified approximately 51 windows that need replacement, along with all the wood soffit around the building. A scope of work for those repairs can be put out for bid and brought back before the Board for cost consideration. It was noted that replacing the 51 windows alone could cost approximately $200,000, as all of the windows need to be replaced. Renovating the exterior of the building will be an expensive project. At the Administration Building, new carpet is needed because the existing carpet is coming up along the sides. One quote has been received for approximately $15,000, and an additional quote is being requested. County Administrator Gorton stated that work is also needed near Ms. Jane’s area to help with drainage issues due to the low-lying area where rainwater runs downhill. One quote has been received for leveling the area, rebuilding it, and likely installing a French drain. Two quotes have also been received for gutter work. It was suggested that, if possible, all renovations for the building be completed together as one total package to determine the full renovation cost. The E-911 Building also needs painting and new carpet. Overall, most of the building interiors need refreshing, including carpet and painting at both the Administration Building and the E- 911 Building. Chief Stephens was then asked to speak regarding Building A and the proposed layout. It was noted that Chief Stephens and Deputy Administrator Fisher toured the building the previous week and developed a proposed game plan for how Building A could be utilized if the County moves forward with the proposed relocation. Fire Chief Stephens discussed the proposed layout for Building A and referred to the handout provided to the Board, which outlined the potential layout to meet the department’s needs. He stated that the layout would be similar to the building’s current configuration, although some interior walls would need to be moved and interior spaces rearranged to better meet operational needs. Fire Chief Stephens stated that the logistics area shown on the bottom of the page would consist of approximately 2,100 square feet, which is very similar to the amount of space currently occupied at the school location. The training room would also consist of approximately 2,100 square feet and would actually be slightly larger than the current training area at the school. He reviewed the proposed office and lobby layout, explaining that the lobby would be directly adjacent to the Administrative Assistant’s office, preferably with a window for easier public access. A small kitchenette would be located in the back area along with a staff bathroom already existing in the hallway, which would mainly require renovation and cleanup work. Fire Chief Stephens noted that the two larger bathrooms would be located adjacent to the training room. He proposed adding showers to those bathrooms, as they currently do not contain showers. He stated that the women’s restroom currently has four toilets, while the men’s restroom contains two urinals and one toilet. He recommended renovating both bathrooms so that each would contain two showers and two toilets, making them identical. This would allow personnel using the training room for physical training exercises and outdoor activities to have access to shower facilities afterward. He further explained that the two offices located in the back portion of the building would be used by logistics personnel responsible for inventory and equipment management. The proposal would also include adding a roll-up door in the logistics area to allow easier loading and unloading of palletized supplies, water, and emergency equipment during declarations or emergency situations while also securing the equipment. Fire Chief Stephens then reviewed additional renovation needs for the building, including replacing flooring with either tile or stained decorative concrete, which he stated is durable and comparable in appearance to tile. Additional renovations would include replacing ceiling tiles and grids, updating lighting, and replacing the front windows due to moisture between the window barriers. Other proposed renovations included relocating certain interior walls, modifying interior and exterior doors by adding, moving, or removing doors as needed, and renovating bathroom stalls and sinks. He also noted that electrical and plumbing work would likely need to be relocated during the renovation process. Fire Chief Stephens stated that internet and phone service upgrades could likely be completed at a reasonable cost. He also discussed installing audiovisual equipment in the training room, including televisions, smart boards, and projectors, to support training exercises. He further discussed the need for metal shelving in the logistics area. While some shelving is currently in use, he stated that it had been pieced together over time and that purchasing new shelving would provide a more organized and uniform appearance. Additionally, he discussed the potential need for appliances in the kitchenette, including a stove, oven, refrigerator, and ice machine. He noted that there had previously been a refrigerator in the building, although he believed it may have been moved to the jail. He stated that the ice machine would be useful for training evolutions and emergency response operations if the department relocates to the building. Fire Chief Stephens concluded by stating that the proposal was primarily a brainstorming effort developed after walking through the building with Deputy Administrator Fisher and evaluating the available layout and operational possibilities. Commissioner Threadgill asked what the additional two offices would be used for. Fire Chief Stephens clarified that the proposed layout would accommodate the current logistics personnel, including the staff currently located in the offices occupied by Alfons and Keith. He stated that those employees already have office space, and the proposal would simply relocate them to Building A. Vice Chairman Snelson asked who would occupy the remaining offices in the proposed layout, stating that she believed the primary goal was to keep county departments and personnel located closer together. Fire Chief Stephens responded that the offices would house all department personnel together under one roof, including himself, Chief Grice, Chief Meeks, Alfons, Keith, and the Administrative Assistant. Vice Chairman Snelson stated that there would be one additional office remaining in the front area. Fire Chief Stephens responded that, for the time being, the additional office could be used for records storage, including file cabinets and related files. Chairman Collins asked if all the offices were already in place there. Fire Chief Stephens explained that the proposed offices would be similar to the current layout, but not at the same size. He stated that the proposal would involve extending the layout and essentially starting over with a different office arrangement, resulting in slightly larger offices. He further explained that the hallway would be relocated to create a common hallway accessible directly from the lobby, rather than requiring individuals to walk through offices to access the hallway. He stated that the redesign was intended to create a more efficient footprint for the building. Fire Chief Stephens added that some of the existing walls, particularly those between the four or five offices located in the front portion of the building, could likely remain in place, although the offices themselves would be lengthened slightly as part of the renovation. Chairman Collins asked if the existing training was being done at the old school. Chief Stephens stated that it was. Chairman Collins asked if the only problem was the air conditioning. Chief Stephens stated he did not know if that was the only problem, but currently the air conditioning is out. Commissioner Worsley asked if the County was paying anything currently to use the school. Chief Stephens stated that they were not, to his knowledge. County Administrator Gorton stated that the County was not paying anything for the building, to his knowledge. Commissioner Worsley asked if this would get everyone completely out of the school building. Chief Stephens stated that it would, and it would move training and logistics. Commissioner Worsley stated that he meant completely; no Fire, EMS, or anything would be left in that area, and that all would be centrally located. Chief Stephens stated yes. Commissioner Worsley asked why Chief Stephens needed ceiling tiles in the building. Chief Stephens explained that when you change walls and move, you will have open spots and stuff. Chief Stephens explained he is not saying that they all need to be replaced, but to him, they will need to go in and change some of those grids and add tiles where those little gaps and things like that are. Commissioner Worsley stated that he believed the building could simply be gutted, painted, and fitted with the necessary light fixtures. He added that doing so would likely be less expensive and easier to maintain in the future. Fire Chief Stephens stated that he was unsure about the insulation factor above the ceiling area. He explained that he believed the building consisted of a red steel structure with the HVAC equipment suspended above the cement ceiling tiles. He then asked if the discussion was referring to completely removing the ceiling tiles. Commissioner Worsley stated yes, and that everything could be painted, similar to many newer business and restaurant buildings where the ceilings are left open and painted rather than covered with ceiling tiles. He added that this style appeared to be common in newer construction. Commissioner Threadgill stated he believed it was sprayed insulation. Chief Stephens stated that he didn't know what was exactly above the tiles. Commissioner Worsley stated that the ceiling tile system dates back to the 1970s and 1980s and that, in his opinion, the building would look better without the ceiling tiles while also reducing future maintenance and upkeep requirements. He further noted that the ceiling tiles themselves did not provide insulation, although he understood the concerns about what might be above them. Commissioner Worsley asked whether anything currently located at the Greenville site would be relocated to the proposed new location. Chief Stephens stated that no operations from the new Greenville site would be moving to the new location, only from the school building and Hijl Haven. Chief Stephens explained that there were three offices on Hill Haven Road that would be moved to the proposed location. Commissioner Worsley asked what would be left on Hill Haven. Chief Stephens stated that it would be for maintenance. He explained that there are four bays over at the Hill Haven location, so he would still be able to use that area as a general shop location for vehicle care. Chairman Collins asked if that is what he was doing with it before they moved in. Chief Stephens stated that they were only occupying the end of that building. He stated that he is still using it as a maintenance facility. Chairman Collins stated that basically he is asking that they go in and re-gut the whole building and redo it just like the Elections office. Chief Stephens stated that is an option and what he is proposing here. Vice Chairman Snelson stated that let's go back and look at what Chief Stephens was saying at the last meeting, where it didn't need much. Vice Chairman Snelson stated she wanted to go back to those numbers. Chief Stephens stated that was fine with him, and he could go ahead and move in it. Vice Chairman Snelson stated that he said it was ready, and now it is moving walls and taking down the tiles. Chief Stephens asked Commissioner Worsley if that is what he requested that he do. Commissioner Worsley stated that that was what he had asked him to do for the meeting, to bring a presentation showing what it would take to fully move in, modernize the building, and provide plenty of room for all staff. He stated, “So, that’s my fault. I asked for that kind of presentation.” Commissioner Worsley further stated that if the County was going to move forward with that endeavor, then it should be done the right way so that it looks good, nice, and like an official county building instead of something put together quickly on a Saturday just to make it look good. He stated that, in his opinion, the County was better than that. County Administrator Gorton stated that if the Board wanted staff to continue looking into the project, quotes could be obtained to determine the cost of completing the work and then brought back before the Board for consideration. Commissioner Worsley stated that, to Vice Chairman Snelson’s point, he was not looking to spend half'a million dollars on the building. However, he stated that the purpose was to determine what it would cost to complete the project the right way and then determine what would actually be necessary, so the County could find a reasonable middle ground. Vice Chairman Snelson stated that the proposal included a couple of extra offices and more renovations than she had expected, including moving walls and rearranging the layout throughout the building. Commissioner Worsley asked whether the proposed renovations would improve operations from an operational standpoint, including whether they would improve training, training time, training effectiveness, staff effectiveness, communication, data gathering, or any other functional aspects of the Fire Department. Fire Chief Stephens responded that the quality of the training would remain the same because the department would still be operating under the same standards and requirements currently in place. However, he stated that the efficiency of the operational staff and training staff being in direct communication with one another would improve significantly. He explained that he currently travels between two separate offices and often has to call staff members to come over so they can sit down, discuss matters, and work through projects together. He stated that having everyone located in one building would make the department more efficient in terms of communication, meetings, accountability, and ensuring personnel are where they are supposed to be. Fire Chief Stephens further stated that the proposed move would not change the standards of the training itself or the amount of time required for training. Commissioner Worsley clarified that he understood the actual training standards would not change, but asked whether having the entire staff located together at the new location would make operations and training more efficient. He further asked whether the centralized location would allow the department to accelerate training or provide better insight and input from different areas during training, rather than having staff scattered across different locations. Fire Chief Stephens responded that having everyone together would allow for immediate feedback during training and daily operations. He explained that when situations arise, he, Chief Grice, or Chief Meeks could immediately identify improvements or suggest implementing different approaches in real time. He stated that, currently, staff may observe something and then have to wait until the following day to regroup and address it. Fire Chief Stephens added that he believed having everyone together would provide operational advantages in that regard. Commissioner Threadgill asked whether any new equipment, including refrigerated storage or similar equipment, would be needed for the storage and logistics area. Fire Chief Stephens responded that no additional refrigerated equipment would be needed because the department already has a refrigerator that could be relocated from the current office. He stated that the department does not keep supplies refrigerated, so there would be no need for specialized refrigerated storage. He further stated that a washer and dryer would be relocated to the new facility and noted that those appliances would simply require standard utility connections. Fire Chief Stephens added that those were the only specialized equipment needs he could think of at that time. Commissioner King noted that not everyone in the department is currently located in the same building and asked Fire Chief Stephens, as a department head, whether he had concerns about placing everyone in one building. Commissioner King stated that, from his experience with other departments and buildings during his time on the Board, having everyone together can sometimes lead to employees spending excessive time in each other’s offices, engaging in conversations unrelated to work, and creating drama, problems, or other issues. He asked whether Fire Chief Stephens had concerns about those types of situations occurring if everyone were housed in the same building. Fire Chief Stephens responded that he did not believe those types of issues would occur. He stated that the current staff works well together, communicates effectively, and gets along well. Fire Chief Stephens further stated that he did not anticipate any problems related to staff conflict or employees not getting along if everyone were located in the same building. Commissioner Worsley stated that he had experienced the opposite of the concern being discussed. He stated that he understood Commissioner King’s concern and believed it was valid, but shared that he had previously worked in an environment where employees were moved into what was referred to as a “bullpen” setting with cubicles instead of separate offices. He explained that, at the time, employees were against the change and complained about it because there was very little separation between workspaces. However, Commissioner Worsley stated that after approximately six to nine months, the group became a stronger team, got along better, understood each other better, and worked together more effectively. Fire Chief Stephens stated that he believed having staff located together would improve communication because employees could simply take a few steps and have a conversation in person rather than relying on delayed communication. He explained that, currently, staff members may be occupied with emails or other tasks and have to postpone conversations. He added that interruptions and other requests can further delay communication, which breaks up the flow and effectiveness of communication within the department. Commissioner Threadgill stated that communication changes when staff members are located in separate offices. He stated that, regardless of how effective communication may be, having to go from one office to another does not provide the same level of communication as being located together. Commissioner Threadgill stated that, in his personal opinion, it is better to have everyone in one area. He further stated that if individuals cannot act professionally and behave like adults, then they should not be there in the first place. Commissioner Threadgill added that when everyone is located together, one communication becomes communication across the board. Commissioner King stated he is fine with it all being together. He was just asking you since it’s Chief Stephens’ department. Commissioner King further stated that he really wanted that consideration to be made part of the record because the Board did not want to move forward with the project and then “every time we turn around there’s a problem.” Commissioner King added that Fire Chief Stephens knows the people better than the Board does because he works with them directly. Fire Chief Stephens stated that situations like those discussed might be more of an issue if there were four department heads or four individuals on equal levels working together. However, he stated that because the staff members are subordinates, those types of issues could generally be managed and addressed appropriately. Commissioner Worsley stated that, in his opinion, the County should move forward with obtaining a scope of work and cost estimates for the project, after which the Board could further discuss or modify the proposal as needed. Commissioner Threadgill agreed. Commissioner King agreed, wanting to find out the cost. Chief Stephens stated that he wasn't trying to go top scale. He was trying to bring back three options: light modifications, moving in as it is, and going all out. Vice Chairman Snelson stated she understood and feels when they get the scope of work in, they will be able to tell what is best budget-wise and best for the department. Commissioner Worsley, Vice Chairman Snelson, and Commissioner King engaged in lighthearted discussion regarding possible building upgrades and finishes for the proposed renovations. County Administrator Gorton stated that the Coroner’s Office had expressed interest in Building C. He stated that before moving forward with any plans for the building, remediation work would first need to be completed. County Administrator Gorton stated that he would begin working on a scope of work for the remediation project and get it out for bid. He estimated that it would likely take approximately 30 to 45 days to determine the cost of the remediation work. Commissioner Worsley asked if it was both the upstairs and downstairs of the building that would need remediation. County Administrator Gorton explained that both the upstairs and downstairs portions of the building would require remediation. Commissioner Threadgill verified it was 9,000 square feet. He stated that the building contains approximately 4,500 square feet on each floor, totaling roughly 9,000 square feet overall, and noted that the project would likely be costly. He added that he was interested in seeing what the final cost estimates would be. County Administrator Gorton further stated that the remediation project would need to be publicly advertised for bids. He noted that ServPro and Penco were the only remediation companies in the county that the County had previously worked with. Commissioner Worsley verified that County Administrator Gorton would go ahead and put this out for bid. County Administrator Gorton stated that the remediation work needed to move forward regardless, because otherwise, the condition of the building would continue to worsen. County Administrator Gorton also stated that an independent testing company had inspected the building and collected nine samples. He noted that the condition inside the building was noticeable upon entering. However, he stated that, fortunately, no one was currently occupying the building, and the main priority at this time was addressing the remediation work. Commissioner Worsley asked if there were plans or an idea of what he was looking to do with the building. County Administrator Gorton stated that Coroner David Boyd was in attendance. Coroner Boyd stated that he had obtained quotes for the morgue equipment that would be needed for the facility. He explained that the County currently has a three-body refrigerator located at the old hospital, but they have experienced difficulties accommodating larger individuals in the unit. Coroner Boyd stated that he had obtained a quote for a 10-foot by 10- foot body cooler capable of holding up to 10 bodies and stated that he believed the County needed to move toward that type of upgrade for the future. He further stated that he had received three different quotes from three separate companies for the equipment. Commissioner Worsley asked if County Administrator Gorton had copies of the three quotes. County Administrator Gorton stated he received the quotes earlier in the day. Commissioner Threadgill asked that he read them out to the Board. County Administrator Gorton reviewed the quotes received for the proposed 10-body cooler. He stated that one quote totaled approximately $23,000, or nearly $27,000 with shipping included. A second vendor submitted a quote of $34,345, and a third vendor submitted a quote of approximately $27,389.70. County Administrator Gorton stated that the cost for the 10-body cooler would therefore be roughly $30,000 overall. Commissioner Worsley verified that this was just for the equipment and shipping and did not include setting it up or installation. Coroner Boyd stated that he had spoken with Lee at the County, who advised that he would be able to assemble and install the body cooler because he was familiar with how to set it up. Coroner Boyd added that the body cooler was the primary equipment item that would need to be installed. Chairman Collins verified it was just panels. Coroner Boyd stated that it was just panels. Coroner Boyd stated that an additional focus would be ensuring the building had a standby generator capable of powering the body cooler in the event of a power outage. He stated that he had obtained quotes for the generator and noted that County Administrator Gorton also had copies of those quotes. Commissioner Worsley stated that, if the County moves forward with the project, a quote should also be obtained for installation of the equipment. He added that he believed Lee already had plenty of work to do at the jail and could likely work there full-time. Coroner Boyd stated he would get installation quotes as well. Commissioner Threadgill asked what the quotes were on the generator. County Administrator Gorton reviewed the generator quotes for the facility. He stated that the lowest quote was approximately $40,193 from CNA Generators, which would require the County to install the propane tank separately. He further stated that another quote from Perkins totaled approximately $77,930, while a quote from Generator Supercenter totaled approximately $83,255, which included installation of the tanks as part of the project. Chairman Collins asked how big the generator was. Commissioner Worsley suggested calling Generac. County Administrator Gorton stated that the Generac was the cheapest quote at $40,193. Coroner Boyd stated that, during discussions with John, it was suggested that if a generator was going to be installed, it would make more sense to power the entire building rather than only the morgue area. County Administrator Gorton agreed and stated that if the County proceeds with installing a generator, it should be sized to serve the entire building instead of only one specific location within the facility. Fire Chief Stephens stated that if the County proceeds with installing a generator, the Board should consider powering the entire complex, including Elections, rather than only one specific area of the building. Commissioner King stated that, if the County moves forward with powering the entire complex, the Board would need to consider installing a large diesel generator capable of serving the full facility. Vice Chairman Snelson stated that the generators being discussed were propane generators and noted that propane systems would likely hold up well also. County Administrator Gorton stated that both Perkins and the other vendor included propane services in their quotes. He further stated that the CNA quote could be reduced to approximately $40,000 if the County provided and installed the propane tank separately. He noted that the lower quote involved a Generac generator. Vice Chairman Snelson stated that she had not been inside the building and asked whether, if the County moved forward with the project, the morgue would need to occupy both the upper and lower floors or whether only part of the building would be needed. She further asked whether portions of the building could potentially be used for dual purposes, such as a warming shelter during severe weather events, or whether the entire building would need to be dedicated solely to the morgue operations. Coroner Boyd stated that he and John had discussed possibly using the top portion of the building as a warming/cooling center and the lower portion for the morgue. He further stated that, if looking at the front of the building, the garage area on the left side with the roll-up door is where the body cooler would need to be located because it has a floor drain, whereas there are no floor drains in the basement. County Administrator Gorton stated that he had the same idea, using the building as a warming and cooling center, and possibly locating the coroner’s area on the upper level. Coroner Boyd stated that a pump drain could be put in. County Administrator Gorton stated that the building has a great deal of potential. However, he emphasized that the building must first undergo remediation before the County can move forward with developing a scope of work for the facility. Vice Chairman Snelson stated that she feels it could be used as a multipurpose center, which would be good for the community as well. County Administrator Gorton stated that the idea for using the building as a warming and cooling shelter originated from the County’s experience operating shelters in Manchester and to be able to have one at the center of Greenville. However, he noted that the estimated cost for only the morgue portion of the project, including the generator, would already be approximately $70,000 to $75,000. He further stated that those figures did not include the cost of removing the old Pathways detention setup located on the upper floor of the building. Chairman Collins asked if they were talking about putting the morgue on the top floor. County Administrator Gorton stated that this is what he would recommend, and the bottom is an open, wide space. Chairman Collins asked if it would require additional support to hold the morgue up. Coroner Boyd clarified that the area where the body cooler and garage would be located is situated on a separate concrete slab and that there is currently nothing located on that slab. County Administrator Gorton stated he doesn't believe it is a load-bearing wall. Chairman Collins stated that if it is on a concrete slab, it is probably before the basement starts. Commissioner King asked whether the generator quotes included the electrical rewiring and automatic transfer switch needed for the system installation. Coroner Boyd and County Administrator Gorton both confirmed it included everything. Chairman Collins asked if he got a quote from the gentleman in Gay, Perkins? County Administrator Gorton stated the quote from Perkins was $77,930. Coroner Boyd stated he got a quote from the one in Senoia. Commissioner King asked if Perkins was a Generac. Coroner Boyd stated that they were, and all three quotes are Generacs. County Administrator Gorton stated that the generator project would also need to be formally put out for bid. He explained that the County would need to ensure all vendors were bidding on the exact same style and specifications for the generator because, at that point, he had only recently received the quotes and could not yet determine whether the proposals were directly comparable. He stated that the County needed to ensure the bids were “apples to apples” rather than “apples to oranges.” County Administrator Gorton further stated that, once the specifications are standardized, the County may be able to obtain pricing from all three vendors closer to the $40,000 range. However, he noted that the estimated cost for the equipment itself was currently running roughly around $75,000. Commissioner Worsley stated that the County had essentially reached the point where little additional work could be done until the remediation process was completed. He confirmed that County Administrator Gorton would move forward with the remediation process and also obtain a quote for installation, stating that this was essentially where the project currently stood. County Administrator Gorton stated that he received the third-party remediation plan on Thursday and reviewed it on Friday. He stated that the report confirmed that remediation work is needed for the building. County Administrator Gorton further stated that, based on previous dealings with ServPro, his estimate for remediation of a building that size would likely be approximately $30,000 to $40,000. He noted that Penco had also worked with the County previously and had generally been fair and reasonable in pricing, estimating that their costs could be somewhat lower. He added that the remediation process would likely take several weeks and explained that the source of the leak causing the moisture intrusion would first need to be identified and sealed. He further stated that additional repairs could also be necessary depending on the extent of the damage discovered during the remediation process. Commissioner Worsley asked Coroner Boyd if he had any other items to discuss. Coroner Boyd stated that was all and thanked the Board for their time. County Administrator Gorton stated that when he mentioned the building repairs for this building, he said SPLOST but meant General Fund because they were discussing General Fund expenditures. He further stated that, if the County is going to complete the project, it would be better to do everything together as one bundled effort to fully complete. Commissioner Worsley asked if they were ready to discuss the Administration Building. County Administrator Gorton stated that he already had quotes for the outside low-lying area, the carpet, and the gutters for the Administration Building. He stated that the exterior refresh work had already been completed and that he was waiting to receive one additional quote before bringing the matter back before the Board. Commissioner Threadgill stated that new gutters had been installed on the building several years ago. County Administrator Gorton explained that the issue was not necessarily replacing the gutters but instead raising them approximately one to two inches because of the way they are currently installed. He stated that, as currently positioned, water shoots over the gutters during rainfall and can be observed doing so during storms, County Administrator Gorton further stated that raising the roof line and gutters slightly may help alleviate some of the drainage issues near Ms. Jane’s area. He added that, after speaking with a contractor, it was evident the area remains low-lying because standing water and puddling can be seen after rainfall. He stated that the area needs to be built back up and a French drain installed to address the drainage problem. Commissioner Worsley stated that he had noticed the grass behind the building had recently died, possibly due to pressure washing or chemicals being sprayed in the area. He specified that the affected area was located near the back hall, between the parking lot and the building along the sidewalk. Vice Chairman Snelson stated that it appeared the grass had been sprayed with weed killer instead of being maintained with a weed eater or edger. She stated that the spraying had occurred along both the front and back of the building and noted that, if looking out the front door, approximately a foot of grass surrounding the concrete areas had been killed. County Administrator Gorton stated that he would check into the matter because he was not aware of anyone spraying chemicals around the building. Vice Chairman Snelson stated that it appeared some type of chemical had been sprayed to kill weeds around the concrete areas on both the front and back of the building. She added that she was unsure whether the grass damage resulted from pressure washing chemicals or weed killer but noted that the affected areas extended around the sidewalks and flagpole. County Administrator Gorton reiterated that he would look into the issue, stating that he was not aware of anyone spraying chemicals and had not requested anything to be sprayed. Commissioner Worsley stated that it appeared the grass had not been maintained properly and asked who was responsible for maintaining the grassy area outside the building, specifically the taller grass visible outside the door. County Administrator Gorton stated that the inmates are scheduled to come every other week to cut the grass. He further stated that Warden Jenkins usually parks his car in the back, and when he notices the grass is tall, he has the inmate crew come out to cut the grass. Commissioner Worsley asked whether it could be placed on a different schedule or something similar so that it does not appear that way when citizens are coming in for meetings. County Administrator Gorton stated that he will reach out but doesn't believe the inmates come on Mondays. Commissioner Worsley stated that Friday would have worked for that. Commissioner Worsley expressed concern regarding the appearance and maintenance of the grass around the Administration Building, noting that citizens regularly visit the facility to conduct business. County Administrator Gorton acknowledged the concern and stated that the area is normally maintained on a regular schedule, typically prior to Board meetings. He further stated that he would address the issue to ensure the property appearance is improved. Commissioner Worsley clarified that he was not attempting to be overly critical but believed the grounds should present a more professional appearance while county business is being conducted. b. E-911 Equipment County Administrator Gorton stated that next, E-911 Director Brin Jones would talk about the E-91] Equipment. E-911 Director Jones stated that the first page of the handout likely caused some initial concern due to the complexity and cost of the radio system improvements being discussed. He explained that radio systems can become very complex and stated that the County currently has high-quality radios that most users are very satisfied with. However, he noted that the County still has to support those radios with the proper infrastructure. Director Jones stated that the infrastructure build-out at the Texaco site is progressing well, but explained that one major component at E-911 is the console radio system used by the 911 operators. He described the console system as a complex graphical radio interface that allows dispatchers to answer telephones and communicate on radios simultaneously through their headsets. He further explained that the system automatically mutes radio traffic from callers when dispatchers transmit over the radio so callers cannot hear the radio communications. He noted that the system also includes physical radios in the background that connect and convert radio communications into the computer system. Director Jones further explained that the County currently pays for access to what is known as the “core system,” which connects through Tallahassee, at a cost of approximately $5 per radio each month. He stated that the County’s long-term goal is to purchase and install its own core system locally at the E-911 Center so that the system would operate from a server housed in the communications center itself. He explained that one of the current issues involves the amount of time required for signals to travel back and forth through the existing system. He added that if communication lines are damaged or cut, the County loses signal connectivity. Director Jones also discussed the advantages of the current radios, stating that they are capable of operating on multiple frequencies and effectively function as several radios in one unit. He explained that the radios support VHF frequencies, which are the older radio systems currently used by the County, as well as 700 and 800 MHz systems used by Coweta County and other neighboring counties. Director Jones stated that he wanted the Board to understand how all of the system components work together and why an investment in the infrastructure would be beneficial. He explained that these upgrades would allow the County to fully utilize the capabilities and features available through the new radio equipment. Commissioner Worsley stated that he did not intend to be rude, but expressed concern that the Board seems to discuss radios on a regular basis every year. He stated that the Board had approved a significant amount of money only a few months earlier for new radios and related equipment. He further noted that Director Jones had just explained that the infrastructure project with Kudzu and the radio towers was still being completed to make the new radios fully functional. Commissioner Worsley stated that the infrastructure work was being completed on the towers and questioned where the spending on radio systems would end. He stated that he was having a difficult time understanding the need for another approximately $830,000 in radio-related equipment when the County had not yet completed the installation and implementation of the projects approved less than six months earlier. E-911 Director Jones responded that the proposal being discussed was a different component from the radio purchases previously approved by the Board. He stated that this particular system had not been updated in approximately 11 years and was originally purchased in 2015 using SPLOST funds. He noted that Commissioner Threadgill had likely just joined the Board at that time. Director Jones stated that the current system is now obsolete. He explained that, while the system can still function, the County needs to look toward the future and ensure that all of the available technology works together the way it is intended to function. He acknowledged Commissioner Worsley’s concerns and stated that it may seem like the County is constantly discussing radios but clarified that the issue is not simply about radios themselves, but rather the larger system that allows E-911 to properly control and manage communications. Director Jones provided an example by explaining that under the County’s previous system, dispatchers were able to track deputies’ locations, place all users onto the same communication channel, and perform several other system-wide functions. He stated that those capabilities were lost when the County transitioned to the current system. Commissioner King questioned how those capabilities had been lost, stating that one of the primary reasons the County upgraded the radio system was so departments could communicate more effectively, know personnel locations, and improve overall coordination. He asked Director Jones how those features could have been lost after the upgrades were implemented. Director Jones stated that everyone had been discussing the radios in the field. He stated that he would be the first to say they are basically disposable radios and described them as inexpensive radios that can open up when they get wet. However, he stated that, for the most part, they did their job. He further stated that there were factors involved that could place responders, including both Fire and the Sheriff's Office personnel, in danger. Vice Chairman Snelson asked if he was referring to the radios that were just purchased. E-911 Director Jones stated that no, it was the old radios. Vice Chairman Snelson asked whether the Board had recently agreed with the company that previously came before the Board to provide a demonstration or presentation. She identified the company as SmartCOP and stated that the system was supposed to allow the County to track and identify the exact location of personnel. County Administrator Gorton explained that, with the CAD system, personnel would currently need to carry an iPhone in order for the system to track their exact location. He stated that an Android version was still being developed. He further stated that, as long as deputies or fire personnel had an iPhone on them, their locations could be tracked through the system. County Administrator Gorton also noted that the Harris radio system now has an additional component available for purchase that would allow the radios themselves to integrate with and be tracked through the CAD system. E- 911 Director Jones stated we would get that back when it is up and running. Vice Chairman Snelson asked how that process was coming along. County Administrator Gorton stated that the County had just made the first payment for the SmartCOP software and that the vendor confirmed receipt earlier that day. He stated that the initiation calls had begun within the last two weeks and that implementation of the system should begin moving forward very shortly. E-911 Director Jones stated that he was just as shocked by the pricing as the Board members were because that was also because today was the first time he had seen the quote. Vice Chairman Snelson stated that her concern came from the earlier comment that the County had lost the ability to track deputies and fire personnel locations. She stated that this raised concerns regarding employee safety and wanted to verify that the County was already working toward restoring those capabilities and getting the system back on track. E-911 Director Jones apologized if his earlier explanation caused confusion. He clarified that he wanted the Board to focus on the fact that the system does much more than simply track radios and personnel locations. Vice Chairman Snelson stated that the safety of personnel was the important issue and that was why she wanted to stop and clarify the discussion. She reiterated that employee safety was important and wanted to ensure those concerns were being addressed. E-91 | Director Jones stated that personnel now have radios in the field that do not fail during rain events and perform very well in harsh weather conditions. He stated that the radios are top-of-the-line equipment and that personnel should be proud of the equipment they now have in the field. However, he emphasized that the County still needs to ensure the supporting infrastructure is in place, which is the focus of the current work. Director Jones stressed that none of the ongoing projects had stopped and that everything previously approved by the Board was still actively in progress. He explained that the tower project located on the hill was progressing well and would link the Forest Road Tower, located around the 500 block of Forest Road, with the tower near the mountain in Warm Springs next to the hotel. He further explained that the County had received what is known as a propagation report, which helps determine how radio signals will perform throughout the coverage area. Director Jones stated that radio communications infrastructure is something that never truly ends because it requires continuous maintenance and upgrades over time. He acknowledged that the systems involve a significant amount of money and stated that the County must decide how much to maintain and how much to expand the system. Director Jones explained that one of the largest current expenses involves the dispatch consoles themselves, which cost approximately $343,000. He described the dispatch consoles as the primary interface that allows dispatchers to communicate with personnel in the field. He added that the County’s current console system is outdated and in need of replacement. Commissioner Worsley asked whether Director Jones meant the system was simply old when referring to it as “out of date.” He stated that he understood technology changes over time and compared it to owning an older iPhone model that is technically out of date compared to newer technology currently available but asked if there was a way to support it, even with a secondary vendor. E-911 Director Jones explained that one indication the system is outdated is that, if the County wants to maintain a service contract on the equipment, Motorola specifically notes that replacement parts may only be available if they can locate them through secondary sources such as eBay or similar outlets. Commissioner Threadgill asked E-911 Director Jones how many consoles he was talking about. E-911 Director Jones stated six. E-911 Director Jones stated that the County had already reached a point where all of the dispatch consoles were being fully utilized. He referenced a previous question from Commissioner Worsley regarding why more than four people could not be trained at one time and explained that the limitation was due to having only four dispatch consoles available, which did not provide enough room for trainees to sit and train simultaneously. Director Jones stated that expanding to six consoles would make it possible to train additional personnel at the same time. He further explained that having six consoles would also improve the County’s ability to respond during disasters and emergency situations because it would reduce the need to place two dispatchers at a single console. Commissioner Worsley stated that he had an additional question that was somewhat related but different from the current topic. He asked whether Building C, specifically one of its floors, might be better suited to serve as the E-91 1 Center, while using the current E-911 facility as a warming and cooling shelter. He noted that Building C appeared to offer more space than the current E-911 location. E-911 Director Jones stated that, in his opinion, relocating the E-911 Center to Building C would require a major overhaul. He explained that the current E-911 Center houses the County’s main server room, which serves as the central hub for operations. He stated that the 911 Center needs to be directly connected to that hub in order to function properly. Director Jones stated that, based on those requirements, he did not believe relocating the E-911 Center would be advisable. He added that similar discussions about relocating operations had taken place in the past, but the complexity of the infrastructure made such a move difficult. Fire Chief Stephens stated that the current E-91] facility is a fortified building and noted that it is designed to withstand severe impacts. He stated that the structure is built to a high standard and could likely sustain a direct hit from a significant event, such as a tornado. Commissioner Threadgill asked if the E-911 center was a bomb shelter. E-911 Director Jones further explained that the current E-911 facility is constructed with approximately 12-inch poured concrete exterior walls and 8-inch interior walls reinforced with rebar placed every six inches. He noted that the building was originally constructed to house inmates, emphasizing its durability and reinforced structure. Vice Chairman Snelson stated that structurally it would be better to keep the 911 center there in case of an emergency. E-911 Director Jones stated absolutely, and that the E-911 Center is the safest location for personnel in the event of an emergency. He advised that if individuals are nearby and have time to safely get there, they should go to the E-911 Center. Commissioner King stated that he wished the Board had been made aware earlier of the additional components and future needs associated with the radio system upgrades. He noted that while the Board had extensive discussions the previous year regarding radios and approved upgrades, the more complex electronic and infrastructure aspects being discussed now were not clearly communicated at that time. He stated that, as a result, it appears as though they are repeatedly coming back for additional funding without prior notice. Commissioner King emphasized the importance of providing the Board with a clearer long-term outlook, including future phases and potential costs, so they can anticipate upcoming needs rather than being presented with another large expense unexpectedly. Commissioner Worsley stated that this was the reason he had asked his earlier question, noting that it feels like every few months the County is being asked to approve another large expenditure, often in the range of a quarter of a million dollars. He stated that there is not an appetite for that level of recurring spending without clearer long-term planning. E-911 Director Jones stated he expected his response. Commissioner Threadgill stated that, based on his experience serving on the Board, the County has never conducted a full audit of the E-911 system. He stated that the cost associated with the system comes up every year and that he has consistently had concerns about the expense. Commissioner Threadgill asked whether there is a company that could evaluate the County’s entire E-911 infrastructure and provide a comprehensive assessment identifying what components work well together, what does not, and what is actually needed. He stated that, in his opinion, the system appears to have been pieced together over time and that having a specialized firm present a clear, detailed evaluation would help the Board better understand the system and its needs. County Administrator Gorton stated that the County could pursue that option and noted that he had already asked Brin to provide firm quotes to better understand the cost. He explained that the County would need to develop a scope of work and put it out so that a qualified company could evaluate the system and provide recommendations on what would work best. Commissioner Threadgill stated that he didn't just want what would work on this, but the whole thing and what will work together for the County. County Administrator Gorton stated that the information provided was based on data received from Dean regarding mobile radio coverage. He explained that the map reflected the three towers previously mentioned, Forest Road, Greenville, and Warm Springs, and noted that all areas shown in white indicated locations where mobile coverage is available. E-91] Director Jones explained that the information being presented showed radio coverage in situations where LTE service is not available. He stated that when personnel have LTE or cellular signal, the radios can communicate over that network, but when there is no cell signal, the radios switch over to traditional RF (radio frequency) communication. He explained that the map being reviewed shows coverage areas for the RF system, with shaded areas indicating where users would have signal coverage. He noted that there are differences between indoor and outdoor coverage, with outdoor coverage generally being more reliable. Director Jones further stated that additional tower projects currently underway would improve overall coverage and reduce areas with weak or no signal. He compared the situation to cellular service, noting that just as cell phone signals can drop in certain areas, the same challenges can occur with LTE-based radio systems, making the RF backup system critical for maintaining communication. County Clerk Stephens stated that the areas located in the four corners of the county are still being worked on in terms of coverage. She noted that those areas would likely continue to experience some spotty coverage. E-911 Director Jones stated that one of the areas still needing improvement is around Mt. Carmel Road, specifically in the 5,000 block, where there is an existing tower that will likely be the next location used to complete the coverage loop. He explained that, for now, the system will rely on three primary towers—Forest Road, Greenville, and Warm Springs—allowing users to operate without needing to switch channels, as they will be able to key up directly on the system. Director Jones acknowledged that the discussion had moved somewhat off topic but stated that he was glad the Board was able to receive an update on the system. He added that, in some cases, the Board may not have previously had all of the information and emphasized that the E-911 system and its supporting equipment are very complex. He noted that the system involves multiple components working together, including the radio infrastructure and the underlying telephone system that must also be maintained. Commissioner King asked whether the County would also be utilizing the new tower located across from the airport. He questioned whether that tower was part of the overall plan and whether it would help improve coverage in that lower area of the county. County Clerk Stephens stated that the County would have rights to put equipment up on the tower. E-91 1 Director Jones stated that anytime the County licenses a tower, it now has the ability to go up on it. Commissioner King asked whether the County was working toward utilizing that tower as well, noting that personnel have reported losing communication coverage in the lower part of the county. County Administrator Gorton stated that as of right now we are not because it is not being constructed yet. Commissioner King asked if it would be once that construction started. Director Jones stated it would be on the radar for that. Commissioner Worsley asked if the County was using those rights on every existing tower in the County. County Administrator Gorton stated that we do have rights. Commissioner Worsley stated he understands we have rights, but are we exercising those rights on every tower in the County? County Administrator Gorton stated that it is not on the initial buildout and that the initial buildout is Forest Road, PSC, and connecting Warm Springs. Commissioner Threadgill stated that, up until Theron Gay came in, it was not part of what the County did to request or require access to any tower. County Attorney Nathan Lee stated that you don’t have an automatic right to, so when those come in, you should automatically make condition number one that the County get access to the tower. Commissioner Threadgill reiterated that until Theron Gay came in, that was not in place and there are many towers that the County does not have access to. Chief Stephens asked how much it cost to get the PSC tower, with the building that had to be built and the repeater. County Administrator Gorton stated that FEMA funding was used, with approximately $135,000 covered by FEMA, and that it costs an additional $75,000 to $80,000 to install equipment on those existing towers. Chief Stephens stated that he feels the problem is that there is not enough funding to put the equipment on the other towers. Commissioner Worsley stated that, while it was said the County does not have the money, approximately $210,000 has already been spent on tower infrastructure, while there is now a request for over $800,000 to upgrade equipment that cannot yet be fully utilized on those towers. He clarified that he was not attempting to be critical but emphasized that the County will have to spend money regardiess of the approach taken. Commissioner Worsley suggested that the County conduct a full audit of the system, as previously discussed, as well as an audit of the towers the County currently has access to. He asked what it would cost to equip those towers and whether doing so would improve current coverage. He stated that this approach could improve accessibility with existing equipment and place the County in a better position for future upgrades when moving to the next level of equipment. Commissioner Threadgill stated that there may be additional towers within the county that the County does not currently have access to and suggested that requesting access to those towers could help improve coverage as well. Commissioner King stated that the owner of one of the towers would likely be willing to grant the County access. County Clerk Stephens questioned if there was a current agreement on the tower in Mountville with Kudzu or Diverse. County Administrator Gorton stated that we did not have an agreement yet. E-911 Director Jones stated that we are already on the tower in Mountville. Commissioner Worsley stated that he thought that was approved prior, but not the internet service. County Administrator Gorton stated that Dean, formerly with Dean’s Two-Way and now with Williams, provided a proposed outline indicating that the County should focus on building out infrastructure on certain primary towers first and then expand to additional towers. He noted that the areas currently being addressed are locations where signal strength is weak. E- 911 Director Jones explained that the repeaters currently in place are the radios located at the towers that receive and retransmit signals when a user keys up their radio. He stated that many of the existing repeaters are older, but the County has begun replacing them with newer, modern units. He explained that the newer repeaters allow users to remain on the same frequency without having to change channels as they move throughout the county. He contrasted this with the current system, where users must switch channels based on geographic areas such as north, south, east, west, and central as signal strength weakens. Director Jones stated that this is why the upgrades are necessary, noting that the County cannot simply install new repeaters freely because they are very costly. He asked the Board if they recalled the cost associated with installing one of these tower sites. Commissioner Worsley stated that they just discussed that just had that conversation. He stated it was around $200,000 dollars. E-911 Director Jones stated that each site would require that equipment in order to function properly. He stated that while that approach works, it is costly, and that is why the County is looking at doing it in phases. He stated that he was trying to help the Board understand that they are not attempting to present everything at once but rather approach it in phases. He explained that while there is an ideal end goal for the system, there are other routes that can be taken to get there, and that the project can be completed in different phases over time. Commissioner Worsley asked whether if the County followed that plan, it would eliminate the need for the approximately $200,000 per tower expenses for the remaining sites. E-911 Director Jones responded that it would not, explaining that the components being discussed at that moment were separate and related to the internal system within the building that controls everything from a central point. He emphasized that there are many different aspects to the overall project and that the system is made up of multiple components that all work together. Director Jones stated that he was trying to help the Board understand the complexity of the system and that he would be willing to sit down and go through each part in detail to ensure they could make an informed decision. He emphasized the importance of understanding how the system operates as a whole, noting that radio communications have evolved significantly over time from simpler systems to more complex, integrated infrastructure. He added that while there may be other options available, the current approach being discussed is what ultimately ties the entire system together in the long run. Chairman Collins asked if the purchase of the Harris radios were just for the handheld radios. E- 911 Director Jones stated that was all it was for. E-911 Director Jones stated that the radios currently in use are excellent and described them as an effective tool for public safety personnel in the field. He stated that the Board has provided staff with high-quality equipment and that it is working. However, he noted that the system is still not operating at its full potential due to limitations in the supporting infrastructure. Chairman Collins stated that basically what E-911 Director Jones is describing is a base station. E-91] Director Jones stated that is correct. Chairman Collins asked if there is any type of grant funding for the base station. County Administrator Gorton stated that he had reached out to Ms. Tara, who is currently looking into potential funding options, including available grants. Chairman Collins stated that he agreed with Commissioner Threadgill and suggested that the County get in touch with a company that could review the system, determine what is actually needed, and put together a complete plan for the entire program. E-911 Director Jones stated that he doesn't disagree, but it will be costly, upwards of $60,000 dollars. County Administrator Gorton stated that he would get together some quotes. Commissioner Threadgill stated that, throughout his time serving on the Board, the County has never conducted a full evaluation of the system. He stated that instead, the approach has been to replace individual components over time—such as radios, CAD, or other equipment, which has resulted in systems not fully matching or working together. He stated that the County needs to move toward a more uniform and cohesive system. County Clerk Stephens asked whether there would be any funding available through NextGen, noting that she believed there had been discussion about opening an account or funding source related to that program. Vice Chairman Snelson stated they are working on that statewide and moving closer. E-911 Director Jones stated that it was approved, and now they just have to find a way to fund it. Vice Chairman Snelson asked Fire Chief Stephens whether the fire personnel had received their radios yet. Chief Stephens stated that he has a handful out doing some testing. He explained that he had to send all of his radios back to Tallahassee for some type of update. County Administrator Gorton stated that the day after Vice Chairman Snelson asked him about the radios, they had to send them back to Tallahassee to have a firmware installed on them. Commissioner Worsley asked whether the County is still paying the full cost for the radios even though they are not yet functioning as intended. He stated that, if so, the County may need to contact the vendor and negotiate regarding that issue. County Administrator Gorton explained that half of the cost had to be paid up front and the other half after they are out. Commissioner Worsley stated that the radios are not fully functioning as intended and that, although they are operational, they are not performing to the expected level. He stated that the County should not be paying full cost if the system is not fully effective and added that the vendor should not be profiting from equipment that is not meeting expectations. Fire Chief Stephens stated that the radios are currently being distributed and tracked as to where they are going. He explained that some radios have already been issued, and personnel are being brought in to receive instruction on how to use the radios, including their functions and features. He stated that Mark Spradlin is conducting the training and is in the process of teaching staff how to properly use and operate the radios as they are being issued. Vice Chairman Snelson stated, we have generally six stations manned, correct, and asked if instead of issuing radios to individuals, they could be issued to each station so that every station would have one or two radios available and could begin using them when crews return. Fire Chief Stephens stated that the radios are being assigned by station. Vice Chairman Snelson stated that she previously understood the radios were being issued to individuals, which was why there was a delay while waiting on additional units. Fire Chief Stephens clarified that volunteer personnel do not operate out of a single station and therefore share radios, while the paid stations are assigned radios that remain at those locations. Vice Chairman Snelson then asked whether there was a timeline for when all radios would be fully updated and returned. Fire Chief Stephens responded that the radios are already back and that the department is currently in the process of issuing the remaining units. County Administrator Gorton stated that Mark Spradlin is currently going through training with the fire department on how to use the radios. He further stated that all radios are already in-house, fully programmed, and ready to be deployed. Vice Chairman Snelson asked if the Sheriff's Department had any trouble with their radios and updates. County Administrator Gorton stated not that he was aware of. Fire Chief Stephens stated that when he asked the Sheriffs Office if they had to send their radios back, they said no. He stated that he did not know if there was a difference in style or branding, as they are the same radio. Vice Chairman Snelson stated that she thought the only difference was that one was waterproof and one was not. Fire Chief Stephens stated that one was intrinsically safe. Fire Chief Stephens further stated that he did not know what the issue was, but he had to send all of his units back because they had some bugs. E-911 Director Jones stated that some of the issues were related to bugs, as well as user error and the need for additional education and training. Fire Chief Stephens stated that he wanted to ensure those issues did not occur within his department and emphasized that he wanted everyone to know exactly how to use the radios. Vice Chairman Snelson stated that the fire department had experienced issues and that she was curious what the Sheriff's Office was experiencing based on what had been discussed regarding the CAD console. Fire Chief Stephens stated that the radios include an emergency button, but noted that in the current system being referenced, activating the emergency button does nothing. He explained that with the integrated system, activating the emergency button would show the location and identify which radio entered emergency mode. He further stated that, in certain situations, activating the button can also turn on the microphone so that others can listen to what is happening, recording the situation if someone is in trouble. Vice Chairman Snelson stated that the radios have features that the County cannot currently access because they do not yet have the newer CAD system in place. County Administrator Gorton stated the radios can do a lot of great things, but they have to have the infrastructure in place. E-911 Director Jones stated that the radios are very good equipment but emphasized that the County still needs to build out the backend infrastructure to fully utilize their capabilities. He noted that the County is not alone in this situation, explaining that it is common for agencies to purchase radios first and then gradually develop the supporting infrastructure over time. Chairman Collins asked if they needed to buy all six consoles at one time and asked if that was what E-911 Director Jones stated was mainly needed. E-911 Director Jones stated that the phased approach is appropriate, noting that costs could increase if the County continues to address the system in a piecemeal manner. He explained that not all components need to be implemented immediately but emphasized that certain critical elements are necessary and should be prioritized. Director Jones reiterated that the project should be approached in phases and stated that he had been vocal from the beginning about ensuring the Board understood that strategy. He added that it is ultimately up to the Board to decide whether to approve the plan, modify it, or consider alternative approaches moving forward. Commissioner Worsley stated that the Board understands its role and that they have already taken action by requesting that a qualified party evaluate the system and provide a clear recommendation on the direction the County should take moving forward. County Administrator Gorton stated he would work on that and get back with the Board. County Administrator Gorton thanked Director Jones and moved to the next topic. c. Road Paving County Administrator Gorton stated that, out of the general fund surplus, the last item under consideration is road paving. He explained that the County could either complete additional paving work in-house or consider obtaining pricing to outsource and complete additional roads. He asked how many roads remained from the original list of 20 and noted that the County is almost finished completing the first 20 roads in-house. He stated that this discussion ties into the next topic regarding LRA funds. County Administrator Gorton further stated that, from the 2024 funding, approximately $300,000 remains. He noted that for 2025, the County is waiting for the RFP to be released, and for 2026, the County is estimated to receive $1,018,607.13. He stated that it will be up to the Board to determine whether those roads will be completed in-house or outsourced. County Clerk Stephens stated that she wanted to make sure she understood the LRA funds. She stated that, for 2024, there is still approximately $300,000 remaining. She further stated that the 2025 funds have already been received and that the County is working on sending out the RFP, but a complete scope of work must first be developed. She explained that she needs to obtain more detailed estimates before sending the RFP out, noting that while Brian has reviewed the projects, more in-depth information is needed to ensure the bid is properly prepared. She stated that specialized estimates are necessary so the project can be accurately bid. County Clerk Stephens further stated that the remaining work includes items previously discussed, such as bridges, culverts, and Dallas Mill Road. She noted that, based on initial review, it is likely that all of the 2025 LRA funds, along with additional funding, will be needed to complete the remaining balance of the current list of projects. Commissioner Worsley stated that there was nothing wrong with that approach. County Clerk Stephens agreed but stated that she wanted to make it clear for discussion purposes. She added that adding Dallas Mill Road will increase the overall cost and noted that Pigeon Creek was already a project with a relatively high estimated cost. Public Works Director Brian Griffith confirmed that Pigeon Creek touched Wrightsville and will require a box culvert. County Administrator Gorton stated that the 2026 LRA funding is the one the County needs to apply for. He explained that the Board needs to determine whether the funds will be used for roads, culverts, or bridges so that County Clerk Stephens can submit the application to GDOT and move forward with the process. Commissioner Worsley asked whether if the County is about to complete the current list and if that list represented all the culverts and bridges that needed to be addressed. County Clerk Stephens stated that there were still others remaining on the list that they started on before, and she was unaware if any others had been assessed. County Administrator Gorton stated that this list was provided in 2024. Commissioner Worsley stated that his perception of the list was that it was all encompassing. County Clerk Stephens stated that when the County submitted for the 2024 LRA funding, she included every culvert and bridge that Bill Cawthorne had evaluated. She stated that only four or five projects were completed from that list. She further stated that the remaining items were carried forward, and that Dallas Mill Road was later added to the list. She noted that she was unsure of the exact estimate for Dallas Mill Road but stated that it was a significant cost. Commissioner Worsley asked for clarification, stating that it sounded like the County had previously created an all-encompassing list of culverts and bridges, with only a few remaining items, plus the addition of Dallas Mill Road. County Clerk Stephens responded that there were a few items from the original 2024 list that were not completed, noting that one project was not approved and others remained, although she did not have the full list in front of her. She stated that Dallas Mill Road was later added to that list. County Clerk Stephens left the Work Session at 5:06 p.m. Commissioner Worsley questioned where the original 2024 list was, stating that it sounded like the list may not have been fully comprehensive if additional items continued to be identified that were not originally included. County Administrator Gorton stated that the 2024 list included approximately seven or eight bridges and culverts, of which about four had been completed. He explained that the remaining projects were being funded through the 2025 LRA funds to complete the original 2024 assessment list. He further stated that once the 2024 list is completed, any additional bridges and culverts would need to be identified through further in-house assessment. Commissioner Worsley stated that completing the current list is a positive step but questioned whether those projects represent all remaining needs in the county. He asked whether additional bridges and culverts exist beyond that list, noting that the County is expected to receive approximately $1 million in 2026 LRA funds and that the Board must decide whether to allocate those funds toward bridges and culverts or road paving. Public Works Director Griffith stated that, at this time, there is not a complete list of all remaining bridges and culverts in the county and that additional assessment would be required to determine what projects remain. Commissioner Worsley asked whether staff could identify those remaining needs, stating that such information would be valuable for planning purposes. Public Works Director Griffith stated that there are a few known projects from prior lists that were not completed. He identified Pigeon Creek and J.W. Dunn as projects that were previously submitted but not finished and stated that Dallas Mill Road had since been added. He noted that those three are the primary known projects that still need to be addressed. County Clerk Stephens returned to the Work Session at 5:08 p.m. Commissioner Worsley stated that the remaining items from the 2024 list, along with the three additional projects identified, would likely consume the remaining 2024 funds and all of the 2025 LRA funding. County Clerk Stephens stated that she had the original list and asked for confirmation of the projects. She identified John Brown and Gordon May, then stated that Trammel Road had been completed. She stated that J.W. Dunn remains and would be addressed under the 2025 funding. She further stated that Pigeon Creek Road is also included under the 2025 funding. She concluded that, with the addition of Dallas Mill Road, there are three remaining projects on the list. Commissioner Worsley stated that, based on the information currently available, those are the only three remaining projects from that list. County Clerk Stephens stated that when the estimates were prepared for the 2025 LRA funding, Pigeon Creek Road was estimated at $470,000 based on Bill’s estimate, and J.W. Dunn was estimated at $80,000. Commissioner Worsley expressed surprise at the lower cost for J.W. Dunn. Public Works Director Griffith explained that the bridge deck itself is in good condition and that the project would involve removing the deck, redoing the footings, and then setting the bridge back in place. Public Works Director Griffith stated that Dallas Mill Road would be right at $470,000 as well. Chairman Collins asked if that was culverts or box culverts. Public Works Director Griffith stated it was box culverts for JW Dunn. County Clerk Stephens stated that when the initial list was submitted in 2024, it was estimated at $1.9 million. Commissioner Worsley verified the three that were left and needed to be done and asked Director Griffith if he could verify if there were more. Director Griffith stated that he could. Commissioner Worsley summarized that, based on the assessed items identified in 2024 by the State and current staff, the County has approved funding and projects in place that should be completed by the end of 2026. He further stated that staff will conduct an additional assessment to identify any culverts or bridges not previously included on the list. He added that the Board is now determining how to allocate the 2026 LRA funds, estimated at approximately $1,018,000. County Clerk Stephens stated that she can move forward with the application. Director Griffith stated that they should receive the state bridge report back in about a month. County Administrator Gorton stated that the application has a deadline of June. Commissioner Worsley stated that the County now needs to develop a scope of work for the 2026 LRA funds so it can be submitted. He stated that, in his opinion, the County has sufficient surplus and other available funds to move forward with a project using LRA funds now, and when the bridge assessment is completed, the County would still have enough resources in surplus or other funding sources to address any additional needs identified. County Clerk Stephens stated that whatever the Board decides can be voted on at the meeting on the 26th, which would still allow sufficient time for her to submit the application. Chief Stephens asked Director Griffith what the criteria were for bridges. Director Griffith stated they have their own scale from the State. Chief Stephens stated they have a lot of creek bridges that they can't cross. Commissioner Worsley stated that, at this point, the Board needs a list identifying the remaining bridges and culverts, their locations, and the estimated cost to bring them up to a standard that allows access to public service vehicles. He added that having that information available would be beneficial for use during work sessions as funding becomes available. 2. Discussion of LRA Funds a. Road Paving Commissioner Worsley stated that while attending a meeting in Savannah, EMC representatives were also present, including Chris, who had previously attended County meetings. He explained that the Board had discussed chip seal roads during a prior work session several years earlier and had been told at that time that it was difficult to find companies that still perform that type of road work. Commissioner Worsley stated that EMC representatives advised that information was no longer accurate and stated that there were multiple companies available to perform chip seal road work. He noted that EMC indicated they could identify several companies capable of performing the work and that the estimated cost was approximately $50,000 per mile. Commissioner Worsley clarified that he was not suggesting anyone had been dishonest previously but stated that the County had now received updated information. He explained that several roads in the County, including Arbor Chapel Road in his district, currently have potholes and other issues but are the type of roads that may be more cost-effective to repair using chip seal rather than full asphalt paving. Commissioner Worsley stated that he wanted the Board to be aware that chip seal may be a possible alternative as the County reviews road project costs. He noted that many of those roads were originally constructed using that method in the early 1980s and suggested that the option could potentially provide a more economical solution than traditional asphalt paving. Public Works Director Griffith stated that the effectiveness of chip seal roads largely depends on the volume of traffic using the roadway. He explained that, when chip seal roads are installed properly, they can last 20 to 30 years on roads that experience normal daily traffic. Chairman Collins asked if any road counters had been purchased yet to see what the traffic is on some of the roads. Director Griffith stated he has not purchased any yet. Commissioner King referenced the current road project already being advertised for bids, which involved approximately two miles of roadway. He noted that Alvaton Road is significantly longer than two miles and asked whether it would make sense, since contractors are already mobilized to the area, to determine how much additional roadway could be completed at the same time. Public Works Director Griffith stated that he didn't think, by any stretch of the imagination, you should start paving Alvaton Road and not finish it. Commissioner King stated that he agreed with completing the entire roadway project rather than paving only two miles and stopping. He stated that it would not make sense to complete only a portion of the road and then move to another location because the remaining portion of the roadway would continue to deteriorate, Commissioner King added that residents would likely question what the County was doing if the project was left incomplete. Public Works Director Griffith stated that they are not going to want to pave behind the County’s work, and the County is not going to want to pave behind theirs. He stated that it needs to be one person that has the entire job. County Clerk Stephens stated that the bid opening was scheduled for the 21st at 11:00 a.m. and that EMC representatives would be present to handle the bid opening process. She further stated that, depending on which contractor is selected and whether additional funding remains after completion of the project, the County could potentially add another road or additional work similar to what was previously done with the 25 LMIG project. Vice Chairman Snelson asked how long it would be open after the bids are opened. County Administrator Gorton stated that the bid opening had already been scheduled and that the results would be brought back before the Board at the May 26 meeting. Commissioner Threadgill stated that he wanted to comment regarding the more than one million dollars being discussed for road projects. He stated that roads have always been an issue in the county and likely will continue to be an issue. However, he emphasized that culverts and bridges are safety issues. Commissioner Threadgill stated that if the County does not replace failing culverts and bridges, the problem becomes much greater than simply deteriorating roads. He explained that roads can be patched or temporarily repaired to keep them usable, but unsafe culverts and bridges present more serious concerns. He referenced earlier comments from the Fire Chief indicating that there are roads in the county emergency personnel who cannot safely travel because of those conditions. Commissioner Threadgill stated that roads will likely continue to require attention long into the future but emphasized that the County needs to prioritize replacing as many culverts as possible in order to improve safety for both emergency responders and the public. Commissioner Worsley asked if the data could be gotten back in time to apply for the funding. County Clerk Stephens stated that she believed they could and asked Fire Chief Stephens if he had a list of the roads he was concerned about. Chief Stephens stated that he could get his map and get a list. Commissioner Worsley stated that we are talking about two different things and asked if Chief Stephens was talking about 3-ton limits. Commissioner Threadgill stated anything that needs to be corrected. Chairman Collins stated it would be culverts in general. Public Works Director Griffith stated it will not be the culverts that you have to worry about, but the culverts covered in earth, and there will not be a weight restriction. He explained that what Chief Stephens is mainly talking about is bridges in particular, mostly on dirt roads. Chairman Collins stated that if the County begins trying to increase bridge weight limits to five or six tons, it is going to cost a significant amount of money. He then asked how long the bridges had been limited to three tons. Director Griffith answered they had been three tons forever. Commissioner Threadgill stated that the residents on the other side of those bridges who may experience emergency situations would greatly appreciate the improvements being discussed. Director Griffith stated they would. Chairman Collins stated that most people are already aware that the bridge has a three-ton limit and typically use another route to access the area and asked Chief Stephens if that is what he did. Chief Stephens stated that is the case most of the time, unless there were houses located between two of those bridges. Chief Stephens asked Director Griffith where there were instances where there are homes between two bridges. E-911 Director Jones stated there is a situation on Fleming Road. Commissioner King asked Chief Stephens how much one of his fire trucks weighed. Chief Stephens stated around 35,000Ibs. Commissioner King stated that there are numerous bridges throughout the county, particularly on back roads, and noted that there would be many bridges impacted. He stated that even if improvements were made, the weight limits would not increase significantly, explaining that it would not be realistic to go from 3,000 pounds to 25,000 or 30,000 pounds. He added that, at best, only one bridge might be improved to that level. Public Works Director Griffith stated to get to that level, most of those bridges would have to be replaced with box culverts. Vice Chairman Snelson asked Chief Stephens if that was something he could work on with Director Griffith. She stated especially the roads where there is a good population on both sides. Vice Chairman Snelson stated that while some dirt roads do have bridges, those roads may only be used infrequently, possibly once every several years. She noted that while those bridges are still important, they may not be the highest priority. She stated that the goal should be to help prioritize which bridges need to be addressed more quickly and asked if that was what was being requested. Commissioner Threadgill stated it was. Fire Chief Stephens stated that in situations where Highway 362 is closed, it creates significant access issues. He explained that when attempting to use alternate dirt roads that cross nearby creeks, such as Red Oak or White Creek, those routes may not be passable. He stated that in those cases, he would have to reroute entirely, traveling out to Gay and then going north to reach the destination, which can delay their response time drastically. Vice Chairman Snelson stated that if the County could prioritize the bridges that need to be addressed most urgently, that would be amazing. Chairman Collins asked if there was anything else. Commissioner Worsley stated that we needed to decide on what to have Director Griffith look into. County Administrator Gorton stated that something could be brought back to the Board on May 26, 2026. Chairman Collins stated that we needed to decide so County Clerk Stephens could apply for the funding. Commissioner Threadgill stated you have to give them a list of what is going to be done with the money. Public Works Director Griffith stated the Board would need to decide if they wanted to do bridges and culverts or roads. County Clerk Stephens stated it can be both, but she would need to get it all together to apply for the funding. Commissioner Threadgill stated that if the County can get it together as far as roads, bridges, and the culverts that are needed before that time, then decisions can be made, because in his line of work, safety is more important than just the road itself. County Clerk Stephens stated that if the Board exceeds the anticipated amount, that would be acceptable but emphasized the need to ensure the County is moving toward that goal. County Administrator Gorton agreed and stated that a list of bridges, roads, and culverts would be brought back to the Board on May 26 for consideration. Commissioner Worsley stated that the Board was discussing two different funding sources for roads and paving, specifically the LRA and surplus funds. He asked whether, before moving on from the topic of roads and paving, the Board wanted to commit any additional funding. He stated that it appeared the Board intended to commit LRA funds toward bridges and culverts and wait for additional information to be brought back and then asked if any other funds should be committed to roads and paving before proceeding to the next topic. Commissioner Threadgill stated the surplus, he thinks is a huge topic with the number of buildings that we have that need to be renovated versus paving. County Administrator Gorton stated that that is one of the agenda items for the next meeting, which is excess for paving, but it also covers the surplus in the General Fund. Commissioner Worsley stated that was fine. If we don't want to discuss it now, that is fine. Chairman Collins stated that the County should move forward with obtaining multiple bids for LRA-related projects, including bridges, culverts, and paving, and ensure that sufficient funding is available to cover the costs. Commissioner Worsley asked if Director Griffith would be getting that to County Clerk Stephens. Public Works Director Griffith stated that he could provide a paving list that would expend every bit of the LRA funds. Commissioner Worsley stated to get whatever is needed to County Clerk Stephens to get the funding approved. County Clerk Stephens explained there is no match required. Director Griffith stated, on a side note, when Chris comes with the estimate for Alvaton Road, if looking at 5.5 miles, Director Griffith stated that his in-house price would be approximately $1.3 million. Commissioner Worsley stated that based on the estimate, the Board had already approved funding for two miles of the road. He explained that, when breaking down the total cost, completing the remaining portion of the road would require approximately $820,000 more. He added that the County had committed about $450,000 toward the initial two miles that were planned. Public Works Director Griffith stated that although there had been discussion about completing two miles on three different roads, the cost to complete Coleman Creek Road and King Road alone would exceed $1 million. He explained that if only $1 million were allocated to a contractor, there would be no remaining funds available to begin work on Alvaton Road, from a contractor's perspective. County Administrator Gorton stated that Chris' estimate was $1.6 million dollars with contingencies included. Commissioner King stated that the County needs to wait and see what all the bids come in at so they can determine how much funding remains available to allocate elsewhere. County Administrator Gorton explained that the information will be available at the May 26, 2026, Regular Meeting. County Clerk Stephens stated the bid opening is next week. County Administrator Gorton stated it was on the 21st. 3. Discussion of Fire/EMS Equipment a. Ambulance Replacement Schedule Fire Chief Stephens stated that the document presented was a draft replacement policy and noted that it did not take into consideration remounts or similar factors. He explained that the policy was based on ambulance chassis, proposing a four-year or 240,000-mile rotation cycle. He stated that he reviewed data from current units in service and noted there are four frontline ambulances averaging approximately 5,000 miles per month, or about 60,000 miles per year. Based on that usage, he explained that a four-year rotation would place those units at approximately 240,000 to 250,000 miles. Fire Chief Stephens clarified that he was not recommending disposing of the units at that point but instead moving them into reserve status. He stated that the policy outlines an annual fleet review process to align with the County’s budget and planning cycle, which typically begins around June or July. He added that the policy also addresses maintenance standards, disposal of retired units, and includes a review of the policy every two years. He further stated that the approach would result in replacing approximately 25% of frontline ambulances at a time and noted that replacements could include either remounted units or new boxes, with the primary goal being to place newer chassis into service on a consistent rotation schedule. Chairman Collins asked if that was basically what they had been doing. Fire Chief Stephens agreed and stated that the policy simply puts the process into a formal format. He explained that it would provide guidance to Chief Garrett, particularly when conducting inspections and routine checks, to evaluate what equipment is worn or becoming costly to repair, and to begin planning for those units to be moved or replaced accordingly. Commissioner Threadgill asked Fire Chief Stephens how often he had to pull an ambulance out of reserve. Fire Chief Stephens stated that since they got the three newest ambulances, it has dropped tremendously. He stated that he did not know the exact number of times units have had to be pulled from reserve but noted that it typically only occurs when there is an issue such as an air conditioning problem, low Freon, or a line being rubbed through and developing a hole. Commissioner Threadgill stated that a three-year rotation at approximately 180,000 miles could move units into reserve sooner while still maintaining strong backup units, rather than extending use out to 240,000 miles. Fire Chief Stephens stated that there are options such as remounting units, noting that a new ambulance would cost approximately $350,000 to $400,000, while a remount would cost around $175,000 to $225,000, including the chassis. He stated that he was not recommending purchasing a brand-new unit every year, but suggested either remounting or replacing one unit on a rotating basis. He added that the ambulance boxes should not be remounted more than two times, noting that while some have been placed on multiple trucks, they have only been remounted twice. Chairman Collins stated that eventually the County would have to purchase a new unit because the existing boxes would no longer be usable. Fire Chief Stephens agreed and stated that the matter is expected to be included on a future agenda. He added that the current fleet includes two 2024 units and one 2026 unit. Chairman Collins stated they are about to get another one and asked Chief Stephens what the newest one they had was prior to the 2022 model. Fire Chief Stephens stated it would be a 2015 model. Chairman Collins stated that we waited seven years to get another one. Fire Chief Stephens stated that the County had not purchased new trucks for a period of time and noted that the 2017 and older chassis have nearly half a million miles on them. Commissioner Worsley then asked how much a new ambulance would cost. Fire Chief Stephens stated a new one would cost between $350,000 to $400,000. Commissioner Worsley asked if Chief Stephens wanted them to adopt the policy he provided for them. Fire Chief Stephens stated that he wanted the Board to review the information and provide him with feedback. Commissioner Worsley stated that he was not trying to oppose the idea but wanted to ensure the Board clearly understood that adopting the policy would mean committing to replacing one unit approximately every four years at a cost of around $400,000. He added that he was not stating whether the idea was good or bad but simply wanted to clarify. Fire Chief Stephens agreed and stated that the document was simply a response to the Board’s request for a replacement plan. Commissioner Worsley stated he understood and verified that they do not have a current policy in place. Fire Chief Stephens stated that there is not currently a replacement policy in place and that what he was presenting was a proposed plan. He added that, without a policy, requests would typically come up as needed, such as requesting another truck. He clarified that the proposal applied only to the EMS side and noted that the fire side is a completely different situation. Chairman Collins asked if the last three units that were replaced would run around $200,000. Fire Chief Stephens responded that remounts would be approximately $200,000, while brand-new trucks would be around $400,000. Vice Chairman Snelson asked Fire Chief Stephens if the new tankers had come in yet. Fire Chief Stephens stated that the units are expected to be delivered by the end of the month, noting there had been some delays with the chassis from Freightliner. He stated that they had visited the facility the previous week and observed that the tanks had been built and were in the process of being lined on the inside. He added that the next steps would be painting the units and completing installation on the chassis, including lighting. He stated that one of the chassis was already being worked on and that he expected the units to be ready soon. He also noted that the units were supposed to have sequential numbering but was unsure of the exact numbering at that time. Vice Chairman Snelson stated that she knew they were supposed to be in at the end of April and just wanted to check on them. Fire Chief Stephens stated that this could just be a guide, this is not necessarily got to be a policy. He stated it is just to give them something to look at that is all in one place. Commissioner Worsley stated that it is all about perception and how the County chooses to do business. He explained that once a policy is created, it becomes public record and is viewed as something that must be followed. He stated that if the County does not follow that policy, future boards may question why it was not followed and emphasized the need to be careful and fully understand what the Board is committing to before adopting a policy. V. EXECUTIVE SESSION There was no need for an Executive Session. VI. ADJOURNMENT With no further discussion, a motion was made by Commissioner Worsley and seconded by Vice Chairman Snelson to adjourn the Work Session at 5:31 p.m. Approved by: ff rit Wok of toe Roard of Conumniesioners Attest: Date: