MINUTES MERIWETHER COUNTY BOARD OF COMMISSIONERS MAY 26, 2026 6:00 PM Commissioners Present: Chairman Emmett Collins, Vice Chairman Jennifer Snelson, Commissioner Gene King, Commissioner Bryan Threadgill, and Commissioner Adam Worsley Commissioners Absent: Staff Present: County Administrator John Gorton, County Clerk Allyson Stephens, Deputy County Administrator Jeff Fisher, Finance Director Tammy Lackey, and County Attorney Michael Hill Staff Absent: I CALL TO ORDER The Meeting was Called to Order by Chairman Emmett Collins. II. INVOCATION The Invocation was given by Deputy County Administrator Jeff Fisher. Ill. PLEDGE TO THE FLAG All. IV. ADOPT AGENDA County Clerk Allyson Stephens stated that there was a typo on the Agenda, and under Unfinished Business #1, it should read “Request for Funding from the City of Manchester for their Fourth of July Celebration — Manchester Fire Chief Ben Williams — Tabled from the April 28, 2026, Regular Meeting. A motion was made by Commissioner King and seconded by Vice Chairman Snelson to adopt the Agenda with the Amendment. All were in favor. Vv. PRESENTATIONS Proclamation - Zion Hill Missionary Baptist Church Vice Chairman Snelson presented a Proclamation recognizing the 150th Anniversary of Zion Hill Missionary Baptist Church of the Zion Hill Community in Meriwether County, Georgia. The Proclamation noted that the church is celebrating its 150th anniversary in 2026 and was founded in 1876 by Will Colton, Sam McGhee, and Jim Spear. It further recognized Reverend Henry Mullins as the church's first pastor and Will Colton, Sam McGhee, Bob Fuller, W.K. Rosser, and Henry Blunt as its first deacons. The Proclamation also acknowledged that a fire destroyed the church in the late 1970s and that the congregation worshiped with other churches in the Luthersville area until its facilities were rebuilt. It further recognized the dedicated members, Board of Deacons, and auxiliaries who have sustained the church's mission and activities for the past 150 years under the leadership of Reverend Dr. E.L. Jimerson, and Deacon H. Douglas Blount, Chairman of the Board of Deacons. The Proclamation concluded by honoring and congratulating Zion Hill Missionary Baptist Church on its 150th Anniversary. Vice Chairman Snelson stated that the Proclamation would be presented to the church on June 7, 2026, during its anniversary celebration. Heather Greene - TNVR - (Trap-Neuter-Vaccinate-Return) Program Ms. Heather Greene presented information regarding a proposed Trap-Neuter-Vaccinate-Return (TNVR) Program for community cats in Meriwether County. Ms. Greene stated that she currently volunteers with the Troup County Animal Coalition, where she traps, neuters, vaccinates, and returns community cats in Troup County, and has also performed similar work in Meriwether County. She stated that Meriwether County previously operated a TNVR program between 2017 and 2021 and noted that a new program could potentially be funded through grants rather than County funds. Ms. Greene stated that Meriwether County has a growing community cat population and referenced numerous social media posts regarding free kittens and requests for assistance with cat colonies. She shared an example of a colony left behind after the death of a resident that continued to grow because rescues were full and unable to assist. She stated that residents are often overwhelmed with caring for large numbers of cats and kittens and do not know where to turn for help. Ms. Greene explained that her involvement in TNVR efforts began after encountering an injured cat at a local business and being unable to find assistance. She stated that she taught herself how to trap community cats and later partnered with another volunteer to establish the Troup County Animal Coalition in April 2025. She reported that the organization has trapped, neutered, vaccinated, and returned more than 200 cats and noted that the organization received mentorship from Sydney Lau and the Whiskers and Paws TNVR Program in Coweta County. Ms. Greene discussed common health issues observed among community cats, including parasites, eye injuries, injuries from fighting, upper respiratory infections, fleas, lice, broken bones, and abandoned kittens. She stated that many kittens die from exposure, lack of care, or other preventable causes. Ms. Greene explained that TNVR is considered the most effective approach for managing community cat populations because it ends the breeding cycle and reduces behaviors associated with mating, including fighting, roaming, spraying, and excessive vocalization. She stated that sterilized cats can live healthier lives and reduce the number of unwanted litters in the community. Ms. Greene outlined the TNVR process, explaining that cats are trapped the night before surgery appointments, provided food and water, housed in a temperature-controlled environment, transported to a clinic for surgery, allowed time to recover, and then returned to their original locations. Ms. Greene stated that implementation of a TNVR program would require partnerships with local shelters, rescues, volunteers, veterinary providers, and transportation resources. She noted that the County has already begun working with Help Spay Neuter Clinic through the “Snip Ship” program, which transports pets for discounted spay and neuter services. She also stated that volunteers would be available to assist with trapping, transportation, and training. Ms. Greene advised that grant opportunities are currently available through the Georgia Department of Agriculture and Best Friends Animal Society and stated that funding for surgeries could potentially be obtained through those sources. She further stated that she would be willing to assist with volunteer training, public education efforts, and implementation of a TNVR program in Meriwether County. Ms. Greene concluded by providing informational materials regarding cat population growth, the “vacuum effect,” which explains why removal or relocation of cats is ineffective, examples of traps used in TNVR programs, and clinic pricing information. She expressed her willingness to assist with establishing a TNVR program in Meriwether County and thanked the Board for the opportunity to speak. VI. FINANCE REPORT Finance Director Tammy Lackey presented the Finance Report. Ms. Lackey stated that the first page of the report reflected the County's bank balances as of that morning and advised that the County expected to receive the next LOST, SPLOST, and TSPLOST distributions later in the week. Ms. Lackey reported that the SPLOST balance was $117,164.20 and the TSPLOST balance was $539,719.16. Ms. Lackey concluded her report and stated that that was all she had to present. Vi. DEPARTMENT HEADS County Clerk Allyson Stephens reminded those in attendance that the Three Rivers Regional Commission would be holding a stakeholder meeting regarding the 2026 update to the Meriwether County Transit Development Plan. Clerk Stephens stated that the meeting would be held on Tuesday, June 2, at 3:00 p.m. in the Commission meeting room. She further noted that Stephanie Wagner with the Three Rivers Regional Commission had sent an email regarding the meeting to the identified stakeholders. VIN, CITIZEN COMMENT None. IX. MINUTES 1. A motion was made by Commissioner Threadgill and seconded by Vice Chairman Snelson to approve the Minutes of the May 11, 2026, Work Session at 4:00 p.m. All were in favor. 2. A motion was made by Commissioner Threadgill and seconded by Commissioner Worsley to approve the Minutes of the May 11, 2026, Regular Meeting at 6:00 p.m. All were in favor. X. PUBLIC HEARING l. Case #PC26-001 - Request from Chisel Mill Design & Build LLC to rezone parcel 028-029, 36.81 acres (Ellis & Forrest Roads) from RR to R-1 for the proposed use from 2- acre lots to 1.5-acre lots. A motion was made by Commissioner Worsley and seconded by Commissioner King to enter the Public Hearing at 6:16 p.m. All were in favor. Cassandra Jones, Director of Planning and Zoning, stated that Mr. John Knight with Chisel Mill was also in attendance. Director Jones explained that the acreage under consideration consisted of only seven lots out of the total acreage owned by the applicant and that the Planning Commission had approved the seven lots at approximately one and one-half acres each. She stated that the lots were located on the upper portion of the property off Forrest Road. Director Jones further explained that the applicant was requesting to rezone the seven lots from RR to R- 1 because Lone Oak had provided a letter stating that water service would be available to those seven lots only and not to the remaining acreage owned by the applicant. Vice Chairman Snelson stated there were 8 lots highlighted on the handout. There was confusion about which lots. Commissioner Threadgill verified lots, 2,3,4,5,6,11, and 12. Director Jones further stated that Lone Oak had provided a letter confirming that water service could be provided to the proposed lots. However, she explained that Chisel Mill would be responsible for the costs associated with having the water lines run to the property or having the necessary taps installed to provide water service to the development. Commissioner Worsley asked if this development was already approved. Director Jones stated that it was already approved. Commissioner Worsley asked how many lots. Director Jones stated the original number of lots approved was 5. Mr. John Knight of Chisel Mill stated that the proposed layout was a preliminary plan and explained that the rezoning request was being made to provide flexibility for 1.5-acre lots. Mr. Knight stated that the three southernmost lots were unlikely to be developed because of soil conditions on that portion of the property and that the development would likely consist of closer to five lots rather than seven. He explained that, because water was available for the 1.5- acre lots, the applicant was seeking approval of the rezoning request in order to provide flexibility and additional options as the project moved forward. Commissioner Worsley stated that the proposal was confusing and questioned why the number of acres mattered if the soil conditions would not allow development on those portions of the property. He asked why the acreage would be a consideration if the lots could not be built on due to the soil limitations. Mr. Knight responded that there are areas of good soil on the property and stated that he believed approximately five lots could be developed. He explained that he is trying to maximize the development potential of the portions of the property with suitable soils and that, because water capacity was available, he was seeking the rezoning to provide flexibility in designing the lots around the areas that could support development. Commissioner Worsley stated this would allow them to get two more lots from 5 to 7. Mr. Knight stated, Yes, sir, Commissioner Worsley explained that is what he was trying to get at. Commissioner King asked about the width of the proposed lots, noting that the print on the plans was too small to read and became blurry when enlarged. He specifically asked about the lot widths for Lots 2, 3, and 4. Director Jones responded that the lots were 200 feet wide and stated that they met the minimum lot width requirements. Commissioner King asked where the proposed water service would originate and whether the development would include installation of a sufficient water main capable of supporting fire hydrants and fire protection, or whether only a basic water line would be installed to serve the lots. Director Jones stated the water would come from Lone Oak. Mr. Knight responded that water service was already available to the property. He stated that there were plans to potentially increase the size of the water line in the future, which would require the installation of a fire hydrant to serve the property. Mr. Knight further stated that the existing water line was already in place and available for use. County Clerk Stephens asked Mr. Knight to state his name and address for the record. John Knight, 104 Peppertree Drive, Newnan. Both Commissioner King and Vice Chairman Snelson asked Mr. Knight what size the existing water line was that was in place. Before an answer was given, Chairman Collins asked Mr. Knight if the Board had just recently approved them to put 2-acre lots on Ellis Road if they agreed to pave a certain portion of the road. Mr. Knight stated that the Board did approve that, but it was a property south of this one that they also own. Commissioner King asked if they were still going to develop that property and pave the road. Mr. Knight responded that they were currently evaluating the availability of water service from Lone Oak for that area. He stated that the seven-lot proposal was where they intended to begin development while continuing to explore future water availability options. Commissioner King asked about a previous approval granted by the Board that would allow lots to be developed if the road was paved. He then asked Mr. Knight when the paving of the road was expected to take place. Mr. Knight responded that Chisel Mill currently owns three large tracts in the area and that the seven-lot development under consideration would be the first phase of development. He explained that the additional properties are located farther south on both sides of Ellis Road. Mr. Knight stated that, after the initial lots are developed and sold, they hope to have the financial capacity to pave Ellis Road and extend development into those additional tracts. Commissioner King stated that, based on Mr. Knight's explanation, the road paving would not be completed at this time. He remarked that the Board had approved the previous request, but the paving of the road was not currently being undertaken. Mr. Knight responded that the paving would not occur immediately. He explained that the properties are all connected and are being viewed as one larger neighborhood development. Mr. Knight stated that he considered the seven-lot development to be Phase One, with the other two properties representing Phases Two and Three. He explained that they are working on the plans and approvals together and hope to complete the first phase, build momentum through development and sales, and then have the financial capacity to pave that portion of Ellis Road and move forward with the subsequent phases. Vice Chairman Snelson stated that she may have been misreading the site plan and asked where access to the two rear lots would be located. She questioned whether those lots would be served by easement driveways extending from the road. Mr. Knight stated that they would be flag lots. Director Jones showed Vice Chairman Snelson where she highlighted them on the drawing. Vice Chairnan Snelson stated that it is just a driveway going all the way down to it. Commissioner King stated that is part of the property and part of the acreage. Mr. Knight stated that is part of a larger tract. Vice Chairman Snelson stated that it was still 1.5 acres. Commissioner King stated it goes all the way back to the one behind it, but asked how it gets to the one next to it. Commissioner King stated that one of the rear lots could potentially be accessed by a driveway extending straight back from the road, but questioned whether a separate access drive would be needed to reach the other rear lot. He then asked Mr. Knight whether those access points were reflected on the site plan. Vice Chairman Snelson referred to Lot 11 on the site plan and stated that she did not see a driveway shown providing access to that lot. She questioned where the driveway to Lot 11 would be located. Commissioner King stated that the rear lot could not use another lot's driveway for access and would be required to have its own separate driveway. Mr. Knight responded that the site plan was only preliminary and stated that access issues would be addressed before a final plat was submitted for approval. He explained that, at this stage, they were seeking approval of the acreage and zoning so they could determine the project's feasibility and budget moving forward. Commissioner King stated that he did not know how the rest of the Board felt, but that it would be difficult for him to make a decision and approve a proposal that was still preliminary in nature. He noted that the access issue for the rear lots had not yet been resolved and questioned whether an additional 30-foot width would be required for a flag lot access strip. Commissioner King asked Director Jones if 30 feet were required. Director Jones stated it was 30 feet. Mr. Knight stated that he believed the Board was reviewing an older version of the site plan. He explained that the current plan showed Lot 11 as a larger 3.21-acre lot and that it would be accessed by a flag lot configuration rather than a separate entrance. Mr. Knight stated that he had brought updated copies for everyone and believed the Board may have been looking at an outdated version. He clarified that the updated plan was the one being presented for approval. Commissioner King stated that, based on the discussion, the site plan submitted to the Board that evening was not the same plan the Board had been reviewing. Vice Chairman Snelson responded that it apparently was not. Commissioner Worsley then questioned whether the Planning and Zoning Commission had reviewed the updated site plan. Vice Chairman Snelson stated that the Planning and Zoning have not approved the new one, they had only seen the one that they don't need now. Director Jones confirmed that Planning and Zoning only approved the 7 lots at 1.5 acres. Mr. Knight stated that Chisel Mill's Land Acquisition Manager, Brandon Larry, had been handling the project and that he was not fully aware of what documents had or had not been submitted. He explained that Mr. Larry was unable to attend the meeting due to complications with his wife's pregnancy, and that he had assumed responsibility for presenting the request. Mr. Knight stated that he had been informed that the updated plan had been provided to the Planning and Zoning Commission. He further stated that the Planning and Zoning Commission approved the concept of 1.5-acre lots and the seven-lot layout and that the revised plan remained consistent with those approvals. Mr. Knight explained that the updated layout did not utilize easements for access but instead provided a 30-foot flag driveway for the rear lot. He stated that this was likely the source of the confusion regarding the larger rear lot, noting that the lot contained approximately 3.5 acres and exceeded the minimum acreage requirement even after accounting for the flag driveway. Mr. Knight further stated that, while the request sought approval for 1.5-acre lots, several of the proposed lots exceeded that size, with some containing approximately 1.75 acres and one containing approximately 3.5 acres. He explained that the purpose of the rezoning request was to provide flexibility and creativity in designing the subdivision while still complying with, and in several cases exceeding, the County's minimum lot requirements. Commissioner King noted that Lot 9 contained approximately 3.21 acres and asked whether water service would also be extended to that lot. Mr. Knight stated they would. Commissioner King stated that it shows a well on that lot. Mr. Knight responded that, if a well was shown on the site plan, it was likely an existing active well already located on the property. He explained that they were not proposing to install new wells as part of the development. Vice Chairman Snelson stated there were 8 lots on the plans provided by Mr. Knight, not 7. Mr. Knight responded that they would be extending water service to the 3.5-acre lot located on the upper portion of the property. However, he explained that the lot located on the far southeastern portion of the property would likely not be developed due to site conditions. As a result, that lot would not be included in the development, and water service would be provided only to the remaining lots that were planned for construction. He explained they would lose that lot due to the soil issues he discussed earlier. Chairman Collins stated that he was concerned about the continued reduction in minimum lot sizes for the development. He noted that the Board had previously approved allowing the lots to be reduced from five acres to two acres if Ellis Road was paved and stated that the current request would further reduce the lots to 1.5 acres. Chairman Collins expressed concern that approving the request could set a precedent and open the door for future requests to approve even smaller lot sizes. Mr. Knight stated that was a different piece of property. Chairman Collins stated that he knows it was a different piece of property, but next it will be that piece of property. Vice Chairman Snelson stated that her primary concern involved existing water pressure issues experienced by residents in Lone Oak. She explained that she was familiar with the property and had spoken with a resident earlier that day to ask whether water service had improved. Vice Chairman Snelson stated that residents were still experiencing water pressure problems and noted that many residents already rely on wells that have their own challenges. She expressed concern that extending water service beyond the current service area to serve seven additional properties could further impact water pressure for existing customers. Vice Chairman Snelson noted that city water service currently ends at the city limits and stated that she was concerned about the effect that additional development could have on citizens who are already experiencing water-related issues. Mr. Knight responded that Lone Oak is pumping water to both Luthersville and Meriwether County, and Meriwether County is also pumping water to Lone Oak. He stated that they had tested the water pressure at a fire hydrant near the property and that it exceeded the pressure needed for the proposed development. When asked by Vice Chairnan Snelson which hydrant was tested, Mr. Knight stated that it was the fire hydrant located near the property that would serve the lots. He further explained that they had not yet been able to obtain approval for additional lots because an engineer would need to complete the necessary topography and engineering work. However, he stated that an engineer was currently working on that process and maintained that the water pressure available at the hydrant exceeded what would be needed to serve the seven lots. Commissioner Worsley asked Mr. Knight if he had a copy of that test. Mr. Knight stated that he did not have a copy of the hydro flow test with him but did have the letter from Lone Oak. He then directed the Board to the second page of the materials, explaining that it contained the results of the hydro flow test. Mr. Knight stated that the hydro flow test was required in order to obtain the letter of service agreement from the City and that the test results demonstrated the available water capacity needed to support the request. Commissioner King asked Mr. Knight what size line they would run down to the lots. Mr. Knight stated that they would not need to extend the main water line. He explained that only a 2- inch service line would need to be run from the existing line at the road to each lot. Commissioner King then asked whether a single 2-inch line would serve all of the lots or whether separate lines would be installed. Mr. Knight responded that the main line was already located at the property and that individual service lines would be run to each of the lots. Mr. Knight clarified that Lot 8 was the lot that likely would not be developed because of the site conditions previously discussed. He stated that the lots shown on the revised plan were acceptable and explained that the development would consist of the remaining seven lots, excluding the lot that would not work out. Commissioner King asked if the Town of Lone Oak would be setting the meters at each lot. Mr. Knight stated yes, and they are responsible for paying for the tap to the meter, but Lone Oak would install. Commissioner King stated that he had encountered a similar situation in Coweta County and noted that Chisel Mill owned the property from the roadway all the way back through the development area. Mr. Knight confirmed that was correct. Commissioner King then noted that, because Chisel Mill owned the property where the water lines would be installed, the development would not require permission from another property owner to run the lines. He further stated that the lines could not be installed within the County right-of-way and would instead need to be placed on private property. Mr. Knight agreed. Commissioner King stated that his point was that, regardless of whether the water line or fire hydrant was located at the road, Chisel Mill owned the property from that location all the way back to the proposed development. Mr. Knight confirmed that Chisel Mill owned the property and answered in the affirmative. Commissioner King acknowledged the response. Commissioner Worsley asked whether the fire hydrant serving the property was supplied by the Lone Oak water system. Mr. Knight confirmed that the hydrant was supplied by Lone Oak. Commissioner King asked where Lone Oak obtains its water supply and Vice Chairman Snelson responded that Lone Oak operates its own wells. Commissioner King stated that this was one of the concerns discussed during a previous meeting involving the Water and Sewer Authority. He noted that Luthersville had expanded its water service area and expressed concern that continued expansion by municipal water systems could place additional strain on existing wells. Commissioner King stated that officials had previously discussed the possibility of significant future infrastructure costs to address water supply issues and remarked that, if Lone Oak was also relying on wells, continued expansion could create additional challenges in the future. He expressed concern that, eventually, residents could experience water shortages and that local governments may be asked to address those issues at taxpayer expense. Commissioner King concluded by stating that he did not understand why municipalities continue expanding water service when their systems are dependent on a well. Commissioner King added that it just doesn't work. Vice Chairman Snelson reiterated that her primary concern was for the citizens currently relying on the Lone Oak water system. She noted that Mr. Knight had indicated plans to eventually extend development farther south toward Ellis Road and stated that doing so would place even more users on the same well system. Vice Chairman Snelson stated that she was aware that Lone Oak had already experienced significant issues with its wells and expressed concern about adding additional demand to a system that was already struggling. She concluded by stating that the situation was very concerning for the residents who currently depend on that water source. Commissioner King stated that he wanted to make a point for the record regarding minimum lot sizes in the County. He noted that some citizens had criticized the current Board for reducing lot sizes from five acres to two acres, but stated that the change had occurred before a majority of the current Board members took office. Commissioner King explained that the County's Ordinance had already been amended to allow 2-acre lots on paved roads and 5-acre lots on dirt roads. He stated that no one currently serving on the Board was responsible for that change. Commissioner King further stated that he had asked the Board and Planning and Zoning Director Cassandra Jones to consider amending the Ordinance. He explained that the current Ordinance allows lot sizes to be reduced to 1.5 acres where water service is available and to 1 acre where both water and sewer service are available. Commissioner King stated that, in order to protect the rural character of the County and prevent over development, he hoped the Board would begin discussing Ordinance changes in the coming months that would establish a minimum lot size of 2 acres regardless of whether water or sewer service was available. He expressed concern that continued reductions in lot sizes could result in excessive residential development and stated that he did not want to see the County become overly dense with housing. During the discussion, Commissioner King asked about an existing house shown on the site plan near the center of the proposed development. Mr. Knight responded that the house already existed and was owned by Brandon Larry. He explained that Chisel Mill purchased some of the surrounding property to help Mr. Larry afford to live in Meriwether County. Commissioner King stated that he could not imagine someone wanting to live in the middle of a development with houses surrounding them. Mr. Knight responded that Mr. Larry was familiar with the project and believed the development would benefit his property value. He further noted that many of the proposed lots were larger than the minimum size requirements, including several lots exceeding 2 acres. County Attorney Michael Hill stated that the discussion had moved directly into questions from the Board. He reminded the Board that the normal procedure during a Public Hearing is to allow the applicant and any proponents up to ten minutes to speak, followed by up to ten minutes for any opposition to present comments. Chairman Collins asked if there was anyone present would like to speak in opposition of the request. With no one wishing to speak, Chairman Collins asked if there was anyone present that would like to speak in favor of the request. No one wished to speak in opposition or in favor. Commissioner King stated that the Board essentially had two options: proceed with a vote or continue the matter if additional information was needed. He stated that if any member of the Board believed more details were necessary, the request could be continued for further review. Commissioner Worsley asked whether the Board needed to hear from the Town of Lone Oak and its citizens regarding the proposal. Vice Chairman Snelson stated that she would like to hear more from residents about their concerns regarding water pressure and water service. She noted that she was not sure residents were aware that the proposed development would be served by Lone Oak water or that they knew to attend the Public Hearing and express their opinions. Vice Chairman Snelson stated that any impacts to the water system would affect those residents on a daily basis if the request were approved. She further stated that she had not heard similar concerns expressed directly by the Town of Lone Oak regarding the proposal. Mr. Knight responded that he had not heard the same concerns from the Town of Lone Oak. He stated that the water testing conducted for the project showed capacity that exceeded what would be needed for the proposed seven lots. Mr. Knight further stated that Lone Oak was currently supplying water to Luthersville while Luthersville addressed issues with its own system. Commissioner King remarked that doing so would seem to create an even greater demand on Lone Oak's system. Mr. Knight responded that Lone Oak currently had sufficient capacity and reiterated that its water capacity exceeded what would be required for the proposed development. Chairman Collins then asked whether Lone Oak also receives water from Meriwether County. Commissioner King stated that he thought a water line had previously been extended to Lone Oak. Mr. Knight responded that they were currently working with an engineer to prepare a report evaluating the water system and determining how many additional lots could ultimately be served. He stated that he would be happy to share that information with the Board once the engineering work was completed. Mr. Knight further stated that, based on the information currently available, they had received approval and confirmation that providing water service to the proposed seven lots would not be a problem and that the water system had sufficient capacity to serve those lots. Vice Chairman Snelson asked whether Chisel Mill had considered a layout that would maintain 2-acre lots and avoid the need for rezoning. She questioned whether water service could still be provided to the development under a 2-acre lot configuration and stated that such an approach might provide the water access being sought while retaining lot sizes that the Board may be more comfortable with. Vice Chairman Snelson then asked whether any alternative layouts using 2-acre lots had been considered. Mr. Knight responded that maintaining 2-acre lots would reduce the development from seven lots to approximately four lots, which would have a significant impact on the project. He stated that, in that situation, they would need to evaluate whether it would still make sense to pursue water service, noting that the primary reason for seeking water service was to allow the 1.5-acre lots. Mr. Knight stated that, if the lots remained at 2 acres, they might instead consider using wells. He reiterated that keeping the lots at 2 acres would likely reduce the development from seven lots to four. Vice Chairman Snelson responded that, based on the information currently before her, she felt more comfortable maintaining 2-acre lots because of concerns regarding the water supply in that area. Vice Chairman Snelson asked if anyone else had any more questions. Commissioner King asked Vice Chairman Snelson if she wanted to table this or come out and make a vote. Mr. Knight questioned why the Board was not accepting the water test results that had already been completed and stated that the test showed the project had passed. Vice Chairman Snelson responded that she believed there was another study being conducted and noted that the Board had not yet received those results. Mr. Knight replied that he had provided all of the information he had and asked if she was referring to the additional topography and engineering work. He clarified that the additional engineering study was intended to determine capacity for development beyond the proposed seven lots. Mr. Knight stated that the existing water test demonstrated more than enough capacity for the seven lots currently being proposed. He further stated that he had provided the Board with the Lone Oak approval letter, which included the water test results on the back, and explained that the water test was required in order to obtain the approval letter from Lone Oak. Commissioner Worsley stated that one concern he had with the flow test report was that it did not clearly identify the units of measurement being used. He questioned whether the measurements were in PSI, bars, inches, millimeters, or another unit and noted that the test criteria were not clearly labeled. Commissioner Worsley pointed to items such as the nozzle size listed as 2.25 and stated that there is a significant difference between 2.25 millimeters and 2.25 inches when evaluating water flow and pressure. He stated that, in his opinion, a more clearly documented report should have been provided. Mr. Knight responded that the test had been performed by Matt Castleberry, whom he stated also performs a significant amount of water-related work for Meriwether County, Commissioner Worsley replied that he would go back to Mr. Castleberry and ask why the report did not clearly identify the units and testing criteria used. He noted that, since the report had been paid for, it should clearly state the information necessary to interpret the results. Commissioner King stated that, if he was following Commissioner Worsley's concern correctly, the issue was that the test appeared to have been conducted using a 2.25 nozzle size, while the development would involve multiple service connections. He questioned whether the test results accurately reflected the demand that would be created by all of the proposed lots. Chairman Collins responded that he believed Commissioner Worsley's concern was more basic than that, noting that the report listed a nozzle size flow of 2.25 but did not identify whether that measurement was in inches, millimeters, or some other unit, making it difficult to interpret the results of the test. Commissioner Worsley asked whether the pressure reflected in the report was 60 PSI or 60 bar. Mr. Knight responded that the existing system had sufficient capacity to serve the proposed seven lots. He explained that, if additional development beyond the seven lots were pursued, the water infrastructure would likely need to be upgraded to a larger line, which was the reason they were having an engineering report prepared for the area along Forrest Road. Mr. Knight stated that the current 2- inch line had been determined to have more than enough capacity for the seven proposed homes. He further stated that, if additional information was needed to make the report clearer or more acceptable to the Board, he would be willing to obtain it. Mr. Knight explained that the report provided the information necessary for Lone Oak to approve water service and confirm that sufficient capacity existed to serve the proposed homes. Commissioner Worsley responded that, while that may have been sufficient for Chisel Mill and Lone Oak, the Board needed a report that clearly identified the testing parameters and exactly what had been tested. He stated that the information needed to be clearly presented for the Board's review. Commissioner Worsley then stated that he understood Mr. Knight's frustration but noted that the Board was also frustrated by the confusion surrounding the request. He referenced the fact that the Board had initially been reviewing a different plat than the one currently under consideration and noted that the Planning and Zoning Commission had not reviewed the revised version. Commissioner Worsley also expressed concerns regarding the test report, stating that it did not clearly explain how the testing was performed or provide sufficient detail for the Board to evaluate it. He stated that there was a considerable amount of confusion surrounding the request and questioned whether the matter was being rushed. Commissioner Worsley acknowledged that Chisel Mill was attempting to maximize the value and development potential of its property but stated that the Board had a responsibility to ensure that future development decisions did not negatively impact existing residents. He noted that the County had recently held a major Water and Sewer Authority meeting regarding significant water issues throughout the County and stated that the Board needed to be certain that approving additional water service would not create problems for existing customers. Commissioner King stated that Mr. Knight had previously indicated that there was sufficient water pressure to serve the seven proposed lots. However, he noted that Mr. Knight had also stated that the intent was to develop these lots first and then continue development farther down the road. Commissioner King remarked that those future lots would likely also be proposed as 1.5-acre lots. Mr. Knight responded that they would be seeking similar lot sizes for future phases. However, he clarified that they were not currently claiming that the existing water capacity would support those future developments. He stated that they believed additional development could be supported, but an engineering study would be needed to confirm that capacity before moving forward. A motion was made by Vice Chairnan Snelson and seconded by Commissioner Threadgill to continue the Public Hearing until the June 23, 2026, Regular Meeting. All were in favor. 2. Case #PC26-10 - Request from the family Smith-Watson for the special use of .06 acres for a family cemetery located on parcel 101-008, McLaughlin Road A motion was made to enter the Public Hearing at 6:41 p.m. by Commissioner Threadgill and seconded by Vice Chairman Worsley. All were in favor. Planning and Zoning Director Cassandra Jones presented a request from Annette Brown regarding the establishment of a family cemetery on her property. Director Jones explained that Ms. Brown's mother was seriously ill and that Ms. Brown was requesting approval to bury her mother on the property. She stated that a survey had been completed and provided to the Board as part of the meeting materials. Director Jones noted that the proposed cemetery area consisted of approximately 0.06 acres and would be known as the Smith- Watson Family Cemetery. She stated that Ms. Brown was present to answer any questions the Board might have regarding the request. Chairman Collins asked it there was anyone present to speak in favor of the request for the cemetery. Annette Smith-Brown of 584 S. Talbotton Street, Greenville stated that the property is her mother's, located at 1216 McLaughlin Road. Ms. Brown stated that her mother wanted to be buried on her property and that it was her dying wish. With no one else wishing to speak in favor, Chairman Collins asked if there was anyone there to speak in opposition. With noone wishing to speak in opposition, a motion was made by Commissioner King and seconded by Commissioner Threadgill to close the Public Hearing at 6:43 p.m. All were in favor. A motion was made by Commissioner King and seconded by Commissioner Threadgill to approve the request for the special use of 0.06 acres for a family cemetery located on parcel 101-008, McLaughlin Road. All were in favor, XI. APPOINTMENTS XII. UNFINISHED BUSINESS 1, Request for Funding for the City of Manchester for their Fourth of July Celebration — Manchester Fire Chief Ben Williams — Tabled from the April 28th, 2026, Regular Meeting. County Administrator Gorton stated that Manchester Fire Chief Ben Williams was present to discuss a request for County funding assistance for the City of Manchester's Fourth of July celebration. Commissioner Threadgill stated that the Board had previously tabled the request to allow additional time for consideration. He acknowledged that Manchester is not what it once was but noted that the City of Manchester contributes significantly to the County's tax base. Commissioner Threadgill then stated that he would like to make a motion to provide $10,000 to the City of Manchester for its Fourth of July fireworks celebration and placed the request in the form of a motion. Commissioner Threadgill stated that he had made a motion to provide $10,000 to the City of Manchester for its Fourth of July fireworks celebration. Chairman Collins announced that there was a motion on the floor and called for a second. After asking if there was a second to the motion and receiving none, Chairman Collins declared that the motion failed for lack of a second. Commissioner Worsley asked what action the Board had taken regarding the Manchester Fourth of July celebration in previous years. He asked, "What have we done? What have we done the last few years? What did we do then?" Commissioner Threadgill stated that the Board only gave $1,000 dollars last year. Manchester Fire Chief Ben Williams stated that the County had provided $1,000 for the event for the last two years. He added that three or four years ago, the County provided $10,000. Chief Williams stated that the celebration draws approximately 4,000 to 5,000 people from Manchester, Meriwether County, Upson County, Pike County, and surrounding areas. He noted that those attendees spend money locally and stated that the event adds money to the SPLOST camp as well. Chief Williams stated that everyone benefits from the celebration, including the citizens of Meriwether County. Chairman Collins stated that the only thing he wanted to add was that Meriwether County had hosted fireworks at Lake Meriwether for the last two years and that he appreciated the City of Manchester for hosting fireworks during the years when the County did not. He noted that the County was approaching its third year of hosting the event at the lake. Chairman Collins stated that the County had taken pride in not using taxpayer dollars to fund the fireworks display at Lake Meriwether and that the event had been paid for entirely through local sponsors. He stated that the County had worked hard to achieve that goal and, with that in mind, he did not feel it would be appropriate to use taxpayer funds to support Manchester's fireworks program. Commissioner King asked whether the City of Manchester had begun any type of sponsorship program that would allow local businesses and organizations to contribute financially toward the Fourth of July celebration. Manchester Fire Chief Ben Williams responded that he had been placed in charge of fundraising for the event. He stated that he had distributed approximately 50 to 55 letters to various businesses seeking sponsorships and support. Chief Williams stated that they had received a pretty good response from the business community. Commissioner King asked Chief Williams how much they had raised. Chief Williams stated that he did not have the fundraising totals with him. He explained that many of the donations had been directed to City Hall and that he would need to obtain the figures from City staff. He noted that he had been responsible for making the requests, while the payments and donations were being received and processed through City Hall. Commissioner King stated that he knew the request placed the Board in a difficult position and that Commissioner Threadgill had every right to make the motion, especially as a representative of Manchester. He stated that he wished there were a way to support the request. However, Commissioner King explained that his concern was that, if the County provided $10,000 or $15,000 in taxpayer funding to Manchester, it would create expectations that the County should also provide similar support to the other municipalities in the County. He stated that other cities could reasonably ask why Manchester received assistance if they did not. Commissioner King further stated that he had personally helped raise money for the Lake Meriwether fireworks event and wanted to be honest about the feedback he had received from sponsors. He explained that some sponsors had indicated that if their donations were being redirected to support other events or communities, they would no longer contribute. Commissioner King stated that if the County contributed $10,000 to Manchester and then lost $10,000 in sponsorships for the Lake Meriwether fireworks, the County could eventually find itself having to spend taxpayer dollars on both events. He stated that this was his primary concern. Commissioner King noted that when businesses and individuals choose to sponsor an event, they generally want their donations used for the specific event they are supporting. He stated that people who want to support Manchester can donate to Manchester, and those who want to support the Lake Meriwether fireworks can donate there. Commissioner King concluded by stating that what concerned him most was the possibility of taking money intended for one event and using it elsewhere, which he believed could discourage future sponsorships. Commissioner Threadgill stated that he disagreed. He remarked that there had been a number of occasions when requests involving Manchester had not received support from the Board and stated that he was sick of it. Commissioner Threadgill expressed his personal opinion that Manchester was not receiving fair consideration and noted that many people who currently serve on the Board are originally from Manchester but now live in other areas of the County. Commissioner Worsley stated that he did not believe the County should refuse to provide any support to Manchester. He noted that the Board had previously agreed to allocate up to $25,000 in taxpayer funds for the Lake Meriwether fireworks event in Woodbury, although local sponsorships had ultimately covered those costs and taxpayer funds were not needed. Commissioner Worsley stated that, because the Board had been willing to commit those funds for the Lake Meriwether event, he was not opposed to providing some level of assistance to Manchester. He explained that he did not support providing the full amount previously requested, but he was willing to help because the residents attending the event are also citizens of Meriwether County. Commissioner Worsley stated that he would support providing the same amount the County had contributed in the past and then made a motion to provide $5,000 to the City of Manchester to assist with the Fourth of July fireworks celebration. Commissioner Threadgill immediately seconded the motion. Commissioner King then asked how much funding was being proposed. Commissioner Worsley responded that the amount was $5,000, which he noted was half of what had been provided several years ago. Chairman Collins acknowledged that a motion and second had been made and called for a vote. Voting in favor were Commissioner Worsley and Commissioner Threadgill. Voting Opposed were Chairman Collins, Vice Chairman Snelson, and Commissioner King. The motion failed. Commissioner Threadgill left the meeting at 6:50 p.m. XIII. NEW BUSINESS I. Approve the 2026-2027 ACCG Property & Liability Renewal and allow the Chairman to sign County Administrator Gorton presented the annual insurance renewal through ACCG-IRMA, noting that the current policy expires on June 30, 2026. He stated that the renewal policy would provide coverage from July 1, 2026, through June 30, 2027. County Administrator Gorton reported that the total renewal premium was $761,516 and that, after applying the 5% Safety Coordinator Discount of $38,076, the total premium would be reduced to $723,440. He noted that the renewal information included a comparison of premiums over the past three years and that the proposed renewal reflected an 8.69% increase over the prior year's premium of $665,577. County Administrator Gorton stated that staff recommended approval of the insurance renewal coverage for the July 1, 2026, through June 30, 2027, policy period and recommended authorizing the Chairman to execute the renewal documents. Commissioner Worsley asked whether ACCG-IRMA had provided an explanation for the premium increase, particularly in light of the significant increases the County had experienced from year to year. He inquired about the basis for the increase and whether any specific factors had contributed to the higher renewal cost. County Administrator Gorton responded that the increase was primarily attributable to vehicle coverage costs. He noted that the County still carried a $10,000 deductible and stated that the premium included coverage for a total loss fire truck claim as well as several newly added vehicles. County Administrator Gorton remarked that, considering those factors, the overall increase of 8.69% was relatively modest. Commissioner Worsley then asked him to repeat the information regarding the increase from the previous year. County Administrator Gorton stated that the County experienced a total loss of a fire truck during the policy period and had also added new vehicles to the fleet, including Dodge Durango pursuit vehicles. He explained that, despite the fire truck loss and the addition of several vehicles to the insurance schedule, the County's renewal premium increased by only 8.69%. He noted that, considering those factors, the increase was relatively reasonable. Commissioner Worsley noted that the County had added a number of vehicles to its insurance coverage and was now getting paid back for totaling two fire trucks. County Administrator Gorton clarified that the current policy year involved only one totaled fire truck, noting that the other fire truck loss occurred during the previous policy period. County Administrator Gorton replied that, with the previous fire truck loss, the County's insurance premium had only increased by approximately $3,400 year-over-year. Chairman Collins stated that the most recent fire truck that was totaled had not yet been factored into the insurance rate increase. County Clerk Stephens responded that the County had already received payment for that claim. Chairman Collins clarified that he was referring to the increase in the insurance premium rather than the insurance payout itself. County Administrator Gorton responded that the current renewal being discussed reflected that loss, and Chairman Collins acknowledged that it was included in the current year's renewal figures. County Clerk Stephens noted that part of the increase also resulted from the addition of the three donated fire trucks to the County's insurance coverage. She reminded the Board that those vehicles had been added separately and that the County had to make an additional insurance payment for them. County Administrator Gorton agreed and stated that the three donated fire trucks cost the County approximately $12,500 a piece to acquire. However, once they were added to the insurance policy, the combined insured value of the three trucks represented roughly three-quarters of a million dollars in coverage each. Commissioner Worsley stated that the insurance increase was a perfect example that actions have consequences and that those consequences affect the entire County tax base. He stated that the County needs to ensure it has adequate training, qualified drivers, proper investigations, and appropriate disciplinary measures when incidents occur because insurance claims and vehicle losses contribute to rising insurance costs. Commissioner Worsley noted that vehicles had been totaled and stated that departments and County administration must exercise due diligence when those situations occur in order to avoid future increases. Commissioner Worsley stated that he understood some of the increase was unavoidable and attributable to inflation and the addition of new equipment, but noted that the issue extended across all departments. He stated that County Administrator Gorton had pointed that out and that he was glad he did because it was a real issue. County Clerk Stephens stated that it is across all departments and that the one fire truck was not the only totaled vehicle. Commissioner Worsley then commented that it seemed like there was a pandemic, similar to COVID, involving people who could not drive. County Clerk Stephens stated it was not limited to one department. Chairman Collins stated that public works employees who operate tandem dump trucks are generally required to have a CDL license, but that firefighters operating fire trucks are not. He suggested that firefighters should receive additional training, such as using a driving simulator or participating in hands-on instruction for operating heavy fire apparatus. Chairman Collins noted that the County would soon be receiving two new tanker trucks, both of which would be tandem vehicles, and stated that it was important to ensure personnel were properly trained to operate them. County Clerk Stephens responded that the County does have training opportunities available through ACCG as part of its safety program. She pointed to the safety discount reflected in the insurance renewal and stated that ACCG brings a driving simulator to the County and has conducted training classes with various departments using that equipment. Commissioner King asked about the status of the new tanker trucks, noting that they were expected to have already arrived. County Administrator Gorton responded that the last update he had received indicated the tankers should arrive either that week or early the following week. He added that he would need to contact the manufacturer to obtain a more definitive delivery update. Commissioner King asked when they were originally estimated to be in. County Administrator Gorton stated that the tanker trucks were originally expected to arrive in April, but delivery had been delayed due to parts shortages. He explained that the latest information indicated the trucks were expected to arrive by the first of June. Commissioner King remarked that he had understood the delivery date to be the end of May. County Administrator Gorton replied that he would need to check with the vendor because the delay was related to parts and manufacturing issues. Commissioner King then asked what the current estimated delivery date was. County Administrator Gorton responded that, based on his understanding, the tankers should arrive by the end of that week. He stated that he would contact the vendor and confirm the delivery status. A motion was made by Commissioner Worsley and seconded by Vice Chairman Snelson to approve the 2026-2027 ACCG Property & Liability Renewal in the amount of $723,440, and allow the Chair to sign. All were in favor. 2. Discuss and Approve 2026 LRA Project List County Administrator Gorton stated that Fire Chief Stephens had provided Public Works Director Brian Griffith with a list of low-rated and low-weight bridges to be evaluated for potential use of the County's 2026 LRA funding. He noted that seven bridges had been identified and listed in order of priority by Fire Chief Stephens. County Administrator Gorton added that, when Director Griffith inspected several of the locations, a few were found not to have bridges and therefore would not qualify for the funding. County Administrator Gorton stated that, as an alternative, the 2026 LRA funds could be used to fully pave Alvaton Road, which totals approximately 5.5 miles. He explained that the work could either be completed in-house or through a bid process. Based on current LMIG pricing, the estimated cost was $269,223 per mile. County Administrator Gorton reported that the total project cost would be just under $1.5 million. He stated that the estimated 2026 LRA funding allocation was $1,018,667 and that an additional $462,120.83 would be needed to complete the project, which could be funded through TSPLOST. Commissioner Worsley asked whether the bridges listed by Fire Chief Stephens could be completed using the available LRA funding without requiring any additional funds from TSPLOST. County Administrator Gorton responded that they could. Commissioner Worsley then asked whether paving Alvaton Road would require additional funding. County Administrator Gorton replied that it would and explained that only the bridge projects could be completed entirely with the available LRA funds. He stated that paving Alvaton Road would require additional funding to complete the project. County Administrator Gorton added that the same situation would apply when the Board later discussed LMIG funding as well, although that project would require approximately $100,000 more in additional funding. County Clerk Stephens noted that the three bridges that staff had reviewed earlier that day would not fully utilize the available 2026 LRA funding. She explained that, based on the estimates provided, approximately $1,018,000 in eligible projects would be needed to utilize the full funding allocation. County Clerk Stephens stated that the three bridges under consideration did not total that amount and that only three of the bridges could currently be used. She added that additional information could be provided regarding the bridge estimates, but explained that staff had compiled a project list in an effort to estimate eligible costs. County Clerk Stephens noted that the three bridge projects totaled only approximately $535,000. She further stated that the County would still need to identify additional projects totaling roughly another $500,000 in order to fully utilize the available 2026 LRA funding. Commissioner Worsley noted that seven bridges were listed on the priority list and questioned why only three of them could be considered for the project. Public Works Director Brian Griffith explained that Mitchum Road was immediately removed from consideration because the bridge is an active CSX railroad bridge with a three-ton weight limit and is owned by CSX. He stated that the County cannot perform work on that bridge. Director Griffith further explained that Al Roberts Road was also included on the list provided to him, but Al Roberts Road is located in Coweta County and had recently been paved to complete that project. He noted that there is no bridge on Al Roberts Road within Meriwether County. County Clerk Stephens stated that parts of that road are located in Meriwether County. Public Works Director Brian Griffith explained that Meriwether County does have property along the left side of Al Roberts Road; however, the roadway itself had already been resurfaced from start to finish, and there was no bridge on that roadway. Commissioner King stated that he thought the bridge being referenced was located farther down Al Roberts Road. He explained that if you travel down Al Roberts Road to where it curves to the right and transitions into a dirt road, it continues all the way Strickland Town. Commissioner King noted that portion of the roadway is within Meriwether County jurisdiction. A discussion followed regarding several bridges identified on the priority list. It was noted that one bridge associated with Rocky Mount Road was not included on the list under consideration and that there are multiple bridges located along that roadway. Discussion then turned to a bridge located on Stovall Road, which was described as being situated on a pond dam and currently in satisfactory condition. Questions were raised about a bridge crossing an active railroad line. It was explained that the railroad bridge under discussion is owned and controlled by CSX and is not a County-owned bridge. Because the structure is located over an active railroad and remains under CSX ownership, the County does not have authority to perform construction or maintenance work on it. The discussion then shifted to a previously closed bridge over a railroad line. It was recalled that the bridge had been condemned and that estimates to rebuild it were substantial. Questions were raised regarding the difference between that bridge and the CSX-owned bridge. It was explained that the previously closed bridge had been transferred from railroad ownership to the County many years ago, making it a County-owned structure and therefore the County's responsibility. In contrast, the bridge on Mitchum Road remains under CSX ownership, and any work performed on that structure has historically been completed by CSX rather than the County. County Clerk Stephens stated that she had reviewed the records for the Mitchum Road bridge because she recalled discussions about the structure within the last three or four years. She explained that the records showed GDOT had inspected the bridge and recommended lowering the weight limit due to needed repairs. County Clerk Stephens noted that CSX subsequently completed the necessary repairs and that meetings had been held involving the County, CSX, and GDOT at the bridge site. She further explained that, according to the file, GDOT had completed certain improvements, including the installation of timber caps and runners. County Clerk Stephens stated that CSX and GDOT ultimately addressed the maintenance issues associated with the bridge. She recalled that when concerns about the bridge first arose, CSX initially took the position that the County should pay for the repairs, but it was later determined that the bridge was not the County's responsibility to maintain. After hearing the explanation, it was acknowledged that the bridge was not a County-maintained structure. Commissioner Worsley confirmed that Murray Road was a go. Director Griffith confirmed. Commissioner Worsley stated that Mitchum Road was out because it was CSX. Director Griffith confirmed. Commissioner Worsley asked about Mt. Pilgrim Road. Director Griffith stated that was out because it was the long wooden bridge over a lake that the County had already closed due to the bypass. Director Griffith stated he did not work up a price on that. He explained that it was going to have to be evaluated by a company, as it is a 3-4 million dollar project. Vice Chairman Snelson asked Director Griffith what bypass he was referring to. Director Griffith stated the bypass for 362. It was determined that Director Griffith was referring to Massengale Mill Road, and not Mt. Pilgrim Road. Commissioner Worsley asked about Mt. Pilgrim. Director Griffith stated he has Al Roberts, Harman, Stovall, and Beaver Lake. Commissioner Worsley stated that Stovall is not on their list. Director Griffith stated it had been removed because the address for that bridge was in Troup County. Director Griffith asked if there was an address on that one for Mt. Pilgrim. County Administrator Gorton stated that it was 2354. Director Griffith stated he could assess that one first thing the next morning. Commissioner Worsley stated that, based on the discussion, the Board did not yet have a complete or accurate list upon which to make a decision. Director Griffith stated that three bridges out of the list of six could be candidates. Commissioner Worsley stated that this basically totaled $500,000 dollars and there needed to be another $500,000 dollars worth of bridge projects identified to obtain the full LRA funding. Director Griffith stated that it doesn't have to be all bridges. Director Griffith stated Murray, Harman, and Beaver Lake are the three selected. He explained that he will have to look at Mt. Pilgrim. Vice Chairman Snelson asked about the bridges on Harmon Road and Beaver Lake Road, noting that they were posted with six-ton and five-ton weight limits. She questioned whether those bridges were already restricted because of their condition and whether they remained in poor enough condition to require replacement or substantial repairs. Director Griffith stated that no, the bridges just couldn't tow a fire truck across them. Commissioner Worsley noted that the County was already working on the 2025 project for Dallas Mill Road, yet the road also appeared on the current bridge list. He questioned whether there were multiple bridges located on Dallas Mill Road, stating that he did not recall there being more than one bridge on that road. Commissioner Worsley expressed concern about the accuracy of the project list and asked if the list could be cleaned up. Public Works Director Brian Griffith stated that, as soon as he knew what everybody wanted, he would clean it up the best he could. He noted that he had prices for 15 small roads to pave, prices for eight large roads, prices for 27 pipe crossings, and a priority list that had been provided to him by someone else. Director Griffith stated that, as soon as he received direction on what the Board wanted to pursue, he would move forward accordingly. Commissioner Worsley stated that Director Griffith shouldn't be getting a priority list from anyone other than County Administrator Gorton. Public Works Director Brian Griffith stated that when the Board asked the Fire Chief which roads he wanted bridges replaced on, the Board had given him the authority to make those recommendations and requests. He then asked if that was a fair statement, and it was acknowledged that it was. Chairman Collins asked Director Griffith if the "fireman" gave him culverts that needed to be replaced. Director Griffith stated that he did. Director Griffith stated that this is not the road department list. Commissioner Worsley stated he understood that. Director Griffith stated that these are not the culverts he would fix. Commissioner Worsley asked Director Griffith if he could clean up confusion with his list. Director Griffith stated that he could give him three bridges for $535,000 dollars right now, and he would have to check on Mt. Pilgrim Road. County Clerk Stephens stated that, once a project list is submitted for the funding, it can still be changed if the Board later decides to pursue a different project. She explained that she had spoken with the GDOT State Aid Coordinator earlier that day and was informed that making changes simply requires submitting a form to GDOT. County Clerk Stephens noted that the process is straightforward and emphasized that changing a project after submission would not be difficult or require an extensive approval process. She stated that she wanted the Board to be aware of that flexibility as it considered its options. Commissioner Worsley stated that the reason he was asking so many questions was because the Board was being presented with two significant requests and he did not believe there was enough information available to make a decision on either one. He noted that the bridge proposal still required clarification, particularly since the discussion had revealed that the available funding would not cover all the proposed projects. Commissioner Worsley further stated that he was not comfortable making a decision regarding Alvaton Road because approximately 2.5 miles of that road was also included in the LMIG project discussion later on the agenda. He remarked that the Board needed all the information before making a decision and did not want to take action on one item, only to find that it conflicted with decisions made during the LMIG discussion. Commissioner Worsley suggested that the Board move ahead to the LMIG agenda item first because it would likely affect the discussion on the current item. It was then suggested that the Board skip ahead to Item No. 6 and return to Item No. 2 afterward. Chairman Collins stated that he had recently spoken with an individual who performs bridge inspections and asked whether the State provides the County with a report each time a bridge is inspected. He questioned whether those reports include information regarding the bridge's weight rating and allowable tonnage. Chairman Collins remarked that reviewing those reports should provide the information needed because the bridges are already posted according to the State's findings. Director Griffith stated that if a bridge has a six-ton limit, the County posts it accordingly, and if it has a sixteen-ton limit, it is posted with that restriction. Director Griffith further stated that the bridges being discussed had carried those restrictions for a very long time and that their conditions were not new issues. Commissioner Worsley asked County Attorney Hill how the Board could pause consideration of Item No. 2 and move ahead to Item No. 6. He questioned whether doing so would require a motion.County Attorney Hill responded that, based on the discussion, it did not appear that the Board was prepared to make a decision on Item No. 2 without first obtaining additional information regarding the bridge projects. He suggested that the Board would likely be better served by tabling Item No. 2 until the next meeting and then proceeding through the remainder of the agenda in its normal order. County Attorney Hill noted that the Board could address Item No. 6 when it reached that point on the agenda. County Clerk Stephens stated that her only concern was the deadline for submission is June 15th, and the next meeting is June 8th. Commissioner Worsley stated that he believed the Board could use the information already available to develop a project plan once the LMIG discussion was completed. Director Griffith stated that he had not seen the bids that came in from the contractors. Commissioner Worsley then asked County Attorney Hill whether he could make a motion to table Item No. 2 until after the Board had discussed Item No. 6. County Attorney Hill responded that, theoretically, the Board could do that. He noted that it was not something typically done and stated that it probably would have been better to amend the agenda to move the LMIG discussion earlier. However, County Attorney Hill advised that the Board could table Item No. 2 until after Item No. 6. A motion was made by Commissioner Worsley and seconded by Commissioner King to table Item No. 2 until after Item No. 6. All were in favor. The Commissioners returned to Item No. 2 after discussing Item No. 6. A motion was made by Commissioner Worsley to approve the 2026 LRA Project List to include Murray Road, Harman Road, and Beaver Lake Road bridges with the funds to come from the 2026 LRA funding, taking the balance of the 2026 LRA funding and bid out the remaining 3.5 miles of Alvaton Road for paving, and any remaining balance of that project be funded with the remaining balance of the 2024 LRA and Fund Balance if necessary. The motion was seconded by Vice Chairman Snelson. All were in favor. 3. Discussion of Speed Bumps for Silver Street and Gold Street County Clerk Stephens reported that the County had received concerns regarding speeding and traffic safety near 376 Silver Street and 363 Gold Street in the Durand community. She explained that residents in the area had requested that the Board consider installing speed bumps to help reduce vehicle speeds and improve safety for motorists, pedestrians, and nearby property owners. County Clerk Stephens stated that the purpose of the agenda item was to allow the Board to discuss the possible installation of speed bumps at those locations and provide direction to staff regarding any additional review or action that might be needed. She further reported that she had consulted with the Sheriff's Office, Fire and Rescue, and the Public Works Department, and none of those departments had expressed any objections or concerns regarding the proposed installation of speed bumps at the requested locations. County Clerk Stephens concluded by stating that staff was seeking discussion and direction from the Board regarding the possible installation of speed bumps near 376 Silver Street and 363 Gold Street. Commissioner Worsley explained that 363 Gold Street is located on the section of Gold Street between Highway 18 and Silver Street. He noted that while Gold Street continues beyond that area, the resident's request was specifically focused on that short stretch of roadway. Commissioner Worsley stated that the resident had indicated he did not care if the speed bump was placed directly in front of his house and was primarily concerned with slowing traffic in the area. Commissioner Worsley described the section of roadway as relatively short, estimating it to be approximately one-quarter mile in length. He stated that residents had reported motorists frequently disregarding stop signs while traveling toward Silver Street. He further explained that traffic coming from County Line Road onto Silver Street and continuing through the area was often traveling at excessive speeds. Commissioner Worsley stated that residents were hopeful the installation of speed bumps would help slow traffic and improve safety, noting that there are many children who play in the area and that their safety was a primary concern. Chairman Collins asked if this was a motion from Commissioner Worsley. Commissioner Worsley stated that he didn't know if the Board wanted to discuss it. With no discussion, a motion was made by Commissioner Worsley and seconded by Vice Chairman Snelson to approve the installation of speed bumps at the locations identified on Silver Street and Gold Street. All were in favor. Commissioner King stated that the Board needed to determine a long-term solution to address speeding in the area. He noted that the Sheriff's Department had indicated it could not conduct radar enforcement because approval from the Georgia State Patrol was required. Commissioner King expressed concern that the County continued to add more speed bumps in response to speeding complaints. While he acknowledged that residents deserved relief from speeding traffic, he cautioned that an increasing number of speed bumps could eventually create other issues. Commissioner King noted that, although emergency services had not expressed concerns with the proposed installation, ambulances and fire trucks are required to slow significantly when crossing speed bumps. He stated that emergency vehicles cannot safely travel over them at higher speeds due to the equipment and personnel they carry. Commissioner King concluded by stating that motorists were ignoring speed limits and stop signs, yet citations were not being issued, and he was uncertain what the best solution would be. Chairman Collins stated that they can't keep the trucks off the no through truck roads. Commissioner Worsley stated that he agreed with Commissioner King that there couldn't be speed bumps all over the County. Commissioner King stated that the Board was likely to receive more and more requests for speed bumps because approving them in one location would set a precedent for other neighborhoods. He noted that he had supported similar requests in the past and agreed with helping residents address speeding concerns. However, he cautioned that the County needed to find another solution because, otherwise, residents throughout the County would continue requesting speed bumps. Commissioner King stated that, over time, the increasing number of speed bumps could create problems and hinder traffic flow and emergency response efforts. Chairman Collins stated that he is not going to vote to put one on Cedar Rock Road. 4. Discussion of Jail Facility Maintenance County Administrator Gorton reported that jail-related work to address plumbing and lock issues was underway. He stated that Bates Mechanical had already been on site to evaluate the plumbing concerns, while C.A. Owens had been scheduled to inspect the lock system but had notified the County that they would instead arrive the following day by 11:00 a.m. to review all lock-related issues at the jail. County Administrator Gorton noted that he did not yet have a complete update on the lock repairs because the inspection had not yet occurred. He explained that Bates Mechanical had already inspected the plumbing system and identified several pipes that had been cut too short, as well as issues involving a pressure regulator. He stated that Bates Mechanical was working to correct those problems. County Administrator Gorton concluded by noting that Bates Mechanical had already begun addressing the plumbing issues and that C.A. Owens would be on site the following day to assist with the lock repairs. Commissioner Worsley asked whether the work being discussed consisted primarily of items that should have already been completed and whether the repairs were being addressed under the warranty for the original work. County Administrator Gorton responded that they were. Commissioner Worsley then stated that the County had hired the contractors to perform the work initially and that they were now having to return to remediate deficiencies in their own work. County Administrator Gorton confirmed that was correct. Commissioner Worsley asked whether there was any action the Board needed to take regarding the matter. County Administrator Gorton responded that there was not and stated that he was simply providing an update on the facility. He explained that, as previously mentioned, Bates Mechanical had identified an issue with a regulator and discovered that some of the piping had been cut approximately one-half inch too short. County Administrator Gorton stated that those items were being replaced and corrected. Vice Chairman Snelson asked if they did not notice the pipe was too short when they put it in. County Administrator Gorton stated that the contractor had changed personnel approximately halfway through the project. He noted that the issues currently being corrected appeared to have originated from work performed by the first crew before the second crew took over the project. Commissioner King asked if that was still an issue now, because that was an issue a month ago. County Administrator Gorton stated that Bates Mechanical had only become involved with the issue approximately two weeks earlier and had recently completed its assessment of the problem. Commissioner King responded that the Board had discussed the issue at a prior meeting two to four weeks earlier and had been told that only a valve or another specific item needed to be addressed. He expressed concern that the problem stil] had not been resolved. County Administrator Gorton replied that he had requested an update from Lee prior to the meeting but had not received one. He stated that he had asked Lee to stop by and provide an update on the status of the work and where Bates Mechanical was in the repair process. Chairman Collins asked about the status of the jail locks. County Administrator Gorton responded that C.A. Owens had been scheduled to be on site that day but called around 1:00 p.m. to advise that they would instead arrive by 11:00 a.m. the following day. Chairman Collins asked whether they would be bringing replacement keys. County Administrator Gorton replied that C.A. Owens would first assess the situation and determine what corrective actions and materials would be needed. Commissioner King asked who was actually overseeing the jail project. He compared the situation to the courthouse project, noting that EMC oversaw the work being performed by River City. Commissioner King then asked who was providing oversight for the work at the jail, stating that whoever was overseeing the project should be responsible for ensuring that issues were addressed and that the work was completed properly. County Administrator Gorton stated that right now it is Lee and Bill Cawthorne when he was still with the county got the locks and plumbing started. County Clerk Stephens stated that the County does't have a project manager right now. She explained that Bill Cawthorne was there in the beginning, and right now all they have is Lee. County Administrator Gorton responded that, when issues arise at the jail, Lee evaluates the situation and identifies the problem. He explained that, after the issue is assessed, the County contacts the appropriate vendor or contractor and arranges for them to come on site to address the problem. 5. Grand Jury Presentments May 2026 County Administrator Gorton stated that the Grand Jury Presentments had been included in the Board's meeting packet and had been reviewed and discussed by the Board. He explained that formal acceptance of the Presentments was now required as repair efforts at the jail continued. County Administrator Gorton also expressed the County's appreciation to the Grand Jury for carrying out its responsibilities and conducting its review of County operations. A motion was made by Commissioner Worsley and seconded by Vice Chairman Snelson to accept the Grand Jury Presentments of May 2026 as presented. All were in favor. 6. Award Bid for 2026 LMIG Resurfacing Project County Administrator Gorton reported that Meriwether County had been awarded $942,044.52 in 2026 LMIG funding. He stated that the required 30 percent local match was $282,613.36, bringing the minimum total project funding to $1,224,657.88. County Administrator Gorton stated that EMC conducted the bid opening on May 21 and received four bids. He reported that Atlanta Paving submitted a bid of $2,205,242.38, F.S. Scarborough submitted a bid of $2, 106,265.59, Piedmont Paving and Grading submitted a bid of $2,082,807.50, and C.W. Matthews submitted the lowest bid at $1,823,088.00. County Administrator Gorton stated that EMC Engineering Services, Inc. recommended awarding the 2026 LMIG project to C.W. Matthews in the amount of $1,823,088.00. He explained that accepting the bid as proposed would require an additional $598,430.12 in funding from TSPLOST in order to complete all three road projects, including Coleman Creek Circle, King Road, and two miles of Alvaton Road. County Administrator Gorton further explained that if the two miles of Alvaton Road were removed from the project scope, the total project cost would be reduced by $538,446.53, resulting in a revised project cost of $1,284,641.47. County Administrator Gorton also noted that the 2024 LMIG project still had approximately $385,000 remaining, although the County was still awaiting one final invoice. He estimated that approximately $300,000 would remain available from the 2024 LMIG allocation and stated that those funds could potentially be used to help fund the 2026 LMIG project. County Administrator Gorton concluded by stating that the decision before the Board was whether to proceed with the additional two miles of Alvaton Road as part of the 2026 LMIG project or remove that segment and instead consider paving the entire 5.5 miles of Alvaton Road under a separate project. Commissioner Worsley asked Director Griffith to come back up to the podium. Commissioner King stated that Alvaton Road is in bad shape. There were several conversations going at the same time. There was discussion amongst everyone about the cost per mile to do this in-house and where estimates came from. Commissioner Worsley asked Director Griffith if it would still cost $1.3 million per his in-house estimate. Public Works Director Brian Griffith explained that each road project is different. He stated that some roads require only resurfacing, but Alvaton Road does not. Director Griffith explained that the road would require full-depth reclamation from one side of the roadway to the other, followed by two inches of asphalt topping, striping, and shoulder construction. He stated that there was no quick or inexpensive fix for the road and emphasized that the project would need to be completed properly. Commissioner King asked whether the scope of work required for Alvaton Road was more than the Public Works Department could reasonably handle in-house at the present time, noting that the amount of work involved would consume a significant amount of staff time. Director Griffith agreed and stated that the project would require a substantial commitment of departmental resources. Commissioner King then suggested that the County might be better served by allowing C.W. Matthews to complete all of Alvaton Road while the County focused on King Road and Coleman Creek Circle. Director Griffith indicated that the approach would be preferable from an operational standpoint. Commissioner Wosley explained that there had to be a list to get the money approved, and now we are into the part of what we want to be approved. Director Griffith stated that the problem was because we have this money plus, oh, we found this money too. What are we going to do with it if we don't know? He stated that if the Board wanted to get C.W. Matthews involved, then let's get them involved. Director Griffith then clarified that C.W. Matthews was going to do these three projects, but not this one now. Commissioner Worsley asked if there was an estimate or presentation for all of Alvaton Road. Director Griffith stated he did not. County Administrator Gorton stated he estimated it to be $1.5 million. Vice Chairman Snelson asked if Director Griffith had an estimate for Coleman Creek and King Road. Director Griffith stated that he estimated that to be $1.1 million for both of those roads, and the total mileage would be 5.09 miles. Commissioner Worsley asked about just letting Public Works do King and Coleman Creek. County Administrator Gorton explained that they would still have to come up with $130,000 of projects to meet the 30% LMIG match requirement. Commissioner Worsley stated that he had an idea and asked the Board to indulge him while he worked through it. He noted that the County still had a Fund Balance overage that had not yet been allocated. Commissioner Worsley stated that if Alvaton Road were removed from the LMIG project and completed in-house by Public Works Director Griffith, the County would need to commit an additional $60,000 from TSPLOST to complete the other roads because the project cost would be reduced to approximately $1,284,000. After confirmation that approximately $1,224,000 was already available through the LMIG funding and required local match, Commissioner Worsley stated that the County would only need to add another $60,000 from TSPLOST and could then complete the other two roads through the LMIG project while Public Works completed Alvaton Road. He further stated that approximately $550,000 remained available from the bridge funding discussion and suggested applying those funds toward Alvaton Road, along with an additional $800,000 from the Fund Balance overage, which he believed would fully fund the project. County Administrator Gorton added that the County also had approximately $300,000 remaining from the 2024 LRA project that could potentially be applied toward the funding plan. Commissioner Worsley stated that the County could use the approximately $300,000 remaining from the 2024 LRA project and combine it with $500,000 from the Fund Balance overage. He noted that doing so would still leave approximately $1 million remaining in the Fund Balance overage. Commissioner King stated that Public Works Director Griffith had just said himself that they really should not be doing Alvaton Road because it was going to be very intensive. Director Griffith stated that a lot of work had to be done there. Chairman Collins stated that he did not think the Board needed to ask someone to submit a bid on a project and then begin removing portions of the work that had already been included in the bid request. He stated that he believed it would be better for Public Works Director Griffith to complete a different road project rather than one that was already included on the bid sheet. He noted that this was simply his opinion. Commissioner King stated that he did not mean any disrespect to the Public Works Department, but he wanted to point out that if you go look at Alvaton Road, it is a project that must be done correctly. He stated that if the road is not rebuilt properly, it will be torn up again within three years. Public Works Director Griffith stated that Alvaton Road is a high-traffic roadway and explained that completing the project would require a 600-gallon tack distributor. He noted that staff would likely have to travel back and forth to Atlanta each day to keep materials supplied and the work moving. Director Griffith further stated that the roadway must be built to accommodate heavy traffic, including tanker trucks carrying approximately 2,000 gallons, and emphasized the importance of constructing the road properly to withstand that level of use. Commissioner Worsley asked whether completing only the other two roads would be enough to satisfy the LMIG match requirement. County Administrator Gorton responded that if the project included Coleman Creek Circle and King Road, the County would still have enough to meet the required match. Commissioner Worsley then stated that if C.W. Matthews did not complete Alvaton Road, the County would not meet the match requirement. County Administrator Gorton clarified that C.W. Matthews had only bid two miles of Alvaton Road and that the cost for that portion of the project was $538,446.53. He noted that this figure had been calculated by EMC and provided by Chris as the estimated cost for the two-mile Alvaton Road segment included in the LMIG project. County Administrator Gorton explained that he had taken the $538,446.53 cost estimate for the two-mile Alvaton Road segment, divided it by two, and multiplied it by 5.5 miles to arrive at an estimated cost of approximately $1.4 million. He stated that this calculation was the basis for the $1.4 million figure shown on the earlier funding worksheet. County Administrator Gorton emphasized that the figure was only a rough estimate and that the project would ultimately have to be bid out, but he stated that it provided a reasonable ballpark estimate for paving the entire 5.5-mile section of Alvaton Road. Commissioner Worsley stated that, based on the figures being discussed, the County would need to commit an additional $200,000 from TSPLOST if it wanted C.W. Matthews to complete all of Alvaton Road. County Administrator Gorton responded that he would instead use the remaining 2024 LRA funds. Commissioner Worsley then stated that, under that approach, the County would complete the other two roads in-house. Director Griffith asked how short that would make the LMIG match. County Clerk Stephens stated that the required match is 30 percent. County Administrator Gorton stated that if the County completed only Coleman Creek Circle and King Road, the project total would still be approximately $1.1 million. Director Griffith responded that Gunter Road, which is off Coleman Creek Road, was a project costing approximately $50,000 and needed to be completed. He stated that there were additional roads that could be added to the project list and rated as priorities. Director Griffith remarked that identifying enough road projects to meet the required funding threshold would be the easy part. Commissioner Worsley stated that the County needed to use the State funding to complete the larger road project. He indicated that he believed the available State funds should be directed toward addressing the major roadway improvements being discussed. County Administrator Gorton stated that if the Board wanted to pave the entire 5.5 miles of Alvaton Road, it would have to reject the current 2026 LMIG bids and rebid the project. He explained that the County would need to rebid everything because the current bid package only included two miles of Alvaton Road, County Administrator Gorton further stated that if the Board chose to reject the bids and pursue all 5.5 miles of Alvaton Road, the project would have to be rebid so that all contractors would have a fair opportunity to submit bids on the revised scope of work. Commissioner King stated that if the contractor removed the shuttle buggy from the project, the County would save enough money to pay for the asphalt needed for Coleman Creek Circle. He remarked that no counties in the area use a shuttle buggy and explained that, for those unfamiliar with the equipment, a shuttle buggy is a machine that moves back and forth between trucks and the paving machine during asphalt operations. Chairman Collins questioned the cost associated with the shuttle buggy. In response, it was stated that the contractor had included the shuttle buggy in the bid price and estimated its cost at approximately $400 to $500 per hour throughout the duration of the paving operation. Chairman Collins noted that the difference between the lowest bid and the next lowest bid was approximately $200,000 and stated that someone apparently had not included the shuttle buggy in their pricing. Commissioner King responded that he did not know that part of it, but he knew that EMC had requested that a shuttle buggy be included in the project specifications. Commissioner King then observed that, at the estimated rates being discussed, the shuttle buggy represented roughly a $45,000 expense and stated that $45,000 would buy a significant amount of asphalt. Commissioner Worsley asked whether the Board could make a motion to proceed with paving the entire 5.5 miles of Alvaton Road. County Administrator Gorton responded that it could not because the project would have to be rebid. He explained that if the Board wanted to pave the entire 5.5-mile section of Alvaton Road, the current bid process would need to be rejected and the project advertised for new bids. Vice Chairman Snelson stated that the Board should keep in mind that contractors must pay EMC to submit bids on projects. He noted that rebidding the project would require contractors to incur those costs a second time for a project they had just bid on. Vice Chairman Snelson expressed concern that the County might receive fewer bids if the project were rebid because some contractors could decide not to participate after having already paid to submit a bid only a short time earlier. Commissioner Worsley stated that, based on the way the Board was discussing the project, there appeared to be a less expensive path forward. He noted that if the County proceeded with the $1.8 million project and then added approximately $600,000 of additional funding, there would still be roughly 3.5 miles of Alvaton Road remaining to be paved, which he estimated would cost another $1 million. Commissioner Worsley stated that, under the alternative approach being discussed, the County would only need to find an additional $200,000 to $400,000 to complete all of the work. He remarked that he would much rather pursue that option, even if it required working through the rebidding process, because it appeared the County could ultimately spend approximately $600,000 less. County Attorney Hill stated that the Board also had the option of bidding out only the additional 3.5 miles of Alvaton Road as an LRA project. He explained that, if the cost estimates being discussed were accurate, the project would come in at approximately $1 million, which would align closely with the available LRA funding and could potentially be completed without creating additional funding issues. County Attorney Hill stated that if the County moved quickly enough, it might be able to obtain a lower price than it would otherwise receive. He noted that timing could be a factor in securing more favorable pricing on the project. Commissioner Worsley stated that, based on the bridge discussion, the County had roughly $500,000 remaining from the current year's LRA funding. He noted that if approximately $600,000 was needed, that would leave about $100,000, which could come from the approximately $300,000 remaining from the 2024 LRA funds. Commissioner Worsley then asked whether that approach would complete the short list of bridges, the road projects, and all of Alvaton Road. It was explained that the proposal would not complete all of Alvaton Road and would still leave approximately $200,000, plus additional funding from the Fund Balance or TSPLOST, needed to finish the project. It was estimated that completing Alvaton Road would still require between $800,000 and $1 million. Commissioner Worsley responded that this was why he believed that approach would ultimately require the County to spend approximately another half-million dollars from its Fund Balance overage or TSPLOST funds, even though other funding sources were already available. Commissioner Worsley then asked what the problem was with pursuing the alternative approach immediately. He stated that the only concern he had heard was that contractors might be upset because the County had asked them to bid on a project and then removed a portion of the work from the scope after the bids were submitted. Chairman Collins stated that he did not believe contractors would be upset if the County chose to let them pave all of Alvaton Road. Commissioner King added that this is simply how the bidding process works. He explained that when a project is put out for bid, the County is not guaranteed to give the job to the lowest bidder. Rather, contractors submit bids to provide pricing information and options for consideration. Commissioner King further stated that he had been submitting bids on projects for 45 years and noted that many times he never heard back after submitting a bid, while other times he was awarded the work. He remarked that there is never any guarantee when a bid is submitted. Commissioner King concluded by stating that the Board could decide to regroup and pursue a different approach, but emphasized that timing was important and the County needed to keep the project moving forward. Commissioner Worsley stated that the estimate for paving all of Alvaton Road was approximately $1.4 million. He noted that the other two road projects required approximately $1.1 million and that the County already had $1.24 million available through the LMIG funding and required local match. Commissioner Worsley stated that he was simply calling the difference approximately $200,000. He then asked whether, once the Board approved the project, it would be able to pull out portions of the work and redirect the funding to whatever projects it wanted to pursue. County Administrator Gorton stated that he believed Commissioner Worsley was proposing to remove the two miles of Alvaton Road from the current LMIG project and instead complete the entire 5.5 miles of Alvaton Road. Commissioner Worsley confirmed that was correct. County Administrator Gorton then noted that County Attorney Hill's suggestion was to bid only the remaining 3.5 miles of Alvaton Road as a separate project. He stated that the additional 3.5 miles would be advertised and bid separately from the current LMIG project. County Attorney Hill explained that the County could not simply add the remaining 3.5 miles of Alvaton Road to the current LMIG project because that mileage was not included in the project that was originally advertised and bid. He stated that if the Board wanted to pave the additional 3.5 miles, it would have to bid that portion separately. County Attorney Hill noted that the County could make the additional 3.5 miles part of its LRA project while proceeding with the current LMIG project as bid. Commissioner Worsley stated that it would cost approximately $1.4 million to have a contractor pave all of Alvaton Road. He noted that the County already had approximately $1.24 million available through the LMIG funding and the required local match that had already been committed. Commissioner Worsley stated that the County would therefore need to add roughly another $200,000 from the 2024 LRA funds to complete Alvaton Road, which would leave approximately $100,000 remaining from those funds. Commissioner Worsley then stated that, with Alvaton Road completed, the County could turn its attention to the other two roads and have Public Works complete those projects. He noted that Public Works would need approximately $1.1 million to complete the remaining roads. Commissioner Worsley stated that the County would have approximately $500,000 remaining from the 2026 LRA funds after the bridge work was funded. He explained that committing those funds would leave approximately $600,000 still needed. He then proposed using the remaining $100,000 from the 2024 LRA funds, reducing the shortfall to approximately $500,000. Commissioner Worsley stated that the remaining $500,000 could come from either TSPLOST or the Fund Balance overage. He concluded that, under that approach, the County would only be spending approximately $500,000 outside of the awarded funding sources rather than approximately $1 million. County Clerk Stephens stated that to receive all the 2026 LRA funding, the project list must be estimated to the amount. Commissioner Worsley stated that the proposal would include all of the LMIG projects that had been discussed, plus finishing Alvaton Road. After receiving confirmation, he stated that the approach would use all of the LMIG funding, all of the current year's LRA funding, and the remaining balance from the 2024 LRA funds. Commissioner Worsley noted that it would then only cost the County approximately $500,000, which could come from either TSPLOST or the Fund Balance overage that had already been discussed for road and building projects. He stated that, if the County proceeded the other way, it would cost approximately $1 million to pay a contractor roughly $1.1 million to complete the other two roads. County Administrator Gorton stated that he believed the Board first needed to approve the 2026 LMIG project as presented and award the contract to C.W. Matthews in the amount of $1.823 million. He explained that, after taking that action, the Board could return to the 2026 LRA discussion and consider bidding out the additional 3.5 miles of Alvaton Road using the available funding sources. County Administrator Gorton stated that the proposal would also include the three bridges and culvert projects. He further explained that the additional 3.5 miles of Alvaton Road would be bid separately and funded through a combination of the 2026 LRA funds, the remaining 2024 LRA funds, and either Fund Balance or TSPLOST funds. County Administrator Gorton noted that the decision regarding whether to use Fund Balance or TSPLOST could be made later by the Board based on the County's financial position at that time. He then asked County Attorney Hill if that was the correct approach. County Attorney Hill noted that, if the Board was returning to the LMIG motion, the motion would need to include the additional local funding required for the project. He explained that the total project cost was approximately $1.8 million, while the County was only receiving about $1.2 million through the LMIG funding and required match. As a result, County Attorney Hill stated that the motion would need to account for the roughly $600,000 difference that would have to come from another funding source. Commissioner Worsley asked whether the Board had to include the additional funding in the motion, even though the County would not actually be spending those funds later if it ultimately proceeded with the alternative plan that had been discussed. He noted that, based on the way the project would be broken out, the County was not intending to move forward with the project in that manner. After further discussion, a motion was made by Commissioner Worsley and seconded by Vice Chairman Snelson to approve the 2026 LMIG to C.W. Matthews for the amount of $1,823,088.00, with the deficit to come from TSPLOST. All were in favor. County Administrator Gorton stated that Finance would run all of the numbers discussed by the Board. He noted that if any discrepancies were identified in the calculations or funding assumptions, staff would bring the matter back before the Board at the next meeting for further discussion and clarification. XIV. REPORT FROM COUNTY ADMINISTRATOR County Administrator Gorton reported that, based on information received from John Megel, the ambulance chassis was currently estimated to arrive in August and stated that the project was moving along quickly. He noted that he had contacted the vendor and ordered the engine for the flatbed truck currently located in the surplus yard. County Administrator Gorton further reported that the County had listed seven vehicles on GovDeals and generated approximately $26,000 in sales. He stated that the County would still need to pay the GovDeals commission but anticipated receiving proceeds in the range of $20,000 once payment was received. He added that staff were waiting on Titles to list the remaining vehicles on GovDeals and remarked that it was surprising some of the pickup trucks sold for over $1,000. Overall, he stated that the GovDeals process had been very successful for the County. County Administrator Gorton also reported that the rodeo contract had been signed and that land clearing had begun across the street. He stated that he attended a meeting that morning with Yancey and also attended the LMIG bid opening. He noted that the County conducted open enrollment the previous week and provided lunch on Friday, May 22. Despite the Memorial Day weekend, he stated that employee participation was fairly good. County Administrator Gorton further reported that he had met with Travis with River City regarding progress on the courthouse project and had another meeting scheduled for Thursday concerning the HVAC installation. He explained that questions had arisen regarding how the system would be routed on the second floor. He also stated that he met with Jim Fallon regarding retirement matters, continued researching options for the courthouse trees to identify the best solution, and was preparing scopes of work as discussed during the work session. He concluded by stating that those were all of the updates he had to report. XV. REPORT FROM COUNTY COMMISSIONERS Chairman Emmett Collins: Chairman Collins thanked the County staff and employees for the work they were doing. He also thanked the citizens for attending the meetings and for supporting the Commissioners. Chairman Collins concluded by stating that those were all of the comments he had. Vice Chairman Jennifer Snelson: Vice Chairman Snelson thanked the citizens for coming out, being involved, and participating in the County's activities and meetings. She also noted that he attended the car show hosted by the Greenville Senior Center on Saturday morning and stated that it was a great event. Vice Chairman Snelson remarked that it was rewarding to walk around, visit with attendees, and have them see County officials participating in community events. Vice Chairman Snelson further reported that the Memorial Day service held the previous day at the Manchester Mill was very meaningful. She stated that hearing a veteran speak about the soldiers he lost while serving in Vietnam brought the significance of Memorial Day into focus and was especially touching. Vice Chairman Snelson expressed hope that more people would attend future Memorial Day services and concluded by thanking everyone for all that they were doing. Commissioner Gene King: Commissioner King thanked County staff and the Public Works Department for their efforts and for continuing to get projects completed. He also stated that he was glad the County was finally receiving some rain. While noting that the rainfall was impacting outdoor work, Commissioner King remarked that the area had been in need of the rain. He concluded by thanking everyone for their work. Commissioner Bryan Threadgill: Commissioner Adam Worsley: Commissioner Worsley stated that he would like to thank everyone for the job they were doing. He also thanked those in attendance for their patience during the previous discussion. Commissioner Worsley further thanked the citizens who attended the meetings, became involved in County government, and participated in the election process. He stated that he was somewhat disturbed by what he believed was an extremely low voter turnout for the County and expressed hope that more citizens would become involved in the future and make their voices heard through participation in local government and elections. XVI. REPORT FROM COUNTY ATTORNEY County Attorney Hill had nothing to report. XVII. FUTURE MEETINGS & NOTICES Chairman Collins read the Future Meetings and Notices. XVIII. EXECUTIVE SESSION A motion was made by Commissioner King and seconded by Commissioner Worsley to enter an Executive Session at 7:42 p.m. for Litigation, Personnel, Real Estate, Tax Matters, and Cybersecurity. All were in favor. Commissioner King left the Executive Session at 8:00 p.m. A motion was made by Commissioner Worsley and seconded by Chairman Collins to go out of the Executive Session at 8:10 p.m. All were in favor. A motion was made by Commissioner Worsley and seconded by Vice Chairman Snelson to go back into the Regular Session at 8:13 p.m. All were in favor. Chairman Collins stated that Action was taken in the Executive Session. Chairman Collins made a motion to accept the County Administrator's resignation effective July 10th, 2026. The motion was seconded by Commissioner Worsley. All were in favor. Chairman Collins made a motion to approve the salary discussed for an employee in Executive Session. The motion was seconded by Commissioner Worsley. All were in favor. XIX. ADJOURNMENT With no further business, a motion was made by Commissioner Worsley and seconded by Vice Chairman Snelson to Adjourn the Meeting at 8:13 p.m. All were in favor Approved by: Attest: Date: