ait vd | ae Downtown £ Devel opMoncAuthority DOWNTOWN DEVELOPMENT AUTHORITY MEETING MINUTES BOARD APPROVED 5:00 pm] JUNE 9, 2026 CALL TO ORDER Chair Harold Shinn called the Downtown Development Authority Board Meeting to order at approximately 5:03 p.m. ROLL CALL Present: Harold Shinn, Chair; Doug Edwards, Board Member (participating remotely); James Kim, Board Member; Stephe Koontz, Board Member; and Sergio Monzalvo, Board Member. Absent: David Shanahan, Board Member. APPROVAL OF THE MEETING AGENDA Motion: A motion was made by Sergio Monzalvo and seconded by James Kim to approve the meeting agenda removing item E. Vote: All in favor. Motion carried. QUARTERLY REPORTS No quarterly reports were presented. DOWNTOWN DEVELOPMENT AUTHORITY NEW BUSINESS A. Approval of Board Meeting Minutes The Board considered the minutes of the March 24, 2026, Downtown Development Authority Board Meeting. Motion: A motion was made by Stephe Koontz and seconded by Doug Edwards to approve the March 24, 2026, meeting minutes as presented. Vote: All in favor. Motion carried. B. and D. Architectural Services for City Center Pad Sites 2 and 4 Authority Counsel Cecil McLendon, Jr. presented the agreements with Phase5 Creative, LLC for architectural and engineering services for Pad Sites 2 and 4. He explained that the work needed to proceed in coordination with the active City Center construction schedule to avoid separate mobilizations and support coordinated development of the site. The agreements were presented for ratification after prior authorization to proceed under the Chair's standing authority. Gary Sobel of Kaufman Capital Partners explained that the Pad Site 2 agreement ranged from $89,650 to $97,050, depending on the final building size. Mr. Sobel mentioned that the contract for services agreement for Pad 2 ranges from $89,650 to $97,050, which covers the architectural services, engineering, civil engineering, structural, mechanical, electrical, plumbing. The preliminary design on that building was for a larger size; however, the architects are leaning towards a smaller, pad building size, hence the reason for the ranges of pricing between the two. The Pad Site 4 agreement totaled $68,900 for a proposed three-story building of approximately 7,200 square feet. The scopes included architectural, civil, structural, mechanical, electrical, and plumbing services necessary to advance the sites toward pad-ready condition. The larger the building would cost $97,050, if the Board decides on a smaller building the amount would be $89,650. The Board also discussed coordination of the architectural character of the pad sites with the concept for Pad Site 3 and the broader City Center development. Motion: A motion was made by Stephe Koontz and seconded by Doug Edwards to approve the agreement of the architectural services design for Pad Site 2 and 4 for the City of Doraville City Center Development between the DDA and Phase5 Creative, LLC not to exceed $170,000 for both sites. Vote: All in favor. Motion carried. C. Concept Design and Implementation for City Center Pad Site 3 The Board considered an agreement with Studio SOGO LLC for concept design and implementation services for Pad Site 3. Mr. Sobel described the proposed site as an activated culinary-market environment that could include food trucks or other temporary uses, along with electrical and plumbing infrastructure. Preliminary concept work was estimated at $10,200, with additional design and construction-document services bringing the potential total to approximately $39,000. The Board discussed advancing the full scope so that additional special-called meetings would not be necessary if the project moved forward. Motion: A motion was made by Sergio Monzalvo and seconded by Doug Edwards to approve the agreement with Studio SOGO, LLC for concept design, implementation, and further study of City Center Pad Site 3 for the Doraville City Center, the DDA and the SOGO, LLC not to exceed $40,000. Vote: All in favor. Motion carried. F. First Amendment to Economic Development Agreement - 5407 Buford Highway Mr. McLendon presented a proposed first amendment to the existing economic development agreement for the former UAW property located at 5407 Buford Highway. He explained that ongoing City Center development and related land-swap matters created an opportunity to consider how the adjacent projects could be implemented most effectively and efficiently. Staff recommended extending the construction commencement and completion dates by one year to allow additional time to evaluate the project through the DDA's updated application and financial-review process. Board members emphasized that the extension would provide time for a thorough evaluation and was intended to support, rather than delay or endanger, development of the City Center and the 5407 Buford Highway property. Board Discussion Board Member Koontz elaborated on the application process implemented by the DDA for new applicants for abatements. Expounded on the process which mirrors DeKalb County Development Authority process including an initial review, and a financial study which is presented to the Board for approval. Thinks it’s important that the public understands the new process for abatements. Chair Shinn commented that the property is designed to enhance the City Center and would like to make the best possible choice for the goals of the City Center while working through the processes as mentioned by Board Member Koontz. Motion: A motion was made by Doug Edwards and seconded by Sergio Monzalvo to approve the resolution authorizing the First Amendment to the Economic Development Agreement for 5407 Buford Highway, extending the applicable development timeline by one year. Vote: Allin favor. Motion carried. EXECUTIVE SESSION The Board did not enter executive session. ADJOURNMENT Motion: A motion was made by Stephe Koontz and James Kim seconded by Sergio Monzalvo. to adjourn the meeting. Vote: All in favor. Motion carried. The meeting adjourned at approximately 5:18 p.m. Lé« Z ae Y Hard ‘ani Shanta J. Bingham, Board Secretary