City: Camilla
Camilla City Council regular meeting, July 20, 2026
26 pages
These are the minutes as Camilla City Council posted them, read from the file on its own website. Georgia Commons is independent and is not affiliated with Camilla City Council.
This record was posted as scanned images, read here by OCR: a letter or a number may be misread. The file the body posted is linked below.
Records of this meeting
Each link opens the body's own website or meeting portal.
- MinutesMinutes (www.camillaga.net) · shown on this page
Summary
Written by an AI model (claude-sonnet-5-5) from the minutes below. It is not the record: the minutes are.
Council approved Veterans Day as a city holiday, a $153,878 cemetery paving bid, and engineering proposals for drainage and baseball field sidewalks.
The council met with five members present and elected a chairman pro tem for the meeting because the mayor pro tem was out of the jurisdiction. It amended the agenda to add a gas trade confirmation, a water change order and a closed session on litigation; a proposed deferred compensation retirement plan item for the city manager failed to get the four votes needed. The council then approved Veterans Day as a city recognized holiday, a $153,878 cemetery paving bid award to CMI Inc., two York & Associates proposals (storm drainage and baseball field sidewalks), the Municipal Gas Authority of Georgia trade confirmation with AllTech, and a $44,329 water system change order. It also approved earlier minutes, went into executive session on litigation, and reconvened. The minutes record no action after the session.
Topics taken up: Veterans Day city holiday; cemetery Phase III paving bid; storm drainage projects proposal; baseball field sidewalk improvements; gas trade confirmation with AllTech; water system change order; city manager deferred compensation plan; executive session on litigation; chairman pro tem election.
Decisions the minutes record (8)
Each decision is followed by the sentence of the minutes that records it, copied word for word.
Cemetery Phase III paving project bid award to CMI Inc., $153,878
5-0
The minutes: “A motion was made by Councilmember Vereen and seconded by Councilman Pollard to approve the bid award to CMI Inc.”
Change Order #1 for water system improvements, additional well grounding, $44,329
5-0
The minutes: “A motion was made by Councilmember Vereen and seconded by Councilman Collins to approve Change Order #1.”
Veterans Day as a city recognized holiday
5-0
The minutes: “A motion was made by Councilmember Vereen and seconded by Councilman Collins to approve Veterans Day as a city recognized holiday.”
York & Associates proposal for miscellaneous storm drainage projects
5-0
The minutes: “A motion was made by Councilman Collins and seconded by Councilmember Vereen to approve the proposal from York & Associates for miscellaneous storm drainage projects.”
York & Associates sidewalk improvements proposal for baseball fields
5-0
The minutes: “A motion was made by Councilmember Vereen and seconded by Councilman Collins to approve the sidewalk improvements proposal.”
Municipal Gas Authority of Georgia trade confirmation with AllTech for June and July 2027
5-0
The minutes: “The motion to approve the trade confirmation for MGAG and AllTech for June and July of 2027 passed by a 5-0 vote.”
Adding city manager deferred compensation retirement plan adoption agreement to the agenda
3-2
The minutes: “Voting in favor of adding the adoption agreement/resolution for the city manager to participate in the Deferred Compensation Retirement: Councilmember Vereen and Councilmen Palmer and Collins.”
Minutes of the May 4 and June 1 work sessions and June 8, 2026 council meeting
5-0
The minutes: “A motion was made by Councilmember Vereen and seconded by Councilman Collins to approve the minutes from the May 4, June 1, and June 8, 2026 meetings.”
Agenda items (4)
Found in the minutes by their headings. Where an outcome is shown, it was read by rule from the item's own words: a guide to the text, not part of the record.
- 3. In the event any provision of this agreement shall be held to be invalid and unenforceable, the other provisions of this agreement shall be valid and…
- 4. Limited drainage plan to improve the site.
- 6. The consulting services provided on this project will be conducted in a manner consistent with that level of care and skill ordinarily exercised by
- 8. The Client agrees to indemnify and hold harmless the Consultant, its principals, employees and agents against any claims arising out of the project based…
The minutes
As posted on www.camillaga.net, read November 12, 2026. Nothing below is written by Georgia Commons.
MINUTES — REGULAR MEETING
CITY OF CAMILLA, GEORGIA
JULY 20, 2026
The regular meeting of the Mayor and City Council of the City of Camilla was called to order at 6:00 p.m. on Monday, July 20, 2026 by City Clerk Cheryl Ford in the Council Chambers at City Hall. Clerk Ford announced Mayor Pro Tem Burley is out of the jurisdiction.
Members present at roll call: Councilmember Vereen, Councilmember Isom, Councilman Collins, Councilman Pollard, and Councilman Palmer.
Others present: City Attorney Alicia Thompson (via Zoom), Human Resources Director Kent Holtzclaw (via phone), and Public Works Supt./Asst. City Manager Luke White.
NOMINATIONS FOR CHAIRMAN PRO TEM
Clerk Ford asked for nominations to elect a Chairman Pro Tem in the absence of Mayor Pro Tem Burley. A motion was made by Councilman Collins and seconded by Councilmember Vereen to nominate Danny Palmer. There being no additional nominations, the nominations were closed.
Voting in favor of electing Danny Palmer as Chairman Pro Tem for the meeting: Councilmember Vereen, Councilmember Isom, Councilman Collins, Councilman Pollard, and Councilman Palmer. The motion passed by a 5-0 vote.
OPENING PRAYER AND PLEDGE
Councilmember Vereen gave the invocation and the Chairman Pro Tem and Council led the pledge of allegiance to the flag.
APPROVAL OF AGENDA
Chairman Pro Tem Palmer stated he would ask for a motion to amend the agenda to add the Municipal Gas Authority Trade Confirmation for AllTech, Change Order #1 for Water System Improvements, Adoption Agreement/Resolution for the city manager to participate in the Deferred Compensation Retirement Plan, and Executive Session to discuss litigation. A motion was made by Councilmember Vereen and seconded by Councilman Collins to approve the agenda with the amendments. Councilman Pollard pointed out he has no issue with the agenda except the deferred compensation retirement plan for the city manager. This was something signed by the Mayor Pro Tem and in the absence of the Mayor Pro Tem he does not think it is fitting for them to be discussing the agenda item and the city manager is not present as well. It is an item signed by the Mayor Pro Tem and important for him to be present. His stance on the city manager hiring still stands and he will be voting no on the item but because there is so much more on the agenda that needs to be taken care of he will support the agenda. As for going in to executive session for litigation, he was just made aware of it and it was not on the agenda for them to go in to executive session for any kind of litigation that could possibly come up. He will conclude with a no vote on that as well.
The addition of adding the Municipal Gas Authority June/July 2027 Trade Confirmation with AllTech passed by a 5-0 vote.
APPROVAL OF AGENDA (cont.)
The addition of change order #1 for water system improvements (additional grounding for well) passed by a 5-0 vote.
Voting in favor of adding the adoption agreement/resolution for the city manager to participate in the Deferred Compensation Retirement: Councilmember Vereen and Councilmen Palmer and Collins. Voting in opposition: Councilmember Isom and Councilman Pollard. The vote failed.
[Clerk’s note: four affirmative votes required to pass an item]
Voting in favor of adding to the agenda an executive session to discuss litigation:
Councilmembers Vereen and Isom and Councilmen Palmer and Collins. Voting in opposition:
Councilman Pollard. The vote passed 4-1.
The amended agenda was approved by Councilmembers Vereen and Isom and Councilmen Collins, Pollard and Palmer per the above votes.
CITIZENS AND GUESTS
Sign-in Sheet Attached.
APPROVAL OF MINUTES
Chairman Pro Tem Palmer asked for a motion to approve the minutes of the May 4, 2026 Work Session, the June 1, 2026 Work Session, and the June 8, 2026 Council Meeting. A motion was made by Councilmember Vereen and seconded by Councilman Collins to approve the minutes from the May 4, June 1, and June 8, 2026 meetings. The motion passed by a 5-0 vote.
SPEAKER APPEARANCES
None
ACTION ITEMS
CONSIDERATION OF VETERANS DAY AS A CITY RECOGNIZED HOLIDAY
A motion was made by Councilmember Vereen and seconded by Councilman Collins to approve Veterans Day as a city recognized holiday. Human Resources Director Kent Holtzclaw commented he surveyed surrounding south Georgia cities and it is also a federal holiday.
Veterans Day is recognized all around us, keeps us competitive in the market, and it is significant to recognize the veterans. The motion passed by a 5-0 vote.
CEMETERY PHASE III PAVING PROJECT — BID AWARD — CMI INC.
Assistant City Manager White commented that CMI Inc. was low bidder with a bid of $153,878 for Phase III of the paving project in the cemetery. The project will be funded with TSPLOST.
The project is on the north side of the cemetery and will be all the lanes in between the circle.
There will be five roads [lanes] paved along with tree removal. A motion was made by Councilmember Vereen and seconded by Councilman Pollard to approve the bid award to CMI Inc. The motion passed by a 5-0 vote.
ACTION ITEMS (cont.)
MISCELLANEOUS STORM DRAINAGE PROJECTS PROPOSAL - YORK &
ASSOCIATES
Assistant City Manager White commented the proposal is to send this project to bid and includes West Circle, Thomas Street, Bennett Street, and Underwood Street. These are storm drainage pipes that are beginning to have failure and need repairs and will be bid out separately. A motion was made by Councilman Collins and seconded by Councilmember Vereen to approve the proposal from York & Associates for miscellaneous storm drainage projects. The motion passed by a 5-0 vote.
SIDEWALK IMPROVEMENTS PROPOSAL — BASEBALL FIELDS - YORK &
ASSOCIATES
Assistant City Manager White commented the proposal is to send out for bid baseball field improvements for sidewalk from the parking lot down to the fieldhouse and connecting the fieldhouse to all the fields. It also includes an ADA wheelchair ramp at the upper field and re-doing the stairways. The project will be in phases whereby they can approve all at one time or in phases. A motion was made by Councilmember Vereen and seconded by Councilman Collins to approve the sidewalk improvements proposal. The motion passed by a 5-0 vote.
MUNICIPAL GAS AUTHORITY OF GEORGIA (MGAG)//ALLTECH TRADE
CONFIRMATION
Chairman Pro Tem Palmer commented the confirmations are for June and July of 2027. A motion was made by Councilmember Vereen and seconded by Councilman Collins to approve
the trade confirmation request. The motion to approve the trade confirmation for MGAG and AllTech for June and July of 2027 passed by a 5-0 vote.
CHANGE ORDER #1 — WATER SYSTEM IMPROVEMENTS — ADDITIONAL
GROUNDING FOR WELL
Assistant City Manager White commented the change order is for additional grounding and protection of assets at the Tyson Well. The $44,329 will come from left over grant money [GEFA loan]. A motion was made by Councilmember Vereen and seconded by Councilman Collins to approve Change Order #1. The motion passed by a 5-0 vote.
EXECUTIVE SESSION - LITIGATION
A motion was made by Councilmember Vereen and seconded by Councilman Collins to go in to executive session for litigation.
Councilman Pollard commented to the people in the public and those watching via Facebook the City of Camilla government. He asked them to pay attention to what is around the desk tonight.
Talking about a flawed system — the same people who were not validated to be their city manager — who do they see present tonight. The same ones who were not capable of running the city, who do they see present tonight. The same one who did not get a thank you from the ones that said “I want someone else new”. What they are seeing on display tonight is they are having
EXECUTIVE SESSION (cont.)
to get all their answers and advice from the same ones they said were not qualified, in his opinion. They are the same people here tonight doing the role of city manager and they have a mayor pro tem that is out that signed the contract. Two people — pay attention to what is going on in their city government. He thanked City Clerk Ford and Luke, the ones that continue to see the city through time and time again and have to fall back on but are not worthy to run the city.
Councilmember Vereen added the city manager, before she was hired, had a trip planned and specifically noted she had made plans and got permission to be excused before she was hired.
Councilman Pollard stated he was not told this and asked if was secret because he did not know anything about it.
The motion to enter executive session passed by a 5-0 vote.
A motion was made by Councilmember Vereen and seconded by Councilman Collins to reconvene the regular Council meeting. The motion passed by a 5-0 vote.
OTHER ANNOUNCEMENTS/COMMENTS
None
ADJOURNMENT
The meeting adjourned at 6:50 p.m. on motion by Councilmember Vereen.
BY: Cea Pally ATTEST: U Wil fi
DEWAYNE BURLEY, MAYOR CHERYL FORD, CLERK
PRO TEM
CITY OF CAMILLA, GEORGIA ~ SIGN-IN SHEET
pate VULLY 0 FORlo rmm8._00 Dam 2PM
MEETING; ZFCOUNCIL L] WORK SESSION [(] OTHER:
_ SPEAKER
NAME ADDRESS ~~*| NO] YES “TOPIC OF DISCUSSION
} Liven Parse WI WN Le St WA 2 Jerome. Teste LIL Kye v — 3 | Leroy ZA ae G33 wilson 5 S| Oh Tub. ___ ; Gort A ba |ComLl, 7 - 8 9 10 11 12 13 14
NOTICE OF AWARD
TO: Cal-Mart Inc. Dba CMI 1220 Joyner Road Cairo, GA 39828
Project Description
The site of the proposed work is in Camilla, Ga. The project consists of the following:
CEMETERY ROADS IMPROVEMENTS - PHASE III
CONTRACTOR agrees to commence work on or before a date to be specified in a written "Notice to Proceed" of the OWNER for the project. CONTRACTOR shall fully complete all work associated with the Cemetery Roads Improvements - Phase III_ within.90 consecutive calendar days from the date of a written "Notice to Proceed".
The OWNER has considered the Bid submitted by you for the above described WORK in response to its Advertisement for Bids and has decided to award you the Contract.
You are hereby notified that your Bid has been accepted for the Contract Price of $ 153,878.00
for which is based on the Units Prices shown on the Bid Form (Section 00300).
You are required by the Information for Bidders to execute the Agreement and furnish the required CONTRACTOR's Performance and Payment Bonds and Certificates of Insurance within ten (10) calendar days from the date of this Notice.
If you fail to execute said Agreement and to furnish said Bonds within ten (10) calendar days from the date of this Notice, said OWNER will be entitled to consider all your rights arising out of the OWNER's
acceptance of your Bid as abandoned and as a forfeiture as may be granted by law.
You are required to return an acknowledged copy of this Notice of Award to the OWNER.
Dated this AO day of J WY , 2026. ro
» | \ \u 4 f Ay Novag S pum x City of Canilld |
ay. DEWAINE BuRLET
DATE: dT 2 3 aY
GAPROJECT\2026\2026-08 CAMILLA Cemetery Phase 3\CONSTRUCTION\NOW\SEC00500_NOW.wpd (Notice of Award) 00500-1
Y @ R | & ASSOCIATES
y | ENGINEERING, INC.
BID RESULTS
CEMETERY ROADS IMPROVEMENTS - PHASE III
CITY OF CAMILLA
PROJECT # 2026-08
Bid Date: Thursday 06/11/2026
Bid Time: 11:00 A.M.
Bid Location: Camilla City Hall, 30 E Broad St, Camilla, GA 31730
Owner: City of Camilla
BIDDER BID AMOUNT Comments ($)
Reames & Son - Jim Boyd Construction - CMI Inc. 153,878.00 Buck Run Preserves, LLC 170,155.50 Zane Grace Construction, Inc. 163,143.00 David Taylor Construction, Inc. 196,164.95
308 E. Water Street. Bainbridge, GA 39817 tel: 229.248.0141 www. yorkassociates. net
BID TAB Prepared For: CITY OF CAMILLA Time: 11:00AM. _ Date: June 11, 2026 By: York & Associates Engineering, Inc.
Place: City of Camilla, Georgia - City Hall Contractor Buck Run Preserve CMI Inc.
Title of Job:
CEMETERY ROADS IMPROVEMENTS - PHASE III : ;
Bid Bond Frankenmuth The Ohio Casualty insurance Company insurance Co.
Item Description Unit EstNo. | Unit Price | Item Total | Unit Price | Item Total No. Units
1570.1 Traffic Control & Detours. Complete LS 4 2,000.00 2,000.00 3,000.00 3,000.00 2100.1 Mobilization LS 1 5,000.00 5,000.00 5,000.00 5,000.00
2100.2 | Trees (PINE) Removal, Compiete EA 11 1,365.00 15,015.00 800.00 8,800.00 2200.1 Minor Grading - Drives E, F,G, H, and |, Complete LS 1 9,000.00 9,000.00 7,335.00 7,335.00 2200.2 | Minor Grading - Drive B, Complete LS 1 5,000.00 5,000.00 1,834.00 1,834.00 2200.3. | Minor Grading - Loop AB, Complete LS 1 7,000.00 7,000.00 1,834.00 1,834.00 2270.1 | Silt Fence LF 20 7.00 140.00 10.00 200.00
2720.1 Culvert (8" Ductile Iron Pipe), Complete LF 20 33.75 675.00 200.00 4,000.00 2931 Grassing, Temporary AC 0.7 2,571.43 1,800.00 2,250.00 1,575.00
310-5060 | Graded Aggregate Base, 6 - inch, Including Material, Labor. Complete. SY 3,705 19.10 70,765.50 20.00 74,100.00 402-3113 | Recycled Asphaltic Concrete 9.5mm, Superpave, Type II, GP 2, TN 280 192.00 53,760.00 165.00 | 46,200.00 Including Bituminous Material and H Lime. Complete
TOTAL BID AMOUNT= 170,155.50 153,878.00
GAPROJECT\2026\2026-08 CAMILLA Cemetery Phase 3\Bidding\BID TAB.wpd
Page | of 2
BID TAB Prepared For: CITY OF CAMILLA Time: 11:00AM. Date: June 11, 2026 By: York & Associates Engineering, Inc.
Place: City of Camilla, Georgia - City Hall Contractor David Taylor Zane Grace Title of Job: Construction, Inc. Construction, Inc.
CEMETERY ROADS IMPROVEMENTS - PHASE II
Bid Bond General Star National Great Midwest insurance Company Insurance Co.
Item Description Unit Est No Unit Price | Item Total Unit Price | Item Total No. Units 1570.1 Traffic Control & Detours. Complete LS 1 5,000.00 5,000.00 3,000.00 3,000.00 2100.1 Mobilization LS 1 5,000.00 5,000.00 8,422.00 8,422.00
2100.2 | Trees (PINE) Removal, Complete EA 11 1,545.45 16,999.95 320.00 3,520.00 2200.1 Minor Grading - Drives E, F,G, H, and 1, Complete LS 1 4,000.00 4,000.00 | 25,800.00 {| 25,800.00 2200.2 | Minor Grading - Drive B, Complete LS 4 4,000.00 4,000.00 7,211.00 7,211.00 2200.3 Minor Grading - Loop AB, Complete LS 1 4,000.00 4,000.00 4,023.00 4,023.00 2270.1 Silt Fence LF 20 10.00 200.00 10.00 200.00
2720.1 Culvert (8" Ductile Iron Pipe), Complete LF 20 150.00 3,000.00 103.00 2,060.00 2931 Grassing, Temporary AC 0.7 1,750.00 1,225.00 1,270.00 889.00
310-5060 | Graded Aggregate Base, 6 - inch, Including Material, Labor. Complete. SY 3,705 28.00 | 103,740.00 16.32 | 60,465.60 402-3113 | Recycled Asphaltic Concrete 9.5mm, Superpave, Type II, GP 2, TN 280 175.00 49,000.00 169.83 | 47,552.40 Including Bituminous Material and H Lime. Complete
TOTAL BID AMOUNT= 196,164.95 163,143.00
GAPROJECT\2026\2026-08 CAMILLA Cemetery Phase 3\Bidding\BID TAB.wpd
YORK
May 19, 2026
Ms.
Diadra Powell
City Manager City of Camilla P.O. Box 328 Camilla, Georgia
RE:
Proposal for Miscellaneous Storm Drainage Improvements Camilla, Ga
Dear Ms. Powell:
We are pleased to submit this fee proposal to the City of Camilla for engineering services for the above-referenced project. The project comprises the following four areas of concern.
fener
West Circle Thomas Street Bennett Street Underwood Street
Based on our understanding of the above concern area (please refer to the attached map) and the City’s request for proposal, York & Associates Engineering, Inc. is pleased to propose the following scope of services.
A.
ls
Scope of Services
Surveying as needed for the design. Locate existing storm structures, collect field data/ topographic surveying, and measure the invert of the existing storm structures and their surroundings, including upstream and downstream.
Prepare CAD drawings from the survey data.
. Evaluate the existing structures.
Preparation of design, Engineering plans for construction shall be to current civil engineering standards.
Preparation of contract documents and technical specifications for bid.
faces Strast, dainaddge. G. FVGL) te: TiM723.0.2. www.yorkassociates.net sige to?s
YORK |
6. Administration of the construction bid process, including advertising and bidding procedures, the bidders' conference, bid openings, and evaluations.
7. Post-award services, Notice to Proceed, including the review of shop drawing submittals, warranties, and as-built drawings.
8. Construction services include monitoring construction, reviewing payment requests as Owner’s representative, handling change orders, and coordinating with the construction contractor.
Periodic construction reviews (at least one visit per week during regular hours) with documentation and photographs to ensure proper execution of the work.
9, Construction close-out, final inspection, and coordination with the City as required
B. Estimated Time required Our estimated design time is | month.
The Bid Advertisement will require 1 month.
The construction phase will require 3 months.
C. Fees Our fee for Part A services is $49,500.
Specifically excluded from this scope of services are geotechnical investigation and boundary surveying. If needed, we will be glad to provide these services at our hourly rate or contracted through a subconsultant.
We look forward to being of assistance to the City of Camilla on the above important improvement project. If this proposal is acceptable to you, please sign below and return a copy to us as our notice to proceed. Attached and made part of this contract are Attachment A, our Standard Contract Conditions, and Attachment B, our Standard Hourly Rates.
If you have any questions, please do not hesitate to contact us via telephone at 229-248-0141 or via email at tyork@yorkassociates.net.
Sincerely,
YORK & ASSOCIATES ENGINEERING, INC.
thea 4 “
Theresa P. York, PE.
President
Attachments
Suu 2 ewacgr alee. Vey eitge. G4 aif tel: ies. die! www.vorkassociates.net
YORK
ACCEPTED:
City of Camilla ()
minted Name. DONKYNE BURLET tite: MAR PRo Taw
Date:__/ 22 | 2 bo
www.vorkassociates.net
UNITED STATES
DEPARTMENT OF THE INTERIOR
GEOLOGICAL SURVEY
= ant GEOL.
rs ange) s
"67 (@ACONTON
£ .
\ 5 { . ‘ . + f s | 4g qoHOIN. AY ~
PROJECT AREAS (1
MISCELLANEOUS STORM
DRAINAGE IMPROVEMENTS
CITY of CAMILLA
nitle-Mitenell ss “Apart
YORK sci 25 es tr cente er
Cec ee ea Ra ans see eenenangieennacnenmeneemnen enema ST
msm 2025-e0 | Ove 05/10/2005 ©, FIGUNE 1
ATTACHMENT A
YORK & ASSOCIATES ENGINEERING, INC.
STANDARD CONTRACT CONDITIONS
The client and York & Associates Engineering, Inc. (hereafter called consultant) agree that the following provisions shall be part of their agreement:
1. It is agreed that the Client and Consultant each binds itself and themselves, its or their successors, administrators and assigns to the other party to this Agreement and to its or their successors, executors and assigns in respect to all covenants of this Agreement.
2. Neither the client nor consultant shall assign his interest in this agreement without written consent of the other.
3. In the event any provision of this agreement shall be held to be invalid and unenforceable, the other provisions of this agreement shall be valid and binding on the parties hereto.
4. This Agreement may be terminated in whole or part in writing by either party in the event of substantial failure by the other party to fulfill its obligations under this Agreement through no fault of the terminating party; provided, that no such termination may be effected unless the other party is given (a) not less than ten (10) calendar days written notice (delivered by certified mail, return receipt requested) of intent to terminate, and (b) an opportunity for consultation with the terminating party prior to termination. If the Client decides to terminate this Agreement, the Client shall reimburse the Consultant for all equipment, devices, and material installed at the Consultants cost.
5. All claims, disputes, and controversies arising out of or in relation to the performance, interpretation, application, or enforcement of this Agreement, including but not limited to breach thereof, shall be referred to mediation under the then current Construction Industry Mediation Rules of the American Arbitration Association prior to any recourse to arbitration or a judicial forum.
6. The consulting services provided on this project will be conducted in a manner consistent with that level of care and skill ordinarily exercised by
members of the profession currently practicing under similar conditions. No additional warranties are provided either express or implied unless agreed to in writing.
7. The Client agrees to limit the Consultant’s liability on the project, including its agents and employees, due to the Consultant’s negligent acts,
errors or omissions, such that the total aggregate liability of the Consultant shall not exceed $100,000 or the Consultant's total fee for services rendered on this project, whichever is less.
8. The Client agrees to indemnify and hold harmless the Consultant, its principals, employees and agents against any claims arising out of the project based in whole or in part by the conduct or actions of the Client. The Consultant agrees to indemnify and hold harmless the Client against the negligent acts of the Consultant to the extent provided above.
9. To the extent that the proposed services of the Consultant are for design which does not include construction phase services such as the review or site observation of the contractor's work or performance and the review of shop drawings, then the Client agrees to defend, indemnify and hold harmless the Consultant from any claim or suit whatsoever, including but not limited to all payments, expenses or costs involved, arising from or
alleged to have arisen from the contractor's performance or the failure of the contractor's work to conform to the design intent and the contract documents.
10. Consultant shal! not be liable for any and all damages or any and all costs due to its delays in performance including, but not limited to, damages or costs resulting from both excusable and inexcusable delays by consultants, its agents, employees and independent contractors.
Additionally, the consultant is not responsible for delay nor shall be responsible for damages or be in default or deemed to be in default by reason of lockouts, accidents, or acts of God: or the failure of client to furnish timely information or to approve or disapprove the consultant’s work promptly; or delay or faulty performance by client, other contractors, or governmental agencies; or any other delays beyond consultant’s control.
11. Consultant shall not be liable for damages resulting from the actions or inactions of governmental agencies including, but not limited to, permit processing, environmental impact reports, dedication, general plans and amendments thereto, zoning matters, annexations or consolidations, use or conditional use permits, and building permits; and consultant shall only act as advisor in all governmental relations.
12. In the event that client institutes a suit against consultant because of any failure or alleged failure to perform, error, omission, or negligence, and if such suit is not successfully prosecuted, or if it is dismissed, or if verdict is rendered for consultant, client agrees to pay consultant any and all costs of defense, including attorney’s fees, expert witnesses’ fees, and court costs, and any all other expenses of defense which may be needful, immediately following dismissal of the case or immediately upon judgement being rendered in behalf of consultant.
13. Should litigation be necessary to enforce any term or provision of this agreement, or to collect any portion of the amount payable under this agreement, then all litigation and collection expenses, witness fees and court costs, and attorney’s fees shall be paid to the prevailing party.
14. There are no understandings or agreements except as herein expressly stated.
15. All original papers, documents, files, and copies thereof, produced as a result of this contract, except documents which are required to be filed with public agencies, shall remain the property of the consultant and may be used by consultant without consent of client.
16. The terms and provisions of this agreement shall not be construed to alter, waive, or affect any lien or stop notice rights, which the consultant may have for the performance of services under this agreement.
Page | of 2
17. The consultant makes no representation concerning the estimated quantities and cost figures made in connection with maps, plans, specifications, or drawings other than that all such figures are estimates only and the consultant shall not be responsible for fluctuations in cost factors. Engineer's opinions of probable Construction Cost (if any) are to be made on the basis of Engineer's experience, qualifications, and general familiarity with the construction industry. However, because Engineer has no control over the cost of labor, materials, equipment, or services furnished by others, or over contractors’ methods of determining prices, or over competitive bidding or market conditions, Engineer cannot and does not guarantee that proposals, bids, or actual Construction Cost will not vary from opinions of probable Construction Cost prepared by Engineer. If Owner requires greater assurance as to probable Construction Cost, then Owner agrees to obtain an independent cost estimate.
18. All fees and other charges will be billed monthly and shall be due at the time of billing unless otherwise specified in this agreement.
19. Payment is due upon the presentation of invoice and is past due thirty (30) days from the invoice date. Client agrees to pay a finance charge of one and one-half percent (1 4%) per month, or the maximum rate allowed by law, on past due accounts. Client agrees to pay Consultant’s cost of collection of all amounts due and unpaid after ninety (90) days, including court costs and reasonable attorney's fees. Consultant shall not be bound by any provision or agreement requiring or providing for arbitration of disputes or controversies arising out of this agreement, any provision wherein Consultant waives any rights to a mechanics’ lien, or any provision conditioning Consultant’s right to receive payment for its work upon payment to Client by any third party. These General Conditions are notice where required, that Consultant shall file a lien whenever necessary to collect past due amounts. Failure to make payment within 30 days of invoice shall constitute a release of Consultant from any and all claims which Client may have whether in tort, contract or otherwise and whether known or unknown at the time.
20. In the event that the plans, specifications, and/or field work covered by this agreement are those required by various governmental agencies, and in the event that due to change of policy of said agencies after the date of this agreement additional office or field work is required, the said additional work shall be paid for by the client as extra work.
21. Consultant expects client to supply any existing information pertaining to the location of underground utilities in the project area. In addition to any information provided by client, Consultant will proceed with retrieving records from regulatory agencies including but not limited to: GA 811 One Call, local and state utility departments, and private utility providers.
22. In the event that the utilities are incorrectly located or not located correctly by a utility owner and the design has to be modified due to the utility owner’s negligence and additional work is required by the consultant, the additional work shall be paid for by the client as extra work.
23. Client will be responsible for verifying any information provided by Consultant that is obtained via contact with utility providers as per the Underground Facility Damage Prevention and Safety Act.
24, Consultant expects that the proposed work area to be free and clear of objects or obstacles that might prohibit access in and around the proposed work area. This would include clearing vegetation, machinery, debris, or any other object that would prevent access to the proposed work area.
Failure to do so could result in time delay or incomplete coverage of the proposed work area.
25. In the event that any staking is destroyed by an act of God or parties other than the consultant, the cost of re-staking shall paid by client as extra work.
26. The client shall pay the costs of checking and inspection fees, zoning and annexation application fees, assessment fees, soils engineering fees, soils testing fees, aerial topography fees, and all other fees, permits, bond premiums, total company charges, blueprints and reproductions, and all other charges not specifically covered by the terms of this agreement.
27. Should the Consultant provide observations or monitoring services at the job site during construction, Client agrees that, in accordance with the generally accepted construction practice, the contractor will be solely and completely responsible for working conditions on the job site, including safety of all persons and property during the performance of the work, and compliance with OSHA regulations.
28. Specifically excluded from the Consultant's responsibility are the following:
! Actual, alleged or threatened pollution damages; that being damages caused by the release of solids, liquids or gases which cause environmental damages or require cleanup.
{Fines or penalties.
! Consultant's advice on bonds or insurance.
Damages arising from handling or disposal of asbestos, asbestos containing materials, or hazardous waste in any of its various forms, as defined by the Environmental Protection Agency.
29. Extended project timeline - If there is an unexpected extension of the project timeline that results in additional costs, such as increased labor or materials costs, inflation, or the construction value of the project, the Consultant may request a renegotiation of the price or terms to reflect the changes in the project schedule of values.
30. General increased costs - If there is an increase in the cost due to market conditions of the value of the project in performing any obligations under this Agreement, due to factors beyond the control of the Parties, such as inflation, market fluctuations, or changes in law, the Consultant may request an adjustment to the agreed payments or performance terms based on the increased costs.
31. Client will inform the Consultant (before mobilization) if any special provisions are needed in order to access our personnel or equipment prior
to mobilizing to the site. If Consultant is unable to enter the Owner’s property, a Change Order may be needed for an additional mobilization and for the down time of our team.
31. Force Majeure - Neither party will be liable to the other or be deemed to be in breach of this Agreement for any failure or delay in rendering performance arising out of causes beyond its reasonable control. Such causes may include but are not limited to, acts of God or the public enemy, terrorism, significant fires, floods, earthquakes, unusually severe weather, epidemics, strikes, or governmental authority approval delays or denials. The party whose performance is affected agrees to notify the other promptly of the existence and nature or any delay.
January, 2026
ATTACHMENT B
STANDARD BILLING RATES
YORK & ASSOCIATES ENGINEERING, INC.
All time spent by York & Associates Engineering, Inc. personnel that is directly related to the services shall be paid for as indicated herein. Such time related to the services shall
include time spent for travel, conferences, correspondence, and reviewing client or vendor information.
Regular Rate Schedule:
Professional Engineer $200.00/hour Project Manager $175.00/hour Project Engineer $150.00/hour Registered Land Surveyor $190.00/hour Survey Crew $250.00/hour Engineering Aide $120.00/hour Sub-consultant Actual Cost + 15%
Reimbursable expenses directly related to the services shall be paid for as follows:
- Transportation, vehicle mileage, and living expenses shall be billed at cost plus 10% for all travel beyond a 50 mile radius from the York & Associates Engineering, Inc.
office.
- Long distance telephone, postage and overnight deliveries, audiovisual aids, reproduction services, binding, outside consultants or specialty services, license fees, and purchases made for the Client’s account shall be billed at cost plus 15%.
All time spent by York & Associates Engineering, Inc. personnel related to the preparation
for and provision of testimony as an expert witness for litigation shall be billed at rates equal to 2.0 times the Regular Rate.
YORK
June 4, 2026
Ms. Diadra Powell City Manager City of Camilla P.O. Box 328 Camilla, Georgia
RE: Proposal for Sidewalk Improvements Existing Baseball Field Camilla, Ga
Dear Ms. Powell:
We are pleased to submit this fee proposal to the City of Camilla for engineering services for the above-referenced project. The project comprises proposed concrete driveways, sidewalks, and limited drainage improvements for an existing baseball field located off Powell Street and Industrial Boulevard. Please refer to the attached location map- Figure 1.
The existing baseball fields lack accessible sidewalks for citizens to safely walk from the parking lot to the bleachers. The grass walkway is uneven and poses trip hazards. The site was likely built in stages, resulting in varying elevations across the fields. The current steps for the east fields do not include an accessible path. Additionally, the sidewalk leading to the men’s restroom is not wheelchair-accessible.
Based on our understanding of the above concern area and the City’s request for proposal, York & Associates Engineering, Inc. is pleased to propose the following scope of services.
A. Scope of Services
I, Topographic surveying and collection of field data as needed for the design. Locate existing storm structures, fencelines, steps, and other structures; measure the invert elevations of existing storm structures and other utilities, along with their surroundings, to understand the existing drainage flow and limitations.
2. Prepare CAD drawings from the survey data.
3. Grading plan for the proposed sidewalk.
4. Limited drainage plan to improve the site.
202 5, yister Street, Seinbyi¢ge, Zé, TSS.) tei: PES Gde. 2.41 www.yorkassociates net nege tof?
YORK
3. Preparation of construction plans, technical specifications, quantity takeoff, and contract bidding documents.
6. Administration of the construction bid process, including advertising and bidding procedures, responding to bidders’ questions, bid openings, and evaluations.
7. Post-award services including Notice to Proceed, administering the pre-construction conference, and review of shop drawing submittals, product warranties, and insurance.
8. Construction services include monitoring construction, review of payment requests as Owner’s representative, handling change orders, and coordination with the construction contractor. Periodic construction reviews (at least one visit per week during regular hours) with documentation and photographs to ensure proper execution of the work.
9. Construction close-out, final inspection, and coordination with the City as required.
B. Estimated Time required Our estimated design time is 1 month.
The Bid Advertisement will require 1 month.
The construction phase will require 3 months.
C. Fees Our fee for the above services is $45,500.
Specifically excluded from this scope of services are geotechnical investigation and boundary
surveying. If needed, we will be glad to provide these services at our hourly rate or as additional services.
We look forward to assisting the City of Camilla with the above-mentioned important improvement project. If this proposal is acceptable to you, please sign below and return a copy to us as Our notice to proceed. Attached and made part of this contract are Attachment A, our Standard Contract Conditions, and Attachment B, our Standard Hourly Rates.
If you have any questions, please do not hesitate to contact us via telephone at 229-248-0141 or via email at tyork @yorkassociates.net.
Sincerely,
YORK & ASSOCIATES ENGINEERING, INC.
Theresa P. York, P.E.
President
San 2. Meter Siveat, Beinorkige. GA D387 tel: ZES SAS 014) www.vorkassociates. net sage 2 art
YORK
Attachments cc: Luke White
ACCEPTED: ~
\ i { By: _<) Ww Awd OA City of Camilla [ |
Printed Name: D CW ATH E Buk LE Title. WAY 0 PAD TEW
Date: _/ { 23] at o
15. Vgter Street, Sainnridge. GA S87 te!: 225.268.0122 www. yorkassociates.net
er C Ny
£
% .
Ry be
: I TANS | f x
ae Me
;
atten Fr:
oe oy PrarS
Sipptretreg
ATTACHMENT A
YORK & ASSOCIATES ENGINEERING, INC.
STANDARD CONTRACT CONDITIONS
The client and York & Associates Engineering, Inc. (hereafter called consultant) agree that the following provisions shall be part of their agreement:
1. It is agreed that the Client and Consultant each binds itself and themselves, its or their successors, administrators and assigns to the other party to this Agreement and to its or their successors, executors and assigns in respect to all covenants of this Agreement.
2. Neither the client nor consultant shall assign his interest in this agreement without written consent of the other.
3. In the event any provision of this agreement shall be held to be invalid and unenforceable, the other provisions of this agreement shall be valid and binding on the parties hereto.
4. This Agreement may be terminated in whole or part in writing by either party in the event of substantial failure by the other party to fulfill its obligations under this Agreement through no fault of the terminating party; provided, that no such termination may be effected unless the other party is given (a) not less than ten (10) calendar days written notice (delivered by certified mail, return receipt requested) of intent to terminate, and (b) an opportunity for consultation with the terminating party prior to termination. If the Client decides to terminate this Agreement, the Client shall reimburse the Consultant for all equipment, devices, and material installed at the Consultants cost.
5. All claims, disputes, and controversies arising out of or in relation to the performance, interpretation, application, or enforcement of this Agreement, including but not limited to breach thereof, shall be referred to mediation under the then current Construction Industry Mediation Rules of the American Arbitration Association prior to any recourse to arbitration or a judicial forum.
6. The consulting services provided on this project will be conducted in a manner consistent with that level of care and skill ordinarily exercised by
members of the profession currently practicing under similar conditions. No additional warranties are provided either express or implied unless agreed to in writing.
7. The Client agrees to limit the Consultant’s liability on the project, including its agents and employees, due to the Consultant’s negligent acts, errors or omissions, such that the total aggregate liability of the Consultant shall not exceed $100,000 or the Consultant's total fee for services rendered on this project, whichever is less. :
8. The Client agrees to indemnify and hold harmless the Consultant, its principals, employees and agents against any claims arising out of the project based in whole or in part by the conduct or actions of the Client. The Consultant agrees to indemnify and hold harmless the Client against the negligent acts of the Consultant to the extent provided above.
9. To the extent that the proposed services of the Consultant are for design which does not include construction phase services such as the review or site observation of the contractor's work or performance and the review of shop drawings, then the Client agrees to defend, indemnify and hold harmless the Consultant from any claim or suit whatsoever, including but not limited to all payments, expenses or costs involved, arising from or alleged to have arisen from the contractor's performance or the failure of the contractor's work to conform to the design intent and the contract documents.
10. Consultant shall not be liable for any and all damages or any and all costs due to its delays in performance including, but not limited to, damages or costs resulting from both excusable and inexcusable delays by consultants, its agents, employees and independent contractors.
Additionally, the consultant is not responsible for delay nor shall be responsible for damages or be in default or deemed to be in default by reason of lockouts, accidents, or acts of God: or the failure of client to furnish timely information or to approve or disapprove the consultant's work promptly; or delay or faulty performance by client, other contractors, or governmental agencies; or any other delays beyond consultant’s control.
11. Consultant shall not be liable for damages resulting from the actions or inactions of governmental agencies including, but not limited to, permit processing, environmental impact reports, dedication, general plans and amendments thereto, zoning matters, annexations or consolidations, use or conditional use permits, and building permits; and consultant shall only act as advisor in all governmental relations.
12. In the event that client institutes a suit against consultant because of any failure or alleged failure to perform, error, omission, or negligence, and if such suit is not successfully prosecuted, or if it is dismissed, or if verdict is rendered for consultant, client agrees to pay consultant any and all costs of defense, including attorney’s fees, expert witnesses’ fees, and court costs, and any all other expenses of defense which may be needful, immediately following dismissal of the case or immediately upon judgement being rendered in behalf of consultant.
13. Should litigation be necessary to enforce any term or provision of this agreement, or to collect any portion of the amount payable under this agreement, then all litigation and collection expenses, witness fees and court costs, and attorney’s fees shall be paid to the prevailing party.
14. There are no understandings or agreements except as herein expressly stated.
15. All original papers, documents, files, and copies thereof, produced as a result of this contract, except documents which are required to be filed with public agencies, shall remain the property of the consultant and may be used by consultant without consent of client.
Page | of 2
16. The terms and provisions of this agreement shall not be construed to alter, waive, or affect any lien or stop notice rights, which the consultant may have for the performance of services under this agreement.
17. The consultant makes no representation concerning the estimated quantities and cost figures made in connection with maps, plans,
specifications, or drawings other than that all such figures are estimates only and the consultant shall not be responsible for fluctuations in cost factors.
18. All fees and other charges will be billed monthly and shall be due at the time of billing unless otherwise specified in this agreement.
19. Payment is due upon the presentation of invoice and is past due thirty (30) days from the invoice date. Client agrees to pay a finance charge of one and one-half percent (1 4%) per month, or the maximum rate allowed by law, on past due accounts. Client agrees to pay Consultant’s cost of collection of all amounts due and unpaid after ninety (90) days, including court costs and reasonable attorney's fees. Consultant shall not be bound by any provision or agreement requiring or providing for arbitration of disputes or controversies arising out of this agreement, any provision wherein Consultant waives any rights to a mechanics’ lien, or any provision conditioning Consultant's right to receive payment for its work upon payment to Client by any third party. These General Conditions are notice where required, that Consultant shall file a lien whenever necessary to collect past due amounts. Failure to make payment within 30 days of invoice shall constitute a release of Consultant from any and all claims which Client may have whether in tort, contract or otherwise and whether known or unknown at the time.
20. In the event that the plans, specifications, and/or field work covered by this agreement are those required by various governmental agencies, and in the event that due to change of policy of said agencies after the date of this agreement additional office or field work is required, the said additional work shall be paid for by the client as extra work.
21. In the event that the utilities are incorrectly located or not located correctly by a utility owner and the design has to be modified due to the utility owner’s negligence and additional work is required by the consultant, the additional work shall be paid for by the client as extra work.
22. In the event that any staking is destroyed by an act of God or parties other than the consultant, the cost of re-staking shall paid by client as extra work.
23. The client shall pay the costs of checking and inspection fees, zoning and annexation application fees, assessment fees, soils engineering fees, soils testing fees, aerial topography fees, and all other fees, permits, bond premiums, total company charges, blueprints and reproductions, and all other charges not specifically covered by the terms of this agreement.
24, Should the Consultant provide observations or monitoring services at the job site during construction, Client agrees that, in accordance with the generally accepted construction practice, the contractor will be solely and completely responsible for working conditions on the job site, including safety of all persons and property during the performance of the work, and compliance with OSHA regulations.
25. Specifically excluded from the Consultant's responsibility are the following:
1 Actual, alleged or threatened pollution damages; that being damages caused by the release of solids, liquids or gases which cause environmental damages or require cleanup.
{Fines or penalties.
! Consultant's advice on bonds or insurance.
Damages arising from handling or disposal of asbestos, asbestos containing materials, or hazardous waste in any of its various forms, as defined by the Environmental Protection Agency.
26. Extended project timeline - If there is an unexpected extension of the project timeline that results in additional costs, such as increased labor or
materials costs, inflation, or the construction value of the project, the Consultant may request a renegotiation of the price or terms to reflect the changes in the project schedule of values.
27. General increased costs - If there is an increase in the cost due to market conditions of the value of the project in performing any obligations under this Agreement, due to factors beyond the control of the Parties, such as inflation, market fluctuations, or changes in law, the Consultant may request an adjustment to the agreed payments or performance terms based on the increased costs.
28. Force Majeure - Neither party will be liable to the other or be deemed to be in breach of this Agreement for any failure or delay in rendering performance arising out of causes beyond its reasonable control. Such causes may include but are not limited to, acts of God or the public enemy, terrorism, significant fires, floods, earthquakes, unusually severe weather, epidemics, strikes, or governmental authority approval delays or denials. The party whose performance is affected agrees to notify the other promptly of the existence and nature or any delay.
January 1, 2026
ATTACHMENT B
STANDARD BILLING RATES
YORK & ASSOCIATES ENGINEERING, INC.
All time spent by York & Associates Engineering, Inc. personnel that is directly related to the services shall be paid for as indicated herein. Such time related to the services shall
include time spent for travel, conferences, correspondence, and reviewing client or vendor information.
Regular Rate Schedule:
Professional Engineer $175.00/hour Project Manager $160.00/hour Project Engineer $145.00/hour Registered Land Surveyor $160.00/hour Survey Crew $215.00/hour Engineering Aide $110.00/hour Sub-consultant Actual Cost + 15%
Reimbursable expenses directly related to the services shall be paid for as follows:
- Transportation, vehicle mileage, and living expenses shall be billed at cost plus 10% for all travel beyond a 50 mile radius from the York & Associates Engineering, Inc.
office.
- Postage and overnight deliveries, audiovisual aids, reproduction services, binding, outside consultants or specialty services, license fees, and purchases made for the Client’s account shall be billed at cost plus 15%.
All time spent by York & Associates Engineering, Inc. personnel related to the preparation for and provision of testimony as an expert witness for litigation shall be billed at rates equal to 2.0 times the Regular Rate.
Municipal Gas Authority of Georgia
“TRADE CONFIRMATION”
Date of Trade: July 6, 2026 City Name: Camilla Requesting Person:
End User Name: ALLTECH Requesting Person: Kevin Perraut Type of Hedge: Fixed Swap Type of Transaction: BUY Effective Date: June 1, 2027 Termination Date: July 3, 2027 Reference Price: SoNat LA Mo Counterparty Confirmation: Contact: Victoria Lawther Ref No.: 7922965 Date:
Distribution to Requestor: Contact: Kevin Perraut Date:
Volume Price Month MMBtu MMBtu Jun-27 4,000 $3.498 Jul-27 4,000 $3.498
The Member signor of this alternate price confirmation is an individual representing themselves to the Municipal Gas
Authority of Georgia as having the capacity to enter into agreements to elect an alternate price on behalf of the Member
and understands the implications of entering into an alternate price agreement made on behalf of the Member by the
Municipal Gas Authority of Georgia. A Member’s election to choose an alternate price is pursuant to the Gas Supply
Contract between the Municipal Gas Authority of Georgia and the Member and does not in any way alter the terms or
supersede the Gas Supply Contract. Please confirm that the foregoing correctly sets forth the terms of our agreement
within three (3) business days by executing this confirmation and returning it to us. Failure to respond within such period
shall not affect the validity or enforceability of this transaction, and shall be deemed to be an affirmation of the terms and
conditions contained herein, absent manifest error.
MUNICIPAL GAS AUTHORITY OF GEORGIA
Sof 2M
ay A wept Oly
CITY OF CAMILLA
\
By:
/ Scott Tolleson Its: President and CEO Its:
Date: July 6, 2026 Date:
Wwisvae PROT Aw
01-29 - POR
Municipal Gas Authority of Georgia
“TRADE CONFIRMATION”
Date of Trade: July 6, 2026
City Name: Camilla
Requesting Person:
End User Name: ALLTECH
Requesting Person: Kevin Perraut
Type of Hedge: Fixed Swap Type of Transaction: BUY Effective Date: June 1, 2027 Termination Date: July 3, 2027
Reference Price: SoNat LA Mo
Counterparty Confirmation: Contact: VictoriaLawther Ref No.: 7922965 Date:
Distribution to Requestor: Contact: Kevin Perraut Date:
Volume Price Month MMBtu MMBtu Jun-27 4,000 $3.498 Jul-27 4,000 $3.498
The Member signor of this alternate price confirmation is an individual representing themselves to the Municipal Gas Authority of Georgia as having the capacity to enter into agreements to elect an alternate price on behalf of the Member and understands the implications of entering into an alternate price agreement made on behalf of the Member by the Municipal Gas Authority of Georgia. A Member's election to choose an alternate price is pursuant to the Gas Supply Contract between the Municipal Gas Authority of Georgia and the Member and does not in any way alter the terms or supersede the Gas Supply Contract. Please confirm that the foregoing correctly sets forth the terms of our agreement within three (3) business days by executing this confirmation and returning it to us. Failure to respond within such period shall not affect the validity or enforceability of this transaction, and shall be deemed to be an affirmation of the terms and
conditions contained herein, absent manifest error.
CITY OF CAMILLA
— a
f ~~
By: 4 oon { Jou “ : By:
Its: WAT OR OR ten Its:
_—
Date: O- hve) “i COX Date:
ALLTECH
EJCDC=
ENGINEERS JOINT CONTRACT
DOCUMENTS COMMITEE
Change Order No. i
Date of Issuance: July 8, 2026
Effective Date: 7-8-26
Owner: City of Camilla Owner's Contract No.:
Contractor: Rowe Well & Pump Services, LLC Contractor's Project No.:
Engineer: Still Waters Engineering Engineer's Project No... C0113.014 Project: Water System Improvements to Serve Newton Road, Contract Name: N/A
Bay Street, & Oakland Avenue The Contract is modified as follows upon execution of this Change Order:
Description: Additional grounding for well to deter electrical / lightning surges at the well site.
Attachments: None
CHANGE IN CONTRACT PRICE CHANGE IN CONTRACT TIMES
Original Contract Price:
$317,310.00
[note changes in Milestones if applicable] Original Contract Times: 90 Substantial Completion: 60
Ready for Final Payment: 90
days
increase from previously approved Change Orders No. 0 toNo.1:
§ 44,329.00
[increase] [Decrease] from previously approved Change Orders No.__ to No. __
Substantial Completion: N/A
Ready for Final Payment: N/A
days
Contract Price prior to this Change Order:
§ 317,310.00
Contract Times prior to this Change Order:
Substantial Completion: N/A
Ready for Final Payment: N/A
days or dates
increase of this Change Order:
$ 44,329.00
[increase] [Decrease] of this Change Order:
Substantial Completion: N/A Ready for Final Payment: N/A
days or dates
Contract Price incorporating this Change Order:
$ 361,639.00
Contract Times with all approved Change Orders:
Substantial Completion: N/A
Ready for Final Payment: N/A days or dates
ACCEPTED:
La
By: > 2
Contractor (Authorized Signature)
~ Engineer (if required) Owner rag ser
tittle: Areyect Engineer Tite MWR P Title Pemreste.
Date: “j= B- IS pate (\-AA- Ab Date Bf: 26 Approved by Funding Agency (if
applicable)
By: Date:
Title:
ECDC’ C-941, Change Order.
Prepared and published 2013 by the Engineers Joint Contract Documents Committee.