County: Madison County
Madison County Board of Commissioners called meeting, August 27, 2026
1 page
These are the minutes as Madison County Board of Commissioners posted them, read from the file on its own website. Georgia Commons is independent and is not affiliated with Madison County Board of Commissioners.
Records of this meeting
Each link opens the body's own website or meeting portal.
- MinutesMinutes (drive.google.com) · shown on this page
- Video recording8/27/2026 Madison County Special Called Meeting for UDC (www.youtube.com)
Summary
Written by an AI model (claude-sonnet-5-5) from the minutes below. It is not the record: the minutes are.
Commissioners and planning commissioners heard a presentation on the proposed Unified Development Code and discussed next steps; no votes were recorded.
The Board of Commissioners held a special called meeting with members of the Planning & Zoning Commission present to hear a presentation on the proposed Unified Development Code (UDC). A consultant from CPL presented the five project phases, upcoming public hearings, additional UDC presentations, the main sections of amendments and changes, transfer development rights and procedures, and Board initiated rezones. Commissioners raised questions on the land development permit section (6.4), best practices, standard operating procedures, the process with EPD, clear definitions, a list of outside review organizations, and a policy for scheduling staff and developer projects. Each planning commissioner addressed the Board, and the Board discussed upcoming meetings, public hearings and the adoption date. No votes or decisions are recorded, and the meeting adjourned at 7:15 p.m.
Topics taken up: proposed Unified Development Code; CPL presentation; five project phases; transfer development rights; Board initiated rezones; Land Development Permit section 6.4; upcoming public hearings; UDC adoption date.
What was said in the recording
Written by an AI model (claude-sonnet-5-5) from the machine transcript below. It is not the record: the recording is what was said. Each account is part of the AI-written summary of the machine transcript, not the record. The time opens the transcript below where the matter is taken up.
Consultants presented the draft Unified Development Code to commissioners, who raised questions on permits, poultry setbacks and development rights, with adoption steps scheduled this fall.
The county commissioners held a called meeting where consultants presented the draft Unified Development Code, a document of roughly 300 to 380 pages that is still being refined. They covered how the code is organized, new rules for transfer of development rights, agriculture and poultry houses, private drives and easements, public notice, permit and code enforcement procedures. Commissioners and planning commission members asked about land disturbance permit tracking, subdivision access points, poultry setbacks, industrial soil amendments, and whether transfer of development rights is ready. Consultants said a planning commission presentation is set for September 1, public hearings for September 15 and October 26, and a clean final draft is targeted for about October 1. No vote was taken, and the meeting adjourned.
What the meeting took up, as said in the recording (7)
Overview of draft Unified Development Code, timeline, and how it is organized
0:02:50Agenda item: Item No. 2. CPL presentation regarding the proposed Unified Development Code Sarah McQuade approached the Board and presented the five project phases, overall…
The chairman said the meeting was to hear the proposed changes, that nothing was final, and that staff had trained on the draft earlier that day. A consultant said the project is nearly three years old and described the schedule: a planning commission presentation, a planning commission public hearing on September 15, and a board public hearing on October 26, with a possible extra presentation if changes are significant. The consultant walked through the code's articles (districts, use standards, overlays, land development, signs, enforcement), new modern uses such as craft establishments and data centers, short-term rentals, bulk standards with minimum lot sizes by district, private road standards, agriculture and stream buffers. They also described process changes: renaming hardship variances as variances, administrative variances, and giving final plat approval to the zoning director, which the consultant said reduces legal risk.
Transfer of development rights, poultry house rules, private drives, and procedures
0:32:08Agenda item: Item No. 2. CPL presentation regarding the proposed Unified Development Code Sarah McQuade approached the Board and presented the five project phases, overall…
A consultant explained how sending and receiving sites would work for transfer of development rights, with one unit per severed acre in A-1. A commissioner noted the A-1 minimum is 15 acres, not 25, and the consultant said it would be corrected. Consultants described commercial agriculture thresholds, poultry house acreage and setbacks, private street and drive limits of four lots, and review roles. On procedures, they covered pre-application meetings, determination of completeness, public notice, community meetings, and the state-required five-day intake and 45-day review. Staff raised a correction on the community meeting trigger, which the consultant agreed to change to say the request includes more than five acres or sixteen or more lots.
Tracking land disturbance permits, EPD role, and county oversight
0:51:35Agenda item: Item No. 2. CPL presentation regarding the proposed Unified Development Code Sarah McQuade approached the Board and presented the five project phases, overall…
Commissioners asked what counts as activity that keeps a permit alive and worried a project could be finished before the county knows. Consultants said the county is not a local issuing authority, so the state agency handles erosion permits and the developer reports to it by the 15th of each month. A commissioner said the county only gets involved when a permit is pulled, and others asked for a county permit and a schedule tied to inspections, or a copy of the seven-day letter. Consultants agreed to think about creating a county permit requirement and standard operating procedures.
Code enforcement process, penalties, and example rezoning with subdivision access points
1:10:31Agenda item: Item No. 2. CPL presentation regarding the proposed Unified Development Code Sarah McQuade approached the Board and presented the five project phases, overall…
A consultant described building permits and the code enforcement steps: unfounded complaint, warning notice, notice of violation, and citation, with civil penalties up to $1,000 per day. A commenter said the state caps fines. In an example rezoning of a 70-acre lot, commissioners questioned the single access point rule, noting the board has favored multiple accesses for emergency services. The consultant read proposed tiers by number of units and agreed to review them. Discussion covered fire code, the lack of a local fire marshal, and long narrow parcels that fit only one entrance.
Questions on poultry setbacks, soil amendments, easements, flag lots, and PUD size
1:25:24Agenda item: Item No. 3. Open Discussion
The chairman worried a backyard flock of 30 chickens could face the same setbacks as a large poultry operation, and a sliding scale was suggested. Consultants said they will add setbacks for animal waste disposal and processing. A commissioner asked about industrial byproduct called soil amendments spread on farmland; others said state law limits county power, but it could be defined as a special use and given setbacks. Concerns about easements led to discussion of lowering flag lot road frontage from fifty to thirty feet. The minimum size for a planned unit development dropped to ten acres, which a commissioner said they were comfortable with.
Transfer of development rights concerns and unintended consequences
1:40:35Agenda item: Item No. 3. Open Discussion
Commissioners said transfer of development rights is confusing and may not work in the county. Consultants explained it as buying density elsewhere while preserved land stays undeveloped, with landowner compensation and a tax reduction. One commissioner said it could work at small scale, another asked that the code be examined for unintended consequences, and a third said river corridors are already protected. A commissioner also asked whether map errors, such as two-acre lots zoned A-1, could be corrected; the consultant said county-initiated rezonings and the later map adoption allow that.
Planning commission members' questions, schedule, final draft timing, and public hearing
1:50:14Agenda item: Item No. 3. Open Discussion
The chairman said the code is not a silver bullet and amendments will follow. A commissioner said it seems far from complete; others said most of the draft is sound. Planning commission members asked when they could ask questions and learned a presentation is planned for their September 1 meeting, with the public hearing September 15. Consultants said the target for a final draft is about October 1, and adoption would be considered in October. One planning member raised concerns about transfer of development rights and larger stream buffers in ag areas; a commissioner said larger buffers date to 2022. Consultants promised an email summarizing changes.
Agenda items (4)
Found in the minutes by their headings. Where an outcome is shown, it was read by rule from the item's own words: a guide to the text, not part of the record. Where a time is shown, it is where the machine transcript below takes the item up. A link marked found by machine rests on a stretch of the transcript an AI model proposed.
- Item No. 1. Chairman Call to Order
- Item No. 2. CPL presentation regarding the proposed Unified Development Code Sarah McQuade approached the Board and presented the five project phases, overall…Discussed at 0:02:50, 0:32:08 (found by machine), 0:51:35 (found by machine), 1:10:31 (found by machine)
- Item No. 3. Open DiscussionDiscussed at 1:25:24, 1:40:35, 1:50:14 (found by machine)
- Item No. 4. Adjourn
The minutes
As posted on drive.google.com, read November 25, 2026. Nothing below is written by Georgia Commons.
Public Meeting Room • Government Complex • August 27, 2026 • 5:00 P.M.
MADISON COUNTY BOARD OF COMMISSIONERS
SPECIAL CALLED MEETING MINUTES
MEMBERS ABSENT:
District 4 Commissioner Brian Kirk
MEDIA PRESENT:
Anna Izequierdo, Madison County Journal
STAFF PRESENT:
Christina Baxter, County Clerk
MEMBERS PRESENT:
Commission Chairman Todd Higdon District 1 Commissioner Dennis Adams District 2 Commissioner Terry Chandler District 3 Commissioner Frank May District 5 Commissioner Derek Doster Planning & Zoning Commission Board members also in attendance: William Smith, Kenneth Bradley, Conolus Scott, Lee Mitchell, Guy Spencer and Cynthia Fortson.
Item No. 1. Chairman Call to Order
Chairman Higdon called the meeting to order at 5:07 p.m.
Item No. 2. CPL presentation regarding the proposed Unified Development Code Sarah McQuade approached the Board and presented the five project phases, overall presentation. Sarah reviewed the upcoming public hearings and additional UDC presentations. Sarah reviewed the main sections of amendments and changes, transfer development rights and procedures.
CPL staff also discussed Board initiated rezones, standards and procedures.
Commissioner Doster arrives at 5:55 p.m.
Commissioner Adams discussed section 6.4 Land Development Permit reviewed. The Board discussed best practices, SOPs and the process with EPD.
Commissioner Chandler requested clear definitions and list outside organizations used for reviews.
Commissioner Doster discussed a policy for staff and developer project scheduling.
The Board held further discussion with CPL staff.
Item No. 3. Open Discussion
Chairman Higdon asked each Planning Commission Board member for any questions or comments.
Each Planning Commissioner member addressed the Board.
The Board held discussions regarding upcoming meetings, public hearings and adoption date.
Item No. 4. Adjourn
Chairman Higdon adjourned the meeting at 7:15 p.m.
Individuals with disabilities who require certain accommodations in order to allow them to observe and/or participate in this meeting, or who have questions regarding the accessibility of the meeting or the facilities should call the Office of the County Clerk at 706-795- 6300 to allow the County to make reasonable accommodations for those persons.
Machine transcript
This is a machine transcript made by Georgia Commons from the body's public recording. It is not an official record, it can mishear words, names, and numbers, and it does not say who is speaking. The recording is what was said.
1,225 turns.
Open the recording on www.youtube.com. The recording opens on the site where the body published it. Nothing is played on this page.
- 0:00:25
Just to know, just to know that we, uh...
- 0:01:21
Two things.
- 0:01:30
Give Chris enough credit for bringing different ideas to it.
- 0:02:50
All right. Um, I know we're running a little bit late. We just came out of a late meeting, uh, that started today at one thirty. Uh, thanks to CPO for coming out and hosting this meeting, but we'll call this meeting to order. This is a public hearing to discuss the unified development code, um, and, uh, to be honest, Sarah, I don't know who's gonna speak. Sarah, do they have-
- 0:03:10
Well, I'll-
- 0:03:11
All three of you gonna speak. So, okay. They all have different topics. Uh, tonight is just to hear a lot of the changes that they're recommend- recommending. Uh, note that nothing is written in stone as of yet. We are still tidying up some loose ends on different zoning ordinances, uh, but it is coming to a close. Uh, but tonight they wanna, uh, present what they have so far and the, the training we had earlier, the staff training, was to, for us to go over line by line and say, "Okay, this is what we got.
- 0:03:45
What do you think?" And we would change a word or this or that or a particular name. I think one of those we got hung up on was lodge bus versus camp, hunting lodge versus hunting camp. And we felt like hunting camp fit Madison County more than the lodge did. So it was just small print stuff. But, uh, thank y'all for coming and to hear about it tonight. And Sarah, I'll turn it over to you.
- 0:04:08
Yeah. Thank you, Chairman. I feel like, uh, it's, what, been almost two, approaching three years that we've been doing this.
- 0:04:16
Yeah, don't wanna talk about that.
- 0:04:19
But I think the, I think the point is, is the time we took to kind of do this in the beginning, I think really set us up for a good place today, at, at least what I'm hoping. And I feel like we've gotten to really know Madison a lot better than I did previously, even though I just live in Athens, so. Um, just to kind of orient everyone since everyone hasn't been along for this ride. When we first started, the way we approach, uh, code updates and, and these sorts of things is we look at what you have existing. We look at your existing ordinance.
- 0:04:49
We look at the policy documents, so your comprehensive plan. Um, we talk to Christina's staff, see what are typical variances and things that you encounter when you're up here on this dais. And so we, we pull that all together, um, and we use it to help us develop the content, um, which we worked a long time on. We had a really great group of both staff and board members who kind of helped us go through this process as we, as we did the update.
- 0:05:20
You know, we're, we've done training and, and this is part of the engagement to really take it from that group we've worked with, you know, those, those months to develop the ordinance, to bring it for the, the bigger feedback, to help train staff and get that feedback back to us. And then we'll move on to adoption of the ordinance, hopefully, and then adoption of an updated zoning map. Um, so to kinda give you some, some details. Today, you know, this is just an overall presentation of, of everything. As you said, it's a draft still, so changes can be made.
- 0:05:54
Um, but what we are looking at is being back here on Monday at the planning commission meeting and doing a presentation to the planning commission at their regular scheduled meeting with the public Um, so that's the first, and then the public hearing for the planning commission will be on September 15th. Um, and again, feedback and any comments, we'll be incorporating those through the process. And then for the second public hearing, we bring it to the board of commissioners, to y'all, on, uh, October 26th.
- 0:06:25
Um, we can come back on October 5th and do another presentation to the board if there are significant changes and y'all feel like we need to, so that's out there. But I kinda wanted to give you those two public hearing dates, um, and then let you know what we're looking at. Um, uh- Do you have a clicker? Okay. Yes. Yeah, I had a clicker. Thank you. Dana brought a clicker. It was changing. I didn't know... Okay, I'm sorry.
- 0:06:49
I found it in my bag.
- 0:06:51
Um-
- 0:06:51
Sara, just to note, it looks like the majority of the planning and zoning's here tonight.
- 0:06:56
Yes.
- 0:06:56
So they'll get a cheat sheet tonight.
- 0:06:57
Yes.
- 0:06:57
And, and actually, it's really good they are here, because they can be prepared for what you got coming next in case they wanna make notes.
- 0:07:03
Exactly. And so the draft, I mean, we've turned the draft over to y'all. I know you've had opportunities to look at it. You can release it to the public when you would like. You may have already. And then obviously, the planning commission has it as well. Um, to, to kind of go back to our goals here, you know, our priorities when we first met with y'all is we wanted user-friendly regulations. We wanted to make sure we did procedural updates. You know, what does Madison County need to be doing procedurally to kind of be in line with development processes?
- 0:07:34
We wanted to a- add some strength and design standards to make sure, you know, when commercial, uh, structures are built or, or certain types of things are built that they look and they, they interact with the community how you want. Um, we looked, you know, as part of the procedural updates, really what you had existing. So existing processes, the services, the infrastructure, how it was all, um, put together, so, and, and provided updates on that. Of course, natural resource protection was part of this.
- 0:08:07
And then, um, encourage the expansion of housing options. So that's kind of the guiding priorities. Those are pulled both from the comprehensive plan and, and conversations with y'all. Um, and I ... This is going to be high level, because it's, it's, you know, a 300-and-something page document. Um, but we can flip to any page you would like. I have a copy for y'all if you want me to share it with you up here. Um, but I wanted to take time to kind of go over how we reorganized it, just so people, you know, have a little bit of a glimpse at that.
- 0:08:41
So the introductory provisions are just kind of your, your standard, uh, establishing provisions. It talks about what's applicable in the zoning ordinance, how it's interpreted, and it kinda gives the administrative framework for this, um, ordinance. Article two is where we put all of the zoning districts there. So your base districts, the minimum dimensional standards for them, and all of that is in article two. It also includes your principal use table and your accessory use table, so what is allowed in each district.
- 0:09:13
And that's one of the things we did, is we put together a table that lists all of your uses. It has the districts at top, so you can see where things are allowed, what requires a conditional use, what is allowed by right. Um, article three, the use standards, this is where we say, okay, you want to open a, um-
- 0:09:34
Hunting
- 0:09:35
... hunting camp. You wanna have a hunting camp. You have a bunch of property. You lease out, uh, leases for it. You wanna make sure you're doing it right, so here are some standards that go along with that. Um, s- if you have short-term rentals, how are those regulated? Um, you know, those sorts of things. So we call them supplemental standards, the use standards. And it goes for residential uses, institutional, commercial, industrial, and agricultural uses, um, as well as accessory structure, and then wireless communication.
- 0:10:06
Um, your special purpose districts, those are similar to your zoning districts. They, they are zoning districts. But it's, uh, it's, it's different. You treat them a little differently. So planned unit development is a good example. It's, this development we're bringing to you doesn't meet the R1 standards for a residential subdivision. It doesn't meet the business standards for this business park development. We wanna do something that isn't allowed by your code. And so we're going to bring it to you, present it as a package, a planned development, and this is why we should do something that's different than what your code outlines.
- 0:10:44
Um, and within that, to... A lot of times when we work in planning, we see a lot of, um, residential, uh, developments that use that as a, a mechanism to create, uh, increase density, reduce lot sizes. So what we did in your ordinance is we said, "Okay, if you wanna increase the density or have different lot sizes, we need to see what you're doing that's unique. So is this preserving, you know, a good portion of the property because it's, um, you know, it's, it's got, uh, hardwoods on it, and you wanna r- you know, maintain the tree canopy, so you wanna concentrate the houses here.
- 0:11:19
And, you know, what are these things that it's doing that makes it different?" Uh, in article four, or excuse me, that's article four. In article five, these are overlay districts. So again, they're zoning districts, but they go on top of your base district. So you could have a zoning district, um, that's, uh, A1, except it's in a corridor protection zone, and you've identified that as a space you want to, to protect the corridor of. So there are supplemental standards on top of that.
- 0:11:50
And through the overlay districts, one thing we did was establish an overlay for transfer of development rights. That is a technique that can be used to conserve and protect property. Um, and so rather than, say, rezoning a- One property to R one, R 100 so that you can do a subdivision there. Let's preserve this as agricultural land and send those, um, development rights so the, the number of units and things that could occur on that property to a part of the county where we want to see it, where there is sewer access, where there is water, where it makes sense, there's access to more, um, utilities.
- 0:12:33
You know, Georgia doesn't use a lot of them. Chattahoochee Hills down in, uh, South Fulton, they've had a successful T- TDR program. That's where Serenbe is. So it definitely can be used, um, and it's just a good opportunity to have it enabled so that if, you know, somebody does want to use it, you have a framework for doing that. Um, six is your land development and permitting. Um, we know that a lot of it is done at the state level right now. Um, so EPD reviews any land development permits for compliance with the state regulations.
- 0:13:07
Um, but we, we also built it into the county so you have a framework of oversight. If they're submitting something to the state, they should be submitting it to you even if you're not doing the reviews internally, that way you're aware of what's happening here. Um, it also goes into the permitting construction and, and how, um, applications are filed. Uh, article seven's your environmental protection standards, so these are a lot of your state ordinances related to soil erosion control, flood plains, trees, water quality, and other re-environmental, uh, environmentally sensitive areas.
- 0:13:43
Uh, article six, we looked at the site standards. So that's if we're developing a business piece of property, you know, how many parking spaces are required? Does the parking lot need to be gravel or is it paved? You know, are you going to have to put up, um, trees like in the front or a buffer along the sides between different uses? Streets and improvements, those are going to be, um, you know, a lot of your technical details. So how wide is your street? What's the wide of- right of way width?
- 0:14:14
Um, how do you do the ditch or curb and gutter? You know, those, those types of standards. Um, easements, utility location. Article 10 goes into signage. Um, sign codes are always fun because you can regulate how they look, but you can't relate- regulate the content. So we looked at how you guys did that and, and did updates to, uh, location, size, and types of signs. Article 11 relates to violations, penalties, and enforcement. So how do you regulate this ordinance?
- 0:14:46
Uh, article 12 relates to your review boards and administrate- and administration of it. So what role does your planning commission have? What role does your zoning administrator have? How does staff handle these things? So it kind of gives guidance on just everybody's role in the process. Thirteen talks about how these public hearings and review procedures occur. And, uh, article 14 is your guarantees and your sureties. So your bonding after a development, how, how you handle that.
- 0:15:17
And then 15 is your abbreviations and definitions. I know that's not exciting, but it's the structure that we found that works. Um, and so hopefully kind of updating your ordi- ordinance and putting in that, that framework is a good step in making it usable and, and reader friendly. Um, I already touched on PDRs, so I'm not going to go too far into them now. But the, the main idea is you have sending zones where you want to conserve, and you have receiving, receiving zones where you want development to occur.
- 0:15:47
Um, the incentive to doing that is if a developer purchases development rights, they would get a density bonus. So they'd be able to develop more densely than they normally would because they're conserving an area in a different part of the, the county. Um, planned unit developments, also talked about, but essentially it's that creative mixed use or, or type of development that doesn't meet your base ordinance. Um, and then accessory dwellings we don't really have. Uh, we clarified that those are all going to be guest houses in this community, so that means they're...
- 0:16:20
they cannot be subdivided, they're secondary to the, the residents. They don't have a kitchen, so they're not meant for permanent lodging. Um, and, and it's, it's a way to allow residents to have, um, a bonus room above their garage and allow visiting family or friends to stay there, but not do a full-time rental on the site. So that way we're not... it doesn't, um, allow two houses on, on one piece of property, and there's no risk of, of, of that increasing density through that way.
- 0:16:58
Um, so the usability I've already talked about, but again, a lot of it is going through the ordinances previously were written in very, uh, legalese, so a lot of lawyerly speak. Um, so we've kind of tried to translate that back to everyday language and, and make it more usable for, for everybody in the community, not just developers. Um, there are design standards that are more user-centric, um, and they, they should help you kind of get the type of growth you are, are interested in seeing.
- 0:17:31
Um, we... the environmental compliance, we consolidated a lot of it into... based on how your ordinance was, so that it was all located in one place. And then we, uh, just made sure that there was internal consistency throughout the ordinance structure. Um, when... I think your ordinance you had for a very long time, it's been updated throughout the years, but never been truly overhauled, so it's kind of going through and making sure everything's internally consistent as well.
- 0:18:03
Um, you know, we can... I'll, I'll go through these. I know it's a lot of text, but it is a long document, so we wanted to make sure we kind of gave you a full kind of breadth of what we did. So with our uses, you know, what is allowed on a piece of property. We added interpretation provisions, um, for zoning district boundary lines and how to use those. Um, we separated the use chart tables for principal and accessory uses. We created those special purpose districts for a PUD.
- 0:18:36
Um, your home occupation regulations were pretty complex originally, so we reduced some of that complexity to make it more user-friendly. We added some modern uses that weren't captured in the code, things like a coffee roaster, like a c- a lot of these are considered craft establishments, so small scale. Is it a microbrewery? Is it a small, um, jeweler who, who, uh, works out of there? Um, we also did include data centers. I know you guys are doing a moratorium on them because there is one upcoming, so we already have those identified in this, this ordinance.
- 0:19:11
But I think feedback from y'all now that you have something, um, to really consider and, and let us know what we can continue to adjust will be really important for us. Um, we added short-term rentals as, as an opportunity, um, since that's a, a modern use that a lot of people use. Um, the state allows short-term rentals to be, um, treated as a hotel/motel, so there's a transportation fee that is assessed. Um, and the, um, if you, if you got the taxes back from the state for hotel occupancies, those would be remitted as well, and it happens automatically at the state level, so having that enabled in your ordinance helps with that.
- 0:19:54
The land development, we did talk about the PDR overlay district, and really that was trying to protect the, the rural part of the county that you guys identified as, as being really important. Um, and then we... Access management, uh, is another thing we looked at, so number of curb cuts or driveways into a, a business. Um, d- driveway separation along a road, so do you want to have a driveway every 20 feet along your roads? That can be pretty, you know, tight, so is there more separation that's needed?
- 0:20:29
Um, when are, like, deceleration lanes or turning lanes appropriate? Uh, those types of updates. With signs, um, billboards are something that was really popular to try and prohibit. But with legal battles and lawsuits, you can't technically just outright prohibit billboards and, and say it that way. What you can do is you can limit the size of, of what you're allowing, the size and the height. So you, rather than saying billboards are prohibited, you just say, "We don't allow a sign that's greater than this square footage or taller than this." Um, and that's one way to kind of reduce the, the potential for billboards in a community.
- 0:21:11
Um, and then we included charts and other graphics to, to show how different types of signs are regulated. Just signs are technical and what is a wall sign versus a monument sign versus a pole sign versus a street sign, just kind of giving some guidance on that. Did I go past my- No. Nope. This is my last- Yes. Just one and then the next one. Oh, two more. Okay. I feel like I'm talking a lot. But the other things we did is we adjusted some of your bulk standards.
- 0:21:44
So we consider your bulk standards like your dimensional requirements. What's your lot size requirements for districts? What are the setback requirements? Um, if you have access to sewer and water, what is it versus on a well and a septic tank? So we did make some adjustments to that. We went up and down throughout the course, I think, of, of all where we met. Um, and I think we ended up on a, a good, uh, medium is, is what I, I think we got to. Um, within...
- 0:22:16
And I'll just go over these quickly so that they are dated. So within the A-1 district, you have a minimum 15 acre lot size across all different types of utility access. Um, in A-2 it is seven acres. Uh, A-R it's three acres. In R-1 it is 32,670 square feet, so that's about three quarters of an acre when you have access to municipal or county water and sewer.
- 0:22:49
And then one acre when there is shared water and no sewer, and one and a half on individual wells and septic. Um, R-2 also mimics those standards. And then R-3 is, um, a little smaller because that would be really when you're connected to the utilities, the public utilities. Um, you know, I... That was, I think, probably one of the, the things we did the most, was talk about what was appropriate. We went up and down and, and tried to balance the right of preserving and encouraging the agricultural uses that, that you, you have in this community and allowing, you know, the subdivision and development of new residential properties and trying to balance that.
- 0:23:37
Um, we worked really hard to try and develop standards for private drives/private roads. I know there are a lot of, uh, landlocked parcels here in the county. There's been a lot of development that's occurred off of access easements. So an access easement is a, is essentially a private drive or a private road. And we defined, um, a set of just standards to help and make sure that when you are subdividing off of an easement, um, that we're ensuring some, like, safety, um, standards to make sure that emergency rescue can access the property.
- 0:24:15
Um, and then, uh, just kind of how that is maintained and regulated. Uh, like the agricultural uses, we talked a lot about what was appropriate in agricultural areas. Where is commercial agricultural appropriate? Should it still be in the A district? Should it be in a B district? How to handle rural businesses that you maybe don't want to rezone the parcel to business, but you want to allow someone since they have a small engine repair shop on their property because they have 50 acres, you know, it makes sense.
- 0:24:49
It's not really bothering anyone. But having a little more flexibility in what could be a rural business without changing the zoning and introducing the non-ag districts. How to handle like agritourism if someone wants to have a wedding event venue or a farm winery. There we go. I worked somewhere where there was a zip line thing that went in and agritourism that way. Um, and so really looking at how those agricultural uses worked.
- 0:25:19
We, I know we talked a lot with you, Commissioner Chandler, about what are the appropriate sizes for poultry houses? What should the setbacks be and separation from property lines? So I hope we ended up at a good place. Feedback would be appreciated. Um, and again, environmental protection. We talked about, but we added county stream, uh, requirements for county streams to create buffers and setback zones along those more than just the, the minimum state requirements.
- 0:25:51
And we enhanced some of those to, to protect, um, the river and, and the land around it. And then buffers, landscaping, and tree conservation. Um, we provided exemptions for single individual lots, single family developments and kind of minor things so that residents here who have a large tract of land wants to split it for family or, or whatever reason, um, they're not necessarily subject to the same things if, you know, a large 100 lot subdivision's coming in.
- 0:26:22
There's a lot of groundwork. There's a lot of removal of trees or, or things like that. Um, and then we added some perimeter and street frontage landscaping requirements for those business uses, industrial uses around parking lots to provide some screening. Last slide for me. Um, so these are changes to the processes that are in there, either additions or changes. So hardship variances, we adjusted them to become the main relief process and it's renamed as just a variance rather than a hardship variance.
- 0:26:59
Um, by the state of Georgia, those are based on physical, um, characteristics of the land. So we added some clarity on that and there's three different criteria, I think, that are in there.
- 0:27:12
Yeah.
- 0:27:12
And one of them specifically addresses that the hardship should be physical in the nature of the land, that it's not necessarily a financial hardship or a hardship created by the property owner themselves. Um, the, for zoning decisions, we just updated the process for, uh, assessing modifications to decisions that the board has f- already made. So when you're making conditions and saying, "We're establishing these conditions for this development. We're approving a subdivision. It can have a maximum of 100 lots in this general layout." If they come in and they say, "Oh, we only have room for 90 lots after we've done the further engineering and we need to adjust this road slightly this way," your zoning, uh, administrator or director is going to be able to say, "Okay, that's okay.
- 0:28:01
That doesn't increase the density of this development. It doesn't change the overall outcome. This is a minor change. It doesn't need to go back before y'all for a change in conditions." Um, whereas something more major would. If they're increasing the number of lots, if they wanna change the product, you know, really change something that had been approved. Um, just providing some clarification on that. Um, we, we added or we clarified what administrative authority there is. Um, administrative variances are a common tool.
- 0:28:32
These are minor reductions in your existing standards. So a setback can be reduced by 5%. Um, you know, I, I'm not quoting directly, but this is a type of example. You know, the, the building height can be increased slightly. You know, things that are not going to have a, a significant impact and can be made administratively. Um, and we also looked at how some of the processes are done, uh, what was coming before you previously, um, and, and gave that, uh, authority to the planning director.
- 0:29:04
So this may be controversial, but I'll go here. Plats. Um, approval of a final plat, we gave that authority to the zoning director because that is a technical compliance standard. The entitlement and your discretion happens during the zoning process. So once a rezoning is approved and you're saying this subdivision can be done in this way, you know, they'll come through for the preliminary plat and the, and, and that process.
- 0:29:35
And as long as everything is meeting what was approved by the board of commissioners at time of zoning approval, it meets the code standards, it's a process that should be able to be approved administratively, and it's best practice that way because bringing it before the board when really you're saying, "Did they develop this in accordance with our regulations? Yes or no," there's a lot of risk and liability by bringing it before a board. You know, I've worked in communities where they think they can deny a final plat, and they end up in lawsuits.
- 0:30:08
So it, it's, it's a misconcep- I feel like it's a misconception for the public to have final plats come before a commission for approval because there's really no denial or change you can do. At this level. The, the denial should come from staff, and they should say, "This does not meet our code right now. It can't... You know, it wouldn't-- it shouldn't even come before you. If it doesn't meet the ordinance, it doesn't meet the conditions of zoning, it shouldn't even be before you for decision." Um, and so having it in front of a, a board tends to just open risk.
- 0:30:43
Um, there are ways that, you know, communication can still be done. Updates. You know, "Hey, these three subdivisions that we approved for rezoning at this time, they've submitted their development permit application. Development's gonna start happening." Um, "Hey, you know what? They've closed out their development permit. They're moving forward to final plat." You know, those can be reports that are provided to you, um, but it should be on your staff to determine if it's compliant and ready for approval or, or not. And then, um, clarified timelines.
- 0:31:15
Aligned them with state regulations, um, as far as zoning procedures law. The advertising windows that you have to have for public hearings to make sure all of that was compliant with state regulations. And then we also clarified your subdivision review process. What can be done as an exemption. So a minor subdivision, five lots or less. No new infrastructure created, just the subdivision of, of land as long as it meets the standards or a major subdivision where there's new im-infrastructure, five lots or more.
- 0:31:48
Okay, we're gonna keep talking some more, but I think it probably makes sense to continue going through this, get the whole presentation done, and then open it up for questions.
- 0:31:57
From what I gather, I'm seeing notes, so- We have questions coming.
- 0:32:01
We'll be ready.
- 0:32:01
So yeah.
- 0:32:02
We'll be ready.
- 0:32:03
Please proceed on. Thank you so much so, so far.
- 0:32:06
Yeah, no problem.
Agenda item: Item No. 2. CPL presentation regarding the proposed Unified Development Code Sarah McQuade approached the Board and presented the five project phases, overall… (found by machine)
0:32:08Uh, Sarah covered a lot- ... of what I'm gonna discuss, so-
- 0:32:11
I wanted this to be more brief. I'm sorry.
- 0:32:14
I appreciate it. Um, but just some key topics, some key changes that we wanted to present tonight and maybe get some eyes on the actual regulatory language, what it's gonna look like. Uh, for transfer of development rights, we're kind of focusing on this is how we'll set up the sending site. So essentially a parcel of land located within an approved zoning district as specified on the zoning map, um, that you sever your development rights from to be transferred to a receiver site. It would be in perpetuity, currently written.
- 0:32:46
Uh, but sending site criteria would basically be if that's designated on the zoning map. You've identified these parcels that you wanna keep as a preservation, either agricultural, rural landscapes. Uh, essentially natural resource priority areas. And then suitable for agricultural production or open space preservation. Not encumbered by, uh, CUVA, Conservation Valuation assessment, just because there could be a breach of contract with CUVA if you have them, uh, tied together simultaneously.
- 0:33:16
Free of unresolved code enforcement matters and then not owned or managed by federal state or local government. On the opposite, the receiving site would be parcel of land that receives the development rights from that trans, or that severed, uh, acres. And then for criteria, it would be, again, designated as receiving site on the zoning map where you'd want more intense development or development at all to, to be located. Uh, so this would be sort of the calculation chart as presented.
- 0:33:51
So if we do an example for, uh, A-1 zoning district, your base density units per acre would be under the existing ordinance zero point zero four. So that's one principal dwelling on a twenty-five acre site. And then each sending zone yields one TDR unit per severed acre. So say for A-1, you would receive one TDR per severed acre. For A-2, two TDRs units per severed acre, so on and so forth.
- 0:34:22
Uh, if you severed fifteen acres of your sending site to your receiving site would receive fifteen TDR units for development. That would otherwise not have been possible on the sending site.
- 0:34:38
Just one, one question. You, you mentioned the recollection on the A-1.
- 0:34:41
Mm-hmm.
- 0:34:42
Uh, minimum acreage of A-1, uh, was not twenty-five. I think it was fifteen.
- 0:34:48
Yeah.
- 0:34:48
Yeah. It needs to be updated.
- 0:34:50
So these would be updated, too.
- 0:34:51
Okay. That's it.
- 0:34:52
So the-
- 0:34:52
Yeah, we caught that.
- 0:34:53
Yeah.
- 0:34:55
Mm-hmm.
- 0:34:55
So fifteen would be fifteen units.
- 0:35:00
Keep going. I think that's it. Uh, this is just a note that we've updated the administrative variance section for allowances in accordance with BPL, uh, new state regulations for quasi and judicial or zoning decisions and quasi decisions. Uh, agricultural uses. As Sarah talked about, commercial agricultural is a deep point of conversation for us during these updates. So, uh, we really wanted to keep commercial agriculture principal use. We're distinguishing them very clearly from more intense, uh, industrial uses so as not to create these spot zoning initiatives where people want, you know, under the existing ordinance maybe an industrial use that is actually very intensely agricultural use.
- 0:35:45
Um, more than thirty poultry, ten pigs, or ten other livestock constitutes a commercial agricultural activity. We're requiring certain agricultural buffers on the ag sites. Minimum of seven acres for animal production, uh, or raising of livestock. So that's your CAFOs, your AFOs. Rural business we distinguish. Again, as Sarah talked about, considering an accessory use. We don't wanna necessarily split these, uh, sites into smaller and smaller parcels just for accessory business.
- 0:36:17
Um, small scale enterprises that are compatible with and support- Agricultural forestry and open space uses. Our example here is cabinet and millwork, equipment repair, retail sales when at least 25% of the products are produced on site. So just local, local, rural, rural business. Um, more so on commercial. This is a... Poultry houses is a clear subsect of commercial agriculture. So we talked about more than 30 poultry can constitute commercial agricultural activity.
- 0:36:51
Uh, we're requiring a minimum of 40 acres for more than eight poultry houses, minimum of 25 for less than eight poultry houses. And then this is still in the works, but structures currently, we have a note for size is limited to 25,000 square feet. Could strike that to allow the building or the developer to... the farmer to, you know, des- designate those sizes as they build them. So 33,000 square feet, we just got. Um, setbacks for those poultry houses, 300 feet from property lines, 400 feet from any existing dwelling on the adjacent property, and then 800 feet set back from schools, churches, care facilities or government buildings.
- 0:37:36
Private streets and private drives. Sarah also talked about this, but just a clear designation distinguishing private streets as privately owned and maintained access ways. They serve, uh, primary means of vehicular access for multiple lots within a shared development, common development. They have to be a private access easement as the base. They shall meet construction standards for public streets, and then are allowed to be unpaved in A-1, A-2, and AR zones, but cannot serve more than four lots.
- 0:38:09
And then private drives and private access easements would be substandard private ac- access way providing access to more than one parcel where one or more of those parcels lack direct frontage on a public or private street. Um, those standards would be located within a recorded private access easement. No new platted lots of record may be created or subdivided using, using an existing or future private drive for access. Again, shall serve no more than four total existing lots. And then where a sufficient private drive exists, uh, existing platted lot of record is allowed to take access from it.
- 0:38:46
The entire length is, uh, brought into compliance with the unpaved drive. So essentially, if you extend beyond that point that we've allotted, you have to come into a compliance. And then private access easements, again, shall connect directly to federal, state or county-maintained roads. Shall have a minimum width of 30 feet. Uh, shall be maintained by a mandatory property owners association. So just creating that shared maintenance, shared access. Everyone, all property owners are working to serve or maintain-
- 0:39:18
Maintain
- 0:39:18
... yeah. And then shall have a private maintenance covenant along those same lines.
- 0:39:27
You still me?
- 0:39:28
No.
- 0:39:28
Uh, role reminders. Just to set clear review and final authority action. Planning Commission serves as a review body. Review authority for comp- comprehensive plan amendments, text amendments, map amendments, special use permits, and appeals. And then the Board of Commissioners would serve as the governing body to assert final authority over those same, um, operations. And then Zoning Director would submit recommendations for those boards and then final authorities for subdivision, conditional variances, and other uses, plus five, and Sarah walked through those last three things.
- 0:40:08
And then for reference, just some external review agencies that would be a part of these processes.
- 0:40:15
Uh, GSWCC, is it applicable? It's EPD.
- 0:40:18
It would be EPD.
- 0:40:19
Yeah.
- 0:40:21
For any land disturbance. Um, CUBA, again, is the tax assessor's office. EPD for greater than or equal to one acre of disturbance. Environmental Protection Division. Sorry, guys. Army Corps of Engineers, uh, for state waters. Septic system approval for the Department of Environmental Health. State licensing for any of your care homes, group homes, daycares, uh, some of the AG processes. Georgia Department of Transportation for any right of way, state roads.
- 0:40:52
So...
- 0:40:57
Thank you, Liz.
- 0:41:00
Okay. So I'm gonna be a new face. I'm Dana Spade. I've been with CPL for about a year. Actually, a year yesterday, I think. Um, before that, I was with Cherokee County for about three years and then City of Roswell for about five. So almost 10 years. Well, now, now I feel old. But 10 years of municipal government work. So I've seen a lot. So my strength really when I came into this project is I think very procedurally. Um, so I'm gonna walk through the procedures. That's kind of that high level thing, that, those key priorities we talked about, uh, earlier on in the presentation.
- 0:41:34
Um, so we can walk through how all of those work. So a pre-application meeting is required for any petition requiring a public hearing. It's intended to discuss, um, the procedure, standards, and regulations with the proposal. So the applicant would come in and say, "Hey, I want a hunting, uh, camp." Um, so that would be their letter of intent. They would have a con- just a conceptual site plan. Not surveyed, not engineered, just, you know, depend... something to go off of.
- 0:42:04
Um, and typically attended by applicable departments. And it's to discuss the steps. If it requires a public hearing, what the public hearing standards and such look like, and then those use standards, the permitting process, all of those. So this is your... I don't know why those are blue, but these are your, uh, public hearing steps. So you start with that p- pre-application meeting.
- 0:42:30
Um, after that meeting, they would submit the application. Staff will do what's called a determination of completeness. So if there's something missing, if there's a traffic impact study that's required and it's missing, it'll be incomplete. And basically, until they're deemed complete is when they then advertise. So that's whatever... where they can advertise per state law, meeting the state law requirements of the next available date. Then there's that public notice, the community meeting, and then goes into those, uh, those boards, those review bodies, um, decisions.
- 0:43:07
So this is kind of how they- the public notice or determination of completeness decision tree works. Um, so like I said, they submit that application. If it's incomplete, you notify the applicant. The staff will notify the applicant of missing information. If complete, it would be accepted for processing and assigned to the appropriate body. And then there are certain ones that don't require a community meeting, but a lot of them do. And then moves into the public notice.
- 0:43:41
So this is a lovely chart we put together for public notice and when it's required. Um,
- 0:43:48
really the big things that we changed here, and it's not identified in this chart, but county-initiated rezonings. We put in a provision that county-initiated rezonings would only be subject to the publish, so that's your, your legal ad in a newspaper. Um, so it gives you those permissions. A lot of communities have been doing that. It really helps with the process. Um, it's usually used for map errors, uh, when you realize the color is not the color it should be.
- 0:44:21
Um, but that's one change. You'll notice a lot of it requires a mail, posted, and published requirement. The text amendment is really just that publish because, um, you know, an overlay, if you were to establish a new overlay, would really be considered a rezoning, so you would follow that procedure. But an amendment to the code to make little edits would just be that text amendment, just the publish procedure. And as I mentioned, you can see where the community meeting is up to the discretion, we call it the zoning director or zoning administrator in this regard, or county manager.
- 0:44:58
You can click in that.
- 0:45:02
So right now, these are the responsibilities for public notice. Um, mailing notice. So the zoning procedures law does require mail notice for what's quasi-judicial to your variances. Um, and then applicant would be posting the sign on the property, again, part of that zoning procedures law, and that's at least fifteen days before the public hearing, and they have to remain on site until the hearing.
- 0:45:34
And then this is what must be included in the notice. You know, time, date of where the meeting is being held, type of request, special use permit, rezoning, the address. Um, some people use the parcel identification number, um, depends upon if they have an address yet. And then for rezoning, existing and proposed zoning.
- 0:45:58
And then the posting and publication requirement. Uh, the conspicuous location on the property is the state law. And then we like to throw in, cannot be attached to a tree. Please don't kill a tree with your sign. Please, come on. Um, and then that newspaper is state law.
- 0:46:16
So, um, I think there was a question from staff about these. Um, so I know they're not in the room, but we'll make sure we get with them on this. But community meetings, so these are for certain types of applications as determined necessary by the zoning administrator. It can include a request for a more intensive use in our zoning district. So if you were going from, let's say, a light industrial to a heavy industrial, that would require one. The request impacts sixteen or more single-family residential lots, and then it impacts more than five acres.
- 0:46:50
So if they're proposing ten acres, that would be an example.
- 0:46:53
It's five.
- 0:46:56
So I really think that should probably say proposed if it-- the request is on...
- 0:47:03
Yeah.
- 0:47:03
I think it's really inten-- I think we'll need to change that. But it's-- I think it's more intended to say the request inclue- includes-
- 0:47:10
Includes
- 0:47:11
... not impacts. So we'll make sure that's changed. So includes sixteen or more residential lots or is more than five acres. And then the-- I think we still have in there that the zoning director can still determine if, if some that doesn't meet these three has to be one.
- 0:47:27
Mm-hmm.
- 0:47:28
And this isn't always a requirement. It can be at the zoning director's discretion.
- 0:47:34
I think these are minimums and then the zoning dir- director still gets or zoning administrator still gets the discretion with this one then.
- 0:47:43
Um, so the applicant would be having that meeting. Um, they have to hold the meeting for at least thirty minutes. Um, they have to provide what's called a meeting report. So any kind of concerns or questions that are brought up in-- during the meeting, they basically are taking minutes and, and creating this report that has to be submitted before the public hearing, and it can be a part of the public record. And it must be near the subject property in question, and of course, ADA accessible.
- 0:48:17
Um, so they're, like it says, responsible for that meeting location and to conduct that meeting would be on the applicant, not on the staff. Some places have staff attend those meetings, but it's... That's what the meeting report is for. Um, you wanna take them on their word, that's up to you. Um, but you know, it's really on the applicant's responsibility.
- 0:48:44
So we went over role responsibilities earlier. So this is just a chart that tells you when that comes before the, uh, planning commission for recommendation and then you as the commissioners for the final decision. Um, really the big thing here is the administrative variance would be that, uh, at staff level, and then an appeal of administrative decision would be, would skip the planning commission.
- 0:49:14
So this is how a public hearing process would work. Um, kind of a, a tree here. Lots of trees. And you have that planning commission public meeting where they make a recommendation, then it comes before the commissioners for a public hearing, and there's that board action, that final decision, um, where you have, you know, approval, approval with conditions, denial, deferred, deferral or postponement. And then an alternative lower intensity rezoning. So I mentioned the, the LI, the HI.
- 0:49:44
So let's say they come in here and you're like, "That's not really an industrial use." It gets all under a business use. So B would be less intensive in that nature.
- 0:49:57
Um, we talked about EPD would be a major land disturbance or land development permit. Um, so that's more than one acre of disturbance. There are certain exemptions that's in state law exemptions. Um, so we aligned those there. And then, um, a minor would be at that staff level. Same kind of, is application complete. If not, you tell them. The big thing with this is the Senate bill that was recently passed, 447, you have to tell when it gets to staff that this front end accepts for review or rejects for corrections.
- 0:50:35
That has to be done within five days of submittal. And you have to tell the applicant all the external reviews that are required once you, um, accept the completion. So, um, that's a big thing, um, for your staff to, to definitely, you know, think about. Um, so it's five days for the initial intake. It's 45 days once you intake it total for the review. Any external agencies are told, so your EPD would be told, a DRI, Development Regional Impact would be told.
- 0:51:11
Um, so those are not included. Um, and then you have to do that first initial review period within that 45 days.
- 0:51:21
And then if comments are met within that time period, the applicant receives them, or if everything is checked off, uh, the permit would get issued.
- 0:51:35
Um, so we mentioned, uh, we changed or clarified expirations on plans. So this would be for development permits specifically. The application itself would expire one year after the issuance of comments. Um, so if they submit and you give comments within 45 days and they wait a whole year, the application is expired and they have to submit anew. Um, permit expiration is six months for the date of issuance if no activity has been initiated.
- 0:52:05
Basically, no inspection has occurred, no seven-day letter has occurred, those kind of things, or six months elapses between inspections. And then the extension, the, uh, zoning director can grant a one-time extension for a period of six months. Basically, application creation, expiration, permit expiration, and then permit extension.
- 0:52:30
Also, a time limit on the, uh, no work is started, so a process been approved.
- 0:52:37
Yes, that's the no activity. So u-under permit expiration, it says if no activity has occurred within six months, that would be considered expired. And then if they have an inspection, let's say they install their initial BMPs, their best management practices, and then they wait six months or seven months, that would also be a permit expiration. So it's between inspection six months, and then if they don't do any activity for six months. That covers both, basically.
- 0:53:09
Does that, would that include, uh, the up to revoking of the zone? So if somebody requested... Okay.
- 0:53:16
Yeah.
- 0:53:18
When, when you say no activity-
- 0:53:21
Mm-hmm
- 0:53:21
... uh, tell me what constitutes-
- 0:53:27
Activity
- 0:53:27
... enough sta- enough substantial activity to keep the wheels from going in motion.
- 0:53:35
Yeah. So typically with a development permit, especially a large one, you'll have what's called a pre-construction meeting, where they'll meet with the, the inspector on the site and basically go over all the steps, and then they move into those initial BMP construction. Um, so that's your, like, phase one kind of perimeter, silt fencing and things of that nature. Um, I think clearing kind of comes either then or phase two. And so pretty much clearing happens at the beginning.
- 0:54:06
So if you don't see dirt movement or, you know, equipment-
- 0:54:13
I mean, you should, with a project like this, um, there should be inspectors or inspections occurring on a pretty consistent basis. Um, so that's why we set it in between inspection periods. Uh, if you deny, you know, if you fail something or there, there's a issue and then they just cease work and there's no activity out there, um-
- 0:54:42
I mean, I think the big thing that this is trying to capture is your, is a pipe farm.
- 0:54:47
Well-
- 0:54:48
Trying to avoid that
- 0:54:49
... an example would be if, if a developer starts a project
- 0:54:54
But i- in your documents, do you have milestones that are established? An example, in many municipalities where, where we work, the first thing that has to happen is the detention or retention pond-
- 0:55:08
Mm-hmm
- 0:55:08
... be put in place, a engineered approval of it before they can move on because-
- 0:55:16
Yeah. So they, if they require a three-phase erosion, they have to have those on their plans. But also, I think, I think the Erosion and Sediment Control Act requires a schedule, like a project schedule, that has to be on the plans, which is what you're talking about.
- 0:55:33
Yes.
- 0:55:33
Yeah. So that's one way to track it. Typically, erosion inspections are done on a weekly basis.
- 0:55:40
Since they're EPB and not an LIA.
- 0:55:42
You could request something.
- 0:55:44
Yeah.
- 0:55:45
If it looks like a site has, it has no movement, you can request an EPB.
- 0:55:50
Yeah.
- 0:55:50
But the burden for those inspections are on the developer, it's not on the-
- 0:55:55
Correct.
- 0:55:55
Who, who's responsible for that? Is it-
- 0:55:57
Yeah, it would-
- 0:55:57
Do we refer it back to the EPB?
- 0:56:00
Yes. It would be the developer has to get their own inspections and proof that they're, you know, meeting the-
- 0:56:06
And present that to the county-
- 0:56:08
Correct
- 0:56:08
... a- as, as meeting milestones.
- 0:56:10
Correct.
- 0:56:10
Okay.
- 0:56:11
Yes. So i- in this case, since you guys don't have a, um... What is it called?
- 0:56:18
Uh, LIA.
- 0:56:18
LIA.
- 0:56:18
Yeah.
- 0:56:19
M-O-U.
- 0:56:20
LIA. What does it stand for?
- 0:56:21
A local issuing authority.
- 0:56:22
Thank you. Since you guys are not a local issuing authority, um, it defaults to the EPB, it really puts all of the onus on the developer to get their own inspections and then report those. I think we've learned, we had, they had to report them in a certain amount of time to the EPB, and so you can then get, you get those same reports.
- 0:56:42
Yes.
- 0:56:43
Would, would you guys agree, though, that in a, in an emerging county like we're in here, if we're not very, very careful with this, we're gonna have a project done before somebody comes out and says, "Stop."
- 0:57:04
Mm-hmm.
- 0:57:05
You, you-
- 0:57:05
They have to, what is it, the 15th or something like that?
- 0:57:10
The biggest thing is we need to make sure it's spelled out.
- 0:57:13
Yeah.
- 0:57:14
Period.
- 0:57:15
Okay.
- 0:57:17
Yeah, because right now we don't spell out the types of inspections in the code, because those really vary depending on project scope. Um, and we don't separate out external versus internal agency review in case you ever become an LIA or get your MOU with, uh, GSWCC. Um, so I think really what we can do, we literally, um, we all became level one As recently, so, um, we just learned about w- how EPB does it.
- 0:57:49
And they are required to report to them, I, and I can't remember off the top of my head.
- 0:57:53
The 15th.
- 0:57:54
15th of the month if they, they have to report.
- 0:57:55
So by the 15th of the month they have to report to EPB.
- 0:57:59
Submit their sampling.
- 0:57:59
Submit their sampling, their inspections, and then you are required, or they have the requirement to submit to the county the same.
- 0:58:05
When, when you encounter this, as we, as we're bringing this to closure, I would hope that we will see, uh, some suggestions or targets for-
- 0:58:18
Mm
- 0:58:19
... conversation like we're having right now.
- 0:58:21
Yeah.
- 0:58:22
That while it's not included i- in our UUDC, this would be best practice.
- 0:58:29
I did, um... What we can do, um, is we made standard operating procedures for staff, and some of that we recommended specific inspections. And so that's something we can do with the training guide that we built, is like these are our recommendations of how to get your, your staff involved with EPB, where, you know, you can, you can as a county require that, um, that kind of thing.
- 0:58:55
Well, I guess for what I envision taking place here, as, as our, uh, building inspection and code enforcement-
- 0:59:04
Mm-hmm
- 0:59:04
... department becomes more sophisticated-
- 0:59:07
Mm
- 0:59:07
... we would incorporate those requirements into that job description so that the applicant that we bring on board ultimately is prepared. We don't, we don't get somebody here and then say-
- 0:59:21
Yeah
- 0:59:21
... "Okay, in two years you've got to have this."
- 0:59:24
Right.
- 0:59:24
It, it, it becomes-
- 0:59:25
Yeah
- 0:59:26
... part of the requirements for the job description. A- a- and, and I-
- 0:59:32
I, yeah, no, I understand what you're saying.
- 0:59:33
You know what, you know what I'm talking about.
- 0:59:34
Yeah, I understand what you're saying. Yeah. For sure.
- 0:59:36
Needs to be some mechanism for clear communication to our staff-
- 0:59:40
Right
- 0:59:40
... on the, on the difference of if something's, uh, governed under EPD. So at, at what point do we know that that is, that is done, that is satisfied?
- 0:59:51
Mm-hmm.
- 0:59:52
So that we need, we need to have clear criteria there.
- 0:59:55
Mm-hmm. Yeah, and I, honestly, I, I didn't realize the, the difference between them until we, we just did our GSWCC training. I was always used to Georgia Soil and Water, so I didn't... When they were like, "Oh, no, EPB does it," I was like, "Oh, oh, oh. Maybe." So we can certainly look into it.
- 1:00:14
But some of the things that you're talking... And I apologize, everybody. I'll, um, I, I don't see it on my calendar, I apologize. But in, in just the references that we're talking about, there, I mean, there could, there, there could still be a significant gap if we do not go ahead and have a, uh, a, a standard operating procedure for, for what we have and what we want. Because I could go out, w- we could go out, EPB, you know, a, a, somebody could come in, we're not a local issuing authority, so they can go in, they can submit the land disturbance permit through EDPD.
- 1:00:49
They can file their NOI, they can come back, they can do their clearing, they can go, they can make a mess of the site.
- 1:00:55
Mm-hmm.
- 1:00:56
And then they can go out there and just basically sprinkle, you know, have coverage on it if it's not disturbed within 14 days. Or after 14 days-
- 1:01:03
Right
- 1:01:03
... you have to have a sta- a stabilization on it, and then just sit there. And then going back to, uh, Commissioner Adam's comment earlier about w- what's, what's the significant development of, of activity? So I go out and clear a spot, and then I don't do nothing, and it sits for a while. I understand what you're saying, that the schedule can be in there.
- 1:01:23
Mm-hmm.
- 1:01:23
But EPD also, a lot of that schedule is... It's, it's almost, it's almost, it's a point of the check, the, the checklist.
- 1:01:33
Right. Right.
- 1:01:33
It's like it was a schedule. Um, because when the schedule moves, that's the driven the teeth to it.
- 1:01:39
Yeah.
- 1:01:39
You're not updating it for EPD. They're just expecting you to ask for water.
- 1:01:43
Right.
- 1:01:43
And you're, you're expecting, as you're talking about, from them. You know, some of the reporting doesn't require unless there's a significant rain event. So there are some of those things that doesn't require too much. So-
- 1:01:52
Yeah
- 1:01:52
... going back to, I think, the standing operating procedure or, or, or a clear code of-
- 1:01:59
Right
- 1:01:59
... of expectations. I, I don't know the right title to put on it. But, um, but when someone comes in to get the permit, we've got all those things identified, which is required from an outside agency. But also, having that contractor put in a schedule-
- 1:02:14
Right
- 1:02:15
... to us.
- 1:02:16
Mm-hmm.
- 1:02:16
Not just some flippy schedule on the plans. Excuse the... You know, just some little block or something.
- 1:02:21
Mm-hmm.
- 1:02:22
But some sort of schedule that we can hold their feet to the fire, say that we're tying your activities to some of these, and if there's not significant progress... Not that we will be unwilling or not to work with you. You know, it's been raining or a dry season and whatnot.
- 1:02:34
Right.
- 1:02:34
But at the end of the day-
- 1:02:36
A notification, maybe. Like, yeah.
- 1:02:37
Yeah. At the end of the day-
- 1:02:38
An experiment
- 1:02:38
... somebody that doesn't do something for a while comes in and says, "Oh, I, I need to pick this back up." And it's like, "No, timeout. Your, your schedule clearly indicates..." And then we're gonna have to draft that to send that applicant a notice saying, "Hey, you know, you're, you're out of bound with your schedule. You, you need to re-up. You need to re-permit." You know-
- 1:02:55
Right
- 1:02:55
... you're, you're, you know, you're in violation of, of whatever.
- 1:02:59
Yeah. I mean, it sounds like at a minimum there should be some sort of notification to the county when they've, like, made the first step-
- 1:03:05
Absolutely
- 1:03:05
... or next step beyond just submitting what's being submitted to EPD. Um, yeah.
- 1:03:12
Yeah.
- 1:03:14
I hear the request.
- 1:03:15
Yeah.
- 1:03:16
But we have no way to enforce that.
- 1:03:19
Mm.
- 1:03:20
And the reason is, um, EPD gets notification for land disturbance.
- 1:03:25
Mm-hmm.
- 1:03:25
We just get notified of a land disturbance. Until they pull a permit-
- 1:03:29
Mm-hmm
- 1:03:30
... for anything, they have to come in and physically pull a permit.
- 1:03:33
Right.
- 1:03:33
It's the only time we get checked in the game. Coaches get in the game.
- 1:03:37
Mm-hmm.
- 1:03:37
Other than that, everything leading up to that-
- 1:03:39
Mm-hmm
- 1:03:40
... is not in our wheelhouse-
- 1:03:42
Mm-hmm
- 1:03:42
... because you've not pulled a permit yet. Now, after they pull that permit, then we can set a schedule to follow.
- 1:03:49
Yeah. And I think-
- 1:03:50
If, if, if you decide to clear off, uh, you... Chris got that timber, right? That was between you and whoever cleared it.
- 1:03:57
Yes.
- 1:03:57
I mean, the county was not involved in that. We don't never get involved until that guy comes in to pull his permit. Had he needed to build a structure-
- 1:04:05
Yeah
- 1:04:06
... he would have pulled that permit, and then that clock would have started, is all I'm saying.
- 1:04:09
Yeah. So a permit is always gonna kick it-
- 1:04:11
Luckily, EPD's nice enough to notify us.
- 1:04:15
Yeah. Which I-
- 1:04:15
Because they don't even have to do that.
- 1:04:17
Yeah.
- 1:04:17
They just do. "Oh, by the way, so and so's clearing something, so if you ride by and you're questioning what's going on, we have been notified."
- 1:04:23
Right.
- 1:04:24
That's all they're telling you.
- 1:04:25
Yeah. And I-
- 1:04:26
Is that at issuance or when they first submit?
- 1:04:29
Yeah, what-
- 1:04:29
It's normally at issuance, because they don't -
- 1:04:31
That's what I was gonna say
- 1:04:32
... they're not, yeah, they're not very-
- 1:04:33
They submit
- 1:04:33
... quick.
- 1:04:33
They wait 14 days-
- 1:04:35
Correct
- 1:04:35
... and they can start.
- 1:04:37
That's right.
- 1:04:38
So...
- 1:04:40
So in other words, until we get hopped in the game-
- 1:04:43
Mm-hmm
- 1:04:43
... and they come to us, it's out of our, it's out of our hands. It's an EPD issue.
- 1:04:48
Yeah. But I mean, unless they're exempted, they would still be required to get a permit and then the, if the EPD issued, it's part... I mean, basically the-
- 1:04:57
If we issue a land disturbance permit-
- 1:04:59
Yeah. It's part of that permit
- 1:04:59
... and that you must carry with you to EPD-
- 1:05:02
Right
- 1:05:02
... now that checks us in the game.
- 1:05:03
You're right.
- 1:05:04
But we would have to create that permit.
- 1:05:06
Yeah. Let us-
- 1:05:09
Think about that
- 1:05:10
... think on it.
- 1:05:11
Because I know we've turned this over a bunch of times. So let us, let us think on it again.
- 1:05:16
I mean, because there's other things, you know, that, you know, there's right of way across. But I mean, there's all kinds of things-
- 1:05:20
Right
- 1:05:21
... that, that could target or, or, or be the, be the impetus of, of what you're doing in our jurisdiction area-
- 1:05:28
Right
- 1:05:28
... that kicks it off. Now, whether the foot comes first, whether it's you submit stuff to us, we look at it, we get it prepared for. We may not be the LIA-
- 1:05:36
Right
- 1:05:36
... and we might not be the final reviewer. But prior to you kicking anything off, it has to come back to us, and I think that could be codified-
- 1:05:45
Right
- 1:05:45
... in, in, in, in some sort of mechanism. So once you come in, you say, "I've, I've got my plans reviewed, I've got this, I've submitted my NOI, I'm ready to go. I need your permit that lets you know what we're doing."
- 1:05:55
Right.
- 1:05:55
Now, anything like timber, you know, timber, steel, I mean-
- 1:05:59
Yeah. Debris
- 1:05:59
... and I can't remember, do, does timber, do we, we don't file-
- 1:06:02
No, debris is more-
- 1:06:03
File timber anymore.
- 1:06:04
Yeah. It's like its own thing.
- 1:06:04
But, but what I'm, my, my point is any- anything that can be classified under agricultural or tim- some other code definition besides land development-
- 1:06:13
Mm-hmm
- 1:06:13
... you know, would, would be required to come through our process.
- 1:06:17
Yeah. So there are cert- certain exemptions, at least from an erosion and sediment control standpoint, for certain, like, agricultural, horticultural operations. So that's something from the state law we have to meet. But from a permit requirement, you can still require a timbering permit, a clearing and grubbing permit. You can still, under this, like, minor, and it falls under this minor category, still require that permit and then the major is the EPD, that one acre trigger. Let me ask this just from... Again, I'm a procedural person.
- 1:06:48
So the way Georgia Soil and Water works is you can run them concurrent. You submit the permit with you as the county, let's say, and then you go submit the erosion plans with them. What's required is that they will stamp them, send them to the jurisdiction, and then that gets stamped by the jurisdiction for in the field. Is that how EPD works? So it's like all the plan sets are together. It's your site plan, your erosion are together for then-
- 1:07:18
Not always.
- 1:07:19
Okay.
- 1:07:19
Not always.
- 1:07:19
There should be, there, there should be a master set of plans at the job site for, I, I mean, that's-
- 1:07:26
I guess, yeah, my question is like-
- 1:07:28
That's the norm
- 1:07:28
... is it required? Yeah.
- 1:07:29
So, and I'm just gonna use Terry because if you got 100 acres-
- 1:07:34
Mm-hmm
- 1:07:34
... you're gonna call EPD and say, "I'm gonna build a lake." You didn't call the county to build a lake. You called EPD. They will determine by your site plan whether the county needs to be involved for your overflow or wherever it's gonna go, right?
- 1:07:51
Mm-hmm.
- 1:07:51
County's never involved. Lake's built. It might be taking three years to build it. County's still not involved. It's in the middle of 100 acres. Not involved in anybody else's land. Until he goes to pull a permit for a structure beside that lake, that lake house or that lake barn or that lake whatever, county's out.
- 1:08:13
I think that's the point where they were arguing is, is that the title of that thing is land development permit.
- 1:08:18
Yeah.
- 1:08:18
Not structure permit. It's, it's-
- 1:08:20
Right
- 1:08:20
... if you want to do something-
- 1:08:22
It requires a permit
- 1:08:23
... it requires a permit.
- 1:08:24
With the county. Yeah.
- 1:08:24
But if we want to establish that as a part of the process, we have all the rings to do that.
- 1:08:29
Yeah.
- 1:08:29
We have-
- 1:08:29
And then the external agency is exactly that.
- 1:08:32
That's-
- 1:08:32
A part of that permit. This is not-
- 1:08:34
Yeah, that's what I, that's what I was saying is-
- 1:08:35
Okay
- 1:08:35
... if we wanna start that, that's great. But-
- 1:08:38
Yeah
- 1:08:38
... if we don't create it, we're just at everybody else's mercy.
- 1:08:41
Yeah. And that's what we're setting up here.
- 1:08:42
I guess that's what I'm trying to say.
- 1:08:43
Yeah. With the distinction is that they would have to submit a permit. It sounds like a minor, which is under the one acre would just be a county, no external EPD review. The one acre would be they submitting the permit-
- 1:08:57
Gotcha
- 1:08:57
... in conjunction on the same tract.
- 1:08:59
That's right.
- 1:08:59
They have to provide that EPD approval. They get the master set of plans stamped. 'Cause if there is a site plan, if even with dams, when you dam something, there's gonna be a permit. Um, they get those stamps from EPD and then county, and then that's within your box in the field.
- 1:09:18
Gotcha.
- 1:09:18
So that's what we're setting up here.
- 1:09:20
Perfect.
- 1:09:22
Okay.
- 1:09:23
I mean, it's really easy, right?
- 1:09:24
And then it's just, it sounds like the inspection, knowing that they only have to report on the 15th of every month, that's maybe something we need to look more into of how they're reporting to the county in between there.
- 1:09:38
Well, and there's nuances to your chart there for minor, minor, major, those kind of things. 'Cause you know, if you have jurisdiction of, so if you guys are in corps or-
- 1:09:45
Mm-hmm
- 1:09:46
... or-
- 1:09:47
Right, right. Yeah
- 1:09:47
... somebody else. So don't, don't think just 'cause it's less than one acre.
- 1:09:50
No. Yeah, yeah.
- 1:09:51
You know?
- 1:09:51
There would still be other certainly-
- 1:09:53
Even, even EPD, you know, if you're within 200 feet of a, of a stream. So-
- 1:09:57
Yeah. Either way, there's gonna be some sort of permit. It's just the category.
- 1:10:02
Yeah. About.
- 1:10:04
And typically your minor is like timbering, clearing, grading, kind of thing.
- 1:10:09
As you work with these procedures, the other side is, I want to be really careful of is, is the user-
- 1:10:15
Mm-hmm
- 1:10:15
... will be very clear that he's, he can, he can look at this and know what those steps-
- 1:10:20
Right
- 1:10:20
... and expectations are that'll likely be given surprises.
- 1:10:24
Right. Right.
- 1:10:31
So, uh, that was land development permits. So building permits is demolition, new construction, interior finishes. That's your like tenant change, uh, remodeling, renovation work. Same kind of procedure. They would submit that application, review for completion, um, required fees. And then of course, we talked about external agencies just now. So septic approval or, or grease traps or, or things like that. Um, fire marshal, you know, state fire marshal approval would be like an example of external approval.
- 1:11:05
Um, so that's what this kind of decision tree process looks like. Um, so they would submit to, to the department. Um, if, if it's, uh, deemed complete, they would distribute the plan to all applicable, uh, county departments for review and any external review agency. That can be, um, septic, water, and sewer, like we just talked about. If, um, they have comments, the applicant will receive those comments or if they're in compliance, the permit will get issued, those inspections will occur, and then essentially the certificate of occupancy or certificate of completion, um, but usually.
- 1:11:48
So code enforcement. Um, we were just talking about this code enforcement officer. So this is what we built into the code in terms of how code enforcement procedures would work. So right now, um, a complaint is received or an officer notices something in the field. Um, if you receive the, the complaint or notice in the field, you would do an investigation to determine if it's a violation or if it's a citation. Um, so there's what's called an unfounded complaint, meaning, you know, well, we got this complaint.
- 1:12:20
I went and investigated. They don't know what they're talking about. There's no violation. There's no citation. They're fine. They just didn't know, you know, the person who complained didn't know the rules. So that's an unfounded complaint, doesn't escalate. Then there's what's called a warning notice. So if you have something where there is an issue, let's say there's a temporary structure they put up, but they wanna make it permanent. Um, you can go and tell them, "Building permit is required. This is your warning notice.
- 1:12:51
Go submit a building permit." And, um, right now it's a minimum of 10 days. I think we allow for discretion to make that earlier if it's a, a major concern. And it's just a, it's just kind of an in-between before you get to a notice of violation. So that's when the violation gets first, it's issued when the violation exists. Um, it is up to the officer to immediately jump to a notice of violation, particularly if it's injurious to public health, safety, and welfare.
- 1:13:22
Um, so that's also at the, the discretion. So those are your kind of like outcomes. And then of course, if it's, um, a citation, that would go to your court system and, and get into your, your, uh, criminal penalties.
- 1:13:40
So, um, if a violation continues, um, you as the county are allowed to withhold the certificate of completion, certificate of occupancy. You can suspend, revoke, or modify a permit, that's planning development permit or building permit. And of course, most often used, issue a stop work order. So those civil penalties are if you do a notice of vi- violation versus a citation, um, there's up to $1,000 per day can be applied per, per violation.
- 1:14:13
And then if it escalates to a citation of court, we do have a fine in there of up to $1,000 or imprisonment. Um, I've always heard that judges can just change that, so if that's, if that's true-
- 1:14:26
Yeah
- 1:14:26
... we, we can just say, "Up to the judge." Um, but, um, so that's, that's kind of how we've built up that code enforcement.
- 1:14:35
I think that's actually classified by the state. You can't assess more.
- 1:14:39
More than like $1,000.
- 1:14:40
More than $1,000.
- 1:14:42
Yeah. So I think they can go below, but you can tell them, "We are assessing this at, at $1,000."
- 1:14:48
Yeah.
- 1:14:52
And then we have a, an example rezoning process. So this is in a, um, an existing A-1 lot, 70 acres in size. You have a designated agricultural, uh, district, A-1, A- AR in COG one, and it's in that rural conservation character area. They wanna rezone from A-1 to A-2 for a 10-lot subdivision. So because they wanna rezone and require the public hearing, it would be that pre-application meeting.
- 1:15:23
Um, part of that would be determining the procedures, standards, and regulations. So the, the rezoning, the community meeting, um, and that public hearing process. Then they would move into that land disturbance permit and the building permits for the individual homes. So with the rezoning, they would be considered by the planning commission and approved by the board of commissioners. I have the wrong section there for special use permits, but by the board of commissioners. Um, the big thing with A-2 and, and the folk standards that Sarah brought up earlier is we have maximum impervious surface ratios.
- 1:15:58
That's a per-lot percentage area. Um, so as they're planning out, especially if they're on the deficit, they have to pretty much pre-plan their, their subdivision. Um, and that's how they will figure out that, that someone of that ratio, and it will come into effect with the, the building permit and those kind of things. Um, because it's over five lots, it'd be considered that major subdivision we talked about. Um, they would s- all the houses would have to meet the building codes.
- 1:16:28
And most likely they're doing this as altogether and not individual lots. So it would create or add 5,000 square feet of new impervious or involves one or more acre of disturbance. So it'd be subject to stormwater management, so your, your water runoff, your water quality, those kind of things. Um, one access point is required to the public right of way. That's dependent on the number of units in the subdivision in terms of access points.
- 1:17:00
Becca, Becca.
- 1:17:01
Yes.
- 1:17:02
You're suggesting that otherwise houses would not be required to be doing this?
- 1:17:06
No. This is just all the regulations that would be applicable to this proposal.
- 1:17:11
Okay.
- 1:17:15
So I notice the, uh, one access point to a public, uh, road.
- 1:17:19
Mm-hmm.
- 1:17:19
We, we crossed this bridge several times. Um, the board of commissioners in the past has favored, uh, multiple accesses for, uh, emergency services.
- 1:17:31
Okay.
- 1:17:32
So in case there's, you know, a catastrophic fire, the road gets blocked, people can't get in and out. Now, there is situations where one is the... I would say the one is the minimum.
- 1:17:42
Mm-hmm.
- 1:17:43
Uh, but it could be more.
- 1:17:46
Okay. Let me check. I actually think we need to update them. So right now eight or 80, excuse me, or fewer units would be the one. 81 to 200 would be two, and 201 to 400 would be three. Anything over 400 units would be four plus one for every additional 200 units. That's how we have it for residents.
- 1:18:07
Did you say 80?
- 1:18:08
80 or fewer units.
- 1:18:09
Yeah, I was like, you're quitting.
- 1:18:11
20. Okay.
- 1:18:12
I know-
- 1:18:13
Niche
- 1:18:14
... I know the fire code I think is 125. It used to be 200.
- 1:18:20
That's what I-
- 1:18:20
And then they went back down I think, but...
- 1:18:23
You, you talking about distance from, from fire hydrant to one way
- 1:18:27
No, for number of access points they have, they have one too in the fire codes.
- 1:18:31
Oh, wow.
- 1:18:32
Mm-hmm.
- 1:18:32
Okay.
- 1:18:32
And then us- it was like 120, 125, and then they went up to like 250, and then they went back down. But it depends I think on the appendix that you have adopted. 'Cause there's a fire code and then there's appendices A, B, C, and D, and I think it's in one of those.
- 1:18:52
Okay.
- 1:18:53
I know way too much about the fire code unfortunately.
- 1:18:56
So for 20 lots or fewer you want one access point, but once you get over 20 you're thinking two? Or are you looking for us to provide a recommendation that is lower than the 80?
- 1:19:13
Well, currently for us on one in, one out you can't have more than two.
- 1:19:16
Okay.
- 1:19:16
Okay.
- 1:19:17
That's fine. Um, we can look at what's existing. If, if that works now, kind of the other gradient stuff, we can... Does that work? You know, 20 to-
- 1:19:28
One of the things we get into-
- 1:19:29
... 100 requires two, or?
- 1:19:31
Code-wise.
- 1:19:32
Yeah. And, and one of the reasons we get into this is because if it's a longer subdivision-
- 1:19:36
Yeah
- 1:19:36
... and a lot more houses, and you live in the back-
- 1:19:39
Mm-hmm
- 1:19:40
... people's gonna come and they use it for a drag strip-
- 1:19:43
They do. Yeah
- 1:19:43
... to get to the back. But if it had a back entrance- They would come in a different way and wouldn't have to fly through the neighborhood.
- 1:19:49
Mm.
- 1:19:49
And we, we've tried to rationalize that between the... and EMS folks.
- 1:19:53
Right.
- 1:19:53
Because depending on the street layout, a lot of times... If it's got an internal loop in it that some people can go right and still access that point, every one's looked at different is all I'm saying.
- 1:20:04
Yeah.
- 1:20:04
And I just wanna be able to add more if the BMC chooses.
- 1:20:08
Okay. Got it. Yeah.
- 1:20:08
Because a lot of it would then be de- determined by the layout.
- 1:20:11
Right.
- 1:20:11
Again.
- 1:20:12
Right.
- 1:20:13
So is this one of those, uh, that could be, uh, the zoning administrator can approve?
- 1:20:19
The number of access points?
- 1:20:21
Yeah, when she gets in, if it's a minimum of one access point, then she can determine based off of the road frontage and, and things of that nature.
- 1:20:29
It would probably with the recommendation of, like, a fire marshal or something like that, just because I, I do know they have their own requirements and access-
- 1:20:37
Well, we'd have a little problem, Blake.
- 1:20:41
And that might be my ignorance of coming in late to this project.
- 1:20:44
Well, I'd say that-
- 1:20:44
So please, you know, educate me if I'm wrong
- 1:20:46
... since you have an older zoning, I'm totally in that.
- 1:20:48
Correct.
- 1:20:49
'Cause it's... How many lots is it, 15?
- 1:20:51
Something, something to that effect. But it makes a complete loop.
- 1:20:54
Okay.
- 1:20:54
So unless something happened at the entrance-
- 1:20:57
Yeah.
- 1:20:57
Yeah
- 1:20:57
... you have another way out. But if-
- 1:20:58
Right.
- 1:20:59
Yeah. In, in that particular case, prior to there being any dwellings, it goes to two ways.
- 1:21:06
Right. Yeah.
- 1:21:07
You know, it makes a loop.
- 1:21:11
Yeah.
- 1:21:12
But we also have an issue with asking the fire marshal. We do not have a fire marshal here.
- 1:21:18
Right.
- 1:21:18
Our closest fire marshal is in Atlanta.
- 1:21:21
Okay.
- 1:21:21
Those are deemed... I think in our ordinances you'll find if it's a, a res- uh, an establishment, say an eatery-
- 1:21:29
Yeah
- 1:21:29
... or an office that has inpatient care-
- 1:21:32
Mm
- 1:21:32
... if you're building it new, you have to call Atlanta to get the fire marshal to come down and inspect it. Everything else-
- 1:21:36
The state fire, state fire marshal?
- 1:21:38
Yeah.
- 1:21:38
Yeah, that sounds like the state fire marshal.
- 1:21:42
Yeah.
- 1:21:42
Let me check. Okay. That, that's my ignorance, not knowing.
- 1:21:42
Yeah, that, that includes personal care homes.
- 1:21:44
Yes.
- 1:21:45
Uh, personal care homes-
- 1:21:47
Any condition-
- 1:21:48
... with 10 or more-
- 1:21:49
Mm-hmm
- 1:21:49
... guests or clients. If it's less than that, it doesn't have to go.
- 1:21:54
Okay.
- 1:21:54
It's basically any condition that whoever inhabits the structure can't fend for themselves. Jail, hospitals and all that kind of thing.
- 1:22:02
Right. Yeah. That sounds like a, a state fire marshal.
- 1:22:05
Basically.
- 1:22:06
Which is... Yeah. That's what I think.
- 1:22:09
Remember, you think you missed it on your outside building obviously.
- 1:22:12
Yeah. Yeah, for sure.
- 1:22:14
Well, I, I, I would say when it comes to conversation on, uh, the, the number of access points, I mean, there's probably not a lot of properties that have points that you can actually get to access points.
- 1:22:24
Correct.
- 1:22:25
You know?
- 1:22:25
Correct.
- 1:22:26
Whether it's your-
- 1:22:27
Yeah
- 1:22:27
... frontage or, you know, one way or, or actually abutting both ways. I think what I was hearing y'all say was, you know, as long as we have, you know... And I think one of the ladies sitting there said maybe, maybe a max, a maxing, you know, block-
- 1:22:45
Maximum block length, yeah
- 1:22:47
... number. Um, so if you got a, you know, if the property that you wanna develop is not conducive to putting a loop in or something like that, then you just gotta deal what you gotta deal with.
- 1:22:57
Yeah.
- 1:22:57
But we're not trying to... You know, we definitely... We're not just trying to cut a, you know, six-mile road straight without no, you know, we can't turn around or go get... There's gotta be some flexibility in there. Because in the state-
- 1:23:09
'Cause of the hospitals.
- 1:23:10
Yeah. 'Cause the state may say, "Hey," if it's a state road, they're gonna have control of it and whatnot. And I would go back to saying that, um, you know, something on, something along, uh, on these lines that we would probably want to, we wanna codify. And then if there's a change in that, not putting that burden on... I mean, we can get a recommendation probably from our planning director, but not necessarily having that decision made. Because I think that's where we're going, or at least I remember, and again, I apologize for being late and know I covered it, is, is the plan development type situation-
- 1:23:43
Yeah.
- 1:23:43
Where we would approve a site plan prior to anything. So-
- 1:23:46
We do
- 1:23:47
... they wanna change something or variances and those kind of things. I, I'm all for empowering our staff, but that seems like a big one to, to empower.
- 1:23:56
I, I don't, I don't want to take anything away from it, but the, a lot of the property that is targeted for development in our county-
- 1:24:07
Mm-hmm
- 1:24:07
... for want of a better word to describe it, it ain't no good for nothing else. So let's build houses on it.
- 1:24:12
Mm-hmm.
- 1:24:13
And that tends to be very long, narrow-
- 1:24:18
Right
- 1:24:18
... parcels that are only conducive to one, one access point in and one out, you know? Um, unfortunately, the, those particular parcels are not large enough to build over 25 homes on.
- 1:24:37
Mm-hmm.
- 1:24:38
You know, the, uh... So anyway, we can move on.
- 1:24:42
No, that's, that's... And again, I, I came in late to this project, so maybe they knew all that, but that's, that's kind of the situation for me. So, um, so again, just from beginning to end process started with that rezoning in this case, moved to that major land of service permit, and then of course building permit per house. Um, and so, uh, this would be a very high-level decision. That pre-application meeting, rezoning requested, public hearing, permits, and then project approval.
- 1:25:17
And that is our walkthrough basically. So that's the end of our little lovely presentation.
Agenda item: Item No. 3. Open Discussion (found by machine)
1:25:24Now you're ready for questions.
- 1:25:26
I mean, yeah, that sounds great.
- 1:25:28
All right. I see some notes. So Mr. Chairman, you wanna start?
- 1:25:33
I can't read them.
- 1:25:38
God knows.
- 1:25:42
Uh, thanks for the presentation.
- 1:25:44
Yeah.
- 1:25:45
There, I'm a little more at ease than I was coming in. I'd al- I was already loaded-
- 1:25:52
What I got here, and, uh, I'm a little more at ease. I, I hadn't seen anything in a while, so I'm anxious to, to, to go through this. Uh, one thing that particularly st- stuck out in my mind is gonna be, gonna be problematic when we talk about commercial poultry. And, uh, and I'm, I'm making some assumptions here based on what I suspect from the past 12 years. So if we're talking about a 300 or 400-foot setback, if somebody's got 30 yard chickens, uh, that's gonna be, that's gonna be a problem. And I, I don't know how you fix this, but if we're talk- if we're labeling 30 chickens as a, as a commercial operation, then you're gonna have the same setback requirements there as you do...
- 1:26:29
would on a, on a real poultry operation that, that, that-
- 1:26:33
Oh
- 1:26:33
... takes you about 500 houses.
- 1:26:34
Like more of a sliding scale than-
- 1:26:37
May consider something like that, but I see that as being really problematic for, for somebody with a backyard flock, backyard flock.
- 1:26:45
Yeah, 33 chickens-
- 1:26:46
Something, something like that.
- 1:26:47
Yeah.
- 1:26:48
Yeah. It's like, like 1 per chicken.
- 1:26:50
300 pounds.
- 1:26:51
Yeah. Something like that. How do you calculate that?
- 1:26:56
And again, that just, that just sort of hit me. I, I'm looking forward to sitting down really, uh, really combing through this-
- 1:27:02
Mm-hmm
- 1:27:02
... and seeing some things.
- 1:27:06
Also, in our poultry discussion earlier, we're removing the structures limited to, to 25,000 square feet. Um, you're aware of what Bill Dale's doing. Um, another thing that we talked about adding, we changed the setback for vet houses. Um, those was some misunderstanding on definition of terms and how those are used. So that will be changed. Uh, we also talked about, because the state does not regulate and have setbacks on chicken pits, and that led us to the conversation of deer processing.
- 1:27:39
And so, um, they're gonna add animal disposal, uh, waste disposal-
- 1:27:45
Mm-hmm
- 1:27:45
... and some setbacks on, on that to cover all of that.
- 1:27:48
And we're also gonna make sure deer processors are yelled at-
- 1:27:51
Yeah
- 1:27:51
... as well.
- 1:27:54
Does that mean they're going to the deer processing?
- 1:27:56
No, I mean, it'll be animals.
- 1:27:58
Smaller.
- 1:27:58
That's the-
- 1:27:59
Custom processing.
- 1:28:00
Yes.
- 1:28:00
There you go.
- 1:28:01
It started off as chicken pits, and then we opened it to all types of-
- 1:28:05
Just noting that Christina or Tom probably already let you know, we do have a current study underway to evaluate where our ordinances are, I guess, in comprehensive to see if we need... I think we need to do something different. So we may have some additional feedback on setbacks or-
- 1:28:22
Mm-hmm
- 1:28:22
... construction or properties.
- 1:28:24
Also, um, we also did discuss, and I think, um, I think Elizabeth, you're the best response to this. We talked about, um, new development next to heavy ag production and the setbacks on the new resident coming in. Um, because I know that that's kind of-
- 1:28:43
The reciprocal setbacks requirements.
- 1:28:44
Yes. So we... I know that that's been discussed with the board. Um, and it's... No, Dana, you were talking about is something under the nuis-
- 1:28:52
It's a-
- 1:28:53
Georgia Nuisance Laws-
- 1:28:54
Yeah. It's coming to a nuisance
- 1:28:54
... and things of that nature that-
- 1:28:56
Yeah. Coming to a nuisance is what it's called.
- 1:28:58
Yeah.
- 1:28:59
Yeah.
- 1:28:59
And maybe you can elaborate a little bit on that, but-
- 1:29:02
Yeah. There's, uh, when you become a planner, there's a lot of case law you have to learn, so-
- 1:29:06
Yeah
- 1:29:06
... uh, basically it's, it's if you have, let's say a hog farm and, and you know it's an established hog farm, been there forever, and you move in next door, it's called 'coming to a nuisance' if you want to, to sue about, about it as a nuisance. Um, and so-
- 1:29:22
So in, in kind of light of that, you can't place greater setbacks on that neighboring property because they're located next to what a nuisance may be. Does that make sense?
- 1:29:34
Sure.
- 1:29:35
But you can, you can have setbacks for the nuisance, quote-unquote, "nuisance" itself.
- 1:29:40
Sure.
- 1:29:41
Can the, uh,
- 1:29:44
referencing that some way. I, I'm just gonna say this. Do, is there any conversation or any statement regarding soil amendments?
- 1:29:56
What kind of amendments are you-
- 1:29:57
Soil?
- 1:29:57
Soil amendments.
- 1:29:59
Like what do you, you mean like application of fertilizers or-
- 1:30:02
No. Well, this is basically industrial byproduct that is-
- 1:30:07
Oh
- 1:30:08
... spread on a-
- 1:30:11
Oh, so like, uh, chicken litter?
- 1:30:13
No, no, no.
- 1:30:14
No.
- 1:30:14
This is, this is-
- 1:30:15
Some of this-
- 1:30:15
It literally has created its own title called Soil Amendments.
- 1:30:19
Yes.
- 1:30:19
That's been-
- 1:30:19
It's Georgia State law on soil amendments.
- 1:30:21
So the state is calling it soil amendments.
- 1:30:23
Basically, uh, what, what... Bottom line is what it is, is from, it comes primarily from poultry process, uh, processing plants.
- 1:30:31
Yeah.
- 1:30:32
It's the waste material that can't be-
- 1:30:36
Mm-hmm
- 1:30:37
... processed-
- 1:30:39
Mm-hmm. Like-
- 1:30:39
... uh, through normal means.
- 1:30:41
Okay.
- 1:30:41
So periodically, they empty the pits out, haul it to-
- 1:30:46
Right. Oh
- 1:30:47
... a county like Madison County.
- 1:30:48
Is that what you were talking about with the pits earlier that-
- 1:30:50
No, no. That's, that's the-
- 1:30:52
Okay
- 1:30:52
... th- this is processing pits within the-
- 1:30:55
Gotcha. Okay
- 1:30:55
... processing facility itself.
- 1:30:58
Oh.
- 1:30:59
And then, then it's hauled here and-
- 1:31:02
Disposed of
- 1:31:03
... disposed of on open ground.
- 1:31:06
They're just like spreading.
- 1:31:06
Maybe hat- maybe hatchery waste. It might be-
- 1:31:09
Mm-hmm. Okay
- 1:31:09
... processing wash down. You can also, it's pretty common to come from a dog food manufacturer as well.
- 1:31:15
Mm-hmm.
- 1:31:15
But it's not fertilizer.
- 1:31:17
It could be.
- 1:31:17
Maybe like a spray field for a subject, just with-
- 1:31:20
Which is industrial. It's industrial byproducts
- 1:31:21
... just with byproducts.
- 1:31:21
Yeah.
- 1:31:22
Yeah. Industrial byproducts in correct terms. I will say, when you look into this-
- 1:31:27
Yeah
- 1:31:27
... you will find a lot of state regulations-
- 1:31:29
I'm sure. Yeah
- 1:31:29
... that has, has, that has, uh, oversell-
- 1:31:33
Preceded
- 1:31:33
... stepped sovereign immunity.
- 1:31:35
Yeah.
- 1:31:36
And counties cannot fight back against it. Oglethorpe County has one that took several years and a team of attorneys to draw up.
- 1:31:43
Mm.
- 1:31:44
And honestly, it has like one tooth, even according to county-
- 1:31:47
And we can define it as a use and require it to be a special use. Because I mean, you might not be able to prohibit it, but if it's a conditional use that at least comes before y'all-
- 1:31:58
Yeah, and it ties into it
- 1:31:59
I, I, I think you need to look at that.
- 1:32:01
Pull into that even more.
- 1:32:02
Yeah.
- 1:32:02
Yeah.
- 1:32:04
I mean, they really tie county government's hands.
- 1:32:07
But here again, what we can do, or it's my understanding one of the things we can do, is enforce setback requirements-
- 1:32:15
Mm-hmm
- 1:32:15
... and things like that to m- to make it to the point where it's simply not attractive enough to, to do. But if you could research that at least.
- 1:32:27
Mm-hmm.
- 1:32:27
Yeah.
- 1:32:29
It is, it's allowed under, um, like the 1974 de- definition of solar amendment. It is not a solar amendment.
- 1:32:36
Yeah.
- 1:32:37
It's allowed under that definition.
- 1:32:39
All right. Thank you.
- 1:32:39
So what if, if we end up putting some sort of, of prohibition or, or setback requirement or whatever, we, we need to label it what it is.
- 1:32:49
I'll get you a copy of the Oak Grove one, because it- they went to the maximum setback the state would allow them to go to. I'll get you a copy of that tomorrow. One other question you've got, Sharp?
- 1:32:59
And, and that's managed under the Department of Agriculture.
- 1:33:02
Yeah, 100%.
- 1:33:03
It, it, it, it leans itself to that environment.
- 1:33:06
Yes, 100%.
- 1:33:07
Yeah.
- 1:33:08
One of the things I know we'll be going over with the new code was that every, every reference that you have to easement, that's still a, that's, that's still an issue that's, uh, if we don't deal with that correctly, it's gonna be real problematic for us down the road. So we start talking about, uh, multiple residences access off easements, and we'll, I wanna look at that real, real close. And w- and the same thing, off private drives, to make sure that's, that those are, those end up being problematic for us. You, you, you did specifically mention a lot of things that have been some questions about, so I, I appreciate it.
- 1:33:43
Uh, community meetings-
- 1:33:45
Mm-hmm
- 1:33:45
... uh, sound like a really good idea. Madison County, those can get out of hand real quick. So there might have to be some thought put into the requirement for a county official be, a county official be required to be there or-
- 1:33:58
Yeah. I mean, it- it's really more about-
- 1:34:01
It's just conducted by-
- 1:34:01
... staff time at that point. It's, it's staff. Like, when, when I was at the city, um, we as staff held those as part of that, like, hearing process.
- 1:34:10
And that, that may be a very creative way to deter development, to require them to have a community meeting.
- 1:34:15
Yeah. With the county, we made the applicant hold those.
- 1:34:16
With no county, with no county officials present.
- 1:34:19
Yeah. Yeah, yeah. Yeah. With the county, we made the applicant hold them, get their report. Um, they had to send mailings within a certain distance of the property, um, those kind of things. But we, we didn't attend those, and it was... But, uh, like a planning commissioner typically did or something like that, but we didn't. So it's, it's more, it comes down to staff time, really, at the end of the day.
- 1:34:42
It, it was interesting, but I, I just-
- 1:34:45
Yeah.
- 1:34:45
A little earlier today in our, in our training, it was an in-house staff training, and, and P&Z, uh, uh, zoning director, department head, um, code enforcement was all in this meeting, myself and Christina and you guys. And I'm just saying this for the public record. We went, Sarah, in part of w- her first presentation about easements, we went more in depth into that, um, it, because one of the things we brought up was, uh, lot width, length, ratios, formulas to calculate.
- 1:35:16
Road frontage.
- 1:35:17
And then took in, took in road frontages-
- 1:35:20
Flag lots
- 1:35:20
... uh, flag lots. We, we got a lot more in depth in that, and we're probably gonna do that again, uh, one more time because they've already took a bunch of notes today. Gonna go back and make those tweaks and/or adjustments. Um, but we, but we have all understood that flag lots were phased out until we sort of took up all the road frontage and l- land locked. So, uh, I do agree easements is, is a little concerning. Um, but I think, yeah, we've made progress today on some things to touch on and help clear that up.
- 1:35:55
And when you get the final verbiage, I ain't gonna say the final verbiage, next to the final verbiage, uh, we'll be able to-
- 1:36:03
That was one of the-
- 1:36:03
See that we reigned it in a lot.
- 1:36:04
That was one of the, uh, Samir, like, solutions is to allow flag lot, then the person owns the property. Um, another thing was road frontage is, um, this flag lot road frontage is, is thirty, is it thirty or fifty foot?
- 1:36:20
Fifty currently, but we've got-
- 1:36:22
Yeah, we're gonna-
- 1:36:23
Down to thirty
- 1:36:24
... we're gonna take it down to thirty because, uh, that's the, that's what is required for easements.
- 1:36:29
With, with county roads, yeah.
- 1:36:30
So we said to just flag lot down to thirty. Um, so that, that'll fixes the problem we get with so many easements because we don't have the right frontage. So that if we decrease the road frontage, they also went in and determined on the type... I know me and Mitchell had a lot of conversations about this in, in the beginning. Um, road frontage versus lot width and what that buildable lot width is back at the, the stretch of the road and is that a different width than what's required of the road frontage.
- 1:37:00
Um, so that'll kind of help address what Mary had brought in, that funny shaped parcel. Um, so there is several things in there that, that we hope will, hope will minimize the number of easements that the board sees.
- 1:37:13
And I...
- 1:37:15
Go ahead.
- 1:37:16
Um, when we touched on the, uh, PUD, what... Currently, I think there's some conversation that a PUD would need to be 100 acres or something. I've heard that figure.
- 1:37:29
Yeah, I think it's been eighty.
- 1:37:30
But it has dropped to ten.
- 1:37:32
Yeah.
- 1:37:33
Okay. That, that, and I'm very comfortable with that.
- 1:37:37
Yeah.
- 1:37:37
Because, um, here again, I think that the growth that we can anticipate, we're gonna see a lot more ten acre-
- 1:37:45
Yeah
- 1:37:45
... developments than we are 100 acre developments like that.
- 1:37:48
Well, there's, there's a lot less 100 acre tracts that's even, uh, viable.
- 1:37:53
Available.
- 1:37:54
Yeah, available. And, and/or viable that's already been produced enough that it wouldn't-
- 1:37:58
That's designated for-
- 1:37:59
Yeah.
- 1:37:59
Yeah.
- 1:38:00
Um, one of the... I, I would say, uh- Dana, that today we probably, I think Sarah probably took notes on about 40 different topics.
- 1:38:11
Yeah.
- 1:38:11
Even if it was just one word changes, like you pointed out a minute ago-
- 1:38:15
Yeah.
- 1:38:15
The impact. Um, so-
- 1:38:19
It was a very, very fine-tuning session.
- 1:38:21
Very, very fine-tuning over a broad, a, a broad area. W- when I get done getting these to answer the questions, I'm gonna open it up to public ask. So you got a couple more there. Okay.
- 1:38:32
Yeah. I have nothing else. I'll wait till I get to see it. One other thing, just really, really definitions.
- 1:38:39
Mm-hmm.
- 1:38:39
Make sure everything is defined very, very clearly. Sorry, go ahead.
- 1:38:45
Well, on that topic, 'cause that is a good point. I need, I need some insight from you guys. Um, I got a situation now where I got an ordinance says one thing and a definition says something different. Completely contradicts itself. I'm being told by the county attorney that the ordinance is what you go by. The definition does not necessarily, uh, overrides the ordinance, and therefore, if there's a discrepancy between, uh, the ordinance and a landowner about the ordinance, courts will rule in favor of the landowner when there's a discrepancy between ordinance and definition.
- 1:39:25
Mm-hmm.
- 1:39:25
Tow always goes to the...
- 1:39:29
I would say ninety-nine percent, yes, I agree with Mike.
- 1:39:33
Okay.
- 1:39:33
Sometimes there could be an argument that the more restrictive regulation-
- 1:39:38
Mm-hmm
- 1:39:38
... takes govern. But it's not a good practice to have standards housed in a definition.
- 1:39:46
Well, on this particular one, we got four pages, I think, of an ordinance spelled out really good.
- 1:39:52
Mm-hmm.
- 1:39:53
And then over here in a different section, which I hope we get to do away with, in a whole different section, there's a 12-word definition-
- 1:40:01
Mm
- 1:40:01
... that says the opposite of what four pages says.
- 1:40:03
I'm assuming your four-page one was adopted more recently.
- 1:40:06
Yes.
- 1:40:07
I think it was five pages.
- 1:40:09
There's three different versions. The reason we're doing this, y'all, is because there's three versions of everything.
- 1:40:13
Yeah.
- 1:40:14
One was in twenty twenty-two, one might have been in nineteen ninety-eight, and one might've been in ninety-four.
- 1:40:19
Yeah. But the definition-
- 1:40:20
For some reason, that definition was in '22.
- 1:40:23
Oh.
- 1:40:23
Is what I think. So I may have a hiccup. I may have a problem. We'll talk about it. This is some of the reasons we're doing this, so y'all know. Multi versions. Anyone?
Agenda item: Item No. 3. Open Discussion (found by machine)
1:40:35The transfer of development rights. I'm lost. What does that mean?
- 1:40:41
I gotta say this first because I knew you was gonna say this. I wrote it down. Education, confusion, and it's permanent.
- 1:40:51
Yeah.
- 1:40:51
Let's just put it this way, Frank. That dog will never hunt in Madison County.
- 1:40:55
It won't.
- 1:40:56
It's tough. It's very hard.
- 1:40:57
We, we want it to, but in act, in practice, PDRs are not used frequently in the state of Georgia.
- 1:41:03
It's like if you had a really big apartment complex-
- 1:41:06
Mm-hmm
- 1:41:06
... like the dogs fur, they didn't have the acreage. They're able to buy acreage elsewhere that will never be developed, so that way they can combine their total acreage and pretend-
- 1:41:19
Oh.
- 1:41:19
... so they can-
- 1:41:19
Yeah
- 1:41:19
... they can, uh, develop more densely in one small area.
- 1:41:23
Basically buying up the density right.
- 1:41:26
Yeah.
- 1:41:26
And then where it's coming from is being perpetually preserved.
- 1:41:30
Yeah. That's, that's the easiest way to put it.
- 1:41:33
And the landowner who gives up his development rights gets financial compensation for-
- 1:41:38
Correct. Yeah
- 1:41:38
... surrendering the rights.
- 1:41:39
And then-
- 1:41:40
Which will work great through his generation.
- 1:41:42
Yeah.
- 1:41:42
But the next generation, when the kids wanna sell off the farm-
- 1:41:46
Okay.
- 1:41:46
You know what I'm talking about?
- 1:41:48
Yeah. We, we talked about that earlier.
- 1:41:50
And it can't be developed.
- 1:41:51
Yeah.
- 1:41:51
So, so where do you see that actually come into play is let's just take your River Forest, say Broad River Corridor. Whoever owned all that property up the river, there'll never be nothing but River Corridor, could sell those rights because there'll never be anything but that.
- 1:42:07
So the developer of the apartment complex, like, do they get a list of, they choose-
- 1:42:13
Who purchased what?
- 1:42:14
I mean...
- 1:42:14
So, so we, we are gonna map the areas. So that's the big thing. You're at least separate map of what we are, like, from what we think could be sending or receiving, and then there's still the criteria to determine that.
- 1:42:27
Mm-hmm.
- 1:42:28
And then, yeah, it's basically at that point working between the homeowners and then the county, like, tracking the, the-
- 1:42:37
Yeah.
- 1:42:37
History.
- 1:42:39
And so, like, there are a couple of ways you could do it. You could have a Madison County Land Trust that, that facilitates it. You could reach out to the Athens Land Trust and see if they could help you administer. They have something like over two hundred thousand acres in conservation easements. Um, so there's regulatory ways we can manage it. And then, you know, yes. The, the next generation, technically, they're just left with, you know, the hundred acres that are preserved. You know, there could be the house that's existing, and it can remain, you know, as a residential use, but not further subdivided.
- 1:43:12
There should also be something that happens in conjunction with the tax assessor's office. So when they sever their development right, they're getting a reduced property tax to account for that lack of a development. So like a CUVA grants you a reduced tax because of your agricultural use, there would be something applied in the same manner as well.
- 1:43:34
When you say that you guys are gonna rework our map-
- 1:43:38
Mm-hmm
- 1:43:39
... to complement our comprehensive plan, are you gonna identify the parcels on the-
- 1:43:49
For the, for the PDR? Or, and you mark overall.
- 1:43:53
Overall.
- 1:43:54
Yes.
- 1:43:55
All right. Are we, in this process, would it be the intent that we correct parcels that were... When we first established zoning in this county, you know, we've got- Two acre lots that are A-1s.
- 1:44:14
Right.
- 1:44:14
Is, would it be the intent to correct that as we go through this process?
- 1:44:19
You can, and that's why, um, I mentioned earlier county-initiated rezoning to just be that, that legal add. So that's why we have the zoning map adoption coming after the UDC adoption.
- 1:44:30
Okay. Okay.
- 1:44:31
So you, if you identify incorrect or, or mapping errors, that's something you, you can retroactively do. It's also because you're adopting the overlay that you don't have. And if you remember, I mentioned that's technically a rezoning. Um, and so we're, that's why we're putting in the procedure first, and then you, you can, with the map, you can identify any mapping errors or, or other areas. And that's why there's a copy for you.
- 1:44:58
Well, I, I just believe that if you're gonna have these public meetings, that somewhere in that conversation, that should be a part of it. Because there's a lot of folks whom I believe are going through the process of rezoning, where it should be something that the zoning administrator ought to be able-
- 1:45:23
To put them in some boxes
- 1:45:24
... to, to handle. If they wanna come in and their, their request is I've got a two acre lot that is zoned A-1, but I want it to be, uh, A-R, then that happens without wasting the, the P&Z committee's time or it having to come in front of us to do that.
- 1:45:46
I learned about one today. And Greg's was the main process.
- 1:45:50
Is it?
- 1:45:51
Yeah. Uh, Greg meat process.
- 1:45:53
Industrial.
- 1:45:53
It's industrial.
- 1:45:54
Oh, it's a mistake.
- 1:45:55
Yeah.
- 1:45:56
But I was thinking defining what that property's-
- 1:46:00
Intent was. That's right. But the problem is, it's that way, and we don't get it back, it could be whatever. So yeah.
- 1:46:09
All right.
- 1:46:10
Frank's got more questions. Uh, he's got a lot of notes over here.
- 1:46:12
These are just my-
- 1:46:14
Oh, personal notes
- 1:46:14
... are you gonna share all this with-
- 1:46:17
Yeah
- 1:46:17
... virtual?
- 1:46:17
Mm-hmm. Yeah. We, we intentionally do this so that way if there's things we wanna add, we can add them when we send this to you guys. I have a note on TDR. Y- you all correct me if I'm wrong, but, uh, conservation easements are already used on a lot of parcels. This is just tying development rights to it. So it might be s- super infeasible or unlikely that someone would give 100 acres in perpetuity, but they could set five acres. A developer comes in, he pulls five acres from this lot, he pulls five acres from this lot.
- 1:46:51
That's the stream corridor. They all have the same stream running against them.
- 1:46:55
Yeah.
- 1:46:55
He pulled five acres from this lot. Next thing you know, they have 15 additional units that they can add to their development. So it can be smaller scale if we, if we think smaller and not-
- 1:47:07
Yeah
- 1:47:07
... and not just like, you know, swapping the entire agricultural land into, into preservation.
- 1:47:13
I can use 11.
- 1:47:15
So one of the things I was, I was worried about, and I brought it up in our meeting a minute ago, was, uh, th- there's still taxes-
- 1:47:22
Yeah
- 1:47:22
... that has to be paid on it. So if the grandkids or great-grandkids get it, and at some point in time they say, "Okay, well, I can't sell it. I'm sort of stuck with it, but I can't afford the taxes," what ends up happening is it's either it's gonna get co- sold on the courthouse step, or the county will start taking over the land.
- 1:47:38
But ideally, your taxes have been reduced, like the new-
- 1:47:42
To a lower rate.
- 1:47:43
So it shouldn't be that same burden.
- 1:47:45
No, yeah, I, I agree. Uh, but right now-
- 1:47:47
Yeah
- 1:47:47
... it appears that this quarter record, depending on who it is, is a burden. To what level is all different. Um, Commissioner Dalstra, you got some questions?
- 1:47:56
I mean, I got, I guess there's more comments, um, as we go through this. There's...
- 1:48:06
A- and I, I truly believe we need to be doing what we're doing. Don't get me wrong. But w- as we move through it, we also need the lens, the, the view, the lens of unintended consequences.
- 1:48:15
Mm-hmm.
- 1:48:15
Because let me just real example. Hey, land lots are great. All right? These need, to me, in my opinion, need to be defined based on lots of record. And we need to establish that they have a lot of records. Say, "This is it." So somebody can use a piece of property that's there. We don't want somebody coming back and saying, "Hey, I got 500 feet of road frontage. I can create 15-
- 1:48:39
Yeah
- 1:48:39
... driveways with 30 foot," you know, and just waltz in and be able to do it. So-
- 1:48:44
There are-
- 1:48:45
There's always something that we need to be, we need to be making sure that, that we're not shooting ourself in the foot.
- 1:48:51
Yes.
- 1:48:52
Um, you know, those kind of things, you know, like the TDRs, you know. I agree, you know. But there's buffers and other types of restrictions in place along the river corridor. I don't think that's where the preservation needs to be because it's already prac-
- 1:49:05
Right
- 1:49:06
... it's already protected.
- 1:49:07
Mm-hmm.
- 1:49:07
It's, I'm, I'm gonna use, say like the moving farms down there on the highway. It's in a highly-
- 1:49:12
Right
- 1:49:13
... probable developmental area, you know, with the railroad tracks, the four-lane highway. If he says, "Hey, I would like to, you know, put it in as a conservation easement and sell off some rights where I can preserve this for my k- kids or grandkids," and then that gets associated with something else. So I think there needs to be parameters around it. I think TDRs can work. I'm not gonna say I know exactly how to make them work. I think in the future, because if we truly want to make areas protected, you know, and keep it rural, we've gotta give a place for it to grow.
- 1:49:43
I mean, it, it, it's, it's a balloon. It's got, it's gotta stretch somehow. Um, so I, I just need y'all's insight on when we say, "This is what we're going to do," stop, pause, and say, "What are we not seeing?" And create the unrealistic expectation to make sure that we can kind of preserve what we're trying to, trying to preserve and provide opportunities where we're trying to provide opportunities.
- 1:50:12
Good point.
- 1:50:14
Any other questions, sir?
- 1:50:16
So quickly-
- 1:50:17
Sure
- 1:50:17
... we do have driveway separation standards to try and prevent those flag lots from just popping up one next to each other, um, because that is a risk. Um, and so that is one way we're... We are hopefully thinking of those unforeseen consequences. Um, and that was just to give you one specific example. But no, it's a good point. Um, I like to say that codes are living documents, so it is likely that this will get adopted. And I think as you referenced earlier, we'll have to make changes, we'll have to make amendments to it.
- 1:50:49
Because as much as we try and quality control it and apply it, you know, we're gonna miss something. Um, and so when something comes up like that, it's a point to go, "Okay, you know what? This doesn't work in practice. This, we've seen it now, let's change it." So I think it's good. We, we hopefully from our experience do have a lot of that insight and, I mean, the, the, uh, common access easements and private drives and private roads, I think we've gone up, down and all around about that as we can- ...
- 1:51:20
to talk about what happens if we do this or we don't do that. Um, but no, I think it's a very good point. Thank you.
- 1:51:26
Well, as we near the 7:00 hour, I wanna take a couple questions because I see a couple of our PNZ board members.
- 1:51:31
Yeah.
- 1:51:32
And that way maybe you're go- maybe you'll be able to answer it and then give them feedback that they may rethink or you may rethink.
- 1:51:37
Mm-hmm.
- 1:51:38
But, but I do wanna mention that when we do, when the board of commissioners, uh, does adopt this, know that it's not a silver bullet. It will not have every answer. Um, it may fit the majority of the topics, but there'll always be a new topic that we probably haven't even heard of in the past five years that'll come to us and say, "We've never thought about that one." So there'll always be amendments. I, I don't think there'll be as, as many as amendments as what we were going through.
- 1:52:08
And for, I don't want anybody in the public to think that, "Well, why are they rushing it?" Because I do believe that about 95% of what we've set out to accomplish is complete. Now, that 5% can be anywhere. So that's the reason that, uh, we're pushing to get this done and behind us. Uh, Mr. Scott, I saw you had your hand up earlier.
- 1:52:31
Well, I got tons of questions, but I'm, I'm gonna do that.
- 1:52:33
You got a PNZ question?
- 1:52:34
And, and, and we're not, and, and, and, and we're not rushing.
- 1:52:37
Yeah.
- 1:52:37
'Cause it's just two years.
- 1:52:39
Right.
- 1:52:40
We can't, we, we can't say we're rushing it. Okay? But there's a lot of different things have been brought up and it sounds like we're far from being complete. So at some point we've gotta adopt something 'cause, because we've gotta... There's gonna be changes.
- 1:52:57
Mm-hmm.
- 1:52:57
It's obvious there's gonna be changes. Like this, uh, I'm like Frank, this transfer of, of, uh, development rights. I mean, that's just-
- 1:53:08
Well, now keep in mind-
- 1:53:09
... confusing as heck
- 1:53:09
... we've never had that before. This is a brand-new topic.
- 1:53:11
I understand. And we got one commissioner saying it'll never happen, we got another one saying, "Well, maybe it will." You know, I'm, I'm... But, but all that's gotta be discussed. But, but I had a very simple question. I saw where, uh, eight chicken h- eight poultry houses was within 25 acres. Does that mean that A-1 doesn't allow chicken houses anymore, poultry houses anymore because A-1 is going to 15 acres rather than 25?
- 1:53:40
No.
- 1:53:40
No, it just says it's your minimum. You can have 100 acres in A-1, it's just saying the minimum threshold for A-1.
- 1:53:46
Okay.
- 1:53:47
You can't have-
- 1:53:48
Can you, can you put a poultry house in A-1?
- 1:53:52
Yes.
- 1:53:52
Yes. But they gotta meet setbacks, which may limit you to-
- 1:53:56
A-1 is 15 acres.
- 1:53:57
No, it's a minimum 15 acres.
- 1:53:59
That's right. So you can have four poultry houses in 15 acres. If you can make it fit, you can have four poultry houses. You can't have eight or more than four and less than 25 acres.
- 1:54:11
Yeah. So to get eight to fit, you gotta have 25.
- 1:54:15
But, you know, uh-
- 1:54:16
And meet setbacks. Yeah, and meet setbacks.
- 1:54:19
Again, I mean, I-
- 1:54:20
That was a perfect lead-in
- 1:54:21
... I'm sure other people have other questions. But, uh, sound like to me we're still a long way from-
- 1:54:27
I actually think that we're not as far, um, as... Because if you look at the whole 380 pages, I would tell you that 300 of them is probably spot on. To think that we're 80 of them is correct and 300 are wrong, I would agree with you. I think we're past that. I do think we will be fine-tuning over the next year. I think we'll be fine-tuning every time we come across something that we haven't recently thought of. It, it, it's almost every week myself or Christina or, um, Melissa gets approached with a topic that, "What?
- 1:55:02
They wanna do what?" And then we have to go look, 'cause I ain't heard of it.
- 1:55:05
Yeah.
- 1:55:06
It's, it, that bullet will always fire. Uh, Lee, you had a question?
- 1:55:11
There's a couple of us on PNZ that were involved with this from the very beginning.
- 1:55:15
Sure.
- 1:55:16
Um, but most of us haven't. So it sounds to me like even with all that I've been involved with, I still got some questions. But it sounds like based on the meetings that we're doing today during, for the staff, a lot of things that I had on my list came up. Um, I don't know what those were. But I guess for the sake of time, when would it be appropriate for this group to ask questions or to have open dialogue like you all are having now? Would it be at our PNZ meeting next week-
- 1:55:47
Yes
- 1:55:47
... when you do your presentation?
- 1:55:49
That's what it's scheduled.
- 1:55:49
So we'll be, we'll be prepared at that meeting to clear up things that we have.
- 1:55:54
Yes, sir. And, and the document today says uni, uh, unified development code staff training guide. It was just to show the staff a lot of those measures, uh, about how permitting goes, what they're considering here. Are you hearing anything that we may need to take into consideration? The exact same thing they're gonna do with you guys.
- 1:56:13
Okay.
- 1:56:14
So I would-
- 1:56:15
So I-
- 1:56:15
... I would suggest that we have a, a different meeting because if it's gonna be in our public hearing- We've got 12 to 15 public hearing things and then to take up this-
- 1:56:26
Business
- 1:56:26
... and that's all the questions. We can't do that in one night.
- 1:56:29
Yeah, some Tuesdays-
- 1:56:30
It's not gonna work
- 1:56:30
... it's scheduled. Tuesdays, it's scheduled for their public hearing thing.
- 1:56:35
Yeah, it's, it was-
- 1:56:35
On the 15th, it's scheduled for our public hearing meeting.
- 1:56:37
Yeah.
- 1:56:38
That will not work.
- 1:56:39
It would've been nice to let us know prior to that.
- 1:56:41
Well, no, well-
- 1:56:42
Because we already planned, I mean, it's been scheduled.
- 1:56:45
The public hearing, yeah.
- 1:56:46
No, yeah.
- 1:56:47
And advertised.
- 1:56:48
But, I mean, I, if y'all wanted to come twice, you could come to their regular business meeting and that's when y'all could have your discussion with them.
- 1:56:55
I thought that's what we were doing.
- 1:56:58
Um, and then y'all wouldn't, then I would say y'all wouldn't really need to come back for the public hearing portion 'cause they could just take the comments from the public hear- from the public maybe-
- 1:57:06
One of y'all could come up to kind of-
- 1:57:08
Yeah, we were planning on being here Tuesday the 1st for that.
- 1:57:11
Okay.
- 1:57:12
That, that's next week.
- 1:57:13
That's when, that's when y'all want her.
- 1:57:14
Yeah, I mean, but-
- 1:57:16
Yeah.
- 1:57:17
Yeah.
- 1:57:17
Which is not a public hearing, but with that public hearing-
- 1:57:21
Yes, they, yes, they will still hold-
- 1:57:23
Yeah
- 1:57:23
... the public hearings that day, and that, they can-
- 1:57:25
Yeah, I mean, we intended on being here Tuesday to do a presentation to you.
- 1:57:30
Okay.
- 1:57:30
All right.
- 1:57:31
Okay.
- 1:57:31
All right, perfect. You're gonna be appreciate-
- 1:57:32
So y'all will, y'all do not have to come back the 15th.
- 1:57:35
Or I'll just come just in case questions.
- 1:57:36
Okay.
- 1:57:36
Well, since it's been advertised for the 15th, how about the public? The public-
- 1:57:41
She's gonna be here for that. Public, it'll still be on there.
- 1:57:44
On the, yeah, see, they-
- 1:57:45
But they are, but they're, they are coming for your regular, your regular meeting on the 1st. That's when they're gonna come-
- 1:57:50
And do that.
- 1:57:51
For you.
- 1:57:51
And do that.
- 1:57:52
Understand. Understand. But what I'm asking is, it's been advertised on the 15th.
- 1:57:59
Yes.
- 1:57:59
This will be part of our public hearing.
- 1:58:01
Correct.
- 1:58:02
Okay? Now, we may have a room full of people that wanna ask questions. We've got 12 or 15 rezones to, to go through on that night. I'm saying that there is not-
- 1:58:16
It'll be a lot shorter and sweeter. Like tonight was a, a lot more drawed out than what we want it to be. Asked a lot of questions tonight. It's your public hearing, you already have, will have heard her information.
- 1:58:31
We will have heard, but the public will not have heard.
- 1:58:34
Correct.
- 1:58:35
Our breath ran out.
- 1:58:36
Correct.
- 1:58:36
We'll have to bottle-
- 1:58:37
But what I'm saying is it's still not the last event. There's still gonna be another meeting that the public can attend. That'll be the night of the vote. There'll also be a meeting that you guys are gonna make a recommendation.
- 1:58:50
Wait.
- 1:58:52
Anyone for coffee?
- 1:58:56
Let me know when you're done with that.
- 1:58:59
So that is not the red line, that's the clean version without any of the track changes.
- 1:59:03
Well, some of you that have-
- 1:59:05
And you know when that happens.
- 1:59:06
Yeah, some of you have been really, really involved in this, and I really appreciate it. Um,
- 1:59:14
I, I'll be honest, where the, where the, where the dysfunction comes in is if, like, the PNZ would've been part of today. We're already asking... There was a time I had to shut the room down 'cause everybody's talking at the same time. These two is talking, these two is talking, these two is talking. We're soon getting over it. So that's what happens when we get a larger group than what we had today with just five. And if we try to do that with a BOC and a PNZ and staff in the same room trying to bounce ideas off each other-
- 1:59:41
Well, I-
- 1:59:41
... it'll just be complete chaos.
- 1:59:43
I will say, uh, that I, I've played a large role in this process with Sarah. Um, we've had a lot of conversations, and I will say we've had a lot of, of our CMP or PMT meetings and, and all that was great, and everybody's kind of frustrated and they're waiting for a document. Um, and so that, that's the conversation is where are we at? Let's take the document we got. We gave it to staff. Staff, what is your immediate we need to fix? That this just does not work. That's what today was. That's what they plan on fixing. And then your recommendation board and your political views, we will make those changes as we go.
- 2:00:20
But we are adopting this October the 28th.
- 2:00:24
And considering adoption.
- 2:00:25
Considering adoption, yes sir.
- 2:00:26
Considering adoption.
- 2:00:28
So I know William had his hand up. Oh.
- 2:00:30
Yeah, I was just gonna say, all right, so Monday you're presenting what to us? Y'all had a meeting today.
- 2:00:36
Today.
- 2:00:36
I have what I see Terry has in his hand.
- 2:00:39
Mm-hmm.
- 2:00:40
But so you're expecting me... When do I get to look at what, to be prepared to talk to you on Monday? When do I get to-
- 2:00:49
Tuesday.
- 2:00:50
Uh, Tuesday. I'm sorry, Tuesday.
- 2:00:52
Tuesday.
- 2:00:52
My date was wrong.
- 2:00:53
Yeah, whatever. I mean, so-
- 2:00:55
The, the, the drafted document has already been sent from my understanding.
- 2:00:58
Got it. All right. And I, I had questions about it tonight, but you're saying now y'all have handled some of them.
- 2:01:03
Yeah, staff did appro- We did address some of those today, but you- your opportunity is Tuesday, uh, September the 1st at your, your meeting.
- 2:01:12
And so-
- 2:01:13
Will we have what y'all's changes are?
- 2:01:16
We can give a summary. Um, we'll try and send an email-
- 2:01:19
Yeah
- 2:01:19
... to Regina tomorrow that summarizes what we've discussed.
- 2:01:23
'Cause it sounded like there were several questions already that-
- 2:01:25
Yeah
- 2:01:26
... nobody-
- 2:01:26
Some of them were really-
- 2:01:27
I mean, there's always separation in the subdivision requirements.
- 2:01:32
Yeah.
- 2:01:33
Yeah.
- 2:01:33
That was one of the things that, you know, it seemed like-
- 2:01:36
Yeah. And that's kind of what-
- 2:01:37
Well, the questions you may have may not been none of the questions we answered today, so-
- 2:01:41
Yeah.
- 2:01:41
But, and that's what I wanted-
- 2:01:41
Until you get that summary-
- 2:01:42
You're gonna know
- 2:01:43
... if you could get that to us so we can be prepared for that.
- 2:01:47
Yeah.
- 2:01:47
Yeah, that'd be good, because I've had no communication.
- 2:01:50
Yeah.
- 2:01:51
I wasn't part of the pre-party.
- 2:01:53
Yeah.
- 2:01:53
So I'm prepared, but then I've been made aware tonight that there was another meeting.
- 2:01:58
Yes. And even, um, even, like, Lee was a part of the committee.
- 2:02:02
Yeah, and he-
- 2:02:03
And he, he sent a lot of questions that he had and just, he just... Kinda like what y'all are doing now. You want something defined, um, and doesn't have been sent and done, and then they're, they're just mixed in to that whole rough draft. So a, a lot of that's been addressed. But...
- 2:02:22
So as, from, from a process standpoint, I, you know, it's not-
- 2:02:29
Like we, when, lack of better terminology, if we need to take it up or, or if we're on schedule to try to take it up-
- 2:02:40
Yes
- 2:02:40
... in October-
- 2:02:41
Different
- 2:02:41
... when should, when, when I, when I say this board actually, I mean when will a, what we would consider a final draft-
- 2:02:50
Yeah
- 2:02:50
... be available for-
- 2:02:52
Sure
- 2:02:52
... whomever that may want to, "This is what-
- 2:02:54
Yeah
- 2:02:54
... we're gonna vote on."
- 2:02:55
Yes. So what we had talked about, uh, Mayor Sarah, was their presentation to P&Z, much you are getting today, at their, uh, September 1st meeting. They will hold their public hearing for this, uh, September the 15th. We have an open, um, meeting October the 6th. Um, we also have, you know, we have some more meetings in September that, that we could work with them if you guys wanted them to come back before you, or if we wanted to do another special called meeting to where it could be a more of a round table discussion.
- 2:03:29
Um, but when do you think that a final draft will be done?
- 2:03:33
So I think, I think a lot of it will depend on Tuesday. Let us hear what P&Z has to say.
- 2:03:42
Yeah.
- 2:03:42
Because even though these are "final drafts," we still want to give y'all the opportunity to make changes. There's still time to do it. Um, so I think we'll get a lot of good feedback on Tuesday. What we've heard today, I mean, it's not a ton of adjustments.
- 2:03:58
Mm-hmm.
- 2:03:58
So I would say, let's say everything goes kind of well on the 1st. On the 15th, we get a s- an additional feedback. We can have the 1st of October as a goal to get you a draft, and that would give you pretty much a month-
- 2:04:11
Yeah
- 2:04:11
... for the, the commissioners, the public, P&Z, to look at the final revisions we've done.
- 2:04:17
Yeah.
- 2:04:17
Yeah. Until you hear their questions after that Tuesday-
- 2:04:20
Yeah
- 2:04:20
... there's really no way to give us a good deadline.
- 2:04:23
Yeah.
- 2:04:23
Except for the fact that I know the questions that was asked today by staff, and that office-
- 2:04:27
Yeah
- 2:04:27
... was fairly minimal.
- 2:04:30
Yeah.
- 2:04:30
And-
- 2:04:31
A lot of it's clarifying as opposed to like-
- 2:04:32
Yeah, it was not re-engineering the wheel kind of comments.
- 2:04:35
No. Yeah.
- 2:04:35
There was, there, for staff today, there was no major, "This just does not work."
- 2:04:40
They w- they wanted a lot of details.
- 2:04:42
So it was a few little things that-
- 2:04:43
Like, "Give us the exact wreckage."
- 2:04:44
Yeah. I mean, like this right here is a limit to 2,500 square feet. We've seen that immediately and we're like, "Hey, we're permitting 33, 3,300."
- 2:04:51
Right. Already bring it to us, so we need to change it.
- 2:04:51
So let's just take that out, and that's not a big deal. Um, so it was just small things like that. But-
- 2:04:58
And we'll look at these acreage breakdowns again and, and see if we need to adjust those.
- 2:05:03
Okay.
- 2:05:03
Um, if it makes sense, we can do some work on that as well.
- 2:05:06
Yeah. I don't want everybody get, to, to get too tore up over the T- uh, TDRs right now. I mean, that's something that it may take a year before we ever hear about one.
- 2:05:15
Yeah.
- 2:05:15
It may take a year worth of adjustments, but it don't hold up the whole stack of 380 documents. Stephanie, you had questions?
- 2:05:24
Um, more just comments than questions-
- 2:05:27
Sure
- 2:05:27
... because there's a lot of discussion and act- it sounds like y'all did a lot today in questions. But, um, I have some concerns about the accessory dwellings with the no kitchen. Um-
- 2:05:39
Yes, that was addressed today.
- 2:05:40
We addressed it.
- 2:05:41
Okay.
- 2:05:41
Yeah. We did change that.
- 2:05:42
Um, the TDRs, I'll just make a comment that we have done some with our business in other counties. Um, you say that they won't come up for maybe years, but you'll have a lot of investors, this is a hunting ground for developers, come in and, and start buying up a lot of land, and they will, uh, build high density, and I just don't think we're ready. So we need more discussion on the TDR is what I think. Um-
- 2:06:11
Can we put a moratorium on a TDR problem, maybe?
- 2:06:13
I, I don't know if we need to go that far. I just-
- 2:06:15
Or we just reserve it.
- 2:06:16
Reserve.
- 2:06:17
We just reserve it and don't adopt the ordinance yet.
- 2:06:20
Okay.
- 2:06:21
Or pause the site selection.
- 2:06:23
Or g- give a st- a different e- like a later enabling date.
- 2:06:27
Mm-hmm.
- 2:06:27
I,
- 2:06:30
I, If there's no per- I mean, I don't think it's a moratorium. I, I, I think it's a, you know, a TDR, I mean, ask Mike, but, you know, does it have to be defined or does it not? I don't know. If you come in here and ask for something, we say it don't meet our ordinances. And they say, "Well, yeah, but we gonna buy some land from somewhere else. We don't have that programmed. It's not a lot." I mean, I, it could be that simple.
- 2:06:51
It could be.
- 2:06:51
I mean, I, I just-
- 2:06:52
It's one
- 2:06:53
... I, and I know it's complicated, you know, I mean.
- 2:06:56
Uh, the only other one is, uh, the stream buffers, um, being more than the state regulated at 25 foot. Um, I'd like to see that less specifically in ag areas, unless it's on a major river like the Broad or something, but being more than what state regulate.
- 2:07:17
We've always been more than what the state regulates. I think the state regulated would be 25, and I think you may have been 50 or 75.
- 2:07:24
Yeah, I know.
- 2:07:24
It's been that way for years.
- 2:07:26
Okay.
- 2:07:26
And it was more for building of structures, not for access.
- 2:07:31
Sure, impervious.
- 2:07:32
Huh?
- 2:07:32
Impervious.
- 2:07:33
Surface.
- 2:07:33
Yeah.
- 2:07:34
Yeah.
- 2:07:35
Which means something with a roof on it or something that's gonna take up, not absorb water.
- 2:07:40
The minimum state is 25.
- 2:07:41
Yeah.
- 2:07:41
And then usually there's an additional 25-
- 2:07:45
Un disturbed
- 2:07:46
... for undisturbed, and then an additional, so 75 feet total, 50 undisturbed, and then 25 as the impervious.
- 2:07:54
And I wanna say this came up in 2022 when it was, uh, adopted to have a, a larger buffer, and it had something to do with the outpost, uh, the, the kayakers. People wanting to build shelters right down our, on the river, and that's when they said, "No, no, no. We're gonna back it up so you can stay off that river buffer." And a lot of it had to do with flood plains too, uh, and different waterways. So yeah. Waters of the state. Next question. Good ones though. Blake, you gotta have one more, buddy, because I wanna wrap up in like three minutes, but I know you got a good question
- 2:08:29
No, I just, I just want the opportunity to get the things that were on my list off my list.
- 2:08:35
Mm-hmm.
- 2:08:35
If we can talk about that Tuesday, that's fine.
- 2:08:38
Perfect. Jenna?
- 2:08:40
Nothing right now. I can get it Tuesday.
- 2:08:43
One second. Guy?
- 2:08:45
I'm good. Waiting for Tuesday. Thank you.
- 2:08:47
Perfect. Young lady?
- 2:08:50
Okay, um, just clarification. What we have here, we need to... Are you gonna give us that so we can come to Tuesday?
- 2:09:00
That is what she has.
- 2:09:01
Yeah. Okay.
- 2:09:01
Yeah.
- 2:09:01
This is what we need-
- 2:09:03
Yeah
- 2:09:03
... to come to you with what you-
- 2:09:04
What you have, I believe, is what has their notes in it. Like, if you've got anything that's, the text that's red or green or like the comments off to the side.
- 2:09:15
Mm-hmm.
- 2:09:15
Okay, so then y'all have what he has.
- 2:09:17
The clean version.
- 2:09:18
Yeah, then you have the clean version of-
- 2:09:20
So we can email you the version with the, the red line comments, so you can see what we've kind of worked through-
- 2:09:28
Yeah
- 2:09:28
... if that would help.
- 2:09:30
I think that-
- 2:09:30
And they can-
- 2:09:31
I think they want the clean version.
- 2:09:32
Oh, they want the, you're wanting the clean version.
- 2:09:34
Yeah.
- 2:09:34
Okay.
- 2:09:35
Yeah.
- 2:09:35
And we can, we can do that.
- 2:09:36
So they, so they have that. Yeah.
- 2:09:37
Yeah, I think what she's asking is that on the final draft we get the new version of this put in this book instead of-
- 2:09:44
Absolutely.
- 2:09:45
We will when we, uh, we, when we get closer to adopting it. But they're gonna allow you guys a chance to, um, recommend some changes in, in what the draft is.
- 2:09:54
Yeah, I just wanna know, I'm gonna look at this to come with questions on.
- 2:09:58
Yeah.
- 2:09:58
Okay.
- 2:09:58
Yeah.
- 2:09:59
That's what I need to know.
- 2:09:59
Make any comments in that, pencil it in, bring them with you.
- 2:10:03
Yeah.
- 2:10:03
Or make a cheat sheet.
- 2:10:04
Yeah.
- 2:10:04
Cheat sheet's easier. Section so and so, my question is... Yeah. Canella, before we go?
- 2:10:09
Yeah. Well, I, I'm looking further to Tuesday, but I have a request.
- 2:10:12
Yes, sir.
- 2:10:13
We've already gotten our agenda for Tuesday, and I don't remember this being on there. If you would, please let us know in advance when something's gonna be added or are we to expect, what to expect when we come.
- 2:10:29
Hang on one second. She might have it right here.
- 2:10:33
Yep. Legal ads published for their reg- their regular business meeting at the normal, if per your normal procedure by August the 17th. P and Z regular business meeting September 1st. Legal ads published for public hearing by, uh, August the 31st for the public, uh, planning and zoning public hearing September 15th, and so on, and it lists the dates, the same dates for B of Z.
- 2:10:58
All right. Anyone else have any questions before we wrap this up and try to find food? Yes.
- 2:11:07
One more comment from Gary because he left. Um, and I don't exactly know who you're talking about, but the land of service permits y'all were talking about, and he said something about they have to have a, a seven-day letter-
- 2:11:20
Yeah
- 2:11:20
... to the P and Z.
- 2:11:21
Yeah.
- 2:11:22
Like, why can't we just put in that seven-day letter also has to be copied to the county or-
- 2:11:27
Yeah, so we were-
- 2:11:28
Okay.
- 2:11:28
We were actually looking at ways we can get that.
- 2:11:31
Okay.
- 2:11:32
That was part of their discussion earlier.
- 2:11:34
Yeah.
- 2:11:34
Yeah. I mean, I think it's important.
- 2:11:36
Good points. Well, if there's no other comments, ladies, Sarah, thank y'all.
- 2:11:42
Yeah.
- 2:11:42
We appreciate it, the hard work that's gone into it. We'll all celebrate when we finally get some of this behind us, and I say some of this behind us. But today's presentation, your time earlier with staff and the future meetings should get you to that. Motion to adjourn. Thank
- 2:12:21
you.
- 2:12:24
Thank you.
- 2:12:24
Everybody, I apologize, y'all. I carried it on. Just blame me too,
- 2:12:31
man. I went and got a water.