Skip to content
Georgia Commons
Menu

City: Peachtree City

Peachtree City City Council regular meeting, August 27, 2026

8:30 AM · 20 pages

These are the minutes as Peachtree City City Council posted them, read from the file on its own website. Georgia Commons is independent and is not affiliated with Peachtree City City Council.

This record was posted as scanned images, read here by OCR: a letter or a number may be misread. The file the body posted is linked below.

Copy for LLM, View as markdown, and Send to AI use the Markdown version: the summary Georgia Commons wrote, under a heading that names it, then the record as posted. View raw is the record alone.

Records of this meeting

Each link opens the body's own website or meeting portal.

Summary

Written by an AI model (claude-sonnet-5-5) from the minutes below. It is not the record: the minutes are.

Council heard library and recreation presentations and favored Option B for the Veterans Memorial Park, with no formal votes besides adjournment.

At a quarterly informational meeting, the council heard presentations from the library director and the Recreation and Special Events Department, with no formal votes except adjournment. Topics included library use and repairs, a conceptual design for the new Kedron pool facility, and options for replacing the Kedron hockey rink, which the council said it would not decide right away. Council members also discussed the Fourth of July drone show, a roughly $5.5 million Tennis Center rebuild, and a Braelinn multi-purpose field. Council members and staff favored Option B for the Veterans Memorial Park on Kelly Drive, and the city manager said staff would move forward with design. On playgrounds, staff were to plan all of them but proceed first with Braelinn, Battery Way and the storm-damaged ones.

Topics taken up: library update and renaming; Kedron pool facility design; Kedron hockey rink options; Fourth of July drone show; Tennis Center renovation; Braelinn multi-purpose field; Veterans Memorial Park concepts; playground replacement plan; urban archery program; special events growth.

Answers are written by AI from this document, and every quotation is checked against it. Not legal advice.

The minutes

As posted on peachtreecityga.api.civicclerk.com, read November 12, 2026. Nothing below is written by Georgia Commons.

City Council of Peachtree City Meeting Minutes Thursday, August 27, 2026 8:30 AM

Call to Order

The Mayor and Council of Peachtree City met in quarterly informational meeting session on Thursday, August 27, 2026. Mayor Kim Learnard called the meeting to order at 8:30 a.m. Council members attending: Laura Johnson, Suzanne Brown, Clinton Holland, and Michael Polacek.

Pledge of Allegiance and Moment of Silence

Public Comment None

Presentation

A. Library Update

Library Director Jill Prouty said the rebranding of the library as the M.T. Allen Memorial Library was an ongoing project, and a public dedication for the new sign was planned for the fall. Naming a library for someone was a high honor, Prouty stated, thanking Council for voting to do so in remembrance of the library’s founder.

Prouty showed that the lending of traditional books had declined slightly over the

past couple of years, but downloads of e-books and audio books were increasing, as was foot traffic. This was a nationwide trend, she said, and it seemed libraries

were becoming community centers.

Many people visited to check out a Chromebook and a wi-fi hot spot or use one of the library’s internet workstations. Other popular services included scanning and the conversion of old VHS tapes to digital formats. The Art Initiative, where regional and local artists were invited to exhibit their work at the library, had been going on for about 10 years, and traveling exhibits of various types visited regularly. There was a partnership program for free tickets to the Alliance Theater, along with free tickets for State parks, museums and other spots of interest. While children’s programming had always been part of the library’s schedule, they had expanded to offer programs and activities for people of all ages. Those adult activities had been slow to catch on, but now they were some of the best-attended programs, she remarked.

Johnson asked about adult sensory storytime, and Prouty said it was aimed at adults with special needs, such as art projects utilizing different textures. Johnson asked if it would be good for someone with dementia. Prouty replied that she did not know and would find out, but that was a great suggestion for a separate program. Holland asked about the Spanish language lessons, saying his wife might be interested. Prouty explained the level of instruction and said Holland’s wife

might benefit from the Mango language program available from their regional!

library consortium free to anyone with a library card.

The Summer Reading Program had always been popular with kids, and now there was a program for adults, as well. Prouty said there were all kinds of programs at the library during the summer, and June and July were the busiest months. This year, she said, they had relaunched the 1,000 Books Before Kindergarten program, which helped children and parents prepare for school.

Learnard asked if the Friends of the Library would be having any more Meet the Author events, and Prouty said they were working on it. Those were the kind of events that attracted people to joining the Friends, which was experiencing a resurgence right now.

Holland mentioned he knew of a local author who perhaps could be invited to visit for a special program. Pouty responded that there were many authors in Peachtree City, and the Library showcased them with a Local Author Expo every year.

Prouty listed some recent and future major repairs and renovations. The original 10,000 square foot library was built approximately 40 years ago and last underwent a major renovation in 2003. They had received grants to install a new HVAC system and elevator, along with re-sealing the exterior and replacing the roof.

Future plans called for replacing the skylights and the awning covering the walkway between City Hall and the Library. There was a void underneath the Floy Farr Room that needed remediation. New carpet was also on the list, and each year they reupholstered or refurbished about 30% of the library’s furniture.

She went on to say that the grants they usually received called for a 50% match from the City, but the skylight/awning project was a big-ticket item that could be combined with other smaller projects into a capital grant that would require only a 10% match if the cost exceeded $1 million. She said the regional library system could also add some of its own projects to get this over the $1 million mark, and Council’s help might be needed to work with State Legislators to get that money included in the budget.

She said the Friends of the Library helped them through fundraisers and actually paid for almost all the Summer Reading Program. The Library’s operating budget was not even $3,000, Prouty noted, and the Friends contributed an additional $5,000. She said the Friends had applied for a lot of grants to fund programs, such as the July 4 barbecue celebration.

Prouty forecasted that they would continue to see the transformation of the Library as a community center. Libraries were no longer the quiet zones of the past.

Holland said he could see a connection between the Library and the new Public Art Group. He asked if Prouty had any contact with artists who would be interested, and she replied the library was already involved in art. The major exhibitions on

their featured walls were by invitation only, selected by a committee. Other walls were dedicated to local groups such as the Fayette Society of Fine Arts, and those rotated bi-monthly.

Holland said he wanted to see more sculpture. They did one three-dimensional art exhibit a year, Prouty responded, adding that sculpture was tricky because it had to be wired to the walls to prevent theft or breakage. Holland said he would come by and share his ideas with her.

The Mayor asked about the rules to reserve the Floy Farr Room for meetings.

Prouty replied there was no cost, but it was for non-profit use only, and groups were limited to six times per year. The room was nearly constantly booked between civic groups and its use as a polling place.

Learnard said she had seen the mockups for the new library sign, noting they had decided it should be written as “M.T. Allen”, not “MT Allen.” She was concerned that the letters were on a slab instead of separately placed, but City Manager Justin Strickland said it was the same as the current “Library” sign. Learnard said she knew it would be wonderful.

Recreation & Special Events Update

Recreation and Special Events Department Director Harold Layton said creating this presentation had helped him see the big picture. He said it had 25 full-time employees, with 15 of those in maintenance, along with 25 part-time staff, and 23 seasonal staff, for a total of 73 employees that he would match against any other Recreation Department in the State. Assistant Director Michelle Johnson reviewed the number of classes offered at Kedron from 2022 to 2026, showing that they remained about the same and consistently brought in about $19,000 in revenue.

Summer camps also had stayed steady, with revenues ranging from about $41,000 to $50,000.

Kedron Aquatics Center

The Kedron pool was highly utilized, with the number of swimmers averaging around 16,000 per year. Five high school swim teams utilized the pool, along with two swim associations. She pointed out that among the daily users, 1,398 were Peachtree City residents, and 1,293 were non-residents. Holland observed that non-residents paid a higher fee than residents.

They had hired a full-time activities director, and Johnson said he had hit the ground running with adding new adult programming. There were adult basketball and volleyball leagues in addition to the youth programs. Camps were held every week of the summer school break, and this year, volleyball camps would run during breaks in October, November, February, and April. Learnard asked about women’s basketball, and Johnson told her there was a league with a smaller number of

teams.

This year had seen the induction of the inaugural class of the Kedron Wall of Fame, which salutes athletes with Peachtree City connections. They were accepting nominations for the 2027 class. Layton observed that sometimes it was hard to schedule these busy athletes for interviews, but they were doing what they could. Holland asked about the selection process, and Layton said they had established criteria. The inductees’ photos were currently displayed in the lobby at Kedron and would be permanently mounted soon. Layton said they each had a QR code that led to their questionnaire and biography.

At the Fieldhouse, he continued, 21 original wooden doors were being replaced.

Layton then said he had just received what he called “very, very, very raw conceptual pictures” of the new Kedron pool facility. He showed the garage doors on the side of the Sprung Structure and pointed out that the wall would come all the way to the sidewalk. The glass storefront doors at Kedron would continue and wrap around to the new Sprung Structure.

The conceptual plan for the pools showed the instructional pool at the rear, but Layton said they were still discussing placement. He indicated the garage doors, the glass doors, and the tunnel and pointed out how the building would be accessed by swimmers. There were three on-deck showers with two showerheads each. There would be a monitor on each wall for timing and scoring. He showed the ramp on the smaller pool, as well as the steps on both pools. They would still use the lift, as well. The larger pool would contain an area outside of the lanes that could be a warmup area or an area for kids to play in while their parents did laps.

Bleachers would be installed outside of both pools.

Health codes required the addition of more restrooms. There would be three women’s and three men’s facilities, plus storage space. The current pump house would be expanded but still utilized. He showed the area considered for a splash pad and said that would be considered an add/alternate to the project.

Once the design was 30% complete, Layton said there would be a town hall meeting, probably around the middle or end of September.

Learnard asked if they were still on track to shut down in March, and Layton said it would, although they were working out those details and believed they would be able to keep the pool temperatures up this winter. Polacek said he thought communication with swim teams would be a good topic at the town hall. There also was a possibility to heat the Glenloch pool, but Layton said they would have to install heaters at about $70,000 to $80,000 and make sure they had the natural gas capacity.

Brown asked if they had blankets or covers for the Kedron pool until it shut down in March? Layton replied that they would be covering the pools with thermal blankets

every night and run the boilers like they did with the bubble. However, he acknowledged that it would be tough when the temperatures dropped below freezing, but the experts he had talked to were confident they could retain an 80 degree threshold.

Would the changing areas be renovated? Holland asked, and Layton said those were renovated around 2017 and did not need it now.

Brown asked if it might be better from a safety standpoint to have the instructional pool in the front so that kids who ran down the hallway would come out at that shallow pool rather than the deeper pool. Layton explained the structural reasons for this preliminary rendering and said they would probably flip the pools so the tunnel would line up with the walkway in between them. They could discuss it at the town hall meeting.

The large pool currently was almost nine feet deep, Layton remarked, and the new pool would be seven and a half feet, transitioning to five feet. He said it would be much easier to maintain temperature and chlorine levels with this shallower depth, and the pool would still meet all the requirements for swim teams.

Kedron Hockey Rink

Moving on, Layton told Council they had three documents in front of them. One dealt with the Tennis Center, the others with the Kedron Hockey Rink. The first was a cost estimate from the Palacio Collaborative, which gave cost estimates for hockey rink projects. He also provided an architectural report from WM2A . There were 245 athletes currently playing in the hockey program, and in 2025-26, the City received $7,500 from the program, the highest amount ever.

Layton said they requested two levels of pricing from WM2A. Option 1 was to demolish the existing building and replace it with a Sprung Structure. The design fee for that would be $485,838. Option 2 called for rehabbing the existing pre-engineered open-air metal building and performing necessary upgrades, including steel rust remediation and the installation of a vinyl insulation system. Both options addressed drainage deficiencies and parking insufficiencies.

The architects had listed some things to consider regarding enclosing the current building. Layton noted that if any work was done to the existing building, they would then be required to bring the restrooms up to new code standards. The existing concrete pad for the rink would have to be replaced due to the lack of a vapor barrier. The playground would have to be relocated.

Layton said the new hockey boards were expected to be delivered in late fall for installation, and a new drinking fountain and water bottle filler would be installed in the coming weeks. He had a quote of $231,625 for spray-foam insulation, but said engineering would need to be done to see if the building could handle the weight in its current condition. The underside of the roof would need to be sandblasted, too,

but Layton did not have a quoted price on that.

He presented a rendering of a Sprung Structure, showing that the building could sit on the original footprint with some expansion to accommodate the restrooms and the parking lot. Due to drainage issues, the playground would need to be relocated, maybe near the Fieldhouse. The Sprung Structure would be oval in shape, with two dressing rooms on each end of the building. Bleachers on the sides would allow for the addition of 110 seats.

Johnson confirmed with Layton that 245 kids were playing hockey this year, and he said that was the largest number since 2022-23. He said there were no adult leagues. Johnson said she would like to see participation numbers for other sports, and Layton promised that would come up later in his presentation. City Manager Justin Strickland said he had sent Council links to both Layton’s and Prouty’s presentations.

Palacio had given a $5.35 million estimate to renovate the existing building and $7.5 million for a new building. Neither cost included a new slab or design fees.

Holland verified that the $7.5 million included removal of the existing building.

However, after having a structural company look over the existing building, WM2A would not provide an estimate on renovations, saying it would not be feasible to do that, considering the amount of work, some of it not readily apparent, that would be required to bring the building up to code. Holland asked about extra beam supports on the roof, and Layton said they did not know about that yet. Layton went on to read a portion of the architect’s report that said they would not provide an estimate out of respect for the City and its resources.

Learnard said she recalled Council had approved spending $500,000 for glass, boards, bleachers, Americans with Disabilities Act (ADA) compliance, and foam insulation, plus some structural improvements. Was Layton saying they could not do all that?

Layton replied that they could do some of it; this was still a building that could be used for a few more hockey seasons. They could try to mitigate the condensation problems with insulation. The boards had been ordered for $285,000, so that, plus the insulation, would account for the $500,000. He would have to ask Council for more money to do the sandblasting required before the insulation could be installed. More money would be needed for scoreboards. The Association had asked for a water fountain, and that was more than $15,000. He said he needed direction from Council.

Learnard went back to the foam insulation, noting that they would have to get the okay from an engineer, plus it would call for sandblasting. Those were unanticipated costs. Would it be ridiculous to pursue that?

It depended on how much they wanted to spend on this facility, Layton responded,

knowing that if they put $1 million into it right now, there was the potential for a $7 million new building in the future. Learnard said she had thought spending the $500,000 or even $1 million would buy them about 10 or 15 years, and Layton said it could, but they needed the engineering report first.

Brown reflected on spending this amount of money for a sport with such a small number of participants. They wanted to provide for those players, but $7 million was a lot of money. It would probably require a bond issue, Brown said, adding that she was not sure how citizens would react. However, did they want to spend money to renovate a building with so many problems?

Brown also wanted to make it clear that Council would not be making a decision immediately. They wanted input from the Recreation Advisory Group (RAG) and citizens. She observed that this was not the only project Recreation had planned.

Maybe they needed a spreadsheet to get all the information, Brown remarked, and Finance Director Kelly Bush said she and Layton had created such a document with all proposed projects, estimated costs, and possible funding sources. She said they discussed a new hockey facility as being a project for the 2029 Special Purpose Local Option Sales Tax (SPLOST). That would bring them to starting construction no earlier than 2030 if the SPLOST was approved, Brown observed.

Strickland said Recreation would be talking about several projects, and Council needed to consider priorities. Some projects could be funded through a bond, others through SPLOST.

Holland said he was in favor of a new building but wondered if they could not repurpose the existing building for another use. They could build a hockey rink in another location. Maybe they could get another building, not a Sprung Structure, which would be less expensive.

Fourth of July

Layton said he felt this year’s Fourth of July celebration was the best in his 22 years with Peachtree City, and Council agreed. He listed all the events of the day, from the morning parade to the fireworks that capped off the celebration.

Did Council want to continue the drone show or let it be a one-time happening? He had gotten prices from two vendors, ranging from a discounted price of $40,000 for 200 drones, as they had this year, to $200,000 for 500 drones. He said he would ask about rotating the drones so the images would be visible from all angles, and that was possible, but would limit the number of images that could be created.

They would have a 10- or 12-minute program and rotating the images would use power on the drones.

Polacek said he was all for going bigger but thought this would be a good opportunity for a public/private sponsorship. The sponsor's name could be one of

the drone images in the sky. He agreed that rotating the images would be helpful to all viewers and said everyone he talked to liked the drones.

Brown agreed, saying the only complaints she heard were from people who were not sitting where they could get the best view. She liked the idea of having sponsors if it let them do a better show.

Johnson said she enjoyed the drone show this year but was concerned that if it became a regular feature of the Peachtree City Fourth of July celebration, it would lose its novelty. She said drones were an emerging technology, and she was not sure how they could make it different next year. That was a lot of money to pay for the same show, she remarked. She liked that they invested in the barge to shoot fireworks from and hoped Luke Morgan could come back to play every year in the afternoon.

Last year, they could get only 200 drones because they were late to make reservations, Layton remarked. He also noted that if they wanted to have a drone show two or three days before the Fourth, they could get 500 drones at probably a third of what the price would be on the Fourth.

Holland remarked that he enjoyed the drone show but acknowledged that it was a lot of money. He said he liked the idea of doing it for another special celebration, maybe at Christmastime. Rather than using the money on drones, he suggested upgrading the fireworks display. Layton reported that one company, Pyrotechnico, shot fireworks out of their drones.

Learnard’s opinion was that they had set a high bar with the drones and could not go backwards. She advised keeping it at 200 unless a good corporate sponsor appeared.

Johnson also mentioned the Wind Ensemble was phenomenal, and Holland said they should certainly bring them back.

Next year, July 4 fell on a Sunday, and Layton advised that the parade would be held on Saturday morning, July 3, and with the afternoon and evening festivities the next day on the actual holiday. Breaking the celebration up would help City staff, who worked 20+-hour days on the Fourth.

Tennis Center

Tennis Center Director Curtis Quandt said there were 469 members, up from the 420 he recalled during the days of private management. Fall and spring were the busiest times for adult leagues, and the Center hosted 44 ALTA and USTA teams.

It hosted the SIAC Conference Championship each spring, plus the Men’s 50 and 55 National Hardcourt Championships in the fall. The Center had hosted several Junior National Championships, bringing in hundreds of players and families from all over the country. Quandt said UTR events served local players from beginner to

intermediate level. He reported that the Tennis Center had been selected as one of the first USTA coaching sites for camps and clinics.

More community events were planned, he related, with the next being a U.S. Open Watch party on September 4. He hoped to continue growth of the Junior programs and expand programs for adult beginners by working with the USTA’s Southern Crescent organization. They were considering converting the old pro shop into a lounge or meeting area. The Mayor remarked that it was a nice space, and Quandt agreed it had potential. She then asked if they had plans for the space that would be vacated with the Fire Department administration moved to a new building, Strickland stepped in to say they were looking at a couple of things.

Revenues remained stable over the past few years at about $1.3 million. He said some of their pros were phasing out, but a few younger people had joined the roster. Strickland asked him to describe the financial arrangement with the pros. He said they did a revenue split based on their professional certification. Those with top certification had an 80/20 split, with the 80% going to the pro, while others might have 75/25 or 70/30. Most of the pros were at 75/25, with a couple at 70/30 and one at 80/20. All were considered independent contractors.

Learnard said the City took over in January 2024, and they broke even plus $50,000, which Quandt corrected to $70,000. She wondered how finances stood now. Quandt showed a table listing the financial information and explained there had been some expenditures of the past couple of years, but operating expenses were going down, particularly as the higher revenue split pros retired.

What should Council’s takeaway be? Learnard asked. Quandt replied that the Tennis Center needed to expand membership and programs. By expanding programs, the pros would make more and so would the Tennis Center. He also wanted to attract more tournaments, saying they were a good source of revenue for a relatively small expense.

Brown asked about membership fees. Quandt said $44 a month for Peachtree City residents and $59 a month for non-residents. He said these were reasonable fees, but they could look at increasing the rates. Brown said she thought it was best to do incremental increases over time rather than wait until a big increase was required.

Holland asked how fees compared to other facilities. Quandt said he thought the fees were reasonable and said the Tennis Center was recognized as one of the premier public facilities in the country.

Polacek wanted to know the split between residents and non-residents for membership, and Quandt said it was about even.

Johnson commended him on having high membership numbers and asked if the popularity of pickleball had impacted tennis. Quandt said there was not a lot of

overlap between the pickleball and tennis communities, although a few people did play both. Johnson said a tennis player had told her they would be willing to pay a higher fee if it meant renovations could take place sooner.

Layton mentioned that the cost to repair water leaks from pipes in the ground was reflected in the expenses for this year. He and Quandt said a strong September would get revenues back on track.

The City had approached Tarkett Sports about a two-phase renovation of the Tennis Center. Phase 1 would include rebuilding 12 asphalt courts, while Phase 2 would rebuild the clay courts and the covered courts. Layton said simply resurfacing these courts would give them only another two or three years of use.

Tarkett would give them a warranty on the rebuild of 50 years for the post-tension concrete and 10 years for the surface. New LED lights would be phased in.

The cost would be approximately $5.5 million. Layton said they originally thought about a four-phase approach in order to keep 18 courts running at one time, but the budget estimate for that was more than $8 million. Doing two phases would keep 12 courts open for the entirety of the project. This was another aging facility that needed costly renovations, he remarked.

Johnson asked if more courts would help them attract tournaments. Layton replied that the first thing to consider was that more courts required more parking. Quandt said they were already short on parking but had an adequate number of courts. His concern when bidding on higher level events was the quality of the courts. It did not make a lot of difference for junior tennis lessons, he remarked, but national championship events wanted courts with no cracks.

Holland asked if they would see a connection in the financials if they spent $5.5 million on improvements and were able to bring in national tournaments and large crowds. Quandt said the tournaments renting the courts would certainly bring in revenue, and the other part was the people coming into Peachtree City, staying in hotels and eating in restaurants. There was a financial benefit to the city that would not show up on the Tennis Center’s bottom line.

The Tennis Center was included in the Tourism Product Development (TPD) fund, Strickland pointed out, and that money had infused the Tennis Center with money for some of the bigger upgrades over the years, although they had not used it in several years. There was not enough to do a $5 million project, but Strickland said he considered the Tennis Center technically in the black if they decided to use some of that TPD money, much as The Fred did each year.

Learnard asked Strickland about funding, and he said he had some ideas that he wanted to discuss at the end of Layton’s presentation.

Johnson asked about room for more parking. Strickland said the City owned some

adjacent land and could expand parking in front or across the street.

The Mayor called for a break at 10:30 a.m. and the meeting resumed at 10:40 a.m.

Jim Meade Pickleball Complex

Layton reflected on how well this project turned out and how much it benefited the citizens. Recreation would be starting a pickleball league that Layton said was not very labor-intensive on their part. They had held several very successful tournaments and some socials since the courts opened in the spring and were working with Georgia Power on the parking lot lights.

Jim Meade Athletic Complex

Last year, the girls softball facility was made completely ADA accessible. Electrical outlets and fans were added to the pavilion and the parking lots were re-done. The new driveway had been installed. Many upgrades had been done to the lacrosse fields as well.

Peachtree City Athletic Complex (PAC)

New higher nets had been added behind home plate at the baseball fields, Layton reported. The parking lot was now ADA-compliant, and there were new golf cart parking spots. He said they worked year-round at all facilities on field maintenance.

While many fields had been upgraded with LED lights, the six PAC soccer fields and the two Riley football fields still needed upgrades. The estimated cost for this at the PAC was between $2.5 and $3 million.

Layton showed the pristine condition of the turf soccer fields and attributed it to the fertilization program and turfgrass management programs. He said these were the best looking fields he had seen in awhile.

A review of the soccer programs show that the AFC Lighting program had 888 players and brought in approximately $33,000 in fiscal year 2025-26, a big increase over the $11,000 of the year before. Layton attributed the increase to a change in the way they were capturing numbers of users of the facilities.

The PTC Lazers had 1,292 participants and revenues of nearly $46,000 to date in FY 2026. PTC Little League had 637 participants and brought in about $18,000 in revenue to this point and was expected to hit around $25,000 or $30,000 when fall baseball was factored in.

These numbers totaled would put the complex revenue generation at well over $100,000 this year, Layton observed, with 2,800 to 3,000 participants.

There was also soccer at Glenloch, Polacek pointed out, and at Braelinn, Layton

added.

Strickland said that, by far, the PAC was the most heavily utilized City facility, with about 300,000 users a year. Meade’s numbers should be going up now that pickleball was there, Strickland remarked.

Braelinn

The conversion of the pickleball courts back to tennis courts had recently been completed, Layton reported.

Another project at Braelinn was a multi-purpose field. In 2025, Layton received two quotes, one from Deluxe Athletics and the other from Sportsturf. He explained that there were currently a soccer field and baseball field on the site with a three- or four-foot elevation difference between the two, requiring significant grading. The proposed multi-purpose field would encapsulate both fields and could be used for cricket or anything else that required a large field.

Deluxe Athletics provided a quote of a little over $4 million for the grading and a synthetic turf field and about $2.85 million for a natural grass field and irrigation system. Sportsturf's quote was not as detailed, Layton remarked, but included grading, irrigation, and sod, along with a synthetic cricket pitch area, for $750,000 to $850,000. Layton said these quotes were more than a year old, and he was sure they would have gone up a little. He thought $2.8 million was really high and $850,000 a little low. His estimate was around $1.25 to $1.5 million.

Learnard asked about the synthetic cricket pitch area, and Layton said it would be a permanent fixture but could be taken up and replaced as needed. He thought it had a 10-year warranty. It would sit in the center so it did not interfere with other fields. Holland said the synthetic area would just be the pitching and batting area, and Layton said that was right.

Layton offered to seek new quotes if Council was interested in moving ahead on this project now. They agreed that they did. Polacek noted that using natural turf meant they would not have to renew the turf every 10 years like they would with synthetic. Layton also noted the biggest cost would be grading. There was an acre and a half of dirt that needed to be spread over three acres to level those two fields.

Polacek said the intent was for a multi-purpose field where people could go to throw a football or something. Layton said right now this was considered a neighborhood field and that would continue, but it would give them flexibility to add more programs. Learnard asked about flag football, and Layton said they already offered it.

Riley Fields and Track

The track had been re-done at Riley and turf renovations were ongoing, but several other upgrades were needed. One was the conversion to LED lights, which would require replacing the wooden poles. The estimated cost of converting the lights at the two fields would be in the $2.5 million range. The restrooms were still connected to a septic system and needed to be moved to sewerage. The parking lot needed to be resurfaced and repainted. They had a quote of $31,000 to replace the old wooden picnic shelter.

Athletic Field Maintenance

This summer, Recreation crews had installed 147 pallets of sod on City fields and top-dressed the fields with 700 tons of sand in addition to the required fertilization, irrigation, and infield maintenance. This was done by 15 full-time maintenance employees, Layton noted.

Recreation Advisory Group

RAG Chair Erin McDowell first explained the origin of the name Capable Way for the new driveway at Meade, saying if you began the sentence “You are...” with any young softball player, she would finish it with “more than capable!” McDowell said she hoped that philosophy would stay with generations of players throughout their lives.

She read the names of the RAG members and said everything Layton had discussed was something RAG had first debated. Their mission statement said they were committed to providing informed, community-driven guidance in support of the City’s recreational goals. She remarked that they were a diverse group that respected each other's opinions.

She recalled that RAG restructured meetings in order to hear citizen opinions as the new pickleball facility was being planned. RAG was reviewing options for every playground and tot lot. She said she traveled with the Council to see the Sprung Structure in Jefferson as they debated the Kedron Pool project. RAG had looked at Battery Way concepts and judged entries in the Fourth of July parade.

Layton said RAG was a joy to work with, and Learnard said it was a relief to have a group that was a liaison between citizens and Council.

Veterans Memorial Park

James Anderson of Carter & Sloope had used the Recreation Master Plan to come up with concepts for a Veterans Memorial Park on Kelly Drive at the community garden site. He said the concepts were based on community surveys.

The original concept had a farmer's market as a focal point and included a Veterans Memorial plaza, a playground, and an amphitheater. Anderson said they took that and worked around some topography and easements. One goal was to

make the veterans memorial more prominent. A farmer's market would integrate into the site, and he said this was what they presented to RAG.

After meeting with RAG, they developed another concept that included a café-type area with space for food trucks along the parking lot. Restrooms would be added, as well. The amphitheater would be a simple facilty, and the price would depend on what they wanted. He showed renderings of several options.

Holland said he wanted to be sure they had enough parking spaces if they included a farmer’s market. Layton said these were just concepts. He pointed out a grassy area where golf carts could be parked. Johnson noted there was parking nearby at the BMX track.

Learnard said she was surprised to hear that the plan included a farmers market, and Holland said he was, too. The Mayor said she thought they were looking for a veterans memorial, a small amphitheater, possibly a food truck area, restrooms, and a botanical connection of this space to Flat Creek boardwalk, but not a farmers market.

Layton said he thought it would be more of a pavilion/pole barn area that would provide shade. They could use it for picnics, birthday parties, or other events. The farmers market was in the Master Plan, which was what they provided to Carter & Sloope to work with.

Layton said he would focus more on the multi-use purpose of the pavilion.

Learnard said she did not want to compete with the existing farmers market. This park could be considered a relief point from Drake Field for smaller events, and Learnard said it would certainly be a better site for their Veterans Day observances. They would remove the commemorative bricks from City Hall and place them in the same positions at the Veterans Plaza, Layton said. Learnard said there should be an accessible shaded area looking over the memorial. They needed to focus on making this the best possible tribute to veterans. The flagpoles and the monument would also be moved from City Hall.

Option A as presented in the Master Plan would cost about $1.4 million to include the pole barns, the Veterans Plaza, parking area, restrooms, cart charging station, and new trailheads. The playground and amphitheater were amenities that would come later. Option B, configured differently, would cost about $112,000 less, or $1.283 million. The design fee for A was almost $140,000; for B, it would be about $128,000. Constructing an amphitheater would be an additional $250,000 to $400,000.

Strickland said he believed they should do the amphitheater now if they wanted it because it was not going to get cheaper. He thought the playground could be put on hold because there should be some money left from SPLOST to fund it.

Holland asked to see the two options again, and Learnard looked at them to ensure

everything was included. Strickland pointed out the restroom in A was farther away from everything, but it was closer to the pavilion in B. Brown noted that this park would have a new entrance off Kelly Drive. Learnard said she did not see anything that would be a problem for neighbors.

The driveway entrance was the same in the second version of B, and it had two pavilions of the same size. Brown pointed out an area that could be used for cart parking, and Layton said it would be good for food trucks, too. Strickland said they wanted to maintain woods for when they built the walking trails.

Holland said he liked plan B, and Learnard said she did, too, because the Veterans Plaza was visible from the street. It would be lit at night, Strickland commented.

Brown, Johnson and Polacek also supported Option B. Layton reported that B was RAG’s choice as well.

Strickland said they would move forward with robust design on this.

Adult Athletics

Assistant Director Johnson explained that the youth associations were doing well, and now the department was focusing on expanding activities for adults, although they already had an outstanding adult program when compared to other cities.

Basketball, indoor volleyball, and flag football were offered for two seasons each year, and seven grass volleyball tournaments were held in 2026. A new pickleball flex league and a kickball league were planned.

Councilwoman Johnson asked if 18 was the minimum age for adult programs, and the Assistant Director replied that she believed they took athletes at 16, but most were 18 or older.

Projected revenue for the adult programs was about $63,000 for 2026, up more than $40,000 the previous year, for a total growth of about 58%. In addition to the programs previously mentioned, table tennis would be starting in 2027, as would an adult softball league at the PAC during the summer.

Learnard asked where grass volleyball was played, and Layton said it was at Braelinn and Riley. Councilwoman Johnson asked if individuals could sign up on their own or did they have to be part of a team. Johnson replied that teams put out calls when they needed participants or the Department could refer someone seeking a team.

Holland wondered about expenses, and Johnson said the only costs they had were for officials and scorekeepers. There were no equipment costs. They had senta team to a State competition and purchased shirts for them.

Strickland pointed out that changing the athletic coordinator from part-time to full-time was, in part, to grow revenue from adult sports. Layton said they now were

reaching the point where they were maxxing out the athletic coordinator and should be considering bringing another athletic coordinator on board. Johnson again explained that these adult programs were in addition to all the youth activities, which meant they were getting maximum use out of all their facilities.

Holland asked about gymnastics, and Johnson said she had received three quotes on putting equipment in at Glenloch. It would be around $32,000 for the equipment and matting needed for a basic course for preschoolers. If they wanted to do tumbling, they would need a facility with a higher ceiling than at Glenloch.

Holland asked if the existing hockey building would be suitable. Johnson said the equipment would need a controlled environment, not open-air like the hockey rink.

Urban Archery Program

Last year, the City opened 16 zones for hunting along the Flat Creek Corridor, with eight being used each weekend of the program, Layton said. The Department of Natural Resources (DNR) wanted 20-acre tracts, and Layton said he and Josh Petty of Seekin’ Whitetails, were able to capture 12 usable tracts out of the 16, which meant they could increase from eight hunters to 12 each weekend. They also located four additional areas, but due to them being adjacent to the Police Department, it would be open to City employees only. He said they had found two more parcels behind Everton subdivision off of MacDuff.

Layton said he wanted to talk to the DNR about the possibility of issuing extra tags to incentivize the harvesting of does. Last year, he believed hunters waited on the bucks and let a lot of does pass. Last year’s numbers showed 18 or 19 deer taken in Peachtree City.

So far, 300 to 500 applications from hunters have been entered into the lottery.

Applications were coming in from all over the state, but city residents had priority.

Last year, they reserved January for employees only, but Layton said this year, all 12 zones would be open to the public through the end of January. The hunting season would begin the second weekend in September.

Holland pointed out that some hunters were getting deer in their own yards, and those were not reported to the City. He thought those numbers could be substantial. Layton said he believed around 50 or 60 deer were culled last year. He said he was going to ask the DNR about doing a study of the deer population in Peachtree City.

Brown asked about getting specialty tags for Peachtree City so that deer taken in the city did not count against the hunter's allotment of 12. They had looked at the possibility of giving the hunter an extra buck for every doe that they killed. The DNR representative was open to that, but first wanted to visit Peachtree City and check the situation. Brown said to tell the DNR rep that at least 202 deer, and

probably many more, were killed on the road last year.

Layton said he was no longer seeing the bigger deer along the paths that he used to see, so he felt many more were being killed that were reported.

Johnson said she recalled that there were identified “hot spots” for deer. Layton said that was true, but 10-acre tracts that did not have a path or were not near a house were rare. People could invite hunters onto their property, Brown said, and Layton remarked that he had seen posts on social media regarding this.

Frederick W. Brown Jr. Amphitheater

Layton recounted this year’s improvements at The Fred, including a mural on the sound booth, an ADA ramp at the pit area to the accessible restroom trailer, new fryers, and new spotlights. This year saw five sold-out shows thus far, with three shows left. Ticket sales totaled more than 24,000.

Public Art Room

At the Convention and Visitors Bureau (CVB) on McIntosh Trail, there was a little-known amenity—a public art room that could be used for events and exhibitis. They were still decorating with the City and CVB logos, but it was a controlled environment that could be used for wall-hung art.

LED Video Screen

The 16'x9' portable video screen purchased this spring had been a huge hit, attracting 1,200 to 1,500 people to World Cup watch parties this summer. It had been used for movie nights, Fourth Fest, and coming this fall, college football watch parties.

Bike Racks

So far, 20 custom bike racks have been installed, and Layton said concrete pads were being poured at City facilities to install more. Businesses also had the opportunity to buy them.

Playgrounds

The Meade pickleball playground had been ordered and would be installed this fall.

Council had talked about a Ninja course and playground at Braelinn, but they were working through some hiccups. They were working on designs for Battery Way.

Smokerise and Rockspray playgrounds were total losses from after trees fell on them. Insurance reimbursement was $24,000 for Smokerise, and a playground similar to what was there was $60,000. The costs to replace Rockspray were similar. Over the past two years, they had spent more than $17,000 replacing

slides and swings.

Layton was working with a co-op to get designs for the Braelinn Rec Center playground at $500,000, $750,000, and $1 million price points to bring back to Council. They were looking at vendors for the Ninja course there. The estimated design for Battery Way was $250,000 through the co-op. Holland had a question, and Layton explained that design meant they were reaching out to different companies through the co-op and seeing what could be done at different price points.

He said most of Peachtree City’s playgrounds were nearing the end of their life cycles. Replacing his list of 17 would total about $1.25 million. Holland asked about use, and Layton said they were all used, but putting in new equipment would attract many more users. He cited All Children’s Playground and Glenloch as examples.

He showed a photo of one of the designs for replacing Rockspray and told Council it would be difficult to deal with 17 different manufacturers in getting replacement parts and warranties. He wanted them to work with only one or two.

One of things they were looking at was renaming Big Pine Park as Wilder Park in memory of Recreation Director Cathy Wilder, who passed away in 2025. Layton said this park was in her neighborhood and her children played there. Council agreed this was a great idea.

The next step would be to work through all the designs and take them back to the RAG to discuss the design and manufacturer. He wanted a “Coming Soon” sign erected at Rockspray and Smokerise as soon as those were awarded.

He acknowledged $1.25 million was a lot of money and did not include the storm damaged parks. The Mayor pointed out it was the entire SPLOST allotment for playgrounds.

Strickland said Council had said they wanted to do these now, but he suggested they get them planned, then hold off on construction until some of the bigger SPLOST projects were completed, and they knew how much money would be left.

He thought there would be perhaps enough money to double the amount, but, on the other hand, he did not want to build the playgrounds and not have enough money for the fire station. He asked if he was correct in understanding that Council wanted them to focus on Braelinn and Battery Way playgrounds, which also would come out of the SPLOST money allocated to playgrounds.

Strickland said he was comfortable with moving ahead on the project at Braelinn, a playground at Battery Way, the two damaged tot lots and Meade for $1.5 million, but could not recommend spending an additional million right away on the other playgrounds.

Brown clarified that he recommended they proceed with the Braelinn project and Ninja course with the money allocated in SPLOST. Also, with covering the part that

insurance did not at Smokerise and Rockspray, Strickland added. The remainder of the smaller playgrounds would be on hold, Brown continued,

Brown commended Layton for his suggestion that they use one manufacturer, and he stated that did not mean he wanted a cookie cutter design for every playground.

At the $100,000 price point, he wanted two or three designs and two or three paint schemes. However, he did want it obvious that it was a Peachtree City playground.

Brown wanted to move ahead with Braelinn, and Strickland said staff agreed with that. Layton said he hoped that provider could also do the two smaller playgrounds at the $60,000 level. If they could get the others prepped and designed, then they could do all the others together when they were ready, and it might keep the price down, Strickland remarked.

Also, there had been discussion about abandoning some of the tot lots, and Strickland said the Planterra HOA President had said they would probably take over the one there. The kids in Planterra were the only ones who used it, but the City was spending time maintaining it.

Special Events

Major level events were the July 4 parade and fireworks, Shakerag Arts and Crafts Festival, Fall Festival and Movie Night, and Hometown Holidays, Johnson remarked. Second level events included the Father-Daughter Dance, Kids to Parks, Veterans Day, and Derby Day, among others. Series events were Food Truck Thursdays, Sunset Sounds, Family Football Saturdays, Park-lt Permits-food vendors, and Southern Conservation Trust programming. She listed some pop-up events, including soccer watch parties, Movie Night, open gym, teen pickleball tournament, and the Chip Conner Island renaming.

Johnson said she had been with the City almost a year, and it was interesting to look back. They went from 32 citywide events in 2025 to 51 this year, and increase of 59%. Last year, 36 special event permits were issued, and 48 have been issued to date this year, up 38%.

Holland asked about Night Market, and Johnson said it was permitted through the City but was not run by the City.

Layton concluded the presentation by re-stating that all this was done with 25 full-time personnel, 15 of whom were maintenance techs, plus 25 part-time, and 23 seasonal employees for a total of 73 employees that he would match against any statewide.

City Council Open Discussion

NONE

Adjourn

There being no other items to discuss, Holland moved to adjourn at 12:15 p.m. Johnson seconded. Motion carried unanimously.

)

Martha Barksdale, Recording Secretary im Learnard, Mayor