Skip to content
Georgia Commons
Menu

County: Upson County

Upson County Board of Commissioners work session, September 8, 2026

4 pages

These are the minutes as Upson County Board of Commissioners posted them, read from the file on its own website. Georgia Commons is independent and is not affiliated with Upson County Board of Commissioners.

2 of this record's 4 pages were scanned images, read here by OCR: a letter or a number on them may be misread. The file the body posted is linked below.

Copy for LLM, View as markdown, and Send to AI use the Markdown version: the summary Georgia Commons wrote, under a heading that names it, then the record as posted. View raw is the record alone.

Records of this meeting

Each link opens the body's own website or meeting portal.

Summary

Written by an AI model (claude-sonnet-5-5) from the minutes below. It is not the record: the minutes are.

Commissioners discussed proposed zoning ordinance and subdivision text amendments, including data center rules, at a work session; no action was taken on them.

The board held a work session at the Thomaston-Upson County Airport and discussed two sets of proposed text amendments together: changes to the county Zoning Ordinance (Appendix A) and changes to Chapter 78 Subdivisions of the county code to match. The minutes say the board discussed changing the requirement that a data center go through a rezoning, and instead requiring a development agreement. The attached memorandum lists proposed changes by article, including larger minimum floor areas and lot sizes in several residential districts, new setback figures, accessory dwelling unit standards, home occupation changes, data centers by special exception in some districts, and a Gateway Corridor overlay district. No vote on the amendments is recorded. The only recorded vote was a unanimous motion to adjourn.

Topics taken up: zoning ordinance text amendments; Chapter 78 subdivision amendments; data center development agreement; accessory dwelling units; minimum floor area and lot size; road setback changes; Gateway Corridor overlay district; home occupations; churches in commercial districts.

Agenda items (8)

Found in the minutes by their headings. Where an outcome is shown, it was read by rule from the item's own words: a guide to the text, not part of the record.

  1. I. CALL TO ORDER
  2. II. ATTENDANCE
  3. III. NEW BUSINESSA vote
  4. III. NEW BUSINESS
  5. 1. Increase minimum floor space from 1,008 to 1,200 square feet.
  6. 2. Remowe home occupations from pemnitted principal uses in F-4
  7. 3. Audd accessory dwelling unit standards as penmnitted accessory uses in R-4
  8. 4. Remowe home occupation a5 accessory use requiring special excephons m R-4
  9. IV. ADJOURNMENTAdopted

Answers are written by AI from this document, and every quotation is checked against it. Not legal advice.

The minutes

As posted on upsoncountyga.org, read November 25, 2026. Nothing below is written by Georgia Commons.

UPSON COUNTY BOARD OF COMMISSIONERS

Work Session Tuesday, September 8, 2026 3:00 P.M.

Thomaston-Upson County Airport

AGENDA

I. CALL TO ORDER

Vice-Chair Christopher Biggs

II. ATTENDANCE

Vice Chair Christopher Biggs, Presiding Commissioner Benjamin Watson Commissioner James Ellington Commissioner Paul Jones County Manager Lonnie Joyce County Clerk Jessica Jones County Attorney Heath English

III. NEW BUSINESS

a. Discussion on a Text Amendments to multiple articles of Appendix A entitled the Zoning Ordinance of Upson County, Georgia to address multiple concerns and provide new regulations for multiple zoning districts

b. Discussion on a Text Amendments to Chapter 78 Subdivisions of the Upson County Code of Ordinances to address regulations due to the changes to the zoning ordinance of Upson County

The board discussed both of the text amendments together with the memorandum. The board discussed changing the requirement of having a DATA Center do a rezoning and require a development agreement.

14.

15.

16.

17.

Article

Add the definition for “dwellimg, Accessory Dwelling Van (ADUY

Add the definition for ‘divelling, ty 'cottage home®

Remove the defimtion for ‘travel trailer” by prewioushy adopted Ordinance 252 Remowe the definttien for ‘travel trailer park’ by previously adopted Ordinance 282

3 — Addition to Overlay Districts

1.

Article

1.

2.

3.

4.

g.

o.

FRewise to include the Gateway Cormidors (GC-1) m the list of established districts to reflect previously adopted Ordimeance 279

4 Clarifies amendments to the appeal processes by previously adopted Ordinance 280 regarding the time frame for a public hearmeg, speaking time limits at the heanmneg, and postponement procedures

FRewises procedure to clarify that all appeals will be handled by the Board of Commissioners, not the Planing (Commission.

Clarifies that use variances are not allowable and that granted warlances must be lomited to the mmmmum extent required to accomplish the applicants need to resolve the hardship

Clarifies amencments to the appeal process by adopted Ordinance 277 that the planning commission wall make a recommendation to the board of commussioners and the board of commussioners will make a decision on a variance application based on enumerated review standards.

Clanties that all variance applications will be heard and decided upon by the Board of Commissioners and that appeals of variance decisions, which are quasi-judicial decisions, will ge to the Superior Court.

Clarifies amencdments to the official zoning map by previously adopted Ordinance 280. Adds text that states the adimmmustratwe officer will rewiew the rezonme application and prowide an assessment of its compliance with requirements. Adds text clanfying public hearme requirements and postponement procedures for the rezoning process.

Clanfies that the board of commissioners may not apply conditions that require rewersion of rezoning approval Conditions requiring the administrative officer to revisit an approved rezoning may be umposed, particularly under circumstances when development milestones noust be met.

Fewises to

Adds section 411. Modification of Previously Approwed Zoning Conditions which establishes purpose, application requirements, and procedures for modifications to conditions of zoning.

Article 5— A-RK Zoning Modifications

1.

2 3.

4

oh La

10.

11.

12.

15.

14.

15.

16.

19.

20h 21.

Increase minimum floor space from 1,008 to 1,400 square feet

Rewises the penuittable uses of apritourism on a five-acre minimum to include a list of allowable activities Remove home occupations as a penmnitted prncipal use

Fewise to clarify RV parks and campgrounds are not Included im ‘recreational facilities” as a permitted special exception by previously adopted Ordinance 282. Added text also clarifies that the expansion of existing RV parks and camperounds is also prolubited except where the Sprewell Bhatf Master Plan provides for such expansion in the future per adopted amendment.

Remove cemeteries as a pemnitted special excepton

Revise to replace “guest quarters’ with ‘accessory dwelling units* and adds additional text on allowances regarding attached and detached ADL’s

Include home occupations as pemmuitted accessory ues

Include reference to the abbreviated special exception review process previously adopted with Ordimance 277

Fewise to exclude cemetenes as pennitted special exceptioms

*

Revise to add text to state: “Auny sumilar or compatible use mot listed within the pemuitted uses section may,

at the discretion of the Planning and “ommeg Dhrector, be presented as a Special Exception and im such case

shall follow the Special Exception procedures as defined in Sechon 409_*

Revise to add newer ordinance references

Increase minimum heated floor area from 1,008 to 1,400 square feet

Increase minimum lot area for unsewered areas and sewered areas to 5 acres

Increase minimum lot width to 200 feet

Revise to state that the front of all buildings must be at least 100 feet from the front property lire.

Increase setback from arterial street='Troads from 35 feet to 100 feet. Increase setback from all collector

roads and all other streetsroads from 35 feet to 73 feet.

. Revise to clarify that only one principal building per lot is allowed. Remowe text that included all exceptions to this regulation

. Rewise to clanify that landlocked parcels must othenaifse meet all 4-R distict damensional and size

requirements

Revise to increas: minimum street frontage from 30 to 200 feet with the exception of lots fronting on a cul-

de-sac.

Revise to add modified Panhandle or flag lot requirements including requirement for variance

Revise to include exceptions for height limitations

Article 6 —R-1 Foning Modifications

Bh

10.

11.

Remove home oocupations from pemmitted principal uses in F-1

Add accessary divelling unit standards as permitted accessory upes in R-1

Add home occupation as accessory use in R-1

Remove home oocupation as special exception m F-1

Revise to remowe allowance for mamuofactured home of tavel trailer for temporary use at comstraction site Establish minimum lot area for sewered areas with public water to ome acre, the same as unsewered areas Revise to clarify minimum lot width, 100 feet for lots served by public water, 150 feet for lots not served by public water

Decrease setback from arterial streetsroads from 100 feet to 73 feet. Increase setback from all collector roads and all other streets/roads from 35 feet to 50 feet.

Fewise to clanify that landlocked parcels must othenaife meet all R-1 district dumensional and size requirements.

Revise to clanfy minimum street frontage with the excepthon of lots fronting on a cul-de-sac.

FRewise to add modified Panhandle or flag lot requirements inchading requirement for variance.

Article 7—R-2 Zoning \odifications

AM Be

ad

Remove home oocupations from pemmitted principal uses in R-2

Add accessory dwelling unit standards as permitted accessory uses in R-2

Add home occupation as accessom use in R-2

Add home oocupation as accessory use requiring special exceptions in F-2

Remove allowance for manufactured home or travel trailer for temporary use at comstmuiction site Establish that upnsewered areas shall be at least ome acre with public water or with well water.

Revise to clanfy that the minimum lot width for lots served by public water shall be 100 feet and for lots mot served by public water it shall be 150 feet.

Decrease setback from arterial streetsroads from 100 feet to 30 feet. Increase setback from all collector roads and all other streetsroads from 35 feet to 50 feet.

G. BRewise to clarify that landlocked parcels must othenaise meet all R-2 district dimensional and size requirements

10. Rewise to clanify minimum street frontage with the exception of lots fromting om a cul-de-sac.

11. Revise to add modified Panhandle or flag lot requirements inchading requirement for warlance

Article 9 — KR-4 Zoning Modifications

1. Increase minimum floor space from 1,008 to 1,200 square feet.

2. Remowe home occupations from pemnitted principal uses in F-4

3. Audd accessory dwelling unit standards as penmnitted accessory uses in R-4

4. Remowe home occupation a5 accessory use requiring special excephons m R-4

3. Remowe allowance for manutachured home or travel trailer for temporary wse at comstmiction site

6. Increase muinmitnowm heated floor area per dwelling wnt from 1,008 to 1.200 square feet.

7. Establish that minimum lot area in unsewered areas with or without jointh camed commen areas shall be one acre with well water or with public water.

&. Rewise to clanfty minimum lot area in sewered areas with or without jomtlh; owed conmumon areas that it shall be ome acre.

Oo. Rewise to clanfy the minimum lot width shall be 100 feet with public water and 150 feet with no public water.

10. Rewise to add requirement for front of buildings to be at least 30 feet from the front property line on all

streets/roads_

11. Revise to clarify that landlocked parcels must othenaifse meet all R-4 district dimensional and size requirements

12. Rewise to clarify minimum street frontage with the exception of lots fronting on a cul-de-sac.

135. Rewise to add modified Panhandle or flag lot requirements inchading requirement for warlance

Article 10 — KR-5 #oning Modifications

1. Increase minimum floor area fom TOO square feet to 1,000 square feet.

2. Remowe home occupations from penmmitted principal uses in R->

3. waded iechode accessory dwellimeg unit stamdards as pemmitted accessory uses in F-5

4. Remowe home occupation as accessory use requiring special exceptions im F-5

3. Remowe allowance for manufactured home or travel trailer for temporary wse at comstruction site

6. Increase muininum heated floor area per dwelling wnat from TOO square feet to 1,000 square feet

7. Establish that the minimum lot area for sewered areas shall be ome acre with public water or with no public Water

8. Rewise to clanify the minimum lot width shall be 100 feet with public water, 150 feet with no public water

So. Decrease setback from arterial streetsroads from 100 feet to 33 feet.

10. Rewise to clanify that landlocked parcels must othenaise meet all R-3 district dimensional and size

requirements

11. Revise to clanfy minimum street frontage with the exception of lots fronting on a cul-de-sac.

12. Rewise to add modified Panhandle or flag lot requirements inchading requirement for warlance

Article 14— 0-1 4oning Modifications

1. Remowe churches, synagogues, chapel, or other place of religious worship or education from as a penmnitted

principal use.

Article 15 — C-1 #oning Modifications

1. Revise principal permitted uses to include cleaners, salomsbarber shops. laundromats, etc. as an example

2. Rewise to specifically prohibit drive-thru windows in C-1

3. Fewise to state that gasoline service stations should hawe a minimum of four pumps

4. Remove churches, synagogues, chapel, or other place of religious worship or education from as a penmnitted special exception

Increase mininuum heated floor area from 1,008 to 2,000 square feet

Decrease setback from arterial streets‘roads from 100 feet to 33 feet.

. Increase minimum street frontage from 30 feet to 100 feet

qa

Article 16— C2 Zoning Modifications

1. Rewise to inchade “flex space’ as a permitted prumcipal use

2. Add new text to state that churches, synagogues, chapels, or other places of religious worship or educational instoacten are permitted privcipal uses m (C2 districts with specified development standards

3. Add construction contractor offices as a pennitted primcipal use

4. Pewise to increase setback from arterial streets/roads from 35 feet to 100 feet.

Article 17 —~ C-3 Zoning Modifications Add new text to state that churches, synagosues, chapels, or other places of religious worship or educational instactien are permitted privcipal uses im C—3 districts with specified development standards FRewise to remowe churches, synagogues, chapel, or other place of religious worship or eduweation as a pemnitted special exception

Add EV charging stations as a pemmitted use

Add flex space as a permitted use

Add EV charging stations as a pemmitted use

Adds Data Centers as a principal use pemmitted by special exception with stipulations (Section 1804.56) FRewise to clarify the minimum lot width shall be 100 feet with public water, 150 feet with no public water Increase setback from arterial streetsroads from 35 feet to 100 feet. Decrease setback from all other streets from 100 feet to 35 feet.

1 2 3 Article 1% —TV/M_-1 Zoning Modifications 1 2 3 4 5

6. Revise to clarify minimum street frontaze with the exception of lots fromting om a cul-de-sac.

Arti 19 — DAL? Zoning Modifications:

Add flex space as a penmitted principal use as previously approved by Ordimance 281

icle

1.

2. Add EW charging stations as 2 pemmuitted principal use 3

4

Adds Data Centers as a principal use pemmuitted by epecial exception with stipulations (Section 1904 89) Increase setback from arterial street=roads from 35 feet to 100 feet. Decrease setback from all other streets from 100 feet to 35 feet.

3. Rewise to clarify minimum street frontage with the exception of lots Gromting on a cul-de-sac.

Article 21 —GC-1] Gatewav Corridor Standards

1. Add text stating purpose, boundaries, and development standards for the Gateway Comidor overlay district.

article 24

1. Add text to state that the administrative officer shall “Generally interpret and enforce the zonme ordinance”

IV. ADJOURNMENT

A motion was made by Commissioner Watson with a second from Commissioner Ellington to adjourn the meeting. The motion passed unanimously.

RESIGNED ___

Chairman - VACANT Commissioner Christopher Biggs, Presiding ____________________________ __________________________________ Commissioner James Ellington Commissioner Benjamin Watson

Commissioner Paul Jones

Machine-readable https://georgiacommons.org/meetings/2026-09-08/upson-county-board-of-commissioners-work-session.md · https://georgiacommons.org/meetings/local/index.md · MCP https://mcp.georgiacommons.org/mcp

Upson County Board of Commissioners work session, September 8, 2026 | Georgia Commons