The second thing is that, uh, this is a, a huge document. Uh, thank, thank you all for getting your questions in and getting them to them so they can- they can look at it. Uh, what I would ask of the board is to, uh, ask your questions, get your questions answered. If you have suggestions for changes or you want so- them to look at it, please be brief and be, uh, considerate of everybody's time so everybody can get their answers in. I didn't, I didn't specifically write any questions 'cause I read y'all's and most- most of what y'all wrote is the same things I had in mind. So- Yeah. But, but there's a lot of stuff in here that, that, that we're not gonna be able to cover, and, and we're not trying to change everything. It's just some things in here that, that, that concern us, and we want to understand it. Okay? That's basically mine. Anybody had... Done, uh, asked questions that I haven't. That you wanted answers to. Okay. With that, uh, we'll get started. Uh, uh, you guys have any comments to begin with? I just... We gave you the presentation last week, and we are here to answer questions and just have, have conversations, so we're just gonna let you kind of direct us with where you want it to go. But I mean, we have looked at the, what you sent, so we can start answering those, but I figured we could kind of guide the conversation. Well, let's just start that way and, uh, we'll start. Melissa, you have them all, I think. Um, yeah, I'll just start- I do ... today and if anybody has, uh, you know, any additional questions, we, we can go through them. Okay. Well, we'll just start with accessory dwelling units. So I believe that was the first attachment I sent to you guys. Yes. Um, and basically, it's just wanting to know... This is from Mr. Blake. We originally started with accessory dwelling unit early on, and then at some point it transitioned to guest house, guest cottage- Mm-hmm ... however the verbiage went. Where did... Like, where did that re... Like, where did that terminology... What was the point that made it change from accessory dwelling unit or full house or garage apartment to just a guest- Yeah. So if I, you know, recall this correctly, we'd been going with the ADUs, and there was a lot of conversation discussing, discussion regarding allowing an ADU being perceived as an increase in density on the property. And so there was a lot of concern regarding allowing it to be a true accessory dwelling that could be occupied full time, rented by non-family members, and kind of utilized as a, you know, additional stream of income. However that other, you know, the primary property owner wanted to be. And then also, if it would lead to future increases in subdivision of those properties when they were sold because you suddenly have two houses on one property, quote unquote, even though it should just be an accessory and not primary. So that guest house is something you already have in your ordinance, uh, as it is, right? Mm-hmm. 'Cause I think we ended up retaining that language and updating it. We, like, brought... We carried over what you had existing, and we updated it with the, I think maybe the 50% standard, where we kept it smaller than the principal structure. And then Mida's added some extra standards for parking or the look of the building has to match the principal structure also. Um, yeah. So a lot of it was just the guidance from, um, those members who were in, both the staff and the different board members in those project team meetings we had over the last two years, year and a half. Ha- have you gone back and took a look at it since the staff met and we, we met? That, that, uh... I think we're going a step too far in limiting, that people can only stay there a certain amount of time and, you know, eliminating the kitchens and all that. You know, from, from my point of view, I think we went a step too far. Which could be the case. So based on the, the board meeting, the special called board meeting last month, we were going to remove the kitchens, the not allowing kitchens, so we are going to put that back in. And there was... What else was there? Yep, we talked about reinstating allowing that full kitchen use. Okay. And then I know we also spoke about not, not regulating who can stay- Yeah ... duration of stay. So that's definitely something that we were going to update, just didn't make it into this. Okay. But you are all looking at that? Yes. Yes, yes. That is the plan to update that. Yeah. So the, the draft you have and what I put to be posted on the, the county website did not capture any of the, the comments really that we had had since the, the 26th, the August 26th board meeting and the discussions we had with you. We wanted to get through at least this meeting and probably the, the first public hearing, so next week, your planning commission meeting, to kind of, before we went and did a, like, a major update. Okay. Yeah. I thought, I thought the, um, the change of terminology from ADU to guest house was an attempt to really emphasize- No permanent dwelling- Okay ... you know, it needs to be a short-term stay for guests and so forth. Um, but I, the research that I've done is that this is a... that ADUs can be used just fine for, you know, c- children that are, you know, very short-term, you, you know, a few months, years, whatever, elderly parents, uh, those kinds of things that I, I just, I just feel like it shouldn't be limited to short-term stays. If, if the owner of the property, who should be living on the property in my opinion, uh, to have an ADU on it, um, you know, wants to do whatever with it, then so be it. We need to, we need to regulate where it is, what it can be used for and then after that, we would never know what they did with it unless there's a- Unless there's a complaint, yeah ... complaint or something anyway. So I think if it's close to the principal dwelling, and I don't know what that distance needs to be, um, if there needs to be. Maybe it needs to be, you know, left up to our zoning administrator. I don't know. But, uh- Well, that might be a good question for Eddie, just for fire and safety. I know a lot of it now with permitting has to be 20 feet- Mm-hmm ... between. And it may be something where accessory dwellings have to be attached to the same septic system. But will health, environmental health allow that? Yeah, they will. It- they will, yes. Okay. And I, I, I would, I really think that's going too far. Yeah. I mean, the way I see it, an accessory dwelling, if, if, if a guy has enough acres of land and, and wants to cut off, or not cut off, but allow his child or mother or whoever to build, you know, if, if it's, if it's the setbacks are... Why sh- why should we say it can't be more than 100 feet from this one, or it has to be attached or whatever? You know, I just think that, that accessory dwelling should be basically left as it was. As the former guest house language was? Yeah. I mean, guest house- Okay, well- You can have two homes. You can have a guest house, and you can have an ADU. So your ADUs right now, is that all a special use process? No. It can be by right? It's your zone, correctly, yes. Okay. And it's allowed in A-1, A-2 and AR. Okay. Does it have to be able to be subdivided to, to stand on its own? No. Okay. And that's where the challenge runs into. Yeah. Let's just go ahead and talk about the elephant in the room. Yeah. I mean, you, you brought it up in your initial. That's the way that ADUs have been perceived in certain municipalities, as an end around density, if you will. And it's, uh, been a way to have a secondary residence, whether the purposes are stated or not, but then what happens when that's where the challenge that we haven't been able to... We're, we're not even talking about. But it's not a question if. We've had it come to us on the front side where somebody says- Mm-hmm ... I want to build this. They're self-funding it. They're not able to complete it, then they come to us because they've run out of funds. Well, they don't own the land. They can't get a loan to finish the ADU. That was our first into the other side of this that they're talking about there. Yeah. And, and that's, that's my concern, and my question was, and it wasn't a question, it was a statement, we needed to u- look at our residential zoning classifications to help. Because an ADU as currently done is just an end around- So- So weird ... what we're- To AR. Uh, so I guess... I think there's two ways you could do it. We could do it through... Well, first let me say one thing. Y'all have the hardest job, and you're never going to make everyone happy. Absolutely. Like, it's just not, it's not possible, and this is, this is where it gets really, really hard because they can come up to you and they can tell you these things. You know them personally. You go to church with them. Your kids play together. You know, whatever it may be. And sometimes to enforce your regulations, you have to say no, and that's really hard to separate that personal relationship y'all have, how you got elected in a lot of the ways, with what your code says. So there's, there's kind of two ways we can approach it. We can try and provide these very clear regulations that say it has to be secondary, it can't be further subdivided. You know, we can put that in, but then when they cal- come and ask y'all to allow them to do it, you know, it puts you in that sit- you know, that difficult situation. Um, so I think we can try and build out standards that you feel comfortable with. I feel like we've been trying to do that a lot, which has brought us, you know, ADUs, no ADUs. Now we're calling them guest houses to make it more appetizing. We don't put a kitchen in so that they can't be full-time residences. But we're not going to be able to make everyone happy. So I think where we need direction is, what is your comfort level? Are you okay calling it a guest house and knowing that people are probably gonna rent it, they're probably going to put a full kitchen in, and you're just going to have to enforce it through code enforcement if you get a complaint because you don't allow a rented ADU? Do you want to go ahead and allow an ADU to be rented and then have regulations around how that is managed? And you can still have a guest house. We could still keep a guest house classification that's used for friends and family, but the hard part is, is- I can't write into the code that, you know, your son, daughter, granddaughter can live in the guest house full time when some, you know, I can't have... If I own that same property, I can't have Liz, who's my coworker, living out there full time. Mm-hmm. I can't just say because it's relationship based that it's okay. Yeah. Um, and so- Can I say something? I don't like the term guest house. I, I, it, it's common terminology to me with looking at other, um, counties and their plans. The, the ADU is a common term, and it's defined pretty much the same way universally in my mind. In my mind. And so that's what I was trying to institute here, was to get away from the independent home on the backside of the 10 acre, you know, and bring it back as a subordinate of the principal dwelling. That's, that was my- So one way we can- I think- Oh, go ahead, Carolyn. Um, I understand what you're saying, but one, the way I look at, we're just, uh, recommending for it, so we don't make the final decision. Mm-hmm. So, but the way that, um... I'm sorry I'm late. Now, you probably might have answered this or you might. But what we're looking at is, um, like he said, if people have enough acreage, and we have it in the... What area is it in? A- 1-2 ... A- A2? A-1? Mm-hmm. Okay. Those are usually people with farms, got large farms. Yeah. That's why they come to us with ADU, because they have children that, or somebody that needs to come in after they gotten a old certain age- Mm-hmm ... that they need help with. Mm-hmm. So I'm with the guest house, um, I get the, that from California where they do have guest houses and people do live in them long-term. Yeah. But here, like, it's, it's common ADU. It's, and guest house to me is like a pool house or something. Mm-hmm. So to me, I think we, it's, it's still needed. But like we said, if we, we have to go by the rules, like when he said that, um, people come in here and run out of money, that should not be something that comes to us as, and it's already listed in our ordinance that, you know, there's only certain, certain, um, things that you can come to us that we can make a, what is it? Greater variance. Yeah. Yeah. So those should be already followed. Mm-hmm. You know, so that's what I'm saying. But ADU should be still in our, in our ordinance because those are where they come in. Okay. And also, I had a question, I don't know if you answered this, where you said it- There's some questions starting off in here first. Okay. Then we, we, we're talking about ADUs right now. Yeah, ADUs. And then we'll move on. Yeah, what is ADU. Where you're saying it can only be 50% of the- The size of the primary. Okay. Now, if I... Like, some of these houses are not that big. I know. Mm-hmm. It might be only 800 square feet. That- So where are we gonna, where does that come into? How do you- That's something we've struggled with- Yeah ... in other communities, and I don't know if I've seen it addressed in our- Yeah. Then, then you're getting into the tiny house type thing. I'm, I'm not sure which- Which is not the goal. Which is not the goal. Okay. Can I ask this one? I ke- can- Go ahead. I, I like ADUs, but there ought to be certain restrictions on the size that you put them on, the size of the house that you make, like 50%. That way, 'cause right now somebody coming in there with a ADU, ADU house, there's no size limit on it. It could be bigger than the house that, that you actually live in, way out the ordinance is right now. It should be set up to have a certain size limit. If you got a, maybe your house is 2,200 square feet, ADU lot should be but 1,100 square feet. There should be a size limit on the ADU. Well, yeah, but it should, but- Okay. That, um, yeah, I, I don't know if you got the email I sent. Um, you? Yeah. Okay, good. So, you know, um, I just feel if you, if you have some land large enough and, um, you should be able to put a second house there for your parents, your children. Maybe you're an elderly farmer and now you need a farm manager. So it has to be a, a house that's, it's, it's, it's an acceptable place to live and not just, you know, a tent in with a kitchen. And, you know, what are they gonna do, take away a bathroom too? Um, you know, I, I, I just can't see them, you know, w- with such a, it's a need. If you've got the land- Mm-hmm ... you deserve a second house. There needs to be restrictions, but that's something we need to address this. All right. I think that they probably have what we, the way we feel about ADUs, but we could discuss ADUs all night. Yeah. So I wanna, I wanna, I wanna make this concise. Let them know what we think, and they're the ones that's gonna rewrite this thing. Well, because here's what- And we can't rewrite it tonight. Here's what I'm gon- I think what we'll end up doing is take summaries from both of our conversations and kind of try and put together a recommendation to the board. And so we'll probably draft that and send it to you, and it's probably not going to make... Uh, 'cause you guys have differing opinions. Sure. But if we can send it to you and say, "This is, you know, we're recommending it not be called a guest house, it be called an accessory dwelling." But we allow this or we, you know, kind of propose some updates to the code. Because clearly everyone here is pro the ADU. Mm-hmm. But where do we come to rental versus non-rental? You do what you want. Do what you want? We don't have the infrastructure to be able to- I mean, I agree. I just- I, I, I'm just... That's my opinion. I'll jump in there. I believe most likely w- the counties that y'all have worked with are probably a couple steps ahead of us in regards to this. I mean, this is the first time we are instituting this since 1994. Really. Okay. And I, once again, I tried to look at surrounding counties on that. Yeah. That's the reason I'd like a little bit more time to be able to look at this and really be able to compare what does Walton County, Etowah, and Gwinnett County. But it's not the same anymore, of course. Mm-hmm. Wasn't it- To really be able to compare ... Franklin that you mentioned that was- Yes ... undoing it? Okay. I- No, no, they're not undoing it, but they're, they are- They're not- They're not happy with it ... happy with their final product. Right. Yeah, after the product- And nobody's gonna be happy, I agree 100%. I want it out there. Nobody's gonna be, uh, happy 100% of the time. Mm-hmm. Uh, in that, definitely. But yes, that is the county. Okay. Attlesboro County is already in discussions because they're putting ADUs on little properties. Oh, yeah. Well, they've, they said no. So that's, that's done. Yeah. Right now. We'll come back up. Um, so call it ADU. Maybe we are either silent on the rental so it's not explicitly... 'Cause we can be silent on certain things. And if it's silent, you can work with your attorney to decide if he, if he wants to pursue citations if issues do come up. Um, remove the kitchen restriction and, but still 50% of the maximum house. Try and see what we can do for small homes. Um- I think putting a cap on it, period. Yeah. Like, you have a, a- So- ... 6,000 square foot house, I don't know who would, but if they did, then why would you want a 3,000 square foot accessory dwelling? Right. So I think we can- I think there needs to be a cap ... a maximum of 1,200, either 50% of the home or a maximum of 1,200 square feet. Yeah. That's right. 'Cause I'm still trying to look up ADU. Okay. Well, I think, and I don't wanna get stuck on ADUs all night. I know, I know. Because we got a lot of other stuff to cover. You guys know coming from- Yeah ... the conversation what you need to do, what you need to look at. Yeah. I'd like to move on to the next topic. Yeah. Because we could, we, we could spend till 4:00 talking about changes in ADUs. I like the idea of you taking the information and putting something together. Right. That's, uh, I think that's what we're here for, to give you something to think about and to work on or to hear our opinion on. Yes. And so we'll wait to do that until after next Tuesday, though I figure Tuesday if there's comment, a lot of it will maybe be from the public. We'll see. Um, but hopefully you get a lot of your comments this, this hour. Sure. So next thing. Ruth? Um, we can either just continue down one if y'all want to, or we can jump around. It looks like there is a consensus about where the reduction in lot size is. Yeah. I was gonna say I said a lot size was- That was kind of- Yeah, that's a good one ... since how did we go from 25- To 15 ... and then 10 and then four to drop to those. Oh, that. We went back and forth a lot again with this. Um, and I think this is, it's... There was a feeling that the current sizes are too restrictive because they're too large, and that's probably not the right way to say it. But it was, it was essentially like 25 is too big at this point in time. You don't have people who want to own that acreage. Mm-hmm. It, obviously ignoring farms. I'm not talking about true agricultural land. And because we, we talked this through a lot. Yeah. We went back and forth on it a lot. It's had at least four iterations of- Of different- ... the numbers ... lot sizes. Um, I think this was sort of a discussion on what that, what parcel sizes, what lot sizes are realistically being seen in the county. So it's an attempt to match what people are asking for with what is policy direction comfortable with, so. Well, I think that A1, from what we've had to go through, A1, A2- Mm-hmm ... we don't have a problem with. AR is where we- You talking about at the current? At the current. At the current. What, at the current, so, you know, A1 is 25, A2 is 10, and then AR is 4. And that's when we started running into a lot of discussion or whatever. Uh. So- You know, because we fought from, we fought a long time from four to two. Yeah. Did we end up at- And you guys recommended three. I think we ended up at three just as a compromise. You recommended- Can I say something? Wait a minute. Oh, okay. Let him finish, please. Oh. Before you go, a- and you cut it to three, but then you put something in there that- Yeah ... that, that really complicates things, is that- Yep ... in certain cases it can be two. Well, we can take that out. This was, again, we were- We tried to accommodate you guys in a lot of ways. And that was probably partially on us. We should have maybe been a little more firm and said, "No." No. Okay. But, so if you aren't comfortable with that way to allow that two acres- Okay ... we, we can strike that. I, I'm not- That's what I was saying We have, and, and I know you looked at it, we have a lot of non-conforming- Yeah ... lots out there. And that's when we went from two to four, that's how they produce. Yeah. So why not go back to the two, and then discuss the three or whatever. Because it was confusing about, okay, you, you have to have three, but you can have two. We already got those twos out there. I think that's why. Yeah, I... That's why we went or why we attempted. I'll say attempted to build flexibility with that 2.1 sub and the criteria for reducing it to two was you have the non-conforming parcels at two acres, and you move back to the four acre minimum. So the three acre minimum was an attempt to find middle ground that it sets policy that you want to see bigger AR parcels than what you're seeing, but it's kind of in the same vein. They're not too different from that one acre difference from what you already put in the county. You know when you're trying to please everybody. But yeah. Yeah. And you can't do that. Yeah. You now have the non-conforming. Well, the non-conforming is gonna be non-conforming. No, I know. But I'm saying you have a lot of two out there. Yeah. If it goes to two, then that's why I said, why wouldn't it, the two remain? Because you already have those. Those will bring those back into conformity. Well, because people felt that two acres was too small for a true agricultural residential property. That two acres just wasn't enough land. You needed more to truly have that- Ag intent ... that rural preservation intent to keep lot sizes large. That's what Okay. Yeah. Now- Our comp plan says that rural conservation land use is supposed to be large, large parcels. Mm-hmm. But large is a- Your large parcel- Large ... is so different- Right ... scale than a lot of other places. It depends on where you live as to whether something's large or small. Two acres is large. And I think, I think the pressure that you are seeing and you're struggling with is you have a lot of these really large A-1, A-2 parcels that have been generational farms and even if it wasn't farmed, in family land. And now they want to be sold, and that's where you're having that pressure to rezone to smaller properties. So I think one of the reasons we dropped those lot sizes some was to try and keep some properties in A-1 and A-2 and still keep agriculture as a primary zoning category by, but recognizing that there is a trend towards smaller lots overall. Does that help explain it? Well, I tell you what, I'm just gonna give you my personal thing. I think you need to leave A-1 and A-2 alone. AR, you need to set an acreage, whether it be four or three or two, and not put that- We may have to- Can it be this or can... Because that just, that just makes it more difficult and, and really hard to make a decision on. Okay. Mm-hmm. Yeah. That's just from my perspective. No, we agree. Let me add this about A-1. We used, we used to have a five-acre A-1. We moved that to 20 acre. If I remember correctly, primarily because that is generally what it takes to build- A commercial operation ... a commercial poultry operation. We don't have really anything else capable besides except poultry. Um, but when we talk about lowering A-1 to 15 acres, and then I think I, I saw in here where you can have up to four poultry houses on 15 acres. It's gonna make- Well, four poultry houses won't fit on 15 acres. The... So my argument back would be that's okay. Yeah. They could either put one or two, or they, if there needs... But I see your point. Yeah. So I was thinking, well, what's the reason for going A- to going to 15 in the first place if you can't put four poultry houses on it, which is typically the standard? The starting, that's what the contract would be. Um, you know, why are we even bothering with it? I, personally, I'd rather keep it at 25. Okay. So I think it's- It can, but that's my opinion. So let's leave definitely A-1 at, at 25. Yeah. Per the recommendation. And A-2, are you all comfortable at 10 acres or...? Yes. Yes. 10 to 35. Okay. And then we'll go with three for AR. And we'll- Whatever you decide. Nope. I'm just, I'm just calling it. Three, four. Some of us want four. Nobody, no. Justin, you're the one that wants- I am the one who picked three, so I'm not putting anybody on the spot. You've got arguments with that, but four or three. We already had that discussion and you compromised it. And you got three for eight is a good compromise, I think so. But how many? You don't have no three acre lots. Well, just a tidbit of information for conservation. The purpose is not to look back. Yeah, I know. The purpose is looking forward. It doesn't matter what... I know, but- For conservation you have to have 10. For conservation or timber you have to have 22 or more. Is- Sitting in a conservation easement. Okay. They will not accept any application with less than that. Well, we've got a program where the last two acres is all woods. So 25 is good. Yeah. And then I think A-2 being- I just learned that. So yeah. Yeah. It has to be at 10. Or eight or even two. I think A-2 at 10 for the cougar makes sense. Well, and you have to have 12 if you want to put a home on it because they count the designated two for your habitat and, and your. So then the other 10 could qualify as a conservation easement. The restrictions are that. But now you have to have 22 acres. Yeah, I did hear that. Or they won't even accept it. So all right. And, and we have here data from 2024 for rezoning cases but, you know- Y'all had 15 on the last one. You're gonna have close to 15 on this upcoming one. Are the requests... What are the rezonings from? Ag to what? Like, what are you being asked? Or is it not residential? Is it other things? Well, most of them they wanna cut off and, and give, give that child or whoever- And I think that's where- Or- -we've started to see a lot of these A-1s getting rezoned to AR, because you wanted to accommodate that, that split for a child. Mm-hmm. And that's where we've run into the complications. Well, and a lot of our A-1s... Oh, sorry. No, go ahead. Are currently lawfully nonconforming. So you have an A-1- Yeah ... that is, like, seven acres. Yeah. Well, because it used to be five. Correct. Sorry. Um- And then I'll jump in there. Once again, the use of ADUs is disproportionately, I would imagine, I don't have the data, but just the number that we, we utilize ADUs under- For ... under AR, 20% of the time. It's primarily- That, that is a lot of what it is that we do. And then there is also the cutting out for an AR for a child, whatever. Mm-hmm. Whether it's two, three or four, whatever the number is, out of a parent parcel, an A-1, A-2 or a nonconforming. Mm. It- that is what we see a lot of our cases revolve around. And we have s- we have some that got, wants to cut R-1 out of, out of A-1 or A-2. Yeah. We got one coming up next week. It's R... What is it? R-2. R-2. R-2 out of a, you know, rural conservation area. A-1, which our comp plan says is unacceptable. Mm-hmm. Yeah. So, okay, I think we have... We're good. Good or relevant. Yes. Decision-making. Now P- PUDs and TDRs. Is that the next good place to go? Well, I mean, let's go ahead and talk about road frontage. Okay. Since we're already talking about lot sizes, that was one of the things on here. Yep. I know we kinda discussed this the last one. But it, I- I'm, I'm a little confused. I don't know if anybody else is confused at all. I second. I third it. I'm confused too. 'Cause I'm pretty sure y'all have heard this, it's like a broken record. We are currently using minimum lot width- Mm-hmm ... as our road frontage. Yes. But going forward, what is the standard road frontage? I think we decided on- Is it 30 feet? 30. Is it 50 feet? Is it... So it's 30 across the board. We decided on 30 feet to match the easement requirements. Oh, or did we discuss upping it to 50? We did discuss if you wanted to h- make sure there was decent separation between driveways. That was one of the options. 'Cause 30 feet is the minimum for easement width. Right. And then we could do 50 to add that additional 10 feet. Well, I just wonder if 150 is too much. So- It, it has flag lots. And, and- Yeah, and... Um, I also... I see what you turned to. Uh, where was I going? Flag lot. Flag lot was 50. ABV or frontage. Road frontage, flag lot, easement. So going back to the one we had, that one was a flag lot. Mm-hmm. And it had three driveways that would've been right close, I mean, maybe 10 feet between each other. Yeah. So that's what I'm saying. That was not, to me... And then it was on a curve. That, that safety reason, still 30 feet, but, you know, I'm just saying. Yeah, driveway separation would not allow that. I think we probably set it at 100, 150. I can't remember off the top of my head. Did we? Right now we're doing 100... We, we, we use 150. Is that right? Yeah. Well, that's the whole front. So page 150. Um, 125 feet for less than 35 miles an hour, and greater than 45, it's 440 feet. So. Maybe we have no back to back on that. I like that. Um- But I, I just feel like road front, if we could c- if we could bring in the road frontage. I did look at other counties as well, and they typically set it anywhere from 40 to 60 feet. Mm-hmm. Mm-hmm. I did notice that a local road... We've had cases where the county has taken over roads, adopted roads. Yes. Yes. And their minimum is 60 feet. It's 60 of right away, yeah. Yeah. So that's why I was like, "You know, if we're choosing footages, then why not choose 60?" But that... 60 feet, yeah, 60 feet, it opens up the distance from driveways if you have to. Yeah. You were, Cynthia was talking about- So do you have the back to back? Do they have that covered? Yeah. I'm just... It's depending on the miles per hour of the road as to how much distance between driveways. It's on page 150. That's the old one. No. The new one. Not the revision. Yeah. Could you elaborate a little bit on what y'all are talking about? That was my... coming along this, was shared drives. That is something that the counties around are utilizing to help accomplish these same things. Yeah. Mm-hmm. So flag lots, I think we encourage shared drives between two, I think maximum. I'll have to find the, the transaction. Maximum two flag lots shared, which would essentially give you, if you're doing 50 foot frontage, 100 foot of frontage to accommodate that. And, and then you would have a shared driveway for just those two parcels. Mm-hmm. Other ways of doing shared driveways, what we've done in your ordinance, there are, there are private streets right now. And that is, say, a new, like, residential subdivision where you're going to have one acre lots or smaller, and it's a gated community. The developer builds the streets. They're always private. They're built to county standards, but they're always maintained by that HOA, that developer under that, um, development. Then your, your public right of ways that you guys build and you maintain. And then we have private drives- Mm-hmm ... which are those substandard, non-conforming streets that y'all have, right? Yeah. Um. Private drives and private streets. Yeah. So private drives, they're substandard, provide access to one parcel, more than one parcel, and they're located within the boundary. So that's where the easement comes in. The private drives are the easements. Um, and there's... The way we have done it, because from what we understood, there's a lot of concern about having all of these private drives and accessibility and maintenance of them. Mm-hmm. So we said all private drives that exist, that they can continue to remain, but no new private drives can be created unless it is a landlocked parcel and they have to get frontage via an easement to develop the site. And how many parcels? Four. Four. Four off of that access easement. I don't know if that's going to make everyone happy. We tried to... Well, nothing's gonna make everybody happy. I know. We tried to allow the development of landlocked parcels without having to construct to full county standards. Mm-hmm. We can allow easements anywhere, but there was such concern about them and y'all's responsibility to maintain them that there really was not a desire to really allow subdivisions along existing road frontage that would then have a common drive. How does that work within the flat? So flag lots are a, a special condition. Like, if it's a flag lot, you can have one shared drive for, for two back to back. I like what you've done with it. I like putting the responsibility of the private drive on the land of the users of the private drive. Mm-hmm. And that they must have a covenant with each other here. My only question was to make sure we didn't have conflicts with, I think, as stated, two different sections. But to me, you're saying if they are an existing private drive today and you split a lot, and now you have a new access to that private drive, are those- I think they can only do that if there's not four already. Yeah. Okay. Okay. So existing common drives- Overall, I like, I like it. And what are other thoughts? My only concern is that it's great to have an HOA or, or whatever, but who enforces it? That's where- Yeah ... at the end of the day, you're sitting at a closing table and that HOA, who enforces it? So I think the distinction would be to think of an HOA for a larger development. That's going to be where you're putting in true streets. You're, you're paving them. There's storm water, sidewalks, that sort of thing, and that's going to be that larger development, and they're going to have to... They'll have a maintenance agreement or whatever. Right. Um, the smaller ones, you're, we're still asking a, like, a maintenance agreement to be recorded as part of that. And ideally it's for owners, and yes, it becomes a civil matter, but- Right ... that's where we- I just, as, as someone who has dealt with this recently. You know, homeowners in California, there's actual a will that's a private- Private ... you know, that services this community and those type things. Mm-hmm. It's not in Madison County, but- And it's all the funds now because, yeah. And, and then, well, who pays for gravel? That's really, I just can't get into my... That's the, that's my only concern. This sounds great, but in practical application, there are- I mean, the only other thing is that you can't do any of that, and you have to either have direct road frontage- Correct ... or you have to build a road. You wanna talk about not making people happy. Mm-hmm. Exactly. So this was our- I like it. It's okay. No, and you, you asked for feedback. That's my feedback on it. That is- No, I mean, that's our... We know that's the issue. Um, but through all of these conversations, we felt like enabling these regulations was more important so that if the county did have to get involved at some point or if there was an accusation of you not help, you know, the in excess of, you know, the life safety. You can say, "Well, you developed this. You knew the standards. We told you. We told you you needed to maintain it." It's not great, but it gives you things to work with if it does ever get to a litigation point. Okay. You'll have to do the litigation, but better than not having something. Who's next, Lois? Um, I think PUDs. PUDs. Yes. Okay. And I misspoke a good bit last time because I forgot that we connected them to the TDRs. We did do that to encourage them, um- To discourage PUDs? To encourage- Encourage. Encourage TDRs, so transferring of those rights from your ag properties to where you want development. And your PUDs are supposed to be those unique ones that are going to request your smaller lot sizes, need access to public utilities. So that was the incentive incentivization. How to incentivize them, um. Well, I guess I, I, I'm confused. Okay. First of all, I still don't understand the TDRs. I don't think anybody does. I don't understand. Can you tell me what that is? Okay, so let me ask you a question then. We created the TDRs in an effort to help the comprehensive plan with that preservation goal of, of preserving ag properties or rural properties and concentrating development where there's the utilities and where there's already existing growth. If you don't feel like it's a tool that makes sense or is useful here, do we even... Do we want to bring it into your ordinance? We could keep the PUD ordinance and just divorce it from TDRs. Um. Can I ask you this then first, so maybe if we understand it. If I'm a farmer, I'm A, and there's land over here, it's B. So Farmer A, a developer, and we say the developer comes in and wants to buy Farmer A's land. So Farmer A wants to do a TDR- Mm-hmm ... over here to buy landowner B's land. Am I doing- Kind of. So Farmer A, developer B. Oh, okay. So developer already has land B. Oh, okay. But he wants to build more than he can on land B, so then he seeks out Farmer A for those development rights to increase development on his existing land. Oh, okay. That's what... I think it, it kinda, it would make more sense if you pose it, you pose yourself as the farmer. So if I have land, say I have 10 acres, I wanna put five acres of it into conservation. It can just be a conservation tool that says, "I wanna permanently conserve this five acres, but also I want some, some trade-off- Trade-off ... a trade-off for... 'Cause, like, if I sold it as is, I know that someone could develop it to a certain level of development rights. But if I wanna put it into conservation, how can I sell those development rights, make money- And then still- And still- ... conserve the property next to you or protect your property. If that makes it a little bit at all I don't, I don't know enough about TDRs to make it mandatory for anything. I think it might be a good tool. Maybe it's an option. Yeah, it can be optional. You know, to consider it. Is that, is it? Like if a PUD uses a TDR. I know nothing about TDRs. I think that's- I would be hesitant to require them. I would too. Yeah. We'll look at if there's a different name we can call it too, rather than transfer of development rights. Well, that's what it is. I mean, it is. But- But if it's confusing... Yeah, I think it should be optional. I mean, once you look at it, if you say farmer this and that- Yeah ... it's, it's clearer. But I don't know if that should be something. People out here in the county don't, wouldn't understand that no way you try to force that on them. Well, there's some people that want it for selfish reasons. You know, but, but, but as, as overall, I, I, I doubt 10% of the county would understand what you're even talking about. I've already had someone mention to me that claims that they know about TDRs, that this might open the door for developers to come in and start buying properties in this county. Well, they got- And I don't know enough about it to even argue with them. Mm-hmm. I think where y'all have a lot of power is the site selection process, so. But if that gets out in public, it's... But I, so, but I don't think it would benefit a developer to buy a farm- Right ... just to sell themselves the rights- Yeah ... to densify elsewhere. Like, they, it would only help if developers bought up property that was around your existing utilities where you've designated that you want that growth to be. But they would still have to go and find somebody in your community that they want to, like, essentially put a conservation easement on their land. But then it's not good for the farmer in the end, 'cause now you have that in conservation. What if you can't take it out again? No, it's permanently conserved. Yeah, it's permanent. So your children, if they wanted to sell the land. They could sell the land, but it would always have to be a farm. Yeah, that's what I'm saying. It would always, yeah. And so to, to restate, the goal was to help you guys find mechanisms that would enforce your goals of the comp plan. And that comp plan goal was to preserve the agriculture and the rural nature. And this is, this is where it... Land development's hard, you know? I was- But then you, you put in stuff to stop, 20 years down the road, a child that may not want that to be a farm. He wants to sell it to somebody to do whatever they want to with. I mean, it's, it's kinda like you're locking it in. Well, but what difference is that from- Yeah ... the child being grown up and the dad selling the land off to the developer and the, the, them being upset that they aren't gonna get the land, you know? Go ahead. I was just gonna say, I'm, I'm gonna repeat my case that we are just, we're just dealing with what some of this is directly in front of us. Mm-hmm. I was probably under the guise that this was gonna be a little bit more encompassing, that we would really look at the zoning classifications, both residential and agriculture, to do what it is. To look at our nodes where we do want growth, and then how, because that's realistically where- Mm-hmm ... we can have higher density because we don't have s- much sewer in the county, and that's where you're able to u- utilize that for higher density. We need to look at the number of residential, what the residential zonings are, as well as the agricultural. To me, that would be the first or the foundational step before then we look at protecting from a development, a transfer point. Mm-hmm. First we start with there's five acre minimums in this portion of the county. There's four acre minimums. There's two acre minimums. As we get closer to allow smart growth- Mm-hmm ... that we are putting true industrial, we are putting true business, we are putting true- Mm-hmm ... intensive agriculture in areas that we deem it to. And I just look at Oconee County and what it is that they've been able to accomplish. It's been a process. It's been, they've been very intentional with it. But look at now where they have a true blend, where within 45 minutes you can go to where you can see stars. Mm-hmm. And then you can also go see Costco. Mm-hmm. And that's where I would like, that's the reason I volunteer my time on this board, is to be a part of trying to have that for my children down the road. And I think we've just, this is a good step, but I think we could go much deeper at really pulling apart and looking at what it is we want to by utilizing our comp plan. The comp plan, I think this is the first time we realistically took it seriously, and a lot of people still aren't happy with it. But you just are continually improving, and that's where I think this transfer development rights... Also, how do we, how do we administer it? We're, that's the other part that I don't even think we included right now. Yeah, we have not. But I'm saying that it's, we have no infrastructure. What are the tax ramifications for somebody is, who is in Cuba- Mm-hmm ... own that large portion to be able to sell? Is there a reduction there? I think w- that just adds a whole nother complex issue, uh, that we're not ready for. So maybe our recommendation- I would- ... is to pull out the TDR right now. That is still a draft that we can retain, you guys can have. We can update the PUD so that it does not require the TDR. Um, and that will be the recommendation at this point in time. Now, when we did develop what we are calling the sending and receiving areas, we did look at proximity to utility, to where existing growth was to, you know... So, so it wasn't just a complete, uh, uninformed- And please, I'm not being rude. No, I know. I know. I didn't know that. We did think about that when we, when we did, like, put the ordinance together. But the, the point about having the structure for, um, administration and the tax implications, you know, that definitely has not been done. So I think if, if you aren't comfortable with it, we can just remove it for now. You can put it back in in the future- ... if and when it is a time after we've had time to, or you've had time to look into those details. We will stay around and help as long as you'll let us, but- ... I'm not making assumptions. And you probably wanna be compensated for your time. I think so. Uh, do we have access to those sending areas? I've, I've gone through. I, I don't know that that's been something that's been revealed to us. Yeah. So we've been working on the, some mapping. Um, we have what we originally did. And then Zach translated to the zoning layer. Did you bring that? Um... I thought she did. I shared it. We can email it. We can email you what we have, like all the criteria selection and, and... Yeah. The criteria. Yeah. Did you bring that? Good. I thought about it as I was walking in the door. I was like, "I should have grabbed the zoning map." But I don't know of any questions about PUDs specifically. I mean, I... So I think it's just how they're related to the TDR. Uh, uh, no, I do, def- Oh. Oh, okay. Uh, PUDs. Sorry. Uh, we are utilizing this to meet, uh, let's see, what was, uh, in my question, as the PUDs we're currently utilized now, we do not allow them in any agricultural zoning class- classifications. They're only, a PUD is only able to be utilized in an R1, 2, and 3. And now, as we've changed the size, that would bring it into effect and into play for agricultural areas. That to me kinda contradicts what it is that we are saying we want to do if we are now gonna take and look at an A2- Mm-hmm ... 10 acre parcel would qualify for a PUD. Uh, we can set lower. We, we've done- Yeah ... three, three acre, like, minimums for the development if it's a, like, an infill project to match an existing com- neighborhood. Um, we could also build in, like, these have to be on public utilities. Mm-hmm. They can't be on water or, like, on well or septic. So we can build in things like that, that would direct it, like, as well. Smart growth policy initiative where you as a board would be able to say, "Yep, this meets the intent of where we wanna see growth happen." You have access to utilities. Yeah. So, and it's not, it's not a conversion of an A- Mm-hmm ... ma- it still maybe is A1 to whatever- And, and I understand- ... but, but it's an appropriate location ... we're gonna have some of those, you know, that border the nodes that we have on the comp plan. Yeah. Yeah. It's not, our comp plan does not have a parcel- Parcel level, yeah ... specific, uh, identification. Mm-hmm. But to me, this just opens it up where then we have the potential for having one in an area that is not- Like... Yeah ... correct. And, and I don't wanna put that burden onto the staff- Oh, yeah ... for something that is not, uh, appropriate. So by disinvesting it from the PDRs, that's essentially opening it up. Mm-hmm. Now it's like our burden to narrow it back. Back, yeah. Yeah. Yeah, we can do that. Where do you really see PUDs being executed? Well? Well. Thank you for that. Um, the ones that were done in the early 2000s that were true master planned communities like Sterling on the Lake and Flowery Branch, Serenity down in Chattahoochee Hills, like the very large scale- Yeah. Because otherwise you see someone come in with 100 acres and they just wanna put 300 homes on, on 10,000 square foot lots, and that's why they wanna do it as a PUD. And have a strip center at the front on the road frontage. Yeah. Mm-hmm. And that's the part that concerns me is we're, we... I'm not saying what we had was right, but as we move from 50 acres or 25 acres- Mm-hmm ... down to 10 acres- Yeah ... then we really- So part of what we did, and I think this is, there's some philosophy to less regulations allows for more creativity. Mm-hmm. But with the PUD, we did try and put those, they have to satisfy two of the different criteria to try and get away from, from what you're talking about, where it's just kind of the, uh, um, like representative commercial, "Oh yeah, I'm throwing a commercial up front. It's gonna be an AutoZone, a Taco Bell, and a Jersey Mike's." Yeah. You know? Um, and then you have all the residential units in the back. But then you see... Well, on 10 acres, I just don't see it either because you say recreational. Okay, they put out a swing set. A swing set- Yeah ... and call it that. Yeah. So, I'm just- But also, I don't want to discourage creativity. Yeah. And that's where I only see, I only know what I know, and that's y'all's purview. Well, so we can do it like this. We can say a PUD needs to be a minimum of 25 acres, but the board of commissioners and planning commissioners through their review process has the ability to consider applications that are less than that, you know? So do you- I, I mean, that really is why do you even have a minimum then? Yeah. But I've seen places, Cataldo did that. Where you have, like, a recommended- Yeah, the recommended size is, like, 10 acres. But, like, if you had a unique five acre site and came in with a really cool cottage court idea or something- Mm-hmm ... yeah, okay, we'll consider it. I'm sorry. I didn't get to look at all of it. Do they have in there design re- like recreation designs and stuff like that? It can't be just something thrown up. Mm-hmm, yeah. There would have to be- So specifically, like, a, a choice of recreational facility that they can use. We've included golf course, equestrian center, and marina. They have to, they have to bring all of their standards to you, to the detail, to the specs that y'all want to see. We talked about, we talked about using PUD when the Roads Golf Course- Mm-hmm. Yeah ... Would, would that have been an appropriate application of- Yep ... a PUD? Yeah. We just felt like we weren't ready to do a PUD. Yeah. And so, so what we've also done and, and you know, this is where you as staff, and you as the board, but really you as staff when they submit an application, you know, for a PUD, they should have a design book that lays out all of the details. Like, not just the high, like, these are a couple of pictures what we want the homes to look like. But they should, I mean, they ideally, they're the land developer and they're the vertical construction. Yeah. So they should have a full picture of what it's going to be. It shouldn't really be speculative. Now, controlling that's harder, but you can push back and say, "This isn't sufficient level of detail for a PUD." Could you put in, uh- Okay ... the zoning ordinance that when they come in for a PUD, have all the details to present to the zoning- Yep. Yep ... board? That should be something that we should see right off hand so we know what to go on. Exactly. And that's the goal. So right now, if they come in with a PUD, they just say, "We're gonna do a PUD," and say that's gonna happen. On the map. Yeah. On the map. Yep. But if we had it in writing what they're gonna do- Mm-hmm ... that would make it more easier for us to determine, right? I think we did the last one that came before us, they actually had a, they had a survey and a representative layout of what they wanted. The, the parcel was on 29. Yeah, okay. You know, I mean, it was not a- But it was a- We gotta, we gotta start somewhere, definitely. To me, that was not a true PUD because they had the, the, I mean, the, the businesses over here and the housing on one s- on the other side. No, but I mean, just the way the parcel lays, sometimes if you have a, a, you know, a rectangular with a lot of road frontage, I mean, that would lend itself to something like that where you would have a, a division. I mean, it wasn't enclosed. It was encased. Is that all on PUDs? You got anything else from us? That's got my... You wanna read mine? That was mine. Two cents. Two cents. Okay. $2. Okay. Then we'll get on to the next. Um, so the last thing I have is the consideration for principal use cases. Okay. At the very end of that one. So we've had a couple of names come up, and boarding house- Yeah ... and a group home. And retreat centers, waste transfer facilities. Like, a retreat center, like, like a rental conference center? Somebody wants to rent it out for a, whatever, a board retreat, or is it like a- Well... Like- Mm ... more like a- We have, we have the... What is it? The old Boys and Girls Club that's out there on- Yes ... on the river, the site on Bicycle. Oh, right. Okay. Yes. So like the- No, that's Columbus County. The summer... Columbus County. Columbus County. Like, it's like a, it's like a religious summer camp. Yeah. So like during the off season, like they do, like- Like a Masonic retreat. Oh, okay. But it's not every weekend. Yeah. Oh, yeah. And it's only... It's very large. I think it's like- Yeah ... 150-something acre tract. Yeah. Yep. And they, do they put up temporary, like, tents, or is it some tents, like cabins? No, there's cabins. Yeah. There's cabins. Like a permanent- Like a center. Yes. Yeah. Kitchen area. We have Camp Renassa. Yep. And that one is- It is quite residential, right? So is it the same, like, as the other one? You can add it to the recreation rent and all. So we could add- It could be standalone. This would be standalone. But what if it's still part of, like, fraternal organizations? Yes. So just... Now, we do have another one on East Commerce. It's not a religious institution. Sure. But it's a Shave Rag. Shave Rag. It's like a hunting lodge type thing. Mm-hmm. Where they do the traditional, like, running of the dog, horse back. Mm-hmm. Fox hunting. Fox hunting, coyote hunting, depending on the season. We need that out here. You have a whole new perspective. Yeah. I know, and I just live 30 minutes away. Right. But, I mean, there are things like that in the county- Yeah ... and people are interested in keeping that- Mm-hmm ... and doing things very similar to that. So, like, the Boys and Girls Club may potentially be- Mm-hmm ... bought out to a different group, no longer be the Boys and Girls Club. Oh. It may potentially be, like, a religious retreat where they do, like, couples retreats and- Summer camps ... summer camps. Mm-hmm. Yes, because it is on the river. Yeah. And there's already the cabins. And, oh, I forgot Camp Little Light. We have that one too. Mm-hmm, still paying. Cornfield Road too. Unless they- There's one more too I'm not thinking about. Let us dig into that a little. You know, with all that they can do. Yes. Because essentially the primary... So it's like the Boys... And this is just an example. Yes. The Boys and Girls Club has their primary facility, but then they have their summer camp location or whatever, you know, where they do special events. Yes. Where they have larger, whatever you call- But it can be rented out for weddings. But it could be rented by the public. Yeah. Well... Like a special event facility. Yeah, special event. Mm-hmm. So currently all of those that are, like, like Camp Renassa, Camp Little Light, the Boys and Girls Club, all, even Shave Rag, they're all agricultural zone with a conditional use or special use. And it's a special use for... Based on the event, the event type. Mm-hmm. Just like if you did it at home. Let us just think through that. Okay. 'Cause, like, Shave Rag may be that hunting camp type thing that we've done, like outdoor recreation. Mm-hmm. Boys and Girls Club could still maybe be outdoor rec something if it's like a camp type facility. Let us just... Is there a dining hall there? Yeah. Recreation. Like an outdoor rec. Those are all kind of outdoor rec things. Yeah. Special event facility. Do you want to send to anyone else, or we can get back to questions? Are these all on ag properties? Yes, ma'am. It's not ag tourism, then. Yes. Well, I mean, one is, but... It's a recreational- If there's recreational- But why is the use different? Yeah. Agritourism. Might be agritourism maybe. It's agritourism. We'll think it through. Other than just, like, renting of the space also. ... homes. What, how do you guys... Is that the state definition of a group home? Where, where is your, where is that used comment coming from? It's currently, like, rehab centers. So, okay. That- So- That's a big thing. Yeah. Yeah, we run into that last month. Yeah. Mm-hmm. Like, a lot of... Like, is it like a halfway house? Like, it's- Yeah. For the most part, it- Mm-hmm ... treatment. But typically, like, it could be, like, group talk therapy, but no, like, medical treatment, detoxing. Like, all of that is done, or is that okay? I don't think it's detoxing, but, um, it's, uh, under supervision. Yeah. Mm-hmm. It's just something drinking or smoking. It made it more complicated that it was a, it was related to a religious, a, a church. Yeah. You know. Um, but it could be. I mean- Yeah ... I know they deal with these in Athens all the time with, with students where you've got, you know, seven guys renting a typical single family dwelling- Mm-hmm ... type thing. But- A lot of the ones that we are seeing, they're literally straight from jail going straight there. Like, that is gonna be their home residence. Mm-hmm. That's gonna be their check-in. Like, literally they're picked up from Athens County Jail and taken there. Okay. So- But they're paying rent. It's not like a court mandated thing or maybe. Is it, is there, like, an organization running it? Yes. Yeah. Yeah. Multiple of them that have been brought are women and men, separate of course. Mm-hmm. They are nonprofit religion. Mm-hmm. But they do have to have a job. Mm-hmm. And they do pay rent weekly. Okay. And there's some sort of stipulation for it. Yeah. I don't know the ins and outs because then you get in the gray area- Yeah ... of what you can request or ask for. Mm-hmm. Like, are they drug tested? Is somebody there? Mm-hmm. Is it just a mother? But we're having issues because it is becoming more of a common thing. Yeah. So we need to know- And that- What zones. So- That's different than a boarding house, or are you considering those both the same? I was considering them the same. Okay. That's what I just wanted to see. And I- And I was talking about the same- The reason I honed in on boarding house was I did go and look up Athens UBC, and they have obviously things for s- for students, but they call it a boarding house. I see. And they have a definition for boarding house. I was... And it's almost identical to what you were. Okay. Well, I don't see them different, a boarding house and a group home. Yeah. Now- A boarding house is a type of group home. Yeah, but I mean the type of group home we're talking about where people go and get recovery. I know. Where a boarding house to me is somewhere people stay for a limited time to, if they're just get on their feet, not a medical or they're not being, they're not, they have not had some kind of- I think they can be the, the same, but there's, there's going to be those that are maybe for that transitional housing, then there's going to be ones that are more geared towards prison to permanent housing or rehab to housing. So I think- So are we gonna separate that? I think they're essentially the same. I think we need to have a strong definition before that can go. Yeah. Because this, last month really throw this for a loop. You know, there's a lot of opposition to it because it was- Oh, yeah ... in a, in a residential district. Yeah. Yes. But there's gonna- But there's some, some state things we have to think about because the way they classify group homes, the numbers, and the type of treatment that occurs at them, there are different levels of licensing at the state. Well, you know why I say that, because like you said, we don't have anybody to go in there and see, okay, it says boarding home, but they're doing something different than a boarding home. Okay. A boarding house, guest house, it really is ain't much different because you, you can look at both of them as not doing what they're supposed to, a boarding house or a guest house anymore, so. I guess we just need, since it is becoming a hot topic and something that is needed, what zones we would allow it in. Mm-hmm. Is it gonna be a special use? What requirements, because there's a gray area- It's fair housing. That also comes into- Require because then it's patient/client privilege. You know, you start getting into a whole nother field of stuff. Mm-hmm. Yeah. I think that answers all those questions then. Mm-hmm. Okay. And did you un- I didn't mean to jump. No, you're good. Did you understand the reason for the waste transfer facility? We've already had one case where we had a hard time figuring out where, and the closest we could come was landfill. Mm-hmm. They are two distinctly different things. Yeah. I just threw that in there. Yeah. So no, we, we noted that and the, um, the pits. Mm-hmm. The animal pits. Um, okay. 10 minutes past 7:00. You feel good? More questions? Yeah, I just ask one question. Yes, ma'am. Maybe, um, I, we have the one that you update, but on the principal use table, the 3.2.3.1- Mm-hmm ... under single family, is the L supposed to be there or is it supposed to be permanent, put a P? So the L means that there are- Limits ... limits. So like there's- They have to abide by the supplemental ... there's some standards. They just a certain size or type. So I'm saying in R-1 it would be limited? Mm-hmm. Is it a permanent? Um, R-1. It wouldn't be. Or committed. It shouldn't be. It shouldn't be committed Yeah, that's just saying that they'll have to abide by- It says the architectural- Yeah ... architectural standards, and then we set minimum, um, floor area. So if you go to section 2... What is it? 3.2.2. 3.1.2 maybe. Yeah, household living. So it's basically saying they have to abide by, there can only be one principal dwelling on a lot. It can include, you know, other apartments. And then, and then single family detached uses shall not be less than 720 feet, square feet. So that's the only- So basically- Yeah. So I always thought we had it permitted under the R1 because that's where they're supposed to be. So it is permitted, it's just permitted with conditions. Oh. Which just say the minimum house size has to be 720 square feet. Mm-hmm. And that it... What was the first one? It can, there can only be one principal structure. Yeah, there can only be one residence per lot. Yeah. That's good. I just have one more question. Yeah. And I don't know if I've already asked it, and if I have- No ... you can tell me. Currently, a religious institution is allowed in all zones. Mm-hmm. That is no longer the case, correct? Like, it is, I think it's not allowed in A-1, but it is in A-2. Oh. AR, R1. They should be business. It should be across the board allowed. Is it? It should. We might need to look at it, 'cause then we may not have the, um- Because I feel like we are- The assembly. The little pieces of assembly. Did we update that in here? No, we did not. I feel like in our office meeting we did notice some, that there was something that was- Okay ... not in every zone, and it was in question. No, it should be the same. Like, all different assembly uses should be treated the same. Okay. So I mean, so if we don't allow anything else in A-1, then it's okay. I just don't remember allowing it in A-1, is it? That might just be a typo. Well, we were talking about it, in a lot of the A-1, you know, is a personal- Yeah. No. See, a lot of the fraternal. It's A-1. Well, that's why, yeah. And it's still out there. So we, we need to... We'll take a look at how we treat places of assembly. Would it be allowed in all of them? Yeah, I mean, like permitted use or special use or- Mm-hmm. Would you want it to be a special use, or do you want someone to just be able to develop any type of religious institution by right? Or any type of hunting camp by right? Because you have to treat them all the same. All fraternal clubs would be allowed by right. So I think it's all special use. She's our attorney. That's typically how. I sure did. Who knows me the best? River. I like that. Oh, we just dealt with this. Don't worry. Well, yeah, that's the reason why we were asking, because, like, we had it in A-1 and now it's not. Now, that's a good, that's a good catch. We just need to write that. But I just wanted to make sure, like... 'Cause it's messing me up with limited and special when I'm used to conditional. Yes, just change it. Okay, we'll take some time to update it. I'll write a new version. So- 'Cause we were looking at it. Yeah. We thought, "Oh." So we will change it too. We just called it U and A-1, and now it's A and A. You know, so yeah, we will. Okay. We're gonna change it to just P and S. If I change all the Ls to P and then permitted, you'll still... We basically did the L to say keep the L, keep the L. Okay. Okay. Just because sometimes new school is better than old school. Okay. And that will tell us that you have to abide by the section in the chart, that it is in the meat of the product. Okay. Instead of just saying, "Oh, there's nothing else that's permitted." Should they just both be supplemental standards then? Ps and Ss? So you thought L would be good for R1? Like- For what? The P. Or a single family dwelling. They don't have to go in. I'm talking about religious institutions. Oh, no. I thought about... Sorry. Yeah. I thought you were with that. All, all they're doing is just saying that they put a size on it. Oh, yeah. Yeah. And it can only be one. I mean, that's all they're doing. That's the only condition that they put onto R1, was just the size. And, uh- We... Let us just- I guess I got- We're, we're having internal conversations. No, that's okay. Yeah. 'Cause we already... I don't... Yeah. We don't like it either. Well, whatever works best. We can merit, yeah, but- Yeah. Let's see. We got any other questions? I have one more and I'm finished. Okay. Under industrial uses, 3.4. Mm-hmm. It starts out with general, and then under general, standards for major odor sources, and then from there it moves on to design standards. The number one concern with industrial or businesses is noise. It's real common. Is there... I, I know we've been waiting on a noise ordinance, and it still has never happened, but is there anything from a noise standpoint that can give us guidance on when people are concerned about noise with industrial zones? Other than the, like, general nuisance language, like- Yeah. I mean, I know with data centers there are decibel and hertz things. But it's how do you measure that. It's how do you measure. That's what I'm... But just like at what, GBL down- GRP ... GRP down on 72. Heard complaints- Oh ... about noise level all the time we heard there for a while. What is GRP? It's a Georgia Renewable Energies. Oh. Oh. Is that the one out by Comer? Yeah. Yeah. Heard a lot of complaints about the noise level there. Yeah, the bio whatever. Yeah. Yeah. Okay I just noticed that it covered odor sources, but nothing about noise. And that might have been because- ... we didn't have a noise ordinance. Mm-hmm. Yeah. We're supposed to have one, but it's never been- They've been working on it as long, for years. They're not surprised by that. Well, now that you throw another- That was not, that is not meant to be that way. Maybe you can, uh, get that pushed over the finish line for us. No, I think I upset Mike last time, so I'm not. He goes, "Thanks a lot." Well, well now that you do another thing in the range, data centers. Yep. Yeah, okay. So is that something that y'all could implement? Because I have been asked this question because I have been tasked to come up with an ordinance section for data centers. Oh, yeah. No, we can do that. Is that something you can come up with? Is that something that you could get me something to go ahead and be looking at, like a template- Yep ... to be able to share and work through? I think we'd already noted to- But as- ... provide some sort of modeling. But is that something you can get to me like yesterday? Yeah. I mean, I can get it to you tomorrow. Like, is that something you could just email me? Yep. Yep. A general template that we could build from or something that's already been established- Yeah ... or multiple somethings that have been done. I can give you probably three versions. We experienced that, Alyssa. Um, huh? We experienced, we're talking about that right now. It's good to have the language in there so that you can protect yourself if you do not want them. I'm cooking so much in the kitchen here. Can't pause. I just burnt something. Open the pot. Well, did you just not put anything in about tiny houses, because we don't have anything or that was something that was discussed? So I- It would not be in there at all. I think we have the smallest house size, that's the 700, that's the primary. Mm-hmm. A guest house or an ADU, I don't know that we have a minimum size. No minimum. So we don't, we don't have a standalone. I think the decision was less than 720 square feet, which is what you currently have potentially. A single wide. Was where you were comfortable. Apparently, you can have a structure as long as it's larger than 401 square foot and it meets all fire and safety codes. Okay, so yours is 400? Yes. 401, but that's seven- So they'll have to approve it at a time now. Oh, you're on video. A tiny house is a prefab construction travel trailer on wheels. That's what they consider a tiny house. You can get a modular home that they advertise as a tiny house that has a DCA number saying that it meets all state requirements as a livable space. There's a little bit of a difference. Okay. I'm slowly learning this as I sit here trying to please. So all that mobile homes- Yeah. It's gotta be, county, county has the ordinance on it, uh, but the structure size on it, don't they have to have- It has to be larger than 401 square feet. Well, what I know about is the, um, like the scourge and all that, it's gotta be bigger than- It has to meet the, the, like ICCA building codes. Like the build- Like that built something. But that DCA number on some of the mobile manufactured ones say that it was built to c- what? The code. The Georgia State code. Yeah. Yeah. And most of them I don't even think are, are 400 square feet. I think the smallest one we've seen is maybe 600 or even 575 because it still has to meet that livable requirement. Yeah, I, I thought the county had, uh, ordinance that they had to meet their certain standards with the county instead of, uh, in addition to the state. Yeah, I'll have to... That'd be a good question for me to ask Baby. There should be something in there, in there, as you just say about that, so if you have any questions because we're always talking about asking people about tiny houses. Mm-hmm. So let me ask you a question. It, should we adjust that minimum to 401 as it currently is? Do you want to have that flexibility to have less than 700, or do you want to keep it where we've set it, which is... I think it should be flexible to 400, because we already have that, hmm? Because you have some lots that are less than a half an acre. Mm-hmm. And- Well, they're still putting 1,800 square foot homes on them. Mm-hmm. Yeah, but I mean, you know some that won't meet- Septic is gonna dictate that. Yeah. I mean, your septic system. The septic set back, and then they can't put nothing on there, they can't do anything with it. It's also gonna depend if you have a well. Oh, yeah. Right. Depending if you're on county water, because then you have to be 50 foot from the property line for your septic. Septic and well have to be 100 foot apart. Right. So unless you're on county water- Yeah ... half an acre's gonna be very hard. Yeah. So I'm just learning a lot of people have properties that are- I think you can leave it at 400, leave it where it currently was. Yeah. 401 or what was it? 420. Yeah. Uh, uh, right now it has to be 401 or larger. 401. Okay? Anything else? My last note, if you don't mind, was is, and it just came as a, a mention, uh, that you threw out, that y'all took the liberty to increase the stream buffer above the state mandate. I would love to lie to you and tell you that I've been able to go through this to be able to look at those. Could you provide a list of anything that you took and added to that is above the state for us to be able to reference? Then I can go back to what our current is. Yep. It just as a cheat sheet. Yep, we can do that. And they were keeping it, it goes to a 200, right? Our, what we was discussing the one, the past one, because he wanted us not to go up to 200 but he- Residential. When, when- Oh. When that's really adjacent to a residential, the setback is 200. Right. So that is changed. In ours In our, is that where you are comfortable or did we want to discuss the option of adding a fence or something to reduce it? Well, I know we want... We were in agreement with that 200. Okay. Well, we need to- I was, I was applying the ointment on that one. I didn't wanna casually adopt that one because there's, there's unintended consequences of everything that we're doing here. And it's easy, easy to casually say, "Yeah, let's just adopt that," but... And I, I'm not gonna lie, I did not, I haven't taken the time to look at other surrounding counties to be able to really grasp the detail on that. Well, I did for you. In Barrow County and other counties, surrounding counties, it's 200. But then they have a 50%- I think the- ... reduction if you have a wind fence ... I think the use of a vegetative buffer- No, I- And a natural- I just saw, I just- Like woodland buffer. I mean, that, you know, we just need- ... seen how far they were from residential- Yeah, because you said vegetative. It could just be tall grass ... and they still were like 200. And they're not touching it. But then you have a 50% reduction- But that's not really above- ... if you have a wind fence. And that's- Yeah. So I think the definition is key. And I was just telling the ladies, and I told them in our little office meeting, the definition for a vegetative buffer can be anything. When you think vegetative, it could be tall grass. It doesn't have to be trees. So we need a definition in there that states what the difference is because just because you say a vegetative buffer at an industrial, if it's all tall grass, they don't have to do anything else. Oh, yeah. That's just the distance. Right. So we need those definitions in there to, to set something. Like, do you want it to be a woodland buffer? Do you want it to be a vegetative buffer? Right. Because vegetative can be a lot of things. Yeah. Yeah, like in a PUD it tells you the species of tree that you can plant. Exactly. Or in a residential development, these are the species of trees. You have to have a number of trees per lot in those types of- And we didn't have that definition, so I did ask them to add that because- ... just because you got 200 feet, it could be a open field with- Right ... tall grass. It is on here. Okay. It is. I feel like every time you say that we Can I ask you something on it? I recently, too, remember that res- I mean, that medical building we was, we went through- Yes, Honeysuckle? They're doing nothing. I mean, it's just sitting there with one building up. That's not even finished. So didn't we discuss that on these desert industrial, I mean business parks or industrial parks? I think we did, but our current ordinance doesn't have anything to state that it has to... Oh. So that's something that needs to be looked at. So is there something... I'm sorry. Did you- I heard that y'all got something in the ordinance I think. I think on 45. And if y'all got anything else y'all need. So can I say, did you address that about those desert industrial business parks? Like, we have one now that there's nothing done and it's just sitting there. They got one building up for, uh- So what is- ... a business park ... what is your concern? Like, what- A time limit on... Did we discuss a time limit on when they have to- I don't think we can write... I think if it's rezoned, that's entitled. We can't say if you haven't started in X, Y, Z. Well, they started, but they're, it's just sitting there. They got one building up. Is it occupied or is it- No, it's just, they're not doing any more construction. I thought we just talked about if they had to have- It's still in the inspection process. Like, it's just kind of- Just sitting ... sitting. So that would be where the permit expiration comes in. But even then, you're just still left with an expired permit. Um, maybe it's a vacant and boarded up structure. So nothing else? I just want to say like four- Well, William just asked a good question. If we are scheduled to vote on this the 11th at Tuesday's P&Z meeting, will you all have whatever changes that you're going to do ready before then where we might be able just to take a... I mean, enough to be confident to vote on this? What we... So what I was going to present is the changes we have discussed, but I would not have those drafted for you and kind of the recommendation that you wanted to provide the board. So it wouldn't be like a line by line, like red line of, of the changes you want, but it would be, you know, lot sizes increased back A1 to 25, A2 to 10, add this. And then when we get the draft to the board in advance of their meeting, we would have those revisions. But even what you're talking about with the red line of just the items in bullet form or whatever, today is Thursday. We can get- Does that mean before Monday or Tuesday or We can do it tomorrow probably. Not the revisions, the, like, recommendations. Oh, yeah. We could do rec- like- We can have, like... So for instance- We can... So you could also hold the public hearing and table your vote and decision or your recommendation to your next meeting. Sorry. And then, I mean what, but that wouldn't coincide. You would meet after the October 5th or 6th, whenever we're meeting with the board. Yeah, because we meet the 7th, I think, of October. Well, we can just vote on the recommendation. Or we don't have to vote on the whole thing. No, you would be recommending- Yeah. So- ... for the- As it is with what we kind of write for y'all for proposed changes. Yeah, we made our mistakes in October. I'll just say it out loud. I, I hear these type things that our congressmen and women have staff that rewrites, and it just makes me chuckle out loud, and here I find myself doing the exact same thing. I don't want to be disingenuous. No. I know, Amanda, I'm going to say it to your face. Yeah. I'm not gonna vote for adoption of something that I can't physically look at what it is that's- Mm-hmm ... gonna be sent. As a recommending body- No, that's completely fair ... I'm not fulfilling my obligation in this chair to do something like that. And I don't wanna be the fly in the ointment for anybody else. I agree. No. But this is... I'm all for... I wish we'd had six months. I would like- Right ... a, a month to be able to go through a section at a time, and I promise you, I'm, I'll do my work. Mm-hmm. It's just I got this two and a half weeks ago. Mm-hmm. I understand that. Let us- I understand you're in communication with other people. I just wanna be honest with you, and I tried to do my homework on the parts that I could. Mm-hmm. And there's still things that I would like for you to provide to me that I could look at to be able to recommend- No, that is- ... approval ... completely fair. So to me, I, I ask the question again. Who's putting the deadlines? I mean, it took two years to get it. Why does it take... Why are we taking so short of a time to- The board is very good for today. I know, but why don't they... I mean, like he said, I would like to take it section to section too. Well- But why do we have to have it done at this time when we took... It took two years to get it. Well- And then it's gonna take only, what, six weeks to put it into- I think what, what it all boiled down to, because me and Lee talked to Denny Adams. He thought we already had these definitions we got. Like what we're going over now, he thought we, we already had them a year ago. And I told him no, we had the, the, uh, UTC booklet on where the resolve is at, but we didn't have all these definitions and the different things until two weeks ago. Sure. It was a, it was a draft a year ago is what- Yeah ... what you all saw at this. Yeah, and then we didn't see all this, what we're going over now, we didn't see it during- No. Right. I, I understand that. Um, well, we're not gonna... I, I would like to promise that we could have revisions to you, but I don't think that's fair to any of us. With the caveat, even if we did provide revisions, is, is two days enough? Is two days enough for it to review- Two days. And everything? Um- So how... It has to be the board that has to push the deadline for- So I mean, I just think that this is going to be a discussion that you all need to have with the board, the commissioners, and- With the chairman's office, to have these dates and- And- I think we need to have a discussion Thank you for your hard work. Yeah. I don't want to come across as- No, you're not. You're not ... uh, you had- This is your job. Yeah. You're hired now. I mean, so we can still do the public hearing and let public comment next week since it's been advertised and meets that requirement. And then you could say we would like to, you know, table the vote until your next meeting so that we can actually get these revisions to you. And then that would... We have the public hearing for the... BOC is October twenty-sixth, is the public hearing and decision. Uh-huh. We meet on the sixth. So do you have to give a recommendation for it to be on the agenda on the sixth, or could we still present to them a- Calendar? It has to be posted two weeks. About two weeks in, uh, prior to the meeting. The public hearing is the twenty-sixth. Yeah, it has to run in the paper. We meet on the sixth. Two weeks, if it's the sixth, that's twenty days till the public hearing for the board. And then their meeting is- Your meeting's the eighth? That's it. We're- Sixth. The sixth. The sixth. So we meet on the first Tuesday of the month. You're the first Tuesday, and then the board is the- They're the last Tuesday. So you gotta- But they hear it at their regular business meeting with the presentation, and then go to the public hearing. They would hear it at their regular business meeting, which would actually be, I think, their- Yes. Yeah, what day is that? Vote. Right. And then they would vote on their public... I mean, regular business meeting, because theirs is opposite to ours. Right. The first of the month for them is their vote. The middle of the month is, is their regular business meeting. They would hear it at their vote and then vote at the business meeting. So are we voting on this- I think we, I think we had tentatively told the board we could come to their first meeting in October. Mm-hmm. I think that's right. So are we voting on this at our business meeting or- No ... or a hearing? Public. This coming Tuesday, the public hearing, you all are voting. To recommend adoption, recommend denial, or table it until y'all can- Maybe I'm missing something. We usually, the first Tuesday of the month- I think we messed up the dates because- First Tuesday of the month is gen- you know, a general meeting, a business meeting. A business meeting. Mm-hmm. And then, and then the public hearing is the third. I mean, the- The- Yeah, the third ... the third Tuesday. Mm-hmm. Why... Is this one off? Why are we not doing that this time? Why is the public hearing for this not on the twenty-whatever it is? Our public hearing's on the fifteenth. Yeah. Okay. Which is the- Coming Tuesday. Mm-hmm. Yeah, I thought we were- So we met on the 1st and did the- See, we could actually call a special meeting. Yeah. I don't know. Everybody tested. We discussed it last, last meeting. Right. Okay. I'm letting Labor Day get in my way. I'm sorry. I'm sorry. But when y'all looked, when you really look at it, it is a little early when you added the dates for ads and stuff. Gotcha, gotcha. So it is a little- Close to me. And there's nothing against you all. It's, it's here. I don't see why we're rushing to adopt something that took us... It took y'all a long time to do this, because you wanted to do a good job- Mm-hmm ... and a, a great job. So why are we rushing to adopt it where we haven't gone over it and made sure it's everything that we want? And I mean, what is the rush for adoption if it took them that long just to write it? So it's like they- I think the commission, I think the commissioners is- Yeah, they don't, they don't have the answer to that. That, that would be for us to ascertain. I think she pointed us in the direction to be able to grasp what we need to. Because I mean, there's like 15 sections here. We went through three sections at our meeting, business meeting. How many, um, zonings we have in the next couple weeks? I mean, the next- You mean applications? Yes. So for October right now, I have 13. 13. I would suggest you talk to your commissioner about that. Mm-hmm. Yeah, I think y'all need to just chat. We'll do what... We will be here Tuesday night, and we'll do what we can. We will at least get you a summary of what we discussed and how we would present it- Mm-hmm ... in a recommendation form. Thank you. I know, because that's how we- Thank you. Yeah. If nothing else- That's all ... is that all for everybody? Yep. I thank you. We should- Thank you, ladies. Thank you. We thank y'all for coming, taking y'all time out. Since this is a called meeting, I do need a motion for adjournment. That's what I'm thinking. Here I was like, "Wait a minute." Are all we, are, is everybody on the board or are we just throwing things out there? We shouldn't, we should just go ahead and adopt it or not adopt it or whatever. Are two... Does everybody think on the same level that we should go to our board and ask them for extended time so we can go with this with quality, I mean, quality- I'm gonna take their recommendation and go to the people that we serve in pleasure of. We're appointed to this. Yeah. And whoever appoints us is who we should ask the questions that you're posing out here, absolutely, and that's what I'm gonna do. Okay. So we're all in agreement with that. Yeah. Do you all hear a motion to adjourn? Motion. Okay. Uh, all say aye.