County: Cobb County
Cobb County Board of Commissioners public hearing, September 15, 2026
9:00 AM · 60 pages
These are the minutes as Cobb County Board of Commissioners posted them, read from the file on its own website. Georgia Commons is independent and is not affiliated with Cobb County Board of Commissioners.
48 of this record's 60 pages were scanned images, read here by OCR: a letter or a number on them may be misread. The file the body posted is linked below.
Records of this meeting
Each link opens the body's own website or meeting portal.
- Minutes09-15-2026 BOC Zoning Minutes with Attachments (cobbcoga.api.civicclerk.com) · shown on this page
Summary
Written by an AI model (claude-sonnet-5-5) from the minutes below. It is not the record: the minutes are.
Commissioners approved a mixed-use rezoning on Plant Atkinson Road 3-2 and a Z-17 subdivision rezoning, and passed a large consent agenda.
The Board held a zoning hearing and acted on a consent agenda, regular agenda cases and other business items. On the regular agenda, it approved the rezoning Z-17 to R-15 with conditions (5-0) and Z-21 for a mixed-use development, 3-2 with two commissioners opposed. It denied three group-home permits (LUP-14 and LUP-18 without prejudice, LUP-27 with prejudice) and approved LUP-23 for 24 months. The consent agenda passed 5-0, covering rezonings Z-13, Z-30 and Z-31, a change for Z-32 to the Tourist Services district, permits LUP-21, 22, 24, 25 and 28, and other business items O.B. 47 and 48. The Board also approved a site plan amendment (O.B. 29) and continued O.B. 49 and O.B. 50 to October 20, 2026. Z-1 was withdrawn without prejudice, and several other cases were continued before the hearing and not considered.
Topics taken up: Z-21 mixed-use rezoning, Plant Atkinson Road; Z-17 Old Canton Road subdivision rezoning; group home capacity permits; consent agenda rezonings; O.B. 29 Shallowford Road site plan; continued and withdrawn cases; O.B. 50 litigation settlement continuance; road frontage reduction O.B. 48 and 49.
Decisions the minutes record (10)
Each decision is followed by the sentence of the minutes that records it, copied word for word.
Rezoning of 2840 Plant Atkinson Road from Heavy Industrial to Regional Retail Commercial for mixed-use development (Z-21)
3-2
The minutes: “MOTION: Motion byAllen, second byCupid toapprove ofZ-21totheRRC zoning district, subject to:”
Rezoning Z-17 from R-20 and R-30 to R-15 for a residential subdivision on Old Canton Road and Clackum Road
5-0
The minutes: “MOTION: Motion byBirrell, second bySheffield, todeleteZ-17tothestraight R-15zoning district, subject to:”
Consent agenda: rezonings Z-13, Z-30, Z-31, Z-32, permits LUP-21, 22, 24, 25, 28 and other business items O.B. 47 and 48
5-0
The minutes: “MOTION: Motion byCupid, second by Birrell, toapprove thefollowing cases onthe Consent Agenda, asrevised:”
Site plan amendment for rezoning Z-15 of 2025 at 2280 Shallowford Road (O.B. 29)
5-0
The minutes: “MOTION: Motion byBirrell, second byAllen, toapprove O.B. 29, subject to:”
Temporary land use permit LUP-23 for group home with six residents at 1934 Pair Road
5-0
The minutes: “MOTION: Motion bySheffield, second byBirrell, toapprove LUP-23for24 months, subject to:”
Temporary land use permit LUP-27 to increase group home capacity to 10 residents at 3235 Avondale Parkway
5-0
The minutes: “MOTION: Motion bySheffield, second byBirrell, todeny LUP-27 with prejudice, subject to:”
Temporary land use permit LUP-14 for group home increase to seven residents at 195 Rockin Hill Drive
5-0
The minutes: “MOTION: Motion bySheffield, second byBirrell, todeny LUP-14without prejudice.”
Temporary land use permit LUP-18 for group home increase to five residents at 1768 Rustic Drive
5-0
The minutes: “MOTION: Motion bySheffield, second byBirrell, todeny LUP-18without prejudice.”
Settlement of litigation regarding case Z-61 of 2023 at 1972 Atlanta Road (O.B. 50)
5-0
The minutes: “MOTION: Motion byAllen, second byGambrill, tocontinue O.B.50untilthe October 20, 2026, Board ofCommissioners’ Zoning Hearing.”
Reduction of required road frontage for Tract 2 at 5310 Pickens Road (O.B. 49)
5-0
The minutes: “MOTION: Motion byGambrill, second byAllen, tocontinue O.B. 49untilthe October 20, 2026, Board ofCommissioners’ Zoning Hearing.”
Agenda items (11)
Found in the minutes by their headings. Where an outcome is shown, it was read by rule from the item's own words: a guide to the text, not part of the record.
The minutes
As posted on cobbcoga.api.civicclerk.com, read November 25, 2026. Nothing below is written by Georgia Commons.
MINUTES OFZONING HEARING
COBB COUNTY BOARD OFCOMMISSIONERS
SEPTEMBER 15, 2026
9:00A.M.
TheBoard ofCommissioners’ Zoning Hearing washeldonTuesday, September 15, 2026, in thesecond-floorpublic meeting room oftheDavidHankerson Building, 100Cherokee Street, Marietta, Georgia. Present andcomprising aquorum oftheBoard were:
LisaCupid, Chairwoman Commissioner ErickAllen Commissioner JoAnnBirrell Commissioner KeliGambrill Commissioner Monique Sheffield
CALLTOORDER – CHAIRWOMAN CUPID
Chairwoman Cupid calledthehearing toorderat9:03a.m.
Mr. Pederson, Zoning Division Manager, reviewed thehearing procedures andannounced the following withdrawn, held, andcontinued cases.
Z-1 FRANCISCO J. GARCIA SANCHEZ (Francisco J. Garcia, Owner) requesting rezoning fromR-20toLIforatreeservice inlandlot133ofthe th 16 district. Property islocated atthewestern terminus ofElnora Drive, west ofShallowford Road (895Elnora Drive). (Previously heldbythePlanning Commission ( PC) from theFebruary 3, 2026, andMarch 3, 2026, PC hearings untiltheApril7, 2026, PC hearing; continued byStaff fromthe April7, 2026, PChearing untiltheMay5, 2026, PChearing; continued by thePCuntiltheJune2, 2026, PChearing; continued bythePCfrom the June2, 2026, PChearing untiltheSeptember 1, 2026, PChearing).
WITHDRAWN WITHOUT PREJUDICE
Z-22 THEHAVEN ATEASTSIDE, INC (Eastside Baptist Church, Inc., Owner) requesting rezoning from R-20toRSL forsupportive andnon-supportive th residential seniorlivinginlandlots 793and 863 ofthe17 district. Property islocated onthesoutheast corner ofLower Roswell Road andLittle Road, on thenorth sideofFreydale Road, andatthenorthern terminus ofLucky Court 2450Lower Roswell Road, 386Lucky Court, 385Lucky Court, and2495 Freydale Road). (Previously heldbythePlanning Commission (PC) from the June2, 2026, PChearing untiltheJuly7, 2026, PChearing; continued from theJuly7, 2026, PChearing untiltheAugust 4, 2026, PChearing; continued byStafffromtheAugust 4, 2026, PChearing untiltheSeptember 1, 2026, PChearing; continued byStafffromtheSeptember 15, 2026, Board of Commissioners’ ( BOC) Zoning hearing untiltheOctober 20, 2026, BOC Zoning hearing; therefore, wasnotconsidered atthishearing).
Z-25 ELITE ENGINEERING (Aarish Group ofInvestment, LLC, Owner) requesting rezoning fromGCandNStoNRCforaconvenience storewithfuel salesinlandlot296ofthe20th district. Property islocated onthesouthwest side of Due West Road, northwest of Lisas Drive (3807DueWestRoad).
MINUTES OFZONING HEARING
COBB COUNTY BOARD OFCOMMISSIONERS
SEPTEMBER 15, 2026
PAGE2
WITHDRAWN, HELD, ANDCONTINUED CASES (CONT.)
Z-25 ELITEENGINEERING (CONT.)
Previously heldbythePlanning Commission (PC) fromtheJuly7, 2026, PC hearing untiltheAugust 4, 2026, PChearing; continued byStafffrom the August 4, 2026, PChearing untiltheSeptember 1, 2026, PChearing;
continued byStafffromtheSeptember 1, 2026, PChearing untiltheOctober 6, 2026, PChearing; therefore, wasnotconsidered atthishearing).
Z-27 KRGDEVELOPMENT, LLC (Cobb County, Georgia andKRGAcworth Stilesboro, LLC, Owners) requesting rezoning fromLRCand LROtoNRC th foradrive-thrucoffee shopinlandlot225ofthe20 district. Property is located ontheeastside ofMarsHillRoad, south ofStilesboro Road (1660 Mars HillRoad). (Previously continued byStafffromtheJuly7, 2026, August 4, 2026, andSeptember 1, 2026, Planning Commission (PC) hearings untilthe October 6, 2026, PChearing; therefore, wasnotconsidered atthishearing).
Z-28 CONNOR THORPE (Charles G. Bullard andBrendaG. Bullard, asTrustees oftheCharles andBrenda Bullard Revocable Trust, dated October 17, 2024, Owners) requesting rezoning fromR-30toR-20forasingle-family subdivision th inlandlot1194ofthe19 district. Property islocated ontheeastandwest sides ofBrown Road, south ofBrownwood Drive (5140and5180Brown Road).
Previously continued bythePlanning Commission (PC) fromtheJuly7, 2026, PChearing untiltheAugust 4, 2026, PChearing; heldbyPCfromthe August 4, 2026, PChearing untiltheOctober 6, 2026, PChearing; therefore, wasnotconsidered atthishearing).
Z-29 ALEXBRANDON NAVA CRUZANDISRAEL NAVA RIVERA (Alex Brandon NavaCruzandIsraelNavaRivera, Owners) requesting rezoning from CF th toCRC foralandscaping business inlandlot279ofthe17 district.
Property islocated ontheeastsideofJoyner Avenue, northofCranfill Road 1665 Joyner Avenue). (Continued byStafffromtheAugust 4, 2026, and September 1, 2026, Planning Commission (PC) hearings untiltheOctober 6, 2026, PChearing; therefore, wasnotconsidered atthishearing).
LUP-6 TASHA TOLBERT ANDALICIA STEEL (2591Morgan Road, LLC, Owner) requesting aTemporary LandUsePermit toincrease thecapacity of th agroup home fromfourresidents toeightresidents inlandlot590ofthe16 district. Property islocated onthewest sideofMorgan Road, south of Ramblewood Drive (2591Morgan Road). (Previously heldbythePlanning Commission (PC) fromtheJune2, 2026, PChearing untiltheJuly7, 2026, PChearing; continued fromtheJuly7, 2026, PChearing untiltheSeptember 1, 2026, PChearing; continued bythePCfromtheSeptember 1, 2026, PC hearing untiltheNovember 3, 2026, PChearing; therefore, wasnot considered atthishearing).
MINUTES OFZONING HEARING
COBB COUNTY BOARD OFCOMMISSIONERS
SEPTEMBER 15, 2026
PAGE3
WITHDRAWN, HELD, ANDCONTINUED CASES (CONT.)
LUP-17 ALEXBRANDON NAVA CRUZANDISRAEL NAVA RIVERA (Alex Brandon NavaCruzandIsrael NavaRivera, Owners) requesting aTemporary th LandUsePermit toallowasingle-family residence inlandlot279ofthe17 district. Property islocated ontheeastside ofJoyner Avenue, north ofCranfill Road (1665Joyner Avenue). (Continued byStaff fromtheAugust 4, 2026, andSeptember 1, 2026, Planning Commission (PC) hearings untilthe October 6, 2026, PChearing; therefore, wasnotconsidered atthishearing).
LUP-19 MARIO ABBOTT (Mario Abbott, Owner) requesting aTemporary Land UsePermit toallow more vehicles thanthecodeallows inlandlot779ofthe th 16 district. Property islocated onthesoutheast corner ofBoydRoad and Addison Road (1884Addison Road). (HeldbythePlanning Commission (PC) fromtheSeptember 1, 2026, PChearing untiltheNovember 3, 2026, PC hearing; therefore, wasnotconsidered atthishearing).
LUP-20 NATISSIA COOPER (Natissia Cooper andTerrance Cooper, Owners) requestingaTemporaryLandUsePermittoallowmorevehiclesparkedoutside th thanthecodeallowsinlandlot384ofthe19 district. Propertyislocatedonthe eastsideofRubyMountainStreet (1863RubyMountainStreet). (Continued by thePlanning Commission ( PC) from theSeptember 1, 2026, PChearing until the October 6, 2026, PC hearing; therefore, was not considered atthis hearing).
LUP-26 NEEDAM MOSES (Needam Moses andEdna Moses, Owners) requesting a Temporary LandUsePermittoallowanincrease incapacity ofagroup home th fromfourresidents toseven residents inlandlot557ofthe19 district.
Property islocated onthewest sideofWoodleigh Road, north ofCliffcrest 1117Woodleigh Road). (HeldbythePlanning Commission (PC) fromthe September 1, 2026, PChearing untiltheOctober 6, 2026, PChearing;
therefore, wasnotconsidered atthishearing).
SLUP-3 JOEDIRT DEVELOPMENT ( JoeDirtDevelopment, LLC, Owner) requesting aSpecial LandUsePermit forchipping, grinding, orreduction of materials ( th organic green waste) inlandlots930and943ofthe16 district.
Property islocated onthewest sideofKennestone Circle, northofCobb Parkway (1284Kennestone Circle). (Previously continued bythePlanning Commission (PC) fromtheApril7, 2026, PChearing untiltheMay5, 2026, PChearing; heldbytheBoard ofCommissioners (BOC) fromtheMay19, 2026, BOCZoning hearing untiltheJune16, 2026, BOCZoning hearing;
continued bytheBOCfromtheJune16, 2026, July21, 2026, andAugust 18, 2026, BOC Zoning hearings untiltheOctober 20, 2026, BOCZoning hearing; therefore, wasnotconsidered atthishearing).
MINUTES OFZONING HEARING
COBB COUNTY BOARD OFCOMMISSIONERS
SEPTEMBER 15, 2026
PAGE4
WITHDRAWN, HELD, ANDCONTINUED CASES (CONT.)
O.B. 50 Toconsider aSettlement ofLitigation forDavidPearson Communities, Inc.
andLandAcquisition Investments, LLCregarding caseZ-61of2023. Property islocated atthenorthwest intersection ofAtlanta Road andDaniel Drive, and th onthewest sideofAtlanta Road inlandlots421, 422, 443and444ofthe17 district (1972Atlanta Road).
Mr. Pederson presented theApplicant’srequest foracontinuance ofO.B. 50;
thereafter, thefollowing motion wasmade:
MOTION: Motion byAllen, second byGambrill, tocontinue O.B.50untilthe October 20, 2026, Board ofCommissioners’ Zoning Hearing.
VOTE: ADOPTED 5-0
Mr. Pederson made thefollowing announcement andreadinthecases fortheConsent Agenda.
AllinformationregardingzoningcasesmustbeturnedintotheZoningOfficeontheWednesday priortothezoninghearingforconsideration. Ifsaidinformationisturnedinpastthedeadline, thenitisattheBoard’sdiscretionastowhethertheinformationwillbeconsidered.
CONSENT AGENDA
MOTION: Motion byCupid, second by Birrell, toapprove thefollowing cases onthe Consent Agenda, asrevised:
Z-13 PRESTWICK COMPANIES (WG-75Partnership, Owner) requesting rezoning fromRSL (supportive) toRSL (non-supportive) forseniorliving th apartments inlandlot55ofthe20 district. Property islocated onthenorth sideofHickory Grove Road, andonthesouth sideofHickory GrovePlace Hickory Grove Road). (Previously heldbythe Planning Commission (PC) fromtheApril7, 2026, PChearing untiltheMay5, 2026, PChearing;
continued byStafffromtheMay5, 2025, PChearing untiltheJune2, 2026, PChearing; continued byStaffuntiltheAugust 4, 2026, PChearing; held bythePCfromtheAugust 4, 2026, PChearing untiltheSeptember 1, 2026, PChearing).
Toapprove Z-13totheRSL (non-supportive) zoning district, subject to:
1. Department ofTransportation comments andrecommendations
2. Water andSewer Division comments andrecommendations
3. FireDepartment comments andrecommendations
4. Stormwater Water Management Division comments and recommendations
5. Letter ofagreeable conditions fromParksHuffdatedAugust 25, 2026, including allexhibits (attached andmadeapartofthese minutes), not otherwise inconflict withtheStaff comments andrecommendations, with thefollowing changes totheletter:
MINUTES OFZONING HEARING
COBB COUNTY BOARD OFCOMMISSIONERS
SEPTEMBER 15, 2026
PAGE5
CONSENT AGENDA (CONT.)
Z-13 PRESTWICK COMPANIES (CONT.)
A. ItemNumbers 3and4 - addasecond sentence: “ Thesubstantial conformity requirement isenhanced tostrict conformity when it comes totheelevations shown ondrawing SK-1astothebuilding as shown having atwo-story frontonHickory Grove Place.”
Z-30 TWOCAPITAL DEVELOPER, LLC (JasaiKrupa, Inc., Owner) requesting rezoning fromPSCtoCRCforlightautomotive repair (TakeFiveOilChange) th inlandlot1029 ofthe16 district. Property islocated ontheeastsideof Roswell Road andonthewest sideofLecroy Drive, south ofBarnes MillRoad 2214Roswell Road). (Continued byStaffuntiltheSeptember 1, 2026, Planning Commission hearing).
Toapprove Z-30totheCRCzoning district, subject to:
1. SitePlanreceived bytheZoning Division onJune4, 2026 (attached and made apartofthese minutes), withtheDistrict Commissioner approving minor modifications
2. Nooutdoor storage oroutdoor display ofmerchandise
3. FireDepartment comments andrecommendations
4. Stormwater Management Division comments andrecommendations
5. Water andSewer Division comments andrecommendations
6. Department ofTransportation comments andrecommendations Clerk’sNote: Commissioner Birrell wanted itnoted thattheEnvironmental Study isincluded fortherecord.
Z-31 BARBARA FURR ANDPATRICIA FURR (Barbara MaeFurrandPatricia Furr, Owners) requesting rezoning from R-20toRD foraduplex inlandlot th 133ofthe17 district. Property islocated onthesouth sideofAustell Road, north ofPatMellRoad (2041Austell Road).
Toapprove Z-31totheRDzoning district, subject to:
1. Existing duplex only, withamaximum oftwodwelling units
2. Theexisting duplex shallremain onasingle parcel andshallnotbe subdivided tocreate separate lotsfortheindividual dwelling units
3. Variances asoutlined intheZoning Division comments and recommendations
4. Department ofTransportation comments andrecommendations
5. Stormwater Management Division comments andrecommendations
6. FireDepartment comments andrecommendations
7. Water andSewer Division comments andrecommendations
MINUTES OFZONING HEARING
COBB COUNTY BOARD OFCOMMISSIONERS
SEPTEMBER 15, 2026
PAGE6
CONSENT AGENDA (CONT.)
Z-32 TWOWINDY HILLS, LLC (TwoWindyHills, LLC, Owner) requesting th rezoning from GCtoLI foracontractor office inlandlot370ofthe17 district. Property islocated onthesouth sideofAtlanta Road, northofTaylor Drive (1718Atlanta Rd).
TodeleteZ-32totheTourist Services (TS) zoning district, subject to:
1. SitePlanreceived bytheZoning Division onJune29, 2026 (attached andmade apartofthese minutes), withtheDistrict Commissioner approving minor modifications
2. Code compliant parking shall beprovided, withtheDistrict Commissioner toapprove thefinalparking plan
3. Property permitted shall haveaspecialized contractor orcommunity retail useonly
4. Nooutdoor storage onsite (except fortheparking ofvehicles)
5. FireDepartment comments andrecommendations
6. Water andSewer Division comments andrecommendations
7. Stormwater Management Division comments andrecommendations
8. Department ofTransportation comments andrecommendations LUP-21 ARTEMIO CALDERON (Artemio Calderon, Owner) requesting a Temporary LandUsePermit (Renewal) toallow more adults andvehicles th thanthecodeallows inlandlot56ofthe17 district. Property islocated onthe north sideofWalnut Circle, atthenorthern terminus ofBirchwood Court (987 Walnut Circle).
Toapprove LUP-21for24months.
LUP-22 CELENE B. HERNANDEZ (Hector Alcides Hernandez, Owner) requesting aTemporary LandUsePermit toallow more adults andvehicles thanthe th codeallows inlandlot155ofthe17 district. Property islocated ontheeast sideofAustell Road, north ofAustell Circle (1877Austell Road).
Toapprove LUP-22for12months.
LUP-24 LUCY MASSEY (CraigStephen Massey andLucyElizabeth Massey, Owners) requesting aTemporary LandUsePermit (Renewal) toallowa th Personal Training Studio inlandlot404ofthe16 district. Property islocated onthewest sideofAcorn FallsDrive, northwest ofDavis Road (3331Acorn FallsDrive).
Toapprove LUP-24for24months, subject to:
1. Nomorethanthreeclients aday
2. Appointment hours shallbefrom8:30a.m. until12:30p.m.
MINUTES OFZONING HEARING
COBB COUNTY BOARD OFCOMMISSIONERS
SEPTEMBER 15, 2026
PAGE7
CONSENT AGENDA (CONT.)
LUP-24 LUCY MASSEY (CONT.)
3. Allparking shallbeinthedriveway, noparking onthestreet
4. Appointments shallbescheduled 30minutes apart
5. Appointments shall consist ofoneclientatatime LUP-25 INDIGO LAWNSCAPE, LLC (Reginald Allen Rutherford, Owner) requesting aTemporary LandUsePermit (Renewal) toallowabusiness and related vehicle parking inlandlots1244, 1245, 1272, 1273, and1319ofthe th 19 district. Property islocated onthesouthsideofHiram LithiaSprings Road, eastofHolloman Road (5280Hiram LithiaSprings Road).
Toapprove LUP-25for24months, subject to:
1. ForthisApplicant only
2. Quarterly inspections byCodeEnforcement
3. Height ofthefence shallbeeight feettoensure screening ofequipment fromtheadjoining property owners
4. Equipment stored ontheproperty shallbethefollowing (totalofeight vehicles):
a) Two-single axeldump trucks
b) Twobucket trucks
c) Twolandscape trucks
d) TwoBobcats
5. Nomore thanfiveemployees LUP-28 MIELKE WAY MANOR, LLC (GordyProperty Group, LLC, Owner) requesting aTemporary LandUsePermit (Renewal) toallowafamily farm, wildlife sanctuary, event center, andeducational facility inlandlot710ofthe th 19 district. Property islocated onthesouthsideofPairRoad, eastofSasanqua Lane (1901PairRoad).
Toapprove LUP-28for24months, subject to:
1. SitePlan dated June10, 2026 (attached andmade apartofthese minutes), withtheDistrict Commissioner approving minor modifications
2. Letterofagreeable conditions fromAdam Rozen datedOctober 30, 2023 (attached andmade apartofthese minutes), nototherwise in conflict
3. Shared Parking Agreement dated November 19, 2023, withtheTrinity Baptist Church ofSmyrna, Inc. andMielke Way, LLC (attached and made apartofthese minutes), nototherwise inconflict
4. ofway, allparking mustbeonanapproved parking area
MINUTES OFZONING HEARING
COBB COUNTY BOARD OFCOMMISSIONERS
SEPTEMBER 15, 2026
PAGE8
CONSENT AGENDA (CONT.)
LUP-28 MIELKE WAY MANOR, LLC (CONT.)
5. Noadditional exterior signs
6. FireDepartment comments andrecommendations
7. Water andSewer Division comments andrecommendations
8. Stormwater Management Division comments andrecommendations
9. Department ofTransportation comments andrecommendations
OTHER BUSINESS
O.B. 47 Toconsider astipulation amendment regarding signage forTheHenry regarding rezoning application Z-69of2020inlandlots914, 915, 945and946 ofthe17thdistrict. Property islocated onthesouthwest side ofI-75, northeast ofCobb Parkway, andonthenorthwest sideofI-285 (Circle75Parkway).
Toapprove O.B. 47, subject to:
1. Proposed signsquare footage approved asshownintheOtherBusiness Item (attached andmade apartofthese minutes)
2. Allprevious stipulations andconditions, nototherwise inconflict, to remain ineffect
O.B. 48 Toconsider areduction ofrequired public roadfrontage from75feettozero feetforTract2forThomas RayTaylor. Property islocated atthesouth endof th CathyAnnLaneinlandlot317ofthe20 district (183CathyAnnLane).
Toapprove O.B. 48, subject to:
1. Tract2roadfrontage reduced tozero-feetwithvariances AtthecallforO.B. 49 (ZachMunoz), neither theApplicant noropposition was present.
Commissioner Gambrill requested Staffreach outtotheApplicant; therefore, O.B. 49was pulled fromtheConsent Agenda untiltheApplicant could bereached. Laterinthehearing, thecase wascontinued (seepage 9forthemotion).
CONSENT VOTE: ADOPTED 5-0
REGULAR AGENDA
Z-17 JAIRO MURILLO (JairoMurillo, J.D. Clackum, Jr., HelenM. Clackum, and Tonya Clackum, Owners) requesting rezoning fromR-20andR-30toR-15for th aresidential subdivision inlandlots768and817ofthe16 district. Property islocated onthewest sideofOldCanton Road, andonthenorth andsouth sides ofClackum Road (1795and1785OldCanton Road, 1797Clackum Road and
MINUTES OFZONING HEARING
COBB COUNTY BOARD OFCOMMISSIONERS
SEPTEMBER 15, 2026
PAGE9
REGULAR AGENDA (CONT.)
Z-17 JAIRO MURILLO (CONT.)
1788Shelley Court). (Previously heldbythePlanning Commission (PC) from theJune2, 2026, PChearing untiltheJuly7, 2026, PChearing; heldbythe PCfromtheJuly7, 2026, PChearing untiltheAugust 4, 2026, PChearing;
heldbythePCfromtheAugust 4, 2026, PChearing untiltheSeptember 1, 2026, PChearing).
Thepublic hearing wasopened; Melissa Murillo, Tonya Clackum, and Jed Beardsley addressed theBoard. Following thepresentation anddiscussion, the following motion wasmade:
MOTION: Motion byBirrell, second bySheffield, todeleteZ-17tothestraight R-15zoning district, subject to:
1. 25-ftbuffer adjacent tothePintoProperty, which includes a10-ft undisturbed bufferlocated closest totheproperty lineandan additional 15-ftlandscape buffer (language readintotherecord – attached andmade apartoftheseminutes)
2. 15-ftlandscape buffertoMillCreekPreserve
3. 50-ftlandscape buffer onthewestern sideofLot16
4. 14homes willbedeveloped now
5. Lot15willremain asgreenspace; itisnotbuildable
6. Lot16willbedeveloped inthefuture withstipulations included from OtherBusiness Item23from2024; onlyonehomecanreside onthislot
7. AllStaff comments andrecommendations, nototherwise inconflict
8. Planning Commission (PC) comments andrecommendations forZ-17 fromtheSeptember 1, 2026PCZoning Hearing (attached andmadea partofthese minutes)
9. District Commissioner tohave finalapproval oftheSitePlan and elevations
10. County Arborist toreview andapprove thelandscape buffers
VOTE: ADOPTED 5-0
O.B. 49 Toconsider areduction ofrequired public roadfrontage from75feettozero feetforTract2forZachMunoz. Property islocated onthenorth sideofPickens th Road inlandlots141and156ofthe19 district (5310Pickens Road).
Mr. Pederson announced thatStaffheard back fromtheApplicant, andhe requested O.B. 49becontinued untilnext month; thereafter, thefollowing motion wasmade:
MOTION: Motion byGambrill, second byAllen, tocontinue O.B. 49untilthe October 20, 2026, Board ofCommissioners’ Zoning Hearing.
VOTE: ADOPTED 5-0
MINUTES OFZONING HEARING
COBB COUNTY BOARD OFCOMMISSIONERS
SEPTEMBER 15, 2026
PAGE10
REGULAR AGENDA (CONT.)
Chairwoman Cupid called forabriefrecess from9:58a.m. until10:07a.m.
Z-21 BRANCH ACQUISITION COMPANY, LLC (Branch Atlanta Road Associates, Owner) requesting rezoning fromHItoRRC foramixed-use th development inlandlots894and900ofthe17 district. Property islocated on thesouthwest corner ofAtlanta Road andPlantAtkinson Road (2840Plant Atkinson Road). (Previously continued byStafffromtheJune2, 2026, Planning Commission (PC) hearing untiltheJuly7, 2026, PChearing; held bythePCuntiltheAugust 4, 2026, PChearing; continued byStafffromthe August 4, 2026, PChearing untiltheSeptember 1, 2026, PChearing).
Thepublic hearing wasopened; Kevin Moore, MergHoffman, PetePellegrin, Thomas Tribble, Borzoo Tahriri, BillMillkey, JackHead, andJennifer Burbine addressed theBoard. Following thepresentation anddiscussion, thefollowing motion wasmade:
MOTION: Motion byAllen, second byCupid toapprove ofZ-21totheRRC zoning district, subject to:
1. Letter ofagreeable conditions fromKevinMoore datedSeptember 9, 2026 (attached andmadeapartofthese minutes)
2. Staff comments andrecommendations, nototherwise inconflict
3. FinalSitePlan, Landscape Plan, andelevations tobeapproved bythe District Commissioner, butwithaseven dayreview process with the Vinings Villages Homeowners Association (HOA), WestVillage Community Association, andthe4400WestHOAtoreview saidplans andelevations
VOTE: ADOPTED 3-2, Birrell andGambrill opposed Chairwoman Cupid called forabriefrecess from11:25a.m. until11:31a.m.
LUP-14 STEVEN VANGINKEL (Steven Wenetta VanGinkel, Owner) requesting a Temporary LandUsePermit toallowanincrease inthecapacity ofagroup th home fromfourresidents toseven residents inlandlot159ofthe17 district.
Property islocated onthesouthwest corner ofWalton Way andRockin Hill Drive (195Rockin HillDrive). (Previously heldbythePlanning Commission PC) fromtheJuly7, 2026, PChearing untiltheSeptember 1, 2026, PC hearing).
AtthecallforLUP-14 (Steven VanGinkel), neither theApplicant nor opposition waspresent; thereafter, thefollowing motion wasmade:
MOTION: Motion bySheffield, second byBirrell, todeny LUP-14without prejudice.
VOTE: ADOPTED 5-0
MINUTES OFZONING HEARING
COBB COUNTY BOARD OFCOMMISSIONERS
SEPTEMBER 15, 2026
PAGE11
REGULAR AGENDA (CONT.)
LUP-18 JAMARRION TABOR (Roberto Urquiza Denova andIsaac Ramirez AKA IssacRamirez Pulido, Owners) requesting aTemporary LandUsePermit to allowanincrease incapacity ofagroup home fromfourresidents tofive th residents inland lot561ofthe19 district. Property islocated onthenorthside ofRustic Drive, eastofMilford Church Road (1768Rustic Drive).
AtthecallforLUP-18 (Jamarrion Tabor), neithertheApplicant noropposition waspresent; thereafter, thefollowing motion wasmade:
MOTION: Motion bySheffield, second byBirrell, todeny LUP-18without prejudice.
VOTE: ADOPTED 5-0
LUP-23 FELICIA UMANAH (EfosaGregory Igbinoba andFelicia Umanah, Owners) requesting aTemporary LandUsePermit toallowanincrease incapacity of agroup home from fourresidents tosixresidents inlandlots710 and 711of th the19 district. Property islocated onthenorthsideofPairRoad, westof Leatherleaf Drive (1934PairRoad).
Thepublic hearing wasopened, andFelicia Umanah addressed theBoard.
Following thepresentation anddiscussion, thefollowing motion wasmade:
MOTION: Motion bySheffield, second byBirrell, toapprove LUP-23for24 months, subject to:
1. Sixresidents
VOTE: ADOPTED 5-0
LUP-27 TYLER HOWEY (TylerRossHowey, Owner) requesting aTemporary LandUsePermit toallow anincrease incapacity ofagroup home fromfour th residents to10residents inlandlot689ofthe19 district. Property islocated atthenorthern terminus ofAvondale Parkway, northofMacedonia Road (3235 Avondale Parkway).
Thepublic hearing wasopened; TylerHowey andVenetia Roy addressed the Board. Following thepresentation anddiscussion, thefollowing motion was made:
MOTION: Motion bySheffield, second byBirrell, todeny LUP-27 with prejudice, subject to:
1. Applicant tocome intocompliance within30days
VOTE: ADOPTED 5-0
MINUTES OFZONING HEARING
COBB COUNTY BOARD OFCOMMISSIONERS
SEPTEMBER 15, 2026
PAGE12
OTHER BUSINESS
Chairwoman Cupid called foralunch recess at12:31p.m. Thehearing reconvened at1:31 p.m.
O.B. 29 Toconsider amending thesiteplanforSidnei andAmber Silva regarding rezoning application Z-15of2025. Property islocated atthesouthwest intersection ofShallowford RoadandShallow Court inlandlots310and339 th ofthe16 district (2280Shallowford Road). (Previously heldbytheBoard of Commissioners (BOC) from theJune16, 2026, BOC Zoning hearing until theJuly21, 2026, BOCZoning hearing; continued byStafffromtheJuly21, 2026, andAugust 18, 2026, BOCZoning hearings untiltheSeptember 15, BOCZoning hearing).
Thepublic hearing wasopened; Amber SilvaandPaulAdams addressed the Board. Following thepresentation anddiscussion, thefollowing motion was made:
MOTION: Motion byBirrell, second byAllen, toapprove O.B. 29, subject to:
1. SitePlandatedSeptember 14, 2026 (attached andmadeapartofthese minutes) forOptionBonly
2. Water andSewerDivision comments andrecommendations included intheOtherBusiness Item
3. FireDepartment comments andrecommendations included inthe OtherBusiness Item
4. CobbDOTcomments andrecommendations included intheOther Business Item
5. Stormwater Management Division comments andrecommendations included intheOtherBusiness Item
6. TheSitePlanforthisuseonly
7. Notractor trailers orarticulated freight vehicles
8. Alldeliveries mustbeon-siteandnotonShallowford Road
9. Noaccess toShallow Court
10. Remove theshedfromthebackyard
11. Nooutdoor storage oroutdoor display ofmerchandise ormaterials
12. Maximum 1200square footattached building withabreezeway tothe existing structure; onestorybuilding
13. FinalSitePlan, Landscape Plan, andbuilding elevations tobe approved bytheDistrict Commissioner
14. Hours ofoperation forthestorage building shallbeMonday through Friday from10:00a.m. until4:00p.m. andhours fortheshowroom shallbeMonday through Saturday from 10:00a.m. until4:00p.m.;
closed tothepublic onSundays
15. Allprevious stipulations andconditions, nototherwise inconflict, to remain ineffect
VOTE: ADOPTED 5-0
MINUTES OF ZONING HEARING
COBB COUNTY BOARD OF COMMISSIONERS
SEPTEMBER 15, 2026
PAGE 13
ADJOURNMENT
The hearing adjourned at 3:01 p.m.
ef Show
Robin L. Stone, Deputy County Clerk Cobb County Board of Commissioners
THIS
PAGE
INTENTIONALLY
LEFT
BLANK
Min. Bk, 10! _ Petition No, 2/3 _ Doc. Type _ letter
.) H Meeting Date ~~ F-[S-Aork
GARVIS L. SAMS, JR. S AMS, LARKIN & HUFF 770°422+7016
(1952-2025) TELEPHONE
JOEL L. LARKIN A LIMITED LIABILITY PARTNERSHIP 77*426*6583
SUITE 100
PARKS F. HUFF FACSIMILE
376 POWDER SPRINGS STREET
MARIETTA, GEORGIA 30064-3448
August 25, 2026
(STIPULATION LETTER)
VIA EMAIL
Mr. John P. Pederson, AICP, Manager Cobb County Zoning Division Community Development Agency 1150 Powder Springs Road, Suite 400 Marietta, GA 30064
Re: Application of Prestwick Companies to Rezone an approximate 3.17+-Acre Tract from RSL Supportive to RSL Non-supportive; Land Lot 55 of the 20" District; Located on the north side of Hickory Grove Road, southeast of the intersection of Hickory Grove Place;
Z-13 for April 2026
Dear John:
Prestwick Companies (“Applicant”) requests approval to convert the existing RSL Supportive zoning approval for the Subject Property to RSL Non-supportive for a 73-unit senior living community in a two- and three-story building, as indicated on the revised site plan submitted to the Zoning Division on July 29, 2026. The property was previously rezoned to RSL Supportive for a 100-unit, two-story supportive residential development. The application is scheduled to be heard and considered by the Cobb County Planning Commission on August 4, 2026, and, thereafter, heard and considered for final action by the Cobb County Board of Commissioners on August 18, 2026.
The Subject Property is a +3.17-acre tract of land located on the north side of Hickory Grove Road, southeast of the intersection of Hickory Grove Place. The Subject Property is within an area denominated as Community Activity Center (“CAC”) under Cobb County’s Future Land Use Map (“FLUM”) and it is currently zoned RSL-Supportive. The property is undeveloped and abuts property zoned GC to the east and is in an area having a mixture of residential and commercial zoning that includes GC, PRD, RA-4, R-20, and R-15.
The County zoning staff has reviewed the application and recommended approval because the proposal will provide additional senior housing in an area with strong access to shopping and transportation corridors. The Applicant submits that the proposed conversion from supportive senior housing to non-supportive senior housing will better address the community’s need for attainable senior housing options.
Petition No. i /3 S H Meeting Date 9-15-2006 Continued
VIA EMAIL
Mr. John P. Pederson, AICP, Manager Cobb County Zoning Division Community Development Agency August 25, 2026
Page 2
During the pendency of this application, we have established a dialogue with the County’s professional staff and area neighbors, and the revised site plan is based on input from the community.
The changes to the site plan include orienting the building so that only two stories face the neighbors to the north and eliminating any access onto Hickory Grove Place. In that regard, this letter will serve as the Applicant’s agreement to the following stipulations, which shall become conditions and a part of the grant of the requested Rezoning and shall be binding upon the Subject Property thereafter. The referenced stipulations are as follows, to wit:
1. The stipulations and conditions set forth herein shall replace and supersede in full any and all prior stipulations and conditions in whatsoever form which are currently in place concerning the Subject Property which constitutes the subject matter of the above-captioned Application.
2. The approval of this Application shall be specifically for the purpose of a 73-unit non-supportive Residential Senior Living (“RSL”) facility.
3. This Rezoning shall be in substantial conformity to that certain revised Site Plan prepared by Kimley-Horn, submitted to the Zoning Division on July 29, 2026, and which is also attached to this letter.
4. The architectural style and composition of the building will be in substantial conformity to the renderings submitted with the application and attached as Exhibit “A” and Exhibit “A Pg. ow
5. In order to increase housing options for seniors in the community, the Applicant agrees to unit layouts for the 73 units as follows:
a. The number of one-bedroom units proposed is 46 (63%).
b. The number of two-bedroom units proposed is 27 (37%).
6. The building will be split between two and three stories, with only two stories facing the neighbors to the north and three stories facing south. The cross-section showing the elevation
differences and the site plan with the finished floor elevations is attached as Exhibit “B” and ad
Petition No. Z-13 5 H Meeting Date 9-15-2526
Continued
VIA EMAIL
Mr. John P. Pederson, AICP, Manager Cobb County Zoning Division Community Development Agency August 25, 2026
Page 3
7. There shall be no access onto Hickory Grove Place, with the fire department confirming emergency access is not required.
8. The District Commissioner is to approve the final site plan and building elevations.
9. Compliance with recommendations from the Cobb County Department of Transportation that are contained in the staff analysis.
10. Compliance with directives from the Cobb County Fire Marshal’s Office regarding life, safety, and fire prevention issues.
11. Subject to recommendations from the Stormwater Management Division with respect to detention, hydrology, stormwater management, water quality and downstream considerations.
This stipulation includes recommendations regarding the ultimate location and configuration of on-site detention and water quality.
12. The District Commissioner shall have the authority to approve minor modifications as this development proposal proceeds through the Plan Review process and thereafter, except for those that:
a. Reduce the size of an approved buffer adjacent to property which is zoned in a more restrictive zoning district.
b. Relocate a structure closer to the property line to an adjacent property which is zoned in a more restrictive zoning district.
c. Increase the height of a building adjacent to property which is zoned in a more restrictive zoning district.
d. Change access location to different roadways.
e. Seek variances to provisions of the Cobb County Zoning Ordinance.
Please do not hesitate to contact me should you have any questions or need any additional
documentation prior to this application being heard and considered by the Planning Commission and the Board of Commissioners next month.
Petition No. Z-!3 S H Meeting Date DV 1S—Acae Continued
VIA EMAIL
Mr. John P. Pederson, AICP, Manager Cobb County Zoning Division
Community Development Agency August 25, 2026
Page 4
With kind regards, I am
PFH/jac Attachments
CC:
Very truly yours,
SAMS, LARKIN & HUFF, LLP
BLS. AY
Parks F. Huff phuff@samslarkinhuff.com
Members, Cobb County Board of Commissioners (via email w/attachments) Members, Cobb County Planning Commission (via email w/attachments) Dr. Jackie McMorris, County Manager (via email w/attachments)
Board of Commissioners Assistants (via email w/attachments)
Ms.
Mr.
Mr.
Ms.
Mr.
Mr.
Ms.
Ms.
Ms.
Mr.
Ms.
Ms.
Mr.
Mr.
Mr.
Mr.
Jessica Guinn, AICP, Director (via email w/attachments)
Terry Martin, AICP, CNU-A, Senior Planner (via email w/attachments)
Cameron Jones, MCRP, CNU-A, Planner III (via email w/attachments)
Jessica Berman, MPA, CNU-A, Planner II (via email w/attachments)
Peyton McClure, CNU-A, Planner II (via email w/attachments)
Shaun Daniels, Planner I (via email w/attachments)
Pam Mabry, County Clerk (via email w/attachments)
Robin Stone, Deputy County Clerk (via email w/attachments)
Leila Washington, Deputy County Clerk (via email w/attachments)
Jeff Byrd, Fire Marshal’s Office (via email w/attachments)
Amy Diaz, P.E., Cobb DOT (via email w/attachments)
Wilson Collins, P.E., Cobb DOT (via email w/attachments)
Andrew Heath, P.E., Stormwater Management Division (via email w/attachments) Chris Duggan, Cobb County Water and Sewer Division (via email w/attachments) Casey Craven, Vice President/Development, Prestwick Companies (via email w/attachments)
James Morris, Concerned Neighbor (via email w/attachments)
Petition No. Z-/3
noone
Meeting Date JAT-aose
Continued
23%
SITE NOTES 33i
PROPERY LINE NOTE “wo REZONING NOTES Gc # ;
* eRon. + PROPERTY LINE SHOWS THE COMBINATION OF TRACT 1 (1540 o~ SUMMARY. rs} ait ARCATECTS, OATED 02.02.2028 AND IS FOR ILLUSTRATIVE cn Conan ere comes LAN LOT ss i f PURPOSES ONLY. - fot) 2OTHOISTRICT - 2ND SECTION pa oes !
i
2A CURRENT ZONING —- RESIDENTIAL SEMOR LIVING RSD) eo 3
‘UNLESS OTHERWISE NOTEC. o> PROPOSED ZONING RESIDENTIAL SENIOR LIVING (RSL) om .
(NONSUPPORTIVE RESOENTIAL UMTS) s
3. SIDEWALK INSTALLED AGAINST BACK | _ i
mam No OF CURB SHALL BE nN TOTAL PROPERTY AREA 317 AC 2% mera eyes suas WM 3
_ NET PROPERTY AREA aeaac =m Hey
4. ALL SRONAGE AND STRIPING MUST MEET i
SoS, a — ny pe : ' = IMPERMOUS AREA {at ACRES 5%) “ seu
1 => PERVIOUS AREA 437 ACRES (45%) le ZZ ;
5. REFERENCE LANDSCAPE PLANS FOR ALL H H
ee eran PROPOSED BUILDING SETBACK: NOT APPUCABLE i g H
(WNINUM 15 FEET SETBACK BETWEEN BU OINGS: u se.
Maen 20 FEET ADJACENT TO ANY PUBLIC ROADWAY :
MAXIMUM BUILDING HEIGHT lad :
VARIANCE 2 STORIES—WAC CAC
REQUEST SUMMARY 4 STORIES 3
. ra oF 1 rc a at rian 3
1.75 SPACES PER UNIT TO 1.25 SPACES PER UNIT. i MAE HG ADDRESS La 3 oronseren MAIMUM IMPERVIOUS AREA 55%
2. VARIATION ROM MAXIMUM BUILDING HEIGHT OF 2 STORIES TO “Sow.
peop gl iy PROPOSED IMPERVIOUS AREA 55% (MAXI
RESIDENTIAL SEMOR LIVING,
REQURED UNITS PER ACRE
OSONAC. 0.75 CAC AND 2ORAC
x
WHICH IS A ZONING RECUIREMENT TO HAVING SURFACE
PARKING.
PRESTWICK
COMPANIES
REQUIRED LANDSCAPE BUFFERS Fa
naz 50 oS 2067 BUFFER ADJACENT TO RESIDENTIAL PROPERTY fs
“ 35 AS) WADE ORES RO 10 FT BUFFER WHEN ADJACENT TO NONAESIOENTIAL PROPERTY fe eeeanenbonaas eieiconesn erg msn amon vacey uf Secon PROPOSED LAND USES & DENSINES: He 3 AED AT OME TOME Tamm or CRORE TFAMLY RESOENTIA—TRUNMTS (OTAL iis snasrmo TaCEE wren 1 BEDROOM UNITS (65%) sant, 5 Fd casero rants ro ream \ YaEoRoOM UMTS 37) punrs H 233 Groactas unoscare surres Hi £82
we Pal a
PROPOTED SHRUBS FOR Ae REQUIRED PARKING 129 SPACES TOTAL) |
Cancae SREB, a\s Se AMY CUTE Toe 9PACES SAT vecen cy res uma 2 NT (| even corre wireee * % x2 5 fy
\ e. So LTH AMY PARES 12 SPACES (1 TAIT - IY a] v “rast tesrace®
vance Conces Bi
THIS SITE IS NOTIN A FLOODPLAIN.
Tosa R 2. THE FLOOD MAP FOR THE SELECTED AREA IS NUMBER
AREA Saha FS TEAC 3 19087 COM EFFECTIVE ON TON/2018 \_— prcwosen oer —~\
PURGING SETRACK LE
THE SITE DOES NOT CONTAIN LAKES, STREAMS, OR STREAM
SUFFERS
[PROPOSED TREE On
COW OSCMPE ANOS
4. THERE ARE NO LANOLOT UNE AND DISTRICT UNES THROUGH {
WILL NEED TO BE SURVEYED FOR PIN LOCATIONS
ALL PARKING SPACES ARE 9 FEET WHDE AND 18 FEET OFEP
UNLESS MEF ‘OTHERWISE,
TMIS SITE DOE'S NOT CONTAIN A CEMETERY.
He ONO.
APPROXIMATE AND SUBUECT TO CHANGE AS DESIGN
DEVELOPS
ALL PARKING COUNTS ARE APPROXIMATE AND SUBJECT TO
CHANGE AS DESIGN DEVELOPS PARKING COUNTS WALL
EXCEED TOTAL PROPOSED SHOWN ABOVE,
1725 UNDERSTOOD THAT THE SITE MUST COMPLY VATH ALL
APPLICABLE ADA STANDARDS, INCLUOING PARKING ANO
AND WALL BE
SUCH,
UAwD LOTS 20TH OSTRIT [hee | ISSUANCE AND REVISION DESCRIPTIONS,
Pmcmmessooase 4 70808800390
10. IF ACCESS GATES ARE REQUIRED THEY WILL BE PLACED
1DOFT FIOM EDGE OF EXISTING RIGHT OF WAY
©6210 ZONING SITE PLAN 2414, 2028 5 27pm by Onriel Kart
HICKORY GROVE
ROAD
omnia we ar ions ent Ne UNDERGROUND STORMWATER DETENTION W4UL BE
ew ) STANOAROS ANO REQUIREMENTS
lg. || 02 THERE AR NO HOON WETLANDS ON THI SITE z et \ || 1 rere ane :,
Fae < AREAS ON THIS SITE. 3
gr NS x
ie 14. SHOEWALK AND CURBING ALONG RIGHT OF WAYS WALL BE a3
oe REPLACED IF DESTROYED OR DAMAGED OURING Fi
A CONSTRUCTION a3
H EH
‘ U 2
LEGEND
a : — — — — mrorerry une
PROPOSED STREET YAMS
TREES EVERY ETN
WAKE HICKOR v GROVE SELF STORGE LAC
PeVSICAL ADDRESS 1988 NICKOMY GROVE PO -
MAEBS ADORESS S80 M ROMALO REAQAM RD
—— OFT BURLING SETBACK LINE
— 10 FT LANOSCAPE BUFFER LINE
Fe] concnere ravine [(] concrre sinewan
@ PARKING COUNT
boast TREE AREA TO REMAN
ie 5 GRAPHIC SCALE IN FEET
o fw ‘0
|
OT FOR CONSTRUCTION
noite eranaznay ie
ZOMING SITE
PLAN
2-13 AS -2s.
a Ne
eeting Dat Continued
Petition No.
fA iVi
ry é (VW. LIGtHXa
Pee PIS ns Meeting Date F-IS-Aore Continued
EXHIBIT "A Pg. 2" 7
~,
Petition No. Z-13 Meeting Date 9-15-2026
- Continued # e i gs" = Fae Ss Af = .: , fx é : - > piece: é
* : :
+ eV A poe ¥ ‘i ’ * ‘ Se * = } 3 +o~ * - 4% Pp i ¥ % ‘ y 4 ied Vie Bldg FFE 3 Story Side Bidg FFE.2 Story Side l} Zp a 1154 ae tae Elevation
Hickory Grove Road
1164
rollin 2a &
mt }
HICKORY GROVE RD
GEHEBER (2 Prestwick SITE SECTION @ é LEWIS GLAATL.COM companies HICKORY GROVE 4/2/2026 SK-1
B ARCHITECTS SIBOREE
HONE: 404 278
ORY GROVE DR
WGA 30144
EXHIBIT "c"
Petition No.
Meeting Date Continued
Z-/3
ke
7,00 « SITE PLAN dwg C710 ZONING SITE PLAN. hd 14. 2026 $ Z?pm_by Danel Kart
KACHB.
SITE NOTES
1 FROM AN ELECTRONIC ews
ARCHITECTS, DATED 02.02.2026 AND IS FOR ILLUSTRATIVE
CONTRACTOR SHALL REFEF
2. ALL DIMENSIONS ARE FROM FACE OF CURB TO FACE OF CURB
UNLESS OTHERWISE NOTED.
2, SIDEWALK INSTALLED AGAINST BACK OF CURB SHALL
INSTALLED PER THE PLAN AS MEASURED FROM THE BACK OF cure,
4. ALL SIGNAGE AND STRIPING MUST MEET THE LATEST
REMENTS SET FORTH BY MUTCD GDOT, AND GEORGIA
STATE CODE.
5S. REFERENCE LANDSCAPE PLANS FOR ALL HARDSCAPE AND
LANDSCAPE DETAILS ANO SPECIFICATIONS,
VARIANCE REQUEST SUMMARY
sf TIEAMILY PARKING oF
1.75 SPACES PER UNIT TO 1,25 SPACES PER UNTT
2. VARIATION FROM MAXIMUM BUILOING HEXGHT OF 2 STORIES TO
HAVING 3 a
RESDENTIAL SENIOR LIVING,
L r
WHICH IS A ZOMING REQUIREMENT TO HAVING SURFACE
PARKING
4. VARIATION FOR MAVING MORE THAN 4 OWELUING UNITS
ATTACHED AT ONE TIME,
Preto
)
He
HICKORY GROVE ROAD) ANO TRACT 2 (HICKOPRY GROVE
ROAD). THE PROPERTY UNE (S YET TO BE COMBINED INTO
ONE PARCEL
* PROPERTY LINE SHOWS THE COMBINATION OF TRACT 1 (1550
open meysical atone 470
MARS ADORESS atze ICRORY CHASE OR
mon aes Tombs aa
GROVE,
a -eRCKORY Fe 1 Sa, OCR lar OF WR Ny sAsre EN st ne9° 00 00 8.
54248 eo N02" 32 54 18E_/ 555 [Tt
s6e-oz 20138 | 6508 ExesTO PROPERTY MES
ART-NR UE
PRomoneo PROPER TYNE
TOT eRY UNE
ez’ oe 8 Mow 4 1 808
; :
Nas: so 37
—_—--
(ane aas resesoxe_/7 ss043 9194
N72: Me 4
OMOEA TE UMUAS 8 MAGA SEDER
Perea
ee EW
[Neo 2s 1726W ast
s
|
OMOEA BANCO CESAR A FUMES
Nts 4S LTE \e== =e
27.808. p
1 * \ ro
2 OO19.O
ae ig ao aew 7 S88 aE al OH
MMR HICKORY GROVE SELF STOROE LAC
PYERAL ADOREES NRE HECKORY GROVE RO
) \ oe
1148
cote ¢ AMER HC KOM (GROVE SEF 5 evERy FT OY two soonest ees now ‘Te tae oncoo0.
om roma oc
ona RS he oee SF STORE
\—— racronee 20-7
Flevaton 14 2¢W
\ L
PROPOSED STREET YARD
Smee EVERY FT
See oe
S77 08 4072
_ eat Serres
ERE TNG DAN EMORY ENTRANCE
focaTes ow
TWO PARCELS
prmeasry RESOONT ACCESS,
mi
ENR
ano
WOMICLE ALCESS PONT
139855
SITE SUMMARY.
LAND LOT SS
20TH DASTRIGT - IND SECTION
CURRENT ZONING RESIDENTIAL SENIOR LIVING (RSL)
TOTAL PROPERTY AF BIT AC
RIGHT-OF-WAY DEDICATION «=O. 4 AC
NET PROPERTY AREA OB Ac
ac
IMPERVIOUS AREA S88 ACRES (55%)
PERI 137 ACRES 145%)
BULOING
MINIMUM 15 FEET SETBACK BETWEEN BUROINGS.
ANIM 20 FEET ADJACENT TO ANY PUBLIC ROAOWAY
IMUM BUILDING HEIGHT TOFT
2 STORIES NAC, CAC
4st G
SSFT.NAC, CAC
SOFT RAC
MWAXGMUM IMPERVIOUS AREA 56%
PROPOSED IMPERVIOUS AREA — SS% (MAX)
REQUIRED UMTS PER ACRE
QSONAC. 0.75. CAC, AND 2.0 RAC
REQUIRED LANDSCAPE BUFFERS
2057 BUFFER ADJACENT TO RESIDENTIAL PROPERTY
SOFT BUFFER WHEN AQJACENT TO NON.RESIOENTIAL PROPERTY
propose LAND USES 4 DENSITIES:
MULTIFAMELY aL 73 UNITS TOTAL,
UMTS
1 BEDROOM UNITS (83%)
2 BEDROOM UNITS (7%). 27 UMTS
e M
REGUIRED PARKING ‘178 SPACES (TOTAL)
ae TAMMY (73 ONT (on sPaces 2m)
PROPOSED PARKING 92. SPACES (TOTAL)
‘ramoano tesraces Nansen Toners
1. THIS SITE ISNOT INA FLOODPLAIN
‘THE FLOOD MAP FOR THE SELECTED AREA [S NUMBER.
ROR?CDOMEE EFFECTIVE On 10/5/2018
v
JHE SITE DOES NOT CONTAIN LAKES, STREAMS. Of STREAM
SUFFERS,
40 THERE ARE NO LANOLOT UNE AND O:STRICT LINES THROUGH
COUNTY
WILL NEED TO BE SURVEYED FOR FIN LOCATIONS
ALL PARKING SPACES ARE 9 FEET WMDE ANID 19 FEET DEEP
UNLESS MENTIONED OTHERWASE.
THIS SITE OOES NOT CONTAIN A CEMETERY.
THE PROPOSED BUILDING INFORMATION SHOWN HEREON [5
APPROXIMATE AND SUBUECT TO CHANGE AS DESIGN
DEVELOPS.
ALL PARKING COUNTS ARE APPROXIMATE AN SUBJECT TO.
aS DEVELOPS, PARKING COUNTS WALL
EXCEED TOTAL PROPOSED:
8 TIS UNDERSTOOD THAT THE SITE MUST COMPLY ¥MTH ALL
APPLICABLE PARIQNG AND
ADA STANDARDS. INCLUDING
ANO WALL BE
suce
10 IF ACCESS GATES ARE REQUIRED THEY WILL BE PLACED
1O0FT FROM EDGE OF BASTING RIGHT OF WAY
17. UNOEROROUND STORMWATER DETENTION WALL BE
STANDARDS AND REQUIREMENTS.
12. THERE ARE NO KNOWN WETLANDS ON THIS SITE
THERE ARE NO.
AREAS ON THIS. SITE.
SDEWAL CURBING ALONG RIGHT OF WAYS WALL BE
REPLACED IF DESTROYED OR CAMAGED DURING
CONSTRUCTION
PHONE 77, 7OLA210
WWW MLEY-HORN COM
Kimley»Horn
BURLONG 190, SUITE 200
aoa
PHONE 404.843.3805 | CHAMBLEE, GEORGIA 30341
PRESTWICK
COMPANIES
AT1S MORTHSIOE PARKWAY. HO
BLOG 200. SLATE 175
ATLANTA, GA. 3032?
our
td [one Te
———— ee
TSSUANCE AND REVISION DESCRIPTIONS,
Pe senassoam 4 20008500390.
LAND cOT 5S. 397m OTR [No
HICKORY GROVE
ROAD
| ree wcK ORY GROVE RO MW
LEGEND
—— = — — PROPERTY LUNE
— — — — wrreurnin seTercK UNE
Ses 10 FT LANDSCAPE BUFFER LINE
[TET] CONCRETE Pavenent
CONCRETE SIDEWALK
PARKING COUNT
STING TREE AREA To REMAN
GRAPHIC SCALE IN FEET
a © ©
PRELIMINARY: NOT FOR CONSTRUCTION
FILED WITH COUNTY CLERK THIS ell DAY
OF ox 0le BY SoAns-Bicrell yy ft) -{1- oe wo Oa5-S+ puSfer
Sfo~re
COUNTY CLERK/ASST. COUNTY CLERK/DEPUTY COUNTY CLERK
COBB COUNTY, GEORGIA
Along the shared property boundary with 1731 Canton Lane, beginning at the northern
corner and extending approximately 35 feet along the shared property line, the Applicant shall provide a landscaped buffer 5 feet in width and increasing to 10 feet in width.
Beginning approximately 35 feet from the northern corner and continuing along the remainder of the shared property line, the Applicant shall provide a total 25-foot buffer consisting of a 10-foot undisturbed buffer adjacent to the shared property line and an
additional 15-foot landscaped buffer.
Existing trees along the shared property boundary shall be protected to the maximum extent reasonably feasible during grading and construction. Tree-protection measures shall include protection of the root plates and critical root zones of existing boundary trees, including trees located on or immediately adjacent to the 1731 Canton Lane property, to the extent those root systems extend onto the Applicant’s property.
Mftin. Bk, LOL Petition No. 4-!7__ Doc. Type ef
Meeting Date _q-|S-0226¢
Min. Bk. LS\_.. Petition No. 2-7 _
MINUTES OF ZONING HEARING Doe. Type Pn tats Plocsnimes Cotman issin COBB COUNTY PLANNING COMMISSION Sommanhs | fesomenpmuchaties Fre F=17 SEPTEMBER 1, 2026 Meeting Date 9-15" 2)—_
PAGE 8
REGULAR AGENDA (CONT.)
PRAN CH A a
rar OND AR ar we J
wz te oS . =
on the northwest corner of Atlanta Road and Plant Atkinson Road (2846Plant Atkinson Road). (Previously continued by Staff from the June 2, 2026, Planning Commission (PC) hearing until the July 7,26 6, PC hearing;
held by the PC from the July 7, 2026, PC hearing until the August 4, 2026, PC hearing; continued by Staff until the September 1, 2026, PC hearing).
The public hearing was opened;-Kevin Moore, Bill .Millkey, Jennifer Burbine, and Jack Head address€d the Planning Commission. Following the presentation and discussiefi, the following motion was made:
MOTION: Motion by Micheletto, second by Beloin, to recommend denial of Z-21.
VOTE: ADOPTED 4-0, Faucette not present
Clerk’s Note: During the public hearing, there was a.brief recess called due
to. technical dithculties.
40-4-C6CHATCEH-CL CUED:
Z-17 JAIRO MURILLO (Jairo: Murillo, J.D. Clackum, Jr., Helen M. Clackum, and Tonya Clackum, Owners). requesting rezoning from R-20 and R-30 to R-15 for a residential subdivision in landlots 768 and 817 of the 16" district.
Property is located’on the west side of Old Canton Road, and on the north and south sides-of Clackum Road.(1795 and 1785 Old Canton Road, 1797 Clackum Road and 1788 Shelley Court). (Previously held by the Planning Commission (PC) fromthe April 7, 2026, May 5, 2026, June 2, 2026, July 7, 2026, and August 4, 2026, PC hearings until September 1, 2026, PC hearing).
The public hearing was opened, Melissa and Jairo Murillo, Jed Beardsley, Tonya Clackum, Silvia Luna-Pinto, Jose Pinto, Walter Strother, Mike Cotti, and Audrey» Zi addressed the Planning Commission. Following the presentation and discussion, the following motion was made:
MOTION: Motion by Dance, second by Micheletto, to recommend approval of Z-17 to the R-15 zoning district, subject to: (stipulations Mr. Pederson discussed — referenced eight conditions in the Zoning Analysis)
1. Final Site Plan to be approved by the District Commissioner
2. Access easement to Shelley Court shall be extinguished prior to the final plat
No construction access or any other access to Shelley Court
Lot 16 is subject to its own stipulations from O.B. 23 of 2024
Water and Sewer Division comments and recommendations
Fire Department comments and recommendations
Stormwater Management Division comments and recommendations
ae So
MINUTES OF ZONING HEARING Petition No. Sa
COBB COUNTY PLANNING COMMISSION reine as AnI3 8026
SEPTEMBER 1, 2026
PAGE 9
REGULAR AGENDA (CONT.)
Z-17 JAIRO MURILLO (CONT.)
8. Department of Transportation comments and recommendations
9. Lot 15 is not buildable because it is in the flood plain
10. Applicant to maintain silt fencing at the drip lines of the trees in accordance with the county code
VOTE: ADOPTED 4-0, Faucette not present
2 Chairwoman Dance-calledfor-a-lunch-+e6ess-Cbeltete-P V4 ARCACHTLFCCOHV CREDA 1:45 p.m. Following the recess, Mr. Pederson requested that LUP-27 (Tyler. Howey) fre moved forward on the agenda and heard next in order to accommodate.those in opposition to the case. Ms. Micheletto returned to the hearing at 1:47 p.m.
LUP-27 TYLER HOWEY (Tyler Ross Howey, Owner). requesting Temporary Land Use Permit to allow an increase in capacity of a group/fiome from four residents to 10 residents in land lot 689 of the 19" district Property is located at the northern terminus of Avondale-Parkway, north’of Macedonia Road (3235 Avondale Parkway). .
The public hearing was opened; Tyler Howey Candice Whittaker, Myloreal Anderson, Lorenzo.Hall Tonya Hamilton, aid Natarlie Criswick addressed the Planning Commission. Following tl hé presentation and discussion, the following motion was made: /
y,
pf MOTION: Motion. by Massey, seeond by Beloin, to recommend dismissal of LUP-27 with prejudice. ‘
VOTE: ADOPTED 4-0, Faucette not present
LUP-14 STEVEN VAN GINKEL (Steven Wenetta Van Ginkel, Owner) requesting a Temporary Lafid Use Permit to allow an increase in the capacity of a group. home from four residents to seven residents in land lot 159 of the 17" district:’Proferty is located on the southwest corner of Walton Way and Rockin Hifl Drive (195 Rockin Hill Drive). (Previously held by the Planning Commission (PC) from the July 7, 2026, PC hearing until the September 1, 2026, PC hearing).
The public hearing was opened; with no Applicant nor opposition present, the public hearing was closed. Thereafter, the following motion was made:
MOTION: Motion by Massey, second by Micheletto, to recommend denial of LUP-14.
VOTE-ADOPTED-4-0,Faucette-not-present
MOORE INGRAM JOHNSON & STEELE
A LIMITED LIABILITY PARTNERSHIP
WWW.MIJS.COM
MARIETTA, GEORGIA KNOXVILLE, TENNESSEE JACKSONVILLE, FLORIDA BRENTWOOD, TENNESSEE
EMERSON OVERLOOK 408 N. CEDAR BLUFF ROAD 10201 CENTURION PARKWAY N. 12 CADILLAC DRIVE
326 ROSWELL STREET SUITE 500 SUITE 401 SUITE 200
SUITE 100 KNOXVILLE, TENNESSEE 37923 JACKSONVILLE, FLORIDA 32256 BRENTWOOD, TENNESSEE 37027 MARIETTA, GEORGIA 30060 TELEPHONE (865) 692-9039 TELEPHONE (904) 428-1465 TELEPHONE (615) 425-7347
TELEPHONE (770) 429-1499
LEXINGTON, KENTUCKY ORLANDO, FLORIDA HARRISBURG, PENNSYLVANIA FAIRFIELD, NEW JERSEY
2408 SIR BARTON WAY 1000 LEGION PLACE 101 ERFORD ROAD 165 PASSAIC AVENUE
SUITE 375 SUITE 701 SUITE 300 SUITE 205
LEXINGTON, KENTUCKY 40509 ORLANDO, FLORIDA 32801 CAMP HILL, PENNSYLVANIA 17011 FAIRFIELD, NEW JERSEY 07004 TELEPHONE (859) 309-0026 TELEPHONE (407) 367-6233 TELEPHONE (717) 790-2854 TELEPHONE 201-602-4082 September 9, 2026
. . Mi [ol __ Petition No. Z-2| Via E-mail Only Min. Bk. .
Doc. Type _ Letters
Mr. John P. Pederson, AICP Meeting Date _A-I'S~ Aare
Zoning Division Manager
Zoning Division
Cobb County Community Development Agency Suite 400
1150 Powder Springs Road
Marietta, Georgia 30064
RE: Application for Rezoning - Application No. Z-21 (2026) Applicant: | Branch Acquisition Company, LLC Property Owner: _ Branch Atlanta Road Associates II, L.P.
Property: 3.47 acres, more or less, located at the intersection of the southerly side of South Atlanta Road and the northwesterly side of Plant Atkinson Road; along the northeasterly side of the Seaboard Coast Line Railroad, being more particularly known as 2840 Plant Atkinson Road, Land Lots 894 and 900, 17" District, 2" Section, Cobb County, Georgia
Dear John:
The undersigned and this firm represent Branch Acquisition Company, LLC, the Applicant (hereinafter referred to as “Applicant”), and Branch Atlanta Road Associates II, L.P., the Property Owner (hereinafter referred to as “Owner” or “Property Owner”), in this Application for Rezoning with regard to a total tract of 3.47 acres, more or less, located at the intersection of the southerly side of South Atlanta Road and the northwesterly side of Plant Atkinson Road, and along the northeasterly side of the Seaboard Coast Line Railroad, and being known as 2840 Plant Atkinson Road, Land Lots 894 and 900, 17"District, 2" Section, Cobb County, Georgia (hereinafter referred to as the “Property” or the “Subject Property”). After meetings with Planning and Zoning Staff, ongoing meetings and communications with Cobb County Staff, meetings and discussions with area residents and homeowner representatives, reviewing the Departmental Comments and
Petition No. __2-2!
MOORE INGRAM JOHNSON & STEELE Meeting Date 1-15 = 202
Mr. John P. Pederson, AICP Continued Zoning Division Manager
Zoning Division
Cobb County Community Development Agency
Page 2 of 6
September 9, 2026
Staff Recommendations, reviewing the uses of surrounding properties, and following the presentation to and hearing before the Cobb County Planning Commission, we have been authorized by Applicant to submit this revised letter of agreeable stipulations and conditions, which, if the Application for Rezoning is approved, as submitted, shall become a part of the grant of the requested zoning and shall be binding upon the Subject Property. This letter shall supersede and replace in full the previous letter of agreeable stipulations and conditions dated and submitted on July 1, 2026. The proposed, revised stipulations are as follows:
(1) The stipulations and conditions set forth herein shall replace and supersede in full any and all prior stipulations and conditions, in whatsoever form, which are currently in place on the Subject Property; together with any and all prior Departmental Comments and Staff Recommendations submitted by Planning, Fire, Water, Sewer, and Drainage, relating to the Subject Property from any previous zoning actions.
(2) Rezoning of the Subject Property shall be from the existing Heavy Industrial (“HI”) zoning category to the Regional Retail Commercial (“RRC”), with reference to the revised Zoning Master Plan (“Site Plan”) prepared for Applicant by Planners & Engineers Collaborative, dated June 2, 2026, last revised August 30, 2026, and submitted to Zoning Staff on August 31, 2026. A reduced copy of the revised Site Plan is attached as Exhibit “A” and incorporated herein by reference.
(3) As an alternative, Applicant also submits a revised Site Plan prepared by Planners & Engineers Collaborative, dated June 2, 2026, last revised August 28, 2026, attached as Exhibit “B” (relocating the main entrance further from the intersection with Olympic Industrial Boulevard).
(4) The Subject Property consists of approximately 3.47 acres of total site area and shall be developed for a mixed-use development consisting of office/retail/ restaurant uses and residential.
(5) Signage for the proposed development shall have finishes, materials, and color consistent with the architecture and design of the components within the overall development.
(6) Lighting within the proposed development shall be environmentally sensitive, decorative, and themed to the architecture and style of the various components of the overall development.
Petition No. LZ 2
MOORE INGRAM JOHNSON & STEELE Meeting Date ___@=-!5 -202¢
Mr. John P. Pederson, AICP Continued Zoning Division Manager
Zoning Division
Cobb County Community Development Agency
Page 3 of 6
September 9, 2026
(7) Setbacks and impervious surface area for the proposed development shall be as more particularly shown and reflected on the referenced, revised Site Plan and shall be measured from existing property lines prior to any dedication of right-of-way.
(8) Minor modifications to the within stipulations, the revised Site Plan, lighting, signage, landscaping, architecture, site features, and the like, may be approved by the District Commissioner, as needed or necessary, except for those that:
(a) Increase the density of a residential project or the overall square footage of a non-residential project;
(b) — Reduce the size of an approved buffer adjacent to a property that is zoned the same or in a more restrictive zoning district;
(c) Relocate a structure closer to the property line of an adjacent property that is zoned the same or in a more restrictive zoning district;
(d) Increase the height of a building that is adjacent to a property that is zoned the same or in a more restrictive zoning district;
(e) Change an access location to a different roadway;
(f) Would be in direct contradiction or conflict with any of the stipulations of this rezoning;
(g) Would be in direct contradiction or conflict with Cobb County Code and Ordinances; or
(h) Would be in direct contradiction or conflict with any Staff Recommendations that were adopted into the final zoning decision.
(9) All setbacks and buffer areas may be penetrated for purposes of access, utilities, and stormwater management, including, but not limited to, detention/retention facilities, drainage facilities, sanitary sewer, water, fire protection, power, surface parking, and any and all slopes or other required engineering features of the foregoing.
(10) The residential component of the proposed development shall have a maximum of two hundred fifty (250) residential units.
Petition No. Z-21
MOORE INGRAM JOHNSON & STEELE Meeting Date F-!F- 2026
Mr. John P. Pederson, AICP Continued Zoning Division Manager
Zoning Division
Cobb County Community Development Agency
Page 4 of 6
September 9, 2026
(11) Building architecture and exterior facade of the proposed residential buildings shall be substantially similar to the renderings reflected on Exhibit “C” attached and incorporated herein by reference.
(12) All residents of the proposed residential community shall have access to and use and enjoyment of the amenity areas, which will include, at a minimum, the following:
(a) Pool;
(b) Fitness center;
(c) Clubroom;
(d) Business center;
(e) Electric vehicle charging stations (or other alternate power source), and
(f) Bicycle racks.
(13) There shall be a maximum of 8,500 square feet of office, restaurant, and retail space within the proposed overall development.
(14) Applicant agrees to comply with all Cobb County Stormwater Management requirements applicable to the Subject Property.
(15) Residential parking shall be provided at a minimum ratio of 1.25 parking spaces per unit. All retail and restaurant parking shall be provided at a ratio of 8 spaces per 1000 square feet.
(16) Applicant agrees to dedicate to Cobb County the right-of-way necessary to construct the extension of the Silver Comet Trail along the Subject Property.
Further, Applicant agrees to construct the portion of the Trail extension located upon the Subject Property as identified and shown on the revised Site Plan.
(17) Applicant agrees to incorporate dedicated Trail parking within the parking structure for a minimum of twelve (12) spaces.
(18) The following recital shall be contained within all marketing documents and materials, all contractual documents concerning the conveyance of Property from the Developer, all deeds of conveyance from the Developer, including, but not limited to, warranty deeds and quitclaim deeds, and all leases, Covenants, Conditions, and Restrictions from the Developer:
Petition No. Z-3
MOORE INGRAM JOHNSON & STEELE Meeting Date G-15-32026 _
Mr. John P. Pederson, AICP Continued
Zoning Division Manager
Zoning Division
Cobb County Community Development Agency
Page 5 of 6
September 9, 2026
“The property contained and referenced in this document is located in close proximity to a Heavy Industrial area which may, at times, house dangerous equipment, materials, and terrain, trespass upon which could cause serious injuries.
Also, said properties may produce loud noises, noxious odors, and sounds. Owner and/or Lessee acknowledges and accepts that the Heavy Industrial land uses, including their necessary ancillary activities, are recognized and acceptable conditions concerning which the parties herein have no control over the use of such industrial properties. Owner and/or Lessee hereby waives any right to file a cause of action for nuisance that may arise out of the lawful use of the above-referenced current Heavy Industrial properties.”
We believe the development of the project, pursuant to the revised Site Plan and the stipulations set forth herein, is an appropriate use of the Subject Property. The proposed development is an exciting project which fits together various types of product into one community. The proposed development shall be of the highest quality; shall be compatible with and complementary to developments, businesses, and venues in the area; and shall be an enhancement to the Subject Property and Cobb County as a whole. Thank you for your consideration in this request.
With kindest regards, I remain Very truly yours,
MOORE, INGRAM, JOHNSON & STEELE, LLP
’ Kevin Moore
JKM:cc Attachments
MOORE INGRAM JOHNSON & STEELE
Mr. John P. Pederson, AICP Zoning Division Manager Zoning Division Cobb County Community Development Agency Page 6 of 6
September 9, 2026
@ Cobb County Board of Commissioners:
Lisa N. Cupid, Chairwoman Erick Allen JoAnn Birrell Keli A. Gambrill Monique Sheffield (With Copies of Attachments)
Terry L. Martin, AICP, CNU-A
Senior Planner
Zoning Division
Cobb County Community Development Agency (With Copies of Attachments)
Cameron Jones, CNU-A
Planner III
Zoning Division
Cobb County Community Development Agency (With Copies of Attachments)
Vinings Homeowners Association (With Copies of Attachments)
Branch Acquisition Company, LLC (With Copies of Attachments)
Petition No. Z-21
Meeting Date__ 9S =202@ Continued
TI a ee
(3
it kA i a i i a ee A a a
Petition No. Z-2!
Meeting Date
GAS -Dosae
Continued
Sw2S
Yo 147.97
070
-~ ,
y*; $4052 04-8
raze
8219"
atone ood Maza Layer FiRiAetie — : / ' $ "
Planners & Engineers Collaborative +
VAD PAN HARI AACE | OE NE
WAHOE EE © BINS OCEANS CRMC
350 RESLARCH COURT SFL 200
PEACHTREE CORNERS, GA 30092
PLANT ATKINSON
RD. at SOUTH
ATLANTA RD.
A MASTER PLANNED RESIDENTIAL
DEVELOPMENT
“
2840 PLANT ATKINSON ROAD, SE
ATLANTA, GEORGIA 30339
(COBB COUNTY JURISDICTION
won mes wT SPE ET ND OEET) Grand MFO EHD)
peered net
es 2 SAYA Co Ina eye RHA resins Rong An APs R9 BOAD
jer arnces
ances
VARIANCES:
VARGANCE #) TO REDUCE REQUIRED XT REAR SETBACK TO 15
VARIANCE 67 TO REDUCE REQUIRED 13 SDE SETHACK TO 17
IMPERVIOUS COVER NOTE:
PER VIOUS COVERAGE 1S BASED ON SITE AREA AT TIME OF ZOHING
(Sty) | 24 our CONTACT toe AY) JACK HAYLETT
“time
TRS SEAL 6 One ¥ VAL B COUNTTR SIGNED
AAO ORI O PALM AN ORRDPN SAQA URE
ZONING MASTER
PLAN
Petition No.
Meeting Date
Z -aA/
9 -([5-- 2026
«G» LIGIHXA
Continued
SSC
Planners & Engineers Collaborative +
IOP ANG * BIDE HORTLE OA EDA
AROAEH, + IA ING ACO LIEN # 6A ESOC
‘380 RESEARCH COURT STE 200
PLACHTREE CORNERS, GA 30092
se
Ry BASED On ATLANTAROAD
Pf cesien Cun me ah Seas hy S18" 5998)
BURDING I
(BOVE 135 FEET MEKGT FOR VEHICLE CLEARANCE.
yr ¥,
PLANT ATKINSON
RD. at SOUTH
ATLANTA RD.
AMASTER PLANNED RESIDENTIAL
DEVELOPMENT
2840 PLANT ATKINSON ROAD, SE
ATLANTA, GEORGIA 30339
COBB COUNTY JURISDICTION
‘Ve HEAT AR PE ATAn Ts AO CDRLES
ORS HLL! PRON GRRE RO
S8 EP EN DEEET VAROES EOE EHD
eraT
BRANCH PROPERTIES
a WS sso7s07°w Vz~ 14795"
z
VARIANCES:
VARGANEE 81 TO REDUCE
REQUIRED 3 AEAR SETBACK TO 15°
VARIANCE #2 TO REQUCE REQUIRED 15 SIE SETBACK TO 10
IMPERVIOUS COVER NOTE:
PER VIOUS COVERAGE IS BASED ON SITE AREA AT TRE OF 2ONANG
24 HOUR CONTACT:
JACK HAYLETT
DES SEAL ONLY VAL COUNTER MARD
"Ae Date O WAIM a1 OFSOPIAL SIGNATURE
ZONING MASTER
PLAN
Petition No. n-th Meeting Date 9-5-2026
Continue
01 | RENDERINGS
m x = @ + Q
a ae so BReNGHe 2 ce a : 2 PRESTON
SOUTHEAST. CORNER’AT PLANT ATKINSON RD
Petition No. Z-2 Meeting Date 9G -IS -202-6
Continued
] |
| \ bak
To PAG PL OABS,. tbs rt
BRANCH
SOUTHEAST CORNER AT PLANT ATKINSON RD
etition No. Z-2! ;
Meeting Date___ Ss I-S Bore
Continued
D3 | RENDERINGS
_PRESTON
VIEW ALONG PLANT ATKINSON RD.
Petition No. Z-2 Meeting Date__ GAS -20n¢
Continued
04 | RENDERINGS
Ea
peat =
ces
__PRESTON
TA RD & PLANT ATKINSON RD AARC! 25!* 2026
Continued
D5 | RENDERINGS
NORTHEAST CORNER AT ATLANTA RD & PLANT ATKINSON RD
Min. Bk. Ol __ Petition No. 230 __ Doc. Type Site (Ge
Meeting Date _A-tS- Acre
gZ-30
GRAPHIC SCALE
OWNER
JAISAL KRUPA, INC.
TWO CAPITAL PARTNERS
3284 NORTHSIDE aon ue SUITE 650
SURVEYOR
CLARKCANADAY, LLC.
HOLLY SPRINGS ROAD
GILLSVILLE, GA
PH, 678.630.2039
CLARKCANADAY2@GMAIL.COM
Po. 0X 88056.
ARIETTA, GEORGIA 30068
765604161
SDG_ENGINEERING@COMCAST.NET
SromenaTER POND
( _REWSIONS
ya #
49440 |
~ 30
BULDING AREA: 1,500 SF (GROSS)
PARKING: 12 SPACES (INCLUDES 1 HC SPACE)
lt OLE LI
rer
j- 0017 |
2
$338 4 - Z8a0 #35 HS<7 ox J z°3Q GxEeB
Z290 Gow l ago Qaeeo
aa é
yw
&
<
=
CUENT NAME )
TWO CAPITAL PARTNERS
3284 NORTHSIDE PKWY NW
SUITE 650
ATLANTA, GEORGIA 30327
404-791-7603
PROJECT TITLE
5 Nw Pe o< 58252 Bg ee < =—2 wee so OuZSa weags oO Oo 242r°S zoge,2 7 ¥oor Sa~ Ba aegoa Sty Nao} N ad
L
REZONING
EXHIBIT
L J
Page 734 of 150:
Z-94
Notes:
1. This Survey complies with both the rules of the Georgia Board of
Meeting Date S-lS-3e26 pe en pagr cerrapuenery rTP =e
effective date, October 5, 2018.
S' ATLANTA GAS
\, LIGHT COMPANY EASEMENT.
TRACT 1
0.446 ACRE
1714 Atlanta Road
«
1 5' ATLANTA GAS
LIGHT COMPANY EASEMENT
S SS > CS
TRACT 2
0.341 ACRE
1718 Atlanta Road
>
Namah coxa
Title Exceptions File No, 26158
Commitment Dote: March 7, 2019 To Consal, LLC Schedule B — Part 2 Atlanta Road, LLC Gregory P. Rackley Georgia Primary Bank
9. Easement to Atlanta Gas Light Company Chicago Title Insurance Company:
Deed Book 12559, Page 167 Shown on plat. ‘This is to certify that this map or plat and the survey on which it is
10. Right of Way Deed to Cobb County Department of Transportation based were made in accordance with the 2016 Minimum Standard Deed Book 11747, Page 204 Detail Requirements for ALTA/NSPS Land Title Surveys, jointly Shown on plot. established and adopted by ALTA and NSPS, and includes Ilems 1,
12. General Permit to Southern Bell Telephone & Telegraph Company 2, 3, 4, 6, 7(@), 8, 11, 13, 17 & 19 of Table A thereof. The fieldwork Deed Book 522, Page 396 was completed on March 26, 2019
Deed shows line is within the Right of Way of Atlanta Road. GEND
13. Right of way Deed to Cobb County Department of Transportation SSMH — Sanitory Sewer March 26, 2019
14. Easement to Atlanta Gas Light Company Deed Book 12559, Page 170
Deed Book 11747, Page 206 Manhole Shown on plat. WM — Water Meter Pa 2 0.
/ =
Shown on plat. Christopher J. Carlan
RLS 3003
aes 1. ‘The field data upon which this plat is based has a closure precision of CONSAL, LLC one foot in 34,925 _ foot and an angular error of _00" per angle point ATLANTA ROAD, LLC eek ws afore eaing ie
GREGORY P. RACKLEY 4 This plat has been calculated for closure and is found to be accurate CARLAN GEORGIA PRIMARY BANK 3. popeepiernoh: used in rh was a Leica TS12-P Robotic CHICAGO TITLE INSURANCE COMPANY Total Station. LAND SURVEYORS
LOCATED WITHIN 4. The Field Work was completed 3/26/19. . 970 SOUTH BROAD STREET Land Lot 370, 17th District, 2nd Section 40 0 40 80 120 COMMERCE, GA 30529 Cobb County, Georgia (706)336-5959
‘ March 27, 2019 GRAPHIC SCALE ~— FEET yjopno. __19-063__ py, __B:394__
1o\
Min. Bk.
Petition No. _LUP-as
Doc. Type Site Pla~
Meeting Date 9-15-2026
DGM
LAND PLANNING
Consurants, INC.
we
y
1635 Op Hwy 41 SuirE 112-314
Kennesaw, GA 30152
770-514-9006
DGMLPC.COM
G oO / # 0000002745 Level Certified
€0S1 30 ZSpL ebed
Mielke WAY
MANORK
family Sarm and
Wi (dlife SANCIUAEY
Site Data
Total Site Area: 14.825 AC (13.7 AC in floodplain)
Present Zoning: R-15
Proposed Zoning: R-15
June 10,2026
(w/temporary land use permit) 0 50
~ Jame BIB1005)
2 $s!
ya eS 5.
<.& S$, |
| \
grassed/ pasture’ Zi , parking \(30 spaces)
WO
living Se & } sanimalhequine thera cs an (pal Fa : ACY \
qusuls:!
~ yamog PISI
nit camping. and ,
nature studies >| , *honeybees
}, *wild blackberries / | *beautyberry
}\ *elderberry ).*native medicinal
C3 os afN
1
Bat / 4 4 : Y Smental & ohydical” G
awareness, area tf
00 200 400
Scale: 1'"' = 100'
We selsooug — J Mina 1
Q_/ ‘sanctuary nature trail ae,
f &) :
beaver ‘ceremony --&- 7 lodge “Sa. site ‘A
\ Nee
y) N
£x f; ™ v ; Ah anctuary
\ y Sec natu rail | pond \Z).-N oC) \ *fishing \
\) *kayaking
dock/ y study area 2,
geasonal, event area~
\ ‘ greenhouse. 3
ra
ey
Min. Bk. 101 _ Petition No, UP -a8 | Min. Bk, _.1©__ Petition No. LUP- 26
Doc. Type _letrec Doc. Type _ letter Meeting Date _Q-IS-2026 Meeting Date _ |\-21-2023
ROZEN, ROZEN & REILLY, LLP
248 Roswell Street, SE Marietta, Georgia 30060
(770) 427-7004 (T)
(770) 426-9584 (F)
ROGER J. ROZEN
rjrozen(@rozenandrozen.com ADAM J. ROZEN Injury, Land Use, ajrozen(@rozenandrozen.com Criminal Defense, JEFFREY M. REILLY, JR. Domestic jreilly@rozenandrozen.com & Business
October 30, 2023
VIA EMAIL DELIVERY
Mr. John P. Pederson, AICP, Manager Cobb County Zoning Division Community Development Agency 1150 Powder Springs Road, Suite 400 Marietta, GA 30064
Re: Application of Mielke Way Manor, LLC for a Temporary Land Use Permit regarding a 14.825 Acre Tract - Land Lot 710, 19" District, 24 Section, Cobb County, Georgia; LUP 26
Dear John:
This firm represents the Applicant Mielke Way Manor, LLC (“Mielke Way”) in LUP 26 which is set to be heard by the Planning Commission on November 7, 2023 and for final action by the Board of Commissioners on November 21, 2023.
This Application seeks a Temporary Land Use Permit (“LUP”) to allow a family farm, wildlife sanctuary and an events and educational facility on an approximate 14.825 acre tract of land located at 1901 Pair Road, Marietta, Georgia.
The property (“Subject Property”) is presently zoned in the R-15 zoning classification and is identified as Low Density Residential (“LDR”) on Cobb County’s Future Land Use Map (“FLUM”). The property is a uniquely and rarely preserved approximately 15 acre parcel situated within a residential area. The subject property historically has been utilized for
Petition No. LuP-28
Meeting Date 4-15-3096
Continued Petition No. Lue-2¢e Meeting Date ___|\-#1-3033__ Continued
ROZEN, ROZEN & REILLY, LLP
A LIMITED LIABILITY PARTNERSHIP
VIA EMAIL DELIVERY
Mr. John P. Pederson, AICP, Manager Cobb County Zoning Division Community Development Agency
October 30, 2023 Page 2
residential and conservation activities preserving opportunities for farming, agricultural and aquatic recreational and educational activities.
The proposal will preserve the subject property similar to its current and historical state in a manner consistent with and restricted by its current dedication to conservation pursuant to O.C.G.A 48-5-7.4 for agricultural and environmentally sensitive land. The Subject Property is currently bound by the Applicant’s existing conservation covenant through 2032.
The proposed uses are less intense and utilize the land in a way that preserves its natural character in a manner that could not be accomplished if developed as currently zoned or as the surrounding residential properties.
Mielke Way is owned and operated by husband-and-wife Ian and Andrea Mielke. The Subject Property is their primary residence. Ian and Andrea are certified educators with Andrea holding a PHd in curriculum, instruction and assessment. Ian and Andrea started a company called Really Fun Science and began their educational journey creating outdoor, science and animal-based curriculum for metro Atlanta schools and created the curriculum for Athens-Clarke County. Ian and Andrea are now focused on bringing similar educational opportunities to their children and children in the Cobb County community in many ways but including partnerships with other home-school children and local City and County private and public schools. Mielke Way provides a great resource for learning in an outdoor environment with animals, plants, Olley Creek and a private pond. Mielke Way is currently partnered with Cobb County’s Adopt a Stream Program for the section of Olley Creek running through their Subject Property, the Cobb County Watershed Stewardship Program and is a Certified Wildlife Sanctuary through the Georgia Audubon Society. All of the foregoing provide a foundation and basis for the events and education operations that Mielke Way proposes.
In furtherance of this Application, this letter will serve as the Applicant’s expression of agreement with the following stipulations which shall, upon the requested LUP Application being approved, become conditions and a part of the grant of the Application and binding upon the Subject Property thereafter. The referenced stipulations are as follows:
1. The LUP shall be applied to the Subject Property specifically for a family farm, wildlife sanctuary, event center and educational facility and related activities in a manner similar
Petition No. LuP- 28
Meeting Date F-IS-20a6
Confaied Petition No. Lue-as Meeting Date {\-al-2023 Continued
ROZEN, ROZEN & REILLY, LLP
A LIMITED LIABILITY PARTNERSHIP
VIA EMAIL DELIVERY
Mr. John P. Pederson, AICP, Manager Cobb County Zoning Division Community Development Agency
October 30, 2023 Page 3
to the Revised Site Plan dated October 12, 2023 attached hereto and incorporated herein (“Revised Site Plan”).
tN
The LUP shall be for this Applicant only as Mielke Way, LLC, Mielke Way Manor, LLC or related entity owned by the Applicant.
3. The LUP approval shall be for an initial period of twelve (12) months with the allowance for the Applicant to seek twelve (12) or twenty-four (24) months renewals thereafter.
4. Entrance signage shall be consistent with the signage currently existing inside the entrance to the property and shall remain inside the entrance and gate.
5. Mielke Way’s regular days and hours of operation are proposed to be Monday through Sunday with the hours and type of operation being limited to those outlined in the County Noise Ordinance with Sunday through Thursday operations being limited to 8:00 am to 8:00 pm. There shall be no events on National Holidays.
6. The granting of contemporaneous variances to:
a. Reduce the side setback for the existing barn to sixty-five feet (65°);
b. Allow vehicle parking on a non-hardened surface in identified areas on the
Revised Site Plan;
c. Allow shared parking among the Applicant and other off-street property(ies). The Applicant currently has an agreement with Trinity Fellowship Church for off-site parking when needed.
7. Compliance with the recommendations from Cobb County DOT, Cobb County Fire Department and the Cobb County Water System with respect to the availability of water and sewer to the site (the subject property is already connected to both with sufficient
capacity).
8 The District Commissioner shall have the authority to make minor modifications to the site plan and these stipulations/conditions.
Haale
Petition No. Lup-28
Meeting Date J-1S-2026
Continued
ROZEN, ROZEN & REILLY, LLP
A LIMITED LIABILITY PARTNERSHIP
VIA EMAIL DELIVERY
Mr. John P. Pederson, AICP, Manager Cobb County Zoning Division Community Development Agency
October 30, 2023 Page 4
Petition No. Lup-26
Meeting Date ___1\-31-3023
Continued
Please do not hesitate to contact me should you or your staff have any questions or require any additional information or documentation.
AJR/
Enclosures
Sincerely,
ROZEN, ROZEN & REILLY, LLP
/s/ Adam J. Rozen
Adam J. Rozen ajrozen@rozenandrozen.com
DGM
LAND PLANNING
Consucrants, INC.
wr
y
1635 Ovp Hwy 41 Surre 112-314
Kennesaw, GA 30152
770-514-9006
DGMLPC.COM
eg
Se op OR &
Site Data
Total Site Area: 14.825 AC (13.7 AC in floodplain)
Present Zoning: R-I5
Proposed Zoning: R-15 (w/temporary land use permit) °
vi
i \ fa t NS ‘ ¢ \ ys at al grassed/pasture & \ Npond Sosy .
; * fishing a parking ae .
i . = {| q \ *kayaking \ (30 spaces) i : : . ~ my A aC ya \ oct’ A t y oa: = we
i. Mee In Ue Sa\ Sage ey living science & —} *h @\a' iW stn Lyle oo , =e Olley aio ' Wh iis Ob Fqe coanimat equine therapy-4creek CNN erie ae qo 6m > Oa, 4 Cobb Count V dias. re
4 3 = t *\\ nn _. - pf y; Wf, anctuary q “4 v Wproara Tae ture tra
. ores Ne WY \ 4 youth camping and »“\4 ;
: i % ¥ X nature studies _\\y"\4y\ La > *honevbees ; AY yt wk Pe *wild blackberries | ty pumpkin patch & >" £ *beautyberry ‘\yseasonal event areas ~~
*elderberry f x \ ne { *native medicinal Ae iC 4 AQ) op enist(ye plants iy ae) = balryt :
mental & physical x kot | es Ae is 4 proposed [, ;
Z > awareness area // ~/ a et or Le i : M - "yoga Paar extension % get : *meditation vet 8 pen f 23 OM AI natural = emmy aX yt § “ae Pe cg * \ 4 ¢ ¢ oval ~ = + ~ { y i f ‘ ares ain Pigs : ‘ f : Oe: A 4 play area A * Le Bee f t/ j ATT Ap ae ( vA
- L / £ g 4/ x ™ y!
7 £ F 3 v
Petition INO. CUF-
Meeting Date {| -al-ag23
Continued
,
October 12, 2023
Petition No. LUP -2g
Meeting Date
G=1S-20a4
Continued
50 100 200 400
Scale: 1" = 100'
Min, Bk. lol
Petition No. LUP-28
Doc. Type Sk —Peycaaseeaants Min, Bk, 18 _ Petition No. LU?-a6 Med#ing Date __ A-tS —Asee Doc. Type _Shhaced Perrine,
— Aa ree ment
Mectng Date {\-g4-ae223
PARKING LICENSE AGREEMENT
THIS PARKING LICENSE AGREEMENT (the "Agreement") made this! th gay of November 2023, by and between Trinity Baptist Church of Smyma, Inc., a Georgia non-profit corporation (hereinafter known as “Trinity”), and Mielke Way, LLC, a Georgia limited liability company (hereinafter called “Mielke Way” and collectively with Trinity known as the “Parties”).
WITNESSETH:
WHEREAS, Trinity is the owner of that certain tract of land known as 2115 pair Road, Marietta, GA, Tax Parcel 1D 19069500160, located in unincorporated Cobb County, Georgia, which is described on Exhibit "A" and the parting ae contempatod by his Agrement shown eros-ached on Exibi "(he “Pung Ac) atc
WHEREAS, Micke Way is the owner of that certain tract known as 1901 Pair Road, Marietta, GA, Tax Parcel ID 19071000010 (“Miclke Way Manor”) located in unincorporated Cobb County, Georgia; and
WHEREAS, the Parties previously entered into discussions and came to a general agreement that Miclke Way could utilize the Parking Area for its customers and guests visiting Mielke Way Manor with advance notice and scheduling between the Parties; and
WHEREAS, the parties desire to enter into a more detailed license agreement to provide specifics on the use of the Parking Area.
NOW, THEREFORE, for and in consideration of the premises and the covenants herein set forth, the Parties declare as follows:
1. Use: Trinity agrees that Mielke Way has the right for Mielke Way's customers and guests to park their vehicles on the Parking Area depicted in Exhibit “B” subject to the provisions of this Agreement and consistent with Cobb County Parking Standards.
2. Term; The term of this Agreement shall be for an initial period of twelve (12) months beginning on November 22, 2023, (“Effective Date”) and ending at midnight on November 21, 2023, with Miclke Way’s right to seck extension of this Agreement to coincide with any extensions of time granted by Cobb County for Mielke Way’s LUP 26 (2023) of November 21, 2023 (“LUP 26”) or subsequent entitlement.
3. Indemnification: Miclke Way shall, except to the extent of any gross negligence or willful intentional act by Trinity, defend, indemnify and save Trinity and the Parking Area harmless from any and all liens, judgments, fines, penalties, costs, expenses, damages, or liability occasioned by any act of Mielke Way, its agents or guests or by their failure to act in connection with the Parking Area or arising out of any accident causing injury or death to any person whomsoever oF damage to any property whatsoever, and due directly to the use of the Parking Arca by Miclke Way or its guests.
4. Maintenance: Miclke Way shall maintain the Parking Arca in a clean and safe manner, and free from litter and debris. If Mielke Way agents, employees, customers or guests damage the Parking Area, Mielke Way shall repair the damage done by the customers. Mielke Way’s use shall be consistent with the stipulations and conditions of LUP and any subsequent entitlement from Cobb
County.
Scanned with CamScannes...,
Petition No. ___LuP-28
Meeting Date __4-15-a0ae
: Petition No. LUP-26¢ | Continued Meeting Date __)\-a)- 2023 Continued
5. Notices: Notices will be properly directed if delivered in person, by nationally recognized overnight mail service, or by electronic mail as set forth below:
To Trinity: Mark Conner, Pastor Trinity Baptist Church of Smyrna, Inc. dba Trinity Fellowship Chureh 2115 Pair Road Marietta, GA 30008 info@ts
To Mielke Way: lan Mielke Mielke Way, LLC 1901 Pair Road Marietta, GA 30008 il email
6. Counterparts: A facsimile, telecopy, or other reproduction of this Agreement may be executed by the parties (in counterparts or otherwise) and shall be considered valid, binding and effective for all purposes. At the request of any party, the parties hereto agree to execute an original of this Agreement as well as any facsimile, telecopy or other reproduction hereof.
Binding Effect: Trinity covenants and agrees that this Agreement shall run with the land and be binding upon its successors and assigns. Absent a recorded document, Trinity shall give a copy of this Agreement to any purchaser of the property of which the Parking Area is a part.
8. Jurisdiction. This Agreement shall be administered, construed and enforced according to the laws of GA.
9. Severability. The invalidity or unenforceability of any provision of this Agreement shall not in any way affect the validity or enforceability of any other provision and this Agreement shall be construed in all respects as if such invalid or unenforceable provision has never been in the Agreement.
10. Counterparts. This Agreement may be executed in any number of counterparts with the same effect as if allof the parties hereto had signed the same document. All counterparts shall be construed together and shallconstitute one agreement.
[SIGNATURES SET FORTH ON FOLLOWING PAGE]
Scanned with CamScanner,,.,
Petition No. Lut -28
‘ - Petition No, LuP-a¢ Meeting Date G-tS-aeae Meeting Date —[l=at-aaa5 Continued Continued
IN WITNESS WHEREOF, the undersigned Parties have set their hands under seal as of the Pffective
Date.
TRINITY:
TRINITY BAPTIST CHURCH OF SMYRNA, INC.
A Georgia non-profit corporation By, LPM Nene Mark Conner,
MIELKE WAY:
MIELKE WAY, LLC,
* A Georgia limited liability company By ,
Tan Mielke, Manager
Scanned with CamScanaes 7.7
SFE DBA LOSE AREA AEA EERE
atl
Petition No. Lue-28 Meeting Date __ T-1S-a096
é Petition No. LUP-ae Continued Meeting Date ____\-at-a0a.3 Continued Exhibit “A” Trinity
All that tract or parcel of land lying and being in Land Lots 695, 696 and 712 of the 19th District, 2nd Section of Cobb County, Georgia, and being more particularly described as follows:
BEGINNING at an iron pin situated at the common corners of Land Lots 695, 696, 711 and 712:
running thence along the line dividing Land Lots 695 and 712 on a bearing of South 88 degrees 35 minutes 45 seconds West 180,40 feet: continuing thence afong the line dividing said Land Lots 695 and 712 ona bearing of South 89 degrees 19 minutes $8 seconds West 187.21 feet to an iron pin; running thence South 21 degrees 10 minutes 24 seconds Bast 321.89 feet to an iron pin; running thence North 88 degrees 23 minutes 47 seconds West 358.87 fect to an iron pin;
running thence North 05 degrees 45 minutes 42 seconds West 86.08 feet to an iron pin, running thence North 00 degrees 13 minutes 59 seconds East 35.72 feet: running thence North 24 degrees 11 minutes 26 seconds West 46.75 fect; running thence North 25 degrees 34 minutes 26 seconds East 21.94 feet: running thence North 32 degrees 16 minutes Of seconds Fast 58.50 feet; running thence North 32 degrees 15 minutes 58 seconds Hast 5.87 feet; running thence North 62 degrees 17 minutes 59 seconds East 32.98 feet: running thence North 00 degrees 19 minutes 06 seconds East 60.38 feet; running thence North 33 degrees 15 minutes 37 seconds East 89.28 feet; running thence North 47 degrees 10 minutes 03 seconds East 24,30 fect; running thence North 30 degrees 32 minutes 41 seconds West 38.81 feet; running thence North 09 degrees 43 minutes 00 seconds West 51.20 feet; running thence North 21 degrees 45 minutes 36 seconds West 89.22 feet:
running thence North 24 degrees 13 minutes 55 seconds West 51.92 feet, running thence North 26 degrees 45 minutes 51 seconds West 19.76 feet; running thence North 00 degrees 25 minutes 20 seconds East 10,97 feet: running thence North 33 degrees 38 minutes 24 seconds West 26.26 feet; running thence North 32 degrecs 23 minutes 04 seconds West [35.08 feet to an iron pin, running thence South 46 degrees 35 minutes 47 seconds Fast 212.27 feet to an iron pin; running thence South 52 degrees 23 minutes 53 seconds Hast 211.22 feet to an iron pin, running theace North 39 degrees 59 minutes 28 seconds East 344.42 feet to an iron pin situated on the southwesterly right-of-way of Pair Road (right-of-way varies), runing thence South 48 degrees 30 minutes 13 seconds East along said cight-of-way 364.30 fect to an iron pin; running thence South 48 degrees 10 minutes 27 seconds West 196.41 feet to an iron pin situated on the linc dividing Land Lots 695 and 696; running thence along said line dividing Land Lots 695 and 696 on a bearing of South 00 degrees 01 minute 40 scconds East 111.32 feet to an iron pin Situated at the common corner of Land Lats 695, 696, 711 and 712 and the point of beginning.
The property herein described consists of 6 902 acres according to a plat of survey prepared tor Trinity Fellowship/Regions Bank dated July 1, 1999 by Paul Lec Consulting Engineering Associates, Inc. which plat is made a part hercof by reference.
Petition No. Lu?-as Meeting Date __9-1S aed
Continued Petition No. LUP-ac Meeting Date [\-21-2033 Continued Mielke Way
ALL THAT TRACT or parcel of land lying and being in Land Lot 710, 19th District, 2nd Section, Cobb County, Georgla, being more particularly described as follows:
BEGINNING at an iron pin located on the east line of Land Lot 710, 250.0 feet northerly of the southeast corner of said Land Lot 710, as measured along the east line of said Land Lot; from said point of beginning, run North 87 degrees 42 minutes West 806.9 feet to an Iron pin and corner;
running thence North 03 degrees 03 minutes East 128.3 feet to an Iron pin; running thence North 08 degrees 59 minutes West 209.8 feet to an iron pin; running thence North 35 degrees 35 minutes East
442.1 feet to an iron pin; running thence North 45 degrees 00 minutes East 90.0 feet to an Iron pin;
running thence North 45 degrees 35 minutes East 82.4 feet to an Iron pin; running thence North 50 degrees 31 minutes East 74.2 feet to an Iron pin; running thence North 63 degrees §2 minutes East
74.4 feet to an Iron pin and corner; running thence North 31 degrees 02 minutes 170.0 feet to an iron pin and corner located on the southerly right of way of Pair Road; running thence northeasterly and easterly along the southerly right of way of Palr Road and following the curvature thereof a distance of 498.0 feet to an Iron pin; continuing thence along the southerly right of way of Pair Road South 89 degrees 50 minutes East 417.2 feet to an iron pin and corner located on the east line of Land Lot 710;
running thence South 00 degrees 04 minutes West along the east line of Land Lot 710 a distance of
967.9 feet to the iron pin at the point of beginning, being 14.825 acres as shown on survey prepared by West Georgla Surveyors, Inc., GA RLS No. 2235, dated November 21, 1994.
Petition No.
Meeting Date Continued
LuP-ab
Lue-26 Petition No.
@ -(S- 2026 x4 ne, i ee ae Meeting Date
Continued
Exhibit “B”
Parking Area
I\-d1-aoe-S
Min. Bk. [Ol _ Petition No. .©.8:24 Doc. Type Site Pla~_
_Mesting Date F-15=222¢
»
oe = ay _ 7 ,
245 TOWNPARK DRIVE, SUITE 470 DATE: 9/14/2026 ° 10
SCALE 1210
=i KENNESAW, GEORGIA 30144
DIRECT: 470-705-0885
3 WITHOUT LIABILITY TO BGE INC,
L6L1 JO LLQL eBed
Main ID C - Large Channel Letters “C” Electrical Connection Reqd.
(West Elevation)
el
Min. Bk. |©\__ Petition No. _O°B. 47.
Doc. Type t
was we am Ye se bash ig eal lies al
Main ID A- Large Channel Letters “A”
y\
TOWER 1
Electrical Connection Regd.
(South Elevation)
Main ID B - Large Channel Letters “B” DENYSE Electrical Connection Reqd. TER TORR
(North East Elevation) ——
Main ID 4 - Monument Sign ee
Electrical Connection Reqd
Management Company
Goldenrod Companies
Property Nama & Adiress The Henry
Tower 1
Circle 75 Parkway Atlanta GA 30339
Opportunity Number 68148
DeNyse Representative Earl Raymond
Designer William J Ballew
TOWER 2 oa
07.22.2026
Revision Date Qes'Tech
08.04.2026 wuaixx 6\
Fitepath
VADrawings and Graphics\HiHenry, The - Atlanta, GA\Tower 1\Preliminary\Tower 1_Exterior Signage 1 v2.cdr
© Concept
t, / ) 7 } e Preliminary <a J a
) Production
Sign Location Pian ~
L6L1 30 819} e6ed
Main ID C - Large Channel Letters “C” TOWER 4 Jectrical Connection Regd.
i 4 } 7 ; i H rh q ay dd HhdeeE Hisces 60s
a”
if i | 5 ee Fr bam iectrical Connection Read. t :
weil
oa HOERED HARE PONE Maid A feet kaa baaee ee
‘yes erreee ene EE
Petition No. OR. 41
Meeting Date G-\S -a02e
Continued
DENVSE
Goldenrod Companies
The Henry
Tower 1
Circle 75 Parkway Atlanta GA 30339
Opportunity Number
68148
William J Ballew
Filepath
V:\Drawings and Graphics\H\Henry, The - Atlanta, GA\Tower 1\Preliminary\Tower 4_Exterior Signage 1 v2.cdr
Exterior Signage Rendering
Property Name & Addrass
08.04.2026 wawixx
L6L1 JO 6L9L e6ed
Petition No. 03.4)
Meeting Date
F -15-Acare
Continued
TOWER 2
SIGNAGE SHOWN NOT ADDRESSED IN THESE DRAWINGS
TOWER1
* Main ID B - Large Channel Letters “B” Electrical Connection Rega.
(North East Elevation)
Due to the vent locations on this elevation ‘the sign will need to off center to the left in order to miss the vents
LL sae
Me Soadee GURRRE Gua
BGG GONGGG BEBREE OE
‘Ted . e a Main ID 4 - Monument Sig
? Jeovsical Connection Re:
DENVSE
Management
Goldenrod Companies
Property Name & Address The Henry
Tower 1
Circle 75 Parkway Atlanta GA 30339
Opportunity Number
68148
DeNyse Representative Earl Raymond
Designer
Willian J Ballew
Date 07.22.2026
Revision Date
08.04.2026
0\
Filepath
V:ADrawings and Graphics\H\Henry, The - Atlanta, GA\Tower 1\Preliminary\Tower 1_Exterior Signage 1 v2.cdr
O
) Preluninary
) Production
Concept
Exterior Signage Rendering RScae
2611 $0 Oz9} eBed
Jah i ft 1 Sammie
Petition No. OD.4+]
Meeting Date J -15-Aore
Continued
DENYSE
Management Comp,
Goldenrod Companies
Earl Raymond
William J Ballew
gs and \H\Henry, The -
a Preliminary y\Tower 1_Exterior Signage 1 v2.cdr
Morument / Rene
L6L1 30 179} e6ed
Petition No. 0.8.47
Meeting Date __ A-1IS-s02a6
Continued
Golors & Finis
| Bt | S Painted to Match Branding Color - PMS 303 veayseeweun 01] O Painted White Satin Finish
Faux Brass Accent - See Approved Sample
| FE2| ¢ ) Concrete Faux Finish - See Approved Sampic (@) 4000K White LEDs (Non Standard Color Teme)
Construction Specifications
iA} Electrical Provision - Brought to site by others within 5 of sign location, Final Connection by Others, Dedicated Branch Circuit(s) to be provided and coordination with Client, GC and Architect may be required
8 | Foundation Area - The area that the sign is located appears to be ment Genp any
ina landscaping planter with soil of unknown compaction. This Goldenrod Companies drawing assumes that there is adequate soil depth for a traditional pier foundation and thal the first several feet of the pier are in soil that is not undisturbed soil
Property Name & A The Henry
er
Circle 75 Parkway Structural Columns - Sch #49 Steel Pipe, 6” ID .280" wal Atlanta GA 30339
AS3B
Direct Bury Pier Foundation - 3000 PS! Concrete Cast in Place, Hand Dug or HydroVac is assumed typical
Opportunity Numer
® © &
Base Structure Cabinet - Aluminum Fabricated Construction with
f~ » Faux Concrete Finish - See Approved Sample. Aiuminum Framing 68148
: with 0.125 Aluminum Skin. Top and side edges to have 45 degree
€ chamfered edges. Steel Saddles to receive steel columns. fetyse Rev Pr A Removable panels on back to access LED power supplies. if
esau:
Ear Raymond iF Logo Icon Cabinet -"H" Aluminum Fabricated Construction with painted finish. Face to be translucent white acrylic. Cabinet edge to f ars have 1” wide Metal retainers to retain face material. Back of Cabinet is assumed to have removable panels for installation and William J Ballew future service. Steel Saddies to receive steel columns. Face to have Faux Brass Accents of 1" deep channel construction is assumed.
Date
Logo Letters - ‘The Henry’ - Reverse Channel Letters with painted = 07. 22.2026
finish and White Halo Iliumination, Letter are to be mounted on
painted standoffs, Letters are LED Lighted. LED power supplies to
be housed within the Base Structure Revision Oe lesiheet GRADE \ 08.04.2026 vissexx
lectrical Notes
@® Disconnect switch(s) UL & ID labels (W Vent Location
FINAL ELECTRICAL CONNECTION AT PANEL BOX BY OTHERS
ELECTRICAL CONNECTION WITHIN 5' OF SIGN IS INCLUDED
Suitable for Wet Location
Electrical Requirement WGOHZ
4 84°C. 10 €. Number of Circuits: 20 amo Deaicated Branch Cwrcuitis| ilepath } a weet. | + ~ $~__9 Max. Line Current: Circuit #01 VA\Drawings and
Connection Type: permanent continuous operation Graphics\H\Henry, The - Primary Wire Size: 12 AWG / conduit siz Secondary Wire Size: 18 avy Atlanta, GA\Tower
+ P inspected and iouled in accordance wih JL Standard tor Elecine Signs 1\Preliminary\Tower (Uy) instation using UL isted parts ard methods of staation wn accordance 1_Exterior Signage 1 | TBO | | TBD | Nee’ with Article 600 of the National nc Cade and other appiicab'e local va.cdr
codes. This micludes p:oper grounding and bonding.
General Notes
1 Dispose of igmps & components that might contain merciny (tq) according to the FRONT VIEW Main ID 1 - Monument Sign RIGHT SIDE laws of the authonty having jursuiction 7 Scale: 48 = 1-{ Qty: 1 SF Scale. 8 =1'-0 This sign tabrieated using UL approved Acrylic Adhasive for chemical bonding © Concepi . 4. Unless ctherw:se specified all mounting hardware to d 01 stainless steet piatinbiary
- rm « . 7 ay ee © Production Main iD 71 - Monument / Specifications Field Survey Required onulifions are to be: fickd verified pre: 9g 2 provacton. Patleins inay be requted fer production. ~
Petition No. OB.41
Meeting Date F -1S—avse
| Continued
Colors & Finishes
—aTT TT «BENYSE
The fascia color shown C avs ak Wie Contax ROITEC here is approx from the F
of the frames are * :
the client renderings. 4 Painted to Match Branding Color - PMS 303 1.800.941.7446 ing to have two angle e denysecu com
pest arity @ Painted io Match Fascia Color- To Be Determined sides of the frame
are to have only
one angle tab on {
© 40004 white LEDs (Non Standard Color Temp)
the inside of the J frame out of view
1 Construction Specifications
a
a - Electrical Provision - Brought lo site by others within §' of sign location, | 2D Final Connection by Others, Dedicated Branch Circuit(s) to be provided and zo] 4 Z coordination with Client, GC and Architect may be required. It is noted that red A) the client provided drawing indicate a 3/4” conduit is pianned. This should be
va
5/8" Wide Metal Retainer on "The"
/) 2, discussed if this s @ primary electrical provision because remole power (big supplies are recommended inslead. Ifthe letters are self contain with LED IS
- power supplies inside the etlers or some raceway outside the building future service / maintenance of power supplies wi'l probably require a swing stage.
| {FE} Mounting Provision - Buzing Conssucton Dela Embed Plates EP-13001 FB 1/2" x8 x 12* Embed Plate w/Four(4) 5/8” Dia x 6° Long Headed Studs 1 . j | Galvanized Finish
} Management Company fea Fascia Material - To be determined. This drawing assumes that it is non 1" Wide Metal siructural and approx 4" thick. The thickness of this malerial is to be verified Goldenrod Companies Retainers by the GC. Coordination with Client / Architect / GC for proper sequencing of : trades so DeNyseco will have access to Mounting Provision Embed Piates
10'-3*
specie
egies icra
‘and for fascia material to be cut around the mounting arms and weather Property Name & Address proofed. The Henry
| Mounting Arm - 4°x4"x3/8" Steel Square Tube A500 Grade B this is lo be Tower 1 field welded to the Mounting Provision Embed Piales. 5/16" filet welds. The Circle 75 Parkw:
gaivanized finish on the embed piates wall need to be ground off for proper cle 75 ay welding surface and refinished in the field. Both sides of arm to have Zx24G/16" Slee! Angles shop welded for bolt flanges. This drawing assumes thal the end of the erm to be capped with steel plate to prevent water from Opportunity Number entering the building.
Atlanta GA 30339
_ 68148 + 7-8 3/4 + B Connection Hardware at Arms - Arm clip angles are connected to the Mounting Frame Angle Cis with 1/2" Dia Stainless Steel HEX Thvu Bolt
Provisions for connection hardware to not joosen over time is needed. DeNyse Representative Consi ft,
pcr Damaged Threads, Double Nut, Lock Washers and or Loctite ® on Earl Raymond
F | Mounting Frame - Perimeter of 3°x3"x3/16" Stee! Square Tube A500 Grade
B welded construction with 2°x3°x3/16" Rect Steel Tube at Partition Joints. Designer Back of frame lo have field welded 2°x2°x3/16" Steel Angie Clips for William J Ballew Connection Hardware to Clips on Mounting Arms. (Any partitioning of frame ’ and sign components should be determined by swing stage weight limit
(Approx 500tbs is assumed) ale al 'G] Letterforms - Aluminum Fabricaicd Construction w/ painted finish. Faces lo 7 .
3| be Oversized While Modified Acrylic Faces retained by 1° wide metal ouler 07.22.2026 “| retainer & metal inner retainer. Primary & Redundant LED Lighting Systems | +} C4 | Te} EET Returns, Trim & Backs fo; Fail Safe Backup. Internal framing as needed. 3mm ACM LED carrier ;
panels, Drain holes w/ light baffles. Letters are to be attached to the mounting Revision Date DesiTech Lighting frame with at least Ten( 10) #12 TEX screws TYP. Leliers that wil fall onto 08.04.2026 wianx
another partition wil need to be secured wilh 2° angle clips and appropriate \ hardware attaching the letter to the frame in the field. A discussion about were = 4 the LED power supplies needs to take place with the Client / Architect / GC
since there drawing indicates a 3/4” power stud out
+
t ae
Electrical Not
@® Disconnect switch(s) UL & ID labels (WZ Vent Location
FINAL ELECTRICAL CONNECTION AT PANEL BOX BY OTHERS
ELECTRICAL CONNECTION WITHIN 5' OF SIGN 1S INCLUDED
Suitable for Wet Location
Electrical Requirement: ___ Volts 50/60Hz Filepath
Number of Circuits: __ 20 amp Dedicated Branch Circuit(s) VADrawings and
Max. Line Current: Circuit #01; _Connection Type: permanent continuous — Graphics\H\Henry, The - Primary Wire Size: 12 AWG / condudt size: 4", Secondary Wire Size: 18 avg Atianta, GA\Tower
i Inspected and labeled in accordance with UL Standard for Elecitic Si 1\Preliminary\Tower
| @) Installed using UL listed parts and inetnods of installation in accordance 1_Exterior Signage 1
4 LAYOUT SIDE VI FRAME DIMENSIONS LETTER DIMENSIONS with Article tric Code and other applicable local v2.cdr z
104"
=—
2
Scale 118"=1-0" Scale ie: Scale: 1/8"= USTED codes. This includes proper grounding anc! boning,
1-0" Scale: 16 General Notes
1. Dispose of lamps & components that might contain mocury (9) according to the laws of the aulhonty having junsdichon, —
;
|
:
i 2. This sign fabricated using UL. approved Acrylic Adhesive for chemical bonding. © Concept
\ 3, Uniess otherwise specified ali mounting hardware to be galvanized of stainless steel Ss Preliminary ‘}
4
Main ID A & C - Large Channel Letters “A” & “C” / Specifications oollesane
(South & West ) === 42
| Noted }
L6L1 $0 7791 eBed