County: Meriwether County
Meriwether County Board of Commissioners regular meeting, September 29, 2026
16 pages
These are the minutes as Meriwether County Board of Commissioners posted them, read from the file on its own website. Georgia Commons is independent and is not affiliated with Meriwether County Board of Commissioners.
This record was posted as scanned images, read here by OCR: a letter or a number may be misread. The file the body posted is linked below.
Records of this meeting
Each link opens the body's own website or meeting portal.
- MinutesAgenda September 29, 2026, Regular Meeting 6:00 p.m. (www.meriwethercountyga.gov) · shown on this page
Summary
Written by an AI model (claude-sonnet-5-5) from the minutes below. It is not the record: the minutes are.
Commissioners adopted the FY 2026-2027 budget, approved a manufacturing rezoning, and awarded the John Brown Road culvert bid while tabling Pigeon Creek Road.
The commissioners adopted the FY 2026-2027 budget and budget resolution, with a General Fund of $27,979,670.50, and approved a rezoning of 19.37 acres for a manufacturing plant expansion by Complete Truck Bodies, Inc. They awarded the John Brown Road culvert bid to Piedmont Paving, Inc. for $499,444.64 and tabled the Pigeon Creek Road culvert bid until October 12, 2026, while the cost of a possible bridge alternative is determined. The board approved a transit agreement, closed two 2020 SPLOST accounts, approved two Courthouse change orders, and tabled a third (restroom vents) to October 12. It heard updates on the Courthouse fire suppression system, Courthouse costs, and the Flat Shoals Bridge. No action came from the executive session.
Topics taken up: FY 2026-2027 budget; Complete Truck Bodies rezoning; Pigeon Creek Road culvert bid; John Brown Road culvert bid; Section 5311 transit agreement; 2020 SPLOST account closures; Courthouse change orders; Courthouse fire suppression system; Courthouse project cost update; Flat Shoals Bridge repair.
Decisions the minutes record (10)
Each decision is followed by the sentence of the minutes that records it, copied word for word.
FY 2026-2027 County budget and budget resolution
unanimous
The minutes: “A motion was made by Commissioner Worsley and seconded by Commissioner Threadgill to Adopt the FY 2026-2027 Budget and Budget Resolution. All were in favor.”
Rezoning of Parcel 166-018-002, 19.37 acres, from Agriculture (A-1) to Industrial (I) for manufacturing plant expansion
unanimous
The minutes: “A motion was made by Commissioner King and seconded by Vice Chairman Snelson to Approve the property to be rezoned from Agriculture (A-1) to Industrial (I) for the manufacturing plant expansion.”
John Brown Road culvert replacement bid awarded to Piedmont Paving, Inc. for $499,444.64
unanimous
The minutes: “A motion was made by Vice Chairman Snelson and seconded by Commissioner King to award the John Broen Road Culvert replacement bid to the lowest bidder, Piedmont Paving, Inc, for $499,444.64 to be funded with the 2024 and 2026 LRA funds.”
Pigeon Creek Road culvert bid award
unanimous
The minutes: “A motion was made by Commissioner Worsley and seconded by Commissioner Threadgill to table the bid award for Pigeon Creek Road Culvert until the next Regular meeting on October 12, 2026, at 6:00 p.m.”
FY 2027 Section 5311 Transit Agreement with Three Rivers Regional Commission, up to $25,900
unanimous
The minutes: “A motion was made by Commissioner Threadgill and seconded by Vice Chairman Snelson to Approve the FY 2027 Section 5311 Transit Agreement between Meriwether County and Three Rivers Regional Commission.”
Closing of the 2020 SPLOST LGIP account
unanimous
The minutes: “A motion was made by Chairman Collins and seconded by Commissioner Threadgill to Close the 2020 SPLOST LGIP Account.”
Closing of the 2020 SPLOST account at F&M Bank
unanimous
The minutes: “A motion was made by Commissioner Threadgill and seconded by Commissioner King to Close the 2020 SPLOST Account at F&M Bank.”
Courthouse change order PCO 17, catwalk extension for new HVAC unit ($6,825)
unanimous
The minutes: “A motion was made by Vice Chairman Snelson and seconded by Commissioner King to Approve the Catwalk Extension ot Service the New HVAC Unit.”
Courthouse change order PCO 19, LED ground floodlights ($5,851)
unanimous
The minutes: “A motion was made by Commissioner Worsley and seconded by Commissioner King to Approve change order # 19 for the LED ground floodlights.”
Courthouse change order PCO 18, vents for restroom exhaust fans
unanimous
The minutes: “A motion was made by Commissioner Worsley and seconded by Commissioner Threadgill to table the Consideration and Approval of Vents for Restroom Exhaust Fans until October 12, 2026 Regular Meeting at 6:00 p.m.”
Agenda items (9)
Found in the minutes by their headings. Where an outcome is shown, it was read by rule from the item's own words: a guide to the text, not part of the record.
- 1. CALL TO ORDER
- 2. Award Bid for John Brown Road Culvert - This was Tabled at the September 14,
- 3. Approval to Close 2020 SPLOST LGIP Account - Titled 20202 SPLOST
- 4. Approval to Close 2020 SPLOST Account - F&M Bank
- 5. Consideration and Approval of Courthouse Change Orders — River City, Inc.
- 6. Update on Fire Suppression System — All Floors of the Courthouse
- 7. Update on First Floor, Second Floor, and Basement Ceilings for HVAC Replacement — Courthouse
- 8. Update on Cost Assessment Completed by EMC Engineering Inc. for Courthouse County Administrator Gorton provided the Board with an update on the overall…
- 9. Update on Flat Shoals Bridge
The minutes
As posted on www.meriwethercountyga.gov, read November 25, 2026. Nothing below is written by Georgia Commons.
MINUTES
MERIWETHER COUNTY BOARD OF COMMISSIONERS
SEPTEMBER 29, 2026
6:00 PM
Commissioners Present: Chairman Emmett Collins, Vice Chairman Jennifer Snelson, Commissioner Gene King, Commissioner Bryan Threadgill, and Commissioner Adam Worsley
Commissioners Absent:
Staff Present: County Administrator John Gorton, County Clerk Allyson Stephens, Deputy County Administrator Jeff Fisher, Finance Director Tammy Lackey, Administrative Assistant Presley Sherrer, and County Attorney Michael Hill.
Staff Absent:
1. CALL TO ORDER
This meeting was Called to Order at 6:00 p.m. by Chairman Emmett Collins.
Il. INVOCATION
The Invocation was given by Deputy County Administrator Jeff Fisher.
Ill. PLEDGE TO THE FLAG
All.
IV. ADOPT AGENDA
A motion was made by Commissioner Gene King and seconded by Commissioner Bryan Threadgill to Adopt the Agenda with the following amendment: Remove Presentation:
Presentation and Request for Support of an EDA Feasibility Study Grant for the Woodbury Research Facility. All were in favor.
VY. PRESENTATIONS
Agenda was Amended to remove: Presentation and Request for Support of an EDA Feasibility Study Grant for the Woodbury Research Facility
1.
VI. FINANCE REPORT
Finance Director Tammy Lackey presented the bank balances as of the morning of the meeting and stated that the County expected to receive its LOST, SPLOST and TSPLOST distributions the following day. She noted that the Commissioners had also received a copy of the August credit card statement for their review. Director Lackey reported that the SPLOST balance was negative $41,331.34. She clarified that the cash in bank per ledger balance reported at the previous meeting was incorrect and should have been $785,071.66. Director Lackey also reported that the TSPLOST balance was negative $67,586.13. County Administrator Gorton stated that the balance should become positive once the distribution was received the following day.
VII. DEPARTMENT HEADS
VIII. CITIZEN COMMENT
IX. MINUTES
1. Minutes, September 14, 2026, Regular Meeting at 6:00 p.m.
A motion was made by Commissioner Bryan Threadgill and seconded by Vice Chairman
Jennifer Snelson to approve the Minutes of the September 14, 2026, Regular Meeting at 6:00p.m. Voting in favor were Chairman Collins, Vice Chairman Snelson, Commissioner Threadgill, Commissioner Worsley. Commissioner King abstained. The motion to approve the Minutes passed.
X. PUBLIC HEARING
1. Case #PC26-012 - Rezoning request submitted by Complete Truck Bodies, Inc. for Parcel No. 166-018-002, consisting of 19.37 acres, from Agriculture (A-1) to Industrial (I) for the proposed use of a manufacturing plant expansion.
A motion was made to go into Public Hearing at 6:04 p.m. by Commissioner Threadgill and seconded by Commissioner Worsley. All were in favor. County Administrator Gorton asked Chairman Collins whether he wanted to establish a time limit for the public hearing. Chairman Collins stated that the time limit would be 10 minutes for those speaking in favor and 10 minutes for those speaking in opposition. Planning and Zoning Director McCartney presented Case #PC26-012, a rezoning request submitted by Complete Truck Bodies, Inc. for Parcel #166-018- 002, consisting of 19.37 acres. He stated that the request was to rezone the property from Agricultural (A-1) to Industrial (I) for the proposed expansion of a manufacturing plant. Director McCartney stated that both staff and the Planning Commission have recommended approval of the rezoning request. Commissioner Worsley asked whether the Board had received any drawings, engineering plans, or other information showing what the applicant proposed to build.
County Administrator Gorton asked whether the applicant was present. Commissioner Worsley asked Director McCartney whether the applicant had provided any additional information to him. Director McCartney stated that someone representing the applicant was present and that he believed the Board had received all the information that had been provided to him.
Commissioner King then asked whether the Board had already gone into the public hearing or whether he had missed that portion of the proceedings. Chairman Collins confirmed that the Board was in the public hearing. Director McCartney referenced the information he had regarding the request. County Administrator Gorton asked the applicant to state his name and address for the record. Joshua Cawley introduced himself and provided the business address as 21850 Highway 85, Gay, Georgia. Commissioner Worsley clarified that the request before the Board was to approve the rezoning of the property to Industrial and that when the applicant was ready to construct the proposed building, the plans would be reviewed for compliance with the applicable zoning and development requirements. Chairman Collins confirmed. Commissioner Worsley stated that he understood and had been asking because those plans were not yet before the Board. Mr. Cawley stated that he had submitted information and dimensions for the proposed building. He explained that the proposed building would be a new welding shop used for production and would be oriented differently to provide better shade for employees working during the afternoon. He stated that the proposed building was expected to be approximately 10,000 to 12,000 square feet under one roof. Mr. Cawley added that the expansion would provide additional jobs, generate additional tax revenue, and contribute to the County’s growth.
Chairman Collins asked whether the existing structure and surrounding property were already zoned Industrial. Mr. Cawley confirmed that they were. Chairman Collins clarified that Mr.
Cawley was essentially requesting that the remaining portion of the parcel be rezoned Industrial and Mr. Cawley agreed. Mr. Cawley explained that there were natural barriers on the adjoining property that was currently zoned Agricultural, including an old drainage ditch. He stated that
the proposed industrial area would extend almost to the edge of the drainage ditch. He also described an old road on the property that dated back to when the property was used as a vineyard and separated the front field from the former grapevines. Chairman Collins asked about a creek located on the south side of the property and whether it was Red Oak Creek. Mr. Cawley stated that Red Oak Creek was several miles away but confirmed that another creek was located below the property. He explained that the area had previously been an old beaver swamp that had mostly dried up, although a creek continued to run through the middle of the former swamp area. Commissioner King asked whether the property being rezoned included the large hayfield next to the business. Mr. Cawley stated that it did not. He explained that the old drainage ditch separated the existing industrial property from the hayfield and that he intended to keep the hayfield Agricultural. He stated that the rezoning primarily involved the planted pine area located behind the existing business. Chairman Collins clarified that most of the proposed rezoning area was located behind the existing structure. Mr. Cawley confirmed and explained that motorists traveling along the road would be able to see the new building, but the development would not extend farther along the road. He stated that the expansion would extend behind and east of the existing property and road frontage. Commissioner King stated that he believed the expansion would provide additional tax revenue and noted that the business had operated at the location for years. He expressed concern about protecting any nearby residences from potential impacts associated with industrial use, including lighting, and suggested maintaining an appropriate buffer or fencing if homes were located nearby so that neighboring residents would not have their quality of life disrupted. Mr. Cawley explained that beyond the planted pines proposed for rezoning was another section of planted pines, followed by a large electrical transmission line. Commissioner King clarified that the surrounding property would therefore provide a substantial buffer, and Mr. Cawley confirmed. Commissioner Worsley then asked Chairman Collins whether anyone else wished to speak in favor of or in opposition to the rezoning request. Chairman Collins asked whether anyone wished to speak in opposition to the rezoning request. County Attorney Hill advised that the Chairman should also ask whether anyone else wished to speak in favor of the request to ensure that all interested persons had an opportunity to speak. Chairman Collins then asked whether anyone else wished to speak in favor of the rezoning request. Hearing no additional comments, a motion was made to exit the Public Hearing at 6:11 p.m. by Commissioner Worsley and seconded by Commissioner Threadgill. All were in favor. Commissioner King stated that unless the other Commissioners had additional questions or wished to further discuss the request, he was in favor of approving it. He noted that, as Commissioner Worsley had discussed, he would like to see the plans and any applicable requirements or stipulations for the future development. Commissioner King stated that he was comfortable making a motion to approve the rezoning to allow the business to expand and noted that the expansion would be a positive addition for the County. A motion was made by Commissioner King and seconded by Vice Chairman Snelson to Approve the property to be rezoned from Agriculture (A-1) to Industrial (I) for the manufacturing plant expansion. All were in favor.
XI. APPOINTMENTS
XII. UNFINISHED BUSINESS
I. Award Bid for Pigeon Creek Road Culvert - This was tabled at the September 14, 2026, Regular Meeting at 6:00 p.m.
County Administrator Gorton stated that the County received five bids for the culvert replacement project, which he presented from lowest to highest: McCoy Grading, Inc. in the amount of $1,239,859.51; Piedmont Paving, Inc. in the amount of $1,242,597.78; Southern Concrete Construction in the amount of $1,473,500.00; Southeast Site Development in the
amount of $1,658,647.27; and Helix in the amount of $1,669,472.50. He stated that Southern Concrete Construction also submitted an alternative bridge proposal in the amount of $962,000.00; however, that amount did not include engineering for design and construction or testing. County Administrator Gorton explained that while a bridge could provide a longer service life, the total cost had not yet been determined and, once the additional costs were included, the bridge proposal could exceed McCoy Grading, Inc.’s culvert replacement bid.
County Administrator Gorton stated that staff recommended awarding the culvert replacement project to McCoy Grading, Inc. in the amount of $1,239,859.51, with the project to be funded using 2025 LMIG funds and 2026 LRA funds. Commissioner Worsley stated that before the Board proceeded further, he wanted to bring to the Board’s attention a consideration that Vice Chairman Snelson had brought to his attention earlier that day. He noted that when comparing the current culvert replacement project with the next agenda item, the John Brown Road culvert replacement project, many of the same companies had submitted bids on both projects. County Administrator Gorton confirmed. Commissioner Worsley stated that the County generally attempts to award projects to a reputable bidder at the lowest cost to the citizens. He explained that based on the individual bids, McCoy Grading, Inc. appeared to be the lowest bidder on the first project, while Piedmont Paving, Inc. appeared to be the lowest bidder on the John Brown Road project. However, Commissioner Worsley stated that if the two projects were considered together, McCoy Grading, Inc.’s combined bids totaled approximately $1,953,000, while Piedmont Paving, Inc.’s combined bids totaled approximately $1,742,000. He noted that awarding both projects to Piedmont Paving, Inc. would result in an approximate savings of $211,000 compared with awarding one project to McCoy Grading, Inc and one project to Piedmont Paving, Inc. County Administrator Gorton stated that for the Pigeon Creek Road project, there was a difference of $2,738.27 between the bids submitted by McCoy Grading, Inc.
and Piedmont Paving, Inc. Vice Chairman Snelson stated that, when possible, she preferred using the same company for both projects. She noted that Piedmont Paving, Inc. had the lowest combined bid for the two projects and stated that she preferred having Piedmont complete both projects. Commissioner Threadgill noted that staff was recommending McCoy Grading, Inc. for the Pigeon Creek Road project and Piedmont Paving, Inc. for the John Brown Road project.
County Administrator Gorton confirmed and explained that the John Brown Road project involved a concrete box culvert and that Piedmont could complete that project at a lower cost because the box culvert could be built locally and was ready to go. Chairman Collins referenced Southern Concrete Construction’s alternative bridge proposal of $962,000 and asked what additional costs would be associated with the bridge. County Administrator Gorton stated that he had contacted EMC but had not yet received a cost estimate. He explained that if EMC charged its standard engineering fee, it could range from approximately four to eight percent and would include design and testing. He noted that County staff was not qualified to perform the required bridge design or testing to ensure compliance with GDOT specifications, so an engineer would have to be involved. Vice Chairman Snelson noted that those additional costs could significantly increase the amount of the bridge proposal and expressed concern about the uncertainty of the final cost. County Administrator Gorton agreed and stated that the County had approximately $2.3 million in LRA funds that had to be spent and that those funds were being used for the projects. Chairman Collins stated that even if approximately $200,000 were added to the $962,000 bridge proposal for engineering, the total would still be less than the culvert replacement bid. County Administrator Gorton agreed but emphasized that the Board would be estimating the final cost without having an actual engineering figure. Chairman Collins asked whether anyone could provide the final cost, and County Administrator Gorton stated that he had contacted Chris the previous week and had been expecting a quick response but had not yet received one. Commissioner Threadgill stated that he understood Vice Chairman Snelson’s position but noted that McCoy Grading, Inc. was the lowest bidder for Pigeon Creek Road and Piedmont Paving, Inc. was the lowest bidder for John Brown Road. He expressed concern that
awarding both projects to one company could require that company to complete one project before beginning the other. He suggested that awarding each project to its respective lowest bidder could allow both projects to be worked on at the same time and potentially completed sooner. County Administrator Gorton explained that Pigeon Creek Road was already closed and work could begin immediately. He stated that if the projects were awarded to two different companies, the Board would also have to close John Brown Road because the contracts were for 120 days. He explained that if both projects were awarded to Piedmont Paving, Inc., the Board could instruct the company to complete Pigeon Creek Road first and then John Brown Road and extend the contract beyond 120 days. County Administrator Gorton added that he believed the John Brown Road project could be completed relatively quickly because the box culvert was already built. Commissioner Worsley clarified that Commissioner Threadgill’s point was whether both projects could be started and completed within the 120-day contract period.
County Administrator Gorton stated that they could if the Board chose to close John Brown Road and Pigeon Creek Road at the same time. Commissioner Worsley noted that the roads were not connected. County Administrator Gorton stated that, based on information from Public Works Director Brian Griffith before he left for vacation, the two projects were in the same general vicinity and approximately a couple of miles apart. Chairman Collins stated that he felt a bridge would be a better option for Pigeon Creek Road and noted that the culvert design called for approximately four barrels. County Administrator Gorton stated that he believed that was correct and noted that the area was deep. Chairman Collins expressed concern that debris could become caught in the culvert barrels. Commissioner King asked about the culvert design and discussed whether the concrete culverts would be able to adequately handle the water. County Administrator Gorton noted that there was currently a culvert at the location that had collapsed and that culverts could fail. Commissioner King noted that the proposed culverts were concrete and stated that Piedmont Paving, Inc. could handle both projects. He noted that the company also owned a local precast operation and could manufacture the structures, bring them to the site and set them in place with a crane. Commissioner King stated that he had seen the company’s work and believed it could handle both projects if doing so would save the County money. He expressed concern, however, about the unknown final cost of the bridge alternative, noting that while the proposal started at $962,000, the Board did not know how much the additional costs could increase the total. County Administrator Gorton agreed and reiterated that the County had approximately $2.3 million in LRA funds available. He stated that once those funds were exhausted, the County would begin using TSPLOST funds. Chairman Collins reiterated that he believed a bridge could handle significantly more water than culverts. He stated that the bridge could potentially be constructed at a higher elevation to increase its capacity and reduce the possibility of a washout. County Administrator Gorton stated that, based on his conversations with Chris, Southern Concrete Construction regularly performed bridge projects using prefabricated components and had completed several similar projects with him. County Administrator Gorton stated that his remaining concern was that he did not yet know what the engineering fees for the bridge would be. Commissioner King stated that he agreed a bridge could be the better option but would not want to vote for a bridge without having a firm cost.
Chairman Collins agreed and suggested that the Pigeon Creek Road project could be tabled for two weeks while the Board moved forward with awarding the bid for the other project.
Commissioner Threadgill asked how long the bids remained available for consideration. County Administrator Gorton stated that the bids were received on September 14 and that the Board could postpone a decision until the next meeting. Commissioner Threadgill stated that he would prefer for Public Works Director Brian Griffith to be present to provide his input since he was the person with expertise on the project. County Administrator Gorton acknowledged that Director Griffith was away on his previously scheduled annual vacation. Chairman Collins asked whether there were any questions regarding the John Brown Road project and suggested that the Board could proceed with a decision on that project. County Administrator Gorton
stated that the Board could table the Pigeon Creek Road project if it wished. Commissioner King cautioned against moving forward with John Brown Road before deciding on Pigeon Creek
Road. He explained that if the Board ultimately decided against the bridge and determined, as Commissioner Worsley had discussed, that awarding both projects to Piedmont Paving, Inc.
would save money, the Board might not want to award one project separately at that time. He suggested tabling both projects until the next meeting. Vice Chairman Snelson noted that the Board could still award the John Brown Road project to Piedmont Paving, Inc. because
Piedmont was already the lowest bidder for that project, which would allow work on that project to begin while the Board further considered Pigeon Creek Road. A motion was made by Commissioner Worsley and seconded by Commissioner Threadgill to table the bid award for Pigeon Creek Road Culvert until the next Regular meeting on October 12, 2026, at 6:00 p.m. All were in favor.
2. Award Bid for John Brown Road Culvert - This was Tabled at the September 14,
2026, Regular Meeting at 6:00 p.m.
County Administrator Gorton stated that the County received six bids for the John Brown Road culvert replacement project, which he presented from lowest to highest: Piedmont Paving, Inc. in the amount of $499,444.64; Southern Concrete Construction in the amount of $518,500.00;
McCoy Grading, Inc. in the amount of $713,829.62; Southeast Site Development in the amount of $721,224.69; Backbone Infrastructure, LLC in the amount of $736,771.00; and Helix in the amount of $749,509.00. County Administrator Gorton stated that staff recommended awarding the culvert replacement project to Piedmont Paving, Inc. as the lowest bidder in the amount of $499,444.64, with the project to be funded using 2024 and 2026 LRA funds. A motion was made by Vice Chairman Snelson and seconded by Commissioner King to award the John Broen Road Culvert replacement bid to the lowest bidder, Piedmont Paving, Inc, for $499,444.64 to be funded with the 2024 and 2026 LRA funds. All were in favor.
XIII. NEW BUSINESS
1. Consideration and Adoption of the FY 2026-2027 Budget and Budget Resolution County Administrator Gorton stated that the proposed FY 2026-2027 General Fund budget totaled $27,979,670.50, an increase of $3,906,348.50, or 16.23%, over FY 2025-2026. He explained that the budget included $2,352,550.50 in committed LRA funds and that, excluding those committed funds, the General Fund budget totaled $25,627,120.00, representing a year-over-year increase of 6.45%. County Administrator Gorton stated that the budget required $1,516,015.00 in fund balance, excluding the committed LRA funds, which was $291,517.00, or 16.13%, less than the amount used to balance the FY 2025-2026 budget. He stated that the budget included a 3% merit increase for eligible non-elected, non-official employees and included 24 budgeted positions consisting of 19 full-time and five part-time positions. County Administrator Gorton stated that the largest staffing increase was within Fire and EMS, with the Fire Department adding 14 full-time and two part-time positions and EMS adding two part-time positions. These additions would bring the total budgeted Fire and EMS staffing to 70 positions.
He stated that the remaining staffing additions included one part-time employee for Magistrate Court, one full-time employee for Probate Court, two full-time employees for Maintenance, one full-time Code Enforcement Officer for Planning and Zoning, and one full-time employee for Recreation. These staffing additions would become part of the County’s authorized budgeted positions upon approval of the FY 2026-2027 budget. County Administrator Gorton stated that the Fire District Fund totaled $3,306,114.00, an increase of 14.59%, including a General Fund transfer of $628,742.00. He reported that all County funds were balanced for FY 2026-2027, including the General Fund, Fire District Fund, Jail Fund, Law Library Fund, Opioid Fund, E- 911 Fund, Drug Abuse Treatment and Education Fund, Hotel/Motel Fund, 2026 SPLOST Fund, and 2025 TSPLOST Fund. County Administrator Gorton stated that staff recommended approval of the FY 2026-2027 budget and personnel requests and adoption of the accompanying
budget resolution, with all funds balanced in accordance with applicable state law.
Commissioner Worsley asked whether the Board could be certain that all of the figures contained in the budget resolution were accurate. County Administrator Gorton confirmed that they were and stated that the figures were the same as those advertised to the public on the County website and in the newspaper. He added that the figures had been double and triple checked. Commissioner Worsley stated that the figures looked correct to him but wanted to ensure that someone else had reviewed them because he did not want the Board to adopt a resolution containing an incorrect figure. County Administrator Gorton asked Finance Director Lackey to confirm that she had verified the figures. A motion was made by Commissioner Worsley and seconded by Commissioner Threadgill to Adopt the FY 2026-2027 Budget and Budget Resolution. All were in favor. Commissioner Threadgill stated that when he first joined the Board, the County’s budget was just over $12 million. County Administrator Gorton noted that the budget had grown considerably since that time.
2. Consideration and Approval of the FY 2027 Section 5311 Transit Agreement Between Meriwether County and Three Rivers Regional Commission
County Administrator Gorton stated that the agreement between Meriwether County and the Three Rivers Regional Commission provides for the operation of the Section 5311 Rural Public Transportation Program from July 1, 2026, through June 30, 2027. He explained that the Three Rivers Regional Commission would manage the program’s daily operations, including scheduling, staffing, maintenance and compliance, while the County would provide funding and vehicles. He stated that the program provides demand-response transportation for residents at least five days per week, with trips generally requiring 24 hours’ notice. County Administrator Gorton stated that the County’s maximum cost under the agreement was $25,900.00 for operating and administrative expenses and that no additional vehicle matching funds were required. He noted that this was the same amount approved the previous year and was included in the FY 2026-2027 budget. Commissioner Worsley asked whether the agreement needed to be reviewed by legal counsel or whether it had already been reviewed. County Administrator Gorton stated that it was the same contract as the previous year and that the County had simply received it earlier than in prior years. A motion was made by Commissioner Threadgill and seconded by Vice Chairman Snelson to Approve the FY 2027 Section 5311 Transit Agreement between Meriwether County and Three Rivers Regional Commission. All were in favor.
3. Approval to Close 2020 SPLOST LGIP Account - Titled 20202 SPLOST
County Administrator Gorton stated that all funds in the 2020 SPLOST LGIP account had been transferred to the 2020 SPLOST bank account at F&M Bank and that no additional 2020 SPLOST funds were expected to be deposited into the LGIP account. He stated that staff requested authorization to close the 2020 SPLOST LGIP account and clarified that the account was correctly titled the 20202 SPLOST account. A motion was made by Chairman Collins and seconded by Commissioner Threadgill to Close the 2020 SPLOST LGIP Account. All were in favor.
4. Approval to Close 2020 SPLOST Account - F&M Bank
County Administrator Gorton stated that after the September interest posts in October, staff would expend the remaining funds from the 2020 SPLOST account at F&M Bank, bringing the account balance to zero. He noted that collections for the 2020 SPLOST had ended and that the County was now collecting the 2026 SPLOST. County Administrator Gorton stated that staff requested authorization to close the 2020 SPLOST account once the balance reached zero and explained that the approved meeting minutes were needed by the bank to close the account. A motion was made by Commissioner Threadgill and seconded by Commissioner King to Close the 2020 SPLOST Account at F&M Bank. Ail were in favor.
5. Consideration and Approval of Courthouse Change Orders — River City, Inc.
PCO #17 Catwalk Extension to service New HVAC Unit —
County Administrator Gorton introduced Travis Evans with River City Contracting, Inc. to discuss PCOs 17, 18 and 19 for the Courthouse project. He stated that PCO 17 was for a catwalk extension to service anew HVAC unit at a cost of $6,825.00; PCO 18 was for venting restroom exhaust fans at a cost of $3,482.00; and PCO 19 was for new LED ground floodlights at a cost of $5,851.00. County Administrator Gorton stated that the total cost of the three change orders was $16,158.00, which would leave a balance of $6,630.50 in the contingency fund. Mr. Evans explained that PCO 17 was necessary because the new third-floor HVAC system required the installation of large units above the ceiling. Due to the inverted false dome and limited space on the sides, the units had to be positioned along the north and south elevations. He stated that an existing catwalk provided access toward the bell tower on the north side and that the proposed change order would extend the catwalk to provide access to the new HVAC unit. Mr. Evans explained that the mechanical contractor had already moved the unit as far over on its support as possible so that a technician could use the extended catwalk to access the unit for future service and maintenance. Without the catwalk extension, portions of the grid ceiling would have to be removed to conveniently access the unit. He noted that the mechanical contractor had identified the access concern, which was why the change order was being brought before the Board. Vice Chairman Snelson asked whether the Board needed to vote on each change order individually.
County Attorney Hill explained that the change orders were listed as one agenda item and that the Board could address them in a single motion while modifying the motion as desired, such as approving PCOs 17 and 18 but not PCO 19. A motion was made by Vice Chairman Snelson and seconded by Commissioner King to Approve the Catwalk Extension ot Service the New HVAC Unit. All were in favor.
PCO #18 - Vents for Restroom Exhaust Fans
Mr. Evans explained that PCO 18 involved venting the third-floor restroom exhaust fans. He stated that during demolition, it was discovered that the existing exhaust fans were not vented through the roof as required by current building code but instead exhausted into the plenum space. The change order would extend the vents through the roof and install vent caps at the four third-floor restroom locations. Vice Chairman Snelson asked whether venting through the roof was necessary and required. Mr. Evans stated that it was required under the current building code but was unsure what the requirements had been when the original system was installed.
Commissioner Worsley clarified that the existing configuration was not up to current code and that the proposed work would bring it into compliance. Chairman Collins asked whether the work would vent all restrooms in the Courthouse. Mr. Evans and County Administrator Gorton clarified that it would only address the third-floor restrooms. Vice Chairman Snelson expressed concern about cutting holes in the new roof. Commissioner King agreed, noting that the Courthouse project originally began because of roof leaks and that additional roof penetrations could increase the possibility of future leaks. He stated that if the work was required by code, the County had no choice, but questioned making the penetrations if they were not required. Mr.
Evans acknowledged the concern and stated that he also disliked cutting into a new roof.
However, he noted that the roofing contractor was reputable and would promptly address any leaks that might occur. Vice Chairman Snelson reiterated that she did not want to make four penetrations in the new roof unless required. Commissioner Worsley asked whether each restroom was required to have a separate vent or whether the vents could be combined. Mr.
Evans stated that they could possibly be combined and suggested tabling the change order so he could determine whether the vents could be tied together to reduce the number of roof penetrations. He explained that there were two restrooms on the north side and two on the south side and that it might be possible to combine the vents, although doing so could require additional piping. Commissioner Worsley stated that he would prefer exploring that option to minimize the number of roof penetrations, and Vice Chairman Snelson agreed that she did not
want four holes cut into the new roof, and Commissioner Threadgill noted that roof leaks were what originally led to the Courthouse project. A motion was made by Commissioner Worsley and seconded by Commissioner Threadgill to table the Consideration and Approval of Vents for Restroom Exhaust Fans until October 12, 2026 Regular Meeting at 6:00 p.m. All were in favor.
PCO #19- New LED Ground Floodlights
Mr. Evans explained that PCO 19 resulted from a request by the architect to replace the existing ground floodlights with LED fixtures. He stated that his understanding was that the lamps currently being used cost approximately $500 each, resulting in an estimated cost of approximately $4,000 the next time all of the lamps needed to be replaced. He explained that the ground-level lighting was not included in the original design and pricing package, although the roof lighting had been included. PCO 19 would replace the existing ground floodlights with LED fixtures. Commissioner Threadgill asked the cost, and County Administrator Gorton stated that it was $5,851.00. County Administrator Gorton noted that at night the Courthouse dome was well lit and visible, while the ground level remained very dark. Chairman Collins noted that LED fixtures would provide a longer-lasting lighting option, and County Administrator Gorton agreed that LEDs have a longer lifespan. Commissioner Threadgill expressed concern that additional costs would continue to be added to the Courthouse project. Commissioner Worsley asked whether the $5,851.00 was already included within the contingency fund, and County Administrator Gorton confirmed that it was. Commissioner Threadgill reiterated his concern that the overall cost continued to increase, and Vice Chairman Snelson agreed, stating that she had hoped some of the contingency funds would remain at the completion of the project.
Commissioner King stated that considering the amount being invested in the Courthouse, he wanted the building to be properly illuminated so that the public could see and appreciate it. A motion was made by Commissioner Worsley and seconded by Commissioner King to Approve change order # 19 for the LED ground floodlights. All were in favor.
6. Update on Fire Suppression System — All Floors of the Courthouse
County Administrator Gorton provided an update on the proposed fire suppression system for the Courthouse. He stated that River City Contracting, Inc. had been working with a company to prepare a quote for the system. A hydrant flow test was conducted on September 22; however, the readings may have been affected by the City of Greenville filling tankers at the same time. A flow test report from more than two years earlier was also located. The company returned on September 25 to test several hydrants and determine the best approach for designing the system.
County Administrator Gorton explained that if the available water flow was inadequate, a pump, storage tank or both could be required, potentially increasing the estimated cost from approximately $200,000 to $400,000 or more. Updated flow rates and proposed design costs were not yet available, and the information would be brought back to the Board once received.
Commissioner Threadgill asked what would happen if a fire occurred while the City of Greenville was experiencing low water pressure. Mr. Evans stated that, based on his conversation with the Fire Chief, the suppression system would need to contain the fire long enough for the Fire Department to arrive and take over. He explained that the system might not extinguish the fire completely but could help contain it until firefighters arrived. Commissioner Worsley noted that the information provided to the Board stated that a hydrant flow test had been conducted but did not include the results. County Administrator Gorton explained that he did not receive the results until late Friday, after the Board’s information had already been distributed. He stated that the results varied and that there was a possibility that valves associated with the recent bridge construction had not been fully reopened. The Fire Department
and the City of Greenville were investigating whether any valves remained partially or fully closed. Commissioner Worsley stated that he wanted those possibilities investigated before the County committed to the system. County Administrator Gorton clarified that the matter was being presented only as an update and was not an action item because exact figures were not yet available. Commissioner Threadgill noted that the potential cost could double or more. County Administrator Gorton stated that depending on the findings, the County could potentially proceed with a wet system using what was currently available at the Courthouse. Commissioner Threadgill stated that the testing should be completed before a determination was made.
Commissioner Threadgill asked whether only one additional test would be performed. Mr.
Evans stated that two tests had already been conducted and that if closed valves were located and reopened, another flow test would be conducted to determine whether the water pressure improved. Commissioner Threadgill asked whether the City of Greenville had been using the water system during both previous tests. Mr. Evans explained that the City had been filling trucks during the first test, but prior to the second test, Justin had been notified and made sure trucks were not being filled. Commissioner Threadgill asked about the difference in pressure between the tests. Mr. Evans stated that the pressure on the square remained approximately the same, but testing on Stovall Road showed approximately double the pressure. As testing moved back toward the Courthouse, the pressure decreased at each location. He noted that the pressure dropped approximately 70 to 80 PSI near Newnan Street and continued to decrease closer to the Courthouse. Commissioner Threadgill asked who performed the testing, and Mr. Evans identified Fuller Fire. Commissioner Threadgill asked whether the County could obtain the City of Greenville’s previous hydrant testing results for comparison. County Administrator Gorton stated that an older report had been located showing good pressure and that they were attempting to determine the reason for the difference between those earlier results and the current readings.
Mr. Evans reiterated that because of the recent bridge construction, there was concern that valves may have been turned off and not fully reopened. He stated that he had met with the Fire Chief to discuss the test results and was advised that valves on either side of the bridge could be involved. He added that Justin believed some valves in the street might have been paved over and planned to locate them. Commissioner Threadgill asked what size storage tank might be required and where it would be located. Mr. Evans stated that the required tank size would depend on the final water pressure and flow results and that he could not yet provide the number of gallons required. Vice Chairman Snelson questioned whether sufficient space was available on the Courthouse grounds for a tank. Commissioner King expressed concern about the appearance of an exterior tank and asked whether sufficient space might be available in the basement. Mr. Evans stated that he did not know whether there was adequate basement space or what size tank would ultimately be required because that would depend on the available gallons per minute. He agreed that he would prefer not to place the tank outside if another option was available. Commissioner King referenced a similar fire suppression installation at a banquet hall where a large exterior water tank was required and stated that such a tank would not look appropriate on the Courthouse grounds. Commissioner Threadgill asked about the size of the water lines serving the hydrants. County Administrator Gorton stated that he would have to check with the City of Greenville. Vice Chairman Snelson asked whether a dry fire suppression system had been considered. Mr. Evans explained that although the piping in a dry system initially remains dry, water enters the piping when the system activates. He stated that a foam System was another option but that records and other materials could still become wet if a major fire activated a sprinkler head. Commissioner Threadgill asked whether Fuller Fire would install
the system if the County proceeded, and Mr. Evans confirmed that it would. Commissioner Threadgill stated that he wanted to review the testing results. County Administrator Gorton stated that once the results were received, the information would be brought back to the Board for an update and any necessary action. Vice Chairman Snelson noted that the testing had also identified a potential hydrant flow issue within the City of Greenville that needed to be investigated because it could affect citizens needing fire protection. County Administrator Gorton agreed and noted that Station One had an approximately 4,000-gallon tanker available, providing an additional water resource in Greenville. Chairman Collins asked whether the Board would receive additional information regarding the fire suppression system. County Administrator Gorton confirmed that he would bring the additional information back to the Board for consideration.
7. Update on First Floor, Second Floor, and Basement Ceilings for HVAC Replacement — Courthouse
County Administrator Gorton stated that because a decision on the fire suppression system had been delayed, River City Contracting, Inc. could not yet complete the design for the basement or the ceilings on the other floors. He reminded the Board that it had requested River City to bring back a cost or design for that work but explained that the company could not proceed until it was determined whether the fire suppression system would move forward. County Administrator Gorton stated that the information was being provided as an update to the Board. Chairman Collins stated that the matter would be brought back to the Board.
8. Update on Cost Assessment Completed by EMC Engineering Inc. for Courthouse County Administrator Gorton provided the Board with an update on the overall Courthouse project costs. He stated that when EMC completed the original Courthouse assessment in late 2024, the estimated value was $3,759,270.00. He explained that the estimate had been withheld .
from the bid packages so prospective bidders would not know the amount EMC had estimated for the project. He noted that an additional $150,000.00 had been added to the contingency because approximately $135,000.00 was required for structural roof supports, bringing the overall anticipated project cost closer to $4 million. Commissioner Worsley referenced the amount shown on the information provided to the Board. County Administrator Gorton clarified that the contract amount before the recently approved third-floor renovations was $2,579,131.00.
Vice Chairman Snelson asked why the amount differed from the figure shown on the issue paper. County Administrator Gorton explained that the current contract amount of approximately $3.16 million included the recently approved third-floor renovations of approximately $577,000.00, bringing the project total to approximately $3.1 million to $3.2 million. Commissioner Worsley asked which renovations had recently been added. County Administrator Gorton and Mr. Evans clarified that the amount was for the third-floor renovations and finishes previously approved by the Board. Commissioner Threadgill asked when the work would be completed. County Administrator Gorton stated that completion of the third floor was anticipated around January or February, while Mr. Evans stated that he was attempting to complete the work sooner. County Administrator Gorton explained that after completion of the third floor, the next phases would include the HVAC systems on the first and
second floors and then the basement. He stated that the first-floor HVAC was a priority because the County was spending a significant amount on maintenance to keep the existing system operational. He explained that when the third-floor HVAC system was removed, the master control board that controlled the first- and second-floor systems was also removed, requiring the existing systems to be reprogrammed. County Administrator Gorton stated that he had directed maintenance to avoid investing approximately $20,000 in additional repairs if possible and to keep the system operating until an HVAC price could be obtained and brought back to the Board. He noted that the County was currently spending approximately $15,000 to $20,000 annually maintaining the existing HVAC system and that the first floor would be the next phase brought before the Board for approval after completion of the third floor. County Administrator Gorton and Mr. Evans discussed using the existing ductwork on the remaining floors, which could significantly reduce the cost compared with the approximately $470,000 third-floor HVAC work. County Administrator Gorton explained that the third floor required a complete removal and replacement because it had remained open and exposed for an extended period, while the existing ductwork on the first and second floors and in the basement should be maintained and intact. County Administrator Gorton estimated that the completed Courthouse project would likely be close to or slightly over $4 million. Chairman Collins stated that the project might exceed that amount somewhat but did not believe it would be significantly higher.
County Administrator Gorton noted that using the existing ductwork would help control costs, although the fire suppression system could increase the final amount. He stated that a little over $4 million was approximately what he had anticipated when planning for the 2026 SPLOST. He further explained that the original EMC estimate had not been made public during bidding because he did not want contractors using the approximately $3.7 million estimate as the basis for their bids. He noted that the approximately $135,000 structural roof change order had been a significant additional expense to the County. County Administrator Gorton stated that the completed roof looked very good and noted that Ryan Moore with Moore Ventures had completed a drone flyover of the Courthouse that had been posted on Facebook. Chairman Collins stated that after trees were removed from the Courthouse grounds, he noticed a large utility pole prominently visible in front of the Courthouse. He stated that he contacted Chris, who indicated that he would look into whether the pole could be relocated. Commissioner King stated that relocating it would be beneficial. Commissioner Worsley asked what relocating the pole would cost, and Commissioner Threadgill commented that it could result in another change order. County Administrator Gorton stated that after all HVAC work was completed, a landscaping design would be brought to the Board to improve the appearance of the Courthouse grounds. He stated that the project was progressing and looking good. County Administrator Gorton concluded that the purpose of providing the original EMC assessment was to allow the Board to compare the current project costs with EMC’s original evaluation. He reiterated that EMC’s estimate, including construction management and engineering fees, was slightly more than $3.7 million for the entire Courthouse project.
9. Update on Flat Shoals Bridge
County Administrator Gorton provided an update on the Flat Shoals Bridge. He stated that he had provided EMC Engineering with GDOT’s report on the bridge for a preliminary review, which resulted in the approximately $700,000 cost previously mentioned to the Board. He stated that a conference call was held with GDOT on September 23 and that GDOT identified one deficiency that must be corrected before the bridge can reopen. EMC Engineering now had that information and could develop a more specific scope of work and cost estimate. County
Administrator Gorton stated that Pike County had experience with this type of repair and, if the work fell within Pike County’s capabilities, Meriwether County would need to enter into an intergovernmental agreement establishing the scope and cost of the work. He stated that he would also discuss possible state funding with GDOT and determine what the cost-sharing arrangement between Meriwether and Pike counties could be once the scope and cost analysis were available. The information would then be brought back to the Board for consideration and approval. County Administrator Gorton emphasized that no decision to proceed with the repair was being requested at that time. He explained that GDOT had been very specific that the deficiency involved bend number four, where the concrete had deteriorated to the point that GDOT required the bridge to be closed to traffic. He stated that if Pike County could perform the work, an arrangement could potentially be made in which Meriwether County paid the engineering costs and Pike County provided the labor to help get the bridge reopened. County Administrator Gorton noted that GDOT had received calls from citizens both supporting and opposing reopening the bridge. Chairman Collins questioned why GDOT was proposing replacement of the Flat Shoals Bridge in approximately 2028 to 2030 while also planning replacement of the Highway 85 bridge over the railroad tracks in Woodbury. He noted that the Woodbury bridge had not been condemned while Flat Shoals Bridge had been closed and suggested that GDOT consider prioritizing Flat Shoals Bridge first. County Administrator Gorton stated that the issue had been raised with GDOT but that GDOT referenced the required design, construction and implementation phases. Commissioner Threadgill referenced a bridge project in Upson County near a GDOT location where the bridge was removed and replaced within approximately four and a half months. Commissioner King asked whether involving someone such as Randy Robertson at the State Capitol might help facilitate discussions with GDOT. County Administrator Gorton stated that he could reach out to someone regarding the matter. Commissioner King also discussed the planned replacement of the railroad bridge in the Alvaton area. He stated that GDOT had been surveying the area for several months and expressed concern about the proposed detour. He noted that although GDOT had discussed routing traffic to Highway 16 or Highway 109, he believed motorists would instead use Mount Carmel Road, potentially causing significant damage to that road. County Administrator Gorton stated that, if he remembered correctly, the proposed route involved approximately a 15-mile detour and could add approximately 45 minutes of travel time. He stated that he had written a strong letter encouraging GDOT to consider a temporary bridge because of the impact the closure would have on local farmers and other motorists. Commissioner King noted that surveying was occurring on the north side of the bridge and stated that a temporary bridge would be a practical way to keep traffic moving because of the volume of traffic on the road. Returning to Flat Shoals Bridge, County Administrator Gorton stated that Chris had asked GDOT about additional LMIG funding and that GDOT wanted to first determine the cost of the project. He noted that Flat Shoals Bridge crosses the Flint River, with portions in both Pike and Meriwether counties, but that based on how the bridge is addressed, Public Works Director Brian Griffith had explained that it is considered Meriwether County’s bridge. County Administrator Gorton noted that the bridge also serves Pike County and crosses a major waterway and stated that he believed GDOT should provide some financial assistance. He reiterated that the County would wait for the final scope and cost estimate regarding the deficiency at bend number four.
Chairman Collins asked whether County Administrator Gorton would bring additional information back to the Board. County Administrator Gorton confirmed that once EMC Engineering provided the scope of work, he would contact Pike County to determine whether it
could perform the work. If so, a proposed intergovernmental agreement would be brought back to the Board for consideration.
XIV. REPORT FROM COUNTY ADMINISTRATOR
County Administrator Gorton provided an update on recent activities and ongoing County projects. He stated that he met with Mr. Evans of River City Contracting, Inc. regarding the Courthouse fire suppression system and the change orders presented to the Board. He also met with the Public Works Director to review the culvert bids, held a department head meeting and safety meeting, attended a Tax Assessors Board meeting, and finalized the FY 2026-2027 budget. He stated that he and Finance would begin reviewing revenue and expenditure budget amendments in preparation for the FY 2026 audit. County Administrator Gorton stated that he participated in a Teams meeting with EMC Engineering to discuss the scope of work needed for the Flat Shoals Bridge and that once the scope was received, he would determine what Pike County could provide and bring the information back to the Board for consideration. He also met with a third-party consultant regarding equipment needed for backup internet service and was working with the consultant to develop a scope of work. County Administrator Gorton stated that a building audit for property appraisals for ACCG insurance coverage was scheduled for November. He reported that the County had submitted an application for the FY 2027 tire grant and was awaiting a decision. He stated that he would attend Certified Public Official training in Athens the following week and had submitted his final project for Financial Officer Level Il certification. County Administrator Gorton reported that contractors working on the jail locks and control panel had returned to the site; however, wiring that had previously been cut created additional issues. He had rescheduled the contractors so they could be on site together to troubleshoot the problems. He stated that the jail plumbing repairs should be completed that week. Commissioner Worsley asked about the cut wiring, and County Administrator Gorton explained that during plumbing work around the P-traps, workers had cut into conduit containing wiring. He noted that a similar issue occurred in the kitchen because a conduit was located within the concrete and that some of the damaged wiring controlled jail locks. Once the wiring was rerun, the contractor from Valdosta would return to work on the control system and locks. County Administrator Gorton also stated that the County was considering installing lightning protection at the jail because two additional control panel boards had been damaged.
He noted that the boards cost approximately $1,200 each and that this was the second time they required replacement. County Administrator Gorton concluded by congratulating County Clerk Allison Stephens on completing the Clerk’s Master Education Management Development Program on September 14, 2026.
XV. REPORT FROM COUNTY COMMISSIONERS
Chairman Emmett Collins:
Chairman Collins thanked the staff and all County employees for the work they were doing. He stated that the Cotton Fair is a major event for Meriwether County and brings in a significant amount of tax revenue. He encouraged everyone to attend and support the event as well as the local Masonic lodges, charities, churches and other local organizations that would have booths at the fair. Chairman Collins encouraged everyone to go out and support those organizations and stated that was all he had.
Vice Chairman Jennifer Snelson:
Vice Chairman Snelson thanked the community for inviting her to speak and serve as a panelist
at the community rally hosted by the NAACP the previous Saturday in Luthersville. She stated that it was a very productive conversation with citizens and the other panelists. Vice Chairman Snelson reported that 29 roads had been paved in-house that year by the Public Works Department and thanked the department for its work. She specifically thanked Public Works for repairing the Keith Road bridge, noting that she had received complaints about the bridge for years, including before she became a Commissioner. She also recognized the boom axe crews for their work clearing the roads and stated that they were doing a great job.
Commissioner Gene King:
Commissioner King stated that he continued to receive positive comments from citizens about the work being completed by the Public Works Department and thanked the employees for doing a good job. He reminded everyone that the Cotton Fair, which he noted he still calls it the Cotton Pickin’ Fair, would be held that weekend in Gay and would take place rain or shine. He encouraged everyone not to let the weather discourage them from attending and expressed his appreciation for everything being done throughout the County.
Commissioner Bryan Threadgill:
Nothing to Report
Commissioner Adam Worsley:
Commissioner Worsley encouraged everyone to attend and enjoy the Cotton Fair that weekend.
He expressed his appreciation to everyone for their efforts in helping move the County forward and thanked them for their continued work.
XVI. REPORT FROM COUNTY ATTORNEY
County Attorney Hill stated that he would report on something other than legal matters and noted that Austin Riley hit a three-run home run that day to lead the Atlanta Braves over the Philadelphia Phillies. He stated that the Braves were one game away from advancing.
County Administrator Gorton commented that in his three years with the County, it was the first time the County Attorney had made a comment during closing remarks. Chairman Collins agreed that it was the first time County Attorney Hill had made a comment. Commissioner King stated that during his four years on the Board, he had never heard a County Attorney make closing comments and said he was glad County Attorney Hill had something to say that evening.
Commissioner Threadgill stated that the comment was just for Commissioner King.
XVII. FUTURE MEETINGS & NOTICES
Chairman Collins announced the Future Meetings and Notices.
XVII. EXECUTIVE SESSION
A motion was made by Commissioner King and seconded by Commissioner Threadgill to enter into Executive Session for Litigation, Personnel, Real Estate, Tax Matters, and Cybersecurity at
6:57 p.m. All were in favor. Vice Chairman Snelson made a motion, seconded by Commissioner Threadgill, to go out of Executive Session at 7:49 p.m. All were in favor. A motion was made by Commissioner King and seconded by Commissioner Threadgill to go back into the Regular Session at 7:52 p.m. All were in favor. No action was taken in the Executive Session.
XIX. ADJOURNMENT
With no further business, a motion was made by Commissioner Worsley and seconded by Commissioner Threadgill to Adjourn the Meeting at 7:52 p.m.
Approved by:
Attest:
Date:
du ole of Ye thavd of Commissiorers, Cousi Clert.