Skip to content
Georgia Commons
Menu

City: Kennesaw

Kennesaw Historic Preservation Commission regular meeting, October 16, 2026

8:00 AM · 12 pages

These are the minutes as Kennesaw Historic Preservation Commission posted them, read from the file on its own website. Georgia Commons is independent and is not affiliated with Kennesaw Historic Preservation Commission.

Copy for LLM, View as markdown, and Send to AI use the Markdown version: the summary Georgia Commons wrote, under a heading that names it, then the record as posted. View raw is the record alone.

Records of this meeting

Each link opens the body's own website or meeting portal.

Summary

Written by an AI model (claude-sonnet-5-5) from the minutes below. It is not the record: the minutes are.

Historic commission tabled the 2881 North Main Street alteration to November 20 for more design detail and approved the Cherokee Street deck repair.

The commission took up two applications for Certificates of Appropriateness. For the alteration of the J.G. Lewis Building at 2881 North Main Street (balconies, storefront restoration, new Lewis Street windows, a rear three-story egress stair, coolers and a dumpster enclosure), commissioners asked for 3D renderings, more design detail and a site tour, and voted 3-0 to table it to the November 20, 2026 meeting. Staff said a special called meeting might also be scheduled. The commission voted 3-0 to approve rebuilding the front porch and deck at 2870 Cherokee Street after vehicle damage, using the same footprint and wood materials. It also approved the August 21, 2026 minutes and the financial report (fund balance $23,398), both 3-0. Staff reported an administratively approved application for 3001 North Main Street and announced a Livable Centers Initiative workshop on October 21.

Topics taken up: 2881 North Main Street alterations; J.G. Lewis Building balcony; Lewis Street windows; rear egress stair and coolers; 2870 Cherokee Street deck repair; 3001 North Main Street administrative approval; financial report; Livable Centers Initiative workshop.

Decisions the minutes record (3)

Each decision is followed by the sentence of the minutes that records it, copied word for word.

  1. Certificate of Appropriateness for alterations to the J.G. Lewis Building, 2881 North Main Street

    Tabled3-0

    The minutes: “Motion by Commissioner Neaves to table the application to the November 20, 2026, Historic Preservation Commission meeting to allow the applicant to provide additional design details on the proposed front balcony, rear cooler and landing configuration, and dumpster enclosure material.”

    Read this item in the minutes

  2. Certificate of Appropriateness to rebuild the front porch and deck at 2870 Cherokee Street after vehicle damage

    Adopted3-0

    The minutes: “B. Exterior Renovation (Repair): 2870 Cherokee Street”

    Read this item in the minutes

  3. Financial report showing a fund balance of $23,398

    Adopted3-0

    The minutes: “Ms. Chanelle Campbell presented the financial report.”

    Read this item in the minutes

Agenda items (9)

Found in the minutes by their headings. Where an outcome is shown, it was read by rule from the item's own words: a guide to the text, not part of the record.

  1. 1. Call to Order / Roll Call
  2. 2. Approval of the Meeting MinutesAdopted
  3. 3. Financial ReportAdopted
  4. 5. New Business
  5. A. Exterior Renovation (Alteration): 2881 North Main StreetA vote
  6. B. Exterior Renovation (Repair): 2870 Cherokee StreetAdopted
  7. 6. COAA Approval by City Staff and HPC Chair
  8. 8. Public CommentsPublic comment
  9. 9. Staff Comment
  10. 10. Adjourn

Answers are written by AI from this document, and every quotation is checked against it. Not legal advice.

The minutes

As posted on kennesawga.api.civicclerk.com, read November 19, 2026. Nothing below is written by Georgia Commons.

MINUTES OF HISTORIC PRESERVATION COMMISSION MEETING

CITY OF KENNESAW

Council Chambers (2529 J.O. Stephenson Avenue, Kennesaw, GA 30144) October 16, 2026 8:00 AM

1. Call to Order / Roll Call

Vice Chair Bramlett called the meeting to order at 8:02 a.m.

Roll Call: Rachel Butler, Thomas Neaves, Alexandra DeLuca Berisford, Andrew Bramlett

Absent: Patrick Gallagher, Sharon Blandford, Priscilla Coley (Assistant Zoning Administrator & City Planner)

Staff Present: Chanelle Campbell (Planning & Zoning Administrator) and Rebecca Goldstein (Community Development Administrative Assistant)

Speakers Present: Leslie Ellsworth (Applicant Representative), Dave Heymann (Business Owner), Kevin Thornton (Applicant), Mary Whitlock (Resident)

2. Approval of the Meeting Minutes

A. Approval of Meeting Minutes: August 21, 2026 Vice Chair Bramlett called for a motion.

Motion to approve by Commissioner DeLuca Berisford Seconded by Commissioner Neaves Vice Chair Bramlett proceeded with a roll call for approval.

Vote taken, motion unanimously approved 3-0. Motion carried.

3. Financial Report

Ms. Chanelle Campbell presented the financial report. The carrying balance for the fund remains unchanged at $23,398. Ms. Campbell stated staff was reviewing potential uses for the fund and would update the Commissioners once the information was available.

Vice Chair Bramlett called for a motion.

Motion to approve by Commissioner Neaves Seconded by Commissioner Butler Vice Chair Bramlett proceeded with a roll call for approval.

Vote taken, motion unanimously approved 3-0. Motion carried.

4. Old Business

5. New Business

A. Exterior Renovation (Alteration): 2881 North Main Street

Consideration of approval of a Certificate of Appropriateness application submitted by Nicole Bridges for an alteration of the historic structure located at 2881 North Main Street. Said alterations include balcony and storefront

restorations, the addition of windows to the Lewis Street elevation, and the construction of a third-floor balcony element, three-story egress stair, composite service platforms, and a dumpster enclosure. Case #COA2026-02 Ms. Chanelle Campbell introduced this agenda item. This is a Certificate of Appropriateness application submitted by Nichole Bridges for an alteration to the historic structure located at 2881 North Main Street. The property is known as the J.G Lewis Building, a three-story building constructed between 1903 and 1904. The request includes alterations to the balcony, storefront restorations, the addition of windows on the Lewis Street elevation, a third-floor balcony element, three-story egress stairs and composite service platforms, and a dumpster enclosure. Ms. Campbell announced that the applicant's representative and the potential business owner were present and available to answer questions. She also announced that staff would be available to answer questions. She invited the applicant's representative to give an overview of the project.

Ms. Leslie Ellsworth provided an overview of the project. She stated that the building was an existing masonry structure with a wood roof and explained that while the walls were in good condition, the roof and the existing balcony would need to be rebuilt. The applicant is proposing a steel balcony, with painted wood as an an alternate material. At the rear of the building, a three-story steel egress stair with walk-in coolers and storage was proposed. The egress stairs would be set back 30 feet from the Lewis Street property line. A dumpster enclosure, wrapped in brick, would also be at the rear of the building. Ms. Ellsworth then discussed the proposed changes to the Lewis Street elevation. The proposal includes the addition of windows on the first and second stories of the building to bring light into the space. The windows would align with the existing windows and aesthetically match the existing third-story windows, including arches over the tops of the new windows. On the front facade, Ms. Ellsworth stated that the proposal was to restore the original storefront configuration based on photos from the 1920s. The storefront brick would also be cleaned and repointed with lime mortar.

Commissioner Neaves asked what the proposed use of the building was. He noted that while the Historic Preservation Commission (HPC) does not evaluate use, knowledge of the use would offer insight into the applicant's request for walk-in coolers, landings, and storage at the back of the property. Ms. Ellsworth responded that the building would be a mixed retail space consisting of a restaurant-bar on the first floor, a coffee shop on the second floor, and an event space on the third floor. Because the restaurant and coffee shop are separate businesses, separate walk-in coolers are required. She added that the current configuration of windows on the front and back did not make for a good retail space and that the additional windows on the first and second floor would improve the space.

Commissioner DeLuca Berisford stated that she understood the third-story balcony addition would need to be steel to comply with fire code. She asked if the restoration work on the existing balcony would replace the existing wood material in-kind. Ms.

Ellsworth responded that the current proposed material for the balcony was steel with an alternate material of painted wood. She explained that the required work meant

the balcony would be rebuilt instead of restored. She stated that their preferred material was steel done in a historically comparable way.

Vice Chair Bramlett asked if there was a reason for the third story addition on the front balcony, noting that it did not seem to be a fire escape egress. Ms. Ellsworth responded that the existing fire platform would be removed and replaced with the proposed third story balcony. She explained that the third story balcony would not be a fire escape and that an internal stair towards the front would provide required egress.

Commissioner Neaves asked if the applicant had any historic information on the existing third-story platform. Ms. Ellsworth responded that the platform appeared to be spare steel that was put together. She stated that she did not know the purpose of the platform as it did not lead anywhere and was not in historic photographs. She further stated that a door did not appear to be original or installed by the previous owner.

Commissioner Butler asked staff if there were historic photos available given the applicant's statement. Ms. Campbell responded that staff had received some historic photographs from Vice Chair Bramlett, but the photos were not included in the packet.

Ms. Campbell worked on retrieving the photographs for review by the Commissioners.

Commissioner Neaves stated that the elevations noted the proposed steel balcony would match the existing balcony in scale and style. He asked for additional details on the proposed material and appearance. Ms. Ellsworth responded that the proposed material was steel, which would appear thinner than the existing wood. She added that additional graphics with details could be provided. Commissioner Neaves commented that he wanted to fully understand the proposed design because the existing balcony is a striking and prominent feature of the building, especially as a pedestrian on the sidewalk. Ms. Ellsworth responded that they could provide images of the thinner option to allow the Commissioners to compare it to the existing painted wood.

Vice Chair Bramlett expressed concern about the addition of a third story to the balcony. He stated that he was not as concerned about the staircase at the back of the building because it could not be seen from the street. Ms. Ellsworth responded that the third story balcony was at the owner's request for an event space that would attract potential customers. Ms. Campbell stated that the business owner was present and wanted to share additional information on why the third story balcony was proposed.

Mr. Dave Heymann stated that the third floor was intended as an event space where they envisioned having rehearsal dinners, weddings, and large events. He expressed that if the space did not have a third story balcony, guests in the event space would likely try to move into the unrented retail spaces to get access to a balcony. He stated that they wanted to keep events contained on the third floor to allow the first and second floor to operate as businesses. Mr. Heymann added that the third story balcony matched the existing balcony in look and appearance. Vice Chair Bramlett asked if the third story balcony needed to be covered. Mr. Heymann responded that the balcony would need to be covered to accommodate ceiling fans for summer use and space heaters for winter use.

Commissioner Butler asked if the third story balcony would have the same square footage and column placement as the existing balcony. Ms. Ellsworth responded in the affirmative. She added that the roof covering the third story balcony would have the same shape and slope as the existing balcony. Commissioner Butler commented that the placement of the roofline on the third story balcony hid the pronounced historic arches on top of the third story windows. Vice Chair Bramlett agreed that the third story balcony roof changed the appearance of the building. Ms. Ellsworth responded that they could provide a 3D view to show the balcony from a pedestrian view. She stated that the tops of the windows would be visible on the third floor, just as the tops of the windows on the second floor were visible. Commissioner Butler commented that the essence of the arch might be visible, but the top piece of the arch would not be visible.

Mr. Heymann responded that the third story balcony roof could be made taller.

Commissioner Butler commented that there appeared to be vents higher up on the building. She asked if they were to provide ventilation to the attic space. Ms. Ellsworth responded that the vents were mostly likely to ventilate the space and that the building was probably not open to the trusses when it was first built. Commissioner Butler asked if the vents would still be needed with the proposed roof replacement. Ms.

Ellsworth responded that the vents would not be needed, but that they were planning on retaining them because they were historic.

Ms. Campbell noted that while the windows on the front were historic, the applicant was trying to maintain other historic details on the building, like the parapet and the windows on the other side of the building. She commented that it was important to balance the use of the building with the restoration of the building, otherwise it might be challenging to utilize the building.

Commissioner Butler asked staff to pull up the historic photos. She noted that a couple of the historic photos did not have vents. Vice Chair Bramlett stated that in the photo from 1927, there appeared to be vents.

Commissioner Neaves commented that he appreciated staff's point about balancing the historic character of the building with ensuring the space was usable and economically viable. He noted that the HPC wanted a vibrant downtown and supported finding somewhere in the middle.

Commissioner DeLuca Berisford stated that the Secretary of the Interior's Standards for Rehabilitation require historic features too deteriorated for repair to be replaced with the same material unless local codes and ordinances dictate otherwise. She commented that she would like to see a plan where the first floor balcony was replaced in-kind with wood. She understood that the second or third floor balconies might require using a different material, like steel. Vice Chair Bramlett was unsure if the wood could hold the weight of steel on top of it. Ms. Ellsworth responded that the connections are difficult and costly, but doable. Commissioner Butler commented that if steel was used, it should be wrapped in wood or painted to look like wood to reinforce the existing wood appearance. Vice Chair Bramlett commented that retaining the wood appearance was

important. Commissioner Butler agreed. She wondered how it would look to have a steel balcony with the first floor balcony wrapped in wood and the second and third floor balconies painted to look like wood. Commissioner Neaves asked why, if a steel balcony was chosen, only the first floor would have a wood veneer. Commissioner Butler responded that wrapping the columns would reduce the available square footage for the event space. She asked what the square footage was on the second balcony.

Ms. Ellsworth responded that the square footage of the second balcony would match the square footage on the existing balcony.

Commissioner Neaves asked staff if the new building proposed on the south corner of the block was also three stories. Ms. Campbell responded that she believed the the proposed building was two floors. Commissioner Neaves asked if the proposed building had one balcony. Ms. Campbell responded that as of the previous proposal, there was one balcony. Vice Chair Bramlett asked staff what the proposed balcony material was for the building at the southern end of the block. Ms. Campbell responded that she did not remember.

Vice Chair Bramlett asked Commissioners if they had any comments or questions pertaining to the proposed recreation of the second storefront. He commented that he liked the change. Commissioner Neaves commented that he liked the change from the existing. Vice Chair Bramlett asked if the second storefront would be recreated in wood.

Ms. Ellsworth responded that the storefront to the left would be recreated and that the existing painted brick covering the storefront would be removed.

Vice Chair Bramlett noted that the elevations show two doors maintained on the second floor balcony. He asked if the intent was to reuse the existing doors or install new doors.

Ms. Ellsworth responded that she had to look at the doors to check for dry rot. She explained that some of the windows have dry rot. She also noted that many of the existing windows are actually new windows that were replaced with metal-clad windows.

Commissioner Neaves asked if there was going to be a stair area in the left storefront on the first floor. Ms. Ellsworth responded that there would be a new egress stair in that location. Vice Chair Bramlett asked if the left storefront door was functional or decorative. Ms. Ellsworth stated that an additional door was not needed for egress, and would not be functional.

Commissioner Neaves sought to clarify that separate walk-in coolers were required for the restaurant use and the coffee use. Ms. Ellsworth confirmed. Commissioner Neaves asked if the third floor was a walk-in cooler or if it was dry storage. Ms. Ellsworth responded that it was dry storage. Commissioner Neaves asked if the dry storage was a required space or a desired space. Ms. Ellsworth responded that it was a desired space.

Vice Chair Bramlett asked what exterior material was used for the walk-in coolers. Ms.

Ellsworth responded that the coolers were typically alluminum but noted they could be

clad. Commissioner Butler asked if there was a reason the coolers were not clad. She asked if the property line setback meant the cooler could not be made into a continuous piece. Ms. Ellsworth responded that it was more cost-effective to make an egress stair and platforms instead of a fully enclosed addition.

Commissioner Butler asked if the dumpster enclosure faced the street with doors in the front. Ms. Ellsworth responded in the affirmative. She noted that they planned to use brick on the dumpster enclosure with either painted wood doors or pre-finished metal doors based on the requirements.

Commissioner Neaves sought clarification on whether the second floor was intended as a coffee shop because the proposed floor plan notated the floor as a bar and dining area. Mr. Heymann responded that the bottom floor would have a full bar with a craft beer focus and two food stalls in the rear of the building. The second floor would feature a second bar on the left side and coffee shop on the right side of the building. He explained that the intent was to have the first and second floor activated during the evening hours. Commissioner Neaves clarified that he was asking about the use because the proposal involved walk-in coolers attached to the exterior instead of being incorporated into the building. Mr. Heymann responded that the craft beer portion of the operation would require cold storage space for both serving kegs and back-up kegs. He explained that some of the cold storage for the coffee shop would be used for kegs.

Commissioner Butler commented that a one-story bank building was behind the proposed three-story staircase and platforms. She asked if the staircase and platforms would be clad. Ms. Ellsworth responded that the structure could be clad with a metal panel or painted hardy plank. Commissioner Butler explained that she was trying to picture what the structure would look like as a pedestrian walking down the street.

Commissioner Butler asked what the roofing material would be used and how water would drain off the roof. Ms. Ellsworth responded that the roof could be a TPO (thermoplastic polyolefin) roof or a low slope standing seam metal roof with a gutter and downspout to the utility alley.

Vice Chair Bramlett asked staff if the alleyway was within the City's right-of-way. Ms.

Campbell responded that the alleyway was privately owned, with ownership split between each of the property owners. Commissioner Butler asked if there was a ramp or other improvements made to the alleyway a couple of years ago under a previous application. Ms. Campbell responded that some changes were made to the alleyway.

She explained that due to updated surveys, it was determined that the alleyway was privately owned and that each property owner could determine how their portion of the alleyway could be utilized.

Commissioner Butler asked how close the proposed building was to the bank on Lewis Street. Ms. Ellsworth responded that the alleyway was twenty-one feet, three and a quarter inches. She was not sure if the bank was on the property line. Vice Chair Bramlett asked if the applicant had spoken to the bank about the plans for the building.

Ms. Campbell responded that the applicant had not spoken with the bank. She stated that the City would hold a meeting to make sure all the property owners are aware of plans in the area. Ms. Campbell commented that Reformation, which was approved a few months prior, also had a rear exterior staircase. She encouraged the Commissioners to consider the block as a whole instead of looking at a single building.

Commissioner Neaves commented that he was concerned about the proximity of the rear staircase to the bank building. He asked if the dumpster enclosure was aligned with the landings. Ms. Ellsworth responded in the affirmative. She stated that the walk-in cooler and dumpster enclosure were aligned but that the egress stairs at the south corner of the building would come out a little further. She added that significant utility work would also be done in the alleyway.

Commissioner Neaves explained that the rear of the building has a certain character with the windows and brick face. He expressed concern that the addition eclipsed the character visible from Lewis Street, but wanted to balance the utility of the space with the historic character. He requested additional details on the walk-in coolers, the landings, and how they would interact with the existing building. Vice Chair Bramlett commented that while he was also interested in the appearance of the rear staircase and coolers, he understood that it was necessary from a fire code standpoint. He stated that he was less concerned about the appearance of the rear of the building because it was not facing the street. He noted that the elevations showed some space between the walk-in coolers and the windows. Vice Chair Bramlett asked if the windows would remain. Ms. Ellsworth responded in the affirmative.

Vice Chair Bramlett reiterated his interest in the appearance of the coolers. Ms.

Ellsworth responded that she kept the Secretary of the Interior's Standards for Rehabilitation in mind for the proposal. She explained that the windows would not be removed because the action could not be undone. Instead, the windows would either be blocked in or shuttered, but not enclosed. She further explained that they chose steel for the back of the building to make it clear that the structure was not historic.

Commissioner Neaves commented that it was difficult to conceptualize the appearance of the staircase and coolers based on the elevations. Ms. Ellsworth responded that renderings of the building from the viewpoint of a pedestrian standing on Lewis Street could be provided.

Commissioner Butler stated that the plans showed the dumpster enclosure as an eight-inch concrete block. She commented that she would prefer the material to be brick. Ms.

Ellsworth responded that the dumpster enclosure could be clad in brick. Commissioner Butler asked staff if the city had requirements for a roof on a dumpster enclosure. Ms.

Campbell responded that the City did not have a requirement but that Cobb Water usually had a requirement.

Commissioner Neaves asked if new window replacements were proposed for the north face of the building facing Lewis Street. Ms. Ellsworth responded that the existing

windows would be replaced and that there would be new window openings on the first and second floor. Vice Chair Bramlett asked if the windows were a fire code requirement. Ms. Ellsworth responded that the additional windows were not a fire code requirement. She explained that the additional windows were to get daylight into the space. Vice Chair Bramlett commented that the new windows on the north face of the building was a very big change and that he was hesitant about the change.

Commissioner Neaves asked if there was ever another building against the north face of the building. Vice Chair Bramlett stated that he had only ever seen the space next to the building as an open space. Commissioner Neaves clarified that he was seeking to understand whether another building prevented the addition of windows on the bottom two floors. Vice Chair Bramlett commented that he had not seen evidence of windows on the north face of the building. He explained that there were no good historic exterior photos of the side of the building, but noted that interior photos of the dry goods store did not show any windows. Commissioner Butler asked if the windows on the first floor of the north elevation were larger than the original windows. Ms. Ellsworth responded that the windows were larger. She explained that they were following the pattern on the main elevation where the windows on the first floor were larger.

Commissioner Neaves asked what the material was for the proposed side door. Ms.

Ellsworth responded that the material was metal clad but could be stained or painted wood. Commissioner Butler asked if the side door was a convenience door for staff or for life safety egress. Mr. Heyman responded that the side door was to serve delivery drivers and patrons entering from parking lots and parking spaces on Lewis Street.

Vice Chair Bramlett asked if the building could structurally support the number of windows proposed for the Lewis Street side. Ms. Ellsworth responded in the affirmative.

She explained that each set of windows only supported the weight of the brick from the sill above them and that each window would have a structural header. She noted that the windows would not be supporting the parapet or the roof.

Commissioner Butler asked if the first floor windows on the north elevation were mimicking the front elevation. Ms. Ellsworth responded that the muntins and sill placement mimicked the windows on the front, but wood was not built below the windows. She stated that they could install painted vertical wood slats below the new windows. Vice Chair Bramlett commented that installing wood slats below the windows on the north elevation would make it look too much like a storefront. Commissioner Neaves agreed.

Commissioner DeLuca Berisford commented that she did not see the existing ghost sign for the former hardware store in the plans on the Lewis Street elevation. She noted that while the store was from the 1970s, it was still a local landmark. She asked if there was room to retain the sign. Ms. Ellsworth responded that there were a lot of remnants of the hardware store on the inside of the building.

Vice Chair Bramlett stated that there used to keystone underneath the hardware sign that was removed and bricked in when the Masonic Lodge moved. He also noted that

there was a blank space on the Main Street facade. He asked if there were any plans for those features. Ms. Ellsworth responded that she was not sure when the items were removed and that they did not have plans to put them back in. Vice Chair Bramlett stated that the keystone was currently embedded in another building. He explained that when the Masons moved out of the building to Big Shanty Drive in the 1970s, they took the keystone with them. He added that there is currently a blank space on the front of the building. Ms. Ellsworth responded that they had thought the blank space was from a potbelly stove.

Commissioner Butler asked if the utilities would be placed towards the back of the building. Ms. Ellsworth responded that electrical, water, and gas utilities would be at the back of the building. Commissioner Butler asked where the mechanical units would be placed. Ms. Ellsworth responded that the mechanical units would be on the roof.

Commissioner Butler asked if the pipes to get air to the first floor would be located inside the building or at the back of the building. Ms. Ellsworth responded that the air would go through an interior shaft.

Commissioner Neaves sought to summarize the comments and discussion points from Commissioners. His requests from the applicant included additional design details on the front balcony, rear cooler, and rear landing configuration. Commissioner Butler commented that she wanted to see brick on the dumpster enclosure. Vice Chair Bramlett stated that the Commission had discussed the proposed third story balcony, proposed balcony material, and windows on the north elevation.

Commissioner Neaves asked if the Commission wanted to request anything about the windows on the north elevations. Vice Chair Bramlett commented that he was hesitant to add so many windows to the first story, especially on the first floor, because they were not present historically. Commissioner Butler expressed concern that the windows were also larger. Mr. Heymann responded that the space had to have bright light as the use was community-hub focused. He stated that without the windows, the space would be incredibly dark. Vice Chair Bramlett asked if there had to be five windows on the first and second floor or if the number of windows could be reduced to three windows on the first and second floor. Mr. Heyman responded that the exterior would not look as nice if they started to take away windows. Ms. Ellsworth responded that Lewis Street now had a lot more pedestrian activity and that there was a community benefit in engaging with Lewis Street. Commissioner DeLuca Berisford commented that the community benefit was definitely a consideration. She stated that the windows and entrance on the Lewis Street side would give people a reason to walk down Lewis Street and would allow people to better discern the purpose of the building. Commissioner DeLuca Berisford asked if it was possible to request a tour of the inside space. Ms. Ellsworth responded in the affirmative.

Vice Chair Bramlett asked the Commissioners if they should vote to postpone to the next meeting given the request for 3D renderings and a site tour. Commissioner DeLuca Berisford expressed a desire to postpone. Commissioner Neaves asked staff if a motion to postpone had to include a specific meeting date. Ms. Campbell responded

that a meeting date would be included in the motion. She stated that the applicant was hoping to continue moving through the process to get feedback from other agencies and departments, like Cobb County Fire. She explained that postponing the meeting would delay the applicant's timeline. Commissioner DeLuca Berisofrd asked if a Special Call meeting was possible. Vice Chair Bramlett commented that the building was an important building downtown and that it was important to get it right. Ms. Campbell responded that a Special Call meeting was possible. She recommended postponing to the November 20, 2026 HPC meeting. She stated that staff would send out an email to identify a date for a Special Call meeting that works for the Commissioners and the applicant.

Vice Chair Bramlett opened the floor to public comment.

Ms. Mary Whitlock commented that she had lived on Lewis Street since the building was a hardware store. She appreciated the applicant's effort in trying to reactivate the building. She expressed that the building had been an eyesore. She stated that the Commissioner's questions were valid, but asked that they not nitpick as the applicant was trying hard to activate the building.

Hearing no additional comments, Vice Chair Bramlett closed the floor to public comment.

Vice Chair Bramlett called for a motion.

Motion by Commissioner Neaves to table the application to the November 20, 2026, Historic Preservation Commission meeting to allow the applicant to provide additional design details on the proposed front balcony, rear cooler and landing configuration, and dumpster enclosure material.

Seconded by Commissioner DeLuca Berisford Vice Chair Bramlett proceeded with a roll call for approval of the motion to table.

Vote taken, motion to table unanimously approved 3-0. Motion carried.

B. Exterior Renovation (Repair): 2870 Cherokee Street

Consideration of approval of a Certificate of Appropriateness application submitted by Paragon Construction, Inc for the historic structure located at 2870 Cherokee Street. Said repair includes rebuilding the front porch and deck due to vehicle damage. Case # COA2026-03

Ms. Chanelle Campbell presented this application. This is a Certificate of Appropriateness application submitted by Paragon Construction for the structure located at 2870 Cherokee Street, which is the Frozen Cow. The exterior patio was destroyed in a vehicle accident. The applicant is seeking to repair the deck portion of the building in the same footprint with the same materials. Ms. Campbell explained that because the deck was visible from the right-of way, the application was required to come before the HPC. She announced that the applicant was present to answer questions.

Mr. Kevin Thornton stated that they want to build the deck to match what was existing

prior to the accident and would not be making any changes. The right side of the deck would not be touched, but the left side would be rebuilt and painted.

Commissioner Butler asked if the porch, columns, or roof were structurally impacted by the accident. Mr. Thornton responded that the porch columns would be rebuilt and that the joists would be replaced on the left side.

Commissioner Butler asked if the porch and deck would be rebuilt with wood that is similar to the existing wood. Mr. Thornton responded that it would be rebuilt with wood.

He explained that the previous structure was a six by six post wrapped in wood trim and that it would be rebuilt the same way. He clarified that the windows were not damaged and would not be touched.

Commissioner Neaves asked if the ramp was required for ADA compliance. Mr.

Thornton responded that he was not sure, but thought that the ramp was for ADA access. Commissioner Neaves explained that he asked because he wanted to ensure that the ramp would be rebuilt to be compliant with accessibility requirements.

Vice Chair Bramlett called for a motion.

Motion to approve by Commissioner Neaves Seconded by Commissioner Butler Vice Chair Bramlett proceeded with a roll call for approval.

Vote taken, motion unanimously approved 3-0. Motion carried.

6. COAA Approval by City Staff and HPC Chair

A. COAA2026-08 - 3001 North Main Street This is a Certificate of Appropriateness application for 3001 North Main Street as submitted by Matthew Bowman. Ms. Campbell reminded the Commissioners that the applicant came to the previous HPC meeting to discuss the request. The application was reviewed and administratively approved on August 21, 2026.

Commissioner Neaves asked if a replacement tree would be planted. Ms. Campbell responded that there were no plans to replace the tree. She stated that there was discussion at the previous meeting that the applicant was having challenges finding an adequate location. Commissioner Butler commented that the applicant had planted multiple trees in the side yard on two previous occasions.

7. Discussion

8. Public Comments

Vice Chair Bramlett opened the floor for public comment. Hearing no public comment, he closed the floor to public comment.

9. Staff Comment

Ms. Campbell announced that the last public workshop for the Livable Centers Initiative would be held on October 21, 2026, at the Ben Robertson Community Center from 6

p.m. to 8 p.m. She stated that it was the last opportunity for residents to engage with the project before it goes to Mayor and Council. She encouraged the Commissioners and residents to attend and provide feedback. Ms. Campbell also announced that the City's Comprehensive Plan was also ongoing. She stated that all the public engagement events had been completed and that staff was working on internal documentation that would be presented to Mayor and Council for adoption. Ms.

Campbell thanked the Commissioners for their patience with the submitted applications.

She acknowledged the challenge of balancing development and historic preservation and thanked the Commissioners for their work.

10. Adjourn

Vice Chair Bramlett adjourned the meeting at 9:21 a.m.