Skip to content
Georgia Commons
Menu

County: Lowndes County

Lowndes County Board of Commissioners regular meeting, October 27, 2026

Georgia Commons holds no minutes of this meeting. Georgia Commons is independent and is not affiliated with Lowndes County Board of Commissioners.

This is a machine transcript made by Georgia Commons from the body's public recording. It is not an official record, it can mishear words, names, and numbers, and it does not say who is speaking. The recording is what was said.

Copy for LLM, View as markdown, and Send to AI use the Markdown version: the summary Georgia Commons wrote, under a heading that names it, then the record as posted. View raw is the record alone.

Records of this meeting

Each link opens the body's own website or meeting portal.

Summary

Written by an AI model (claude-sonnet-5-5) from the machine transcript below. It is not the record: the recording is what was said.

Commissioners approved the comprehensive plan, a lift station pump, a fire van and cylinder bid, then heard data center and Hall Road concerns.

The commission approved all five business items on the agenda. It adopted the 2026 Comprehensive Plan, approved buying a replacement Pine Grove Lift Station pump from Xylem for $37,354.60, renewed the 2027 Section 125 plan, approved a state-contract passenger van for fire rescue, and awarded the SCBA cylinder bid to Thermo Fisher. There was no county manager's report. In public comment, three residents spoke against the proposed data center on Coleman Road, and the chairman said the draft ordinance would be released the coming Monday, with discussion in November and a possible vote in December. A Hall Road resident asked for a narrower right of way for paving. The meeting then adjourned.

Topics taken up: Comprehensive Plan adoption; Pine Grove lift station pump; Section 125 plan renewal; fire rescue passenger van; SCBA cylinder bid; Coleman Road data center; data center ordinance timeline; Hall Road right of way.

What the meeting took up, as said in the recording (7)

Each account is part of the AI-written summary of the machine transcript, not the record. The time opens the transcript below where the matter is taken up.

  1. 2026 Comprehensive Plan adoption for the county and its municipalities

    0:02:34

    Staff recommended authorizing the chairman to submit the plan to the regional commission and the Department of Community Affairs, adopting the 2026 Comprehensive Plan. A commissioner asked how many public meetings were held. Staff answered about four, including the kickoff meeting, and said no additional comments came in during the 30-day transmittal period. The motion to approve as presented carried with no opposition.

  2. Pine Grove Lift Station replacement pump purchase from Xylem

    0:03:50

    Staff said one of the 30-horsepower pumps at the duplex station failed. Xylem quoted $30,517 to repair it and $37,354.60 for a new pump, and staff recommended buying the new pump. A commissioner asked whether this pump had been replaced before, and staff said maybe one of them had. Another commissioner said the county is working through all of these stations, and staff agreed. The motion carried with no opposition.

  3. Section 125 cafeteria plan renewal for 2027

    0:04:59

    Staff explained the Section 125 plan lets employees pay for health, dental, vision and other benefits with pre-tax premium deductions, and the county has offered it since 1989. No commissioner had questions. The motion to adopt the renewal for 2027 carried with no opposition.

  4. Passenger van for fire rescue bought under state contract

    0:06:07

    Staff asked to use state contract pricing to buy a 2027 Chevrolet passenger van to carry trainees to classes, also usable by other departments when available. A commissioner asked how many departments could use it. The motion to purchase from Hardy Chevrolet under the state contract carried with no opposition.

  5. Bid award for 109 replacement SCBA cylinders for fire rescue

    0:07:14

    Staff said the 109 cylinders have reached end of life and this is the third and last year of a replacement program. One compliant bid came in, from Thermo Fisher, at $1,525 each, $166,225 total. In answer to commissioners, staff said the cylinders typically last 15 years, are inspected every three years, and the purchase is funded by SPLOST 9. The bid award carried with no opposition.

  6. Public comment: proposed Coleman Road data center and its risks and ordinance

    0:08:44

    Three residents spoke against the proposed 480-megawatt data center on Coleman Road. One said chemicals on site and the karst ground create a risk of spills into the aquifer, citing collapse and spill examples elsewhere. A second asked about the schedule and, per the chairman, the draft ordinance would be released Monday, discussed at the one November meeting, and put on the December agenda for approval or not. That speaker also cited opposition, a poll, and a study on home value declines. A third gave recommendations for the ordinance: true closed loop cooling, paying their own energy costs, an impact fee, up-front tax payments, and a substantial bond. The same speaker also set a March 6, 2027 date for a river paddle event.

  7. Public comment: Hall Road paving and 80-foot right of way

    0:18:47

    A Hall Road resident said a majority of property owners signed a petition, submitted around August 31, calling the requested 80-foot right of way excessive and said the county had not explained the need. The resident cited a comprehensive plan policy on alternate paving methods and asked for a compromise of 40 or 60 feet, with curbs and gutters in residential areas, to save old trees and rural character. No response from the commission was heard.

Answers are written by AI from this document, and every quotation is checked against it. Not legal advice.

Machine transcript

This is a machine transcript made by Georgia Commons from the body's public recording. It is not an official record, it can mishear words, names, and numbers, and it does not say who is speaking. The recording is what was said.

162 turns.

Open the recording on www.youtube.com. The recording opens on the site where the body published it. Nothing is played on this page.

  1. 0:00:05

    order. If you would please rise, I'm gonna call on Commissioner Weisenbaker for the invocation and the pledge.

  2. 0:00:12

    Let's pray. Our Father, we, your people, humble ourselves and pray, seek your face, repent by turning from sin while trusting your word that you will hear from heaven, forgive our sins, and heal our land. Cover every citizen, every sphere of influence, and all in authority with your banner of blessing and canopy of protection. May your kingdom come, your will be done in our states and nation as it is in heaven.

  3. 0:00:47

    May the gospel be proclaimed, disciples made, and laborers sent into the harvest. May the hearts of the fathers be turned to the children, and the children to the fathers. May we, may we be one as Jesus and the Father are one. May we be a shining city on a hill that brings you glory. As scripture urges, we pray for the peace and prosperity of our nation.

  4. 0:01:17

    In your great mercy, for our namesake, your namesake, answer our petition as we come boldly before your throne of grace in our time of need. As in Nehemiah's day, rebuild our walls, restore our homes, revive our hearts as we intercede as one nation under God, renewing liberty and justice for all. In Jesus' name, amen.

  5. 0:01:45

    Amen.

  6. 0:01:47

    I pledge allegiance to the flag of the United States of America, and to the republic for which it stands, one nation, under God, indivisible, with liberty and justice for all.

  7. 0:02:05

    Good job, Mark.

  8. 0:02:06

    Thank you, sir.

  9. 0:02:08

    Thank you, Commissioner Weisenbaker. Commissioners, inside your package you'll have your minutes of the work session of October the 12th, as w- as well as the regular session minutes from October the 13th. If there are no additions, deletions, or corrections, I will entertain a motion to approve the minutes.

  10. 0:02:25

    Motion to approve.

  11. 0:02:26

    We have a motion. Do I have a second?

  12. 0:02:29

    Second.

  13. 0:02:29

    Do I have a second? Any discussion? Hearing none, all in favor signify by by aye.

  14. 0:02:34

    Aye.

  15. 0:02:34

    Any opposed, like sign. Hearing none, the minutes are approved. Agenda item 5A is the 2026 Comprehensive Plan Adoption. Mr. Dillard?

  16. 0:02:46

    Yes, sir. Thank you, Mr. Chairman. Good evening, commissioners. As stated yesterday, staff, the public, and the appropriate decision makers have been involved in the update process of the plan, and staff recommends authorizing the chairman to submit the plan to the regional commission and the Department of Community Affairs officially adopting the 2026 Comprehensive Plan for Lowndes County and the municipalities within.

  17. 0:03:07

    Okay. Any questions for Mr. Dillard?

  18. 0:03:10

    Yes, sir. Uh, J.D., approximately how many meetings were held with the public participation?

  19. 0:03:16

    Uh, including the-

  20. 0:03:17

    Two, three?

  21. 0:03:17

    ... kickoff meeting, about four public meetings were held overall. And again, public comment was solicited. Um, the material's available on our website. No additional comments were received during that 30-day period in which you transmitted it to the regional commission and before tonight's meeting, so.

  22. 0:03:32

    Okay. Perfect. Thank you.

  23. 0:03:34

    Yes, sir.

  24. 0:03:34

    Any other questions?

  25. 0:03:36

    No, sir.

  26. 0:03:36

    All right. Hearing none, I'll entertain a motion.

  27. 0:03:38

    Motion to approve as presented.

  28. 0:03:41

    We have a motion to approve as presented. Do I have a second?

  29. 0:03:43

    Second.

  30. 0:03:44

    I have a second. Any discussion? Hearing none, all in favor signify by aye.

  31. 0:03:49

    Aye.

  32. 0:03:50

    Any opposed, like sign. Hearing none, the motion carries. Agenda item 5B is the Pine Grove Lift Station pump. Mr. Stadler?

  33. 0:04:00

    Yes, sir. The Pine Grove Lift Station is a duplex station with 30-horsepower pumps. We had one of the pumps go out. It was sent in to Xylem and broke down. They sent us a repair cost of $30,517 and a price of a new pump of $37,354.60. Staff recommends approval to purchase the new pump from Xylem for $37,354.60.

  34. 0:04:23

    Okay. Any questions for Mr. Stadler?

  35. 0:04:25

    This one's not been replaced or repaired ever, has it? Or...

  36. 0:04:31

    Maybe one of them on this one is all.

  37. 0:04:35

    Is it fair to say that we're working our way through all of these now?

  38. 0:04:38

    We, we're working our way.

  39. 0:04:40

    I thought so. Okay, thank you.

  40. 0:04:42

    Any other questions? Hearing none, I'll entertain a motion.

  41. 0:04:46

    I move we approve the purchase.

  42. 0:04:47

    Okay, we have a mo- a move to approve the purchase of the new pump.

  43. 0:04:51

    Second.

  44. 0:04:52

    And we have a second. Any discussion? Hearing none, we'll call the vote. All in favor signify by aye.

  45. 0:04:58

    Aye.

  46. 0:04:59

    Any opposed, like sign. Hearing none, the motion carries. Agenda item 5C is the Section 125 Plan Document Renewal for 2027. Mr. Beal?

  47. 0:05:11

    Thank you, Mr. Chairman. Good evening, commissioners.

  48. 0:05:13

    Good evening.

  49. 0:05:13

    As we talked yesterday, the, uh, Section 125 Cafeteria Plan is a, uh, pre-tax premium deduction plan for our qualified health, health plans that we have. Uh, we have, uh, several benefits, medical, dental, vision, critical, just to name a few. We've been providing this, uh, benefit, uh, for our employees since 1989, and with your continued approval we'll do it in, uh, 2027. I'm happy to ask, answer any questions you might have.

  50. 0:05:41

    Any questions for Mr. Beal?

  51. 0:05:42

    I don't have any.

  52. 0:05:44

    All right. Thank you, Mr. Beal. Commissioners, I will entertain a motion.

  53. 0:05:47

    Motion to adopt 125 premium only plan for 2027.

  54. 0:05:53

    Okay, we have a motion to adopt the 125 Plan Document Renewal for 2027. Do I have a second?

  55. 0:06:00

    Second.

  56. 0:06:00

    I have a second. Any discussion? Hearing none, I'll call the vote. All in favor, signify by aye.

  57. 0:06:06

    Aye.

  58. 0:06:07

    Any opposed, like sign. Hearing none, the motion carries. Agenda item 5D is the purchase of passenger van for fire rescue. Ms. Black?

  59. 0:06:18

    Um, yes, sir. Thank you. As discussed yesterday, um, the county is requesting to utilize the state contract pricing to purchase a 2027 Chev- Chevrolet passenger van for the fire department. Um, this will be used to transport, um, multiple trainees, um, when they're going to different classes, um, but can also be used by other departments when needed.

  60. 0:06:40

    Okay. Any questions for Ms. Black?

  61. 0:06:43

    How many departments can use it?

  62. 0:06:46

    Uh, other departments can use it as needed-

  63. 0:06:48

    Whoever, whoever

  64. 0:06:48

    ... when it's available.

  65. 0:06:49

    Okay. Thank you.

  66. 0:06:51

    All right, any other questions? Hearing none, I'll entertain a motion.

  67. 0:06:56

    Motion, motion to purchase from Hardy Chevrolet under the state contracting.

  68. 0:07:02

    Okay, we have a motion to purchase the passenger van under state, uh, contract.

  69. 0:07:07

    Second.

  70. 0:07:07

    Do I have s- we have a second. Any discussion? Hearing none, I'll call the vote. All in favor, signify by aye.

  71. 0:07:13

    Aye.

  72. 0:07:14

    Any opposed, like sign. Hearing none, the motion carries. Agenda item 6A is a bid item for the SCBA cylinders for fire rescue. Ms. Black?

  73. 0:07:25

    Um, yes, sir. Again, as discussed yesterday, this is to replace 109 SCBA cylinders, um, that have reached the end of life. Um, this is a part of a replacement program, and this will be the third year of that. Um, we had one bid that met the specifications that was received on time, um, and that was for Thermo Fisher for $1,525 each or a total price of $166,225.

  74. 0:07:51

    Okay. Any question for Ms. Black?

  75. 0:07:54

    What is the life of these cylinders individually?

  76. 0:07:58

    Um, I think they're typically 15 years.

  77. 0:07:59

    15 years.

  78. 0:08:00

    15?

  79. 0:08:01

    Yeah.

  80. 0:08:01

    And they have to be inspected every three years?

  81. 0:08:05

    Yes, sir.

  82. 0:08:05

    Hydro tested?

  83. 0:08:06

    Yes.

  84. 0:08:08

    Okay.

  85. 0:08:08

    This is the last of that three-year replacement, and this is also SPLOST 9 funded? Or is it-

  86. 0:08:14

    Yes

  87. 0:08:14

    ... uh, SPLOST 8?

  88. 0:08:16

    Uh, SPLOST 9.

  89. 0:08:17

    SPLOST 9?

  90. 0:08:20

    Okay.

  91. 0:08:20

    Any other questions?

  92. 0:08:21

    I took mine.

  93. 0:08:22

    Got it all. Okay. All right, if there's no other questions, I'll entertain a motion.

  94. 0:08:29

    Motion to award the bid to Thermo Fisher.

  95. 0:08:33

    Okay, we have a motion to award the bid to Thermo Fisher. Do I have a second?

  96. 0:08:37

    Second.

  97. 0:08:37

    I have a second. Any discussion? Hearing none, I'll call the vote. All in favor, signify by aye.

  98. 0:08:43

    Aye.

  99. 0:08:44

    Any opposed, like sign. Hearing none, the motion carries. All right, agenda item 7, county manager's report. Ms. Lover says she was not going to provide the support- ... or the reports with, uh, with Ms. Dukes' absence, then we will not have a county manager's report. We'll move on now to our citizens wishing to be heard. Our first citizen is Mr. Jimmy Lafiles. Please come forward and state your name and address for the record, please.

  100. 0:09:13

    Uh, Jimmy Lafiles, 3561 Riverchase Drive. Thank y'all for listening to me again. Uh, so I presented a few times with the same message each time, namely that the proposed 480 mil- uh, megawatt data center at Coleman Road presents an unacceptable risk of environmental pollution based on the large quantities of chemicals that are gonna be on that site and the fragile nature of the karst substrate. If you recall, the chemicals will be diesel fuel or natural gas for the backup generators, propylene glycol in the cooling fluid, and potentially PFAS refrigerants that'll be used in the mechanical chillers.

  101. 0:09:54

    The fragile karst substrate is documented to collapse under the weight of industrial buildings and with changes in underground hydrology associated with new buildings, which could cause failure of the structural components such as tanks, pipes, retainer walls, and result in large scale spills into the groundwa- groundwater into the aquifer. While there are engineering controls and process controls designed to mitigate this risk, I can tell you from decades of working with chemical plants, that eventually spills are gonna occur.

  102. 0:10:27

    And with the unpredictable nature of the karst substrate, it's practically inevitable. Last meeting, I presented a real-life fail- uh, failure of a data center in New York, uh, New Jersey, that spilled about 5,500 gallons of diesel into a nearby river. The cleanup there continues with no update yet on the environmental impact or the cost of the cleanup. Tonight I wanna bring up a few more real-life examples of structural failures known to be caused by sinkholes and karst related, uh, limestone collapses.

  103. 0:11:00

    All of these projects were designed by competent engineering firms and passed the usual required inspections and reviews. The first one is the well-known collapse of the Corvette Museum in Bowling Green, Kentucky, where the floor of the building collapsed into an underground cavity. Eight museum quality Corvettes were lost into the cavern. But we're not discussing cool cars here, we're discussing chemicals that could have a much more serious effect on the environment and on people. Investigations by the US EPA, the National Transportation Safety Board, and the US Chemical Safety Board document numerous incidents which are localized failures of piping, tanks, drainage systems, and structural supports, and related in, and resulted in significant release of chemicals to the environment.

  104. 0:11:48

    Here are some of the examples. One is Colonial Pipeline in Sandy Springs, Georgia, when a pipeline ruptured, spilling more than 30,000 ga- gallons of gasoline. Another is Bulk Chemicals in Pennsylvania, where 2,200 gallons of nitric acid were spilled as a result of the failure of a storage tank. At Red Hill, uh, Storage Facility, two piping joints failed, spilling s- fuel that contaminated groundwater used for s- drinking water. And at Dan River's steam station, a buried stormwater pipe failed, allowing wastewater and coal ash to escape into the Dan River.

  105. 0:12:23

    So the whole building doesn't have to collapse. It can just be some part of the building and have, you can have a chemical spill. So the sequence of, so the sequence of events, uh, at the proposed data center would be a subsurface void develops or existing voids enlarge due to changes to hydraulage- hydrology from construction of the data center. Localized settlement or loss of foundation support occurs, joint separation, pipe fracture of containment cracks, and then chemicals are spilled, the diesel, the propylene glycol or the PFAS.

  106. 0:12:58

    Those chemicals migrating to the soil, in our groundwater, and possibly into the aquifer. So I'm aware that there are engineering and technological options that can be sitter, um, considered to mitigate this risk, but they're complex, they're highly technical, maintenance intense sensitive systems, and some may not even be possible. Con- considering the catastrophic long-term consequences of failure, it's my professional scientific opinion, within a reasonable degree of, of scientific certainty, that a data center operating in Col- Coleman's Road site will cause inevitable adverse and irreversible chemical and structural impacts to the surrounding environment and residents.

  107. 0:13:40

    The only effective mitigation strategy is to site the dat- data center on a more suitable site that has a stable building substrate and is located an acceptable distance from neighborhoods and wetlands. That's what I got.

  108. 0:13:56

    Thank you, sir.

  109. 0:13:57

    Thank y'all.

  110. 0:13:57

    Thank you.

  111. 0:13:58

    Thank you.

  112. 0:13:59

    All right, our next speaker is, uh, Michael Knoll. Please come forward and state your name and address for the record, please.

  113. 0:14:08

    Uh, good afternoon, commissioners, Chairman Park. Um, my name is Michael Knoll. I live at 2305 Glendale Drive.

  114. 0:14:14

    Chairman who?

  115. 0:14:16

    Chairman Park.

  116. 0:14:17

    I'm, I'm sorry. I had a little, little flashback-

  117. 0:14:20

    Come on, man

  118. 0:14:21

    ... as I was sitting there. Chairman Slo- Slaughter, of course. Actually, the reason why I had been thinking of, of, of Chairman, um, Park, a long, long time ago, I had a little flashback as I was sitting in the audience. Wow, that hasn't happened to me in a long time. And I was remembering all the times that I've been here, um, um, also with my late wife, uh, making presentations, uh, to, to commissioners. And, um, I was reflecting on the fact that every now and then we may be mad at each other, but every now and then we also realize that we're all human beings.

  119. 0:14:49

    Exactly.

  120. 0:14:50

    And so I will, for instance, never forget that actually two of you approached me the first time I came here in January, as you, uh, knew that my wife had passed away, to share your condolences with me. And those are the kinds of things I will never forget. Now I may be mad as hell at you at other times, but those are the moments that I will never forget.

  121. 0:15:05

    Fair enough.

  122. 0:15:06

    So that's why, that's why actually Park came into my mind for some reason. I apologize for that. In any case, um, I also appreciate the update in regard to, to, um, uh, what your process will be when it comes to the data center ordinance, so to have this on tape also. So if I understand this correctly, you will release the, the draft for the data center ordinance this coming Monday.

  123. 0:15:26

    Correct.

  124. 0:15:27

    And then, uh, we will have a meeting in, uh, November, the only meeting in November where we might have a, uh, a discussion of it.

  125. 0:15:34

    Correct.

  126. 0:15:34

    And until that time, of course, we can, uh, communicate. And then we have a kind of like a concluding, um, meeting discussion possibly in December where you then may ha- vote up or down on a presented, possibly updated or edited, uh, data center ordinance. Is that correct?

  127. 0:15:49

    Yes. That would be correct. My plan would be to have it on the agenda for the December meeting for approval, or not, either one.

  128. 0:15:56

    Okay, good. Um, just so just a few, uh, brief comments, Chairman Slaughter. Oh my goodness. Uh, and this is in regard to the, uh, Q&A session we had the last time. And, um, and I appreciated the Q&A session, although I would, would have liked to have an announcement so that, um, key players or, or key stakeholders in the community would have been able to attend and also participate in this. But what I'm really wanna talk about today is the fact that there are several things that came up, uh, during that conversation I find troubling. On one hand, AI hyperscale data centers are not just big buildings as, as was mentioned, as if one could compare them to, say, a Buc-ee's.

  129. 0:16:34

    AI hyperscale data centers have an enormous energy footprint that come with significant pollution, especially noise and air, and can pose serious threats to our natural resources, especially our groundwater in this area of Lowndes County, as we also just heard from Mr. LaPhiles again. We also heard from you about the many calls you received in support of the data center. We have been coming to your meetings now since January. Dozens of us have spoken up against data centers. No one ever spoke in favor, not one. Not one person. Why? Because the vast majority of your constituents oppose AI hyperscale data centers, and that opposition goes across the political spectrum.

  130. 0:17:11

    And according to a recent Gallup poll, actually we have 71% of Americans oppose AI hyperscale data centers, and we'll share all these sources with you later on. Three, based on the comments, it also appears that you trust your process when it comes to evaluating the pros and cons of new projects, yet the example of Camelot Crossing, which is not the only one we could talk about, indicates this process is flawed, and perhaps because it is not impartial. That's one of the human, uh, weaknesses we have. Just as the development of a multi-apartment complex in an area of high sinkhole activity should never be permitted, the same is true for the currently envisioned site for a data center.

  131. 0:17:51

    Then lastly, let me bring up a concern we have ignored so far. According to a study from the University of California at Berkeley, the value of homes within one mile of a data center declines by 7.2%. I actually just had a chance to get my hands on that and read that very carefully. In other words, if your home was valued at $300,000, to just give you an example, before a data center comes in, from one day to the next, its value declines by $22,000. Now there's still the decline when you go to the boundaries between one to- one mile and three miles, but I'm focusing on the one mile, which is particularly impacting people that live in places like w- uh, parts of Wood Valley perhaps or Foxborough, what have you.

  132. 0:18:31

    So the decline is about 7.2%. Now how do we address this? How will you address this? So those are the f- the few reflections I have to share with you today. I, again, apologize for my oops. I just had memories bubbling up. Thank you so much.

  133. 0:18:45

    Thank you.

  134. 0:18:46

    Thank you.

  135. 0:18:47

    All right, our next speaker, um, Julia Pike. Please come forward and state your name and address for the record, please.

  136. 0:18:57

    My name is Julia Pike.

  137. 0:18:58

    Pull the microphone down please. Thank you, ma'am.

  138. 0:19:01

    My name is Julia Pike. I live at 6148 Hall Road in Hahira, 31632, and I want to talk to y'all concerning the 80-foot right of way y'all have asked for for the paving of Hall Road. We submitted a petition to y'all, um, think it was August the 31st, and a majority of the property owners and residents signed that petition stating that we feel the 80-foot right of way is excessive. And we really haven't been explained to why y'all feel the 80-foot right of way is needed.

  139. 0:19:38

    Because your e- your own Greater Lowndes Comprehensive Plan, Policy 6.5, directly mandates that counties consider alternate methods of paving dirt roads that specifically protect natural resources and preserve the rural atmosphere, and I don't think a 80-foot right of way on a little country dirt road is gonna do that. So I was just wondering if y'all had an explanation of why y'all want to pave this road this way and consider the impact it's gonna have on the families and the wildlife that live along the road, because you're talking about going from a little rural country dirt road to a major highway.

  140. 0:20:21

    It's gonna increase speed, it's gonna increase traffic, and it's gonna cause a big safety issue for our family and for the wildlife and for the, you know, the animals along the road. So what we're asking for is a compromise. Maybe a 40-foot right of way or a 60-foot right of way with curbs and gutters in the residential parts and the parts where the older trees can be saved, 'cause it's a shame to just cut down trees that's been standing for hundreds of years just for a highway.

  141. 0:20:55

    It's not like you don't have Valdall and Union and 41. I mean, I just don't see the need for this. I'm 72, and I am born and raised on this little country farm where it's been passed down from generation to generation. My brother and sister and I and our children and our grandchildren still live there. And honestly, we love the dirt road, and I would love it if y'all would just leave it alone, but I know that's not gonna happen. So we're asking for a compromise, you know?

  142. 0:21:29

    You can't take away the feeling of walking down a dirt road and pulling your grandchildren in a wagon and looking for turkey tracks and deer tracks. But I understand progress, and I'm willing to compromise, but y'all need to meet us halfway. I mean, to y'all it's just a dirt road, but to us it's home, and it's beautiful to us, and changing it, cutting down the trees and opening it up and all that is just gonna change our way of life, and I just don't think it's fair.

  143. 0:22:02

    Thank you.

  144. 0:22:03

    Thank you, ma'am.

  145. 0:22:03

    Thank you, ma'am, for speaking.

  146. 0:22:07

    All right, next speaker, uh, is Mr. John Quarterman. Please come forward and state your name and address for the record, please.

  147. 0:22:23

    How you doing? How you doing? Howdy. Howdy. It's like they know who I am. I don't know.

  148. 0:22:29

    Amazing, isn't it?

  149. 0:22:31

    Uh, I'm John Quarterman. You have my address on file, but it's 6565 Quarterman Road, Hahira. And, uh, let me put on my Suwannee River Keeper hat for a moment. Chairman, uh, Chairman Bill, um, the mayor and chairman's paddle, how does the 6th of March, that's a Saturday, of 2027 strike you? With the fallback date of the 27th.

  150. 0:22:56

    I'm sure we can work with either one of those.

  151. 0:22:58

    Mm-hmm. Belinda already has it in the calendar. Oh, she do- Okay, good. All righty then. So data centers. As you have heard, hyperscale AI data centers are become very unpopular. And naturally, this has caused the AI industry to do a marketing campaign. There've been a bunch of articles about the truth about AI data centers. I've seen them from US Department of Energy, Forbes, Databank, and one seems to be popular around here, Steven Wiese of Foundation for Economic Education.

  152. 0:23:36

    And they, they have a number of common points. They all conflate hyperscale AI data centers with cloud storage data centers. That's like saying a log truck is the same as a pickup. They're both trucks, right? You know, it's the same kind of comparison. They all claim cooling water is not really a problem, but they don't mention cooling water for the power plants to power the data centers. They claim data center opposition is like previous opposition to things like airports and railroads, but AI layoffs are not like previous job loss, as each company competes to lay off people.

  153. 0:24:09

    Where are the new jobs gonna be for all those people? So they're really not the same. He does, uh, Wiese, this guy I previously mentioned here- Indicates one likely reason the AI bubble will, bubble will pop. Efficiency gains in AI are real and dramatic. OpenAI's Sam Altman says ChatGPT has become roughly 1,000 times more efficient in less than two years. Well, uh, to me that means you got one of these in your pocket, which is better than a supercomputer, which used to take up a whole room not so long ago.

  154. 0:24:45

    What Sam Altman's saying means there ain't gonna be need for those data centers. Now, one thing that none of these mention that used to be a popular point only a few months ago was AI data centers are national security. Well, the US already has 10 times as many of them as China, and China is not competing with the US to build these things. Number two in the world for AI data centers is France, and it's, like, way less than the US. It's just not a real point.

  155. 0:25:16

    It's probably why they don't mention it anymore. So, um, some recommendations for the ordinance. Please require real closed loop cooling, not just closed loop where it gets to a machine, but also that doesn't, uh, suck in groundwater or lose it to the outside. You know, cooling the inner loop by having an open loop outside. And what about all those chemicals in there when they flush it? Where's it gonna go? Require any data center to pay for its own energy use, not pass it on to everybody else.

  156. 0:25:47

    There was a state bill that would've done that, but didn't pass. Here's one. All this time you've already spent dealing with this issue, commissioners and staff, and all the time you're gonna have to spend if there is one or even if an application comes through, how about an impact fee? Make them pay for all that time. I mean, I don't see why it should have to come out of the budget of the commission and out of the taxpayers' pockets.

  157. 0:26:15

    George

  158. 0:26:15

    And, um, any projected tax revenues, there was a rumor in Irwin County this was gonna happen. They were gonna get 50 million in tax revenue up front by the end of this year. I sent in an open records request to the, uh, county clerk up there, and the response was no responsive records. It was just a rumor. But you could require it, pay each year the tax revenue up front. And, um, thank you, I believe you already said you're gonna put this in here, a very substantial bond for if something happens to it.

  159. 0:26:50

    And basically, some of you may believe data centers are good. Okay, require them to be good. They gotta be good or they can't come here. That's my recommendation. Thank you.

  160. 0:27:00

    Thank you.

  161. 0:27:04

    All right. That's the last of our citizens wishing to be heard. Commissioners, any questions or comments? Motion to adjourn?

  162. 0:27:11

    Motion to adjourn.