County: Morgan County
Morgan County Board of Commissioners regular meeting, November 3, 2026
Georgia Commons holds no minutes of this meeting. Georgia Commons is independent and is not affiliated with Morgan County Board of Commissioners.
This is a machine transcript made by Georgia Commons from the body's public recording. It is not an official record, it can mishear words, names, and numbers, and it does not say who is speaking. The recording is what was said.
Records of this meeting
Each link opens the body's own website or meeting portal.
- Video recordingBOC Meeting 11-3-2026 (boxcast.tv)
Summary
Written by an AI model (claude-sonnet-5-5) from the machine transcript below. It is not the record: the recording is what was said.
Commissioners approved live streaming planning and zoning, a railroad access agreement, a radio tower consultant contract, fire equipment, and surplus property, with long debate on the radio system.
The Morgan County Board of Commissioners approved minutes and the consent agenda, then took up several items, all passing without opposition in the votes described. Staff presented a SPLOST cash flow plan, and a commissioner suggested changes to its format. The board voted to live stream planning and zoning meetings only. It approved a memorandum with a railroad on Appalachians Road, and a consulting agreement with Federal Engineering for radio tower work, not to exceed $131,178, after a long debate about the radio system. It also approved up to $40,000 for fire truck equipment and declared surplus property. The county manager gave a report, one resident commented on the radio towers, and commissioners reminded residents to vote.
Topics taken up: live streaming planning and zoning; SPLOST cash flow plan; railroad right of way agreement; radio system tower consultant; P25 radio system; fire truck equipment purchase; surplus property; county manager report; election day turnout.
What the meeting took up, as said in the recording (8)
Each account is part of the AI-written summary of the machine transcript, not the record. The time opens the transcript below where the matter is taken up.
SPLOST cash flow plan for fire stations, arena, 4H facility and radio towers
Staff presented a spreadsheet of expected SPLOST spending, saying it covers two fire stations, the ag arena cover, an indoor 4H facility and radio upgrades. Staff said it assumes build times of 6 to 20 months, set aside a $500,000 safety net (starting from 8.4 million rather than 8.9), and uses slightly lower monthly revenue than the roughly 404 thousand being received. Staff said 5.4 million remains undetermined and FY28 and FY29 project spending was cut to 1.2 million. A commissioner said it was the first look and suggested the format be revised because it mixes a cash flow statement with project totals and could confuse the public. No vote was taken on it.
Live streaming planning and zoning commission meetings
The chair renewed a proposal to live stream the elections board, assessors board and planning and zoning meetings, noting only planning and zoning can be required to do so. Commissioners said the elections board had reasonable concerns, and favored starting with planning and zoning. One commissioner said people may want to watch without participating. A concern was raised about computers failing before evening meetings, and the county manager said IT staff would be on site whenever meetings are streamed. A motion to live stream planning and zoning commission meetings passed unanimously.
Appalachians Road and railroad right of way agreement
A staff member explained an agreement with the railroad giving each side access to the other's right of way near the bypass intersection, with each responsible for its own maintenance and mutual indemnification. The county attorney had no objections. A commissioner asked whether it addressed a nearby crossing where large trucks have been damaged; staff said no, and the attorney said that would be handled separately, perhaps through conversations with the railroad. The motion passed unanimously.
Federal Engineering consulting agreement for radio system and new towers
Staff asked approval of a two-phase agreement with Federal Engineering: $36,178 to assess the current radio system and identify tower locations, and up to $95,000 for specifications, bid review and construction oversight, for a total not to exceed $131,178 from SPLOST. A commissioner questioned the contract's 10-month schedule against a longer plan; staff said fees should be roughly the same and the work can be stopped at any time. Commissioners disputed the earlier radio vote and whether $130,000 of prior upgrades helped, and one asked about a prior vendor's claims. The county attorney stressed that the study is for a P25 700/800 MHz system, so towers might not suit another system. Staff said construction would likely start next summer and that equipment would go on the ballot in a future SPLOST. A fire official said microwaves were not replaced and the current system can be reconfigured. The motion passed unanimously.
Loose equipment for new fire pumper and water tender
The fire chief said the purchase covers hand tools and water supply equipment required for state ISO approval, with hose covered by a grant. Staff said all three trucks will come in under the internal estimate. A commissioner asked about vendors, and the chief said all are frequently used. A motion to approve up to $40,000 from SPLOST passed unanimously. The chief also described regular task force training at the new training center, which helped in a weekend fire.
Declaring county property surplus
Staff presented a list of unused or replaced property to declare surplus, noting a 2015 F-150 would be sold to a city at an agreed trade-in value. A commissioner asked whether other departments might want items. The motion passed unanimously.
County manager report on roads, elections, and recent fire
The county manager reported 38 new public works orders in October with 29 completed, mowing at round six, and completed resurfacing, with striping rejected and the contractor agreeing to restripe at its cost in spring 2027. The recycling sorting facility still awaits state EPD approval. About 40% of active voters voted early, and he reported a large Old Buckhead Road fire with no injuries and a partial building collapse in Buckhead.
Public comment on radio towers
One resident urged that the radio upgrade include connectivity for metal buildings and asked the consultant to look at renting space on water towers or existing cell towers to save money.
Machine transcript
This is a machine transcript made by Georgia Commons from the body's public recording. It is not an official record, it can mishear words, names, and numbers, and it does not say who is speaking. The recording is what was said.
702 turns.
Open the recording on boxcast.tv. The recording opens on the site where the body published it. Nothing is played on this page.
- 0:01:10
Oh, ho, ho, ho.
- 0:01:21
What were we talking about? I know we had talked about, uh, something with the fire station, one of the fire stations.
- 0:01:44
Oh, we got everybody in?
- 0:01:50
Good morning. I call to order the November 3rd meeting of the Morgan County Board of Commissioners. If everyone would please rise for the pledge and invocation by Commissioner Riden.
- 0:02:00
I pledge allegiance to the flag of the United States of America, and to the Republic for which it stands, one nation, under God, indivisible, with liberty and justice for all.
- 0:02:13
Bow your heads, please. Dear Lord, please be with us as we do the business of the county. Help us to make decisions that benefit the county as a whole in the best interest of the county. And as we go to this election cycle, please, uh, Lord, help our country heal. And please help us to understand that we were founded on Christian values, as we just acknowledged in the pledge. And please help us to espouse those f- Christian values as we go through life and the decisions that we make.
- 0:02:44
Bless us in Jesus' name. Amen.
- 0:02:46
Amen.
- 0:02:48
All right. First on the agenda, we've got the... I need a... looking for an approval of the agenda. Has everyone had a chance to, to look at it?
- 0:02:56
So moved.
- 0:02:57
Got a motion.
- 0:02:58
Second.
- 0:02:58
And a second. Any further discussion? Hearing none, all in favor, please raise your right hand. Motion carries unanimously. None opposed. All right. Next, we've got several minutes. If you would please take time to review those, and I'll entertain a motion individually to approve those minutes as presented.
- 0:03:14
You want them individually or all together?
- 0:03:16
I believe they gotta be individually. Yeah.
- 0:03:21
I'll make a motion we approve the minutes of September 29 BOC meeting.
- 0:03:26
Second.
- 0:03:26
Got a motion and a second. Any further discussion? Hearing none, all in favor, please raise your right hand. Motion carries unanimously. None opposed.
- 0:03:37
I motion that we approve the minutes for the October 2nd plenary brief.
- 0:03:42
Got a motion.
- 0:03:43
Second.
- 0:03:44
And a second. Any further discussion? Hearing none, all in favor, please raise your right hand.
- 0:03:51
Motion carries unanimously. None opposed.
- 0:03:57
I'll make a motion to approve the October 20th, 2026 work session minutes.
- 0:04:01
All right. Got a motion.
- 0:04:02
I second.
- 0:04:03
And a second. Any further discussion? Hearing none, all in favor, please raise your right hand. Motion carries unanimously. None opposed. All right. Now to the consent agenda. So everything on here is, uh, we already discussed. Um, now there was one thing before we, uh, before I entertain a motion. Uh, and thank you, Mark, for getting this, uh, SPLOST cashflow list to us. Now this isn't anything that we've approved as far as like this is the exact timeline we want, but this is what staff has laid out and said, "Here's where we think it'll all fit." Is that a correct statement, Mark?
- 0:04:35
Th- that's correct. This includes all of the items that are specifically mentioned in the referendum that was approved by the voters. So it will, uh... We've already taken care of the, uh, fire trucks and public safety vehicles as mentioned in referendum. Uh, this spreadsheet covers the, uh, construction of the, uh, two, uh, fire stations. Um, the, uh, ag arena, covering the show arena and upgrades there. Uh, building the indoor 4H sports facility, um, as well as public safety radio system upgrades.
- 0:05:10
Um, some assumptions on here, um, is that, um, we planned... I mean, right now, what we're estimating for the fire stations are 15-month build-out, a 20-month build-out for the radio towers, um, six-month build-out for the cover of the arena, and 15-month build-out for the 4H facility. And these estimates here, uh, we used the, uh, the budgeted amount, um, and used a bell curve so that generally, you know, the first few payments are less 'cause they're just getting started, and then the last few payments they're finishing up.
- 0:05:49
So we just used a bell curve to estimate those payments. Um, but this sheet also includes, we, uh, uh... I pulled out a $500,000 safety net. So, uh, instead of starting with 8.9, we're gonna start with 8.4. Um, I've also have, uh, s- slightly reduced the monthly revenue from what we're actually been getting, just in case. Um, so that, uh, if there are surprises, if things go faster and payments are due sooner, things like that, there should be enough money to cover it.
- 0:06:22
And I also see you've got it in there starting in month nine, at least $100,000, or $100,000 a month for undetermined projects, because 5.4 million of the SPLOST is still undetermined-
- 0:06:34
Right
- 0:06:34
... um, that we could shift if we need to, to different projects.
- 0:06:36
Right. So that starts... So, so we've got projects already identified for FY27.
- 0:06:41
Mm-hmm.
- 0:06:42
Uh, so for FY28, I've reduced. We typically have been spending between two and four million out of SPLOST for projects every year. Uh, but because we will be having the fire station and the ag arena and everything going on at one time, uh, I've reduced that to just, uh, 1.2 million for FY28 and FY29 because we're taking care of so many other SPLOST projects. But we know there are some other things that come up. There's, you know, four, four sheriff's office vehicles a year. Um, there's some other, um, other items on here.
- 0:07:14
You know, some, some other renovations to county buildings, roofs, replacements, things like that. So there'll be a little bit of money. Uh, and then, then the money frees up again, uh, starting FY30. Um, there is, um- At some point during this process, we are gonna have to do some, uh, some upgrades and maintenance to the, uh, package facility that we have out at Madison Lakes. We estimate those are gonna cost us about a million, but there'll be plenty, uh, on the back end to take care of that.
- 0:07:45
Okay. So Mark, I wanna talk to you afterwards. This is the first time I've looked at this.
- 0:07:51
Mm-hmm.
- 0:07:52
I might have a couple of suggestions on the format.
- 0:07:55
Okay.
- 0:07:56
But the revenue of 425, you're showing that for each project. That's just a-
- 0:08:01
Monthly.
- 0:08:01
That's our monthly revenue in total, right?
- 0:08:03
Yes. And that-
- 0:08:04
That's not allocated by project. That's just-
- 0:08:05
No, no. That's just, that's the average revenue. Actually, we've been receiving an average of about 404.
- 0:08:11
All right. So-
- 0:08:11
But I reduced it to make sure-
- 0:08:13
In this beginning balance-
- 0:08:14
We're okay
- 0:08:14
... of 8.4 million, that's the total, right?
- 0:08:16
That, that's what we have in the bank right now in
- 0:08:18
So I would suggest, not to confuse anybody, 'cause this is a public document, that we might need to revise. Do we revise that a little bit? 'Cause that... If somebody's looking at this, they may think we're bringing in this revenue on all these projects, and that's not the way it works.
- 0:08:35
No, that's the, that's the total revenue-
- 0:08:37
So do we-
- 0:08:37
... that we receive every month
- 0:08:37
... and also, we probably need to put on here, on the projects, you've got expenses. And I guess that's the, that's what's in the red.
- 0:08:45
Mm-hmm.
- 0:08:45
That's what expenses, uh, is-
- 0:08:47
Our plan for, for each category
- 0:08:48
... that you've alr- Oh, that's the planned expenses.
- 0:08:50
That's the plan for each category, yes.
- 0:08:52
In total.
- 0:08:53
Mm-hmm.
- 0:08:53
Okay.
- 0:08:53
For, for, for, for that month. It's divided by month.
- 0:08:55
For that month. So-
- 0:08:56
And then, and then the payment schedule show what's scheduled that month and how much we're-
- 0:09:00
Well, we also, for these projects, we also have a total budget for each project, right?
- 0:09:04
We do. We do.
- 0:09:05
I would suggest... I'll get with you. I think we probably need to put the total project-
- 0:09:11
If you, if you-
- 0:09:11
... expected cost in there.
- 0:09:13
If you go to page four.
- 0:09:14
Well, I meant in line with each project.
- 0:09:16
Yeah, I know. You go to page four, it's got like the fire stations, the total 4.6. That's what our budget is.
- 0:09:21
Mark.
- 0:09:22
Yeah.
- 0:09:22
Yeah. First box.
- 0:09:24
Oh, first box up there. Okay.
- 0:09:25
The one on page one.
- 0:09:26
Oh, it is up there. I forgot I, I forgot I did that.
- 0:09:28
It's up top. Totally.
- 0:09:29
Yeah. That, that's, that's our budget there for the fire stations.
- 0:09:32
Page one. Uh, top of commitment schedule.
- 0:09:35
Oh, okay. Okay, okay.
- 0:09:38
Yeah, I forgot I put it there also. It's, it's on the bottom of page four as well.
- 0:09:42
Okay. All right. I see that. So it, all I'm saying is for a reader reading this, that might be a little bit confusing.
- 0:09:49
Okay.
- 0:09:50
I know what you're trying to do. You're trying to do a cash flow statement and also do a project analysis statement all together.
- 0:09:56
Yes.
- 0:09:57
And that does not work well, but we'll talk about it.
- 0:10:00
Okay.
- 0:10:01
I don't think I wanna spend any more time on it right now.
- 0:10:04
Thanks, Nathan.
- 0:10:06
Thank you, Mark and team, for the, for taking the time to do that report. Um, Mark, I'll take, I'll entertain a motion to-
- 0:10:14
I'll make a motion to approve the consent agenda.
- 0:10:16
A motion.
- 0:10:18
I second.
- 0:10:18
A second. Any further discussion? Hearing none, all in favor, please raise your right hand. Motion carries unanimously. None opposed. All right. Next, we've got unfinished business, uh, live streaming meetings for elections, assessors boards, and planning and zoning. Uh, this is something that I presented last meeting, and there was concerns that, uh, Nathan had, had brought up, Commissioner, uh, Parks brought up about the elections board and planning. And I think we've had some discussion and discussion with the attorney about, you know, planning and zoning's really the only board we can say, "Hey, you gotta do it." The others, you know, it's up to them.
- 0:10:52
We can just control if they're doing it in this, this room. So, um, I'm not sure what everybody else's thoughts are on it, but I still think that they should all be live streamed.
- 0:11:02
Well, I've talked to the, um, all of them. I've talked to the elections board, and I think she has very reasonable and good concerns not to do it.
- 0:11:13
I felt like she did as well. I, me and you talked about that-
- 0:11:15
Yeah
- 0:11:15
... a little bit as to why.
- 0:11:17
The only one I wanna do is planning and zoning. That's the only one I vote for.
- 0:11:23
I think, you know, h- honestly, I think starting there, giving everything that's on the horizon, coming up with planning and zoning, they're gonna have a lot of stuff that, um... So I, I would say we, we motion forward to live stream planning and zoning, and then we can revisit down the road elections and-
- 0:11:46
And Chuck's not in here, is he?
- 0:11:48
He's not here.
- 0:11:48
Yeah, he is.
- 0:11:49
Yeah. I think Chuck has some concerns about planning and zoning as well, and I don't know if he wants to, if you want, if he wants to say anything about that or not. But I certainly see the, um, I certainly see the need or the reason why you'd wanna do planning and zoning, 'cause they do take up a lot of, uh, interesting topics.
- 0:12:07
Yeah, no, Chuck, when you weren't welcome last time Chuck spoke, you mentioned the fact that, you know, if people wanna participate in the public hearing process, they have to be here to participate, and that is well understood. But I still think there's people that don't necessarily want to participate, just wanting to actually view what's going on and what's happening, myself included. Um-
- 0:12:24
The only thing I would, only thing I would ask is that we have somebody here to make sure at, at meeting time everything is, um, operational.
- 0:12:35
Yeah.
- 0:12:35
Because we've had issues with the, um, computers there on the dais-
- 0:12:42
No, that's, that's-
- 0:12:43
... shutting down between the time they come and set up at f- at 4:30 or 4:00 and our meeting at 6:00. And we're h- in here, we're at a rush trying to get it back up and going. So that was, that would be the only thing I would request.
- 0:12:57
Adam, is that something we need to put in the motion, or is that just something we can handle staff-wise now that we have IT here?
- 0:13:04
No. It's, it's nothing that we need in the motion. Chuck and I talked about this earlier in the week. I, I agree. We're, we're, we're to that point and, you know, some of the things that we do in this room, when we put this room together, um, during COVID, um, obviously we've got a, we've got a really nice room, but we still put the room together on a budget. And, um, in talking with, um, the IT team, uh, Trevor specifically, we, we did get some recommendations, uh, of things that we need to do a little bit differently in the room and, and probably spend a little b- bit more, um, resources and money to get it really where it needs to be.
- 0:13:39
But, um, I do agree that any time, um, that, you know, we have one of these boards meeting, that we have, um, IT, uh, on site in case there is an issue. I mean, most of the things that, that we do in here, um, I'm familiar enough with the system that, um, I can- ... work through most of the issues. But if it's a day that I'm asking, I mean, Mark and I were having a conversation, um, two weeks ago about BoxCast, that he's not familiar with. So, um, having the IT team here on site, and we just, we just need to adjust schedules a little bit on, on the days that, um, Chuck's team is, uh, um, is meeting and just, uh, just schedules.
- 0:14:15
Probably Ben will probably be the one handling it, so he'd just come in later, stay later type thing. So it's something we can work on the back end. And, um, and I would agree, um, some of the issues that they've had, you know, after 5:00 um, around here, computers kinda do what they wanna do. So, uh, during the day, they, they work very well, but we have so many scheduled updates after hours to not impede, um, the workflow of, of most of our team during the day. A lot of updates do happen after 5:00. So, um, I think it would be beneficial if the board does move forward with that, that we have somebody on site, um, anytime we're live streaming.
- 0:14:48
Okay.
- 0:14:50
All right. I'll entertain a motion.
- 0:14:52
I'll make a motion that we live stream planning and zoning commission meetings.
- 0:14:59
Second.
- 0:14:59
Got a motion and a second. Any further discussion? Hearing none, all in favor please raise your right hand. Motion carries unanimously. None opposed. Thank y'all. All right. Next we've got new business. Uh, Appalachians Road and CPR Railroad MOU. I believe is that Kevin and Aaron, or?
- 0:15:16
No, it's, uh, me, Mr. Chairman.
- 0:15:18
Okay.
- 0:15:19
Uh, we were contacted by the Carro- Parro- Parrot Railroad, um, that's opening the railroad tracks that are on Lower Appalachians down here at the end, uh, closest to the bypass intersection. Um, it... We are currently using some of the railroad's right of way to maintain our roadway, and the railroad needs some of our right of way for upgrades and maintenance to their tracks. And so this MOU is just to basically grant each party, uh, access to the other's right of way, and we're each stay responsible for our own maintenance.
- 0:15:51
And we agreed to indemnify and hold harmless the other party.
- 0:15:56
Patrick, I'm sure you've reviewed this and-
- 0:15:58
I did. I've reviewed it. I have no objections to it.
- 0:16:01
Carl, this is your district. Any questions or concerns?
- 0:16:04
I don't have any question or concerns. If anybody don't, anybody else don't have any. If fact, if you got one.
- 0:16:09
Quick.
- 0:16:10
Yeah.
- 0:16:11
Does any of this address current crossing?
- 0:16:13
No.
- 0:16:14
Because that'd be part of this, and then we need to go back. We've had an issue recently with trucks crossing there. If Bigfoot big trucks cross, we get some stuff, um-
- 0:16:25
It should be. The area they've got indicated is just the, the area that runs parallel to Appalachians Road after it makes that 90-degree turn.
- 0:16:35
This, this one's not far from it.
- 0:16:37
Okay.
- 0:16:39
We'll, we'll talk about it.
- 0:16:40
Okay.
- 0:16:40
I, I didn't know if this was gonna come along.
- 0:16:44
They have trouble getting across?
- 0:16:47
I, I work... I ripped the, uh, truck bracket out of my truck. Four trucks damaged at the crossing. I questioned whether mine was gonna get crossed against that. So.
- 0:17:03
Well, they're gonna be doing maintenance, so we can talk to them about that.
- 0:17:08
Yeah, that was good. They're holding harmless though.
- 0:17:10
Yeah.
- 0:17:10
If there was damage to it, do we need to-
- 0:17:12
Well, if it's already that way.
- 0:17:13
Yeah.
- 0:17:14
Right. I mean, the, the, uh, a claim wouldn't arise under this agreement, but that, that's kinda something you'd address separately, not really as part of this. But maybe some human conversations before you document it-
- 0:17:28
Got it
- 0:17:28
... would be effective.
- 0:17:32
Any other questions?
- 0:17:33
I'll make a motion we approve the, um, Appalachians Road CPR Railroad MOU.
- 0:17:41
Got a motion.
- 0:17:42
Second.
- 0:17:43
And a second. Any further discussion? Hearing none, all in favor, please raise your right hand. Motion carries unanimously. None opposed. All right. Next we have the approval of the consulting agreement with Federal Engineering. And is that you again, Mark? Or is that-
- 0:17:57
It is. Thank you, Mr. Chairman. Uh, as the board's aware, uh, after receiving approval to move forward with a new radio system, um, we discovered that it wasn't gonna be affordable because of the situation with the towers. Uh, we're gonna have to construct new towers. Um, while staff knows a lot about radios, we don't know anything about towers themselves. So, uh, we talked to several engineering firms, and we've selected Federal Engineering. Um, and so, uh, their work will be in two phases.
- 0:18:30
Uh, first phase will encompass assessing the current system and, um, identifying improvements that can be made to make the system more usable until a new system is in place, and then identifying the locations for the to- towers, like, basically confirming what we've been told by the vendor, make sure that we have the best locations for new towers. Um, and that phase of the project is $36,178. Um, and then assuming the board is willing to move forward after that, um, the consultant firm would develop the scope of work and specifications for the RFP, uh, evaluate the RFPs, and then during the construction phase, they would act as the project management to make sure that the towers are being built to the specifications, because again, that's, that's, that's out of our expertise.
- 0:19:24
And then they would also assist us with getting the necessary frequencies. Um, and the second phase, uh, is not to exceed $95,000. So we're asking for a motion to approve the consultant agreement not to exceed 131,178, and that would be from, uh, SPLOST dollars.
- 0:19:41
So now, I, the questions I have and con- the only concerns I saw in there was the, at the end of the contract, it states that this contract is to start this month and to not exceed 10 months. Um- This is on page 49 of the contract. Of p-
- 0:19:57
Mm-hmm.
- 0:19:58
19 the contract, 49 of the agenda packet. Um, this assumes a 10-month schedule. When we go and look at the SPLOST, um, so you're saying that the, the SPLOST takes about 20 or th- or 29 months. So is that gonna be the phases? Phase two is gonna be another-
- 0:20:14
Phase, phase one and two is gonna take them a couple of, three, four months, and then the construction will be a different phase.
- 0:20:22
The there... The way I read it is it's 10 months, so it's... You know, I don't know if that's congruent or they're gonna break that up.
- 0:20:26
I, I think that is-
- 0:20:27
So I wasn't on the-
- 0:20:28
I think that's optimistic to build. We're not gonna build three towers in 10 months. There's no way.
- 0:20:34
On the initial approval, was it not forecasted 18 to 24 months?
- 0:20:39
It was.
- 0:20:39
So I think that might be where your lead time coming in blank.
- 0:20:44
No, yeah, I'm just reading number 10 in the contract.
- 0:20:46
Yeah.
- 0:20:46
It says, "FE is prepared to begin this project immediately upon execution of the contract. This proposal is based on a start date on or before November 2nd and assumes a 10-month schedule. Delays to the project schedule due to actions or lack of actions on the part of the county, county participants, third parties, and others, including but not limited to vendors, uh, delays, impacts to program schedule will increase the cost of the county and will be brought to the attention of the county's project manager in a timely manner."
- 0:21:10
Mm-hmm.
- 0:21:11
So I just was concerned about that 10-month schedule, 'cause our written schedule is 29.
- 0:21:16
So, so th- th- they... Basically, the fees for doing the project management are kind of like per, per location. Um, and
- 0:21:32
they're, they're assuming a very compressed construction timeline, so I think the fees work out roughly the same, just spread out more. Uh, the company has people that are local. So it's not like, uh, with some other projects where we've had to pay travel. That's one of the reasons why we selected them. We did have a company that looked a little less, but every time they came on site to inspect something, there's gonna be travel cost. Uh, so, uh, just because the project spreads out, it's still the same amount of work. Um, we're still managing the construction of three tower sites.
- 0:22:03
It's just maybe... You know, there may be a little factor in time, but I don't expect it would be that much.
- 0:22:11
Okay. I just, just wanna make sure we look at that. I just saw that a minute ago.
- 0:22:14
Yeah.
- 0:22:14
I was comparing the timeline with, with, with-
- 0:22:16
They, they, they, they-
- 0:22:17
... with FE.
- 0:22:17
They assumed it would build all three simultaneously, and I don't think we would. Um, and I d- I don't, I don't think we can build... Even if we build them all at the same time, I don't think we can build them in 10 months.
- 0:22:28
But this is also a project management company. We don't want them to continue... If we say, "Hey-
- 0:22:32
We can stop
- 0:22:32
... we got everything we need from you."
- 0:22:33
Right.
- 0:22:34
We're good. We don't, we don't-
- 0:22:36
Right
- 0:22:36
... automatically start paying them $300 an hour.
- 0:22:38
Right. We can, we can say, "Okay, everything's off to a good start."
- 0:22:41
Yeah.
- 0:22:41
The base is done, and it's just finalized work. And, you know, we can, we can stop that at any time.
- 0:22:48
Okay. Any other questions for staff?
- 0:22:51
Of course.
- 0:22:52
Okay.
- 0:22:56
You go ahead.
- 0:22:58
Um, Mark, let me back up a little bit. Uh-
- 0:23:00
Mm-hmm.
- 0:23:01
The company that put the current system in years ago and, and maintained it, did we ever contacted them saying that there's something not working right with the current system?
- 0:23:16
Well, w- we reached out to them, and we were asking for people to come look at the system and, uh, tell us what needed to be repaired and fixed, and they advised us that they, they had too much business on the west side of the state and did not have the time to, to work with us anymore.
- 0:23:32
Do you have that in an email though?
- 0:23:33
I do.
- 0:23:33
So because the company disputes that.
- 0:23:35
I do. I have an email from them saying that they were not gonna, they were not gonna come bid on that work 'cause they didn't have the time.
- 0:23:41
Okay. Can I get a copy of that?
- 0:23:42
You can.
- 0:23:43
And I also believe they hadn't updated the system in how many years?
- 0:23:46
They hadn't, they hadn't made any. They, they made no recommendations or suggested during the previous I don't know how many years for any updates or upgrades.
- 0:23:54
The original firmware from 2013.
- 0:23:57
2013.
- 0:23:59
Well, the, the owner just called me yesterday-
- 0:24:01
Wow
- 0:24:01
... and he said nobody ever contacted him saying there's anything wrong with it.
- 0:24:06
But I mean, anybody that's doing any kind of business-
- 0:24:07
Yeah, but I-
- 0:24:07
... if you haven't been out to check on it since 2013, and we're 2026.
- 0:24:10
So you got the emails to prove that so I can send it to him?
- 0:24:12
That is a no.
- 0:24:13
Okay, you got the emails to prove it so I can send it to him?
- 0:24:16
Mark sent an email.
- 0:24:16
And can I get a copy of that? And so the next question is, well, David, we just spent $130,000 with, with the company Augusta Communication.
- 0:24:25
Mm-hmm.
- 0:24:26
And it's still, there's no improvement from what I understand. I've been talking to, uh, to dispatch and talking to some of the deputies, but there's absolutely zero improvement, and some of them say it actually made it worse because you got more busy signal. So-
- 0:24:41
What made it worse?
- 0:24:42
They said more busy signals right now. That's what I'm told.
- 0:24:46
More busy signals?
- 0:24:47
Yeah. Apparently, you know, when you, when several people try to get on it at the same time or so.
- 0:24:53
Well, it's not-
- 0:24:53
But anyway, they, they said, they said there was no improvement period, you know? So-
- 0:24:57
Well, we didn't, we didn't, we didn't add any talk paths. We replaced, uh, repeaters. Uh, we, uh, we-
- 0:25:04
Updated firmware
- 0:25:04
... replaced some antennas. We updated the firmware. Some of the antennas were out of alignment, so they were rehung so that they were in alignment.
- 0:25:11
Yeah, but I mean, if we did all this for $130,000 and you got zero improvements... And I got the sheriff sending me a picture of his portable, said it's still not working. And the tower off this, that, for this portable is from the, from the sheriff's office is what, a couple miles at the most. Isn't there a problem there? Now we hired this company to fix what Augusta Communication didn't fix for $130,000.
- 0:25:35
No, we're going to a different sys- radio system because that system's not working. So we've decided to go with the P25 system. Am I not correct? Am I missing something?
- 0:25:44
The system is working. I mean, we, you know-
- 0:25:46
No, it's not working well. That's why we're going with a new system. That's why the sheriff is sending you pictures of them not working.
- 0:25:51
There's a couple things about that building that cause issues with it. One is they're steel inside the walls
- 0:25:57
Okay? There's not a whole lot that's gonna get in that building till you start embracing new technology. You know, this particular old radio system, even if it did work like it's supposed to, it's still not a public safety paired radio system. Period, end of story. And we can spend $100,000 more on it and it still won't be that.
- 0:26:15
Well, it's served us well for 50 years, hasn't it?
- 0:26:18
Right. Well, I would ask the question of what well means.
- 0:26:21
Yeah. I mean, the P25 doesn't go through buildings either. It's notorious for not going into buildings.
- 0:26:26
It's making one highway.
- 0:26:28
If you get that option on there-
- 0:26:31
Well, why wouldn't you?
- 0:26:32
Because it adds a substantial amount of money to that.
- 0:26:34
That's the LTE.
- 0:26:34
It can still operate on version 2.0.
- 0:26:37
Well-
- 0:26:37
Well, technically right now ... All right, Mark.
- 0:26:43
We all know that this thing's been a complete cluster. We've spit the, the county spit the bit on this thing. It was approved by a split vote. And when we asked to have a consulting firm brought in, now everybody's going back saying, "This is the right thing to do." It was the right thing to do to begin with, by God.
- 0:27:06
Then why do we have a conversation about it? Let's, let's approve it and move on.
- 0:27:09
Well, I kinda would-
- 0:27:10
This is what y'all wanted
- 0:27:10
... agree with you, but I'm gonna have my piece.
- 0:27:12
Okay.
- 0:27:12
I'm gonna say my piece about it. We should have done this to begin with. We should not have jumped the gun and tried to force stuff through that we could not afford, and we could not afford it. And here we are now back to this. So, uh, and Blake, you're looking at the thing now. You-
- 0:27:32
Yeah, I'm just seeing the-
- 0:27:33
You, you-
- 0:27:33
... additional $5.4 million of-
- 0:27:35
You, you-
- 0:27:35
... additional projects
- 0:27:35
... at the last meeting, at the meeting we approved this-
- 0:27:38
So-
- 0:27:38
... you chastised me and Philip for not trusting the process.
- 0:27:40
And I still chastise you for not trusting. If you ... Did you distrust anyone that worked for this county?
- 0:27:44
Well, you don't have the right as commissioner to go into executive session to bring up those personnel issues-
- 0:27:49
I'm not bringing up-
- 0:27:49
... to multiple boards-
- 0:27:50
... any personnel issues
- 0:27:50
... in a correct way.
- 0:27:51
You're the one that brought it up.
- 0:27:53
I'm sorry.
- 0:27:53
I'm speaking, please.
- 0:27:54
I ... Oh, I can hear you fine.
- 0:27:55
When you-
- 0:27:55
I can hear you as well. I know that
- 0:27:57
When you, when you, at that meeting, you chastised us.
- 0:28:01
I didn't chastise anybody. I spoke my mind.
- 0:28:02
Yes, you did. Go back and look at it.
- 0:28:04
I-
- 0:28:04
You chastised us. You said, "Y'all wanna waste money on doing this."
- 0:28:07
And waste time and have county employees-
- 0:28:08
Well, now we're doing it
- 0:28:09
... go around and chase rabbits that the employer-
- 0:28:11
We're doing it
- 0:28:11
... hasn't told them to chase.
- 0:28:12
I guess we're chasing rabbits now.
- 0:28:13
We ain't chasing any rabbits. We're getting what we asked for.
- 0:28:15
Oh, we do. Oh, we do.
- 0:28:16
Based on the recommendation of the staff.
- 0:28:16
Well, that's what we recommended before.
- 0:28:18
You don't know what you're talking about. They're not looking at different systems. They're looking at the system we g- we've approved.
- 0:28:23
No.
- 0:28:23
They've come to us saying that.
- 0:28:24
I see 'em. They look at towers. They're not looking at a system. They're looking at putting in towers.
- 0:28:27
For a P25 system.
- 0:28:28
It can work for any system.
- 0:28:29
Okay. So-
- 0:28:30
He also said right there we're gonna improve. He's looking at the current system to see what we can do to improve it, which is what-
- 0:28:36
Well, then just ask for an email-
- 0:28:37
... the recommendation-
- 0:28:37
... from a company that hasn't been out here to look at the system since 2013.
- 0:28:40
I've been asking for anything. Well, we just spent $130,000 looking at the system.
- 0:28:42
Okay. Philip, I agree with you. Okay, you're correct. You didn't ask for anything.
- 0:28:45
I didn't ask for anything.
- 0:28:45
Okay. Well, what are you asking for now?
- 0:28:48
All I ... I just wanna put on record, I think everybody should go look at the October 1st, uh, uh-
- 0:28:53
Please do, everyone. Please, Ben, go look at it
- 0:28:55
... article in the paper. Because I think what it'll show is that our po- our vote was dismissed earlier, our recommendation. And now we're going right back to the recommendation. And I just wanna go on record saying that I think we're doing the right thing now. It's what we should've done to begin with, and we wasted all this time.
- 0:29:13
Okay.
- 0:29:14
Can we get this company to come to us and make a presentation to you to get an update on this?
- 0:29:20
If that's your motion, make your motion. If you get three other members of this board to decide, you can do what you want, but two of y'all don't decide anything.
- 0:29:27
True.
- 0:29:28
Nobody ever said two did.
- 0:29:30
To your point, yes, they will come to the next presentation if that's what you want.
- 0:29:34
Is it gonna be, like, at the end or during the-
- 0:29:37
At the end of phase ... At the end of, of pass number two.
- 0:29:42
Well, we have asked them for a report. Once they complete the current evaluation of the current system, we have asked them for a report and a part of that report. If you would like them to come and present the report, I'm sure they would be more than obliged to do so.
- 0:29:58
I think I would like to do that, you know-
- 0:30:00
Well, thank you
- 0:30:00
... given, given the past. You know, some of the emails that we got from some of the other vendors that claimed, you know, things were staying, steered too much in one direction or the other direction, you know, so.
- 0:30:11
Well, this, this is one thing. This, this company does not sell or install any system, so they're not, they're not, they're not gonna try to sell you Harris. They're not gonna try to sell you Motorola. They're not gonna try to sell you Kenwood. They, they, they are, they are a brand that they, they, they don't sell, so they don't, they're not, they're not loyal to any particular brand.
- 0:30:30
True, but some consultants, you know, you tell them what you're looking for and then they'll steer you toward that direction.
- 0:30:34
We, we told them we want a better radio system to park.
- 0:30:37
So to your point, Commissioner, yeah, we put over ... We, we can put out an overall general specification based on certain products, certain capabilities, certain processes, if you will. We can't make them be responsible. If they don't respond, we can't go any further with them. We put a bid specification out. We put an RFP out. We put an RFQ out. If they choose not to respond, they're done. We can't talk to them anymore about it.
- 0:31:08
And going back and talking to all these people that didn't respond and are sending us letters saying, "We don't wanna have ... We're not gonna do that. We can't come any further." That's futile. It's not abiding by the board's original call.
- 0:31:22
Well, I'm not quite sure what you're talking about. You know, I was referring to, to the original, was it ISQRP that was sent out about that? And, and when one of the guys responded to it right there, they said it was clear that the system that we are selling is not an option. Only the, the P25 system is an option.
- 0:31:40
Okay.
- 0:31:42
So, uh, they didn't waste their time anymore coming down here and looking into that.
- 0:31:46
Well, they don't have to waste their time.
- 0:31:50
I mean, what ... You know, I don't really know how to answer that. I mean, what-
- 0:31:52
I mean, it, it, it wasn't a-
- 0:31:53
It's a specification
- 0:31:54
... it's not a question right there
- 0:31:55
... for a radio type. If he doesn't sell a P25 radio type, then there's not much we can do about that He doesn't sell that. He doesn't sell that
- 0:32:05
I mean, provided is that the system that, that was only focused on, you know? Obv- obviously there's other systems that work just as well that, that were kicked out.
- 0:32:14
I mean, there, there are some that, that, that are... Look, if you can take certain characteristics of all of them, you can probably make the best radio system ever. But all of them are gonna have some limitations. All of them are gonna have some, uh, features that work better.
- 0:32:28
True, true. No doubt about it.
- 0:32:29
At the time, again, you have to remember that we have to partner with Walton County, Morgan County, Greene County in order to do this at the most cost-effective rate and share their core system. And the other components of the radio that we don't necessarily have to bear a cost on, that's what's really driving it towards the ATMS system.
- 0:32:53
Mark, let me ask you a q- two questions. As I understand it, this is about designing and building towers in proper locations.
- 0:33:05
Correct.
- 0:33:06
And as I understand it from what I've been told by Adam, and maybe you and s- others, is that because of the cost that, that we've done, once we build the towers, then in the next FLOST is when the radio system would be enhanced to whatever y- whether you do a P, or whether you do a P25 or whatever. Is that correct?
- 0:33:33
That, that's correct.
- 0:33:35
Okay.
- 0:33:35
Uh, but we're, we're looking for them to tell us exactly where towers need to go-
- 0:33:39
Okay
- 0:33:39
... for a new system to work correctly.
- 0:33:41
And so you're gonna fi- You're gonna get the towers built, you're gonna fix the current system or whatever to its highest modification, and the next FLOST is when the actual... You'll pay the ever how many millions of dollars to put in the new system.
- 0:33:57
Yes. Well, as far as fixing the new system, we'll look at the recommendations. They're, they're, they're going to tell us what, what is the best avenue to take to get this system as viable as we can until a new system is put in place.
- 0:34:10
Until the new system, until that FLOST.
- 0:34:11
Mm-hmm.
- 0:34:11
And so I'm o- I'm okay with that.
- 0:34:13
And, and, and-
- 0:34:14
And-
- 0:34:14
... you know, if, if they come back and say UHF is the better, then, then that's fine. That's what we'll do. But we still have to build towers in either situation.
- 0:34:22
Well, I, I, I get it.
- 0:34:22
Or-
- 0:34:22
I'm not arguing, I'm not arguing P25, UHF.
- 0:34:25
Yeah. Yeah.
- 0:34:25
I'm, I'm just-
- 0:34:26
I'm just, I'm just saying we gotta have the towers in either location.
- 0:34:27
But you did make the recommen- You did make a, uh... I'll give you credit for it. You made a, in a earlier meeting, you made a reference, 'cause you were worried about... 'Cause, uh, when we... Well, I didn't. But when three of the members of the board approved this earlier in that split vote, the whole idea was you could use existing towers, and that-
- 0:34:48
That's correct
- 0:34:49
... and that didn't work out. Okay, that didn't work out. Um, but you said at that point, "Maybe we should look at just building towers for right now." Why did that not go anywhere in your group? Did you get kinda outvoted on that, or was that just, did y'all just make a decision that wasn't the way you wa- 'Cause realistically, that's where we're going now.
- 0:35:08
Well, yes. S- several months ago I, I had floated that idea. Um, but overall, the committee wanted to try to go ahead and move forward for basically time, because the radio system is so critical to our first responders.
- 0:35:20
Yeah.
- 0:35:21
And they thought let's, let's just, if we can move forward and use existing towers, then, then let's do that so that our first responders ar- are as safe as, as, as we can make it for them.
- 0:35:32
And, and I think, I think that-
- 0:35:33
But, but, but, but th- this, this is, this is an option. It does slow down the implementation considerably. Um, but given the fact that we can't use existing towers like we thought, um, and we, we gotta build towers. And, and I, I would say that, uh, um, m- my recommendation would be that, um, even if the consultant firm comes back that the best solution for right now is UHF, I think the ultimate solution is the 700. So I would want to build the towers, go ahead and build the towers to the height necessary so that a board in, in, in the, in the future is not trying to scramble and build towers again.
- 0:36:12
And you, you said that before. And I, and I have no... I, look, I, I, I know Blake said something earlier that it's not that I don't, it's not that I don't trust the people, it's that I don't trust the money. I mean, I know, I know it costs a lot of money and I-
- 0:36:26
That, that, it, it is a lot of money
- 0:36:27
... and, and, and that, and that, and I, I don't think, I don't personally think the cost factors were taken into enough consideration up front. I think they will be now. I think we're probably looking at doing the right thing now by bringing in a... Well, obviously we gotta bring in a tower expert.
- 0:36:44
Well, if you were-
- 0:36:45
And then you're gonna have to hire, then you're gonna have to hire somebody separate to build the tower.
- 0:36:49
Well, yes. Those-
- 0:36:49
'Cause these guys are just gonna oversee the project.
- 0:36:51
They're just gonna oversee.
- 0:36:52
Okay.
- 0:36:52
So, so we'll have to... They'll, they'll, they'll draft the scope of work for the RFP, because I don't know nothing about building towers. Um, and then, and then we'll, we'll issue the RFP, uh, for the tower construction. Uh, also if you'll recall back in, in the public meetings that we've had on this, and privately I've, I've always said that my biggest concern is that annual cost for the P25 system, especially in light of the unknown with what the state legislature's trying to do with our revenue sources. So that's, that's always been a concern of mine.
- 0:37:23
Um, and a- again, we, we, the, the committee started drifting towards the P25 when that cost gap between the UHF25 started shrinking, because it is ultimately, it is a fully public safety designed system, and, and is truly what is-
- 0:37:43
But let's-
- 0:37:43
... best, all the recommendations that-
- 0:37:44
But let's be fair. The only reason it shrunk was because you were putting in a parse- You we- you were gonna, you were gonna fully, you were gonna cover it with- Uh, the radios.
- 0:37:55
W- yeah, because-
- 0:37:56
Yeah, because-
- 0:37:56
Because, because that, that, that was an option that has been available in the past.
- 0:37:59
I, I didn't ask you a question.
- 0:38:00
That, that, that-
- 0:38:01
Okay
- 0:38:01
... that was an option that had never been available up until about 2022, '23 when that-
- 0:38:06
Okay
- 0:38:06
... technology came out. And so, so yeah, it, it was a plan to, to step into it because that is ultimately the, the, the best system to have.
- 0:38:15
Okay. I, I, I'm, I'm not arguing any of that.
- 0:38:17
Yeah.
- 0:38:17
I... It's hard for m- I, I can't oppose this because this is basically what I asked for to start with.
- 0:38:23
Right.
- 0:38:24
So I, I can't oppose this.
- 0:38:25
And this is the same as what we did for the recreation center. After it was approved, we hired-
- 0:38:29
That's correct
- 0:38:29
... a project manager-
- 0:38:30
That's correct
- 0:38:30
... to come in and handle it, because we don't build buildings every day-
- 0:38:33
Right
- 0:38:33
... just like we don't build towers every day, so.
- 0:38:34
Right.
- 0:38:35
Can I ask you a couple more questions on this?
- 0:38:36
Yes.
- 0:38:36
Yeah, but we're backing up on this.
- 0:38:38
Okay.
- 0:38:38
But that's okay. That's, this is the right thing to do. We're talking about the right thing.
- 0:38:40
I, I, I think so too. But, but this current company that you're hiring right here, which, which is supposed to be a good company, it's got a, a good reputation.
- 0:38:47
Mm-hmm.
- 0:38:47
Um, are they looking also into improving the current system or not?
- 0:38:53
Yes.
- 0:38:53
The, the, the, their, the first thing they're gonna do is evaluate the current system, and that will involve them talking to all of the, the, the current users to find out the shortfalls, and they'll, they'll do the mapping of the coverage and all that. So their, their, their first task is to, to what's, what's the shortfalls with the current system, how can that be, um, it, it c- what, what improvements can be done there? And even with those improvements, w- but what, what does that look like? And then in order to then move us to the next step, you know, where would towers go for a new system?
- 0:39:26
So they are gonna be looking at, at the shortfalls of the current system and ways that it can be improved to g- to make it better until we can get a new system. Um-
- 0:39:35
So for example, like we all know that Hard Labor Creek has been an issue in the past.
- 0:39:39
Right.
- 0:39:39
It's always been-
- 0:39:40
Right
- 0:39:40
... an issue, no matter if you got cell phone, whatever.
- 0:39:41
That's, that's 100% correct.
- 0:39:43
So would, would that be a, a, one of the primary towers to be built right there so they c- they can fix this grounding and, and fix that hole?
- 0:39:52
I mean-
- 0:39:52
We'd have to wait to see what they recommend.
- 0:39:53
We'll have to... I mean, I mean, we'll see what they say. I mean, I mean, I mean, I mean, I mean, they could come back and say your current system is fine as long as you build six towers for it, you know? I mean, it, it, it, it, we'll just have to see what they come back with. But, but, you know, the, the committee ultimately feels that, that it's time to move to a, to a public safety branded system. But the consultant is gonna look at what can we do to the current system to basically patch it and improve it until we can move forward with a new radio system.
- 0:40:24
So these towers when they get built, are they gonna be built to a standard where you can rent out-
- 0:40:29
Yes
- 0:40:30
... to the public right there and, and-
- 0:40:32
Yes. Yes, yes.
- 0:40:32
Will you recover some of the cost?
- 0:40:32
We will, we will carve out the space that we need, and the rest of it would be accessible for us to, to rent out. Uh, the consultant also said in a couple of locations they were able to work out a deal where the county gave the land to the tower company in exchange for free tower space, and the tower company rented it out. But then that would be sort of like what we're looking at before, it's just we wouldn't have to pay a- any-
- 0:41:00
Any lease
- 0:41:01
... a- any lease on it. And we feel like we have on the, with all of our fire stations and stuff, we feel like we have enough land that no matter where they ultimately say we need to have towers, we feel like we're gonna have land, so we don't feel like we're gonna have to do any land acquisition.
- 0:41:17
Well, I think the, I think the good thing about this, correct me if I'm wrong, is we get this done with the current SPLOST money. And then when you, when you implement the actual system of this next SPLOST, the people get to vote on it.
- 0:41:31
Right.
- 0:41:31
And that way we're not, we're not putting the burden on their s- their... They get the choice.
- 0:41:37
Right. And, and-
- 0:41:37
And I, I think that's the way to-
- 0:41:39
A- and by the time we get the towers built, it's not gonna be that much of a time difference between-
- 0:41:44
Right, right
- 0:41:44
... this SPLOST-
- 0:41:44
It's gonna take-
- 0:41:45
... and the next SPLOST between then
- 0:41:46
... it's probably gonna take a couple years to build the towers, I would think.
- 0:41:48
Right.
- 0:41:49
And you don't know whether it's gonna be two or four, right? We j- we won't know until they-
- 0:41:52
I mean, yeah. I mean, if they come back and say we need six towers, then we've got to completely regroup, 'cause that's not budgeted at all. We, we relied on, uh, several times in the past we have gotten, uh, uh, proposals from Harris and Motorola saying we could do it with as, with as few as three towers. Um, but, um, the four towers seems to be what, what is actually needed. Um-
- 0:42:17
Well, we got one, right?
- 0:42:19
Huh?
- 0:42:20
I thought you said there were gonna be a three.
- 0:42:21
Well, we're, we... The plan is to build three now, because if, if we-
- 0:42:23
Okay
- 0:42:24
... if we, if we gonna build the towers, we would want the main tower to be at the PSC, but there's no reason to put that up until we are doing the system.
- 0:42:35
Is the old tower on History, is that still usable or...?
- 0:42:38
It's not gonna hold that equipment. We- we've had, uh, Tillery look at it. He, he did send us a quote for a full engineering study of it.
- 0:42:48
He-
- 0:42:48
But just his initial look at it, he doesn't think it will support the weight and everything for a P25 system.
- 0:42:56
But it's currently got all-
- 0:42:57
It's currently got the, the VHF system on there.
- 0:43:00
System.
- 0:43:00
Yeah.
- 0:43:00
Okay.
- 0:43:01
And the other problem with that would be, um, that the current system has to stay up and running until the new system gets cut on. And so, um, uh, definitely having the current equipment and the new equipment on at the same time probably would be catastrophic for us.
- 0:43:22
But they... Okay. I, I, I think I'm, I, I think this is-
- 0:43:25
Well, they'll, they'll, they'll-
- 0:43:25
I think this is probably-
- 0:43:26
They'll, they'll... If, if, if the other thing, I, I know there was some hesitation from the board about is Motorola just trying to make a buck. Um, so a- at the, the very least they, they, they will confirm whether or not Motorola's tower locations will actually give us the coverage that we need.
- 0:43:45
Well, this is probably the most financially and fiscally prudent way to go, because it's, once you build the towers, at least you won't have to be paying lease.
- 0:43:56
That's correct.
- 0:43:56
And from what I understand, you told me they couldn't guarantee us the heights necessarily.
- 0:44:01
That's correct.
- 0:44:01
And, and the reason some, part of the reason the other one fell through is- Uh, there was some bad assumptions made on the part of you all, not me- There was. Yeah ... that, that, uh, we were gonna get rental discounts and we didn't get 'em. Yeah. Our, our ordinance didn't say it, it... Anyway, our ordinance was not as strong as we thought.
- 0:44:19
Why, why don't you, you or Philip want to finish the bill and make a motion on this?
- 0:44:24
I'll make a motion.
- 0:44:25
Okay.
- 0:44:26
One second.
- 0:44:26
Mr. Chairman, if I may.
- 0:44:27
Yes.
- 0:44:27
Just so there's no confusion in the future, I'm sure that the board has read the proposal that's in the packet, but I think it'd be worth noting on page 39, um, or page nine of the proposal, the understanding of the project so there's no confusion in, in months to follow that this is, they're evaluating tower sites for a P25 700/800 MHz system, for a P25 system. So when they come back, that's what the proposal is gonna be based on, a P25 700/800.
- 0:45:01
It's not gonna be on any non-P25 system. So just as... A- again, I'm sure the board's read it, but-
- 0:45:08
And that-
- 0:45:08
... just so it's clear, that's what they're gonna be reporting on.
- 0:45:11
That's-
- 0:45:11
That's what the understanding, project understanding.
- 0:45:13
And to clarify, that's what this board, even though it's been split a vote three to two, it was a majority vote, voted to-
- 0:45:19
Was it a split vote?
- 0:45:20
It was not, I don't think split. I think it was majority is what you would call it.
- 0:45:22
It was split and you broke the tie.
- 0:45:24
Yeah. Majority went this way, so.
- 0:45:27
So just that's, that's what they're evaluating. They're evaluating the current system. They're evaluating whether, where the new towers will go for the P25 700 MHz system, whether there's a benefit to add additional VHF equipment from the current system on the new proposed tower locations to get us, um-
- 0:45:47
To patch us over till we get through this
- 0:45:48
... through 2030 on the next FLOS. And of course, everything is contingent upon voter approval.
- 0:45:54
Yep. Well, I'm glad you pointed it out, but I, I don't have a problem with that because what it basically does is the next FLOS, the people will be voting if that's what they want. And if they don't want that, then it's something else will be done-
- 0:46:08
Right
- 0:46:08
... whether it be a UHF. 'Cause even though it's being evaluated for a P25, as Mark said, if you, if there's some other thing out there, the P25, the towers will be at the right height that they'll accommodate whatever. So, uh-
- 0:46:22
That, that is, that is correct to an extent. If they're, they're basing tower location on a P25-
- 0:46:30
I got it
- 0:46:30
... 700/800 platform.
- 0:46:31
Yeah.
- 0:46:31
If the board chooses or the voters choose to go a different way, those tower locations of towers that this board will ultimately vote to approve may not be in the right location for another system.
- 0:46:45
Then we'd be going backwards. We'd have to go back and reevaluate.
- 0:46:47
That's right. So just because you get it, it's, it's putting towers based on a particular radio platform. If you go with a, a UHF system, some of those towers or locations, or maybe all of them might be good, none of them may be good, and you may have to put up six or seven additional towers. That's the, that's the point and what I wanna make sure that the board is understanding of, is this proposal is evaluating a P25 700 MHz system, not anything else. So if the board chooses to go a different direction-
- 0:47:15
Well, no. All right. What if, what if, or say we do this and it, and on the next FLOS the voters don't approve it?
- 0:47:24
I mean, they wouldn't be approving the entire FLOS.
- 0:47:25
They would, they would be impr- They would be... Well, yeah, it would be approving the entire FLOS, but this would be a, this would be a, this would be one of the projects in the FLOS.
- 0:47:36
I would certainly recommend that if we're gonna, uh, whatever the outcome of this is, this is 100 and, uh, not to exceed 131,178, um, you're looking at a, a, a multimillion dollar tower build today, right? When they come back. That's gonna be, um, likely what we're gonna see 'cause we know the cost of the towers. So the, the board on the current FLOS will be making a determination whether you build those towers. And then in a future FLOS, I would, I specifically identify the project that we built those towers for, if the board moves forward with that, to put the equipment on.
- 0:48:11
And I think that should be a very specific project with a specific cost in the overall FLOS referendum so that the people that are gonna vote on that will know at least one of the projects in there does include this particular system from towers that the county's likely already built, and of course they're, they're making a yes or no vote on the entire referendum. But that might be the one thing that pushes them over the finish line to vote for it. They might not like the other projects, but they might specifically like the public safety radio projects and so they vote yes for that.
- 0:48:45
But I, I, I think, again, just to avoid confusion two years from now or whenever the case may be as, you know, this, this part of this board is up for a, a potential, um, change every two years, that this board is understanding what you're voting on today, which is in the packet specific to evaluating tower sites for P25 700/800 system.
- 0:49:10
So let me ask you this. Aren't we doing two things with this contract with this company? One of them is evaluating the tower sites and one of them is evaluating the current system?
- 0:49:21
That's right.
- 0:49:21
So why-
- 0:49:22
Task, task one and two
- 0:49:23
... why not separate these two right there and get them to evaluate the current system first-
- 0:49:28
Th-
- 0:49:28
... and make some kind of-
- 0:49:30
They're, they're doing that
- 0:49:31
... report on it?
- 0:49:32
They're, they're doing that.
- 0:49:33
That's, that's task four.
- 0:49:34
So-
- 0:49:34
That's the first one
- 0:49:34
... so if you'll, Philip, if you will turn to page, um, gray box 47, and I'll, uh, I'll swing to it over here on the screen too.
- 0:49:50
So you see their cost of service is at the top, the firm fixed price for task one and two. That's, that's why, uh, Mark has it broken down in the agenda cover. 36,178 for task one and two, which is evaluating, um, the, the current radio system to determine sustainability through 2030, along with identi- identifying any improvements that can be made with the county's existing equipment, especially in the underserved coverage areas. And then number two, determine where new site, tower sites should be located to provide optimal on-street and in-building 700 MHz coverage from, again, very specific to the Oconee Area Wide Radio System, or ORS, which we've talked about.
- 0:50:28
3.2 on, on, uh, your screen is a time and material not to exceed. It's different, right? We're asking the board... The ask of the board is to, just so we don't have to come, come back is, "Here's the total not to exceed cost." But the time and material not to exceed tests three, four, five, and six is, is that. It's a, it's a time basis, and they won't charge more than $95,000 for that part. So-
- 0:50:54
How'd we come up with these numbers?
- 0:50:55
Those are the, the dollar values?
- 0:50:58
Yeah, I mean the 36,000 and the 95,000.
- 0:51:00
That's what's proposed from the, from the firm.
- 0:51:01
If you look at the bottom of that page-
- 0:51:03
Is that what the company came up with?
- 0:51:04
If you scroll down, well scroll down to the bottom of this.
- 0:51:06
Yeah, get to their-
- 0:51:06
There's their, their breakdown of their s- their consulting fees are right there.
- 0:51:09
Yeah, I mean, I, I mean, like I said, they based that on previous...
- 0:51:15
That's right, other projects that they-
- 0:51:16
Other projects.
- 0:51:16
Um, same way, it's... Yeah, same way we do any project, project management. Um, they know about what it's gonna cost and, um, and then they, you have that not to exceed. Um, so basically they're gonna complete those. They're gonna complete what they said. So if you were to just look at the, you know, chief consultant at $300 an hour, you, uh, divide that by and you get X amount of hours, like just for simplicity sake. Whether they're gonna exceed that 95 or not, they have to produce the tasks that they say they're gonna produce in the agreement.
- 0:51:48
So obviously, you know, they, they do this. They're, they're for-profit companies. They're not gonna leave themselves short. Um, and it said not to exceed, so it won't exceed $95,000. It could be less than 95, depending on their actual, uh, time and material costs.
- 0:52:05
I gu- I guess what that, that does bring up a point or a question. If, if they're just going in to, uh, do 36,000, if it's to identify areas to improve the system, we don't have any idea what that's gonna cost.
- 0:52:24
No.
- 0:52:25
No.
- 0:52:25
The improvement of the system, no.
- 0:52:27
I mean, it could be, it could be a half a million dollars.
- 0:52:31
Could be.
- 0:52:32
We don't know. And I got, I was thinking maybe they could use the towers they're building, but that wouldn't make sense. They can't use the towers 'cause they won't be built. And-
- 0:52:42
Well, well they could. Well, I mean, part of it is, is the, the proposed location for the future system.
- 0:52:47
I know.
- 0:52:48
Is, is-
- 0:52:48
But I'm talking about enhancing the current system.
- 0:52:50
They will, but the towers would have to be built fir- Again, this is through 2030, so the towers would have to be built. Let's just say, hey, if we were to put additional VHF equipment on one of these new towers that we're gonna construct and it'll improve reliability of the current system, that's at an additional cost that will come in front of this board to say, "When the last tower is built," and by the way, we can improve, um, our radio communication by some percent, right? But it's gonna cost you this.
- 0:53:21
Then the determination of this board is to say, "Okay, it's, it's still temporary," right? Because you're gonna put something on referendum. I mean, there is a means to, to an end here, is we can spend interim, spend money, additional money, if this is what they recommend, to increase productivity of the system, all for if the voters approve in 2030, that at some point that equipment will not be needed.
- 0:53:44
And voters already approved during this FLOS for these upgrades, maintenance, whatever it is.
- 0:53:48
Correct.
- 0:53:48
When they come back and say, "We've got $5.4 million to do so," or five, $5 million to do so and an additional 5.4 in miscellaneous, that if this board decides that's more important than the well at the rec center or the, you know, uh, the fire station or whatever, then this board will make that decision.
- 0:54:06
That's right.
- 0:54:06
It was the, the maintenance was a much lower amount that was approved. He's just saying-
- 0:54:11
No, the maintenance was 5 million 95 and the undetermined projects was 5.4 million.
- 0:54:15
The, the maintenance approved in the original FLOS was like $1 million.
- 0:54:20
1 point, 1.5.
- 0:54:21
It wasn't no 5 million.
- 0:54:21
The voters didn't see what the, what, one point, what was-
- 0:54:25
It was-
- 0:54:25
The original budget.
- 0:54:26
They, they, they were... The, the, the referendum was, uh, $11,000,101 for public safety, and it listed the, the, uh-
- 0:54:38
Money
- 0:54:38
... the projects that'd be included in that. Each individual project didn't have a price tag on it in the referendum.
- 0:54:43
But, but it said-
- 0:54:44
We had, we had an internal budget-
- 0:54:46
Yeah
- 0:54:46
... of that $11 million.
- 0:54:47
But it, but it said maintenance. So when y'all internally allocated 1.5 million-
- 0:54:51
Well, no, it, it says public safety radio systems upgrade was the word on the referendum.
- 0:54:54
Okay.
- 0:54:55
But that, that 1.5 was an internal number that we had.
- 0:54:57
Right. Right. And it... And I know you can use more to build towers. That-
- 0:55:00
Yeah.
- 0:55:00
How long... If, if... All right, they do this consulting work. How long is this consulting work you think gonna take?
- 0:55:06
It's gonna take-
- 0:55:06
When, when will tower construction start?
- 0:55:09
I mean, it would be sometime next year. I mean, it would, it would, it would, it would... By the time they do the evaluation and come back, present their findings, and then by the time, uh, if we move forward, by the time we draft an RFP and put it out for bid and all that, I mean, it's, it, it's easily next summer, probably before-
- 0:55:25
So obviously, though, the 130,000 that was previously spent on upgrades, based on what Philip said and based on what I've heard from the fire chief and everybody, was it didn't do a whole lot. So whatever upgrades they recommend will probably cost more money, I would assume. That's just a, that's just an expense we'll have to incur to improve the system more.
- 0:55:48
I mean, any upgrade you do is gonna cost money.
- 0:55:50
It... Yeah.
- 0:55:51
Yes, Chief.
- 0:55:52
So the only thing that wasn't upgraded on this last touch were the microwaves. We know the microwaves need to be replaced. However, that is a very, very expensive part of the process and the equipment has a very, very long lead time. We didn't feel like it was necessary to take that step at this time because we were still kind of in limbo about exactly which way we're gonna go. So yes, we can build additional towers. We can reconfigure the current system where it should work much more, much, much better. But at the end of the day, it's a VHF system and it's only gonna go as good as it can go.
- 0:56:26
I realize. This is stopgap I, I realize-
- 0:56:30
At this point, yes, we can reconfigure. Right now we have one transmit/receive site and three receive only sites. We can build additional tower space. Somebody asked a question about where we might build a tower related to Hard Labor Creek State Park. Two sites we're looking at, station six and station 12 on either side of the park. Uh, also serves as a short micro top back to Morgan County's 911 center. But we can reconfigure from a hub-and-spoke to a, uh, circular design, which should increase the coverage.
- 0:57:01
So I guess that goes back to his original question. Did we effectively just waste that other money? 'Cause it didn't sound like it improved-
- 0:57:09
No. I mean, at the end of the day, we have new antennas, we have new repeaters that were out of service. What we did was in the event, in the unfortunate event when something happens, whether that be to a civilian, whether that be to one of our law enforcement officers, whether that be to one of our deputies, we have put the county in a position to say, "You know what? We didn't do anything to improve this radio system that we knew was horrible from the word go." Now we have. We've taken proactive steps to say, yeah, we did. We did some maintenance on the system.
- 0:57:39
And so we're not, we're not as liable to be
- 0:57:42
Thank you.
- 0:57:50
Thank you.
- 0:57:52
I'll entertain a motion, if anyone, further questions.
- 0:57:54
You go ahead.
- 0:57:57
Uh, well, you-
- 0:57:59
I motion we approve the-
- 0:58:02
Go with it
- 0:58:03
Consulting agreement.
- 0:58:04
Consulting agreement.
- 0:58:06
All right, got a motion. Do I have a second?
- 0:58:08
I'll, I'll, I'll second.
- 0:58:10
All right, got a motion and a second. Any further discussion? Hearing none, all in favor, please raise your right hand. Motion carries unanimously. None opposed. Next, we've got approval of equipment purchase for the new pumper and water tender. Is that you, Chief, or is that Mark?
- 0:58:27
That is the chief.
- 0:58:28
He said Mark.
- 0:58:34
I will say, as the chief comes up, that with the, the, the referendums specifically said three fire engines, uh, this, we've already got the three fire engines that they've received. They're encumbered, and this will finish up all the equipment for them. And, uh, it will come in, all three trucks will come in under our internal estimate for the three trucks.
- 0:58:56
Right.
- 0:58:58
Yeah, this is just the loose equipment that's got, required to be on the pumpers and the water tenders for ISO State of Georgia approval. Um, you may notice on the list there is no hose on there. That's because we got a grant to buy all the hose for these trucks.
- 0:59:12
Okay.
- 0:59:12
So that is mainly, uh, hand tools, water supply, water flow, uh, couple of items that we don't currently carry on the trucks so that we can better work with the City of Madison and their five-inch hose that they use. So, uh, that is equipment to go on the truck.
- 0:59:30
I- I've looked at these quotes and it's, it's obvious it's a little difficult 'cause like, uh, like Fire Line, they combine a lot of these things into one package. You know, like $5,000 worth of it's kinda broken out. Um, what is... Are any of these, all these companies very reputable companies, I'm sure, I'm assuming?
- 0:59:45
Oh, yeah.
- 0:59:45
Yeah.
- 0:59:45
They're, they're all vendors that we use very frequently. Um, some pr- some vendors are preferred vendors. 10-8 usually beats just about everybody on equipment. It's very hard for anybody to compete with them-
- 0:59:56
I've seen them, yeah
- 0:59:56
... because they sell so much equipment. Um, but, uh, we t- I, I do try to spread it around. You know, it's, it's... I'd be irritated if I was a vendor and I got calls to send quotes all the time and nobody ever bought anything from me. Um, so you know, I do try to spend it around, spread it around and be fair with all of our local folks. Fire Line's probably the closest to us.
- 1:00:19
Yeah.
- 1:00:19
And in a pinch, we do have to call them and we can go pick up equipment from them. But, um, that's, that's about it.
- 1:00:25
Anybody else out of, out of state except for Fire Line or Wander?
- 1:00:29
Uh, well, Fire Line's in Milledgeville and Wander, 10-8, uh, is out of state. They do have a local office. Um, Katz is in Alabama. Uh, but they're all fairly close to here.
- 1:00:43
Any questions for the chief?
- 1:00:46
I'll make a motion to approve the purchase of the required equipment for the pumper truck and water tender, not to exceed 40,000, funded from Splash 8.
- 1:00:56
Second.
- 1:00:57
Got a motion and a second. Any further discussion? Hearing none, all in favor, please raise your right hand. Motion carries unanimously.
- 1:01:03
No.
- 1:01:03
Can I ask chief-
- 1:01:03
Yeah
- 1:01:04
... a question about the, uh, the new training center out there? I know you use it a good deal out there. How, can you give us like a, a little update on that, how that's working?
- 1:01:11
So, um, we have been, uh, just about every night, uh, or every Tuesday night, we've got what we've designed what we call task force training, where we'll pull multiple companies from all over the county to kind of train together. Initially, we started out with companies that often don't see one another, and now we're kind of bringing that in to companies that work next to each other. City of Madison's been out, trained on it a time or two. Um, again, uh, one of the biggest, uh, I would say to date, uh, things that we got out of it, I'm sure you're all aware of the fire we had on Old Buckhead Road this past weekend.
- 1:01:46
Uh, had extremely long way to shuttle water, uh, had a very long driveway, and we've been working on what's called a rural hitch water supply, where you rotate tenders in and out rather than try to draft, and that really paid off in this last, uh, fire. So having the space to be able to do those kinds of things and spread out and get people, uh, has been a true benefit.
- 1:02:06
Thank you.
- 1:02:07
All right. Thank you, chief. I'll entertain a motion.
- 1:02:13
You already had one.
- 1:02:14
Oh, did I?
- 1:02:15
We already did.
- 1:02:15
Well, he just asked for comments.
- 1:02:16
I forgot what it was. Now property be surplused. Mark.
- 1:02:20
Thank you, Mr. Chairman. I attach the list of property that is, uh, no longer utilized, has been replaced, and, uh, seeking authority to, uh, declare it surplus. Uh, would like to note that the first item on there, the, uh, 2015 F-150, uh, City of Rutledge- I want that, and we've negotiated a, uh, price with them based on Kelley Blue Book trade-in value, so the, that truck will be, be sold to the City of Rockledge.
- 1:02:45
That was gonna be my only question. Is there anything that the cities or, or even, or other departments don't want us to get, you know, from the surplus? And now someone's coming to ask for a tractor we just got rid of, or- ... they're needing a bush hog, and we just sold it.
- 1:02:56
Well, we, uh, uh, we, we should be good on that, yeah.
- 1:02:59
Yeah.
- 1:03:03
I give that tractor and that bush hog to the sheriff also then we're out all these lawn mowers out there.
- 1:03:07
Yeah.
- 1:03:10
I don't know how much longer that tractor will last.
- 1:03:16
If there's no other questions, I'll entertain a motion.
- 1:03:18
I'll make a motion, uh, to approve the property to be declared a surplus.
- 1:03:24
Motion.
- 1:03:24
I second.
- 1:03:25
Second. Any further discussion? Hearing none, all in favor please raise your right hand. Motion carries unanimously, none opposed. All right, next we've got the county manager report, which I think Adam's already handed out to everybody.
- 1:03:37
Thank you, Mr. Chairman. A couple of things to, uh, go over. Public works, month of October, 38 new work orders entered, 29 completed. There's 19 pending in the system. Motor graders in the Fairplay area. Grass cutters are on round six in, uh, Godfrey. Probably, uh, coming to a, a close, uh, pretty soon, probably after this, this round. Um, yeah, we've... I think we've been a little fortunate. Well, fortunate/unfortunate, right? I mean, the, um, the drought is, is not good for a lot, but for right of way mowing, it's, it's good.
- 1:04:07
Um, we're usually nine rounds about this, uh, this time of year, and so we're only at six. So, um, we can certainly use some rain. But as it's getting colder, the grass will stop growing, so that's, uh, good. Intergreens over in the, uh, Apalachee area. Uh, road resurfacing, um, as I've reported over the past months, that project is, uh, complete. Um, we have had some issues with, uh, striping from our sub- from our contractor, really a subcontractor, but it's all under our contract with Pittman Construction. Um, and we have, um, very thoughtfully rejected all of the striping, um, on all of the roads that they, um, have done.
- 1:04:43
And Pittman has agreed to re-stripe all the roads at their cost, um, spring of, uh, '27. So as you know, they always put temporary striping down first. Um, and then after a cure period, they come back and they put high build paint down, um, which gives us some reflectivity and stuff like that. And if you happen on any of the roads in the evening times, it, it's, uh, very sporadic. Um, you see some of the temp striping, you see some of the high build, um, and there's just no consistency there. Um, so we've rejected all that work, and they will be doing that again in spring of '27.
- 1:05:14
Um, they also owe us, um, rumble strips in a, in a couple of areas, um, and a, and a couple that they're doing for us at, uh, at no cost. That was not in the original contract. That'll be, um, happening at that time as well. Uh, sorting facility, um, as I reported on, this is a recycling sorting facility, still awaiting EPD approval. But there is a, a, uh, level of communication between county engineering and EPD, and the process is ongoing. Uh, as far as, uh, elections, uh, go, today is, um, election day in the United States, and more importantly here in Morgan County, Georgia.
- 1:05:48
Um, we had 606,659 early voters. About 40% of our active registered voters, um, in Morgan County cast an early, uh, vote, which is a- about on, uh, target for where we were, uh, during our last, uh, general election. Uh, may- we're about a half, half a percent lower. Um, so, um, uh, folks in Morgan County are certainly utilizing the, um, the early voting process. Again, polls are open 7:00 to 7:00. And as of 9:30 this morning, we had over 650 voters, um, already voted on election day.
- 1:06:24
The only other two things I'll mention is, uh, the chief talked about this, um, just in his remarks. But, uh, we did have a, uh, pretty substantial, uh, fire on Old Buckhead Road, um, over the weekend that, uh, required response from, um, pretty much most of our stations, as well as the City of Madison. Um, and I believe Greene County, um, uh, came and assisted as well. Um, and one of the things that you heard the chief talk about, and if you... He posted a, a video on the, um, uh, fire department's Facebook page, was about what, what the resources that were needed, and, and certainly it was about, uh, shuttling water.
- 1:07:00
As we continue to talk about, um, in comp planning and where the, the county's going in the future, water sourcing is, is obviously always gonna be a topic of discussion, or pressurized water sourcing, um, makes, uh, things like that, um, easier. The fire departments did a great job. They were able to put a, uh, a, a good stop to a pretty significant, um, fire that was fully involved. And, and certainly we're very thankful that there was, uh, no injury or, or loss of life, um, as there were occupants inside the, uh, inside the structure that were able to get out.
- 1:07:32
It's, uh... We did just change our, our clocks back, uh, on Sunday. And, and that should always be a reminder to everybody, um, that that is the time that you wanna change the batteries in your smoke alarms. And there's no doubt that smoke alarms is, uh, probably what saved, um, the occupants' life in that fire. They heard the smoke alarms go off. They were able to get out. Uh, there was l- a loss to, uh, personal property and, um, uh, but, but thankfully nobody was, um, um, injured or, or killed. And then, uh, finally, um, as, as things circulate on Facebook, um, there was a, a partial building collapse, um, inside the, uh, town limits of Buckhead at, at Parks Mill and, uh, Bethany, um, not Bethany, um-
- 1:08:18
Baldwin Dairy
- 1:08:18
... Baldwin Dairy, um, over the, the weekend as well. Um, I wanna give, uh, uh, props to, um, our public works department. Um, they were, um, able to come out and assist. Certainly the sheriff's office was out helping with the traffic control and the f- fire department as well.
- 1:08:34
Um, this is a building that I believe's been discussed in, um, town council meeting, um, about the condition, and maybe some posted on Facebook about the condition, um, a few days before, uh, the collapse. Again, thankfully, um, at the time of the collapse, uh, of the building, um, no cars were passing by because if you saw any of the pictures on, um, on social media, um, the, the bricks did, uh, extend into the roadway quite a bit. Uh, and I believe we have, at least for the time being, have, uh, the, the initial concern of further collapse was, uh, taken care of, um, on that day.
- 1:09:08
And certainly I think it's something the property owners, um, and the town of Buckhead will be, um, taking up over the, the, the next days and weeks. That's all I have, Mr. Chairman. I'll answer any questions.
- 1:09:20
Any questions for Adam?
- 1:09:22
One question on the, uh, resurfacing. I mean, um, the striping. Is that just for the projects from this year?
- 1:09:29
Yes. That's just, just for, um, everything that was in the-
- 1:09:33
Recently done?
- 1:09:33
That's right.
- 1:09:34
Okay.
- 1:09:37
Well, thank you, Adam.
- 1:09:39
Yeah, sure.
- 1:09:39
All right. Next we have public comment on agenda items. Do we have anyone from the public that would like to come up and speak on anything that was on the agenda today? Yes, sir. Please state your name and residence.
- 1:09:52
Hello, my name is Travis Mumford. I live at 3250 Buckhead Road. I just have, uh, two comments on the, um, upgrading the radio system. The, uh, upgrading it, I definitely think that it should be included to connect to Wi-Fi 'cause, uh, all the metal buildings have a Faraday cage effect, so you don't get any cell service in there or much less of older radio system. And then a, uh, my other comment on it was if we're building more towers, I know we're having a consulting firm come out, I would, uh, consider asking them to look into maybe looking at water towers or existing cell towers, maybe renting space on those to prevent, maybe help the budget out a little bit.
- 1:10:31
Just use stuff that's already existing. I know we probably do need more towers, and nobody really gets good cell service in the county. So that's my two comments on.
- 1:10:40
Thank you, sir.
- 1:10:40
Yes, sir.
- 1:10:41
Yeah. All right, next we've got... Uh, anybody else from the public wanna speak on anything? All right, I'll close the public's, the, the public comment section, and we'll move on to commissioner comments. We'll start with Commissioner Jones.
- 1:10:54
Okay. Um, as, uh, Adam said, today is vote day. If you hadn't voted, please go out and vote. And I also, as Adam said, we're at 41% of people that voted early. So if you're like me, you're tired of seeing those TV commercials, so let's go out and vote.
- 1:11:11
That's right. That's right. And the, and the mailers. I know we're all tired of that. I got 15 text messages this morning, you know, telling me I need to get out. So, but to reiterate, very important to get out and vote. Make sure we're, you're, you're doing your part. Um, the, I haven't had any board meeting or any, um, any liaison meetings. I have the Board of Health meeting will be Monday, uh, the 9th, and I'll report back the next meeting. But other than that, everybody get out and vote. Ben?
- 1:11:37
I got a couple. Uh, JDA met last week. Uh, most stuff's pretty quiet right now. Still trying to sell, sell, still attempting to sell about 88 acres. Um, and when that is sold, uh, all that money, the county's portion will come to the county. There's, uh, the county spit the land's, uh, sales, so that's, uh, not, that'll have to be shared with other organizations. So that'll be good when we get some of that money. Um, the meta buildings, they hope to have all the final CEOs by the end of the calendar year, and that would be good, 'cause if it would, that would probably be another, uh, it'd probably be another amount, um, some more money that the county could add to the budget if, if that occurs.
- 1:12:28
It would have to get CO prior to December 31st for that to occur, so I'm not absolutely sure. Hospital, um, last week they honored Sarah Burbach for I think it was over 40 years of dedicated service. She had a very long and, and, uh, distinguished service with the, uh, with the hospital board. Uh, they continue to expand services and, uh, they're experiencing record revenue growth, so the hospital is doing well. Um,
- 1:13:01
last week the city of Bost- the city of Bostick City Council didn't meet yesterday, so I don't have anything there. But last week, the Bostick Veterans Plaza, they had a ceremony to honor local, uh, service men that l- that lived in the Bostick area that lost their lives in service to their country. Um, I'd just like to quickly name them. Floyd Jasper Colbert, um, World War I. Um, Isaac Robinson, World War I.
- 1:13:32
Asa Butler, World War I. Walter Henry Ruart, World War II. James Edward Wagoner, World War II. Paul Clifford Wagoner, World War II. They were brothers. Um, and many of y'all know Mr. Bob Wagoner who passed away several years ago, and that was, he, those were his older brothers. Tinsley Varner Landrum, Jr., World War II. William Shelton, Korea, and he was MIA, and I don't think ever really been, anything's been recovered, so he's MIA.
- 1:14:03
And Malcolm Gibbs in Korea. And they put a granite, uh, plaque there for them. And, um, if anybody has any loved ones that are from that area, um, they can also buy a brick or put a plaque out. But, uh, it was a, it was a nice service. It was, it was great to honor the people that have, uh, given the full measure for our country. And, um, that's all that I have.
- 1:14:31
I don't really have anything. I just wanna give out the condolences to, uh, Commissioner Jones for the passing of his cousin.
- 1:14:38
Thank you.
- 1:14:38
Yes, Commissioner.
- 1:14:42
Yeah. Um, first off, uh, uh, thank you to everybody with the building collapse, um, that got out and helped. Fire, sheriff's office, public works, thank you for the great work. Um, Chief Smith working mutual aid, uh, Sunday morning on the Buckhead Road fire. Um, outstanding job, uh, by the county, uh, I think. Uh, there wasn't, I mean, there was always a tender with water.
- 1:15:13
They did an outstanding job shuttling water. Um, and Bill, guess what? Volleyball three-peated the state championship. So congratulations to the high school volleyball team.
- 1:15:24
Great.
- 1:15:24
There you go.
- 1:15:27
All right. Thank you, commissioners. Uh, with that I'll entertain a motion to adjourn the meeting.
- 1:15:32
So moved.
- 1:15:33
Got a motion and a second. All in favor?
- 1:15:35
Aye.
- 1:15:36
We're adjourned. Thank you, everyone.