Skip to content
Georgia Commons
Menu

County: Bartow County

Bartow County Commissioner meeting, November 4, 2026

6 pages

These are the minutes as Bartow County Commissioner posted them, read from the file on its own website. Georgia Commons is independent and is not affiliated with Bartow County Commissioner.

Copy for LLM, View as markdown, and Send to AI use the Markdown version: the summary Georgia Commons wrote, under a heading that names it, then the record as posted. View raw is the record alone.

Records of this meeting

Each link opens the body's own website or meeting portal.

Summary

Written by an AI model (claude-sonnet-5-5) from the minutes below. It is not the record: the minutes are.

Commissioner approved four rezonings, including a Kroger store with ten conditions, plus a $6.7 million water plant contract and a Center Road development moratorium.

The sole commissioner held a public hearing on abandoning a section of Old Tennessee Highway at U.S. Highway 411, then approved a long agenda. He approved the road abandonment, a $6,731,445.00 contract for the Paga Mine Road Water Plant and Well Project, engineering task orders of $2,093,000.00 for the West Bartow Water Reclamation Facility, land purchases, and a temporary moratorium on development along the Center Road Corridor. He also approved four zoning applications: a wedding venue conditional use permit, a 107-townhome rezoning on Allatoona Gateway, an industrial rezoning on Highway 411, and a Kroger rezoning on Fire Tower Road with ten conditions. Other approvals covered alcohol license renewals, a grant application, Upper Payment Limit #27 for Townsend Park, and agreements for services and planning.

Topics taken up: Old Tennessee Highway abandonment; Kroger rezoning on Fire Tower Road; Allatoona Gateway townhome rezoning; Center Road Corridor moratorium; Paga Mine Road water plant contract; West Bartow Water Reclamation Facility; Townsend Park Upper Payment Limit; 2028 Comprehensive Plan update; Wedding venue conditional use permit; Surplus county property sale; Tire recycling agreement and amnesty event; Data center tax appraisal agreements.

Decisions the minutes record (15)

Each decision is followed by the sentence of the minutes that records it, copied word for word.

  1. Kroger rezoning of 27.38 acres at Fire Tower Rd. and SR 41 from A-1 to C-1, with ten conditions

    Adopted

    The minutes: “Having heard comments and concerns from those in attendance, Commissioner Taylor approved the application with the following conditions, adding that Kroger will pay for these conditions:”

    Read this item in the minutes

  2. Rezoning of 17.54 acres at 6870 Allatoona Gateway for a 107 townhome development

    Adopted

    The minutes: “He approved the application as presented.”

    Read this item in the minutes

  3. Rezoning and land use change of 123.51 acres on Highway 411 to industrial (BPD)

    Adopted

    The minutes: “Commissioner Taylor approved the application as presented.”

    Read this item in the minutes

  4. Conditional use permit for a wedding venue at 1414 Old Alabama Rd.

    Adopted

    The minutes: “Commissioner Taylor approved the request as presented.”

    Read this item in the minutes

  5. Temporary moratorium on development along the Center Road Corridor for a traffic study

    Adopted

    The minutes: “Commissioner Taylor issued a Temporary Moratorium on development along the Center Road Corridor in order to allow for the completion of a traffic study.”

    Read this item in the minutes

  6. Contract with Willow Construction for Paga Mine Road Water Plant and Well Project, $6,731,445.00

    Adopted

    The minutes: “A contract was awarded to Willow Construction, Inc. for the Paga Mine Road Water Plant and Well Project (Project # 26-55-04) in the amount of $6,731,445.00.”

    Read this item in the minutes

  7. Task Orders 26-1 and 26-2 with ESG Engineering for West Bartow Water Reclamation Facility, $2,093,000.00

    Adopted

    The minutes: “Commissioner Taylor approved Task Orders 26-1 and 26-2 with ESG Engineering, Inc. in the total amount of $2,093,000.00 to provide engineering-related services for the construction of the West Bartow Water Reclamation Facility.”

    Read this item in the minutes

  8. Abandonment of a section of Old Tennessee Highway connecting to US Highway 411

    Adopted

    The minutes: “Commissioner Taylor authorized the removal of a section of Old Tennessee Highway that connects to US Highway 411 from the County road system.”

    Read this item in the minutes

  9. Purchase of 124.317 acres at Taylorsville-Macedonia Road and US Highway 411 for recreation

    Adopted

    The minutes: “Commissioner Taylor authorized the purchase of 124.317 acres of real property located at Taylorsville-Macedonia Road and US Highway 411 for future recreational use.”

    Read this item in the minutes

  10. Purchase of 2.5 acres on Paga Mine Road for a potential water resource

    Adopted

    The minutes: “The purchase of 2.5 acres on Paga Mine Road for a potential water resource was also approved as presented.”

    Read this item in the minutes

  11. Master Consulting Agreement with Kimley-Horn for the 2028 Comprehensive Plan update

    Adopted

    The minutes: “Commissioner Taylor awarded Kimley-Horn Associates, Inc. a Master Consulting Agreement for the completion of the 2028 Comprehensive Plan update.”

    Read this item in the minutes

  12. Upper Payment Limit #27 agreement and fund transfer for Townsend Park Health & Rehabilitation

    Adopted

    The minutes: “Commissioner Taylor approved the agreement and transfer of funds as presented.”

    Read this item in the minutes

  13. CMAQ grant application for Manning Mill/SR 41 Roundabout Project with $170,000 local match

    Adopted

    The minutes: “An updated CMAQ Grant Application to apply for funding for the planned Manning Mill/SR 41 Roundabout Project was approved and authorized for submittal.”

    Read this item in the minutes

  14. Service Agreement with The Compassion Center for homelessness needs

    Adopted

    The minutes: “The Commissioner authorized a Service Agreement with The Compassion Center to address certain needs related to homelessness and at-risk of homelessness individuals in Bartow County.”

    Read this item in the minutes

  15. Master Planning Agreement with Croft & Associates for Manning Mill Park expansion

    Adopted

    The minutes: “A Master Planning Agreement with Croft & Associates for design and planning services related to the Manning Mill Park expansion was approved as presented.”

    Read this item in the minutes

Agenda items (4)

Found in the minutes by their headings. Where an outcome is shown, it was read by rule from the item's own words: a guide to the text, not part of the record.

  1. MINUTES
  2. PUBLIC HEARINGPublic comment
  3. MINUTESAdopted
  4. ZONINGA vote

Answers are written by AI from this document, and every quotation is checked against it. Not legal advice.

The minutes

As posted on www.bartowcountyga.gov, read November 25, 2026. Nothing below is written by Georgia Commons.

MINUTES

PUBLIC MEETING

BARTOW COUNTY COMMISSIONER

October 14, 2026 - 10:00 a.m.

PUBLIC HEARING

• Commissioner Taylor opened the meeting with a Public Hearing regarding the County’s proposed abandonment of a section of Old Tennessee Hwy. connecting to U.S. Highway 411.

County Administrator Peter Olson gave the following summary of the planned abandonment.

The abandonment was requested by the property owner, HAC Mixed Use Owner, LLC in order to allow for intersection improvements along Highway 411. They will tie the north side of the intersection back into the underpass once the improvements are complete. Although there are no other property owners that touch this section of the roadway, a representative for the Aubrey-Hines Corporation reached out to the neighboring property owners to discuss the plans for the closure and improvements. Mr. Roger Alexander of 101 Old Tennessee Highway (not an adjoining property owner), thanked the Commissioner and the Aubrey-Hines Corporation for re-opening that section of Old Tennessee Highway in the future once the planned intersection improvements are complete. There were no other comments. The Hearing was adjourned at 10:02.

MINUTES

• After calling the Meeting to order, Commissioner Taylor approved the minutes of the September 2nd Public Meeting and the October 9th Special Called Meeting as presented.

ALCOHOL LICENSES

• A total of eight 2027 Alcohol License Renewals were approved. A list of the approved licenses are attached.

ENGINEERING - MPO – ROADS

• An updated CMAQ Grant Application to apply for funding for the planned Manning Mill/SR 41 Roundabout Project was approved and authorized for submittal. The update includes the County’s local match requirements in the amount of $170,000 in the event the $680,000 grant is awarded.

FINANCE AND GOVERNMENTAL AFFAIRS

• Commissioner Taylor approved an agreement with Rep’d to provide an add-on interactive website search feature on the County’s website.

• Attorney for Townsend Park Health & Rehabilitation, LLC presented Upper Payment Limit # 27 for approval. As the owner of the facility, Bartow County qualifies for funding for improvements and operations of the facility through the Upper Payment Limit Program. UPL #27 will entitle Townsend Park to receive a total of $1,530,889.00 for facility improvements and medical related services, while Bartow County will receive $259,624.00. Commissioner Taylor approved the agreement and transfer of funds as presented.

• Professional tax appraisal agreements with J.F. Ryan Associates, Inc. and Lisa A. Hobart, LLC were approved as presented to provide professional valuation and consulting services related to Data Centers and related real and tangible personal property.

PROPERTY

• Commissioner Taylor authorized the removal of a section of Old Tennessee Highway that connects to US Highway 411 from the County road system. The abandonment is made at the request of the property owner, HAC Mixed Use Owner, LLC who owns the adjoining properties located on either side of the section of roadway being abandoned.

• Commissioner Taylor authorized the purchase of 124.317 acres of real property located at Taylorsville-Macedonia Road and US Highway 411 for future recreational use.

• The purchase of 2.5 acres on Paga Mine Road for a potential water resource was also approved as presented.

• The following items were deemed to be surplus County owned property and authorized to be sold on GovDeals Internet Auction Service or otherwise disposed of in accordance with the law:

o 4 mowers (Road Department) o 2004 Ford Super Duty Truck (Water Department) o 2017 Ford Transit Van (Recreation Department)

PUBLIC SERVICES

• Commissioner Taylor authorized an Ordinance amendment to Chapter 26 of the County Code related to reporting of automated external defibrillator locations. The Ordinance comes as a compliance with a State law that was passed last year requiring 911 to create a central registry of automated external defibrillators.

• A Master Planning Agreement with Croft & Associates for design and planning services related to the Manning Mill Park expansion was approved as presented. The County previously purchased 50 acres immediately south of the existing park and plan to add walking trails and other recreational features on the property.

• The Commissioner authorized a Service Agreement with The Compassion Center to address certain needs related to homelessness and at-risk of homelessness individuals in Bartow County. The Center also functions as a warming shelter on cold nights. The County has found that unsheltered individuals are resistant to taking refuge from the cold in a County-run facility when there are deputies present. They are more willing to go to shelters like the Compassion Center than to County facilities.

• A Tire Recycling Agreement with Liberty Tire Recycling, LLC to remove tires from the County’s landfill was approved as presented. Grant Lockman, Assistant Director of the Bartow County Solid Waste Facility also shared information on the upcoming annual Tire Amnesty Event that will take place the week of October 24th

-31st. Residents can bring as many tire as they want to the County landfill during the week at no charge. As a general rule, residents are allowed to bring 4 tires per year at no charge.

WATER & SEWER

• Commissioner Taylor approved Task Orders 26-1 and 26-2 with ESG Engineering, Inc. in the total amount of $2,093,000.00 to provide engineering-related services for the construction of the West Bartow Water Reclamation Facility.

• A contract was awarded to Willow Construction, Inc. for the Paga Mine Road Water Plant and Well Project (Project # 26-55-04) in the amount of $6,731,445.00.

ZONING

• Commissioner Taylor issued a Temporary Moratorium on development along the Center Road Corridor in order to allow for the completion of a traffic study. The County and the City of Cartersville have agreed to share in the cost of the study.

• Commissioner Taylor awarded Kimley-Horn Associates, Inc. a Master Consulting Agreement for the completion of the 2028 Comprehensive Plan update. A representative of Kimley-Horn presented a summary of their plan moving forward to complete the fourteen-month project.

• The following Zoning Applications were presented for Commissioner Taylor’s consideration and ruling:

o Z-26-00045: a conditional use permit request by Sydney Painter on behalf of the property owner for a wedding venue facility located on 38 acres at 1414 Old Alabama Rd. (Tax Parcel # 0033-1036-001). The Planning Commission recommended approval with a 4-1 vote. Ms. Painter presented the owners’ plans for the property to the Commissioner, noting that the property is zoned agricultural. The owners have made a few improvements on the property with the intention of using the property as a wedding venue. They have built a reception hall and there is an open-air chapel as well as a bridal suite. They still have some farm animals there as well. All of the fixtures they have built are at the back of the property, not near the road and not near the existing buffers on the property. They have hired a coordinator and have a contract in place to outline certain event measures/rules. If alcohol is served, security will be required. There is an 11:00 p.m. cutoff time for all music and for everyone to be off the property. Events will be heavily managed by the owner. The owner intends to eventually reside on the property to make sure it is being properly managed.

Commissioner Taylor approved the request as presented.

o Z-26-00042; a request by Gaskins & LeCraw to amend the Future Land Use Map and rezone 17.54 acres located at 6870 Allatoona Gateway (Tax Parcel #0116-0851-004) from Commercial-Mixed Use to Medium High Density Residential and from A-1 zoning to R-3 in order to place a 107 attached townhome development on the property. The Planning Commission recommended approval with a 4-1 vote. There were a number of registered speakers for the application. Speaker No. 1: Michelle McCauley, with Gaskin LeCraw, 1266 Powder Springs Road, Marietta provided a PowerPoint presentation of the planned development. Speaker No. 2: Lonnie Cox, 4500 Bartow Carver Road spoke in support of the development, stating that at the hearing he heard “spot zoning” but this is not spot zoning. It adjoins three mobile home communities, so it is already high density residential. This is too good an area.

It’s going to grow so what area are we going to grow in. We have developers that want to put nice homes in the area, so he thinks it’s a move in the right direction for us. Speaker No. 3: JoAnne Chitam, 4662 Creekside Drive, Acworth spoke in opposition to the development citing traffic concerns and road conditions. Their number 1 priority is the safety of the residents. That property is several miles from Highway 41, Highway 92, and either side of I-75. You may have mobile homes already, but you don’t have six mobile homes to an acre, which is what this would be.

Allatoona Gateway is still a narrow, two-lane, winding road with no shoulders. We still have drainage problems and dangerous drop-offs all along this corridor. We have dangerous drivers speeding and tailgating. This will only be made worse by the addition of several hundred vehicles and vehicle crashes are going to be inevitable.

She urged that the County make safety, not profits a priority and asked the Commissioner to think about our children that have to get on the buses and ride the buses. She can’t find anywhere along that corridor that is safe for the buses to stop.

She asked him to think about our adolescents. You have inexperienced, teenage brains, and road hazards. That is a recipe for disaster, catastrophic injury or death.

She asked him to think about the senior citizens who are traveling this corridor. She asked again that the County make safety, not profit a priority and deny the high-density rezoning. Speaker No. 4: Kevin Erisman, 18 Allatoona Woods Trail, Acworth, vice-president of the Allatoona Community Association, speaking on behalf of the Association, spoke in support of the development. The Association and Mr.

Cox have communicated, noting that Mr. Cox was reasonable in their expectations, and was willing to accommodate them. It is evident that development will happen in this area, so it is important to make those expectations known of what they want the community to be. He would like to present to Mr. Cox and the Commissioner the Association’s approval of the rezoning. Commissioner Taylor stated that there are three big mobile home parks in this community, so he feels this is an improvement.

There is traffic issues everywhere in the County. He thinks this is a step up in that area. He approved the application as presented. County Administrator Peter Olson added that the County makes extensive efforts to study the roads in the County. A county-wide study was just completed that identified a long list of intersections that need improvement. Anytime the County identifies a situation that needs to be addressed, we program in engineering, moving utilities, etc. and it’s a long process.

Shanice Amos, MPO Director stated that the staff has looked into constructing a roundabout at that intersection in the past. A number of residents have reached out to them about that. The MPO Committee is in the process of updating its 20-year plan, so once that process gets underway, we’ll be reaching out to residents for input to identify intersections and roadways that need to be considered for improvements.

o Z-26-00044; an application by Two Run Ranch II, LLC to amend the Future Land Use Map and rezone 123.51 acres on Highway 411 (Tax Parcel #0048-0255-001). If approved, the property will be changed from Residential/Mixed Use to Industrial on the Future Land Use Map and rezoned from A-1 to BPD in order to combine the property with the owner’s property to the north to be potentially combined for future marketing purposes and to be consistent with the adjoining land uses. The property is adjacent to the battery plant. The Planning Commission recommended approval with a 5-0 vote. Attorney Keith Lovell, 102 Leake St., Cartersville, representing the applicant presented details of the request. Commissioner Taylor approved the application as presented.

o Z-26-00043; an application by The Kroger Company to rezone 27.38 acres at the intersection of Fire Tower Rd. and SR 41/Joe Frank Harris Pkwy. (Tax Parcel # 0059C-0001-001) from A-1 to C-1 for a commercial marketplace development. The Planning Commission recommended approval with a number of conditions. There were several registered speakers for the proposed development. Speaker No. 1: Josh Suess, 3155 Royal Drive, Alpharetta, speaking as a representative for The Kroger Company, provided a PowerPoint presentation of the planned development. The plan is for a 99,000 sq. ft. store that would employ 250-300 employees, slated to open in 2028. The development will include a gas island, a pharmacy drive-through and several outparcels along Fire Tower Road. Speaker No. 2: Trevor Evans, 3460 Preston Ridge, Alpharetta, explained the design and planned road improvements along SR 41 and Fire Tower to provide access to the development. Sidewalks will be included in the project. Speaker No. 3: Gerald Thompson, Big Canoe, GA deferred.

Speaker No. 4: DeVaughn Pettit, 548 West Main Street, Cartersville deferred.

Speaker No. 5: Jim Andrews, 11 Pettit Circle, spoke of his concerns for the planned development, stating that five years ago, the original application for the property stated that this would be a market style grocery store, but this is anything but a market style grocery store. This will forever change the community, schools, recreation, neighborhoods, families, the fire station and the post office as well. He asked that the Commissioner protect the neighbors that make this community their home. This should not be abused by development. If the request is approved, he asked that the conditions included by the Planning Commission be included in the approval, as well as some conditions that will be requested by Pettit Circle neighbors. In particular, he requested that Kroger not have access to Fire Tower Road until it is improved from Highway 41 to the Hamilton Crossing intersection. Speaker No. 6: Gloria Shinall, 167 Gaddis Road, stated that she and other residents are gridlocked every day. They are trapped in the neighborhood due to the traffic on Fire Tower Road. This mega store will create 3-4 times more traffic. This is not fair to the residents that live here.

She asked that Fire Tower Road be widened from Highway 41 to Hamilton Crossing Road before any construction occurs. Speaker No. 7: Lawson Crowe, 14 Sweet Gracie Hollow, stated that this doesn’t fit in with the area. The 2021 development stated there would be no gas station there and no other commercial development.

Speaker No. 8: Ronnie Nix, 151 Gaddis Road, stated there needs to be some improvements to Fire Tower Road. He believes there is a proposed roundabout project at Hamilton Crossing and Fire Tower Road. These improvements need to take place before construction begins. There does not need to be two access points from Fire Tower Road to the development. One of the conditions the Planning Commission placed on the application is for road improvements to Fire Tower Road, but it doesn’t define what these road improvements should be. He provided the Commissioner with a detailed drawing of suggested improvements. (Mr. Nix is a retired engineer with GDOT.) The drive should be moved back to Akin Road, and left and right turn lanes should be added. Speaker No. 9: Dee Andrews, 11 Pettit Circle, stated that the residents of Pettit Circle are positioned in the middle of a huge land disturbance. They don’t see the need for this mega development. There is a grocery store within three miles. Kroger will destroy their neighborhood. It will destroy property values and quality of life. She presented the Commissioner with a list of requested conditions by the residents of Pettit Circle. She added that these conditions are the least they could do for the destruction of property values and quality of life.

Speaker No. 10: Dr. David McKalip, 39 Johnston Road, opposed the development without more conditions being placed on it. He asked the Commissioner to table the application or refer it back to the Planning Commission because there is a lot of work that needs to be done on this. He asked that 1) no large truck deliveries on Fire Tower Road; 2) a 4-lane divided highway on Hwy. 41 with turn lanes; 3) a traffic light should be installed at Cassville Road and Hwy. 41. 4) Kroger should pay for at least half of the road improvements; 5) Kroger should also address drainage improvements; 6) there should be no construction of out parcels until road improvements are done. Having heard comments and concerns from those in attendance, Commissioner Taylor approved the application with the following conditions, adding that Kroger will pay for these conditions:

1. No non-emergency access to Fire Tower Road until road improvements are completed.

2. Neighborhood Commercial uses only allowed on Commercial Outparcels noted on the Conceptual Plan, with exception of minor auto repair/tire shops with no outdoor storage.

3. Green barrier within 50’ buffer around adjacent residentially used properties. Green Giant Arborvitae or other evergreens that grow to a minimum of 30’ high when mature.

4. In addition to the 50 ft. buffer on the western property line, an additional 50 ft. is restricted to light poles no higher than 10 ft. Additionally, all site lighting shall be directed downward onto the site, whether on the exterior of buildings or in parking areas.

5. No construction before 7 AM or after 8 PM.

6. Along the North end of Pettit Circle, a gate similar to the gate at the South end of Pettit Circle, must be erected by December 1, 2026.

7. Clearly marked emergency/delivery/mail access to properties on Pettit Circle, during construction and after.

8. North entrance on Fire Tower Road must align with Akin Road. Entrance at Joe Frank Harris Rd must align with the entrance to the Board of Education property.

9. County Engineering staff will work with Kroger representatives and local citizens to determine what upgrades are required on Fire Tower Road to accommodate the additional traffic generated by the development, including the section north of the Kroger property to Hamilton Crossing Road.

10. Developer must monitor stormwater runoff for potential negative affects to neighboring residential properties. Developer must provide owners of residential properties a contact for any complaints regarding stormwater runoff.

Having no further business to address, the meeting was adjourned at 11:08 a.m.

On File Kathy Gill, County Clerk

APPROVED:

On File Steve Taylor, Sole Commissioner 11/4/2026 Date