Skip to content
Georgia Commons
Menu

County: Cobb County

Cobb County Board of Commissioners public hearing, November 17, 2026

Georgia Commons holds no minutes of this meeting. Georgia Commons is independent and is not affiliated with Cobb County Board of Commissioners.

This is a machine transcript made by Georgia Commons from the body's public recording. It is not an official record, it can mishear words, names, and numbers, and it does not say who is speaking. The recording is what was said.

Copy for LLM, View as markdown, and Send to AI use the Markdown version: the summary Georgia Commons wrote, under a heading that names it, then the record as posted. View raw is the record alone.

Records of this meeting

Each link opens the body's own website or meeting portal.

Summary

Written by an AI model (claude-sonnet-5-5) from the machine transcript below. It is not the record: the recording is what was said.

Commissioners passed a consent agenda, approved a 249-unit apartment rezoning 3-2, and withdrew, denied or continued several contested cases.

The Cobb County Board of Commissioners zoning hearing began with a revised consent agenda that passed 5-0, then took up contested cases. A flooring business rezoning and special land use permit on Ernest Barrett Parkway were withdrawn without prejudice after a long, tense discussion. The board approved two single-family and home-business rezonings, and approved a 249-unit apartment rezoning at Atlanta Road and I-285 by a 3-2 vote over traffic and school concerns. Several vehicle permits were decided: one denied with a compliance deadline, one held to December 15, one approved with conditions. A pool buffer encroachment was denied, one other business item was continued and another withdrawn.

Topics taken up: consent agenda zoning cases; flooring business rezoning withdrawn; Powder Springs Road single-family rezoning; apartment rezoning Atlanta Road I-285; vehicle permits and parking; group home capacity denial; pool buffer encroachment; school capacity concerns.

What the meeting took up, as said in the recording (13)

Each account is part of the AI-written summary of the machine transcript, not the record. The time opens the transcript below where the matter is taken up.

  1. Consent agenda of rezonings, land use permits and other business items

    0:01:03

    Staff read the consent cases. No one opposed most of them. Z-50 was withdrawn and other business item 57 was pulled for opposition. On a vehicle permit, the applicant said two cars had been removed, and a commissioner asked that Code Enforcement verify it. One commissioner struck a condition limiting farm animals to one applicant on other business item 52. The revised consent agenda passed 5-0.

  2. Flooring business rezoning on Ernest Barrett Parkway and waste transfer permit withdrawn

    0:20:25

    The applicant and owners asked to keep a home-based flooring business with two small vans, saying they would remove larger trucks and dumpsters. Residents opposed, citing the future land use plan, traffic at level of service F, runoff, property values and precedent. A commissioner questioned the applicant about a business license, and the chair called a recess, later criticizing the questioning as antagonistic. A commissioner proposed denial with a December 31 cleanup deadline, but without a second. Staff said a land use permit might fit the remaining needs. The applicant agreed to withdraw without prejudice, and both Z-48 and SLUP-10 withdrawals passed 5-0.

  3. Rezoning for 13 single-family homes on Powder Springs Road

    1:33:16

    The applicant's representative described 13 homes on 5.6 acres across from a middle school, with an updated stipulation letter. A school district speaker said the zoned high school is over capacity. The district commissioner noted nearby schools have room and that the packet figure was higher than the testimony. The motion to approve with the stipulation letter and construction hour limits passed 5-0.

  4. Rezoning on Powder Springs Road for home and appliance storage business

    1:44:29

    The applicant described a high-end appliance business run by appointment from the owners' home, with a storage building, fencing and landscaping. A neighbor raised an unresolved property line survey with leftover survey pins. The applicant said deliveries would be once or twice a month and a letter to the neighbor was entered into the record. The motion to approve added evergreen trees along the fence and passed 5-0.

  5. Group home capacity increase denied after applicant no-show

    2:08:23

    The applicant was absent, also absent at the Planning Commission, which denied it. The district commissioner moved to deny, noting a group home of three or four residents remains possible with sprinklers. It passed 5-0.

  6. Permit for extra vehicles denied with prejudice, cleanup deadline set

    2:10:52

    The applicant did not appear for the second time. Four residents were opposed, and one asked about a timeline. The commissioner moved to deny with prejudice and add a clerk's note requiring compliance by December 18, 2026. It passed 5-0.

  7. Vehicle and adult permit held while driveway parking solution sought

    2:16:16

    The applicant, with an interpreter, sought five cars after being unsure whether her concrete pad needed a permit. A resident opposed. A transportation official said the pad needed a permit and the second driveway could not be permitted, suggesting widening the existing driveway. The commissioner proposed a site visit and holding the case to December 15. It passed 5-0.

  8. Continuance of other business item 57 over fence encroachment

    2:42:00

    The district commissioner said a fencing and encroachment issue with the neighbor needed resolving and moved to continue to December 15. It passed 5-0.

  9. Permit for three vehicles and four adults at Olive Springs Road home

    2:44:46

    A tenant asked to keep three vehicles for work. A neighbor opposed, citing blocked streets, trash and house size. Staff said the house size would allow two adults and two cars. The commissioner moved approval for one year with the driveway extension brought into compliance within 60 days. It passed 4-1.

  10. Reconsidering fence condition on livestock variance (other business 52)

    3:10:32

    After reconsidering, the board amended the condition so only the eastern line requires a privacy fence, since neighbors wanted an open fence on the northwestern side. It passed 5-0.

  11. Apartment rezoning of county-owned site at Atlanta Road and I-285

    3:13:07

    The developer's representative proposed up to 249 apartment units (reduced from about 350), four stories facing the road, and said its traffic trips were lower than a hotel or office. Neighbors and a nearby business said U-turns and traffic were concerns and wanted a DOT study. A school district speaker said the elementary school is over capacity. The commissioner moved approval with a hard cap of 249 units and limits on two-bedroom units. It passed 3-2.

  12. Pool encroachment into undisturbed buffer denied

    4:43:45

    Homeowners and a pool contractor asked to encroach about six feet into a buffer. Staff recommended denial. The commissioner moved to deny, saying allowing it would set a precedent, and suggested working with permitting on a smaller plan. It passed 5-0.

  13. Private road and gate request withdrawn (other business 55)

    4:50:29

    Staff said the applicant no longer needed the private road or gate. The applicant asked to withdraw without prejudice, and the motion passed 5-0.

Answers are written by AI from this document, and every quotation is checked against it. Not legal advice.

Machine transcript

This is a machine transcript made by Georgia Commons from the body's public recording. It is not an official record, it can mishear words, names, and numbers, and it does not say who is speaking. The recording is what was said.

1,525 turns.

Open the recording on www.youtube.com. The recording opens on the site where the body published it. Nothing is played on this page.

  1. 0:00:24

    Okay, let the record show there's twenty-five people here opposed to rezoning case Z forty-eight and SLEP ten. Can I get a show of people here who are in support of this rezoning case? Please stand up, raise your hand. So we got two in support.

  2. 0:00:40

    And the opposition?

  3. 0:00:40

    Twenty-five. All right, we have twenty-five opposed and two in support. So we hear that one in its regular order. And Madam Chair and board, I'm ready to start the consent agenda.

  4. 0:00:53

    Please do. Thank you.

  5. 0:01:03

    Okay, first case, uh... Oh, excuse me. Cobb County Board of Commissioners zoning hearing consent agenda for November seventeenth, twenty twenty-six. First case on consent is rezoning case Z thirty-nine, Penland Development LLC request a rezoning from GC to RRC for multifamily residential in land lots seven twenty-one and two oh nine of the sixteenth and twentieth districts respectively. Uh, the property is located at the northern terminus of Lodge Road, east of Groves Chapel Road. The planning commission recommends approval of Z thirty-nine to the RRC zoning district, subject to, uh, staff department, uh, comments, uh, and recommendations.

  6. 0:01:44

    Uh, not zoning. Uh, the applicant is present. Is there anyone here opposed to rezoning case Z thirty-nine?

  7. 0:01:54

    Okay, let the record show there's no one opposed.

  8. 0:02:01

    Next case is rezoning case Z forty...

  9. 0:02:07

    Oh, Z forty-six. Uh, Jacobed Robes, uh, Aerolanzes, uh, request a rezoning from CF to R15 for a single-family residential, uh, house in land lot two twenty-four of the seventeenth district. The property is located on the north side of Osborne Road, west of Austell Road. The planning commission recommends approval of Z forty-six to the R15 zoning district, subject to the following conditions. Number one, reduction of front setback to fourteen feet for the existing footprint only.

  10. 0:02:42

    Number two, driveway to be paved with review by the Department of Transportation. Number three, fire department comments, recommendations. Number four, water and sewer division comments, recommendations. Number five, storm water management division comments, recommendations. And number six, Department of Transportation comments and recommendations. Is the applicant present?

  11. 0:03:04

    Uh, the applicant is here. Is there anyone here opposed to rezoning case Z forty-six?

  12. 0:03:11

    Okay, let the record show there's no one opposed. Rezoning case Z forty-seven, Warehouse Space Acquisitions LLC request rezoning from CRC to LI for, uh, small business warehouse spaces in land lot two oh eight of the twentieth district. The property is located on the northwest side of Cobb Place Drive and on the east side of Cobb Place Boulevard, west of Roberts Boulevard. The planning commission recommends deletion of Z forty-seven to the CRZ zoning district, subject to the following conditions. Number one, site plan received by the zoning division on September third, twenty twenty-six, with the district commissioner approving minor modifications.

  13. 0:03:48

    Number two, this applicant and use only to be permitted alongside CRC permitted uses. Number three, no, uh, outdoor storage on site except for parking of vehicles. Number four, all vans and trucks to be parked on the north side of the property. Number five, fire department comments, recommendations. Number six, water and sewer division comments, recommendations. Number seven, storm water management division comments, recommendations. And number eight, Department of Transportation comments, recommendations.

  14. 0:04:18

    The applicant is present. Is there anyone here opposed to rezoning case Z forty-seven?

  15. 0:04:27

    Okay, let the record show there is no one opposed. Next case is rezoning case Z forty-

  16. 0:04:31

    John, Commissioner Campbell would like to add something.

  17. 0:04:34

    Oh.

  18. 0:04:34

    John, we also had, um, a submission by their representative, another stipulation letter dated November twelfth, twenty twenty-six, that we need to include as part of the minutes.

  19. 0:04:46

    Okay, and that's the letter from Ellen Smith.

  20. 0:04:47

    Yes.

  21. 0:04:48

    Okay.

  22. 0:04:53

    All right.

  23. 0:04:54

    Thank you.

  24. 0:04:55

    Next case is rezoning case Z forty-nine. Juan Carlos, uh, Aguirre Flores and Erick Sebastian request a rezoning from R-20 to NRC for a grocery store in land lot two seventy-seven of the seventeenth district. The property is located on the north side of Padmill Road, east of Dink Lane. The planning commission recommends approval of Z forty-nine to the NRC zoning district, subject to the following conditions. Number one, hours of operation to be from eight AM to eight PM.

  25. 0:05:26

    Number two, the metal structure shall be removed from the property, thereby eliminating the req- the request for setbacks. Number three, for grocery store use only and other, uh, existing tenant in suite B use. Uh, number four, revised site plan to include the enclosed dumpster location by the November seventeenth, twenty twenty-six Board of Commissioners zoning hearing. And number five, staff comments and recommendations. Is the applicant present? Okay, applicant is here. Is there anyone here opposed to rezoning case Z forty-nine?

  26. 0:05:59

    Okay, let the record show there's no one opposed.

  27. 0:06:04

    Z-50. Um, all right, next case is rezoning case Z-53. Jenna Singleton requests a rezoning from LR to CRC for a wellness center in Lot 349 of the 17th District. The property's located on the east side of Old Concord Road, north of Patt Mill Road. The Planning Commission recommends deletion of Z-53 to the NRC zoning district, subject to the following conditions. Number one, for this applicant's use only, or other neighborhood retail uses. Number two, district commissioner approval required for final site plan, which shall demonstrate adequate parking facilities and proper buffering adjacent to adjoining residential properties.

  28. 0:06:43

    Number three, no automotive uses. Number four, Fire Department comments and recommendations. Number five, Transport- Department of Transportation comments and recommendations. Number six, Stormwater Management Division comments and recommendations. And number seven, Water and Sewer Division comments and recommendations. Is the applicant present? Uh, the applicant is here. Is there anyone here opposed to rezoning case Z-53?

  29. 0:07:08

    Okay, let the record show there is no one opposed. And moving into land use permits on the consent agenda. First case is LUP-19. Mario Abbott requests a temporary land use permit to allow more vehicles than the code allows in Lot 779 of the 16th District. The property's located on the southeast corner of Boyd Road and Addison Road. The Planning Commission recommends approval of LUP-19 for 24 months, subject to the following conditions. Number one, applicant to provide status report to the board at the November 17th, 2026 Board of Commissioners hearing regarding installation of a fence pursuant to documentation pictures presented.

  30. 0:07:46

    Number two, approval of five vehicles to be parked outside. And number three, two vehicles to be removed from the property by November 17th, 2026, uh, BOC zoning hearing. Is the applicant present? Applicant is here. Is there anyone here opposed to LUP-19?

  31. 0:08:03

    Okay, let the record show there is no one opposed. And Madam Chair and board, um, regarding stipulation number one, uh, the applicant does have a contract to install the fence, uh, on one side of the property.

  32. 0:08:14

    Okay, thank you. Commissioner Birrell?

  33. 0:08:15

    No, that's it.

  34. 0:08:16

    Okay, never mind.

  35. 0:08:17

    There were, thought there were two things-

  36. 0:08:19

    Use your mic

  37. 0:08:19

    ... that, um, they were have to, to have by today. Have both, both been submitted, the fence and-

  38. 0:08:28

    Uh, all I have in my notes, Commissioner, is the, the fencing along, I think, uh, Boyd Drive, Boyd Road.

  39. 0:08:35

    Okay.

  40. 0:08:37

    I thought you-

  41. 0:08:37

    Those two cars will be removed

  42. 0:08:40

    ... I thought you read two things in the record for today, but-

  43. 0:08:44

    Well, it, he agreed to remove two of the cars-

  44. 0:08:46

    Right

  45. 0:08:46

    ... before today.

  46. 0:08:47

    And that's been done. Has that been done?

  47. 0:08:51

    Yeah.

  48. 0:08:51

    Yes. Applicant says it is done.

  49. 0:08:52

    Okay.

  50. 0:08:57

    All right?

  51. 0:08:58

    Great. You know, as long as Code Enforcement verifies that.

  52. 0:09:02

    Yes.

  53. 0:09:03

    Okay. Thank you.

  54. 0:09:05

    All right. You're welcome.

  55. 0:09:06

    Code Enforcement isn't here. Um.

  56. 0:09:08

    No.

  57. 0:09:09

    So we'll have to relay.

  58. 0:09:09

    Y- Yolanda's not here today.

  59. 0:09:11

    Okay. But just ask if someone can relay that to Code Enforcement.

  60. 0:09:14

    Okay.

  61. 0:09:15

    Yeah.

  62. 0:09:16

    All right, next case is LUP-36. Jennifer Vasquez requests a temporary land use permit to allow more adults and vehicles than the code allows in Lot 557 of the 19th District. Property's located at the northwest corner of Woodley Road and Calla- Callaway Road. The Planning Commission recommends approval of LUP-36 for 24 months. Is the applicant present?

  63. 0:09:40

    Is the applicant here for LUP-36, Jennifer Vasquez? Is there anyone here opposed to this case?

  64. 0:09:49

    Uh, Madam Chair and board, she is not here. Uh, we can give her a call.

  65. 0:09:53

    Okay.

  66. 0:09:53

    Okay.

  67. 0:09:53

    Unless you just wanna keep it on consent, since there's no opposition and no changes.

  68. 0:10:00

    Yeah, we can do that.

  69. 0:10:00

    Okay, just leave it on consent.

  70. 0:10:02

    Okay.

  71. 0:10:02

    All right.

  72. 0:10:03

    Okay.

  73. 0:10:03

    Thank you. Okay, uh, next case is LUP-37. Carol J. Hicks Vargas and Michael E. Vargas request a temporary land use permit renewal to allow more adults and vehicles than the code allows in Lot 80 of the 16th District. The property's located on the south side of Rocky Top Court, north of Watkins Glen Drive. The Planning Commission recommends approval of LUP-37 for 24 months, subject to the following conditions. Number one, maximum of seven related adults and six vehicles.

  74. 0:10:34

    Number two, all vehicles to be parked in the driveway. Uh, no parking on the street. Is the applicant present? Uh, applicant is here. Is there anyone here opposed to LUP-37?

  75. 0:10:48

    All right, let the record show there's no one opposed. LUP-38, Norma F. Ortega, uh, Victoria O, uh, Maciel, and Miguel Maciel, uh, Neto request a temporary land use permit renewal to allow more vehicles than the code allows in Lot 75 of the 16th District. The property's located at the terminus of Tate Creek Court, west of Bells Ferry Road. The Planning Commission recommends approval of LUP-38 for 24 months, subject to the following conditions. Number one, maximum of five related adults.

  76. 0:11:19

    Number two, maximum of five vehicles at the residence, four to be parked outside the driveway and one in the garage. Number three, no vehicles can be parked on Tate Creek Court. And number four, staff comments and recommendations not otherwise in conflict. Is the applicant present? Okay, applicant is here. Is there anyone here opposed to LUP-38?

  77. 0:11:42

    All right, let the record show there's no one opposed. SLUP-8, Rick Coleman requests a special land use permit to allow firewood splitting and storage in Lot 899 of the 17th District. The property's located on the west side of Olympic Industrial Drive, south of Plant Atkinson Road. The Planning Commission recommends approval of SLUP-8, subject to the following conditions. Number one, ongoing communications with Georgia Power to ensure the occupier conforms to the, to the easement requirements. And number two, staff comments and recommendations.

  78. 0:12:14

    Is the applicant present? Uh, applicant is here. Is there anyone here opposed to SLEP8?

  79. 0:12:23

    Okay, let the record show there is no opposed. And moving into other business cases on the consent agenda. First case is other business, item number 49 of 2026, which is to consider a reduction in required public rear frontage from 75 feet to zero feet for tract two, and a front setback variance, uh, to 30 feet from 45 feet for Zach Munoz. The property is located on the north side of Pickens Road in land lots, land lots 141 and 156 of the 19th District.

  80. 0:12:54

    The st- uh, staff recommends approval subject to the following conditions. Number one, tract two to have no public rear frontage with a front setback of 30 feet. Number two, no further subdivision of the property. And number three, fire department comments and recommendations. Is the applicant present? Uh, the applicant is here. Is there anyone here opposed to other business item number 49?

  81. 0:13:18

    All right, let the record show there is no one opposed. The next case is other business item number 52 of 2026, which is to consider a lot size reduction for livestock, uh, farm animals from required two acres to 1.84 acres, and other variances for Claudia Bryce. The property is located on the east side of Ewing Road, south of Beecher Drive in land lot 1012 of the 19th District. Staff recommends approval subject to the following conditions. Number one, deny, uh, variance request from a 100 feet to 13 and a half feet, as the barn no longer exists on the site.

  82. 0:13:54

    Number two, farm animals shall be restricted to two horses or two ponies or one of each. No other farm, farm animals are permitted on the property, uh, except any by right. Number three, the applicant shall store manure in a covered container or bin located away from the property lines and drainage ways. It shall not be, uh, become a nuisance to the neighbors. Number four, uh, the applicant shall maintain ground cover and pasture areas to prevent s- uh, soil and manure from washing onto neighboring properties or public roadways.

  83. 0:14:26

    Number five, applicant to install a privacy fence, uh, along the northwestern and eastern property line and shall be 10 feet from the property line. Number six, replace damaged wood planks on the shed near the northwestern property line. Number seven, elevations to... Uh, excuse me, uh, elevations to be to the converted garage structure shall be in conformity with the neighboring properties, the district commissioner to approve the final elevations. Number eight, the use of farm animals at the subject property is for this applicant and this applicant only.

  84. 0:14:58

    And number eight, all other staff comments and recommendations that otherwise in conflict. The applicant is present. Is there anyone here opposed to other business item number 52?

  85. 0:15:09

    Uh, there is no one opposed.

  86. 0:15:11

    Just one modification to the conditions to strike number eight, the use of farm animals at the subject property is for this applicant and this applicant only. I think we have a fair amount of guardrails in place where we can remove that condition.

  87. 0:15:24

    Okay, thank you.

  88. 0:15:25

    Thank you.

  89. 0:15:28

    Okay. All right, next case is other business item number 56 of 2026, which is to consider a site plan and stipulation amendment for John Morris and, uh, Maris, uh, Pentels regarding rezoning application Z59 of 1996. The property is located on the west end of Timemore Court in land lot 745 of the 17th District. Staff recommends approval subject to the following conditions. Number one, site plan review comments. Number two, site plan showing the lot combination received by the zoning division on September 29th, 2026.

  90. 0:16:03

    And number three, all previous stipulations not in conflict remain in effect. Is the applicant present? Uh, the applicant is here. Is there anyone here opposed to other business, uh, uh, to other business item number 56?

  91. 0:16:18

    Okay, let the record show there's no one opposed. And last item on consent is other business item number 57 of 2026, which is to consider a lot size reduction for livestock farm animals from, uh, required two acres to 1.299 acres, and other accessory structure variances for Jordan G. Miller. The property is located on the south side of Old Billerica R- uh, Old Billerica Road, south of Reese Road in land lot 609 of the 19th District. Staff recommends approval subject to the following conditions.

  92. 0:16:51

    Number one, site plan received by the zoning division on October 5th, 2026. Number two, maximum of six farm animals, livestock on the property. Is the applicant present? Uh, the applicants are here. Is there anyone here opposed to other business item number 57? Uh, one-

  93. 0:17:08

    My name is Chris Brown and-

  94. 0:17:09

    Ma'am, this is, this is not a time for you to... It's, you're either opposed, and if you're opposed, just raise your hand.

  95. 0:17:15

    Yes, opposed.

  96. 0:17:16

    All right, thank you.

  97. 0:17:17

    Okay, we w- want opposed, so we'll pull that one off consent and put it in its regular order, Madam Chair and Board.

  98. 0:17:21

    Okay, thank you.

  99. 0:17:24

    And with that, that completes the consent agenda, Madam Chair and Board.

  100. 0:17:27

    Thank you, John. Um, just clarification, Z50, we are continuing?

  101. 0:17:33

    Z50 has been withdrawn.

  102. 0:17:34

    It's withdrawn? Okay, thank you. So that's the only other change I have is Z50, and then other business 57 will actually be heard.

  103. 0:17:48

    Th- th- that's on regular, Jane.

  104. 0:17:49

    Z28 is not on consent.

  105. 0:17:51

    Sorry.

  106. 0:17:52

    Mm-hmm.

  107. 0:17:56

    Is that all you have, John?

  108. 0:17:57

    Yes, ma'am.

  109. 0:17:58

    Okay. With that, commissioners, I move that we approve the consent agenda as it has been revised.

  110. 0:18:03

    Second.

  111. 0:18:04

    Is there any discussion? Call the question. The motion carries 5-0. For those of you in the audience who are here, of any of those cases that have just been approved, you are welcome to leave at this time. They include all of the cases that have been read except for Z-50 for William Aaron Hudson, which has been withdrawn, and also other business item 57 for Jordan Miller, which we will hear today. Every other matter c- um, again, has been dispositioned and approved.

  112. 0:18:36

    So Thanksgiving has come early for many of you.

  113. 0:20:17

    All righty. With that, that now, um, takes us to the rest of our hearing. And John, I'll turn to you to approach our first matter.

  114. 0:20:25

    Okay. Madam Chair and board, um, since we did have 27 people here for the early head count case, uh, Z-48, Sleptin, would the board wanna hear that one first or just go, or go in order?

  115. 0:20:38

    It's up to the board. I don't have a- any particular, um, preference. Is the board okay with hearing Z-48? Commissioner Brown or Sheffield, you're all okay?

  116. 0:20:51

    Yes.

  117. 0:20:51

    All right. We'll go ahead and hear it. Thank you, John.

  118. 0:20:54

    Okay. All right. Next case we're gonna hear, and we're gonna hear these cases together, but then we're gonna make separate motions on these two cases.

  119. 0:21:02

    Okay.

  120. 0:21:02

    So I'm gonna call them together. Rezoning case Z-48-2026, Benjamin Middlebrooks requests a rezoning from R-20 to NRC for a flooring install business in land lot 318 of the 20th District. Property's located on the east side of Ernest Barrett Parkway, south of McDaniel Road. Together with its special lanes permit, SLEP 10-2026, Benjamin, uh, Middlebrooks requests a special lanes permit to allow a flooring business waste transfer station in land lot 318 of the 20th District.

  121. 0:21:33

    The property's located on the east side of Ernest Barrett Parkway, south of McDaniel Road. Earlier, there was 25 people here opposed and two in support. All those who would like to address the board either for or against, please come forward to be sworn in.

  122. 0:22:17

    Good morning.

  123. 0:22:21

    Excuse me. Is this yours?

  124. 0:22:26

    Yes. Yes.

  125. 0:22:36

    Good morning. You may proceed whenever you're ready. Just ask that you please state your name first.

  126. 0:22:40

    Thank you. My name is Benjamin Middlebrooks. Uh, we're here on behalf of 3261 Ernest Barrett Parkway. Uh, the last time we were here, we were blessed to be able to hear the concerns from neighbors about the rezoning. And I want you all to hear from the owners this morning as well. The concerns that we heard last time are very receptive. The challenge that we have is that Ernest Barrett Parkway is already a busy thoroughfare.

  127. 0:23:17

    There's a fire station down the street. There's commercial already there. Two small vans not gonna change any density there. What these owners are trying to do at their business has no impact in any way to add to what's already going on there. So they're not manufacturing anything. They're not bringing in a airport. They're just being able to take their vans in and out to do a business that they have at their home.

  128. 0:23:50

    So we don't wanna punish them for something that's already going on in the area. There's so much business going on in that area that you won't even know they're there.

  129. 0:24:02

    Mm.

  130. 0:24:03

    They don't do anything at 3:00 in the morning. There are no fire trucks coming up and down the street at their home. There's no dump trucks loading, unloading. No excavators No helicopters flying in and out. Two small vans to go in and out of their property that they own and live in. That's all. There's been a drought this year. There's no water runoff from these people's property on the backside. You take pictures during the wintertime when there's no leaves on the tree.

  131. 0:24:35

    If you'd have took those same pictures six months ago, you couldn't even see their property. It's, it's, it's a natural barrier that's blocked off. This request only allows someone to continue to be able to do business, pay taxes to the county, take care of their families and grandchildren. Excuse for my breath. I got caught in traps. I was running from the parking lot to get here. So-

  132. 0:25:00

    It's okay. You're fine

  133. 0:25:01

    ... 285 was horrible. Co- Parkway was horrible. So jumped out, 66 years old, I still got a little juice left in me, so ran up here. But listen, we understand the future land use concerns. We understand that they wanna keep this residential. That's gone a long time ago. Barrett Parkway will never be residential ever again. Doesn't mean that they don't have a right to want their pocket, their homes be protected. What they're saying is already going on.

  134. 0:25:33

    It's nothing different. This is not gonna change anything, these two vans that they're talking about. We understand about the transfer station. We already made amends for that. But just to allow them to have their business operating at their property, it's a very simple request. I'd like for you to hear from the owners. This is Mr. Corey Ford.

  135. 0:25:52

    Thank you.

  136. 0:25:52

    Good morning.

  137. 0:25:53

    And, and when you make your remarks, can you just stop the time?

  138. 0:25:56

    Uh-

  139. 0:25:56

    This is the first time we're hearing this case, so if you would just introduce this to us. I know you were before the planning commission, but I would just ask that you present this case as if we have not heard this case.

  140. 0:26:08

    Yes, ma'am.

  141. 0:26:08

    Thank you.

  142. 0:26:09

    So good morning. My name is Corey Ford, and this is my wife, Peggy Ford. We bought the property about a little over two years ago on Barrett Parkway. I own a flooring company, and I do residential flooring. Um, and, um, I'm asking you guys to, to let me keep operating my business. I install sand and finish hardwood floors, and I started in flooring when I was 17 years old, and Mr. Hardwood has served Metro Atlanta since 1989.

  143. 0:26:42

    June of this year, I just celebrated 37 years. This property is not, is not an investment. It's, it's our home, and it's also where we raise our granddaughter. And we actually, we took out some trees, leveled the property, so we... And it's also sloped to where water doesn't go towards any houses behind us. It goes in, uh, we just, no dirt was brought in, but where our granddaughter can ride her bike, um, on level ground.

  144. 0:27:13

    Um, this property, it's also the base of my business that I've spent my whole life building. Um, I want you guys to know what actually happens at this property because it's less than people may picture. There's no store. There's no showroom. Customers don't come to our house. Um, our, my office staff, they all work remote from home. All of our crews, they go straight to the projects, and that is where all the work happens.

  145. 0:27:43

    And what stays as our property is, is our little office and sometimes some materials. And behind, we did put up an eight-foot fence because there's like 30 to 40,000 cars, trucks. We're three doors down from a fire department, and that's just to help minimize some of the sirens and the noise and everything else there on Barrett Parkway. Um, I do have some materials, some small stuff like my stair treads and leftover material that I try to store in the garage, just leftover 'cause I, I hand make custom staircases.

  146. 0:28:18

    Um, I've listened to all of my wonderful neighbors, and we've already acted on their biggest concerns. The box truck and my E350 van, my two big trucks, and also the roll-off dumpsters, I've already g- um, scheduled to get those moved off of the property to a commercial lot. That's gonna happen. And what remains at the home are two transit connect vans, the same kind of little van that you see in driveways all over across Cobb County.

  147. 0:28:49

    We've done our best to improve the property, and a recent appraisal valued our home at a little over $1 million, and we maintain it like it's the beautiful home that it is, and we respectfully ask that this board approve our request. Uh, 37 years ago, I started with nothing but a strong back and a promise to treat people right, and that business today, it supports our family and puts local crews to work. I'm just simply asking to, to keep doing that from the home that we love, and we're gonna honor any conditions that the board attaches, and thank y'all for your time.

  148. 0:29:27

    Thank you.

  149. 0:29:28

    I'm sorry. To answer your question, Ms. Cupid, uh, the original request was to rezone to NRC to allow the administrative business that they have there, Mr. Hardwood, to allow them to bring their two, uh, small vans onto the property and swap out the, um... Like, when a person goes out to do their work, they come back. If they've done carpeting at your home, they have the carpet, they can't go to the landfills at a certain time. They can come to the house, take it off, and put it in a little dumpster or holding thing to go to the dump site the next morning.

  150. 0:30:07

    So that was the request for the rezoning, to allow the already home-based business to have that operation so the vans could come there and unload. The reason for the SLUP was we were told that if that were to happen, if they were to take two pieces of wood out of the van and put it in another van on that property, it has to be considered a transfer station. So that's where the SLUP came in at There's already a business operating there as an administrative business, home-based business. We just wanna add these two little small pieces of operation so that they won't have the expense of trying to do it somewhere else.

  151. 0:30:41

    So that's, that's the nature of the request.

  152. 0:30:43

    Thank you. Appreciate it. You have two and a half more minutes on the clock if anybody else wants to speak. Yes.

  153. 0:30:48

    Good morning, board members. My name is Peggy Ford. I'm here with my husband, Corey. When we bought our home over two years ago, we believed we would be here for many years, enjoying country living in the city. From the day we moved in, we've worked hard to improve the property so our children, grandchildren, and grandchildren could enjoy coming here, and so our elderly mothers would have a place to live when they could no longer take care of themselves. We also hope to run our business from our home without upsetting the neighborhood. In this economy, every dollar counts, and working from home has helped us save some money while serving our customers well.

  154. 0:31:22

    As one of our own neighbors said, 40 to 50,000 cars a day travel down Barrett Parkway. With the traffic, the drag racing, the emergency vehicles that pass by daily, we put a eight-foot fence up to block out some of the noise so our family could have a little peace. On the claim that water from our property caused neighboring buildings to settle, we have had a very dry year, and our grading sends no excess water down that side, as we left 150-foot barrier of trees in place to prevent it. The ordinance allows only one company vehicle at a residence.

  155. 0:31:54

    Corey and I both work for our company, and we ask that we be allowed to keep both of our transit connects here so we can do our work most efficiently. Barrett Parkway already has a lot of commercial business on it, and I'm sure everyone enjoys the convenience of having those nearby. We're not asking to rezone our house completely to commercial, only in a way that allows us to run our business out of it efficiently. I'm asking for your help in finding the compromise. We will then, we will begin compliance, the compliance process by relocating the box truck, the work van, and moving the dumpsters and storage buildings as we will be permitted to run our...

  156. 0:32:32

    And should we be permitted to run our business out of our house, we will not keep the dumpsters there because we know that's already been voted down. I want to take this time to apologize to the county for this time, uh, this matter has taken, your time and our tax dollars. We ask for your grace and forgiveness and for your help in working with us to get within the county code. We would like the opportunity to be good neighbors and productive citizens of the county. Finally, to the person who said that being here would bring their property values down, when we bought the property, it barely appraised for $653,000.

  157. 0:33:06

    A most recent appraisal valued our home at over a million dollars. So the improvements we may have made have raised the value of our home, and with it, the homes of us, around us, which benefits not only us, but the county as well.

  158. 0:33:19

    Thank you.

  159. 0:33:19

    Thank you for this time.

  160. 0:33:21

    Thank you, ma'am. That now concludes the amount of time that we've had for our applicant. Um, just ask that you sit somewhat close in case we call you back as we deliberate this matter. And then anyone who's here in opposition, you'll have a total of 10 minutes to speak. Just ask that you be mindful as there are multiple people who, um, raised their hand in opposition, so as many people who desire to speak have that opportunity.

  161. 0:33:49

    Do you have the clicker for

  162. 0:33:53

    me?

  163. 0:33:54

    Also, as you're getting ready, just remember to state your name before you begin your comments, and there is a timer up there.

  164. 0:34:00

    The other slide.

  165. 0:34:00

    Oh, I guess they're, they're... Somebody, somebody's got it. Sorry, the, we're sorting out who's got the clicker.

  166. 0:34:07

    Okay.

  167. 0:34:10

    Good morning, commissioners. My name is Mary Marx, and I am a resident of Ridgewood Park. I rise on behalf of the 106 families who call our neighborhood home to speak against the application being considered today. We ask that you vote to deny Z-48, the proposed rezoning of 3261 Ernest W. Barrett Parkway from R-20 residential to neighborhood retail commercial, as it raises serious concerns. First, consider the county's own future land use plan. The property in question is currently designated low density residential R-20 zoning and is compatible with the county's plan.

  168. 0:34:46

    Neighborhood retail commercial is not. What has changed to deviate from that plan? Plans are established for a reason. We should be able to trust that the county will honor its commitment to protecting established residential communities without encroachment and follow their own plan. Second concerns the impact this proposed commercial development, particularly what impact dumpsters could have on surrounding homes. This may seem like a minor detail, but for directly impacted residents, it presents a very real concern, which include potentials for unpleasant odors, increased noise from garbage collection, pests, and more commercial activity near homes where families expected to enjoy peace and quiet.

  169. 0:35:24

    We already deal with the noise of Barrett Raceway, where our lives are at risk daily when we all leave our area because no one drives the 45 speed limit. Who would want a possible hazardous dumpster located near our own backyard? For the families living nearby, it would become part of everyday life. Third is the potential impact on property values. For most of us, our home is our largest financial investment. We have been working hard at making long-term commitments to our homes based on the residential character of the area because we all want to be here.

  170. 0:35:55

    Introducing commercial, commercial zoning, uh, would, uh, uh, propose, uh, op- give the opportunity to more residential, um, uh, commercial development. Sorry. Uh, finally, our greatest concern is the precedent this decision could make if approved now, which prevents... What prevents property owners along Barrett from seeking other similar changes? One approval can lead to others, and the residential character of an entire area can be permanently changed with no reversal.

  171. 0:36:25

    This decision is about much more than one piece of property or one proposed business. Help lessen the impact of the, uh, to the families in the five neighborhoods along Barrett Parkway who already call this home area, uh, this area home. Protect the p- character of the established neighborhoods. Honor the long-term vision of the Cobb County that is already established through the future land use plan. Who are asking for responsible development to occur in appropriate locations consistent with the county's adopted plan. We ask to put the interest of the surrounding residential communities first because we concur with the re- recommendations of the reviewing county officials and request the commission deny Z-48, protecting the neighborhoods and families who invested decades in this community.

  172. 0:37:13

    Hi, uh, my name is Megan Dominy. I live in the Zachary Woods subdivision directly across Barrett Parkway from this property, and I'm asking you to deny Z-48 based on traffic and safety. Getting out of our subdivision is already a nightmare. Turning across Barrett Parkway can feel like playing Frogger in a Honda Odyssey. Cobb DOT reports that this stretch of Barrett carries 47,700 vehicles a day and operates at a level of service F, meaning that it's already carrying more traffic than it was designed to carry. And this particularly uniquely non-commercial stretch of Barrett is only four lanes across.

  173. 0:37:48

    It narrows from the six lanes to the four at a nearby Burnt Hickory Road intersection, which adds to the congestion. Our DOT also found that the right of way falls short of arterial road requirements, and that this driveway would need to be completely rebuilt to commercial standards. That's because this site was never meant for commercial traffic. Its driveway is too narrow for large vehicles, and it has no deceleration lane. My own neighborhood entrance has a similarly tight turn, and I can't imagine making it onto a skinny driveway instead of a full street.

  174. 0:38:20

    This driveway's adjoining sidewalk slabs already show diagonal cracks from the large vehicles crossing over them trying to navigate the turn. Uh, I submitted photographs of that last week, as well as, uh, photographs of the loose millings that DOT reported were being dragged into the public road. Trucks and trailers would have to slow down abruptly in a lane where traffic already travels at unsafe speeds. The driveway also sits directly beside the median opening, which is used for U-turns. Adding oversized vehicles or heavy equipment without a decel lane creates an obvious safety concern there.

  175. 0:38:55

    This intersection has seen fatalities before, and we see a- accidents along Barrett far too frequently. Finally, DOT's estimates of sev- 57 daily trips was, in its own words, for reference only based on a flooring business. That doesn't account for the proposed waste transfer station or for the other businesses that are already operating from this home, including a basement apartment that's rented to a tenant and a hair salon. The traffic and parking numbers in front of you don't reflect those. This case really isn't about asking for permission.

  176. 0:39:26

    It's about asking for forgiveness for a business that has no business being there in the first place. I respectfully ask that you follow your own staff's recommendations and deny this request. Thank you.

  177. 0:39:37

    One

  178. 0:39:40

    more minute.

  179. 0:39:40

    Okay.

  180. 0:39:41

    Good morning. My name is Michael Ryberg. I'm a resident of the Battle Forest community, um, and probably one of the most impacted people in this case as my house backs up directly to their property. Um, so it's that second purple one on Cleburne Ridge from the right. This is just an aerial view, um, of their house from over a month ago. So you can see the couple of dumpsters, the box trucks that they've had in there, um, which they said that they were going to remove those, so I'm very, very happy to hear that.

  181. 0:40:15

    Um, so that corner is what you can see from my house. Um, this is a view from my backyard. So yes, it is fall. You can see it better, but I promise you, you can see it in the middle of summer, too. All these trees are very thin. There is still a very easy path to, to that view. Um, and I was, um, the applicant also mentioned that there was no water runoff.

  182. 0:40:47

    Um, I invite all of you guys, I invite the applicants to come and see where my, the ya- you can see the downhill slope from their yard into mine, whi- which has already always existed, and I, I understand that. Except with the clearing and the paving, it's gonna make it 100 times worse. There is a visible little gully, um, that's formed where you can literally see the water coming from that property into my property. In fact, there is so much water runoff right there that underneath that shed, there was a four-by-four sinkhole that I had to fill with gravel rock, and I ordered three to four tons of rock, and I still haven't built it up all the way.

  183. 0:41:29

    So water is a very big concern for me and my family, and the safety. Um, I was, I have two little kids, and so I was, you know, terrified of them crawling under the shed and falling in a hole to who knows where. Um,

  184. 0:41:46

    this is a view that a neighbor in Zachary Woods took recently of a dump truck coming out and then immediately flipping a U-ey, which, um, is very dangerous. And if you drive down that stretch of Barrett Parkway, you know that that can cause a lot of traffic as cars are... It gets very backed up right there. Um, and as to asking the board of commission to consider all of our savings and our equity that we've put into this home, my wife and I bought this home three years ago.

  185. 0:42:22

    Um, we've put a lot of money into it just to get it on par with the neighborhood. And if we have a commercial zoning behind us with an active business with hardwood that has ev- dumpsters and waste transfer stations coming in and out, I know that will decrease the value of my home and all of my neighbors. Just because their home went up because they did renovations to their home, that does not affect my home. Um- I am positive that this would destroy my equity, any equity that I have built over the last three years with all of my work, and just time and savings would be instantly wiped out.

  186. 0:43:03

    Um, so I just ask you to follow the previous recommendations, um, and, and vote deny. Thank you.

  187. 0:43:15

    Thank you. Yes, you have one minute on the clock if you'd like to use it.

  188. 0:43:17

    Okay. Sorry.

  189. 0:43:18

    Mm-hmm.

  190. 0:43:18

    I also wanna say, um, like, I do have sympathy for these owners. My dad owned a small business. Whether or not this business in particular, uh, is a terrible neighbor, once it's rezoned for this, it's rezoned for this forever, and then who knows what comes next. The next people that move in maybe aren't a small flooring business, and everybody that lives behind and adjoining them then has to live with the reality of that. So thank you for letting me add that.

  191. 0:43:46

    Thank you. You have about 25 seconds left if anybody wants to use it. Hey.

  192. 0:43:51

    No, we're good.

  193. 0:43:52

    Okay. All right. Thank you. I will now turn things over to our district commissioner.

  194. 0:43:59

    And I would like the applicant to come forward, and I believe it was Mr. Middlebrooks who spoke first, but he did not identify himself when he started speaking.

  195. 0:44:07

    He did.

  196. 0:44:08

    He did.

  197. 0:44:08

    He did, he?

  198. 0:44:09

    Mm-hmm.

  199. 0:44:09

    I didn't catch it. Thank you.

  200. 0:44:22

    So we heard testimony that there is an apartment on the property. Is that correct?

  201. 0:44:28

    There's an apartment?

  202. 0:44:29

    Or ADU.

  203. 0:44:30

    Our, our basement is finished.

  204. 0:44:32

    Okay. And does that have a separate entrance?

  205. 0:44:35

    It does.

  206. 0:44:35

    Okay.

  207. 0:44:37

    It was that way when we bought it.

  208. 0:44:44

    Do you have a salon business on site?

  209. 0:44:48

    I do my friends' hair, but I don't have the business there.

  210. 0:44:51

    Do you have any salon stations within your home?

  211. 0:44:54

    I do.

  212. 0:44:55

    How many?

  213. 0:44:56

    Just one.

  214. 0:45:05

    I- is it correct that you used to have a location at 4260 Industrial Center Lane?

  215. 0:45:12

    Suite 100. Yes, ma'am.

  216. 0:45:14

    Okay. And how long were you at that location?

  217. 0:45:18

    Seven years.

  218. 0:45:20

    Okay. And are you still there or have you left?

  219. 0:45:24

    No, ma'am.

  220. 0:45:24

    Okay. And was that in an industrial area up in Acworth?

  221. 0:45:30

    It was.

  222. 0:45:31

    Okay.

  223. 0:45:35

    So are you storing materials on site currently since you no longer have that warehouse?

  224. 0:45:43

    Stair treads and handrail, yes. Flooring, no. Um, the flooring, my crews will pick it up and then take it directly to the site. I don't have room for it at this location, sir. Oh, I'm so- I'm sorry. Um, stair treads and handrails, yes, ma'am.

  225. 0:46:07

    So do you have a warehouse where the other flooring material is kept?

  226. 0:46:12

    No, they take it straight to the house from the distributor.

  227. 0:46:21

    Okay. Is your property on septic?

  228. 0:46:24

    Yes.

  229. 0:46:25

    Have you received approval from the Department of Health to have a business at your home?

  230. 0:46:32

    It's a home-based business.

  231. 0:46:36

    Correct. But the Department of Health has different criteria when you have a commercial business and y- and you are applying for commercial use on your property.

  232. 0:46:48

    Mm-hmm.

  233. 0:46:48

    And then also have... Is the Department of Health aware of the apartment?

  234. 0:46:54

    Our protocol, we were told, is just the first step, and if this is approved, then we would have to go through the next step of getting in and all the other approvals. But doing it now would be putting the cart before the horse.

  235. 0:47:05

    Okay.

  236. 0:47:13

    Um, Mr. Ford, does this look familiar to you? And I can hand this to you if you need to. This is your business license that you filled out back in 2024. Would you like to see this before I ask you a question on it?

  237. 0:47:44

    Is that right?

  238. 0:47:45

    Let's

  239. 0:47:50

    see. That was supposed to say 3 million, not 300,000.

  240. 0:48:00

    If you'll go ahead and ask your question, we'll know what we're looking for.

  241. 0:48:06

    Is that your signature on the form?

  242. 0:48:09

    Is that what?

  243. 0:48:10

    Uh, is that your signature?

  244. 0:48:12

    That is my signature, yes.

  245. 0:48:14

    Okay. And for the board's purpose, the reason why I'm verifying this is on there, there is a box that says that this is for a residential location. It specifically says, "If this property is zoned residential, no clients, employees, sales, deliveries, storage of inventory, or equipment is allowed on the premise. Only one commercial vehicle not to exceed 12,500 pounds gross weight used as transportation by the occupant may be parked at the residence." The next line says, "I will comply with the zoning resict- restrictions stated above," and that is your signature, correct?

  246. 0:48:56

    Where... Would you please tell me where-

  247. 0:48:58

    It's on the second page.

  248. 0:48:59

    I- I'm sorry. Let's go ahead and take- Um, I, and let's take a recess. I need to ask some questions because this is sounding like a cross-examination to me, and I'm just not following very well. Please, let's take a break.

  249. 0:49:11

    Well, this is a public hearing.

  250. 0:49:12

    Please take-- I, I know.

  251. 0:49:13

    We should have this discussion out-

  252. 0:49:13

    Please, please just take... I just need a break. I need to talk to our zoning manager, and then I'll talk to the commissioner. Thank you.

  253. 0:49:20

    How long?

  254. 0:49:20

    Um, I don't know how long. I just...

  255. 0:54:39

    Hearing November 17th, 2026. We are in the middle of dispositioning case C48 and SLUP-10 pertaining to Benjamin Middlebrooks, and I will turn things back to our District 1 commissioner.

  256. 0:54:54

    And if I could have that document back so I can submit it to the clerk for the record, please.

  257. 0:55:10

    So I'm ready to make my motion. You can have a seat. I have been asked not to further question the applic- I've been asked to not further question the applicant.

  258. 0:55:22

    Excuse me. That is, that is not true, and let me clarify here. There certainly has been a lot of research that has been done by Commissioner Gambrill to get to the, um, to get some background information here, which I do appreciate. What I don't understand is why this is coming across as a cross-examination and a gotcha moment for anybody that comes before here. The way that the questioning was going, I couldn't even understand what we are trying to get to for this matter and what the applicant was asking.

  259. 0:55:57

    So I did ask for some additional background information from our zoning manager and our county attorney to find out how we got here and what we are trying to get to beyond perhaps my understanding of the zoning record in front of me. And as I shared with Commissioner Gambrill, which I didn't want to have this conversation because as much as I found her questioning of the applicant to be antagonistic, I did not want to have an antagonistic communication with Commissioner Gambrill up here on the dais.

  260. 0:56:30

    So I asked, I shared my communication that I had with our zoning manager and our county attorney with Commissioner Gambrill. I asked her if she could please help us in understanding what is going on in a way that we can disposition this without being as antagonistic. I do think it's antagonistic when you pull somebody's business license, you ask them questions from a distance, have they seen this document they clearly can't see? Did you sign this document that they clearly can't see? All of these come across as if somebody is on a witness stand and being cross-examined by someone who, again, is trying to incriminate from someone from wrongdoing.

  261. 0:57:07

    Now, with respect to wrongdoing, this matter before us has come before us because it is a code enforcement issue. Matter of fact, there have been a number of code enforcement issues with this property that's probably led for, um, to this property being here before us. So I'm not saying that there aren't issues here to be addressed, but I am just of the position that we can address issues without having to do it in an antagonist, antagonistic way, which masks the reason why we are here in the first place. That is what is going on.

  262. 0:57:37

    Commissioner Gambrill was not asked to not ask questions. This is, um, why I'm sharing this with you today. She has the right to disposition it how she wants it to be dispositioned. I am facilitating this meeting, try to facilitate meetings in a certain way that encourage people to come before the county and believe that they're going to be heard and respected by those up here, and I found the way that the questions were going was in contrast to that. That is why I'm having this conversation. So that is, um, what has led for us to be here.

  263. 0:58:11

    I will turn things back to you, Commissioner Gambrill.

  264. 0:58:17

    Therefore, I'd like to make a motion. As the applicant, when they first took out their business license, knew that it was okay to have a home occupation on site as it was a residentially zoned property, and they had signed as such.

  265. 0:58:36

    Spot zoning is a practice of singling out a parcel of land for a zoning classification that is completely different from the surrounding area. This parcel is surrounded by established single-family residential development, which is not compatible with the proposed use. Therefore, I recommend the board to deny Z-48 of 2026, and they allow the applicant until December 31st of 2026 to continue to relocate all material, dumpsters, equipment, and vehicles from the property related to the flooring installation business.

  266. 0:59:12

    The applicant shall also work with Stormwater Management Development and Inspections to correct any and all conditions caused by the unpermitted land disturbance and have remin- reme- remediated by December 31st of 2026. All non-customary home occupations shall cease immediately upon denial of this application.

  267. 0:59:43

    Is that in the form of a motion or a rec- You said recommendation. So I need to make a motion.

  268. 0:59:50

    I said I would like to recommend denial. So, so I am recommending denial. I am giving the applicant until December 31st of 2026 to remove... We already had testimony that they had removed the dumpsters and the large trucks, but they need to continue to remove all the other equipment, vehicles, and items related to the flooring installation business.

  269. 1:00:23

    We also know from staff comments and recommendations from Stormwater Management Development and Inspections, there are conditions that have been caused by th- the applicant that need to be remedied, and again, I'm giving them until December 20- December 31st of 2026. The all c- non-customary home occupations must cease. That's just a general statement. We know by code under R20 they can have one home occupant business.

  270. 1:00:56

    So if they wanna run just their home office for Mr. Hardwood from there, they can do that. They just cannot do the other aspects of it because R20 allows one home occupancy to be done.

  271. 1:01:14

    Okay. So that was a recommendation, not necessarily a motion, and there isn't a second. And I'm just going to ask that we have some time to deliberate this, and I've got questions for the applicant. So it would be my recommendation that instead of having a motion and a second, that we still have some further clarification on this matter. And I've got some clarifi- I, I have some questions I'm trying to understand still from our zoning manager, uh, with respect to this matter. Um, it's, it's my understanding that there has been a preexisting business there that they do have a business license for.

  272. 1:01:51

    They have a business license for a home office for, for the flooring company, and they've had that since 2024.

  273. 1:01:57

    Okay.

  274. 1:02:02

    And there has been additional activity beyond what is permitted with the home office that code enforcement has observed.

  275. 1:02:12

    Uh, that is correct. They did get a notice of violation back in June of this year for violating the customary ho- home occupation part of the code.

  276. 1:02:20

    Okay. It seems to me that what they have requested initially in their zoning application, that they are no longer asking that in its entirety.

  277. 1:02:37

    And, and perhaps I'm not seeing this as a question of whether or not they can have a business, it's whether or not they can have the dumpsters that they've had there, the two larger vehicles. I'm perceiving, and this may be a question for the applicant, I'm perceiving that the request here today is to just allow those two additional... What vehicles did I have here?

  278. 1:03:01

    Vans.

  279. 1:03:02

    Yeah, there was a specific name that I wrote. Yes, those two larger vans. Oh, excuse me. If, if, if I could have the applicant approach.

  280. 1:03:16

    The two Transit Connect vans. I'm just trying to find out, w- w- what are you asking for for today? What is it you... What is your request before the board? Certainly, it seems as if things have changed from your application to what you're requesting today.

  281. 1:03:31

    So what we want to do is... I'm sorry.

  282. 1:03:33

    It's okay.

  283. 1:03:34

    What we want to do is comply with what you're asking, but we're also asking for a little grace on some things like we both work for the company, and I drive the Transit, a Transit Connect, which is the smaller van, and so does he. And, um, the eight-foot fence, we're asking for grace on that because of all the noise.

  284. 1:03:56

    Okay.

  285. 1:03:56

    We are, we did find a lo- a commercial lot to move the dumpsters and the larger vehicles, which is a E350 van and a box truck too. We're selling the storage containers. Um, of course, it may take a little time, but we, we are in the process of doing that. And any excess material, we're in the process of hosting a, um, an estate sale to get to become into compliance because we want to be good citizens of the county.

  286. 1:04:25

    Okay, so you're, you're telling me that you are gonna remove the trucks that are there.

  287. 1:04:31

    The two big trucks.

  288. 1:04:32

    The big trucks. And you're gonna remove the storage containers that we saw.

  289. 1:04:35

    Yes, ma'am.

  290. 1:04:35

    All of them.

  291. 1:04:36

    Yes, ma'am.

  292. 1:04:36

    And the two dumpsters.

  293. 1:04:37

    Yes, ma'am.

  294. 1:04:39

    Okay. And the only thing then that you're asking a variance for at this point is the eight-foot fence, which exceeds our six foot?

  295. 1:04:46

    Yes, it, it's eight feet.

  296. 1:04:47

    And possibly, we're not really sure what your, uh, decision is on our parking situation because we do have millings that have been packed down. I'm not sure if we're gonna have to spray some kind of tar tack where we park. Uh, we may need someone to come out and look at that to give us what the recommendation of the county is.

  297. 1:05:08

    Yes, irrespective of what happens today at zoning, um, vehicles need to be parked on a hardened surface.

  298. 1:05:13

    Okay.

  299. 1:05:14

    And I don't... I, I perceive that code enforcement would need to evaluate whether or not that is a hardened surface, or is there someone else that-

  300. 1:05:22

    Yeah, and just the millings by themselves would not be a treated, hardened surface.

  301. 1:05:25

    That's not a treated...

  302. 1:05:26

    Okay.

  303. 1:05:27

    Okay.

  304. 1:05:30

    We welcome any approval with conditions to the-

  305. 1:05:33

    I'm sorry, sir.

  306. 1:05:33

    It's all right.

  307. 1:05:34

    I'm gonna need for you just to refrain your com- unless you're responding to something that I asked because the hearing portion of the meeting has ended, so really any com- comments at this time is to respond, so I just need everyone to-

  308. 1:05:47

    Okay

  309. 1:05:47

    ... monitor parking. Unless, um, are you clarifying what you're, um, asking for for today, sir?

  310. 1:05:53

    Well, when you were asking about the original application and what we were asking for-

  311. 1:05:56

    Yes, sir. Mm-hmm

  312. 1:05:57

    ... we understand that sometimes in these proceedings there's an approval with conditions.

  313. 1:06:02

    Yes.

  314. 1:06:02

    We understand the community's concern that, "Hey, look, we don't want, uh, you know, Microsoft to come in here and put a data center because now it's in our scene." So with this particular property in question, 3261, we welcome the fact that if we allow this, there are gonna be conditions of what can happen at this lot, not with Mr. Hartwood, but at 3261-

  315. 1:06:24

    Okay

  316. 1:06:24

    ... Barrett Parkway.

  317. 1:06:25

    Thank you.

  318. 1:06:25

    We've looked, you know, that's-

  319. 1:06:27

    Okay

  320. 1:06:27

    ... so we, yeah.

  321. 1:06:28

    Thank you, sir. Appreciate it.

  322. 1:06:30

    Commissioner.

  323. 1:06:30

    Yes, Commissioner Sheffield, and then Ms. Martin.

  324. 1:06:31

    Question with relative to parking. Um, have we established how many employees are going to be at this location?

  325. 1:06:39

    Zero.

  326. 1:06:40

    Zero? Um, in looking at the var-

  327. 1:06:43

    Except us.

  328. 1:06:44

    Okay, just the two. So the variance request is to reduce the parking from 11, I think it said, to three.

  329. 1:06:52

    Four.

  330. 1:06:53

    To five? John, would that be necessary considering the recent changes-

  331. 1:06:57

    On our property

  332. 1:06:58

    ... um, and removing vehicles-

  333. 1:07:00

    Well, the, uh-

  334. 1:07:00

    ... and the number of employees?

  335. 1:07:01

    The, the parking's based on the square footage of the house.

  336. 1:07:04

    Okay. All right. All right, thanks.

  337. 1:07:07

    Okay.

  338. 1:07:10

    Well, and John, for clarification, I also took the parking because the original application was also for a showroom. So I kind of took it that the parking was to accommodate the showroom.

  339. 1:07:20

    Oh, it was not for a showroom.

  340. 1:07:22

    We don't know anything about a showroom.

  341. 1:07:23

    We never asked for a showroom.

  342. 1:07:26

    Okay.

  343. 1:07:28

    Commissioner Allen

  344. 1:07:29

    And then John also, if you can clarify, 'cause, um, under the, the zoning department comments, there is no note of asking for a variance for the height of the fence or for the two vehicles. Am I correct? And I did not see any documentation come through modifying that request.

  345. 1:07:55

    No, the, the fence is not in here. There's four variances that are listed in the zoning comments. One's for parking, maneuvering on a non-dirt surface. Next one's to reduce the parking from 11 to five spaces. Then, uh, to allow o- outdoor storage of materials. And the last one is to reduce the 20-foot landscape buffer to zero adjacent to the north, east, and south property lines.

  346. 1:08:21

    I have no recollection of any parking for 11 to five vehicles in our application.

  347. 1:08:26

    N- I think this is part of staff's evaluation-

  348. 1:08:28

    Oh, okay

  349. 1:08:28

    ... is what we're reading. So it's not necessarily-

  350. 1:08:30

    Okay

  351. 1:08:30

    ... what you've applied for. Just in assessing the application, there's an analysis that's provided by our staff.

  352. 1:08:43

    Ms. Cupid? If we do not have anything in there that asks for the eight-foot fence-

  353. 1:08:50

    I don't believe we do

  354. 1:08:50

    ... would you please direct us in the way we need to do to apply for that? Because it's very loud on Barrett Parkway.

  355. 1:08:56

    Okay. That's for the board to deliberate. That's gonna have to be for the... But I appreciate that request. It's something that stood out to me when you were, when, um, you were providing comments during the hearing. 'Cause I, I know we typically don't condition eight-foot fences. Yeah.

  356. 1:09:18

    I, I just wanna make sure I'm clear, and thank, thank you all for your patience on this. Um-

  357. 1:09:22

    Sure

  358. 1:09:23

    ... but, so no dumpster.

  359. 1:09:26

    We're removing it.

  360. 1:09:26

    Removing it. So there's no change to the physical building structure that you're asking for at all. No customers on site.

  361. 1:09:35

    No.

  362. 1:09:35

    You've confirmed that. Um, no additional lighting. I know someone brought up lighting, but is there any plans for additional lighting or any of that? Um, and then you, you mentioned earlier there's some materials on site, but you also said you're gonna n- now move materials off site.

  363. 1:09:55

    I build custom staircases, and a lot of them are radius.

  364. 1:09:59

    Mm-hmm.

  365. 1:09:59

    And so when I'm cutting the radius stair tread and also cutting the returns, um, I, I make those for the spiral staircases.

  366. 1:10:09

    Mm-hmm.

  367. 1:10:09

    Same thing with some of the handrails that I have to rip down into 3/8 strips. So I make a lot of that for the smaller sections and, but that's it.

  368. 1:10:19

    Is that all done inside in like a garage or a workshop or?

  369. 1:10:23

    No, I just rip it down.

  370. 1:10:24

    Yeah, I see. I mean, I just-

  371. 1:10:25

    Work done at the site.

  372. 1:10:27

    Is it work done at your house?

  373. 1:10:29

    When you do the stairs-

  374. 1:10:31

    Mm-hmm

  375. 1:10:31

    ... do you do that here at 3261?

  376. 1:10:34

    Sometimes I'll go ahead and rip down some of the pieces just for, to go ahead and get it glued, and then I take it to the site to finish the modification so I can pre- prepare it for the install.

  377. 1:10:45

    Okay. So con- considering all of that, I, my question then, John, is-

  378. 1:10:51

    It's like a work, you just work-

  379. 1:10:52

    Well, one second. I- is, is there still a need to ask for the rezoning or is this just var... Because I, I don't, I don't see that it needs to be commercial or rezoned from anything residential. It would just need to be a variance for the eight-foot fence and an additional work vehicle, um, because they said they have two of the vans. O- outside of that, I'm not hearing that there are any other-

  380. 1:11:19

    Because they're allowed to

  381. 1:11:20

    Yeah. They're, they're allowed to run a business out of a, out of a home.

  382. 1:11:24

    Well, for a customer home occupation, there, there's several different things that they have to meet. You know, they have no employees, no clients come to the home, which they don't.

  383. 1:11:32

    Yeah.

  384. 1:11:32

    Uh, they can't have any materials at the house, which they do. Um, you know, the customer home, the customer home occupation is limited to the people who live in the house, which they do. So they meet that. So, you know, it sounds like if they really wanna have the extra van, you know, that's something that they could probably apply for a landing permit for, to allow an ex- an additional van, and then they could apply for a variance to have the tall fence. Is this, is the tall fence along the road?

  385. 1:12:03

    Fair par- Okay.

  386. 1:12:04

    It's-

  387. 1:12:05

    No, it's-

  388. 1:12:05

    It's along the back. It's-

  389. 1:12:07

    It's, it-

  390. 1:12:08

    John, it's, um-

  391. 1:12:10

    Oh, there it is on the side. Okay. That's it right there

  392. 1:12:12

    ... it's on the side.

  393. 1:12:13

    Wait, what's on the si- I'm sorry. I can't, I can hardly hear you.

  394. 1:12:16

    The fence. We're... S- sorry, ma'am. We're saying, where is the fence located? And it's not along the-

  395. 1:12:21

    It's on the front of the property and on the sides in front of the house. We have four acres, so it's not-

  396. 1:12:26

    And on the front of the property, we have a bunch of evergreens

  397. 1:12:30

    ... that are not so green anymore.

  398. 1:12:35

    So where's the location for the proposed fence? Because it appears that there, there's fencing, it looks like-

  399. 1:12:41

    Right

  400. 1:12:41

    ... on the north-

  401. 1:12:42

    It's already up

  402. 1:12:42

    ... and southern.

  403. 1:12:43

    It's already there.

  404. 1:12:44

    It's already there. Okay.

  405. 1:12:45

    Yes, ma'am.

  406. 1:12:46

    Okay.

  407. 1:12:47

    So, so John, back to what we were discussing. The, the variances needed would be maybe a SLUP or a, a different vehicle for the additional work vehicle, the eight-foot fence.

  408. 1:13:02

    It could be a LUP for that.

  409. 1:13:04

    Right. And then the materials is the only thing that's now-

  410. 1:13:10

    W- and that would be included in a L- in a LUP also

  411. 1:13:13

    ... that could be included in a LUP as well. So this, and this would prevent, o- once again, no...

  412. 1:13:22

    It would only be a LUP. And so if this were, if the commissioner were to deny this, would anything prevent them from Later today or tomorrow, applying for a LUP for those other-

  413. 1:13:35

    Well, if-

  414. 1:13:35

    ... components

  415. 1:13:35

    ... if this was denied, then they could not come back for a year

  416. 1:13:38

    That, and that's why I wanna make sure we're... Right

  417. 1:13:40

    So, you know, if they wanna ask to withdraw this without prejudice-

  418. 1:13:43

    They can

  419. 1:13:43

    ... then the board can consider that, and then they come back.

  420. 1:13:45

    They-

  421. 1:13:45

    They come back for a LUP

  422. 1:13:46

    ... but they can make the choice to withdraw?

  423. 1:13:48

    Yeah, it's their choice to make.

  424. 1:13:50

    We can, but we can have them withdraw.

  425. 1:13:52

    Well, but we, we, we can, but they, they can, they can do it without... I'm, I'm just trying to find a path.

  426. 1:13:58

    I... Thank you.

  427. 1:13:58

    Yes.

  428. 1:13:58

    I appreciate that. I appreciate that.

  429. 1:14:00

    Um, so the... So they could withdraw without prejudice and bring it back as a LUP.

  430. 1:14:08

    In, in February.

  431. 1:14:09

    For those, for those three items, because I'm hearing those are the only three items that they're really seeking, which would also reduce some of the concerns for the community because, like I said, no additional lighting. There's not gonna be any dumpsters. There's no customers. There's no employees, so we're not really increasing the traffic of the, the, the property or expanding the footprint. And all of those could also be put in as conditions or stipulations that they c- they aren't allowed if that LUP were to go through. Could they not?

  432. 1:14:40

    That's correct.

  433. 1:14:40

    Okay.

  434. 1:14:44

    I'm sorry, sir. You're gonna have to... U- unless you... No question was asked. I'm sorry, sir. I know you wanna share something.

  435. 1:14:52

    So, so I guess the question would be whether or not the applicant is willing to withdraw this application without prejudice and then come back with a, a LUP.

  436. 1:15:03

    A temporary, a temporary land use permit.

  437. 1:15:04

    Because they also said, I just want to make sure, they also said they would harden the surface, because that was another, uh, issue that they had with the parking, that it's not considered a hardened surface. But you were willing-

  438. 1:15:13

    Yes

  439. 1:15:13

    ... to harden that surface.

  440. 1:15:14

    We can, um, put tar tack on that and harden it. We were given permission by that. That was the, the direction we were encouraged to go.

  441. 1:15:23

    Okay. Do, do you all understand the process that I'm-

  442. 1:15:26

    Yes

  443. 1:15:26

    ... speaking of?

  444. 1:15:27

    Sir, I'm sorry so much.

  445. 1:15:28

    I do. We thought that was done with the SLUP, but I guess you're saying LUP. So with our due diligence, we thought that that was what we actually, based on what we were told at the time.

  446. 1:15:38

    Right. And, and, and that's what I gathered. It sounds like you, you came in and sought guidance, and based on what you were asking for at the time, this was the right approach. A lot of things seem to have shifted-

  447. 1:15:47

    Yes, sir

  448. 1:15:47

    ... since then. Um-

  449. 1:15:49

    It originally started with salt being placed on... They were grading to put salt down.

  450. 1:15:56

    Right.

  451. 1:15:56

    Because it was such a large lot and the grading was over one acre, there was a issue and a, a violation because there was no LDP permit. When we went in to submit for the LDP permit conversation-

  452. 1:16:10

    I, I'm sorry, sir

  453. 1:16:10

    Okay.

  454. 1:16:10

    S- yes, yes

  455. 1:16:10

    ... thank you. I'm, I'm gonna have to stop you right there. Commissioner Gambrill?

  456. 1:16:15

    Um, just-

  457. 1:16:16

    Yes

  458. 1:16:16

    ... I, I agree with what Commissioner Allen is saying, but what I'm concerned is, is I don't want the applicant to go and harden any surfaces, because we know from staff comments we've got storm water issue, development issues that need to be resolved before they finalize whatever they've done. So, so I agree with you. T- the best path forward would be... 'Cause even if, John, if we did this without prejudice, then it would still be six months.

  459. 1:16:47

    No. I- if, if we did without prejudice-

  460. 1:16:49

    Because if we-

  461. 1:16:49

    ... then they can come back-

  462. 1:16:50

    Tomorrow

  463. 1:16:50

    Yeah.

  464. 1:16:50

    In February.

  465. 1:16:51

    Tomorrow

  466. 1:16:51

    What... Is that with the withdraw or if we denied it, though?

  467. 1:16:54

    If, if it's de-

  468. 1:16:54

    'Cause I thought if we denied it was six.

  469. 1:16:56

    If it's denied, then it's 12 months. If you guys deny it without prejudice, then it's six months.

  470. 1:17:01

    Then, okay.

  471. 1:17:01

    But if they withdraw it-

  472. 1:17:03

    That's what I'm saying

  473. 1:17:03

    ... So if they withdraw it, right, and I, I agree with you on that. But my, my concern is, is making sure that they clearly understand that before they do any other improvements to the site, you really need to get with our zoning and, um, community development with your site plan and come, come into compliance with development standards, because there is impact to the adjoining neighbors.

  474. 1:17:28

    Correct.

  475. 1:17:29

    Um, s- so I, you know, I will, I will leave that to you if you would like to consider to, um, withdraw Z-48 and also SLUP 10.

  476. 1:17:43

    Okay. Commissioner, would you like to make that motion?

  477. 1:17:46

    I, I feel it should be the applicant that-

  478. 1:17:49

    Can we please move on? The w-

  479. 1:17:50

    ... is willing to do that.

  480. 1:17:52

    Yeah. W- we need to h- have the app-

  481. 1:17:53

    We need to vote on it.

  482. 1:17:55

    I, I do have a question, probably for Mr. Pederson. Because of the fact that we're here-

  483. 1:17:59

    Can we vote on this? Let's vote on this

  484. 1:17:59

    ... based on citation, if we withdraw, how does that impact the citation? 'Cause this is part of satisfying the citation.

  485. 1:18:06

    Right.

  486. 1:18:07

    Uh, you know, as far as a ci- citations go, and I, I think y'all have got some, some extensions in the past. You know, if we know you're currently working on it, and you come back... You know, say you withdraw it right now and the board accepts it, and you submit your application in December for a February land use permit case, then we could have code enforcement, you know, extend them even more than, than that.

  487. 1:18:28

    Perfect.

  488. 1:18:29

    But, you know, one thing we want you to do in between is meet with our stormwater management division, because, you know, y- you did clear and grade a lot of property in the back, and I think you graveled, graveled it or milk- put milk buildings on it.

  489. 1:18:40

    I put some, I put some buildings down there, and then I rolled it.

  490. 1:18:43

    So I'm pretty sure that's gonna n- need a detention pond. So you probably need to get a cost on what that's gonna cost you, 'cause that's usually a big, a big-ticket item as far as cost.

  491. 1:18:54

    Well, that's what I thought.

  492. 1:18:56

    It, it usually, it usually costs a lot of money to build a, a detention pond and come up with stormwater management plans.

  493. 1:19:01

    They can return it to, uh, its, the previous state. It doesn't have to come-

  494. 1:19:04

    Okay.

  495. 1:19:05

    More expensive.

  496. 1:19:06

    Yeah.

  497. 1:19:08

    That's right.

  498. 1:19:08

    They can do that, too.

  499. 1:19:10

    Yeah. They can.

  500. 1:19:12

    Yeah. Yes.

  501. 1:19:13

    All right. So-

  502. 1:19:14

    So, so-

  503. 1:19:15

    Just... Go ahead. No, I was gonna add with respect to the de- the detention pond with another option being to just to remove the asphalt.

  504. 1:19:24

    Yes. So they could-

  505. 1:19:25

    Maybe that would be less expensive

  506. 1:19:26

    ... they, they, they, they could remove it and just replant it according to a plan approved by the county arborist Return it to its original state-

  507. 1:19:33

    Right

  508. 1:19:33

    ... that it was before the-

  509. 1:19:35

    I just wanna share too also for the adjoining property owner, we saw the storage shed, and I'm not sure if storage sheds are supposed to be right on the property line. Thank you.

  510. 1:19:45

    Normally, um, for a shed that looks that big, it, it should be at least five feet off the property line.

  511. 1:19:49

    Yeah. So that may be something for, um, the adjoining neighbor to be mindful of.

  512. 1:19:55

    Also, one of our adjoining neighbor's building is on our property.

  513. 1:19:58

    It should, yeah. Well, that's something to be addressed.

  514. 1:20:02

    Yes.

  515. 1:20:04

    All right. So with that, there's seems to be some consensus to withdraw, if that is, if the applicant's amenable to that.

  516. 1:20:12

    Is he open?

  517. 1:20:12

    Yes, we are.

  518. 1:20:13

    Without prejudice, in a way that allows you to come back?

  519. 1:20:15

    Yes, withdraw without prejudice. That's correct.

  520. 1:20:16

    Okay.

  521. 1:20:16

    Thank you.

  522. 1:20:17

    You're welcome.

  523. 1:20:18

    Thank you so much.

  524. 1:20:19

    Thank you.

  525. 1:20:21

    I make a motion that we withdraw without prejudice Z48 of 2026.

  526. 1:20:27

    Second.

  527. 1:20:29

    Is there any further discussion?

  528. 1:20:30

    You may ask for it.

  529. 1:20:31

    Call the question. The motion carries 5-0.

  530. 1:20:36

    And I'd like to make a second motion to withdraw SLUP10 of 2026 without prejudice.

  531. 1:20:43

    Second.

  532. 1:20:44

    Is there any further discussion? The motion c- excuse me. I'm sorry. Call the question. The motion carries 5-0. Thank you.

  533. 1:20:54

    Thank you very much.

  534. 1:20:54

    Let's take a, um, recess until 10:45, please.

  535. 1:20:57

    Hey, hey, Corey.

  536. 1:32:55

    Coming together and communicating, as this is what should be happening around our zoning cases. Um, however, I am five minutes over the time I said we'd get started, and there are other matters to be heard today. So with that, I'll turn things over to John Pederson, and he will queue up our next matter.

  537. 1:33:16

    Okay. Next case we're gonna hear is rezoning case Z37 of 2026, Hawk Guys LLC request a rezoning from R15 and R20 to R5 for a single family residences in land lot, land lots, uh, 563 and 564 of the 19th District. Property's located on the west side of Powder Springs Road, uh, the northern terminus of Heart Ridge Drive, and the east end of Sebring Court. The applicant is present.

  538. 1:33:46

    Is there anyone here opposed to rezoning case Z37? Got one.

  539. 1:33:51

    One.

  540. 1:33:52

    Kayla, direct show there's one person opposed. All those who would like to address the board, please come forward and be sworn in.

  541. 1:34:00

    Travis.

  542. 1:34:07

    No, no, she's on the next one. She's on the next one.

  543. 1:34:19

    Yeah.

  544. 1:34:21

    She's on the next one.

  545. 1:34:23

    This also works?

  546. 1:34:24

    Yes.

  547. 1:34:31

    All right, Kevin, you can begin whenever you're ready.

  548. 1:34:35

    Uh, this is... I haven't put up Z37. This is 37. Is that it?

  549. 1:34:42

    Oh, we're still-

  550. 1:34:43

    Waiting for it

  551. 1:34:43

    ... waiting for your-

  552. 1:34:44

    Z37

  553. 1:34:44

    ... information to come up.

  554. 1:34:45

    What... Yeah, he's just putting that up.

  555. 1:34:52

    There we go. Can you zoom out a little bit? There we go.

  556. 1:35:04

    Um, Kevin, you're welcome to present, um, but we have, uh, worked on this case qui- quite a bit over the last few weeks, so I'm okay, uh, with a very brief, uh, presentation, but of course, if the board would like to hear the entire presentation, you may do so. I understand that there's opposition here, and I'm not being insensitive to the opposition, but I do recognize, I believe he's with the school board. Um, so, um, I am willing to-

  557. 1:35:35

    It's completely up to- It's completely up to the applicant how they-

  558. 1:35:39

    Yeah

  559. 1:35:39

    ... how they would like to present

  560. 1:35:40

    ... how he would like to move forward.

  561. 1:35:42

    Uh, with, with that introduction, Commissioner, um, look, I'm Kevin Moore here on behalf of the applicant. Uh, but with that introduction, I'm happy to answer any questions. This is a rezoning, uh, that arrives to you with a recommendation, uh, from the Planning Commission. Uh, we have worked on it very, very closely in terms of having stipulations. Um, we updated the stipulation letter based on certain requests, uh, that's dated November 16th, which was yesterday.

  562. 1:36:06

    Mm-hmm.

  563. 1:36:06

    And it includes the additional requests for stipulations that have been asked of us, and so we've presented that for your consideration as well. I'm here to answer any questions and respectfully request your, um-

  564. 1:36:18

    I would-

  565. 1:36:18

    ... approval.

  566. 1:36:19

    Please just describe what you're doing here today.

  567. 1:36:21

    Okay, great. I'll be happy to.

  568. 1:36:23

    Yes.

  569. 1:36:23

    I'll be happy to. I don't, I don't get paid by the word, so if somebody tells me not to- ... that they're okay with where I am, I'm, I'm okay with keeping it short for you.

  570. 1:36:31

    Just every six minutes.

  571. 1:36:32

    Sure, absolutely.

  572. 1:36:33

    Right.

  573. 1:36:34

    Absolutely. Uh, this property's on Powder Springs Road. It's 5.6 acres. You can see it highlighted on your screens. Uh, to kinda give you a orientation of exactly where it is, uh, across the street is Smith Middle School, and so that tells you where on Powder Springs Road you are. Uh, this proposal, uh, the property is currently zoned R20. It's adjacent to R15 on Powder Springs. It's just down, uh, from the intersection, uh, where you do have a neighborhood activity center in this area. Uh, the request is for a RA5 single family detached neighborhood, um, which is, uh, shown on your screen, for 13 single family detached homes on a very nice street and lot that will be, uh, and property, uh, that will be developed very, very nicely for future homes.

  574. 1:37:18

    Uh, probably the, one of the bigger things that I wanted to point out today, uh, in, in keeping it brief, is that, uh- Um, this stretch of Powder Springs Road, and by the stretch, I mean basically from its intersection with Macland Road to, to the intersection with Ernest, um, to the intersection with, uh, the east west connector. This stretch of Powder Springs Road has seen activity over the years. What it hasn't seen is a proposal for a single family, uh, detached subdivision, uh, like we're proposing here today. We've seen proposals that have been approved for town homes. We've seen, uh, proposals that have been approved for residential senior living in various forms.

  575. 1:37:53

    Uh, we've seen, um, the housing authority, uh, put in a pr- a project as well for seniors within this area. But what we haven't seen in 20-plus years is a single family detached residential development, uh, that I believe actually builds up the schools, uh, that actually I believe builds up this area and is, and, and is, should be very, very welcomed. Um, when you... Uh, if I can get some help. I wanna show you the proposed homes so you can see what's envisioned here by this developer, because I think it's important to see and important to note, especially as you, commissioners, of what they are proposing, uh, for this particular project.

  576. 1:38:29

    Uh, it will tie into a, an existing traffic light, so they'll have to up- upgrade that traffic light across from Smitha Middle School. Uh, and otherwise, uh, we are in agreement with all of staff's comments and recommendations from the departmental review level, um, except for zoning, which we've replaced with our proposal, uh, which includes our stipulation letter, uh, which goes into great detail based on input, uh, from an area resident as well as input from staff and from Commissioner Sheffield as t- in terms of addressing certain concerns and requests.

  577. 1:39:01

    Um, again, happy to answer any questions that you may have, uh, and, uh, appreciate your consideration this morning. Thank you.

  578. 1:39:08

    Thank you for pr- your presentation.

  579. 1:39:10

    Of course.

  580. 1:39:11

    And we'll now hear from opposition.

  581. 1:39:24

    Good morning, Board of Commissioners. Travis McComb, Cobb County School District. Approval of this petition may impact Osborne High School, which is already over capacity. Currently, Osborne High School is over capacity 211 students. We're currently landlocked. We had a recent additions to the school within the last four to five years. Thank you.

  582. 1:39:47

    Thank you.

  583. 1:39:51

    Is there anyone else here in opposition? Turn things over to the district commissioner.

  584. 1:39:57

    Thank you. Uh, Kevin, did we submit these, uh, elevations in the record? I don't...

  585. 1:40:06

    We, we certainly can. I have them here, and they can-

  586. 1:40:08

    Yeah

  587. 1:40:08

    ... be provided to the clerk if you would like.

  588. 1:40:10

    Okay. Yes.

  589. 1:40:11

    Yes, ma'am.

  590. 1:40:11

    Please. Let's do that. Um, okay. Z-37. Um,

  591. 1:40:31

    thanks, g- uh, thanks, Kevin. No, that's good. I appreciate the, um, the amenities. As you guys can see, it's a really small community of just 13 homes, but we were able to be a little creative in creating a, um, amenity area at the front of the community, which will include a walking track, uh, a walking loop on both sides of the amenity area and some small neighborhood amenities, um, so people can remain and feel connected.

  592. 1:41:01

    Um, also, there was concern with wildlife in the area, so the developer agreed to a 10-foot undisturbed buffer in perpetuity to demonstrate the sensitivity of the wildlife, uh, on the property. Uh, this one is slightly above, uh, the 2.5 threshold, but I think that 13 town... I'm sorry, 13 single family residences would be a great addition along Powder Springs Road.

  593. 1:41:32

    Um, I, I, I am supportive of this application. Staff supports it, and, uh, I'm ready, Madam Chair, to make a motion.

  594. 1:41:42

    Okay. Um-

  595. 1:41:44

    So-

  596. 1:41:44

    Sure. Yes, go ahead.

  597. 1:41:46

    Okay. I make a motion to approve Z-37 2026 with the following conditions, include letter of agreeable conditions dated November 16, 2026 from J. Kevin Moore, uh, elevation shared at the Board of Commissioners hearing on November 17, submitted to the clerk as part of, um, as part of the record. Uh, construction hours are restricted to Monday through Saturday, 8:00 AM to 7:00 PM with no construction on Sunday.

  598. 1:42:22

    Let me just check one thing regarding elevations.

  599. 1:42:31

    It may be in the letter, but for the sake of time, I'll include that the district commission- commissioner will im- uh, approve the final site plan and final landscape plan, which may be in the letter already. And all other staff comments and recommendations not otherwise in conflict.

  600. 1:42:49

    Second.

  601. 1:42:50

    Is there any discussion? I'd just like to make an observation-

  602. 1:42:54

    Mm-hmm

  603. 1:42:54

    ... that we did hear from the school board in stating that Osborne was over enrollment by 295, but I do want to note that Hollydale Elementary School has a capacity status of 324 students under capacity. Also, the middle school, Smitha, is also 331 students under capacity, and there's a presumption that if there are any students in this community at all, that they would be at the high school Number two, um, it's also come to the public's attention that the school board is now accepting students from outside of Cobb County to come into Cobb County schools.

  604. 1:43:33

    So the g- the greatest contribution to the capacity of the schools may not solely be from the rezoning applications, but through other practices that the Cobb County School Board has. So I would just ask them to, um, help us work with them with where their interests are, but from what we've seen, there's just some contrasting information to the position that the school board has taken on this matter.

  605. 1:44:01

    Yeah. And, and just to point out also, the zoning application, uh, packet reflects 295 over capacity, but the testimony today was 211, so it's even less than what was originally submitted.

  606. 1:44:16

    Okay. All right, are there any other comments? Call the question. The motion carries 5-0.

  607. 1:44:29

    All right. Next case is rezoning case Z-38 of 2026, Sonny N. McMillan. Request a rezoning from UVC and R-20 TVC for, uh, single family residence and, uh, sale of high-end appliances in land lots 837 and 866 of the 19th District. The property's located on the north side of Powder Springs Road, uh, and on the south side of Pine Grove, Pine Grove Drive across from Sanders Road. Is the applicant present? Is there anyone here opposed to rezoning case Z-38?

  608. 1:45:02

    You got one? Okay. Let the record show there's one person opposed. All those who would like to address the board either for or against, please come forward to be sworn in.

  609. 1:45:36

    That's interesting. Yes, you can begin whenever you're ready.

  610. 1:45:41

    Thank you, Madam Chair. Uh, Kevin Moore here on behalf of the applicant and owner, Sonny McMillan, in this application for rezoning. Uh, this property is located, um, on Powder Springs Road. Actually, it's located, uh, further west on Powder Springs Road once you pass the east-west connector, but right before you get to actually, uh, the city of Powder Springs city limits. Uh, so what you're seeing on your screen is, uh, uh, where the property's located. You see it highlighted. That's Powder Springs Road along the b- kind of the bottom. On the top is a, a road called Pine Grove Road.

  611. 1:46:12

    Just a couple hundred yards further west going to your left, Pine Grove Road and Powder Springs Road then intersect. Uh, but you'll see where this property's located. It's basically the front of it is, is zoned currently UVC, urban village concept, uh, which is something we do not see very often. It was a, it was used back in 2002 when this property was rezoned to UVC. Uh, Mr. McMillan and his wife, Ms. McMillan, uh, live, uh, at this, uh, property. Uh, and they also, at that time, it was approved to UVC to allow them to continue to live at this location as-

  612. 1:46:48

    Bless you

  613. 1:46:48

    ... as well as, uh, have their psychic reading business at this location. Uh, so if you're familiar with this stretch, you've, you've probably seen it through, through the years. Uh, but they also own the rear portion of this property, which fronts out to Pine Grove Road. Uh, but if you're looking at this, um, screen, you'll see to the left as GC zoned property. That's GC and commercial all the way to that intersection with, uh, Pine Grove and Powder Springs Road. This property is, half of it at least, is zoned UVC. But from this particular property, the McMillan property going west, is all within the neighborhood activity center.

  614. 1:47:24

    So the entirety of this property is within the neighborhood activity center, both the front part and the back. Uh, so this application comes to you, uh, for, uh, essentially a, a change, where they would rezone the entire property to the UVC so they can utilize it. Uh, but importantly, what's, what's really proposed here is that, um, they want to continue to live where they've been living since 2002 and before, uh, but instead of having, uh, the current business, the business that they would like to have, uh, from their home, uh, is a high-end appliance business.

  615. 1:47:58

    And so all they would be doing is adding a, uh, what is a storage building to the rear of the property, uh, and you see that l- here on the screen. As a storage building to the rear of their property, they would still live there. Uh, to have a... And by high-end appliances, it's primarily an internet or web-based business, uh, that they, th- would run. Uh, any customers, it's by appointment only. That's per our stipulations and conditions as well. It's just a, a place where they can have some of the inventory stored, um, and delivered out.

  616. 1:48:29

    Uh, but it's not, don't, it's not a, a warehouse. It's not a business that you, where you'd have customers coming routinely through. Uh, it's mainly just to assist them in their, uh, continuation of a, a different type of home-based business, but it would be this type instead of, of the other. Uh, and you can see how they've made those, uh, made the arrangement here on this property. Um, one of the things that we've done through this time has been working with our neighbors. Uh, and I wanted to highlight some of those stipulations for you. And in particular, what Mr., and then I say we, it's really been Mr.

  617. 1:49:02

    McMillan, who's, I believe, has gone very much out of his way in, in terms, and as you should when you're dealing with neighbors, uh, to be very, very neighborly. Uh, one of the things that we've done, uh, and he's agreed to, and it's a part of our stipulation letter, uh, is to install boundary fencing against the adjacent residential neighbors. And I'm gonna flip back to the site plan, and those are the ones on the right. If you remember, it's commercial to the left, and you have, um, commercial at the front, but then t- to the back of the Gillenwater is Mrs. Gillenwater, uh, to the back right.

  618. 1:49:32

    And so we're gonna be able to provide new fencing, uh, that will, uh, provide for that as well as landscaping, uh, a landscaping around, uh, the, uh, property boundaries with the new fencing included along Pine Grove Road. Just want to, want to kind of show you what that orientation look like. Uh, that, uh, in terms of the highlighted stipulations. So we would be installing new landscaping from a buffer standpoint against that existing residential and along that rear portion of Pine Grove Road, which we think is very important, 'cause it becomes residential when you're back across Pine Grove Road.

  619. 1:50:05

    Uh, also, we wanted to provide that there would be no access to Pine Grove Road. Access is totally from Powder Springs Road and solely from Powder Springs Road. And that was another important request from our neighbors, to have no access to Pine Grove Road. And lastly, uh, when you get to Pine Grove, it's a small road, uh, and there are areas outside the property lines but within the right of way and outside of the actual street paving, uh, that, uh, sometimes cannot be ma- are not maintained because it's not the property owner's, it's actually county right of way.

  620. 1:50:36

    But where that is, a lot of the times people do maintain that, and we wanted to make sure we had the commitment that we would maintain those areas outside of our fence that are along the right of way so it, again, presents a nice look. One of the other, uh, aspects of this was an expressed concern of, well, what is this storage building gonna look like, and a concern about, well, let's, let's try to make it look somewhat residential or different in size, different in nature than some sort of warehouse-type building. Uh, Mr. McMillan and Ms. McMillan, uh, have s- uh, searched and, and located this type of building that they would build.

  621. 1:51:09

    It's a storage building. You can see it's much more residential in appearance, uh, and how it would appear very nice looking, uh, and would not be at all out of place in this particular location, and we've agreed to this specific elevation. And I wanted to show you just so you could see the difference. These are pictures that the McMillans took on Pine Grove Road. If you remember that section I told you about, when you move from their property towards the intersection with Powder Springs where you have the commercial properties that stretch between Pine Grove and Powder Springs Road, just like their property does.

  622. 1:51:40

    These are pictures taken from Pine Grove, and you can see those businesses and how it looks for the adjacent properties. The buildings are largely metal, warehouse-y looking buildings as you continue down, with access for other businesses, um, uh, and low commercial businesses located along Pine Grove. And you can see how those appear. Perfectly fine, they're zoned commercial, but I think it's important that you can see what they're doing and really, you know, compare that to what the McMillans have agreed to for their neighbors so that it really comes into p- focus that since their property is the end of the f- of the activity center, it seems actually quite fitting that while it may have a commercial and residential use to it, that that commercial as- aspect is really much more subdued, uh, and with no access to Pine Grove Road, and we think those are extremely important.

  623. 1:52:31

    Lastly, I wanted to touch on, 'cause Ms. Gil- Ms. Gillenwater is here, uh, and go to our actual site plan and survey. Uh, Ms. Gillenwater, as I said, she's, uh, property is up on the far right, uh, adjacent to us. Uh, we, this was a new survey that had been produced, uh, from our surveyor, uh, located here in Cobb County. Uh, likewise, the, uh, Ms. Gillenwater has a surveyor, also a respected surveyor company. Uh, and, uh, initially there was a, um, there was a disagreement between the surveyors about where that property line exactly was and what pin started it and so forth.

  624. 1:53:06

    We have, uh, had our surveyor get with her surveyor, and they have agreed where that line should go, and in fact, it, it does agree with Ms. Gillenwater's surveyor's line, and we're happy that that... And we've agreed to that. In fact, Mr. McMillan has provided even her a written letter dated that the survey line from her survey is the bro- pro- property line, and that the pins and fencing will be put in that location, uh, according to her survey. I know she's gonna have some comments about that, but I wanted to be very kind of, uh, proactive on that note to let you know what has been done from Mr.

  625. 1:53:37

    McMillan's standpoint, who has been very proactive in assuring her that the property line that she's always thought it was remains the same for her, absolutely. Uh, and that we've authorized at our cost, or, well, our, again, at Mr. McMillan's cost, uh, to, uh, reset those pins, uh, for that surveyed line. And so I just wanted to be real clear on that for your sake, since I know that's what she wants to express to you, and that she has something in writing from Mr. McMillan to that effect as well. Uh, with that, we think this is an excellent application to convert this property and just change it, uh, from how it's currently used to a new use which we think is better and more suiting.

  626. 1:54:16

    Uh, and again, this property is within, fully within the future land use plan of a neighborhood activity center. Uh, the McMillans have just done a fantastic job of addressing each and every concern and item and request that has come across during this application. It has been recommended for approval, uh, by staff, as well as a recommendation of approval, uh, from your planning commission, and we would appreciate and very much respectfully request, uh, your vote to approve this application today subject to these conditions. Thank you.

  627. 1:54:43

    Thank you, Kevin. We'll now hear from opposition, and you'll have a total of 10 minutes to address the board. We just ask that you please state your name.

  628. 1:54:51

    Edith Gillenwater.

  629. 1:54:54

    Yes. You can state it here on the microphone. Yes, ma'am. Just watch your step as you... Yeah.

  630. 1:55:05

    Yes. I am here just because of my property. Um-

  631. 1:55:08

    Okay. Tell us your name again, ma'am.

  632. 1:55:10

    Edith Gillenwater.

  633. 1:55:12

    Edith Gilmore. Okay. Yes, ma'am. You can go ahead.

  634. 1:55:15

    I'm sorry.

  635. 1:55:16

    Yes, you can tell us what you would like for us to know.

  636. 1:55:19

    Okay. So they had the survey done, and they put up the fence. And I went out after they put up the fence, and they was two iron post, like, 28 inches or 30 inches, I don't know, just iron post laying out there beside of where he said his property line was. So I was talking to my son and telling him what, you know, they put up the f- the fence, and this is what I found. And he said, "Well, sound like you're gonna have to get a surveyor to s- make sure where your line is." So that's what I did.

  637. 1:55:58

    I got- The surveyor done. But they sent me a, the survey on my phone, and it is telling me that they cannot clear the... I cannot get a clear survey until they take down the fence, which he did yesterday.

  638. 1:56:18

    Okay.

  639. 1:56:19

    He took the fence down on my side, and he's promised to, to make everything right. But they're, they're saying there is four bars, half bars, I mean, no, three I think, in different areas, and they can't put down their bar until, you know, these have been taken up, I guess. But that, that's my problem. We, I've lived there for 40 years. We lived there before Powder Springs Road was widened and East-West Connector wasn't there and...

  640. 1:56:55

    But I just want to be able to get a clear deed to my property.

  641. 1:57:02

    Mm. Understood. I'm sure the commissioner will take that into consideration-

  642. 1:57:08

    Thank, thank you

  643. 1:57:08

    ... when she addresses the case. Thank you.

  644. 1:57:11

    She can just-

  645. 1:57:12

    She said you can just stay there.

  646. 1:57:13

    Yes, I don't want her to have to walk back and forth.

  647. 1:57:14

    Okay. Do you mind staying there? She's gonna ask you some... We are gonna have to... Can you stay here?

  648. 1:57:21

    I'm sorry?

  649. 1:57:21

    Just gonna ask you a couple of questions.

  650. 1:57:24

    I'm not understanding.

  651. 1:57:25

    Well, I just didn't want her to have to-

  652. 1:57:26

    I understand

  653. 1:57:26

    ... keep walking back and forth.

  654. 1:57:28

    Okay.

  655. 1:57:28

    Why don't we just end the hearing so we can get to the deliberation, and then we'll move to Commissioner Sheffield. Okay. So I'm gonna thank you with your, um, comments, and I'm gonna turn things over to Commissioner Sheffield.

  656. 1:57:44

    Thank you for joining.

  657. 1:57:45

    I can go ahead and-

  658. 1:57:45

    Okay. Thank you for joining us today. I just didn't want you to have to walk back to your seat and walk back to the podium. But you mentioned that there's still pins or posts on your property that need to be removed. I think you said there were three or four of them, or four bars that need to be removed.

  659. 1:58:01

    About the bars, is that what you're asking?

  660. 1:58:04

    Y- yes, ma'am.

  661. 1:58:04

    Yes, ma'am.

  662. 1:58:05

    Yes. Yes. It shows on your, that, uh...

  663. 1:58:11

    About the bars.

  664. 1:58:12

    Okay. And they're still on your property?

  665. 1:58:15

    Yes.

  666. 1:58:16

    Okay. And you cannot receive a f- a complete survey until those are removed?

  667. 1:58:24

    Right.

  668. 1:58:24

    Okay. All right. Thank you. I just wanted that clarification. So you're waiting for this to be removed before you can receive a final survey.

  669. 1:58:35

    I, I want them to come out and make a clear, say everything's right, you know, and give me a clear-

  670. 1:58:40

    Yes, ma'am

  671. 1:58:40

    ... survey.

  672. 1:58:41

    Okay. All right. Thank you.

  673. 1:58:43

    Thank you.

  674. 1:58:43

    That's all I have for the applicant, unless you guys have anything.

  675. 1:58:51

    Kevin?

  676. 1:59:02

    Um, she, she mentioned that the fence was removed on 11/16, but there remains four bars. Do you have a timeframe on when that would be removed?

  677. 1:59:12

    They may be out there doing it today.

  678. 1:59:13

    Okay.

  679. 1:59:14

    I'm not sure. But, uh, this has been an ongoing process. You know, we, we had a, our surveyor, um, d- do it, and then, th- uh, the, her surveyor also. And this happens quite often. And then you get the two surveyors to get together to figure out was there an error somewhere that somebody made, and they were able to resolve it, um, where, uh, it was, uh, handled in... It's actually the line that she has thought it was.

  680. 1:59:40

    Mm-hmm.

  681. 1:59:41

    Um, and so where he had placed pins, he's now going back to out, out. Since we've moved the fence, um, he's going back out and removing those pins as well, um, and then her surveyor will be able to produ- produce the, the correct survey.

  682. 1:59:54

    Okay.

  683. 1:59:54

    Yeah.

  684. 1:59:54

    I was just won-

  685. 1:59:55

    It's happening as we speak.

  686. 1:59:56

    Okay. I, I just wanted to confirm that timeframe-

  687. 1:59:59

    Mm-hmm

  688. 1:59:59

    ... because I, I would like for her to receive a-

  689. 2:00:01

    Yeah. Oh, absolutely

  690. 2:00:02

    ... a final survey.

  691. 2:00:03

    Yes. And he-

  692. 2:00:04

    Um-

  693. 2:00:04

    ... and he gave her a, he wrote her a letter, uh, and sign- Mr. McMillan did-

  694. 2:00:09

    Mm-hmm

  695. 2:00:09

    ... you know, com- stating just what I just told you, so that it's-

  696. 2:00:12

    Okay

  697. 2:00:12

    ... in writing from him to her.

  698. 2:00:13

    Okay. And has she received it-

  699. 2:00:15

    Yes, ma'am

  700. 2:00:15

    ... the letter? Okay. You received it? Okay. All right.

  701. 2:00:18

    Yes, ma'am.

  702. 2:00:19

    Mm-hmm.

  703. 2:00:19

    In her envelope, yes.

  704. 2:00:20

    Mm-hmm. Okay. Yeah. Um, all right. So...

  705. 2:00:27

    Um, Commissioner Birrell asked if we can enter that on the record, the letter.

  706. 2:00:30

    Mm-hmm. Okay.

  707. 2:00:32

    A copy.

  708. 2:00:32

    Certainly.

  709. 2:00:32

    A copy. Mm-hmm.

  710. 2:00:33

    I can, I can provide that copy. Sure.

  711. 2:00:35

    Thank you.

  712. 2:00:35

    I'd be happy to.

  713. 2:00:36

    Yep.

  714. 2:00:36

    Okay.

  715. 2:00:37

    Okay. Thank you.

  716. 2:00:38

    You have the copy?

  717. 2:00:38

    Um, the parking, the request, um, was to reduce it to zero. How do they plan to accommodate customer parking?

  718. 2:00:48

    Well, it, it's by appointment only. Um, and so if you'll, um, if you look on your screen, you can see where you have the driveway that comes in, and then over, uh... And this is existing, uh, where customers would come in, and there, there's parking area there to the right. It's just not designated striped parking, uh, because it's just the same type of parking they've had for the last 24 years.

  719. 2:01:11

    Mm-hmm.

  720. 2:01:12

    But it's not, it's not designated parking, which if we called it parking, it'd have to be striped.

  721. 2:01:16

    Got it.

  722. 2:01:17

    And this, and this-

  723. 2:01:17

    Mm-hmm

  724. 2:01:17

    ... and the idea is it's not, this is not that l- level of commercial-

  725. 2:01:21

    Okay

  726. 2:01:21

    ... operation.

  727. 2:01:21

    All right. Um,

  728. 2:01:26

    although this is a online business, this will, the storage set, which is beautiful, will serve as a, um, showroom of sorts. So-

  729. 2:01:36

    It could, yes

  730. 2:01:37

    ... can you share with us what the delivery schedule is for the appliances, and if you know at this point about how many, how many appliances, uh, will be stored in that unit? It may be tough to, to say because you don't know what, what they plan to sell from there. But I'm more concerned-

  731. 2:01:57

    Sure

  732. 2:01:57

    ... or interested in knowing the delivery schedule of the appliances.

  733. 2:02:00

    Sure. That's, I, let me, let me get that information. I'll provide it to you.

  734. 2:02:04

    Okay.

  735. 2:02:27

    Yes. So in terms of deliveries, um, once or twice a month is all that s- it, is all that it would be. You could have months that there might not be any. Uh, but I think if you s- uh, based on what that information is, but once or twice a month.

  736. 2:02:45

    Okay.

  737. 2:02:47

    It's, it's pretty, it's limited. It's just an area where like they can have that if somebody wants to see it on an appointment-level basis, uh, and also one where it can also be delivered out, so once or twice a month.

  738. 2:02:59

    Okay. Um, also just reading stormwater comments, it's likely that this development may trigger the 5,000 square foot threshold to install, install a stormwater management-

  739. 2:03:13

    It, it's-

  740. 2:03:13

    ... facility

  741. 2:03:14

    ... it's intentionally designed to be below that threshold.

  742. 2:03:17

    Okay.

  743. 2:03:17

    That's why it's smaller.

  744. 2:03:19

    Okay. All right.

  745. 2:03:19

    So it's intentionally designed to be below the, that... We're well aware of that threshold for stormwater management, so we're intentionally keeping it below that threshold.

  746. 2:03:27

    Okay. And obviously, stormwater will confirm that through, um-

  747. 2:03:30

    Sure

  748. 2:03:30

    ... during site plan review.

  749. 2:03:31

    Of course, if it-

  750. 2:03:32

    Um, also with the fencing, you and I discussed evergreens to be planted along the fencing, but I didn't find that in the stipulation letter.

  751. 2:03:43

    I believe...

  752. 2:03:47

    If we...

  753. 2:03:57

    We can add that if it's not in there, that the, that the applicant is, is agreeable to installation of, uh, evergreen trees-

  754. 2:04:07

    Okay

  755. 2:04:07

    ... as the, as, as the landscaping along the fence.

  756. 2:04:11

    Okay.

  757. 2:04:15

    If it's not in there, it's supposed to be, so if, w- if, if that's not, then please include that if, if you're considering any approval.

  758. 2:04:22

    Okay. All right. Um, I don't think I had any other questions. We dealt with that. We dealt with that. Parking space is up on there. I don't have anything else for Kevin, uh, the applicant, um, or opposition, so do you guys have anything?

  759. 2:04:39

    Commissioner Birrell?

  760. 2:04:41

    Yeah, I just have one question. So, um, this is all online ordering-

  761. 2:04:48

    Yes

  762. 2:04:48

    ... and then if somebody orders an appliance online-

  763. 2:04:53

    Mm-hmm

  764. 2:04:53

    ... then is that when it would be shipped to this warehouse, this storage facility, and then they would come pick it up by appointment only?

  765. 2:05:04

    It could be. That, that's one way to do it. It also can be shipped directly to them, uh, or this could be a location where somebody picks, picks it out, comes to come see it and picks it out, and then they, it's delivered to them. And so it's a-

  766. 2:05:17

    I see

  767. 2:05:17

    ... it can happen any, uh, any of those ways, but that's why it's appointment only, um, again, for that reason.

  768. 2:05:24

    Okay.

  769. 2:05:24

    So it's a low volume.

  770. 2:05:25

    Yeah. That's... When you said one to two a month, that's-

  771. 2:05:30

    Right

  772. 2:05:30

    ... that's what I was thinking. So, um, it could be shipped directly to the-

  773. 2:05:35

    Could. That's right

  774. 2:05:36

    ...

  775. 2:05:38

    home. Okay.

  776. 2:05:39

    And Commissioners, while I've got you, this is a copy of that letter, uh, that's to Mrs. Gilwater, and I wanted to just make sure that's placed in the record.

  777. 2:05:47

    Okay.

  778. 2:05:54

    Okay.

  779. 2:05:55

    Thank you.

  780. 2:05:56

    Mm-hmm. Does anyone have anything else for Kevin or for opposition? Okay. All right. Okay, let me just kinda get the...

  781. 2:06:09

    Okay. All right. Um, thank you, Kevin, for working with the, uh, neighbors, your client working with the neighbors. They have been, uh, had a business there quite some time in the community. Uh, Madam Chair, if you recall, that's the psychic building that's-

  782. 2:06:28

    Yeah.

  783. 2:06:29

    Yeah, yeah. So they've been there for many years, so I'm glad to see that there is a, um, they continue to invest in their business, although this is a different business from what's currently there. Uh, also like to thank, uh, the opposition, Ms. G- Gilwater, for coming down, and you have the letter, so I feel confident that those pins will be moved, and you'll receive your survey, um, in, in the coming weeks and possibly a month.

  784. 2:06:59

    Um, so thank you for joining us today and being a part of the process. Um, I am supportive of the application, uh, staff's recommendation and the PC app, uh, recommendation, and I am prepared to make a motion, Chair.

  785. 2:07:14

    Yes, ma'am.

  786. 2:07:16

    I make a motion to approve Z-38-2026 with the following conditions: That delivery shall be once or twice per month, uh, the applicant will install evergreen trees for landscaping along the fence, uh, and

  787. 2:07:39

    all other staff comments and recommendations not otherwise in conflict.

  788. 2:07:46

    Thank you. I'll second.

  789. 2:07:47

    Ma'am.

  790. 2:07:47

    I think you said Z-28. You meant 38?

  791. 2:07:50

    I'm sorry, did I say 28? Yeah, it's Z-38.

  792. 2:07:53

    Okay.

  793. 2:07:54

    Yes. Thank you.

  794. 2:07:54

    All right. You're welcome.

  795. 2:07:56

    And do you have the stip letter?

  796. 2:07:59

    Yes. Thank you.

  797. 2:08:00

    All right.

  798. 2:08:00

    And to include, uh, the October 27th, 2026 stipulation letter from Kevin, Kevin Moore.

  799. 2:08:10

    Thank you. There's a, a motion and a second. Is there any discussion? Call the question. The motion carries 5-0.

  800. 2:08:23

    All right. Next case we're gonna hear is LEP-6 of 2026, Tasha Tolbert and Elisa Steele request a temporary land use permit to allow an increase in the capacity of a group home from four residents to eight residents in Land Lot 590 of the 16th District. The property's located on the west side of Morgan Road, south of Ramblewood Lane... or excuse me, Ramblewood Drive. Is the applicant present? Is the applicant here for LEP-6, Tasha Tolbert with Elisa Steele?

  801. 2:08:56

    They haven't been here.

  802. 2:08:57

    Is there anyone here opposed to this case?

  803. 2:09:02

    Madam Chair, board, the applicant is not present, and the applicant was not present either for the Planning Commission hearing-

  804. 2:09:07

    All right

  805. 2:09:07

    ... so they-

  806. 2:09:08

    Yeah, I see

  807. 2:09:08

    ... denied it without prejudice.

  808. 2:09:10

    Okay, I'm gonna turn it over to district, to our district commissioner, excuse me. Three.

  809. 2:09:17

    Um, thank you. You know, this has been continued for several months. Actually, when it initially came in, it was, um, continued or held for three months, and the applicant has not been here at Planning Commission, and now we're getting it, and they're still not here. Uh, the request was a group home for eight, um, residents, but at the time when they came in, they didn't even have three or four.

  810. 2:09:58

    They had none. So if they haven't gotten even four, which we don't know, 'cause they haven't been here to ask, um, but Planning Commission denied it at their meeting this month, and staff has recommended denial. And I would like, like to make a motion, uh, to deny this. Um, but also they can still have a group home of three or four with sprinklers, so they'll still be allowed to do the initial amount.

  811. 2:10:38

    So I make a motion to deny.

  812. 2:10:42

    Second. Is there any further discussion? Call the question. The motion carries 5-0.

  813. 2:10:52

    All right. The next case is LEP-30 of 2026, Keith Mingo requests a land use permit to allow more vehicles than the code allows in Land Lots 1027 and 1028 of the 19th District. The property is located on the northwest corner of Cherry Ridge Drive and Hiram, uh, Lithia Springs Road. Is the applicant present? Is the applicant here for LEP-30, Keith Mingo? Is there anyone here opposed to this case?

  814. 2:11:21

    Mm.

  815. 2:11:21

    So we have four opposed, and, uh, this applicant no showed, uh, for the Planning Commission.

  816. 2:11:29

    All right. I'll turn it over to the commissioner.

  817. 2:11:31

    Yeah.

  818. 2:11:35

    Um, the applicant was a no-show for the BOC. And was it PC also last month? There was a no-show.

  819. 2:11:43

    It was a no-show for the, uh, the, uh, the BOC last month.

  820. 2:11:48

    Mm-hmm.

  821. 2:11:48

    So he no showed October 20th.

  822. 2:11:50

    Right.

  823. 2:11:50

    And now he's no showing now.

  824. 2:11:51

    Right.

  825. 2:11:52

    And-

  826. 2:11:52

    But for PC, was he also a no-show?

  827. 2:11:53

    He... I believe he was here for the PC in October.

  828. 2:11:55

    Okay. And we reached out to him on Friday to remind him of-

  829. 2:12:00

    Yes

  830. 2:12:00

    ... today's hearing? Okay. Um, and much like last month, we have opposition, uh, who's here, and they had an opportunity to speak, uh, last month. But at this stage, I am, um, moving forward to deny this application, and I'd like to make a motion to do that. But, um, what I'll say is when, when this is denied or upon denying this application, the applicant would still need...

  831. 2:12:34

    And this is for the, um, for the, uh, neighbors. He would still need to bring his property into compliance. So it's not that it's going to be denied and he will continue, uh, to operate the way he has been. But once it's been denied and the decision is rendered, then Code Enforcement will continue to work towards him bringing it into compliance. And I just want to be able to share that with you so you'll know what the next steps are. Um, I saw a raised hand.

  832. 2:13:07

    Um, I would be willing to have you come since you all made time to come down today. So if you would like to approach, um, and be sworn in, then you can approach and, and...

  833. 2:13:34

    I would just like to ask upon this that I hear what you-

  834. 2:13:36

    Please state, yeah, please state your name first.

  835. 2:13:37

    Delores Smith.

  836. 2:13:38

    Thank you, Delores.

  837. 2:13:39

    Sorry.

  838. 2:13:39

    Okay.

  839. 2:13:39

    Upon this, what you just said, how long... W- will it be up to Code Enforcement how long he has to remove it?

  840. 2:13:47

    Hmm.

  841. 2:13:49

    This has been going on for two years.

  842. 2:13:51

    Yeah. It has been going... Well, a- and Debbie helped me with this, because this I'm going to deny with prejudice. That means he cannot come back. So in term- for a year at least, right? So in terms of Code Enforcement, and I know, you know, I can add conditions for him to remove it in a certain timeframe, but how, how would that work with, like, Code Enforcement?

  843. 2:14:15

    Sure You know, he did receive a notice of violation from code enforcement-

  844. 2:14:20

    Mm-hmm

  845. 2:14:20

    ... so all, all enforcement is stayed until there's a decision, a decision by the board. So if the board denies this, then we're gonna go immediately back to our code enforcement action on it.

  846. 2:14:30

    Mm-hmm.

  847. 2:14:30

    He'll probably get a citation.

  848. 2:14:32

    I guess what the thought is, can we, rather than continue to go through that process, because it's been going on for so long, if I can just require him to remove it, like, in 30 days or something like that.

  849. 2:14:48

    If it would be possible, could... A timeline would be great.

  850. 2:14:51

    I mean, yeah.

  851. 2:14:52

    These, these-

  852. 2:14:52

    'Cause they've been doing-

  853. 2:14:53

    ... deadlines have been dodged for two years.

  854. 2:14:55

    Yeah.

  855. 2:14:56

    I guess we could add a, a clerk's note that it, all, uh, improper vehicles be removed within 30 days from today's date.

  856. 2:15:04

    Thank you.

  857. 2:15:05

    That... Okay. All right. All right.

  858. 2:15:07

    Thank you, Queen. Thank you.

  859. 2:15:09

    And I know sometimes, you know, we oftentimes do this, but sometimes-

  860. 2:15:12

    Mm-hmm

  861. 2:15:12

    ... it's just, if we kinda go back and forth-

  862. 2:15:14

    It's 12

  863. 2:15:14

    ... I can never... I just wanna clear with legal.

  864. 2:15:16

    Okay.

  865. 2:15:20

    Okay. Okay. So, um, I make a motion to deny LUP 302026 with prejudice, and I will also require, as a cl- a clerk's note, that the applicant brings the property in compliance within 30 days. Let me just give a date here.

  866. 2:15:46

    30 days. Okay, 30 days. Well, I still wanna give a date, so let- let's just say December... Let's say December 18th, 2026, to come into full, full compliance.

  867. 2:16:03

    Second.

  868. 2:16:04

    Is there any further discussion? Call the question. The motion carries, 5-0.

  869. 2:16:12

    Thank you.

  870. 2:16:13

    You're welcome. Thank you.

  871. 2:16:16

    All right. Next case is LUP 31 of 2026, Doris Diaz requests a temporary land use permit to allow more vehicles and adults than the code allows in land lot 564 of the 19th District. The property's located on the east side of Elkhart Circle. Is the applicant present? Uh, the applicant is here. Is there anyone here opposed to LUP 31?

  872. 2:16:42

    Okay, let the record show there's no one opposed. Would the applicant please come forward to be sworn in?

  873. 2:17:08

    My name is Doris Diaz.

  874. 2:17:11

    Good morning. My name is, um, Yareli Arias. I will be interpreting on behalf of her.

  875. 2:17:15

    Thank you.

  876. 2:17:16

    Thank you.

  877. 2:17:17

    Mm-hmm.

  878. 2:17:20

    You may begin your presentation whenever you're ready.

  879. 2:17:23

    Okay.

  880. 2:17:23

    Just ask that you state your name first.

  881. 2:17:26

    Okay.

  882. 2:17:52

    Okay. Um, so my name is Doris Diaz, and this is my third time here already. Um, they did... I went to the DOT to, um, get approval for extra vehicles in my property, and I did, uh, do, uh, like, a concrete driveway. Um, so I mean, that's what we have here to see if, uh, would it be approved.

  883. 2:18:35

    Okay. So we went to DOT to, um, ask for permission if we needed any additional, like, permits to, uh, do a driveway, and they said they didn't need any additional permits. Um, and then we went back again because the DOT didn't approve for it, and they said that who told me to do the driveway, but I have the name of the person who did say that no permits were needed.

  884. 2:19:02

    Okay.

  885. 2:19:12

    Um, do you have any questions for me?

  886. 2:19:15

    Thank you. For this pre... For this part of the hearing, you get 10 minutes to present-

  887. 2:19:22

    Okay

  888. 2:19:22

    ... and tell us what's going on. I do remember the applicant, so she probably doesn't need to share everything, but during this time, we don't ask you questions yet.

  889. 2:19:32

    Okay.

  890. 2:19:33

    We'll just, we just listen.

  891. 2:19:35

    Okay.

  892. 2:19:35

    Then when we close this portion of the hearing, I'll turn it over to the commissioner, and then we can begin the questions.

  893. 2:19:43

    Okay.

  894. 2:19:58

    Okay. So I was just asking for permission to have more people and more vehicles, um, since we live, uh, five people in the home. Um, so it'd be me, my, uh, boyfriend, two children, and two grandchildren that live in the property. Um, I also wanted to state that, uh, prior, uh, prior years, um, I left the car on the curb and overnight there's a car that hit my car. So we wanna prevent that, and that's the reason for asking for this permit.

  895. 2:20:30

    For the driveway, to have two, uh, additional cars on the other side, and the rest on the original driveway.

  896. 2:20:37

    Okay.

  897. 2:20:38

    Mm-hmm.

  898. 2:20:44

    Is there anything else that you would like for us to know?

  899. 2:21:06

    And in prior, uh, hearings that we had, we've had, um, uh, pe- uh, somebody came and was opposed to us, but the reason that they had pictures of more cars being on the property was because I do have, um, like, biblical, uh, reunions and church r- reunions at my house, but that only happens... So twice per week. That's it.

  900. 2:21:43

    So we have, uh, just family meetings and, you know, women meetings that, um-

  901. 2:21:48

    Yes, ma'am

  902. 2:21:48

    ... from Monday and Tuesday, and that'll be it. Yeah.

  903. 2:21:58

    So we only ask for five, uh, permission for five cars in the property.

  904. 2:22:03

    Okay.

  905. 2:22:04

    Okay. All right. That's all.

  906. 2:22:07

    Thank you.

  907. 2:22:08

    Thank you.

  908. 2:22:08

    Thank you. Appreciate it.

  909. 2:22:10

    Okay.

  910. 2:22:10

    Again, I just wanna check to see if there's anybody in opposition.

  911. 2:22:17

    You're in opposition to this matter, ma'am? Okay, yes, then you'll need to be sworn in to speak. You'll need to come s- be... Thank you, ma'am. We do have one person in opposition today.

  912. 2:22:28

    Mm-hmm.

  913. 2:22:43

    Again, just ask that you state your name and then you'll see a timer up there.

  914. 2:22:48

    Okay. My name is Gary Cameron and I did speak out on the last meeting about the additional cars, and I am still opposed to the, the additional cars. In the last meeting, they did not have a permit for the paved area that they have for the cars.

  915. 2:23:07

    Mm-hmm.

  916. 2:23:08

    And that's why I am still in opposition to having those additional cars. Children are out there playing, and with other people coming by, it is hard to get by without walking out in the street or crossing over and coming back.

  917. 2:23:24

    Okay. Thank you, ma'am.

  918. 2:23:29

    All right. Anybody else?

  919. 2:23:34

    Okay, th- this closes that portion of the hearing. I'm gonna turn things over to the district commissioner.

  920. 2:23:38

    Thank you, Chair. Um, I call Wilson up.

  921. 2:23:56

    Cobb County Department of Transportation, Wilson Collins.

  922. 2:23:59

    Okay. Well, for starters, I'll ask you to clarify whether or not a perm- permit was required for the paved area. I believe there's, like, an apron that exists or a parking pad that exists on the property.

  923. 2:24:12

    Uh, what was installed and showed on the photos would have required a driveway permit, yes, Commissioner.

  924. 2:24:17

    Okay. And the applicant communicated that at one point they were told they needed a permit, and then they were told they were not, they did not need a permit. Um, would you happen to know or have any background on, on that confusion? Because I know that you spoke with them quite a bit over the last couple weeks.

  925. 2:24:40

    I, I think I've pieced it together okay. Uh, I believe it might have been code enforcement that came out-

  926. 2:24:46

    Okay

  927. 2:24:46

    ... and s- and said that, uh, t- t- they came out for vehicles and gravel, and that, uh, that parking had to be on a solid surface, such as concrete strips or a full concrete pad for the two vehicles.

  928. 2:24:59

    Okay.

  929. 2:24:59

    Um, I, I don't know if there... Is, if that would've been out of the right of way and not a full driveway apron, that would've, would not have b- required a permit. But as it's installed-

  930. 2:25:09

    Okay

  931. 2:25:09

    ... it, it does.

  932. 2:25:10

    Okay. It seems like the applicant may have been responsive to, uh, the code enforcement request without realizing that a permit was required.

  933. 2:25:19

    I believe so.

  934. 2:25:20

    That's probably what might have happened. Okay. Um, so w- we spoke about a week and a half ago when you had a recommendation, uh, on, um, on the driveway, if you wouldn't mind sharing that with us for the record.

  935. 2:25:35

    Uh, yes, Commissioner. After reviewing the distances for the second driveway, uh, it would not be permittable. Uh, but if the applicant, uh, wanted to extend the existing driveway concrete area after it leaves the right of way on the existing, um, I guess, parking pad concrete in front of their house, if they could e- extend that to allow additional vehicles to be parked on that hardened surface, uh, that would be a way to, uh, get the vehicles on a hardened surface without getting an additional driveway, just, uh, adding more surface, and it appears that that would be, uh, below the, uh, threshold for impervious area as well.

  936. 2:26:16

    Okay. And, and just for context, so we're painting a very accurate picture, if you can use the clicker and just kinda draw the area that you're referencing so that everyone can follow along with your recommendation.

  937. 2:26:34

    And while you're doing that, I'll just draw the attention, uh, there's a driveway across the street at the R20 lot, and you'll see where there are two vehicles parked in a driveway.

  938. 2:26:47

    Uh.

  939. 2:26:48

    The... No, across the street.

  940. 2:26:52

    Okay.

  941. 2:26:52

    Mm-hmm.

  942. 2:26:53

    Across-

  943. 2:26:54

    Wait.

  944. 2:26:54

    Across the street. Where it says R20. Yeah, where it says R20. Excuse me. That was your recommendation for the subject parcel. You see how the driveway kinda goes over to the right?

  945. 2:27:09

    Uh-huh.

  946. 2:27:09

    Oh, I see.

  947. 2:27:09

    I, I s- um

  948. 2:27:10

    Yeah

  949. 2:27:10

    ... it was a different address, um, a couple of blocks away. I could find that very-

  950. 2:27:17

    Right. But your recommendation is very similar to what's on the R20 lot in terms of extending the driveway-

  951. 2:27:22

    Oh

  952. 2:27:22

    ... for the subject parcel.

  953. 2:27:24

    Oh. Oh, oh, I see. Yeah.

  954. 2:27:25

    Where it says R20 parcel.

  955. 2:27:25

    Sorry.

  956. 2:27:26

    Oh, okay. Screen.

  957. 2:27:27

    But-

  958. 2:27:27

    Oh, it says it on our screen. Okay. Yes. I'm like, "It says R20."

  959. 2:27:33

    Sorry, we got there.

  960. 2:27:34

    No. Okay.

  961. 2:27:35

    We got there.

  962. 2:27:35

    No, I didn't realize that. Thank you, T. I didn't realize that it didn't say. I wasn't looking. Um, yeah, so just kinda share with us your recommendation for the subject parcel.

  963. 2:27:45

    Uh, since this second driveway is not permittable, I would recommend it being removed, uh, to... As it would not be permittable and, and should not be in a right of way, and should be restored, um, with, uh, with grass or some other type of vegetation. Um, but for the parking, they could extend their surface area on their existing driveway within the property line, um, as an alternative.

  964. 2:28:13

    Okay. Is there a re- recommendation for the width?

  965. 2:28:20

    On the, uh... Great question. Uh, I believe it is less than 20 feet wide right now based on GIS, and they could absolutely, uh, widen their driveway to 20 feet wide at the right of way with- without even triggering a permit. Uh, so, so a way to get additional, um,

  966. 2:28:45

    area to the side without going to the side of the house. They could get 20 feet a- across the driveway. Absolutely.

  967. 2:28:52

    Okay. All right. Um,

  968. 2:28:57

    I don't have any other questions for Wilson, unless you guys have a question for him. I do.

  969. 2:29:03

    We do. And I don't know if it's for you, Commissioner, or, um, for DOT. Can we, um, zoom out a little bit and just look at that property across the street?

  970. 2:29:13

    Mm-hmm.

  971. 2:29:13

    And this is what I presumed you were getting at.

  972. 2:29:15

    Mm-hmm.

  973. 2:29:15

    There's a pr- there's a property here. It's a hot mess on the left, but-

  974. 2:29:19

    I digress.

  975. 2:29:21

    Um-

  976. 2:29:21

    It is a hot mess.

  977. 2:29:23

    You see how they have that second driveway on that property? Is that what you were talking about, trying to do something like that? 'Cause I'm hearing that that's not what's-

  978. 2:29:31

    What-

  979. 2:29:31

    ... being deliberated. That we're just looking at widening the other-

  980. 2:29:35

    Right

  981. 2:29:36

    ... property.

  982. 2:29:36

    But yeah, just widening it, widening in it. But my thought was, and I thought this was the conversation you had with the applicant, that to the right of this home would be similar-

  983. 2:29:49

    Yes

  984. 2:29:49

    ... to the home that's at R20.

  985. 2:29:51

    Yes, that's what I'm thinking too.

  986. 2:29:51

    That's what I thought the conversation was with the applicant.

  987. 2:29:55

    'Cause it's h- it's already dirt, so you can tell there's activity. And like you said, there are the two cars there. I thought that's where you were going, to get that paved and... I don't know. Are we saying that's not a option, or that would, that would require a permit?

  988. 2:30:15

    The gravel area outside of the right of way could be paved, uh, but would have to be accessed from the right of way from the primary, uh, driveway that's already concrete.

  989. 2:30:27

    Mm-hmm.

  990. 2:30:27

    Uh, so, so-

  991. 2:30:28

    Okay

  992. 2:30:28

    ... in order to get that area, it would have to be-

  993. 2:30:29

    I see what you're saying

  994. 2:30:29

    ... from that single access.

  995. 2:30:31

    I see. Okay. Yeah.

  996. 2:30:32

    Mm-hmm.

  997. 2:30:33

    So the other one might not be in compliance across the street. Okay. Well, you pick it up. We got a lot of people getting in trouble today.

  998. 2:30:41

    So ju- just finally, uh, for clearance, if you wouldn't mind, just take the clicker, uh, or the pointer and just draw on the subject parcel where you're proposing the extended driveway. Because I wanna make sure that the applicant is clear, because I had not been a part of the conversation between you and the applicant, and I wanna make sure that there's clarity in what we're asking of her.

  999. 2:31:09

    Okay. Um, all right.

  1000. 2:31:35

    Yeah, but

  1001. 2:31:50

    Okay.

  1002. 2:31:51

    For consideration, a potential option, um, and this would a- again, be on private property and is up there to their own means and methods, but, uh, based on what I've seen in the neighborhood for additional area outside of the right of way, uh, one example would be, uh, right there.

  1003. 2:32:08

    Okay. All right. So this is my understanding based on our conversation of your recommendation, and I recall our conversation, you mentioned that it would be extended by 20 feet. So with this outline that we're looking, with this outline that we're looking at, is that roughly about 20 feet is what you would recommend?

  1004. 2:32:32

    On the existing? It would have to be measured. It's-

  1005. 2:32:35

    Okay

  1006. 2:32:36

    Within a few feet, but probably a little bit less than 20 feet right now.

  1007. 2:32:40

    Okay. And this is the conversation you had with the applicant, and I'll have the applicant come up and confirm her understanding of it. But when you spoke with the applicant, this is what they were agreeable to?

  1008. 2:33:12

    And I can call the applicant up in the meantime, if you wouldn't mind. If the applicant would approach, please. Thank you. I'll just confirm from them if that, if they... Okay. Hmm?

  1009. 2:33:30

    He needs to stand

  1010. 2:33:35

    I understand that there has been conversation between you and DOT, uh, after our last zoning hearing with respect to a solution to the parking. And my understanding is that the proposal that you see on the screen here outlined in red is what has been recommended to Ms. Diaz.

  1011. 2:33:57

    That's what I understand.

  1012. 2:33:58

    And I just want to make sure that that is her understanding of what we are being asked.

  1013. 2:34:05

    So,

  1014. 2:34:13

    Okay.

  1015. 2:34:28

    If it's okay, can I show some pictures of the... Yeah, sure.

  1016. 2:34:46

    So that's the extension that I did, uh, do on the, uh, other side of the-

  1017. 2:34:51

    Mm-hmm

  1018. 2:34:51

    ... house, because on the, the original driveway, it goes into, like, a slope. It goes down since it has a basement. On that side of the house, um, I do have a, a garage that is behind... uh, that I currently use as a storage. So that's the one that I created right now.

  1019. 2:35:14

    Um, if I could, uh, possibly extend it if, if it needs to d- be extended.

  1020. 2:35:28

    Yeah, because on the original driveway, it-

  1021. 2:35:30

    I'm sorry

  1022. 2:35:31

    ... it goes down. It goes, like, literally go... The, like, the grass area goes straight down.

  1023. 2:35:38

    At the o-

  1024. 2:35:38

    So there's no way to actually do a driveway, like an additional side of the driveway.

  1025. 2:35:48

    Okay. Okay. But can we place the, uh, the aerial back up with the red outline?

  1026. 2:35:55

    Okay.

  1027. 2:35:55

    Because I would like for you to point at the area where there is a topography challenge.

  1028. 2:36:03

    So you mentioned that on this side of the property, that the property goes down.

  1029. 2:36:09

    It, it, yeah, it goes down into a slope. It... So-

  1030. 2:36:12

    Okay

  1031. 2:36:12

    ... I mean, the... from the driveway, and then it goes down, since that side of the house has a, a basement.

  1032. 2:36:22

    But there's also a boat door. Is the boat door on that side?

  1033. 2:36:26

    The, the, the si- uh, it's on the other side of the house, so where the bravo would be.

  1034. 2:36:33

    Okay.

  1035. 2:36:33

    So that's where... on the back si-

  1036. 2:36:35

    That's where you would access the boat door.

  1037. 2:36:37

    Yes.

  1038. 2:36:37

    But on this side, there's a, a slope or drop.

  1039. 2:36:41

    Yes.

  1040. 2:36:43

    And that drop would be within the proposed area of the driveway?

  1041. 2:36:49

    See-

  1042. 2:36:50

    Because I'm just trying to figure out, when you had the discussion with DOT, um, and I don't know if you shared that with DOT, but I'm just trying to figure out why that wasn't resolved before now

  1043. 2:37:19

    So, um, ac- according to her, um, there was never a mention or a suggestion to create an additional space on the side of the house, um, so we opted for the other side and asked for if there was any permits needed for... to, to do the, um, d- driveway for two cars, and there was no permit necessary said.

  1044. 2:37:43

    Okay. I, I

  1045. 2:38:10

    just can't tell where the s-

  1046. 2:38:12

    So yeah, so if, if we were to extend on this side of the house, there's no way to ac-... I mean, they would have to literally, like, somebody have to access the whole s- backside of the house to access the boat, um, because it's on this left. It's not on the right side of the house, the, the garage, the boat garage.

  1047. 2:38:31

    Right,

  1048. 2:38:34

    but you're not utilizing- But you're not utilizing the boat door as a garage. But I, I'm, I'm, I'm trying to get this to work where you can-

  1049. 2:38:42

    Mm-hmm

  1050. 2:38:42

    ... get sufficient parking. But where the proposal is, can you describe how far along the driveway Before you get to the slope. Is it the slope is- runs the entire length of the driveway, or is it closer to the home? Is it closer to the rear of the home? At what point in that driveway-

  1051. 2:39:04

    So, ella quiere-

  1052. 2:39:05

    ... do you encounter the slope?

  1053. 2:39:06

    Okay. Quiero ver de, de cuando empieza la curva para abajo del lado de la casa. Como desde todo el driveway o solo es la mitad o es más cerca de la casa.

  1054. 2:39:17

    El bajón.

  1055. 2:39:18

    Sí.

  1056. 2:39:19

    El bajón empieza donde termina. Aquí- aquí va la... El driveway. Aquí está la casa y el bajón empieza aquí, al la- al lado de la casa-

  1057. 2:39:28

    So it will be-

  1058. 2:39:28

    Al lado-

  1059. 2:39:28

    So it will be closer to the house

  1060. 2:39:30

    ... la casa. La casa está. Sí. El bajón de la casa está. La construcción de la casa está en el bajón.

  1061. 2:39:35

    So right when we get to the garage part-

  1062. 2:39:38

    Okay

  1063. 2:39:38

    ... it goes into a slope, a very, like, deep slope.

  1064. 2:39:41

    Okay. Here, here's what I'm proposing, um, that we hold this. I'd like to visit the property with DOT because I, I'm afraid there may be some type of disconnect. And, and part of what I will require is for you to remove the concrete pad that you have now.

  1065. 2:40:03

    Mm-hmm.

  1066. 2:40:04

    But before taking on that expense, I, I, I just wanna make sure we have a viable solution for you before, you know, I cause any additional expense. So I, I would like to, um, hold this for 30 days until December 15th, and I'd like to visit the property along with DOT so we can come up with a viable solution.

  1067. 2:40:27

    Okay.

  1068. 2:40:27

    Would, would that be okay?

  1069. 2:40:29

    Ella dice que quisiera, eh, ir a la propiedad con el, la persona de transporte para que así ellos vean cómo está la propiedad y cuál es la solución, porque ella no quiere causarle más gastos para levantar lo que ya puso en concreto. Si está bien con, con usted, se, se, se juntaría 30 días más.

  1070. 2:40:49

    Para que ellos lleguen a mi propiedad, vean.

  1071. 2:40:51

    Sí.

  1072. 2:40:52

    That's to be.

  1073. 2:40:52

    That's fine.

  1074. 2:40:53

    Would that be okay?

  1075. 2:40:53

    Yes.

  1076. 2:40:53

    Okay. Um, and just make sure you share your number with Wilson, and we'll come out, um, perhaps... We'll find out what's good for you. How about that?

  1077. 2:41:03

    Okay.

  1078. 2:41:03

    And then we can, uh, make arrangements to visit the property so we can figure this out.

  1079. 2:41:08

    Okay. Ella van a hacer una cita prácticamente para ir a la propiedad. Entonces que si le puede dar el número telefónico al señor.

  1080. 2:41:14

    Okay. Sounds good.

  1081. 2:41:15

    Okay. All right. Thank you so much.

  1082. 2:41:18

    Thank you.

  1083. 2:41:19

    All right, Chair. So I'll make a motion to hold LUP 312026 to the December 15th Board of Commissioners hearing.

  1084. 2:41:27

    Second.

  1085. 2:41:29

    Is there any discussion? Call the question. The motion carries 5-0.

  1086. 2:41:39

    Okay, Commissioners, just wanna observe that we are now at noon. We do have one more LUP before us, another zoning application, and two, um-

  1087. 2:41:49

    Three

  1088. 2:41:50

    ... other business.

  1089. 2:41:51

    Angela pulled something.

  1090. 2:41:52

    Oh.

  1091. 2:41:53

    It's a consent.

  1092. 2:41:54

    I forgot.

  1093. 2:41:55

    LUP.

  1094. 2:41:56

    Something didn't make it on consent. Um, three other business items.

  1095. 2:42:00

    I will share that I am going to take mine because there was a new development for OB57 and we will not hold it today.

  1096. 2:42:07

    Okay.

  1097. 2:42:08

    That was-

  1098. 2:42:08

    Or, or continue it. We, we're not gonna have it here.

  1099. 2:42:11

    Continue.

  1100. 2:42:11

    Okay. Why don't we go ahead and disposition other business 57 right now?

  1101. 2:42:16

    Okay.

  1102. 2:42:16

    Okay.

  1103. 2:42:18

    Not before you come, Stan.

  1104. 2:42:20

    Yes, ma'am.

  1105. 2:42:23

    Direction.

  1106. 2:42:23

    Whenever you're ready. Yes, ma'am.

  1107. 2:42:26

    Okay.

  1108. 2:42:26

    Um, so for OB57, I had an opportunity to speak with the applicant and the opposition, and I understand that there is, uh, an issue that we need to work out regarding fencing and encroaching on, uh, the neighbor's property. So we will hold this, which we-

  1109. 2:42:45

    Oh, continue

  1110. 2:42:45

    ... discussed during the break. We will, uh, I'm sorry, continue this case to the December 15th, 2026 Board of Commissioners hearing. And in between that time, I'll reach out to the applicant, uh, just for an update, or the attorney, um, to figure out where we are so we can move forward and have a timeframe, uh, as to the resolution with, with the neighbor. Is that, is that okay? Is that fair? Okay, fantastic. Um, and that's it.

  1111. 2:43:14

    All right.

  1112. 2:43:15

    I made my motion.

  1113. 2:43:16

    Second. Second.

  1114. 2:43:17

    I just kept talking, but I- Okay.

  1115. 2:43:20

    Made the motion.

  1116. 2:43:21

    All right. Is there any further discussion? I call the question. The motion carries 5-0. That still takes us to the next LUP. We, again, we still have four matters before us, which is one LUP, one zoning matter, and two other business items, and we do have lunch upon us, so I'm just checking in to see how you would like to move forward. Are you okay with us at least going through LUP 33 at this time? I... Commissioner Allen.

  1117. 2:43:50

    I think there, there are more people who are here in opposition of Z51, if you wanna do that one so they can-

  1118. 2:43:56

    Okay. John, I don't know if you heard-

  1119. 2:44:00

    This-

  1120. 2:44:00

    ... but Commissioner Allen said there are more people. I'm sorry. Go ahead, Commissioner-

  1121. 2:44:04

    It's gonna take longer.

  1122. 2:44:05

    It is...

  1123. 2:44:06

    If there's more opposition.

  1124. 2:44:07

    I, I would agree. I would agree it could take longer. You don't think?

  1125. 2:44:12

    I don't, I don't think so. I mean, I've had conversation with even the people that are in opposition, so we're coming up pretty quick.

  1126. 2:44:18

    Wait, was-

  1127. 2:44:21

    I just hate-

  1128. 2:44:21

    I guess she was-

  1129. 2:44:22

    Is the applicant for LUP 33 here? Santos Martinez. I would just hate-

  1130. 2:44:27

    Is there any opposition?

  1131. 2:44:27

    ... to make them wait too.

  1132. 2:44:29

    Is there any opposition?

  1133. 2:44:31

    Yeah. Yeah, I would hate to make them wait.

  1134. 2:44:34

    Okay. All right. So let's-

  1135. 2:44:35

    Yeah. I, I, I don't mind hearing both before.

  1136. 2:44:36

    Yeah.

  1137. 2:44:36

    Why don't you just hear both then?

  1138. 2:44:38

    Okay. All right. Why don't we go ahead with the LUP, m- maybe address Flor and I before break?

  1139. 2:44:44

    Yeah.

  1140. 2:44:46

    All right. Next case we're gonna hear is LEP33 of 2026, J. Santos Baza-Martinez requests a temporary land use permit to allow more adults and vehicles than the code allows in Landlot 207 of the 17th District.

  1141. 2:45:01

    The property is located on the southwest corner of Olive Springs Road and, uh, Tatum Street. Is the applicant present? Okay, applicant is here. Is there anyone here opposed to LUP 33? Okay, we got one person opposed. So one person opposed and the applicant is present. All those who wish to address the board either for or against, please come forward and be sworn in.

  1142. 2:46:04

    Okay.

  1143. 2:46:05

    He's not. He's the applicant. He's with her.

  1144. 2:46:06

    Hello, and good morning everybody here, board and commissioners. He is the owner of the house, and I am the tenant.

  1145. 2:46:15

    Okay.

  1146. 2:46:16

    Um, I'm here to respectfully request approval to keep three vehicles on our property instead of the two currently allowed.

  1147. 2:46:25

    Okay. Please help us in saying your name.

  1148. 2:46:28

    Okay. Sorry.

  1149. 2:46:29

    It's-

  1150. 2:46:29

    My name is Carla Hernandez.

  1151. 2:46:31

    Thank you, Carla.

  1152. 2:46:32

    Thank you. Okay. The reason for this request is that the members of our household need reliable transportation to get to their respective jobs. Each person has different work responsibilities, and having three vehicles helps us manage our daily schedules and transportation needs. I understand that county has regulations regarding the number of vehicles allows on the property.

  1153. 2:47:02

    However, I would like to consider our, our particular situation. I want to emphasize that all three vehicles fit within our property. We are not asking to park vehicles on the street or block the sidewalk. We, we respect the county's regulations, our neighbors, and the communities. We simply want the opportunity to keep the vehicles we need for our daily lives. I kindly ask you to consider circumstances and approve our request for these additional vehicles.

  1154. 2:47:40

    Thank you, ma'am.

  1155. 2:47:41

    Thank you.

  1156. 2:47:42

    Appreciate it. That concludes your presentation.

  1157. 2:47:46

    Uh, I-

  1158. 2:47:47

    You have te- you have eight and a half minutes left to provide your case because once you're done, the only time you'll be able to speak to us is when we're asking you questions. So you wanna let us know everything that you want us to know.

  1159. 2:48:01

    Okay. So I just have one picture to note you that we have some space for three vehicles if you allow it.

  1160. 2:48:08

    Okay.

  1161. 2:48:35

    So we have-

  1162. 2:48:36

    One second

  1163. 2:48:37

    ... two spaces for car vehicles, and we have three vehicles, so we need, um-

  1164. 2:48:47

    Okay.

  1165. 2:48:47

    We need you if you can permit or allow because the main, the main sidewalk just permit two vehicles.

  1166. 2:49:06

    Thank you. Appreciate it. Stay close in case the commissioner has questions for you, but thank you. We'll now hear from opposition, and we'll just ask similar to the other matters that you state your name before you speak, and up on the podium there'll be a clock that will let you know how much time you have remaining. You'll have a total of 10 minutes. Yeah.

  1167. 2:49:35

    I think it's afternoon now. Good afternoon.

  1168. 2:49:37

    It is.

  1169. 2:49:37

    My name is Joy Haley. Um, the property that's in question is at 1786 Olive Springs Road. Uh, my family owns 1775 Olive Springs Road, directly across the street. Um, family-owned property. Uh, my father-in-law built the house there in 1962, and we've seen a lot of changes in the area, as y'all have seen as well. Um, we just want to be a good neighbor and ask other people to be a good neighbor as well.

  1170. 2:50:09

    Um, I am, I not only own this property, but I own a rental property, which is the house that I grew up, also in the Olive Springs School District. Um, I hold my renters to Cobb County code. Um, never gotten a citation because I value, um, the community that I grew up in and want to maintain a standard, um, not only for my property value, but for my neighbors as well. Um, can I show a picture as well?

  1171. 2:50:42

    Um, with this, this is...

  1172. 2:50:47

    So this is the house, and she showed a picture as well. And, and lately there have only been three cars there. Uh, the car that's parked on the road up there, um- Was a fourth car that was there, um, for a while. I've also seen, you know, lots of, you know, taxis dropping, yeah, and picking up as well, you know. So I, I'm not sure how many people actually live in the home.

  1173. 2:51:18

    It is a two bedroom, one bath home, which, um, I mean, for safety, I mean, if there wa- was a fire, I mean, y- you should maintain a standard. Um, the one particular morning, there's not only that car parked, but there's another car parked, and the neighbors can't e- can't even come down Tatum Street. It's... The road was completely blocked. I, I've got a thing here.

  1174. 2:51:55

    Like the truck cannot even get down the street there because they're, they're blocking the street. But anyway... Hang on. But anyway, what I would request is if y'all would just help us maintain a standard in the area. What happens, and you hear and see this probably all the time as well, when you get too many people in a home, it's not only the cars, it's the trash that is just overflowing at the st- it's an eyesore.

  1175. 2:52:30

    So it's a constant reporting to code enforcement and, um, I mean, I wanna be a respectful neighbor. It's not personal. I mean, it's truly not. I mean, they're quiet, and it's not personal, but I think this home allows two cars for that size home. And what happens if it is stretched, then you get the fourth car. And, um... But anyway, so for me personally, I, I would just request that, you know, they do the same that we do with our property and our rental and just maintain the standard to what Cobb County code allows.

  1176. 2:53:16

    Thank you. Does that conclude your presentation? Is there anything else to add?

  1177. 2:53:20

    I think, I think it does, if y'all don't have any questions for me.

  1178. 2:53:23

    Yeah, so just, just stay close in case the commissioner does.

  1179. 2:53:26

    Okay.

  1180. 2:53:27

    Thank you. Clo- excuse me, closing the hearing, I'm gonna turn things over to the district commissioner. You can have a seat, ma'am.

  1181. 2:53:34

    You can have a seat. If the applicant can come back up.

  1182. 2:53:51

    So first question, just to clarify, the addition to the driveway that's to the left, is that gravel or is that concrete?

  1183. 2:54:02

    It's concrete.

  1184. 2:54:03

    It's concrete.

  1185. 2:54:04

    Yes.

  1186. 2:54:04

    Okay.

  1187. 2:54:10

    And is, s- similar to the last case is, is, does that require permitting to have that extension? John, on that? The, the extension they've added to the driveway, does that require permitting?

  1188. 2:54:26

    That, that wouldn't normally require a, a permit per se, Commissioner Allen, but it would need to be built in compliance with county standards-

  1189. 2:54:33

    To standards

  1190. 2:54:33

    ... which w- which requires it to be paved.

  1191. 2:54:35

    Right.

  1192. 2:54:36

    And I think it's gravel right now.

  1193. 2:54:39

    So you s- you said it's concrete. It's just, looks like it's-

  1194. 2:54:43

    Yes

  1195. 2:54:43

    ... probably not the best concrete-

  1196. 2:54:45

    Yes, but it's-

  1197. 2:54:46

    ... job that was there. Okay. And the, the picture that was shown earlier of the cars on both sides, the cars on both sides of, of the road, looks like on Tatum Street, were both of those cars belonging to someone in the, in the residence?

  1198. 2:55:06

    No.

  1199. 2:55:06

    Just one on your side?

  1200. 2:55:08

    Yes.

  1201. 2:55:09

    Okay. And you're, you're, you're asking for the number of vehicles to be increased by one from two to three vehicles. Is that correct?

  1202. 2:55:21

    Yes, it's correct.

  1203. 2:55:22

    Okay.

  1204. 2:55:22

    That's true.

  1205. 2:55:23

    So is that fourth vehicle, was that just temporary?

  1206. 2:55:28

    It was temporary and that happened-

  1207. 2:55:30

    Can you step up a little bit closer to the mic so we can hear you?

  1208. 2:55:32

    Um, that problem it was, um, that was a temporary...

  1209. 2:55:40

    There you go.

  1210. 2:55:43

    That vehicle is not mine or any members of the house, and that problem cause it was j- uh, once, and, um, just because we have three vehicles. That car was to my, uh, to the boss to my w- um, stepmother. Yes. And I'm really sorry, and I don't want to cause another problem like that.

  1211. 2:56:12

    Okay. And the four related adults that are in the home, can you tell me the relation?

  1212. 2:56:18

    No.

  1213. 2:56:19

    No. Who, who-

  1214. 2:56:20

    Who?

  1215. 2:56:21

    You said there are four related adults. Are these your family members?

  1216. 2:56:26

    Uh, yeah. We are four adults and one teenager.

  1217. 2:56:31

    All related?

  1218. 2:56:32

    Teenager.

  1219. 2:56:33

    Are, are you all related?

  1220. 2:56:34

    A teen.

  1221. 2:56:36

    She doesn't understand.

  1222. 2:56:37

    Yeah.

  1223. 2:56:37

    Are they all related?

  1224. 2:56:40

    Yeah.

  1225. 2:56:42

    Are you related?

  1226. 2:56:43

    Esu familiar?

  1227. 2:56:44

    Yeah. Yeah. Um, in that house we live, uh, live my stepmother, my sister-in-law, my husband, my son, and I.

  1228. 2:56:56

    Okay.

  1229. 2:56:57

    We are pa- family.

  1230. 2:57:01

    So, so it's you and your husband?

  1231. 2:57:03

    Yes.

  1232. 2:57:03

    And then your stepmother and mother-in-law?

  1233. 2:57:08

    Sorry, it is my stepsister

  1234. 2:57:11

    Stepsister

  1235. 2:57:11

    Yeah

  1236. 2:57:12

    Okay

  1237. 2:57:12

    Yeah

  1238. 2:57:13

    Okay.

  1239. 2:57:20

    Does anybody else have questions for-

  1240. 2:57:24

    Yes. Can you show us the picture of the property again, please?

  1241. 2:57:27

    Yes.

  1242. 2:57:41

    Okay. Can a car fit in your carport?

  1243. 2:57:46

    Yes, the car does.

  1244. 2:57:48

    Okay. And it's not even necessary, I guess, if all cars can fit on the driveway. I was just curious. Um.

  1245. 2:57:59

    Um, this might be for John. Based on the 390 square feet, one person per 390, what would this allow? How many adults would this allow?

  1246. 2:58:12

    It would allow two adults and two cars.

  1247. 2:58:15

    Okay. So they need two additional people-

  1248. 2:58:20

    One

  1249. 2:58:20

    ... and one additional car. Yeah.

  1250. 2:58:22

    Right. That's what they're asking for.

  1251. 2:58:35

    And this is... You're renting this property, correct?

  1252. 2:58:38

    Yes.

  1253. 2:58:39

    And you... This is the owner?

  1254. 2:58:41

    He's the owner.

  1255. 2:58:41

    Okay.

  1256. 2:58:42

    Yeah.

  1257. 2:58:43

    But he doesn't live there?

  1258. 2:58:44

    No.

  1259. 2:58:45

    No.

  1260. 2:58:45

    Okay.

  1261. 2:59:04

    So

  1262. 2:59:07

    what's really st- I'm struggling with is the, the size of the property and the amount of, of people, um, and cars that are there. Um,

  1263. 2:59:21

    and I hate asking personal, real personal, but, but the, the three cars that are there, who drives... Who are those cars for?

  1264. 2:59:29

    I drive one car, my husband drive another car, and my sister-in-law, um, drive another cars.

  1265. 2:59:36

    Three cars.

  1266. 2:59:36

    We need it because we working in different places.

  1267. 2:59:40

    Mm-hmm.

  1268. 2:59:41

    And we have different schedules.

  1269. 2:59:48

    And if, if the three cars were allowed, are you able to bring that extension to the driveway to compliance, to have it repaved?

  1270. 3:00:02

    You have to, uh, pay a payment?

  1271. 3:00:04

    Pavement. To, to repave that portion of the driveway.

  1272. 3:00:16

    Um, can you repeat again, please?

  1273. 3:00:18

    The... If you go back to that picture. G- Yeah, I'm sorry to keep dragging your phone up there.

  1274. 3:00:40

    There you go. So the area where the car is not parked, that lighter gray area, it doesn't look to be to standard similar to what the other side is.

  1275. 3:00:55

    Are you willing to bring that area up to the same standard as the area where the car is?

  1276. 3:01:23

    We can do it like it does the main sidewalk.

  1277. 3:01:28

    Okay.

  1278. 3:01:35

    You got a question?

  1279. 3:01:36

    I just have a question. Mm-hmm.

  1280. 3:01:38

    Yeah.

  1281. 3:01:38

    If the stepsister's a teenager, is that three adults and one child?

  1282. 3:01:45

    Oh, I didn't ask the age-

  1283. 3:01:45

    Or is that-

  1284. 3:01:46

    I didn't ask the age of the s-

  1285. 3:01:48

    Well-

  1286. 3:01:49

    Yeah

  1287. 3:01:49

    ... children are allowed-

  1288. 3:01:51

    Right. Yeah

  1289. 3:01:51

    ... but they aren't counted in the three.

  1290. 3:01:53

    Yeah. How, how old is the step- is your stepsister?

  1291. 3:01:57

    She is-

  1292. 3:01:57

    She just said teenager

  1293. 3:01:58

    ... 36.

  1294. 3:01:59

    Yeah, so she's an adult.

  1295. 3:02:00

    She's what?

  1296. 3:02:01

    26.

  1297. 3:02:01

    Ah.

  1298. 3:02:02

    Yeah.

  1299. 3:02:02

    I thought she said teenager.

  1300. 3:02:04

    Not teenager, is my son is-

  1301. 3:02:05

    Her son

  1302. 3:02:06

    Yes.

  1303. 3:02:06

    Yeah.

  1304. 3:02:07

    He is-

  1305. 3:02:07

    She's, she's got a son

  1306. 3:02:07

    ... he's 16 years old.

  1307. 3:02:09

    Oh.

  1308. 3:02:09

    Her-

  1309. 3:02:10

    So there are four adults and one-

  1310. 3:02:11

    And one teenager

  1311. 3:02:12

    ... yeah, teenager.

  1312. 3:02:13

    Yeah.

  1313. 3:02:13

    Okay. Sorry. I thought... Okay. I didn't... And then, um,

  1314. 3:02:24

    what... If that is paved or asphalt, what does that do to the impervous, pervious surface? 35% max.

  1315. 3:02:36

    It should- it shouldn't change it, 'cause it's already, um... And that wasn't one of the citations, so it shouldn't change the impervious to do that.

  1316. 3:02:50

    So, um...

  1317. 3:02:57

    All right. If there, if there are no other questions, um,

  1318. 3:03:07

    I'd like to, to move for approval for one year-

  1319. 3:03:16

    Um, for the four unrelate- four related adults and three cars with a stipulation that the extension of the driveway needs to come into compliance within 60 days.

  1320. 3:03:36

    16 days?

  1321. 3:03:37

    60.

  1322. 3:03:38

    60 days.

  1323. 3:03:41

    Mm-hmm.

  1324. 3:03:45

    No, the, the, the four, four adults and then one child, one minor.

  1325. 3:03:53

    Okay. Was that a motion?

  1326. 3:03:54

    That was a motion.

  1327. 3:03:55

    All right. I'll second. Is there any further discussion? Call the question. The motion carries four-one with Commissioner Birrell in opposition. Thank you.

  1328. 3:04:05

    Thank you so much.

  1329. 3:04:07

    With that, commissioners, the time is now 12:20. Commissioner Allen, would you like to move forward with the next matter?

  1330. 3:04:13

    Um-

  1331. 3:04:13

    The Flowenoy development, or would you like to... I'm asking you first, but-

  1332. 3:04:18

    We, we can.

  1333. 3:04:19

    We can?

  1334. 3:04:19

    It's, everybody's okay?

  1335. 3:04:20

    Yeah.

  1336. 3:04:20

    We're, we'll keep, keep going as long as we can. Yeah.

  1337. 3:04:23

    All right. Well, let's m- I have to take a brief break. I have to run to the ladies room. So why don't-

  1338. 3:04:29

    How long is-

  1339. 3:04:29

    Well, uh, it's not that long. G- give me about five minutes. I'll be right back. It'll be less, but I'm asking everyone.

  1340. 3:04:37

    Go to.

  1341. 3:10:32

    All right, before we get to the... I'm sorry. Welcome back to our Board of Commissioners Zoning Hearing this November 17th, 2026. Before we get to the next matter, Z 51 Flournoy Development, I understand that we need to revise a condition on a prior motion. So I will turn things over to Commissioner Sheffield. We'll need to have a motion to reconsider.

  1342. 3:10:56

    Okay.

  1343. 3:10:59

    I make a motion to reconsider OB 52.

  1344. 3:11:04

    And then make another motion to... Okay.

  1345. 3:11:06

    Make a motion on that to reconsider. Okay.

  1346. 3:11:09

    All right, I'll second the motion to reconsider. Is there any discussion?

  1347. 3:11:17

    Call the question.

  1348. 3:11:19

    Okay.

  1349. 3:11:19

    The motion carries 5-0.

  1350. 3:11:21

    So let me go up. And what we are reconsidering, there was a stipulation for fencing around the northwestern... I'm trying to get to the condition.

  1351. 3:11:38

    Okay, um, yeah, there was a, uh, a stipulation with respect to fencing around the northwestern and the eastern property line. The stipulation- What's the Z number? Oh, I'm sorry. OB.

  1352. 3:11:54

    OB.

  1353. 3:11:54

    OB 52. OB 52.

  1354. 3:11:56

    Okay.

  1355. 3:11:57

    Um, so for the privacy fence, we will leave it at the eastern line. But for the northwestern-

  1356. 3:12:05

    Mm-hmm

  1357. 3:12:05

    ... we're just gonna have a regular fence because there is a desire to have it more of an open area since it's going to be a farm. So rather than have a privacy fence on that side.

  1358. 3:12:16

    Okay.

  1359. 3:12:16

    Um, the, the neighbor, the next-door neighbor and the applicant asked if they can just have, like, a fence but having an open area to feel more like a farm. So I neglected to remove that earlier. So, um, I make a motion to revise or amend spe- stipulation number five to read, "Applicant to install a privacy fence along the eastern property line and shall be 10 feet from the property line." And that's, that's the amended motion.

  1360. 3:12:47

    Okay, and everything else remains-

  1361. 3:12:50

    Yeah, everything-

  1362. 3:12:50

    ... as stated in the prior motion?

  1363. 3:12:52

    Yes, and all staff comments and recommendations not otherwise in conflict.

  1364. 3:12:56

    All right, I'll second. Is there any further discussion? Call the question. The motion carries 5-0. That now takes us to the next matter. John, I'll turn it over to you.

  1365. 3:13:07

    Thank you. Next case we're gonna hear is rezoning case Z 51 of 2026, Flournoy Development Group, LLC, request rezoning from GC to RRC for a multi-family residential development in land lots 763 and 764 in the 17th District. The property's located at the southeast intersection of Atlanta Road and I-285, north of Brownwood Lane. The applicant is present. Is there anyone here opposed to rezoning case Z 51?

  1366. 3:13:38

    So we got three opposed. Okay. Let the record show there's three opposed. All those who would like to address the board either for or against, please come forward to be sworn in.

  1367. 3:13:55

    Yeah. I'll start there. You can start. I need the...

  1368. 3:14:05

    Um, can I also get a show of people here who are in support of rezoning case Z 51? Please stand up, raise your hands if you're in support.

  1369. 3:14:16

    Four? Okay. Let the record show there's four people here in support.

  1370. 3:14:19

    Kevin, that's five.

  1371. 3:14:21

    I just appreciate you asking.

  1372. 3:14:28

    Five. You may begin whenever you're ready. Just step out.

  1373. 3:14:36

    Right.

  1374. 3:14:37

    Yes, sir, you may begin.

  1375. 3:14:38

    Thank you, Madam Chair and commissioners. I'm Kevin Moore here on behalf of and pleased to represent, uh, Flournoy Development in this application for rezoning. Uh, this property is, um, just over three and a half acres, uh, as Mr. Pederson said, located at the intersection of 285 and Atlanta Road. Um, you should be very familiar with this property as this property is actually owned by Cobb County. Uh, and, uh, the Board of Commissioners, uh, o- entered into a purchase contract with Flournoy Development, uh, for the purchase of this property, uh, and, and hopeful development of it.

  1376. 3:15:12

    But of course, it does require rezoning according to, uh, to move forward with Flournoy Development's, uh, proposal, uh, for a multifamily development here. When you where, look at where this property is, it is located at the interchange of 285 and Atlanta Road and the off-ramp, uh, of 285. This was a former pilot truck stop, uh, that was there for many, many, many years. Uh, ultimately when the road improvements went in, uh- Along South Atlanta Road at this location many years ago, uh, Cobb County acquired that location, uh, as part of those, uh, rather large road improvements that occurred here and acquired the, uh, Pilot truck stop at that time.

  1377. 3:15:53

    The surrounding area that you're very familiar with, again, has a multitude of different zonings and uses, a multitude of different zonings and densities, and a multitude of different multi-family projects. One located exactly on the other side of 285 called West Village, uh, that's located across 285 from this project and exactly the same orientation as this property, just the other side of 285. Um, then once you go nor- north of Atlanta Road, uh, you do have, uh, other types of, uh, more dense, uh, residential properties that are RM-12 and RM-8 in nature that are a very, that are various, uh, residential communities there, uh, that have also been very, very successful.

  1378. 3:16:32

    And then you have commercial zonings, uh, as well as light industrial zonings as you proceed down Atlanta Road. So that gives you the overview from a zoning and, and standpoint of the different communities, different zonings and uses.

  1379. 3:16:51

    Now turning to our particular site plan, uh, for, from Fennoy Development, and again, Fennoy Development is a, a developer for multi-family, uh, communities, uh, that is, not only has a great presence and a very strong presence in the state of Georgia, uh, and in the southeast, but also here in Cobb County. Uh, they have built a very successful project at, uh, at The Battery, uh, that was not part of, um, The Battery itself, but adjacent to it and did a fantastic job there in working with the community there at the time, and likewise has been very successful in its project there.

  1380. 3:17:26

    Fennoy Development brings that, uh, wealth of knowledge, expertise, and success to this property. Uh, what is proposed, uh, is a multi-family community. It would have a total maximum of 249, uh, units. A little bit about that, so context, 'cause this has been around for a while. I know y'all have seen it. You had to deal with it from a contractual standpoint.

  1381. 3:17:47

    Mm-hmm.

  1382. 3:17:47

    And primarily that was... I don't know, it was not primarily, but it was almost in totally due to the fact of the GDOT, uh, announced, uh, express lanes on the north side of 285 and across this particular area. And while they have not acquired it yet, the plans have been announced, and it has been out there. One, and one of those plans would put the flyover bridge here, and it would be a flyover bridge as part of that express lane project traversing over Atlanta Road and 285 that would clip this property as part of that project.

  1383. 3:18:17

    And so, uh, we had to work through that, and Fennoy had to work through that and to determine exactly what that would be, see how close they could get to, to GDOT in terms of having them nail down what plans that would be, and that's what delayed this for so long. Now we are ready to bring it forward, but you do see on the backside of this property against 285, uh, there is a, there would be a potential loss of property should that brid- should that flyover bridge be the actual plan, and so our plans therefore have to accommodate that future eventuality and possibility, which did move things forward.

  1384. 3:18:50

    So the plan that you see before you again is 249 maximum number of units. That is substantially reduced. When this was initially submitted, uh, it was around 350 units. Uh, it was initially submitted, uh, for that number. It has since come down. Why has it come down? Because we have been involved in community c- conversations, and there have been a, a number of those over, over this period of time, um, to reduce that, and we have. We've reduced that down to 249 to make this a, which is much now, a much smaller type of project and much smaller than you usually see.

  1385. 3:19:22

    You usually see multi-family projects that are wrap construction like this, where you have a parking deck and structure that's to the rear that faces on the 285, uh, are normally well over 300 in terms of the number of units. This is now p- proposed 249 units. Uh, in addition, our primary access, you see, is the, uh, right in, right out as you come off of the 285 interchange. That location has been determined not only by state DOT standards but Cobb County s- standards. We will be installing, in fact, a full new deceleration lane that extends far more than u- usually has a typical deceleration lane.

  1386. 3:19:59

    It's almost a full right-hand turn lane coming off that would allow for easy turn in as well as exiting from this entrance. We also have a secondary access that's primarily for service and loading and moving, uh, that's much closer, uh, uh, to the south, and you'll see that other entrance access as well. Uh, the property does face very, is out onto Atlanta Road. Uh, that's consistent with the Atlanta Road design guidelines, which state that they want the p- buildings closer to Atlanta Road, not further back, and so that orientation actually is consistent with those design guidelines with our parking structure to the rear.

  1387. 3:20:37

    Uh, but we were also forced to bring this building up because of what was happening potentially with the GDOT flyover bridge, so that forced everything a little bit further up. Now one of the other, uh, big components of this application in terms of what we took into consideration was input from some that you'll hear from today, and that was originally this was a five-story building. As you see, most of these types of multi-family communities that have a wrap around a parking deck, and we removed a floor. Uh, this is now, uh, a maximum of four stories, and you can see the elevation, a beautiful job that would be done by Fennoy Development.

  1388. 3:21:11

    So it's actually been lowered to four stories, which was a s- specific request, um, that we, uh, modified our plans to. It's only five stories in the rear along, uh, 285 to provide for the five-story parking deck that still must be utilized here so we can provide adequate parking. But visually from Atlanta Road, you can see this is accurately depicted from a scaled version of Atlanta Road, and this is appropriate. You're on 285. This is an appropriate look coming off of 285. Have beautiful landscaping along the front, beautiful entrance as you come in.

  1389. 3:21:45

    Uh, to the community, uh, and it's only four stories, which therefore is consistent with what's across, um, uh, 285 at West Village and consistent with this area, and a beautiful job that would be done by Flannoy, as you can see. Uh, also, one of the, uh, questions or issues that has come up, and we have done an immense amount of work with our traffic study, which has been done, redone, updated, re-updated, resubmitted, and reviewed, uh, num- numerous times, uh, to take a look at all aspects of the turning movements here.

  1390. 3:22:17

    One is that, uh, from a, a U-turn question. There had been a question, "Well, what about U-turns?" Since there'll be restricted access coming out, and we've pointed out to you there are two protected areas for U-turns coming out for residents to go back to 285. Uh, we point out where those are located. Those intersections are signalized intersections with protected left turn arrows and turning movements that provide for that today. Uh, so if you miss the first one, you can catch the second one. Uh, but there's both in very close proximity that allow, uh, great movement in and around this area, uh, and allow for that, uh, should that be the case or sh- should that be needed.

  1391. 3:22:56

    Lastly, I want to talk about traffic, because that's been a lot of discussion throughout the time about traffic, traffic impact, uh, and so forth. And, uh, so part of our traffic information, uh, was providing a trip generation analysis that compared uses. This property has been simply a spot on the earth that held the world together without being put to any sort of meaningful use for over a decade now. And so something should go here, and the county should recoup at least some of its investment that it made when it did the road improvements for Atlanta Road, and it bought this property for not a...

  1392. 3:23:30

    for, for a very nice price at the time. So what would go here? What we've shown you is with our project, a multifamily housing project, um, that, uh, Flannoy Development would do at 249 units. You can see with the daily traffic trips, and keep in mind, trips are counted as in and out. That's two trips. So trips are counted. You can see total 24-hour trips, uh, for multifamily housing, as we've proposed, is just over 1,100. Uh, if you did a hotel here, which was also a proposed use and a potential use and, and, and s- and buyer of this property, it would be just over 1,200 total trips.

  1393. 3:24:05

    If you did an office building, medical, dental, you know, or any type of office building of any, uh, type of size, 50,000 square feet would be a very reasonable size for this location, you're looking at over 2,000 total trips. What that means is that no matter what type of meaningful, reasonable use you would have for this property, there's going to be a number of traffic trips that are gonna be generated from it, and that actually, when you compare whether the two most likely, uh, potential uses versus our proposed use, the Flannoy Development use is actually less.

  1394. 3:24:36

    And we think that proves the point, and we ask that you respect, and respectfully request that you approve this rezoning application as presented. Thank you.

  1395. 3:24:45

    Thank you, Kevin. We'll now hear from opposition. And just be mindful, again, to state your name, and if others are going to speak, be mindful of the time. There is a, um, timer that's on the dais, or excuse me, on the podium where you're speaking.

  1396. 3:25:03

    Okay. Are you, are you ready? Are you ready? Okay, so I'm Nat Milburn. I am, uh, the president of the Old Ivy at Vinings Neighborhood Association and the vice president of the Townhomes Association old, in Old Ivy. And I'm here, uh, representing the interests of, of this community, um, and that board in particular. Uh, we have a total of 295 homes. This is just east of this, uh, subject site.

  1397. 3:25:34

    Across Atlanta Road, then there's a Shell station, and then across Log Cabin Road. It's about 500 residents in this community, and we use this intersection that's being affected at Brownwood Lane and Atlanta Road, uh, significantly. Um, so, uh, our... This has been going on a long time, obviously. Um, I think it was about, uh, almost, we're 15 days away from the year mark of when we first presented our, our opposition to this.

  1398. 3:26:04

    And to be clear, we are not in opposed to this, to this applicant. Uh, I've said before I think they do great product, great people, and we've hated looking at this site. So we're happy something's gonna happen. The opposition is really to, um, the traffic situation, the constraints on this property, um, and a lot of the information we had gotten from the original Cobb DOT, um, traffic study, which indicated, based on some calculations, about 80% of this traffic was gonna be heading north, and there were gonna be a significant number of U-turns, just under 500 U-turns, which we're also concerned about safety.

  1399. 3:26:44

    So we've presented all of these, uh, all of these issues at these previous meetings, and in previous planning commission meetings, uh, th- the commissioners have said we need Cobb DOT to take a look at and document the concerns that we had raised about how these further down the road intersections would be impacted and how the U-turn issue could be addressed. Uh, we're just here asking that those things actually happen. We have not heard anything back, uh, from the commission or Cobb DOT on how those issues, which again, the commission had said ought to be looked at, um, have been addressed.

  1400. 3:27:26

    So with that, I'll yield my, the rest of my time.

  1401. 3:27:34

    I think, I think address

  1402. 3:27:48

    Good afternoon, Board of Commissioners. Travis McComb, Cobb County School District. Approval of this petition may impact Nicky Jack Elementary School, which is already over capacity. Um, currently at this school, we're landlocked, we have additional trailers on site, so there's no additional land for us to add on to that school currently. Thank you.

  1403. 3:28:20

    Good afternoon. My name is Sam Lindley. I'm with Stromquist & Company, which is 4620 South Atlanta Road. It is the adjoining property just south of it on that map.

  1404. 3:28:37

    Years ago, about around 1990, I requested and received the red light installation for our customers and tenants. Since then, it's been made into a four-lane road, and the deceleration lane is gone. My main concern right now are the U-turns. We're projecting f- around 500 U-turns a day if you wanna go north on, uh, Atlanta Road, or if you wanna go east or west on 285.

  1405. 3:29:20

    The main concern with that U-turn is I don't think everybody that leaves there wants to do a U-turn on that fast a stretch of road, and I think they're gonna be coming into our parking lot to do a U-turn at the Brownwood and Atlanta Road intersection. We have tenants there. We don't want a parade of people that have no relation to us circling through a limited space and then queuing up for a turn lane to get out to Atlanta Road, where they can go north.

  1406. 3:30:03

    At the first planning commission meeting, people, as we were closing, uh, as I was closing my statement, said that they would refer this thing to the Cobb DOT for possibly a study on alternative ways to get around the block and U-turn. And I see the gentleman sitting over here. Did he bring that study with him? I never got it. I didn't get... I haven't heard anybody bring it up except me.

  1407. 3:30:34

    We still don't have that study on the alternatives to all the U-turns. I just want to g- have our par- parking lot and our business relationships with our customers to stay in one place. We have a full tenant list, people waiting to come to the building, and we're happy there. We don't wanna move to Holly Springs or to, or to Cartersville because of traffic issues.

  1408. 3:31:06

    That's all I've got. Thank you, ma'am.

  1409. 3:31:12

    Are there any additional speakers?

  1410. 3:31:16

    It's about four and a half minutes on the clock. Okay, not seeing any, I'll turn things over to the district commissioner.

  1411. 3:31:25

    Thank you, Madam Chair. Um, before I, I go into to any of my comments, are there any questions from members of the board? So, um, first of all, I, I agree with, I think, everybody's sentiment that this has been, been dangling out there for, for quite some time, so I wanna thank the community for being, being patient as we've, we've worked through a lot of these issues. Um, and, and it's not just the last, you know, few years.

  1412. 3:31:55

    I know Matt talked about, you know, one year, um, since you came up and, and gave the, the first, you know, comments about this. This has spanned three commissioners from the purchase of the property to the RFP that went out to select, um, someone to develop the site to now, where we're, we're trying to disposition this. So this has been a very long and, and thoughtful process, so for that, I appreciate everybody's, uh, patience. Um, I, I have spoken with, uh, the community several times.

  1413. 3:32:27

    Um, also Vonnings Village, and I know Bill is here from the Vonnings HOA. Um, Matt and I have, have had conversations committing to continue these conversations, um, around the traffic because they are a concern, and I've, I've shared those, uh, with everyone, but I've also been working with DOT, um, with the developer, and I, I firmly believe we're at a place where, um, it may not be perfect, and we're gonna continue to work towards solutions, but I think we're at a point where most of the concerns that I know I've had have, have been addressed.

  1414. 3:33:03

    Um, we've also had conversations, as, uh, Kevin talked about with GDOT. That was a, a very important piece to this to make sure that whatever was built wouldn't have to be immediately knocked down if flyover lanes come in the next 10 to 15 years. Um, also, um, working with some of the other groups in the area but not necessarily impacted. Uh, I know West Village has taken an interest to this and, and quite a few, few residents who do believe that this is an eyesore that needs to be, uh, be addressed.

  1415. 3:33:37

    And I think what, what Flournoy is presenting is, is a great, uh, option. Uh, it is also less intense than the other uses that would be, uh, on the property. Um, so we have to take all of those into consideration. Also not lost with me is the consideration of making sure that, um, we do get a return and aren't wholesaling property, um, that could be, be developed for, for a great use. So with that, um, I would like to make a motion to approve, um, with a couple of, um, edits to some of the department comments.

  1416. 3:34:18

    Um, on the zoning division, uh, comment two, I'd like to strike, uh, well, replace no more than 53 units per acre with, uh, no more than 249 units to make sure there's a hard cap, uh, there. I'd also like to strike number three, um, and add a stipulation that this is only one and two-bedroom units with no more than 90 two-bedroom units.

  1417. 3:34:50

    Uh, this has already been agreed upon with the, the developer to make sure that we're keeping that density down as, as much as we can with those units. Uh, and also, um, final site plan and landscape plan to be approved by the district commissioner, and all other staff comments not in conflict.

  1418. 3:35:13

    I'll second. Um, for purposes of discussion, I do have one question. Commissioner, you may be able to answer. I... And I think Kevin may have, but it's, it could be you, Kevin, or DOT. It's with-

  1419. 3:35:24

    Mm-hmm

  1420. 3:35:25

    ... it's with respect to transportation, which is the dominant concern here. If people are coming out of this property that's gonna be built, is the first place they can make a U-turn at Brownwood?

  1421. 3:35:40

    So the, the first... The short answer is yes.

  1422. 3:35:44

    Okay.

  1423. 3:35:45

    But there are ongoing conversations I've had with DOT of ways to minimize that to possibly, as they come out, right restrict from entering into the left lane until after they cross Brownwood-

  1424. 3:35:58

    Yeah

  1425. 3:35:58

    ... where they would then have to go down to the next signalized light. Because that's one of the main issues that I had, is if one, someone wants to make a quick jump left, it's not much space there for-

  1426. 3:36:11

    Oh, yes. I see what you're saying

  1427. 3:36:12

    ... for that turn.

  1428. 3:36:13

    Yeah, yeah. Mm-hmm.

  1429. 3:36:13

    But if you were to, to-

  1430. 3:36:15

    Okay

  1431. 3:36:15

    ... control that access to-

  1432. 3:36:16

    I see what you're saying

  1433. 3:36:17

    ... where they turn left and stay left-

  1434. 3:36:18

    Mm-hmm

  1435. 3:36:18

    ... and not able to get right until after the light-

  1436. 3:36:21

    Okay

  1437. 3:36:21

    ... um, that would improve that. No- nothing has been finalized.

  1438. 3:36:26

    Okay.

  1439. 3:36:26

    Um, one of the other things that, uh, we've taken into consideration is because this was a, a SPLOST project when the land was purchased, that money will go back into SPLOST-

  1440. 3:36:38

    Mm-hmm

  1441. 3:36:38

    ... which could then go, gives us now money for improvements-

  1442. 3:36:42

    I see

  1443. 3:36:42

    ... to the overall, all corridors. So there's, there's a lot of options on the table. I, I, I hear the concerns, and I, I share 99% of them. Um, but I think there is a path forward to make sure that we're doing this in a responsible way.

  1444. 3:36:57

    Okay. Commissioner Birrell?

  1445. 3:37:02

    Um, with the maximum 249 units, what does that equal in units per acre now?

  1446. 3:37:12

    I believe it's about 60 to 60... Yeah, 65.

  1447. 3:37:15

    No, it's less than that.

  1448. 3:37:16

    It's higher?

  1449. 3:37:16

    It's, I think it's less than 65.

  1450. 3:37:18

    It-

  1451. 3:37:18

    It's around 62.

  1452. 3:37:19

    It, it's 54.7.

  1453. 3:37:20

    54.7, okay.

  1454. 3:37:23

    Okay, so it's increasing. I, I thought in Kevin's presentation they reduced the number of units.

  1455. 3:37:31

    They, they did to, to the 249.

  1456. 3:37:34

    All right.

  1457. 3:37:34

    What I want to do is make sure that we stay that way, and then when it's engineered, it's not all of a sudden we can squeeze in 260.

  1458. 3:37:40

    Okay.

  1459. 3:37:40

    So I wanna stay at that 249.

  1460. 3:37:42

    Okay. And then my other question is for DOT. What... Are there two or three access points into to-

  1461. 3:37:53

    Two

  1462. 3:37:54

    ... which is required for state fire marshal law now over 200 units?

  1463. 3:38:02

    Mm-hmm.

  1464. 3:38:03

    Okay. I couldn't tell if this one on the corner is just a right turn or if it goes actually into the property, but it does.

  1465. 3:38:14

    Mm-hmm.

  1466. 3:38:14

    Okay. Thank you.

  1467. 3:38:18

    Are there any other questions or comments? All right, call the question. Motion carries 3-2 with Commissioners Gambill and Birrell in opposition. Commissioners, it's 1:00. I'm gonna ask that we take a break right now for lunch and come back at 2:00 PM. And sorry, we, we do have two other business items that will be heard, but we will take a break at this time and come back and hear the remainder of those two items after lunch. I assure you that we will be of better mind, um, to do that after we've had lunch.

  1468. 3:38:51

    So with that, um, yes, we'll go ahead and take our break.

  1469. 4:43:30

    Good afternoon, and welcome to our Cobb County Board of Commissioners zoning hearing this November 17th, 2026. I will turn things over to John Pederson, our zoning manager, and he will help us get to our next case.

  1470. 4:43:45

    Next case. Next case we're gonna hear is other business item number 58 of 2026, which is to consider amending the site plan and stipulations for Erick and, uh, Julie Trehearn regarding rezoning application Z157 of 2004. The property's located at the western end of Cambridge Approach Circle, north of Children's Road and land lot 50 of the first district. Is the applicant present? Okay, applicants are here. Is there anyone here opposed to other business item number 50...

  1471. 4:44:15

    5, uh, 58? None? Okay. Let the record show there's no one opposed. Would the applicant please come forward to be sworn in?

  1472. 4:44:48

    Hello, sir. You can begin whenever you're ready. Just state your name, and you'll see the, um, timer up there-

  1473. 4:44:54

    Okay

  1474. 4:44:54

    ... on the podium.

  1475. 4:44:56

    Good afternoon. My name is David Evans with Lake Country Pools. Um, I am here on behalf of Erick and Julie Trehearn, who, Julie has joined me here, to... we have contracted with them to build a pool. Um, we are requesting that the Board of Commissioners grant approval to encroach into the landscape buffer, um, I believe it's approximately six foot, um, in order to complete the project for the, the pool and outdoor living space.

  1476. 4:45:24

    All right. Thank you. And does that complete your presentation, or ma'am, would you like to add anything else?

  1477. 4:45:29

    Sure, I can add a little bit.

  1478. 4:45:30

    Just state your name for us before you-

  1479. 4:45:32

    Julie Trehearn is my name.

  1480. 4:45:33

    Yes, ma'am.

  1481. 4:45:33

    And I'm an owner and resident at this property, and we're just looking to, um, as David mentioned, build a pool into the backyard. This was the best of many different options we looked at. It would be the less, least disruption to the property and the property line. And we're adding additional landscaping, um, so anything that we're removing we're tripling.

  1482. 4:45:55

    Okay. Thank you.

  1483. 4:45:56

    Mm-hmm.

  1484. 4:46:00

    That, that concludes it.

  1485. 4:46:01

    Okay. Very good. You can feel free to have a seat, and the district commissioner will call you back up if she has any questions. John, before I turn things over to JoAnn, I'm seeking what staff's recommendation is for other business item 58.

  1486. 4:46:17

    Yes, ma'am. Uh, Madam Chair and Board, the staff would recommend the board, uh, deny the request.

  1487. 4:46:23

    Okay. Thank you. I will turn it over to Commissioner Birrell.

  1488. 4:46:28

    Thank you, Madam Chair.

  1489. 4:46:32

    Mm-hmm.

  1490. 4:46:32

    John, um, did I... I saw something, I thought, that said this was, um, a 25-foot stream buffer. Is this a landscape buffer or a stream buffer? There's... It- When you're looking at the site plan, there's a 25-foot buffer along the rear property line- ... which is also the rear setback. And then along, I guess, the, the southern part of the lot is the 25-foot stream buffer. Right. But wait, well, I can't encroach on the stream buffer or landscape buffer if that's undisturbed buffer, I mean.

  1491. 4:47:11

    'Cause when it was zoned, it was a undisturbed buffer, correct? Well, it would be- 25-foot undisturbed buffer ... it would, it would be landscape and then left undisturbed after that. Okay. And staff's recommendation is denial? Yes, ma'am. Okay. I'm ready to make a motion.

  1492. 4:47:31

    Yes, Commissioner.

  1493. 4:47:33

    Um, I make a motion that we deny OB58-

  1494. 4:47:39

    Okay. Is there a second?

  1495. 4:47:42

    Second.

  1496. 4:47:42

    Is there any further discussion? Um, just for the applicant, this is something we deal with a lot, and they're all very difficult, and we just had a practice not to. Because once we open this up, it becomes Pandora's box for all the, um, developments where there have been undisturbed buffers. So I know this may seem like a, a, a, a, a slight thing for us to be able to consider, but in the totality of all the circumstances we have come up here, it, it, it will be significant for us to allow encroachment into the undisturbed buffer.

  1497. 4:48:21

    And this is the first time I've ever seen a request for encroachment to a stream buffer under these circumstances as well. Please, um, Commissioner Birrell?

  1498. 4:48:30

    Yeah. Um, one other thing. Could they decrease the size of the pool and be within the, um, setbacks or-

  1499. 4:48:43

    The, there's definitely an opportunity to make the pool smaller and to shift it a little bit, but the problem is, Commissioner, is this lot, it's kind of on the other side of a ravine once you go over the driveway, and there's not much room to put a pool on the lot. It's kinda confined with, by the buffer, the stream buffer, and the house.

  1500. 4:49:02

    Okay.

  1501. 4:49:03

    Yeah.

  1502. 4:49:04

    But if, um, if, if they could do that, would then, would they automatically be denied a permit, or would they be able to get a permit and, or not have to come back through zoning?

  1503. 4:49:22

    A- as long as they're not in the 25-foot buffer or the stream buffer, they can come in and get a permit for whatever they could fit in that little triangle area.

  1504. 4:49:30

    Okay. Can I ask the applicant to work-

  1505. 4:49:33

    Of course you can

  1506. 4:49:33

    ... with the com dev or zoning to see, permitting, I mean, to see what they could, a different plan-

  1507. 4:49:42

    Yeah

  1508. 4:49:42

    ... that they could do-

  1509. 4:49:43

    Sure

  1510. 4:49:44

    ... without encroaching on the buffer? Okay. Um, I still have to deny this as presented, but, um, y- you can work with the permitting office to see if you could decrease the size or be within the, the requirements that you could get a permit without coming back through zoning. So my motion is still to deny with that recommendation to the applicant.

  1511. 4:50:14

    Any other comments, commissioners? Call the question. Motion carried. The motion, the motion carries 5-0. Let's see if it's work.

  1512. 4:50:26

    And the last-

  1513. 4:50:26

    Okay. The motion carries 5-0. Thank you.

  1514. 4:50:29

    Okay. Madam Chair and board, the last item on your agenda is other business item number 55, uh, Chuck Awuzu. And, uh, I believe Chuck can withdraw this application now, Madam Chair and board, 'cause he, he does not need this, uh, private road or gate anymore.

  1515. 4:50:44

    Okay.

  1516. 4:50:45

    So-

  1517. 4:50:45

    I'll turn it over to the district commissioner.

  1518. 4:50:49

    If I could ask the applicant up, to approach.

  1519. 4:51:08

    Thank you, Mr. Awuzu. So for the record, you are asking the board to, um, allow you to withdraw your other business item without prejudice, correct? Yes, ma'am. Thank you. Thanks. So with that, I would like to make a motion to withdraw OB55 without prejudice.

  1520. 4:51:26

    Second.

  1521. 4:51:27

    Is there any further discussion? Call the question. The motion carries 5-0, commissioners. Thank you.

  1522. 4:51:34

    Thank you.

  1523. 4:51:35

    I believe this is the last matter of the day.

  1524. 4:51:38

    Happy Thanksgiving.

  1525. 4:51:39

    Happy Thanksgiving to all. Thank you everyone for your time today. Our meeting is adjourned.

Machine-readable https://georgiacommons.org/meetings/2026-11-17/cobb-county-board-of-commissioners-public-hearing.md · https://georgiacommons.org/meetings/local/index.md · MCP https://mcp.georgiacommons.org/mcp

Cobb County Board of Commissioners public hearing, November 17, 2026 | Georgia Commons