County: Paulding County
Paulding County Planning Commission regular meeting, November 17, 2026
Georgia Commons holds no minutes of this meeting. Georgia Commons is independent and is not affiliated with Paulding County Planning Commission.
This is a machine transcript made by Georgia Commons from the body's public recording. It is not an official record, it can mishear words, names, and numbers, and it does not say who is speaking. The recording is what was said.
Records of this meeting
Each link opens the body's own website or meeting portal.
- Video recordingPaulding County: Planning Commission (www.youtube.com)
Summary
Written by an AI model (claude-sonnet-5-5) from the machine transcript below. It is not the record: the recording is what was said.
Planning commission recommends the county's data center rules with a 200-acre minimum, tables a resident's version, and approves four smaller applications.
The commission recommended approval of two stipulation amendments and two rezonings to agricultural use, each by unanimous vote. Staff announced that several applications were deferred or withdrawn. The main business was two data center text amendments. A resident's amendment was tabled to March at the applicant's request, after the applicant said they supported the county's version. The commission then recommended the county's amendment, which moves data centers to special use permits in three industrial districts with larger setbacks, with the minimum lot size changed to 200 acres, by a vote the chair gave as six to one after a correction. Many residents spoke on both sides. Recommendations go to the Board of Commissioners on December 8.
Topics taken up: data center text amendment; technology park overlay district; special use permit for data centers; minimum lot size 200 acres; stipulation amendments; agricultural rezonings; roundabouts at Bobo Road; deferred rezonings and cell towers; reuse water stipulations.
What the meeting took up, as said in the recording (9)
Each account is part of the AI-written summary of the machine transcript, not the record. The time opens the transcript below where the matter is taken up.
Staff announcements on deferred and withdrawn applications
Staff announced that three rezonings and two cell tower special use permits were moved to a later date because of missing items or application discrepancies. A rezoning near Hiram was indefinitely removed for non-compliance with the R-55 district. The chair let attendees leave if their item was not being heard. Staff gave January 26th as the new date.
Stipulation amendment for 4.11 acres near Macklin, Bobo and Mount Tabor roads roundabouts
The applicant asked to remove the first ten stipulations from a 2000 rezoning, saying the current development ordinance covers them, and to modify stipulation 11 and add a right-of-way stipulation tied to the county roundabout project. Staff recommended approval. The applicant said there is no user planned and that a convenience store would need a special use permit. A county transportation staffer said most parcels for the roundabouts are acquired, with a bid letting hoped for in March. The president of a neighborhood HOA asked that no convenience store or shopping center be approved, and stressed the need for roundabouts. The chair said this application does not approve any store. The motion to approve passed unanimously.
Removing buffer and paved-parking stipulations on 0.9 acres on Dallas Acworth Highway
A representative of the engineering firm asked to remove two 1989 stipulations, a 10-foot buffer and a five-space paved parking limit, so the owner can add a commercial building tied to an adjacent center. They said a 25-foot planted buffer is proposed to the south and 20 parking spaces are shown. There is no end user yet. Staff recommended approval. No one spoke in favor or opposition. The motion to approve passed unanimously.
Rezoning 5 acres on Fort Wood Way from R-2 to agricultural for a hobby farm
The applicants want agricultural zoning to keep more livestock, mainly poultry. Staff recommended approval with no stipulations and noted that swine would still require a special use permit and that poultry shelters need setbacks. One resident spoke in favor, tying support to opposition to data centers near homes. The motion to approve passed unanimously.
Rezoning 24 acres on Rickles Path to agricultural for small cattle and livestock farm
The applicant wants to scale a small, non-commercial farm with meat birds, sheep and a few more cattle. Staff recommended approval with no known opposition. One speaker supported small farms and opposed data centers beside homes. The motion to approve passed unanimously.
Resident's data center text amendment, asked to be tabled until March
The chair said both data center text amendments would be heard before any vote. Staff had recommended denial of the resident's amendment, citing definitions that did not match the industry classification system. The applicant proposed definitions by size, special use permits instead of by-right use in three industrial districts, stricter standards, a new data center zone, and repeal of the Technology Park Overlay District (TPOD). After reviewing the county's draft, the applicant praised it, acknowledged that repealing the overlay has legal ramifications, and asked to table to March while the county's version moves ahead. Commissioners questioned whether one buffer fits all sizes. Speakers backed the tabling and asked for transparency and a pause. Public time was extended five minutes by unanimous vote.
County text amendment on data centers, reuse water, and technology park overlay
The community development director presented the county's amendment: repeal old reuse-water zoning stipulations (water system director said reuse is no longer required), define cryptocurrency mining, make data centers a special use permit in three districts with setbacks of 200 feet from right of way, 500 feet from non-residential and 1,320 feet from residential, require a development agreement, and shrink the overlay from 1,314 to 1,089 acres by removing two parcels off Electric Dam Road. Battery storage was set aside for more research. Commissioners questioned the 500-foot setback and the 50-acre minimum lot size, and staff agreed it was probably too small. A speaker in favor cited the tax base imbalance and the amendment's noise and generator rules. Many speakers opposed or asked for stronger rules, including applying the standards to the remaining overlay parcels, bonds or escrow for decommissioning, noise limits, water, radon, and a pause. Public time was extended twice by unanimous vote, and a five-minute break followed.
Staff and school official responses to public comment on data centers
After the break, the chair asked staff to address concerns about remaining overlay parcels, environmental effects and decommissioning. A staff member said the two parcels were removed at a commissioner's request and that the moratorium meant the county moved quickly. Development must still meet soil erosion and green space rules, and development agreements address buffers. A commission member who works in schools confirmed the district's size and said more non-residential tax base would help offset heavy residential development, if sustainable.
Votes on the two data center text amendments
A commissioner moved to table the resident's amendment (2026-02-TAA) to March as requested, and it passed unanimously. For the county's amendment (2026-03-TAA), a commissioner moved approval with the minimum lot size changed from 50 to 200 acres and the rest as written. The chair first announced five to one, was corrected, and then said six to one.
Machine transcript
This is a machine transcript made by Georgia Commons from the body's public recording. It is not an official record, it can mishear words, names, and numbers, and it does not say who is speaking. The recording is what was said.
698 turns.
Open the recording on www.youtube.com. The recording opens on the site where the body published it. Nothing is played on this page.
- 0:17:00
Good afternoon, everyone. I'd like to welcome everybody to our November the 17th, 2026 Planning and Zoning Commission, uh, meeting. Got a couple of things that I would like to go over, uh, kind of procedural items that I would like to go over for the group. Uh, first and foremost, if you have got any kind of audible device, cell phone, uh, watch, anything that, uh, that can make noise while we're going through the proceedings, if you don't mind, take a moment right now to put those on silence or turn those off. Um, we've got a, a good crowd today, and we wanna make sure that we don't have any kind of distractions while anybody is presenting the information that they're presenting.
- 0:17:37
Thank you very much for- ... confirming my point and taking the opportunity now to, to do that.
- 0:17:47
So, um, the Planning and Zoning Commission is a recommending body. So what the recommending body means is, as applications are presented to the Planning Commission, we will review those for conformity to the UDOs and the standards that are set forth by the, by the county, and then a recommendation will be made, uh, and submitted to the Board of Commissioners, and the Board of Commissioners will make the final decisions for any applications that are presented to them. So again, as applications are presented to us, uh, we make recommendations to them, but the ultimate decision comes down to the Board of Commissioners.
- 0:18:20
For today, November the 17th, uh, the applications that are gonna be presented to us, and with, uh, whatever recommendations that we put to them, those will be forwarded over to the December 8th, 2026, uh, Board of Commissioners meeting. Uh, confirmation from Mr. Robinson that I'm correct on that?
- 0:18:38
That is correct. 2:00 PM, back in this room.
- 0:18:40
So it'll be, again, 2:00 PM. Anything that we have a recommendation to the Board of Commissioners from today's, uh, viewing will go 2:00 PM for the December 8th, um, Board of Commissioners meeting. So for, uh, the way that the proceedings work is as the applications are presented to the Commission, every a- every applicant will have an opportunity to come and speak, uh, basically about their application, give us an overview of the application. There will be an exchange between the Planning and Zoning Commission, potential staff members, uh, as we...
- 0:19:12
If there are any questions that we have about aspects of their application. Then there will be an opportunity for anybody that wants to speak on behalf of or for the application. They will be offered a 15-minute timeframe to be able to do that, along with the application, uh, or the applicant themselves. So basically, you get a 15-minute timeframe that is a cumulative time, meaning it is a shared timeframe. So as the applicant comes in and they present, they will have a certain amount of time to be able to present, and then we will, uh, when there's questions or interchanges between us and the applicant, that does not count against their time.
- 0:19:50
And as such, there will be an opportunity for a 15-minute opposition time, or if it's, if you have any questions. Uh, and again, those are cumulative. So I notice that we have a very good showing today, so I'm appreciative of everybody that has shown up that wants to hear and, and have a voice, uh, in, uh, whatever application that y'all want to speak to. So again, I appreciate everybody for showing up. But in so, I would also like to ask that we're being respectful. Uh, as people are presenting today, we wanna make sure that we are able to hear the information that is being presented to us.
- 0:20:21
So if there are side conversations or there are things in the audience that are going on, it makes it a little bit difficult for us or other people that are in the audience that, that wanna be able to hear that. So, um, just kind of be mindful of that. Uh, I hope that we don't get any kind of, uh, out of line or anything on that side. So if it is, I, I'll just do a little correction just to let everybody know that we need to kinda quiet down. Again, and that's just in a, uh, in an effort to, uh, be respectful to whoever is, whether or not they are on the behalf side or whether or not they're on the opposition side, everybody has an opportunity here to be able to speak.
- 0:20:57
So we wanna make sure of that. The other thing is, as you are speaking, be mindful of that 15-minute timeframe because, again, with it being cumulative, if you have... If you're up here speaking and, and giving your voice, but there are 10 people behind you that want to be able to give their voice as well, be mindful that you're taking up, up... You're, you're all collective. So if, uh, you have something to say, please, by all means, we want you to have an opportunity to be able to say that, but just be mindful of the people that are behind you, so that way they have an opportunity to be able to hear, be heard as well.
- 0:21:29
So again, we wanna make sure that we're being respectful of everybody's time and make sure that we're being respectful of everybody's opinions, uh, while we're going through the proceedings.
- 0:21:41
So at this time, um, I will ask, uh, our... We've got a set of meeting minutes from our previous meeting from October the 27th. I will ask our, uh, commission if we've had an opportunity to review those, uh, meeting minutes, and if there is any comments or concerns with them as presented. All right, seeing none, I will ask for a motion to approve the meeting minutes from October the 27th.
- 0:22:06
Motion to approve.
- 0:22:07
I have a motion from Mr. Steele. Do I have a second?
- 0:22:10
Second.
- 0:22:10
I have a second from Mr. Callahan. Uh, all in favor? Vote passes unanimously.
- 0:22:33
All right, I will turn it over to Mr. Robinson, if you would like to present, uh, any announcements that you have, or start the proceedings and pres- present the first application.
- 0:22:42
Okay. I'm gonna start off with the announcements on some applications. Uh, application 2026.11z, this is r- rezoning, uh, at Scoggins Road and Buchanan Highway. 2026.15z, a rezoning at Cartersville Highway, Shady Grove Road. 2026.16z, that was a rezoning near the Costco on Charles Hardy Parkway. And then two cell towers, SUPs. Uh, 2026.08 and 2026.09 SUP, uh, 08 is r- over near Creekside Golf Course.
- 0:23:21
It's actually w- it's within the City of Hiram. And the number 9 is near Paulding High School and Villa Rica High School. Those, those two SUPs are forwarded to another date on some discrepancies in their application. And then there's a few more items needed for the other three zoning applications, uh, and they have been moved to January. I have one application, 2612Z, Land Buyers of, uh, America, which was another potential city of Hiram for R-55.
- 0:23:55
That one's been, uh, indefinitely removed for non-compliance with the R-55 district.
- 0:24:03
Okay. Um, so since we have a number of applicants or applications, it sounds like, that were either forwarded or moved, and the fact that we do have a, a fairly, um, you know, significant crowd, I will offer up an opportunity right now. If there was an application that you were here to, to, you know, have reviewed, you're more than welcome to stay for the, the entire proceeding. I'm just saying that if there's an application that you were here for specifically that was just mentioned, um, if you would like, you can go ahead and, and leave, or again, you can stay for the entire proceedings for the remainder of the applications.
- 0:24:37
So, uh, because there were a few of them, can we run through those one more time, just in case there's somebody in the audience that was here for a specific application that is now no longer being reviewed?
- 0:24:47
Yes, sir. This 2026.11z was a rezoning over at Scoggins Road and Buchanan Highway. 2026.15z, that was a rezoning at, on Cartersville Highway at Shady Grove Road. Uh, 2026.16z, uh, that was a rezoning near the Costco on Charles Hardy. 2026.12z, the one that's, uh, indefinitely removed, that was located off Angham Road over near Hiram, and that actually had a annexation pending.
- 0:25:23
Uh, 2026.08 SUP, City of Hiram, that was for a cell tower within the Creekside Golf Course community. And then 2026.09 SUP, another cell tower, that was along Villa Rica Highway just north of Paulding High School.
- 0:25:43
All right. Thank you, Mr. Robinson. And again, if there's anybody in the audience that was here for one of those specific applications, um, that are not being presented at this time, uh, again, you are more than welcome to stay with the proceedings, but if you would like to exit, you have that opportunity as well.
- 0:26:05
What was the new date for those?
- 0:26:10
It would be January 26th.
- 0:26:13
Thank you.
- 0:26:19
All right, we'll give a few minutes
- 0:26:25
or a few moments.
- 0:26:38
All right, Mr. Robinson, if you would like to, uh, take us into our first application, please.
- 0:26:44
Would be glad to, and thank you, everyone. First application is 2026.08 SPSA. It's application by Charles Rand, Adura Group, Inc., requesting a stipulation amendment to remove prior rezoning application stipulations from case Z06-2000. Uh, it would be stipulation, uh, one through 10, and a proposed modification... Removing those and a proposed modification to stipulation number 12.
- 0:27:16
One third... Uh, stipulations 11, 13, and 14 would remain in effect. The subject property is 4.11 acres in zone B2 highway business district. It's in land lot 315, district two, section three. It's located between the Macklin Road, Bobo Road, and Mount Tabor Road intersections. It's in compig- commission post one. Uh, staff has been working with this applicant because there was... This actually coincides with a, uh, our Paulding DOT roundabout projects out there.
- 0:27:51
And, uh, staff has recommended approval of removing the first 10, 10 stipulations, uh, leaving number 11 as is, and, and adding some right of way, uh, easement request along Bobo Road at Macklin. So it'll added some wording. Uh, 12 and 13 and 14 are the same, and we added 15, which is that the owner developer agrees to set back project improvements along Bobo Road, at Macklin Road and Mount Tabor Road corridor improvements with the, the project PR-39937134-1.
- 0:28:36
Uh, the applicant is present.
- 0:28:42
All right, I believe the applicant is already at the podium. Uh, sir, if you don't mind, if you haven't already- ... uh, if you will write your name down and-
- 0:28:52
Thank you. Oh, and by the way, I know there's... I think there was some traffic on social media, but as far as P&Z, we did not receive any calls or questions on this one.
- 0:29:01
Okay. Thank you.
- 0:29:08
That's the name.
- 0:29:09
And sir, if you don't mind, state your name and then we'll turn it over to you to, uh, for presentation of your application.
- 0:29:16
You'd think as many times as I've been up here, I'd know that I should take the opportunity to, you know, put that in writing. I'm, uh, Charles Rand with Ardura Group Inc. And I'm the applicant for the, uh, stipulation amendment that's before you this, uh, this afternoon. Uh, to give... Oh.
- 0:29:34
Hold on one second, please. Um, Pam, could you put us on the-
- 0:29:38
Oh.
- 0:29:39
We're on, like-
- 0:29:40
We don't have a map. We don't have a map for this one. It's a site plan amendment.
- 0:29:45
What's that?
- 0:29:46
There is no map for this one.
- 0:29:47
Okay. Okay.
- 0:29:48
Okay.
- 0:29:48
Thank you.
- 0:29:49
So-
- 0:29:49
Okay, Charles
- 0:29:50
... no, it's just stipulations only is what we're looking at today. But a little bit of history with the, with the, uh, project with, uh, Commissioner Leggitt will probably, uh, hopefully recall this application from, uh, from a long time ago. But this was rezoned from R3 to B2, uh, back in 2000, a few months before I actually started here at the county. But when it came through, it was approved with 14 listed stipulations, and they involved various items, transportation requirements, utility, infrastructure, development standards, um, that were anticipated at the time the application came in.
- 0:30:28
It was subsequently approved by the Board of Commissioners, and all that backup is included in the packet. Um, in the last 25 years, little to nothing has really gone out or gone on at the, at the property. Um, but there's definitely everything around it has substantially changed. Traffic, infrastructure, and this road project that we're talking about today as far as associated with DOT. Um, I believe back in 2002, when I was with the water system, I did the utility relocation for the first time that, uh, the road improvements were proposed, and we're on the second set of improvements, uh, as far as plans.
- 0:31:07
I think it went from one modification to just doing stop, uh, stop... I don't think it was stoplights, but the second iteration was, and this third one is roundabout. And we're supportive of the project, and again, while we work with the county DOT on the, um, on the improvements that they're gonna make, we are taking this up as an opportunity to modify the stipulations. And the 1 through 10 are really stipulations that are handled with the current unified development ordinance.
- 0:31:38
Uh, when this project came through back in 2000, we were working off the original 1998 development regulations as amended through that time, and pretty much the same with the zoning ordinance. A lot of items in those old ordinances just did not cover, uh, a lot of items that were needed at the time, and that's why those stipulations were placed in, uh, uh, placed in motion at that time, especially, uh, where, where it looks at the, the water utility and the pressure in the area, which is some of the limiting things.
- 0:32:10
A lot of that, some of that stuff has been improved, but all of that has been encompassed in this current UDO. And so, that's with the removal of 1 through 10. That'll address that. And then as far as the modifications that Mr. Robinson mentioned for the remaining stipulations, they're mainly reflective of the current road project. We are going to do the, the donation of the right of way as it was originally conceived back in time, uh, in 2000 when the original application, uh, was put into place.
- 0:32:43
So again, that gives you a little bit of history, uh, on why we're here. Again, trying to work with DOT, um, on the improvements and hopefully, uh, I'll, I'll do, do my best to answer any questions y'all may have. Thank you.
- 0:32:59
Chuck, I got a couple of questions. Um, yeah, I'm familiar, and since we're gonna be doing the two roundabouts, how much property's gonna be left? Um-
- 0:33:11
Um-
- 0:33:11
Do you have an idea?
- 0:33:13
I know... I think it's 4.11 acres right now. It'll put it, probably just put it underneath four acres by the time we get done with all the, the dedication.
- 0:33:23
Do you have, do you have a possible usage of it in mind or?
- 0:33:27
We don't, and that's, uh, I think that's important to bring up 'cause I know I have, I've received a couple of calls on, "What are we doing out here on this piece of property?" And, um, it was originally zoned for a convenience store and retail use. Um, the convenience store use we couldn't do today if we wanted to without coming back in front of this body, uh, for a special use permit. But currently, we have no, uh, interested party, uh, that's taken up the project. It's really just to align the stipulations, remove the ones that, uh, we think are handled more better into the, uh, plan review process and the development regulations that currently exist.
- 0:34:06
Why do you want to leave number 14 on there, no access to Mount Tabor? That looks like it'd probably be your only access to it.
- 0:34:14
No, there's-
- 0:34:15
Um, between two roundabouts, there's, you're not, you're not gonna get very much on Bubba.
- 0:34:20
No, there, there's not. There are two access points that are, are planned, uh, as part of that, as far as the location for that project. One pretty much across from the existing, uh, retail center across the street, and then one additional one. We do have the option in the future if we need it, uh, to work one off Macklin at a safe distance from the roundabout, uh, back up, uh, I guess that'd be back west on Macklin. Um, but we didn't We didn't have a reason to come out on Mount Tabor as it currently sits, so if there's a, if there's a use that comes in that wants to modify that, we'll let them come back and handle that at another time.
- 0:34:58
Okay. Thank you, Chip.
- 0:35:00
You're welcome.
- 0:35:06
Mr. Rann, I just want to, uh, for the record, uh, you mentioned and we've discussed the removal of the first 10 stipulations, the modification of stipulation 11, uh, keeping number 12, 13, and 14 the same, and then the addition of number 15. You are aware of those changes, and you are in agreement with those changes, correct?
- 0:35:26
We, we are aware of the changes. We worked with staff, so we are in total agreement with those stipulations.
- 0:35:30
Okay. Thank you, sir.
- 0:35:32
Mr. Chairman, step 11 is struck out on our staff sheet, and I thought the intent was to keep that.
- 0:35:41
Um, I... On, on my sheet, I do not have a strikeout on number 11 on mine.
- 0:35:47
I, I can address that. That was a overreach in strikeout. 11 should have stayed there. Um, 11 reads exactly like it used to, and then there was a addition of owner/developer agrees to provide required right of way and easements along Bobo Road at Macland Road and Mount Tabor Church Road corridor improvements in this, the, the project out there.
- 0:36:24
Mr. Robinson, since you're already speaking, on a lot of these stipulations that we're striking or they're asking to strike here,
- 0:36:35
I understand Mr. Rann saying that they're covered in some of our UDO. So like the ACL D cells, we handle that during plan review, a lot of these others. So it's just been that time difference between 2000 and now. We've made a lot of modifications to-
- 0:36:52
That's, that's correct
- 0:36:53
... both the development regs and to the UDO.
- 0:36:55
And, and, uh, the owner and, and Mr. Rann are... They're also still working with the water system, um-
- 0:37:03
And it's... There is no map, but I think the, the majority of the audience, if, if they don't know what we're talking about, you're, you're talking about the intersections of Mount Tabor and Bobo, Macland and Bobo. Um, Ms. Parrish, any interest in giving an update on the, the pro- the project itself or the roundabouts, where we're at with them?
- 0:37:23
Sure. Oh, sorry, if you can hear me. So this, uh, as, as Mr. Rann had shared and, and most Mr. R- Mr. Leggett, you know, this project has been, um, needed for many years. It was on, I think, our very first SPLOST. Um, had some, some, some movement on it, and it, it got delayed, um, and then, then pretty much shelved. Um, the initial project that was identified, um, later on, probably about 10 years ago, five years ago, was identified that the turn lanes and the signals weren't gonna be the best and most appropriate, um, intersection improvements for the locations.
- 0:38:02
So, um, did a- another traffic study and reviewed that and determined roundabouts would be more appropriate at those locations. So that'll be a roundabout at the intersection of Macland and Bobo, and then a roundabout at the intersection of Mount Tabor and Bobo. Um, there will be turn lanes at, um, Macland and Mount Tabor. Um, currently we have acquired, I think there's 24 parcels identified for this project. All but, I believe, six have been acquired, um, for a prop- for the property owners, um, th- that have been identified along here.
- 0:38:38
Uh, Mr. Brock act- he does own four of those parcels. So we're working together, and this is part of that right of way negotiations for all of those parcels, was to work with him to come forward to clean up the zoning cat- the zoning stipulations on the property as we finalize those negotiations and the acquisition of those parcels. And then I think there's two other property owners that we need to acquire out there. Um, the goal, the hope, the plan that we have right now is for a let in probably March of next year.
- 0:39:10
We were hoping for December of this year. Um, we've just... It's been... There's some complicated properties out there, and we've had to do some additional appraisals and some special studies on some of those. So we have had to push that schedule out a little bit, but we are believe, believe that we can hit a March, um, let date next year for this project.
- 0:39:28
Thank you.
- 0:39:29
Yes, sir.
- 0:39:34
Are, are there any additional questions, uh, for the applicant from the Planning and Zoning Commission?
- 0:39:45
All right, Mr. Rann, if you don't mind, you can have a seat. Um, we'll have an opportunity to call you back up in a little bit. Uh, at this time, is there anyone in the audience that would like to speak, uh, in favor of or on behalf of, uh, the application?
- 0:40:04
Okay, seeing none, at this time, is there anyone in the audience that would like to speak in opposition of the application or have any questions pertaining to the application? Sir, if you have an app... I mean, if you have a question, if you don't mind, approach the podium. Uh, make sure... There is a, uh, sign-in sheet over to your right. Please make sure that you put your name in for the sign-up sheet and then state your name for us.
- 0:40:30
Yeah, there's a sign-in sheet just to your right.
- 0:40:33
Oh, thank you.
- 0:40:53
Okay. Just have a, I just have a brief statement. Um, my name is Ronald Johns and I am the president of the Azalea Lakes HOA location located in Paulding County just off Bobo Road halfway between New Hope and Hiram, Dallas. Um, I come to you today based on the display of the sign, 'cause I know they talk about stipulations, but the display of the sign to request the commissioners to turn down any request for a C-store or a shopping center between the intersections of Macklin Road and Mount Tabor at Bobo as stated in the public notice that we're discussing right now.
- 0:41:30
The neighbors of the Azalea Lake subdivision that I have spoken to do not need, do not see a need for a third store in the area as there are already two convenience stores with gas stations at these two intersections. Um, this is m- more important and you guys have been knowing about it. My neighbors and I would like to stress the need for a roundabout each at Mount Tabor and Bobo intersection and Macklin and Bobo intersection. At the morning rush hours, 40 cars can be counted at one time heading south on Bobo at the Mount Tabor intersection, and at the evening rush hour, 50 cars can be counted west on Macklin at the Bobo intersection.
- 0:42:14
And lastly, um, these rush hour times the connection betwe- uh, uh, the connecting Bobo Road runs so slow that you can literally talk to your neighbor across the way. That's how much traffic is there. Thank you.
- 0:42:29
Thank you, sir.
- 0:42:34
Is there anyone else in the audience that would like to speak in opposition of or have questions to the applicant, uh, application?
- 0:42:44
All right. Mr. Ann, I'll let you come back up. Um, I do, I will address with this, and I'll just ask Mr. Robinson to confirm this, to answer the question for you about the concern with the, the convenience store or the shopping center. Again, with this application, this is, um, they would have to re- be required to come back with a special use permit, which they are not filing for in this. So this is not a discussion of bringing a convenience store or a shopping center for this parcel. Currently, what I, my understanding, and Mr.
- 0:43:15
Robinson can confirm, is this is a cleaning of the existing stipulations that were established back in 2000, uh, or back in 2000, and this is kind of, um, just kinda cleaning it up with the op- with the, uh, the roundabouts that are being proposed in there to make sure that everything aligns. So if, uh, at any time somebody would wanna come in and apply for a convenience store, they would have to come back before the Planning and Zoning Commission with a special use permit, and it would have to be under review again. Uh, but for this application, that is not what is being considered.
- 0:43:49
That's correct. Thank you.
- 0:43:50
Okay.
- 0:43:50
I'd also like to say I was on the very first zoning, and at that time the applicant was not the app- the property owner at this time. So at that time, that's what he, uh, wanted it, uh, be to, to put a convenience store there, but that never happened. So as he said, um, there's nothing planned at this time, and it would have to come before us again before anything was brought on that property.
- 0:44:26
All right. Any additional questions or comments from the Planning and Zoning Commission?
- 0:44:33
All right. Before us we have a recommendation from staff, uh, for approval of the zoning application 2026-0-808-SPSA with the, uh, removal of the first listed 10 stipulations, a modified number 11, keeping number 12, 13, and 14 the same, and the addition of number 15. Do I have a motion for this application?
- 0:45:00
I make a motion.
- 0:45:01
I was gonna-
- 0:45:01
Yeah, I guess.
- 0:45:02
Okay. I was gonna make a motion to approve with 11, 12, 13, 14, and 15 stipulations added to and the other 10 deleted.
- 0:45:16
I'll second.
- 0:45:18
All right. So I have a motion to approve, uh, as presented, uh, by Mr. Leggett. I have a second from Mr. Steele. All in favor? Vote passes unanimously.
- 0:45:36
Thank you very much.
- 0:46:06
All right, Mr. Robinson. Sorry, I didn't have my microphone on. Sorry, Mr. Rob- or if you don't mind-
- 0:46:11
Sure
- 0:46:11
... please present our next application.
- 0:46:13
Absolutely. Thank you. This one's another stip- stip amendment application. 202609SPSA is application by Lead Engineering re- requesting to remove two prior zoning stipulations, and this would be on a .9 acre property that, uh, is zoned B-1 general business district. The stipulations require a 10-foot perimeter buffer and limits the number of paid parking spaces to five. This is from a rezoning application in, uh, 1989 61Z.
- 0:46:50
This property is located in land lot 541, district 3, section 3. It's on the east side of Dallas Ackworth Highway. And across from Stonewood Creek Drive. It's in commission post one, and staff has recommended approval.
- 0:47:07
All right, I see that we have the applicant present. Uh, have you already had a chance to sign in-
- 0:47:12
Yes
- 0:47:12
... sign in? And if you don't mind, state your name for us, sir.
- 0:47:15
Hello. My name is Will Summey. I'm here with Lead Engineering, uh, representing our applicant. Um, as, uh, Mr. Robinson had said, uh, we're here today to have two stipulations removed that were part of the original zoning of this parcel back in, uh, 1989. The original case was 1989-61-Z. Uh, during that meeting, um, two stipulations were put on the property. Uh, one was a 10-foot buffer requirement with adjoining property lines, and the second was a maximum of five, uh, paved parking spaces.
- 0:47:50
So what a, what our client is proposing to do is, uh, they are the same developers of the Town Creek, um, commercial center that has recently gone up out there in the last couple years. And they've purchased this property to tie into that and add an additional commercial building. Um, so therefore, we're seeking to get these removed today, so that way they can complete build out of this and be able to do interparcel connectivity. Uh, that's why we need the 10-foot buffer removed. Also, the 10-foot buffer is smaller than what we would provide adjacent to, uh, the B2 property, um, to the south.
- 0:48:22
Uh, there's a... As you can see on the site plan, there's actually a 25-foot planted buffer that goes into there. Um, and additionally, uh, it wouldn't make sense to have just five paid parking spaces, as, um, requirements would be higher than that, and we'd obviously like to pave the entire parking lot. We currently show 20 parking spaces on our site plan. So, uh, that's what brings us here today, just to get these cleaned up, so that way we can move forward with this plan and something that's actually enhanced over what these stipulations would have allowed. Uh, so I'll reserve time to answer any questions you have.
- 0:48:53
All right. Thank you. Do we have any questions for the applicant?
- 0:48:59
Will, do you have a user yet?
- 0:49:02
Uh, they do not have an end user. Um, they'll develop the same way they did the rest. It... Even though there's some different owner names out here, it's all the same development group. So they'll do the same thing they did with Town Creek, where they'll, they'll go ahead and construct the, uh, commercial building themselves and all while seeking an end user, but they don't have one at this time. But it would be much the same as what they've got out there, shops, a restaurant, something along that nature.
- 0:49:24
Is that, is that detention facility, that's in place currently?
- 0:49:28
Yes, that's in place currently, and the, um, plan is to tie into it. Um, they've long looked into having this parcel. They wanted it to be part of the original plan, but they weren't able to secure it at that time. Um, so, uh, our firm did the design on that. So we knew they were looking at this one, so we've designed it for that, and it'll tie into that master detention.
- 0:49:47
Okay. And your 20 lot, your 20 parking spaces meets the UDO, meets the zoning?
- 0:49:53
Yeah.
- 0:49:53
That's why you had 20 shown-
- 0:49:54
Yes
- 0:49:54
... the requirements. And that right-in, right-out is, that's an existing access or is it a new-
- 0:50:00
No, that's not existing. It would be a new access point that'll, um, go through getting a GDOT permit and all that. It is-
- 0:50:05
Okay
- 0:50:05
... a GDOT roadway. So, um, they do have a... To the east on the site plan where the other 5,000 commercial is, that, that is existing. There is a tie out that's currently existing there, so this project would tie into that, and it would... So that would become another access point for the whole development should this move forward and go in.
- 0:50:25
And that buffer you're showing to the south, that's there, or that's proposed?
- 0:50:29
Uh, so it's existing on the part that's already been done. It's proposed on our plan-
- 0:50:33
Okay
- 0:50:33
... and would go in the same way. It would continue to be planted down through there.
- 0:50:37
Okay. All right. Thank you.
- 0:50:38
Yep.
- 0:50:42
Can we change the screen? Is there a site plan? No. For this one? Okay.
- 0:50:51
Are there any additional questions for the applicant?
- 0:50:59
All right, Mr. Summey, if you'll have a seat for me. Thank you.
- 0:51:05
At this time, is there anyone in the audience that would like to speak on behalf or in favor of, uh, the applicant?
- 0:51:16
Seeing none, is there anyone in the op- uh, audience that, uh, would like to speak in opposition to or have questions pertaining to the applicant?
- 0:51:28
Seeing none, we have a recommendation for, uh, approval of removal of the two listed stipulations from the previous case of 1989-61-Z for approval of the applicant 2026-09-SPSA. At this time, I would like to ask if we have a motion from this-
- 0:51:51
I make a motion to approve.
- 0:51:53
I have a motion to approve by Mr. Steele. Do I have a second?
- 0:51:57
Second.
- 0:51:57
I have a stick- second from Mr. Rakestraw. All in favor? Vote passes unanimously. Thank you, Mr. Summey.
- 0:52:23
That is good.
- 0:52:39
All right, Mr. Robinson, if you will lead us into our next application, sir.
- 0:52:43
Okay. Next application, okay, 2026-13-Z. It's an application by James Travis Par- James Travis Parr and Ginger Goodparr. Uh, they're requesting to rezone 5.01 acres- From R-2 Suburban Residential District to A-1 Agricultural District for a small-scale hobby farm and other agricultural uses. The property's located in ni- land lot 960, District 19, Section 2. It's on the south side of Fort Wood Way and west of Cleburne Parkway.
- 0:53:16
Address is 237 Fort Wood Way. It's in commission post three. Staff has recommended approval of this application, and we have no noted opposition or cause for concerns on this, and the applicant is present.
- 0:53:32
Have y'all had an opportunity to, uh, sign in for the-
- 0:53:35
Yes
- 0:53:35
... elector?
- 0:53:36
Yes, sir.
- 0:53:36
All right. Well, if you don't mind, present, uh, your names to us and then proceed into, uh, into discussions of-
- 0:53:43
I am-
- 0:53:43
... your application
- 0:53:44
... I am Ginger Parr. This is my husband, Travis. We are applying to get our property rezoned to agricultural so we can have more livestock than residential zoning allows, mainly poultry.
- 0:54:06
All right, thank you. Um, do we have any specific questions to the applicant from the Planning and Zoning Commission?
- 0:54:21
I see on here, Mr. Robinson, that, uh, there are no listed stipulations for this application. Am I correct?
- 0:54:27
That's correct.
- 0:54:31
And just one note, in, even in the A- A-1 District, any kind of swine or pig farming requires a special use permit, and they have not sought that out.
- 0:54:42
Thank you for the clarification.
- 0:54:43
Is there any, like, chicken house requirements or any other type of farm-related stuff they may wanna know?
- 0:54:52
Yes. Uh, any kind of shelter for a non-domestic animal or a chicken or fowl requires a 100-foot setback in the A-1 District from what would be the right of way of Fort Wood W- Way and, uh, 50 feet from the rear and side property lines.
- 0:55:15
Okay. Any questions, again, from the Planning and Zoning Commission? All right. If y'all don't mind, have a seat for me, please. Thank you.
- 0:55:27
Is there anyone here that would like to speak in, um, favor or on behalf of the applicant?
- 0:55:41
Yeah, I'd like to speak in favor of the applicant.
- 0:55:44
Okay. If you don't mind, just sign in at the, on the-
- 0:55:46
All right
- 0:55:46
... sign-in sheet to your right there and then state your name.
- 0:55:57
I'd like to f- speak in favor of the applicant. My name is Daniel Routment. I have seven acres in the county, and there are certain types of animals I can't have closer than what the county is proposing to put data centers next to other people's houses. That's why I accept somebody trying to have a small farm. Thank you.
- 0:56:28
Is there anyone else in the audience that would like to speak in favor of the application?
- 0:56:36
Okay, seeing none, is there anyone here that would like to speak in opposition to or have questions concerning the application? Seeing none, we have, uh, been presented with a, a recommendation from county staff for approval of zoning application 2026-13-Z. Do I have a motion for the application?
- 0:57:01
Motion to approve.
- 0:57:02
I have a motion from Mr. Callahan. Do I have a second?
- 0:57:04
Second.
- 0:57:05
I have a second from Mr. Astin. Uh, all in favor? Vote passes unanimously.
- 0:57:59
Congratulations.
- 0:57:59
Mr. Robinson, if you're ready, you can go ahead and present the next application on the agenda.
- 0:58:04
Okay. 2026-14-Z, application by Heather Pogue requesting to rezone 24.37 acres from R-2 Suburban Residential District to A-1 Agricultural District for the proposed operation of a small-scale cattle slash livestock farm as an agricultural business. Property is located in land lots 829 and 900, District 18, Section 3, and land lots 864 and 865, District 3, Section 3.
- 0:58:35
It's on the west side of Raccoon, Raccoon Creek Road in the... It's along Rickles Path. It's in commission post four, and staff has r- also recommended approval on this one, and we have no known opposition that's been, has reached out to P&Z.
- 0:58:52
Okay. And I see no, um, proposed listed stipulations for this application either.
- 0:59:00
I would assume Ms. Poe?
- 0:59:01
Yes.
- 0:59:02
Uh, have you had an opportunity to sign in?
- 0:59:04
Just did.
- 0:59:04
All right. So the podium is yours.
- 0:59:06
Okay. My name's Heather Poe. Um, we live at 391 Rickles Path, and we are looking to rezone just to be able to scale our, uh, farm business in the future.
- 0:59:21
Can you elaborate a little bit on farm business?
- 0:59:25
Sure.
- 0:59:25
Are we talking about- ... commercial farm business-
- 0:59:27
No, no, no
- 0:59:27
... or are we talking about-
- 0:59:28
No commercial
- 0:59:28
... private farm business?
- 0:59:29
Just small scale.
- 0:59:30
Um-
- 0:59:30
No. Um, potentially adding some, like, meat birds, chickens for meat. Um, that's what we call them, meat birds. Um, adding those into the pasture, adding some sheep. We have cows now, but potentially adding a few more, but no commercialized. We are regenerative, so everything is based just on the land that we have around us.
- 0:59:50
Okay. Thank you.
- 0:59:56
Are any of these miniature animals?
- 1:00:01
We have one mini Highland, and we hope to, uh, breed her and add a few more of her around.
- 1:00:07
Thank you.
- 1:00:16
Are there any additional questions, um, for the applicant?
- 1:00:23
Ms. Poe, if you don't mind, have a seat for me.
- 1:00:25
Mm-hmm.
- 1:00:30
At this time, do we have anybody that would like to speak on behalf of or in favor of the applicant?
- 1:00:40
Hi. Me again. Do I need to write my name again?
- 1:00:43
I'm gonna say you need to write your name again.
- 1:00:44
All right.
- 1:00:45
It gets recorded. It gets recorded for the applications.
- 1:00:47
All right.
- 1:00:52
But we know who you are, so we'll let you go ahead.
- 1:00:53
All right. If I'm not hammering my point home enough- ... I support small farms in our community. I don't support data centers next to people's houses.
- 1:01:17
Yay.
- 1:01:17
Is there anyone else in the audience that would like to speak in favor of or on behalf of the applicant?
- 1:01:26
Seeing none. Is there anyone here that would like to speak in opposition of or have questions pertaining to the applicant?
- 1:01:35
Seeing none. We have been presented with a staff recommendation of approval of zoning application 2026-14-Z with no listed stipulations. Do I have a motion for the application?
- 1:01:51
I make a motion to approve.
- 1:01:52
I have a motion from Mr. Rakestraw for approval.
- 1:01:55
Second.
- 1:01:56
A second from Ms. Fitzgerald. All in favor? Vote passes unanimously.
- 1:02:57
Before we get into our next listed, um, application, I would like to kinda make a, um, a statement on these. So what has been presented to us as the Planning and Zoning Commission is two text amendments that are dealing with the same subject matter. However, they are not the same. So in an effort for us to be able to provide, um, the best decisions that we can or the best recommendations that we can, what I'm going to ask is that we have the presentation of one of the applications, we hear them, we speak to them, and we will give public opportunity for, um, speaking in favor of or in opposition to, and then we will hear the second text amendment being the fact that, again, they are speaking on the same subject matter, uh, they are just a little bit different.
- 1:03:44
So again, in an effort to be transparent and clarity of all the information, we want to go through the presentation of both of them before we make a, uh, a motion or a recommendation for either of them. Um, I just wanna make and confirm with Mr. Phillips that that is, uh, I am correct in, in my actions and that we are able to do so.
- 1:04:04
Yes.
- 1:04:05
All right. Thank you. So Mr. Robinson, um, I will ask that you introduce our first, uh, text amendment application, sir.
- 1:04:16
Very good. Thank you. This is, uh, 2026-02-02 TAA. It's a zoning ordinance text amendment. A zoning ordinance text amendment application by Shannon Utz to Title 1, Administration, Chapter 110-40, General Definitions, Title 2, Zoning, Chapter 210, Base Districts, Section 210-210 ECBP, which is E-Commerce Business Park District, Section 210-30 AML, which is a Advanced Manufacturing L- Logistics District, and Section 210-240, I-1 Light Industrial District, Chapter 220-40, Technology Park Overlay District.
- 1:05:06
In Chapter 240, Tables 240 point- dot 3 of the Unified Development Ordinance for Paulding County. Uh, staff has recommended a, a denial on this and for the reasons that, uh, some of the definitions didn't meet some of the na- uh, didn't match up with some of the North American Industrial Classification System, and that there was some other changes that needed to be made in the ordinance to work with these po- potential changes.
- 1:05:36
And I know we're after the sprints.
- 1:05:38
Mm-hmm.
- 1:05:44
Have you had a chance to sign in as a-
- 1:05:45
Yes, most certainly
- 1:05:46
... Paulding?
- 1:05:46
Thank you.
- 1:05:47
Uh.
- 1:05:47
Hello, everybody. My name is Shannon Utz, and I live here in Paulding County in Wimberley Way. Um, it is both an honor and a privilege to present my text amendment to you today. Um, the purpose of my proposed text amendment is intended to provide a clear and predictable path, um, to responsible data center and advanced technology development, um, while also protecting existing residential communities, um, sensitive uses, public infrastructure cap- capacity, and the public hearing process. The way our unified development ordinance is written currently, it has some opportunities which I have been advocating to change.
- 1:06:24
Um, at the time of submitting, planning and zoning had not yet been charged with drafting a revision, which is why I took the step and figured I would submit my own. So my proposed amendment sets out to do five primary objectives. Number one, to establish clear definitions that distinguish between different types, sizes, and operational characteristics of data centers. Um, amend the I-1, the AML, and the ECBP to remove the data hosting and processing to a special use permit only and not have it by right.
- 1:06:57
Um, establish supplemental development standards specific to data center operations. Number four, create a data center and technology zoning district to- for major data centers, um, and data center campuses. And then lastly, repeal the existing technology park overlay district, commonly referred to as the TPOD. Now, um, the importance, I'm gonna break it down for each section, just quick blips. So the de- importance of definitions is because data centers are not all created equal.
- 1:07:29
They're not all evil monsters. They range in size from a few Conex boxes sitting on, like, a quarter acre lot to hundreds of thousands of square feet on hundreds of acres. Data centers from the early 2000s consumed but a fraction of what today's hyperscaler data centers do. Today's campuses can try to secure so much power that our current administration is encouraging them to bring their own power creation, which makes them much more than just a building with servers and computers.
- 1:08:00
They're becoming power plants. This is why defining the size and scale of a data center is important. Under my proposed definitions, a limited data center could easily fit into an industrial or commercial space with very little impact, whereas a major data center that is incorporated into a data center campus could also have substations, gas turbines, and maybe even one day a small modular nuclear reactor. These things will have greater impacts on their neighbors.
- 1:08:31
Now, in regards to amending I-1, AML, and ECBP to move data processing and hosting from by right to a special use permit, many jurisdictions across this country who have existing experience with data centers will tell you the number one rule is to never allow a data center by right. We've actually seen this information repeated in educational materials that our very own county manager has sent to planning and zoning.
- 1:09:04
So this is not, like, a new and surprising concept. Um, nextly, to create supplemental standards. Um, as I mentioned before, not all data centers are created equal. By setting stricter standards, it clearly defines what is and is not acceptable and forces variance requests to be put in f- at a public hearing in front of this very board right here. If a two-story 10-megawatt data center wants a 100-foot buffer against a 10-acre residential parcel, that is much more easier to review and approve than a variance reduction on a 3,000 square foot, 70-foot tall building that plans to have 40-plus diesel fire generators attached to it.
- 1:09:48
So definitely different, but set our standards high and encourage public review and transparency. In creating a data center and technology zone, it also forces major data centers and data center campuses to do a public hearing and provide due process to the neighbors of that development. Yes, some people in this county don't want any data centers, but a lot of that comes from fear of the unknown. By forcing transparent public review, the uncertainty is removed and fears are eased.
- 1:10:22
And then, of course, my final request, to repeal the technology park overlay district.
- 1:10:27
Ooh.
- 1:10:28
Tim Estes even said when the board, the BOC, presented and voted to adopt the moratorium, that they had lo- listened to some of the wrong people. The TPOD was created to ensure entitlement rights. We did not need that because we already had three zones they could have rezoned into to build a data center. Um, a lawyer for the entitlement company submitted, um, sent, you know, some verbiage that he used and helped other communities, um, and that was used to create our TPOD.
- 1:10:59
Um, but he spoke in front of this very commission, and all without announcing who was paying him to be here. So James, I know you had asked him, asked Anne, excuse me, if the overlay was like our other overlays. But it is not. It handpicked partials on which ones the entitlement company was working with, and then added other ones at the last minute that they knew would not be feasible for development. Those other partials will be requested to be removed by the county in just a few moments.
- 1:11:32
Of all of our other overlays, they are intended to establish additional developmental standards for particular geographical areas, without necessarily changing the underlying zoning classification. Our other overlays cover a geographical area by definition and not by partial number. They are blankets over the Sweetwater Creek Water Basin, the airport district, the Silver Comet Trail, and our major corridors. Um, the overlays control more of visual and developmental standards.
- 1:12:03
Um, now the Silver Comet Trail does allow additional commercial uses, but it does not completely change the zoning category. The TPOD allows a data center campus, which is gaining more acknowledgement to be heavy industrial, to be built by right or by ordinance, same basic principle, um, on residentially zoned land. It does not have to go through any traditional rezoning into another category to be built.
- 1:12:33
What's even scarier is that as long as they adhere to minimum standards, that development will never have to face public hearing or any votes from the Board of Commissioners or this commission. Now, not to mention that when the board voted in the Cole Lake partial, they set a dangerous precedent. All the other partials originally adopted were PRDs, Cole Lakes and R2. The landowner petitioned for inclusion and it was given, and that standard opens the door for every other landowner in Paulding County to ask to be included if rejected.
- 1:13:07
Now, I need a sip 'cause my mouth is surprisingly very dry.
- 1:13:14
Mm. Okay. But now to mix things up a bit, everybody likes a good change, right? So in response to the staff's recommendations and feedback on my amendment, and after getting the county's updated draft, um, text amendment, um, I'd received everything yesterday morning, I would like to acknowledge my support that the direction, the support of the direction of the staff has taken on their text amendment. I believe the county has proposed meaningful improvements on how data centers will be regulated in Paulding County going forward.
- 1:13:49
It addresses many of the same concerns that motivated me to submit my own amendment, like moving data processing and hosting to a special use permit, um, in I-1, AML, and ECB zones. Um, and I had actually done a lot of compromises in my text amendment. Um, I was hoping not to set my expectations too high, um, out of fear of not anybody taking me seriously. So I did have a lot of compromises and buffers and things like that.
- 1:14:19
So the planning and zoning's text amendment includes amazing buffers and some amazing ideas. Um, so I actually, I, I can't help but embrace what they have produced. Now, I do recognize that there are ongoing development considerations associated with the TPOD, and I want to acknowledge that repealing the TPOD does create signi- substantial legal ramifications right now. So even though I wish we could attach more suitable standards to protect the community surrounding the proposed SR 92 project, I do understand the predicament that the county has gotten themselves into.
- 1:14:58
I don't believe that responsible land use and planning should be a competition between proposals. So I would respectfully like to ask the planning commission to table my text amendment 2026-02-TAA until the March 2027 meeting. During that time, I would like to work with staff to narrow down my amendment to address modifications that may have been missed during the county's text amendment proposal.
- 1:15:29
I am asking that the commission not delay consideration of the county's amendment. I support allowing the amendment to proceed independently as written and as presented. So hopefully, if you guys pass theirs, I really hope the BOC approves it as is and doesn't decide to, you know, reduce buffers or do anything crazy over there. Um, with that being said, um, my objective remains responsible growth, protecting our existing communities, and consistent regulatory framework for Paulding County.
- 1:16:06
As much as I really wish you would vote to repeal the TPOD today, I am a realist, and I would much rather protect future of Paulding County over being selfish. So, thank you.
- 1:16:28
Oh, questions, sorry.
- 1:16:34
I mean, took your phone.
- 1:16:41
Yes.
- 1:16:42
Go ahead.
- 1:16:42
So, uh, you're asking us to, to table it.
- 1:16:46
Yes.
- 1:16:46
And Mr. Wicks had said we were gonna listen to both. So question for counsel, do we act on that if applicant is asking to remove it and table it?
- 1:16:58
The idea is to hear both presentations, and then once all information is received, for y'all to vote on each of those independently.
- 1:17:07
Okay.
- 1:17:10
Yeah, 'cause I believe you'll s- you can still have the opportunity to deny it or vote it through.
- 1:17:14
Right. Yeah, just-
- 1:17:15
You can do whatever you want
- 1:17:15
... ask him to, you know- ... move it. I was like, "Okay, move."
- 1:17:19
I, I would just... I would prefer we table it until March than have it denied, um, just in case there are any further developments that would allow for further eyes to kinda revisit it. That's all.
- 1:17:31
And, and, and I was just trying to clarify if we need to table it now or wait. So either, either is fine.
- 1:17:38
Okay. Are there any questions, uh, for Ms. Utz concerning the information that was presented?
- 1:17:47
Yes. How, how did you, um, come up with the data that you've presented to us? Are you an engineer? Did you-
- 1:17:54
No, I'm, I'm a, I'm a really big research nerd. So this is actually based on a lot of ordinance that are already created and have been passed within the past, like, six months across the county. I mean, across the country. So we have Birmingham, the newer, stricter restrictions in Loudoun County. Um, and again, like I said, I did make, um, some compromises. For example, Loudoun County now mandates, I think, an 800-foot buffer against residential properties. So I came down, I believe it was to 500, but then I requested, like, generators be an extra 100 foot.
- 1:18:25
Um, I was thinking, you know how big a football field is. So just think about a generator, two football fields, you know, from your house. Um, and then I also included definitions- ... for, like, special, um, for sensitive uses, like schools, hospitals- ... um, you know, things along that line, nursing homes, and then that had to be 900 feet from an existing sensitive use building, so three football fields, but that was from building and not by property line. So there were some things in there, um, I, I had been working on an amendment for a few months, and I kept giving up and getting frustrated 'cause I couldn't make up my mind, and then at the last, last minute, I was like, "Okay, I guess I gotta put my, all my best ideas together." So I, I do recognize I like the direction that the county's going.
- 1:19:13
Um, I, I understand not wanting to do a separate data center zone. That can set us up for failure in the future, as we're seeing with 20-year-old PRDs that are approved. Just imagine if we approved a zone. So I understand if that's a direction we don't wanna take. Um, but, uh, I am, I'm impressed with what they've done. And, uh, like I said, I think there's improvements that should and that definitely should be made on the technology park overlay district, but I do also understand that there's a lot of stuff happening behind closed doors that could, you know, um, give us some legal ramifications on that, so.
- 1:19:49
Now, I understand that, uh, you're in the process of moving to Coweta County?
- 1:19:54
No, that's not true, sir. So my house is currently under a contract with an investor, because he's already bought five on my street. So there's currently six at the end of the cul-de-sac that he came after. He secured a contract on five of those. I'm sure he's watching right now. Hi. Um, so um, um, if the data centers don't come in, it's a very good chance I don't have to sell my house, but I don't wanna live in a neighborhood next to a data center, nor in a rental property, uh, street. I don't wanna live next to a whole bunch of rentals. So I'm kind of stuck.
- 1:20:25
Um, right now in doing this, it's what's best for Paulding County in the future and the neighbors, you know, with everybody that's here. You know, I know if I push changes to the TPOD, it's gonna get voted down. You know, the board's not gonna do that right now. I know that. Um, but, you know. So it's, it's like riding on a knife's edge, you know? I push too hard this way or push too hard that way, but it's like, what is the best for Paulding County in the long run? That is what's, you know, that's what we need to focus on.
- 1:20:59
You had indicated that they're not all the same.
- 1:21:01
Correct.
- 1:21:01
And, and we know that. There are small ones. I mean, I looked at six different projects that ranged anywhere from nine acres to 300 acres. They, you know, building sizes from 12,000 square feet to a million five.
- 1:21:14
Mm-hmm.
- 1:21:14
They're, they're, they're all over the place. Um, in your plot summary or policy summary, you've got things like a 500-foot residential, uh, setback for the data center itself, but in a small data center, it may be on a smaller site.
- 1:21:28
Yes.
- 1:21:29
So you read the county's proposal-
- 1:21:31
I did
- 1:21:31
... staff proposal. So it, it, if I understood it correctly, it does not, it's not going to show... It's gonna show a special use permit requirement-
- 1:21:39
Right
- 1:21:39
... but not a zoning requirement. But we see-
- 1:21:43
Well, it'll still-
- 1:21:43
But-
- 1:21:43
... it'll still be, have to be in the I-1, the AML, or the ECBP.
- 1:21:47
We, we see all the time with special uses coming through-
- 1:21:51
Mm-hmm
- 1:21:51
... to where they're still advertised. You still have public input. You still have... I mean, it basically feels like a rezoning sometimes, that you're coming in with the same, the same people, seeing the same people, answering the same questions. So to me, sometimes I feel like a special use, personally, is, you know, permission, just like if I were going to rezone a piece of property, that I'm asking for that same thing.
- 1:22:12
Yes.
- 1:22:12
So sometimes it's hard for me to really think that they're different when they're both, "Here's what we're wanting to do, and here's the requirements." I just see sometimes, like with, like with the buffers, I, I saw theirs, and, and it's, it's a large buffer too, um, that sometimes they may be a different situation, that if it's a small site or if it's a large site, so.
- 1:22:34
And that's something, like, I think with theirs, I would've liked to see a differential, especially if we're trying to really encourage economic development here.
- 1:22:41
Right.
- 1:22:41
You know, I believe, like, over in Cobb County, there was one that was, like, only, like, 125 megawatts, which I know is still big, but in comparison to some other scales, you know, it's, it, it's small in comparison right now.
- 1:22:52
Yeah. I, I personally think they are site-specific sometimes or size specific, and-
- 1:22:56
Mm-hmm
- 1:22:56
... and things can-
- 1:22:58
Yeah
- 1:22:58
... vary from one to the other, 'cause you said it perfectly. They're not all the same animal.
- 1:23:01
Yeah.
- 1:23:01
So.
- 1:23:02
But anybody can come in here and ask you guys for a variance.
- 1:23:05
Right.
- 1:23:05
I see you guys do it all the time. So, um, set the standards high, and then the force-
- 1:23:10
... people to come in here and get, you know, like that transparency-
- 1:23:14
Right
- 1:23:14
... get the professionals to weigh in and not just give them the easy pass ticket to a land disturbance permit.
- 1:23:22
All right. Thank you.
- 1:23:24
Anything else?
- 1:23:27
Do we have any additional questions for Ms. Utz?
- 1:23:33
We'll ask you to have a seat for just a moment.
- 1:23:34
Mm-hmm.
- 1:23:37
Again, as we're going to, um, review both of the text amendments, we're gonna have an opportunity for both of them for the public input portion. So at this time, uh, based upon the information that Ms. Utz has presented, is there anyone in the audice- audience that would like to speak on behalf of, um, the application?
- 1:24:11
Hi.
- 1:24:12
Yeah. I was gonna say, do you know... We know who you are. But if we, if you don't mind, just sign in again. We appreciate it.
- 1:24:18
Um, yeah, I'd like to support her motion to table so that we can allow the board to have a more prudent approach to hyper-scale data centers. By the way, I, I should have said I don't want hyper-scale data centers, um, next to people's houses. I should have been more precise with my language earlier.
- 1:24:40
Yeah.
- 1:24:40
Thanks.
- 1:25:05
Hi, my name is Katherine McKinney, and I've been in Paulding County for six years, and I love it, and I think it's great. And I do support Shannon's, um, proposal to table it, and I want the county... I appreciate totally what they've done so far, but it's not enough, and we need to still keep working on this before we pass anything about these data centers. I use data all the time, so I know we need them, but I just want more robust rules and regulations, um, so it's not rampant.
- 1:25:39
Thank you.
- 1:25:46
Thank you. If you would like to speak, you can go s- you can go stand and-
- 1:25:49
Yeah, so you want to be loud?
- 1:25:50
Yeah. I mean, if you, if you... We've got roughly, um, three minutes left, uh, for the 15 minutes, so it's gotta be allocated through. But if you have, if you would like to speak in favor of, you can line up. Uh, hopefully we get to you, um, as we're going.
- 1:26:05
I'll just
- 1:26:08
Hi, my name is Dakota Cash. I'm Paulding County resident. Uh, I do, uh, I, I favor this. This is actually a really good path forward. Right? The transparency between both the community, the constituents, and the board, and the people who do the planning and zoning. If we have that transparency, I think that's the altruistic thing to go about. Right? If we can find the greater good for everybody, that would be the ideal situation. So I thank you guys for your consideration.
- 1:26:36
Thank you.
- 1:26:38
Hey. Um, I'm Jimmy Hawkins. Um, I just wanna address you, Mr. Steele. You had talked about real quick that you had said, yeah, 1.5 million square foot was on the high end. Well, the one they're proposing off Coal Lake Road is four million square feet. So I just wanted to kinda clarify that. Um, and it is literally in the very center of over 10,000 homes.
- 1:27:03
Wow.
- 1:27:05
So that's just my... I'm not quite sure about this clarification, but I just want to say that y'all have approved a technology overlay in the m- literally in the middle of 10,000 homes, and I don't want a data center in a residential area. Thank you.
- 1:27:30
Good afternoon. Todd Pownell, Coal Lake Road. I'm here to support Shannon. She's done a great job, and, uh, one of the reasons she moved forward with everything was simply because we weren't sure if the county was gonna do anything different. And so Shannon worked very hard. She's very good. A lot of coffee. And, um, and she turned hers in on September 11th, Friday at noon, which was y'all's deadline. Uh, so I'm saying that because we didn't see anything else until basically this morning.
- 1:28:06
So I support y'all taber- tabling it. If you would for her, that'd be great. Um, and then you can always do what you need to do with it when March comes around. I appreciate it, and Shannon, I appreciate you. Thank y'all.
- 1:28:29
Good afternoon. My name is Michelle Puckett. I moved from Cobb County 34 years ago, and I've been a Paulding resident ever since, and never regretted it. However, with the changes that we have been seeing in the last few years, I agree with what she is asking to put a pause on something because it seems like something that we've needed for decades, which is the Paulding County Animal Shelter, finally got approved not long ago. But yet something like this is on a fast track to be accomplished in a short timeframe, so I don't agree with that.
- 1:29:06
And I think that Paulding does need some re-
- 1:29:11
... improvement, and I know that that's the wave of the future. But I think we need to take a pause and look at everything and with transparency. That's the ultimate ask here by every citizen in this room and those that could not join us today. Thank you.
- 1:29:35
Just to let you know, we have roughly 40 seconds left- ... of the 15-minute, uh, allotted timeframe.
- 1:29:42
Hi there. I'm JD Henley. I'm from Paulding County, and I, like the other residents here, have moved here and really like it. Didn't like it, but I have grandchildren. I'm a grandmother, so you go where your grandchildren are. So I am against the data centers altogether. I don't know, uh, the young lady, but I, I support her endeavors in trying to f- trying to make sure that this is not rushed, and I think everybody's on agreement that we are not for that. We wanna have Paulding be the best county.
- 1:30:12
When I tell people, when I go to Florida and I go to New York and different places, I... They always say, "Where is Dallas?" And they think I'm in Texas. We want Paulding to be pleasant. We want people to come here and be happy. And we don't want-
- 1:30:26
Uh, here's-
- 1:30:26
We got people who have special needs. We got-
- 1:30:27
The 15 minutes is up. I'm sorry.
- 1:30:29
Okay.
- 1:30:29
Um, now-
- 1:30:30
I make a-
- 1:30:30
Yeah.
- 1:30:30
Can I make a motion to extend it?
- 1:30:32
We... I have a motion for extension. Um, for clarification, are you, are you going to put a timeframe on the extension?
- 1:30:41
I will. I, I give five more minutes for her to speak.
- 1:30:43
Okay. I have a motion to extend the, uh, public participation of support by five minutes. Do I have a second? Second. All in favor?
- 1:30:53
Mr., Mr. Leggett, are you opposed? No, I, I- Okay ... vote for it. Vote passes unanimously. So adding five additional minutes.
- 1:31:02
Thank you, sirs.
- 1:31:03
Ms. Henley.
- 1:31:04
I am a little bit, uh, military family. We are... We came here. We've served our country, uh, federal workers. Like I said, we came here to, to Paulding County. We wanna be proud of county, uh, Paulding County. When we go to the football games and cheer for Paulding County, we wanna see Paulding County win. But we all wanna be happy and be on the same regard, and we don't wanna feel like things are pushed down our throats and we don't understand. I'm a grandmother. I don't understand all this data center. I'll be the first to tell you. I don't understand a, a lot of the terms that was using, uh, but I do understand peace and harmony and getting along with my neighbor, and if I need a loaf of bread or some sugar to go over and ask, and I don't care about...
- 1:31:45
And we wanna be happy. So we don't want a lot of noise from data centers, and we don't want our waters... I know the young lady said that there's different types of data centers, and I'm learning that. But I w- I stand with the majority of the group that we want Paulding County pretty much to stay, um, at peace and not have data centers and noise and all that and big centers that we don't understand. So for all the grandmothers that's in the room and grandfathers and people who don't understand all of this stuff, we say no.
- 1:32:18
Good afternoon. My name's Michelle Nelson, and I have lived in Paulding County essentially my whole entire life. Um, first I wanna thank Shannon for all her hard work. Uh, I've been on the phone with her for hours while she was going through all of these things, so I know how much time and effort she put into it. I wanna thank Ann and Chris because I know you guys have put a lot of work into this as well, and, um, Chris is one of my favorite people, so I love him to death. Um, I am in support of data centers responsibly in Paulding County.
- 1:32:50
We need economic development. We need the tax benefits for our elderly, for their homestead exemptions. We need those things, but they need to be built responsibly. They need to be built away from people's homes. I live on Cole Lake, so I obviously have a vested interest in this. Um, when we agreed to allow Pearson to have that property, you guys opened it up for all other R-2 developments. Not necessarily y'all, but you know what I mean, the county. Um, and that's very troublesome because of the fact that the others are PRDs and now we have R-2s.
- 1:33:24
What's to say that other people that own R-2 property aren't gonna want this themselves? If I had 50 acres and I could sell to a developer for an obscene amount of money, I probably would be before the board asking for a, a TPOD on my property. So while I think that responsible development is necessary for Paulding, I do not agree with the TPODs. I think the TPODs need to be repealed. I think that we need to go about this the right way, the responsible way, and the transparent way, and start over.
- 1:33:56
Yeah.
- 1:33:56
That's not saying, that's not saying that we don't have data centers. That's just saying that it's done responsibly, it's done transparently. That's what I would ask. Thank you. Oh, and by the way, y'all can thank me for Shannon's football analogy because when... She's from up north. She don't understand us southerners. Everything's defined by a football field. So...
- 1:34:27
Hey, guys. My name is Steven Cochran, and I, I don't want it to be missed, uh, that there is no room for a data center in Paulding County. We have out west is the Dug Mountain Corridor and a lot of protected land out there. Uh, everywhere in this county that doesn't... I know. If you don't know that, then, then there is. I mean, take a look at it. The Dug Mountain Corridor goes across the whole west side of the county.
- 1:35:00
And so there's not really a lot of room, uh, that's, uh, not around neighborhoods, and that happened because the county somewhere along the line, I don't know who was doing what when, uh, and that's, and that's my fault for, for not paying better attention. But, um-
- 1:35:20
Without having an area where we have industrial areas-
- 1:35:25
40 second warning
- 1:35:26
... we don't. Huh?
- 1:35:27
40 second warning on the five minutes.
- 1:35:28
Okay, yeah. We don't have any large in- industrial areas. And if we had a place to put one, that would be great. But as far as I can tell, I've done... looked over the maps and everything, there really isn't a place in Paulding County for these, uh, hyperscale data centers. And as much as I would... If we had a large place for 'em, it would be great, but we, we don't. Thank you.
- 1:36:02
We have five seconds left.
- 1:36:07
Is there, uh... But we, we don't wanna be remiss. Is there anybody else that would like to, uh, to come to the podium or, you, you know, and we can entertain another motion?
- 1:36:19
Okay. Seeing none, um, at this time, I would like to open it up for anybody in the, uh, audience that wants to speak in opposition of or has questions to the information that was presented by Ms., Ms. Utz and her text amendment.
- 1:36:39
Seeing none. What I would like to do at this time, uh, again, before we make a motion or make a ruling, we will go ahead and move into the presentation of the second text amendment, um, for everybody's, uh, for everybody to hear.
- 1:37:01
Good afternoon, Planning Commission. Um, just as way as introduction, I know you all know who I am, but I'm Anne Littman. I'm the Community Direct- Development Director for Paulding County. I've been the Community Development Director for 13 years, going on 14, after 16 years. Yes, I started when I was five with, uh, Union City, Georgia, um, after receiving a master's in city and regional planning from Clemson University. Sorry Tigers did not do so well this weekend.
- 1:37:31
But I also have a geography degree from the University of Georgia. Go Dogs. Um, and I am very happy this afternoon to present the amendments that the county is proposing to the text amendment. This would be the 16th, um, amendment to the Unified Development Ordinance. Um, there are four major changes that I'm proposing today. Um, I will start with the change to title one, chapter 100, section... an addition of a section 100-100.
- 1:38:02
Um, this is the repeal of reuse related zoning stipulations. This was an item that was previously approved by the Planning Commission and the Board of Commissioners in 2021. Um, this deals with, ironically or not ironically, a lot of probably the PRD zonings that we have. There were... It's not hundreds, but it's tens. There's lots of zoning stipulations that we had out there that required the use of reuse water. Um, and Water System Director, Mr. Wooten, is here today, and he can explain this a little bit more, but this is something that, um, Planning Commission already recommended, Board of Commissioners already adopted, and when we adopted the Unified Development Ordinance in 2022, was simply omitted.
- 1:38:45
Um, we realized this, and we would like to correct that error. If we still had the old zoning ordinance, we would go, "Oh my gosh, we forgot this," and we would put it in. But because we have an entirely new document, we wanted to go through and do it the text amendment route. So that is item number one. Um-
- 1:39:00
Let me-
- 1:39:00
... number-
- 1:39:00
Let me stop you there, right there. Explain what you're saying, the use of reuse water.
- 1:39:06
I'm gonna defer to Mr. Wooten for this.
- 1:39:09
Mr. Wooten.
- 1:39:14
Uh, I'm not sure if everybody knows, but, uh, we had something that was a major lawsuit with Georgia and, uh, Alabama and Florida. They ki- kinda called it the water wars as far as water in rivers and navigable ways. Um, one of the things that EPD did is they turned around and they changed their position on reuse water as being a consumptive use, and that turn was so that we now turn water and put it all back into the waterways.
- 1:39:54
And so back in 2021, we turned around at the water system, uh, and got rid of the regulations requiring developers to put in additional reuse because we were going back to put it back into the rivers. Does-
- 1:40:14
So, so in this case, you're recommending to not use reuse in the... if these facilities are made not to use recycled water?
- 1:40:24
No, no, no. This, this is to... For all of the... We are not using reuse, and we are not expanding our reuse system. And if you had regulations on a previous zoning that required you put into reuse, this got rid of that so that if you developed, uh, had a piece of property that you got zoned in 2020 that required reuse to be installed, you no longer have to install it.
- 1:40:59
Because it's a consumptive use, it is no longer required as part of our regulations.
- 1:41:05
So if they do a recycle system in a data center, it is allowed?
- 1:41:10
Yeah. That, that would be a totally different animal. It's, it's not a, a reuse system coming from our wastewater facilities.
- 1:41:19
Okay.
- 1:41:20
This, this part of, this part of the-
- 1:41:23
Well, the text amendment is not directed at data center.
- 1:41:26
No.
- 1:41:26
This is a text amendment that is just handling reuse, like when we use reuse in-
- 1:41:32
Like if you've-
- 1:41:32
... Savannah Hill or Bent Water
- 1:41:33
... if you've ever driven through the Georgian or Bent Water and seen a strange little skinny purple fire hydrant and thought to yourself, "Hmm, what is that?" That is a reuse fire hydrant, and that is probably to... It is non-potable water. It is water that has been treated, um, but is not drinking water, but you could use to water your lawn or to wash a car or to spray a golf course. Um, we had, it's not hundreds, tens of zoning cases from the 2000s era that had a stipulation requiring reuse water system.
- 1:42:14
Rather than put the planning commission and everybody through striking all of those stipulations, this change eliminates all those requirements.
- 1:42:27
Okay.
- 1:42:27
So if a piece of property that hadn't been developed had a reuse requirement, this stipulation makes it null and void.
- 1:42:35
Okay, that makes it plainer because I know when we zoned Bent Water and some of the, the Georgian and some of the places like that, we did do that stipulation. So I just wanted to make that clear that any industry that we had potentially come in the county, they could do a closed system and be able to operate in that realm.
- 1:43:01
Rick, this, this does not give a... This is more of a history-
- 1:43:05
Okay
- 1:43:06
... of what's been reported down there.
- 1:43:07
That clears it up. Thank you.
- 1:43:09
Okay. Um, next section, Title 1, Chapter 110, Section 110-40, um, the legal advertisement, there is a use out there called battery energy storage systems. Um, if there, there's nothing better than a planner and their acronyms. A lot of times that gets referred to as BESS. Um, we had proposed a definition, and I- I purposely left up this map. If you see the, um, swath of property that straddles, um, Ms. Poe's property, that is most likely, I am 99.9% sure that that is Georgia Power right of way.
- 1:43:42
It is.
- 1:43:43
And Georgia Power, um, I- I just read about a case in Cherokee County where Georgia Power installed a battery energy storage system. And what a battery g- energy storage system is, is at night when we're all asleep and we're not using as much electricity, they have, um, modular buildings that are full of lithium ion batteries pulling energy off of the grid so that when in the coldest day in winter or the hottest day in summer and we need energy, that energy has been stored.
- 1:44:16
Um, we think that there needs to be some regulations. I will acknowledge that if Georgia Power or Greystone or Cobb EMC or Carroll EMC wanted to do a battery g- battery energy storage system, they are a public utility, and if they owned the property, they would have every right to do so. Um, we would like to do more research. Our initial proposal for the battery g- battery energy, I'm trying to, I'm just gonna call it a BESS-
- 1:44:42
Yeah
- 1:44:42
... um, came in as a private entity. We looked probably at the same three zoning districts for the, the data centers, and this is a perfect example of where Georgia Power has, um, transmission lines, which is where people would look to put a BESS, and I don't know if an industrial zoning in the western part or any part of the county would be the best opportunity. So at this time, we would, um, like to do more research. We would like to look at where all the transmission lines are and then come back perhaps with a recommendation for a moratorium or at least do more research and consider, um, A-1 and AG or AB, agricultural business.
- 1:45:24
So that is something that we will be coming to you in the future. At this time, we would not like to take any action on battery energy storage systems. Um, however, we would like to add a definition for virtual currency/ or . Um, this is one area that I agree with, um, Ms. Utz. I do think there is a big, huge difference between cryptocurrency mining and a data center that is storing my MyChart data or my Instagram photos.
- 1:45:56
So we have proposed a definition for cryptocurrency mining, um, which kinda leads us into our next change in Title 2, Chapter 210, the sections about e-commerce business park, advanced manufacturing, logistics, and light industrial zoning districts. Um, we would like to remove data processing, hosting, and related services from the list of permitted uses and place computing infrastructure providers, data processing, hosting, and related services, except, except virtual currency, cryptocurrency mining to the list of uses requiring a special use permit.
- 1:46:37
Um, a big... We did a lot of work when we adopted the UDO in 2022. The North American Industrial Classification System is a giant book, about this big, that the U.S. Census Bureau categorized every kind of industry that they could think of. Um, it's what we use to issue our business licenses, so we thought it was very important to use that same terminology in the zoning ordinance. And, um, I know back in 2020, I spent hours, days converting all the uses in our, um, existing zoning ordinance to North American Industrial Classification terminology.
- 1:47:21
So we would like to stick with that. With very few exceptions do we only use the North American Industrial Classification System terminology. The only place we really differ is when it comes to daycare and childcare and- Like guest home, not guest homes. Chris, help me out. What's the word I'm looking for?
- 1:47:44
Group.
- 1:47:44
Like-
- 1:47:45
Oh, community living or-
- 1:47:46
Community living. That, those are State of Georgia definitions for, um, things that we thought because of the state's definition, we use the state's definition, not the North American Industrial Classification System. So, um, the definition, the data centers, which includes cryptocurrency, um, we would like to move computing infrastructure providers, data processing, hosting, and related services, except virtual cryptocurrency mining, to the list of uses requiring a special use permit.
- 1:48:17
Um, which brings us to,
- 1:48:24
um, I'll go ahead and while we're talking about that, we would like to move it to a s- requiring a special use permit. Um, there's a, there's special exception uses, there's special use permits, and then there's land use permits. So all the requirements for those are listed in Chapter 230. So to Section 230-40, we would like to move that use to the special use permit. Um, and what we did, we didn't just... A lot of the special use permit, it just says, for instance, um, basic chemical manufacturing.
- 1:49:01
Um, and if someone were to come in and want to rezone, there's certain zoning districts that allow that, and it requires a special use permit. I know you're familiar, if somebody wants to rezone for a mini warehouse or, and now a convenience store, you do both. You get a rezoning and a special use permit. So our recommendation is to move, let's just shorten it to data centers as a special use permit in E-Commerce Business Park, Advanced Manufacturing Logistics, and I-1.
- 1:49:32
And we used the, for the most part, with a few changes that I'll go over in a minute, all the requirements that are listed in the Technology Park Overlay District. And, um, these are the changes that we recommend. Um, there is a minimum green space requirement. We increased the setbacks based on use to 200 feet from any right of way, 500 feet from any non-residential user district, and 1,320 feet, which is equivalent to one-quarter mile, and what?
- 1:50:03
About four football fields, if we're doing our football analogy, um, from any residential use or district. Um, there are increased building facade requirements, and there is a requirement of a development agreement to be in place prior to the issuance of a land disturbance permit, which at a minimum addresses the following: Letter from public water provider indicating sufficient capacity, limits of closed loop or similar systems for water consumption. And by limits, we mean we would limit them to using those or a similar system.
- 1:50:35
A letter from the public sewer provider indicating sufficient capacity, a letter from the electrical provider indicating sufficient capacity, a letter from the natural gas provider indicating sufficient capacity, and a decommissioning plan. And this would just be the minimum. There would be other topics, depending on the specific site, that may need to be addressed. So with that, I will be happy to answer any... And oh, there was one other change. Um, Chapter 230, Section 230-4, which is the Technology Park Overlay District.
- 1:51:11
Um, oop, wrong one. Chapter 220, Section 220-40, there are two tracts that we would like to remove. We would like to reduce the, um, area of the Technology Park Overlay District from 1,314 acres to 1,089 acres by removing parcel number 060.3.4.001 and 075.2.2.001, quad zero. Um, these properties are located off Electric Dam Road, and it has been determined these parcels are not viable because after a broad review of the area, um, everything indicates that it would be too costly to deliver power to these areas.
- 1:51:53
So that is the conclusion of the county-initiated text amendment, and I will be happy to answer any questions that you may have.
- 1:52:00
Both of those that you want to remove are off of Electric Dam Road then?
- 1:52:04
Yes, sir.
- 1:52:09
Okay, now one question I have is why 500 feet from a non-residential use if it's another building, another commercial building, why that kind of a distance?
- 1:52:22
I think just, I mean, just to get a data center as far away and to provide as much buffer and setback for any piece of property. As has been pointed out, there's, there's, you know, if we zoomed out on our map, we don't have a lot of industrial property, and most of our commercial property is located on our major corridors. So if there were the opportunity for anything, we would want it to be as far away from any kind of use so that there are no harmful side effects.
- 1:52:57
Um, I don't see why it'd make a difference. You're, you know, 500 feet would be a lot for a package store to be setting aside in operation.
- 1:53:07
Yeah. Well-
- 1:53:09
Um, but-
- 1:53:09
And also remember, um, there are, there is nothing zoned E-Commerce Business Park. The only properties that we have zoned AML, um, there's just the AutoMan that's off Bill Creuth Parkway, and I believe there's a piece along Highway 92. Um, and most of the I-1 we have is built, it's occupied. Um, most likely anyone would have to come rezone and get a special use permit to which we could get the most information about what is being proposed and- We can do site-specific zoning and if a variance is needed, if, if the use next door is agreeable and was okay with less than 500 feet or less than 1320 feet, a variance could be requested and each case could be evaluated on a site-by-site basis.
- 1:53:59
But according to the information that you're presenting, you know, the, uh, the proposed removal of the two parcels that you've mentioned off of the Electric Dam Road, but I know that there was a parcel mentioned off of Coal Lake Road specifically from, um, some of the s- uh, public comment. With these minimum, or with these minimum requirements of enhancements to the TPOD, they would-
- 1:54:20
That, the, this is not an enhancement. This is not a... The only change to the Technology Park Overlay District would be to remove those two parcels.
- 1:54:27
Okay.
- 1:54:27
Moving the enhanced uses, we- we're taking the same requirements from the Technology Park Overlay District and putting them in the special use permit.
- 1:54:36
Gotcha. So again, those requirements that you have listed for the enhancements to the TPOD minimum requirements that are already listed, which are your 200 feet away right of way, 500 feet non-residential, and the equivalent of a quarter mile from the residential use, those are applicable to the, the parcels in the TPOD?
- 1:54:54
No.
- 1:54:54
They're not.
- 1:54:55
Yeah.
- 1:54:55
Okay.
- 1:55:00
No. No. No.
- 1:55:03
So question on, on some math here. So I'm looking at, looking at section 230-40 special use permits, lot sizes and setback requirements. Minimum lot size of 50 acres. And then I jump down and I look at the setbacks. So just sitting here doing some math in my head. 1,320 feet, for those that don't know, is a, a number that equates to a land lot. So a land lot, when the, when property was broken up into Georgia, they were broken up into 40 acre and 80 acre land lots.
- 1:55:37
A land lot is twel- 1,320 feet by 1,320 feet equating to 40 acres. So where that number come from, I don't know. I mean, I- ... I don't know where you got the number either. But if you're having to be 1,320 feet away from any residential use or district, and then you have your facility sitting there, regardless of the size, and as Ms. Utz or Utz, I'm sorry if I say it wrong, earlier said, they're not all the same. We see small ones, we see large ones. And I use the 1.5 million just because out of the six I looked at earlier, that was the largest one I looked at.
- 1:56:12
I'm sure there is ones larger than that. But the 1.5 million that I looked at, that's a 34 acre, 34 acre building. Now, if it's broken up into smaller buildings, it's still 34 acres of impervious area. If you were to put that 34 acre building on something, you need something way more than 50 acres.
- 1:56:32
I, I-
- 1:56:32
You're gonna be 300 acres to 500 acres.
- 1:56:34
I would be fine, um, and I agree with you that the minimum lot size, 50 acres is probably too small. At a minimum it should probably be 250 acres.
- 1:56:45
Yeah. And, and, and again, like she said earlier, and I agree that they're not all the same, so they're specific to what they are. I mean, hyperscale or not hyperscale, that the 1320... I mean, in this county if you just look at parcels available, if you needed 300 acres, I mean, you're needing, you know, that many land lots. There's, there's not that many that I can think of from even being in the business I'm in. Large parcels. So I just...
- 1:57:17
Some of that, some of that doesn't go together. It's the only, only thing I'm trying to prove.
- 1:57:20
Any kind of parcel like that's owned by the City of Atlanta. So, you know, we're, we're not gonna be... So we're con- basically, if you go this kind of land lot, uh, you're condemning the county to nothing but residential from th- this point on.
- 1:57:36
All right.
- 1:57:36
And then you think, you think yeah, but you got a neighborhood, you're gonna have 2,000 houses beside you and you've got, you think you've-
- 1:57:45
Thank you, Bridget.
- 1:57:46
You got noise, then, you know, you really gonna have noise with 2,000 houses on this piece of property.
- 1:57:52
No. No.
- 1:57:54
But anyway, uh, to get back to the footage. In my opinion, 200 feet from a- any public right away would be good, and I would say 200 feet from non-residential. And a, a good number is 2, 250 to 300 feet from any residential.
- 1:58:13
No. No. Come snow you're gonna know it.
- 1:58:17
Well, if we-
- 1:58:18
I wish it was. I got a subdivision coming beside me.
- 1:58:21
If we could-
- 1:58:21
I'd love to have it.
- 1:58:22
If I could pause for a moment. If we could, um, understand that we all want to be heard. Uh, so again, I wanna remind everybody of what we talked about at the beginning of the meeting. Um, please be respectful and let's kinda minimize the, the comments in the audience until we have an opportunity for you to be able to be heard. It is very difficult for us to be able to hear, um, as we're doing this. And the other thing is not only for us as a commission to be able to hear it, but we also want the other people in the audience to be able to hear the information, information and the comments that are being put out there as well, because it is again, a public forum.
- 1:58:55
So just an, a reminder, uh, if we can make sure that we keep that tone down, uh, we would appreciate it. Thank you.
- 1:59:08
All right. And what you, what is your recommended, uh, minimum lot size?
- 1:59:13
Um, in looking at it, I, I feel pretty strongly about these increased setbacks. So, um, I, I get that there are different types of data center. I think the way that we are proposing, if you had a smaller data center, um, that's what the SUP and the rezoning process and any potential variance it would cover if you were trying to do a small one. Um, I think, I think 50 acres is too small. Um, I feel more strongly about the increased setbacks, so I would at least consider going up to 200 to 250 acres.
- 2:00:27
Do we have any additional questions, uh, for Ms. Lippman from the Planning and Zoning Commission?
- 2:00:37
Okay. Thank you, Ms. Lippman.
- 2:00:44
So at this time, um, this is an opportunity for you to be able to, uh, to be heard. So if you would, um, if you have any comments or would like to support, uh, or, or you are wanting to speak on behalf of the application, this is your opportunity. So if you have anything that you would like to say, please make your way to the podium. And this, again, is for support, uh, or being on behalf of the application and what was presented.
- 2:01:24
Good afternoon. My name is Lee Rollins, and I live in the Cedar Crest area of Paulding County. I've been there for 25 years. Appreciate the opportunity to speak.
- 2:01:36
We like to be able to take the documents that are out there and respond to them in a positive way and still take into effect e- everything that's being said. I read this amendment, I've read the staff memo, and I've read a fair amount of what's been said about data centers this year. And I'm here to support 2026-03-TAA. I wanna tell you why, and I wanna do it with numbers that you can check, not with slogans.
- 2:02:07
I'll say this upfront. The people who have packed these meetings since June aren't wrong to care. They love this county just like I do. Where I've landed is that the answer to their concerns isn't never, it's strong rules written down with teeth, and I believe that's what this amendment is. The residents spoke, the county took the time to listen, and I think we should thank you for that.
- 2:02:37
More than three decades ago, and this has already been alluded to, this county was blanketed in R2 residential zoning. Whatever that exact year, the result is plain on the map today. We built houses. We built lots of houses, and we didn't build much of anything else. The county's own annual financial reports have said it for years. Paulding is working to make the jump from a bedroom community to a self-sustaining one. That's a polite way of saying our tax base is almost all rooftops.
- 2:03:09
About a decade ago, our tax commissioner put numbers on it. Homeowners cared about, carried about 70% of the property tax burden. Commercial property paid about 13%. Industry paid 1.4%. It hasn't really gotten much better. Today, only about 14% of the tax digest that funds our schools, which are important to us, is non-residential. The average for Georgia's large school districts is 38%, so 38 versus 14.
- 2:03:44
Among large districts, we've ranked dead last on that measure year after year. And that's not a talking point. That's from the school district's own budget documents. So here's where it hits home. Paulding is the 11th largest school district in Georgia. But in total revenue per student, we rank 137th out of 180. A few years ago, we were 162nd.
- 2:04:15
So we're one of... Our school district is one of the biggest in the state, but it's funded like one of the smallest. Only about 37% of our school funding comes from local sources. The state average is 44%. By the district's own count, we collect about $1,500 less in local revenue per student than the average large school district. When the tax base is almost all homes, every new subdivision adds students faster than it adds revenue.
- 2:04:51
The district has said so in writing. Property taxes from new residential construction typically don't cover the added enrollment, so the gap grows. And homeowners are the only ones left to fill it today. For about 40 years, researchers have run what's called a cost of community services study. They take a county's budget and ask, "For every dollar a type of property pays in taxes, how much does it cost in services?" Across more than 150 communities, the median answer is about $1.16 in services for every dollar a homeowner pays.
- 2:05:34
For business property, it's about 30 cents.
- 2:05:36
Mr. Rollins. I don't mean to, uh, interrupt you, uh, in the middle of this, but the 15 minutes has, uh, expired, so...
- 2:05:46
Okay.
- 2:05:47
Is there a-
- 2:05:48
So, so I have a question. Behind Mr. Rollins, how many people are looking to speak, and do, do we have a line?
- 2:05:54
Yeah.
- 2:05:55
A couple.
- 2:05:56
This is... Yeah, this is going to be in favor of the application. Who, who would like to speak in- On behalf of the application. We have-
- 2:06:05
Same
- 2:06:05
... Ms. Rollins' remainder, and we have one additional. Is that correct?
- 2:06:11
All right, so I'm gonna make a motion and, and not foreshadowing for the, the next one. I'm gonna do 10 minutes on this one, but I'll do 10 minutes on the next one, too.
- 2:06:20
Okay. So I have a motion for extending the allotted, uh, public participation by 10 minutes. Do I have a second? Seconded by Mr. Rakestraw. All in favor? Motion passes unanimously. I apologize for my interruption.
- 2:06:37
No, thank you very much. So for business property, it's about 30 cents, so homes run a deficit and business carries a surplus. A data center is about the leanest business there is. It doesn't send children to our schools. It has a small workforce. Once it's built, it doesn't fill our roads. It needs police and fire coverage like every other building, and that's about it. What it does have is very expensive buildings and equipment that sit on our tax digest.
- 2:07:10
We don't have to guess what that looks like. Next door in Douglas County, right over here, data centers paid about 3% of the county's general fund in '23. By '25, it was 8%, more than $11 million in a single year. A large campus here would be a much bigger boost to our county's budget. In Loudoun County, Virginia, data centers are projected to bring in $1.3 billion, with a B, this fiscal year. That's 40% of that county's entire budget.
- 2:07:41
So none of that ba- none of that matters if the rules are weak. So let me give you my read on what this amendment actually does, and I'll try to run through this. First, it ends by-right data centers in our three industrial districts: E-commerce Business Park, Advanced Manufacturing and Logistics, and Light Industrial. Today, a data center is a permitted use there. Under this amendment, any project outside those, the existing TPO needs a special use permit, which requires a public hearing and then a vote by the Board of Commissioners every time.
- 2:08:19
That won't change the rules for properties already in the overlay, but I'd expect our leadership to address those sites through solid development agreements. Second, it moves them further away from homes. Buildings, substations, generators, cooling equipment must sit at least 1,320 feet, or four football fields, a quarter mile from any residential use or district, 500 feet from other non-residential property, 200 feet from the road, and a 200-foot buffer of berms, canopy trees, and evergreens to stay opaque all year long.
- 2:08:54
That's honesty more than most people ask for, short of an outright ban, and a ban doesn't make sense given how lopsided our tax digest is. Third, noise. No more than 65 decibels by day and 55 at night at the property line. If the area is already louder than that, they can't add to it. An independent acoustic engineer measures it. Equipment has to sit behind sound walls for the life of the building. Here's the part I like. Even if a facility technically complies, the county can still act on a history of complaints and fine them up to $1,000 a day until it's fixed.
- 2:09:33
Fourth, generators. Emergency use only, testing no more than two hours a day, weekdays between 11:00 and 5:00, so no middle-of-the-night excuses or surprises. Fifth, nothing gets graded until there's a signed development agreement with the county. That agreement has to include letters proving there's enough water, sewer, electric, and gas. It has to set limits on water use through closed loop cooling. It has to cover decommissioning and site restoration, so we're never stuck with an empty building.
- 2:10:04
Crypto mining, the kind of operation we talked about, that's given this industry its worst reputation, is excluded. Finally, it trims the existing tech- technology park overlay, the areas the county already planned for this kind of use, from about 1,314 acres to 1,089, dropping partials that practically can't get power. So the county's done two things here. It picked its locations in advance, and it set a high bar everywhere else. That's not a giveaway.
- 2:10:35
That's one of the tougher sets of rules I've seen in Georgia. Thank you.
- 2:10:54
Hi. Michelle again. Um, so I wanna thank Anne, 'cause that was a great start to what I think, you know, should've been done in the beginning. Um, unfortunately, at this point, we can't go back and add all of this to what was already done, and I think that, and I think that Anne realizes some of the things that happened in the f- in the TPOD needed to be addressed, and she's trying to do that now. Um, I commend you for standing up and, and even on the pushback of the minimum acreage, you standing firm on what you believe.
- 2:11:27
Um, you have the degree here. I don't know how many of y'all have the same degrees that she has. So I would suggest that if we at a minimum listen to what she suggests, um, we can always go back and have them come forward to ask for smaller buffers in the future. You can't extend them. So, you know, set the standard high now and make them come ask for smaller buffers if that's what they need, and do it on a case-by-case basis like she suggested. Um, I do wanna touch on something, and I wasn't gonna say anything about this, but he brought up the school system.
- 2:12:00
Um, I have an e-commerce business, and in my e-commerce business I have roughly about 15,000 customers, and a lot of them live in Loudoun County, Virginia. So I went to them and I said, "Give me the good, the bad, the ugly about data centers," because that's what my county's doing. The one thing that resonated with me was the school system Their school system and you guys can do your research has gone downhill since data centers. The reason why is because with temporary workers they come in and they work.
- 2:12:32
They bring their families. When they bring their families, they bring their children. Those, those children have to go to school somewhere so they flood the county school system. A lot of the Loudoun County schools now have trailers where they didn't before because they don't have room for these students. So everybody talks about housing developments, and we don't want kids, and we don't want the school system. You're gonna get them with data centers. You're gonna get them. So be prepared for that because it will happen. Also, he talked about the economic benefits of a data center.
- 2:13:06
You guys are old enough to know trickle di- trickle-down economics is not a thing. The co- the state has given so many exemptions on data centers-
- 2:13:17
Yeah
- 2:13:17
... that the state itself says that we're going to lose 4.6 billion, he, he said, he stressed billion, I'm stressing billion, $4.6 billion in forgone tax revenue because of the exemptions. There was a House bill that was put forward to, to eliminate the exemptions, and it got vetoed by Kemp. So-
- 2:13:39
Yes
- 2:13:39
... we are giving up a lot of money to data centers at the state level. So how much is really gonna come at a county level? That's my question, and I understand that we won't really know anything until all the agreements are in place. He also mentioned traffic. I did read recently a DRI from another, another county, um, that said that their projected traffic flow was 900 cars. 900 cars a day in and out, heavy trucks, um, concrete trucks.
- 2:14:10
That's a lot of wear and tear on our roads. So I just wanna say that while we're talking about economic development, I hope you guys are factoring in repairing roads. So...
- 2:14:28
Speaking against. Is that okay?
- 2:14:32
Yeah. Yeah. Let's, um, so we kinda got a little bit of a twofer in that one. Um, so, I, I just wanna make sure. We still have a little bit of time left on the, um, the side that is in favor of. So is there anyone else in the audience that would like to speak on behalf of the text amendment changes that Ms. Listman, Ms. Lippman has presented? Okay. Hearing none, we are now gonna open up the floor for those in opposition or that have questions to, uh, to this.
- 2:15:18
So I'm ad-libbing this. Normally, I like to prepare my speeches, but I'd like you to refer to my previous speech on August 25th about the unforeseen consequences of inviting industry into any community of any kind, and how the public ends up pi- picking up the tab. I don't trust these people. And when I say these people, I mean the move fast and break things crowd, the Elon Musks of the world, the Peter Thiels of the world.
- 2:15:48
These sorts of people are not our friends. We should not be groveling at the feet of billionaires for a little bit of their benevolence, which ends up turning on us. The fact is these people come into communities, they ruin them, and then we can't fight them because they're like vampires. Once they're in your community, we can't get rid of them. You've invited them into the house, and then we can't afford to beat them at their own game because they've got piles of cash, more than everybody in this county combined.
- 2:16:24
If we find ourselves in a lawsuit with these people, we will be buried. Our taxes will go up to try to just put regulations on them. The cost of them paying small fines for disobeying things is nothing to them.
- 2:16:43
That's right.
- 2:16:44
What will happen is they will run ramshod. I am so tired of hearing the supposedly pro-life crowd tell me that they care about kids, and then they don't wanna build houses to house those kids. What is wrong with this community? I am not a religious person, but for God's sake, what is going on? I really don't understand. How can we constantly say, "Oh, well, it's somebody else to build houses for kids.
- 2:17:16
We don't want houses to house kids in this community. We do not wanna put, we don't wanna put 2,000 houses to house kids and send them to school," but then you wanna force people to have kids that they can't afford. So I'm really confused here. So what I asked for in my August 25th speech was, one, the revocation of the TPOD, period.
- 2:17:42
Woo.
- 2:17:43
Second, if we're going to have these companies, I want escrow accounts and I want bonds, and I didn't hear any of that here. We need those things. That will give us some sort of pause, some sort of slowdown, some sort of pushback, and the funds to do it. I did not hear that, and that's why I'm against any sort of amendments until I hear that we're going to have billions in our pocket to push back on these people.
- 2:18:15
Thank you.
- 2:18:20
My name's Michelle Wolvin. I'm a longtime Paulding County count- resident, and I'm speaking on behalf of myself and my Paulding County neighbors. I'm particularly concerned about these AI hyperscale data centers being placed so close to homes and schools. As they're directly bordering properties, especially-
- 2:18:42
Sorry. Especially the unknown long-term effects of low frequency noise and vibrations on nearby homes, families, and elementary school students, as well as potential damage to house foundations and the release of radon gas due to blasting during construction. This is an ongoing issue in Senators Ridge in North Paulding where radon gas has been found in high concentrations and where Switch has done no surveys of the foundations on anyone's homes prior to daily blasting.
- 2:19:18
There's still very little independent research on the health and quality of life impacts of locating facilities of this scale next to established neighborhoods. We support moving data center uses to special use permits, and I do appreciate all the work that's been done, um, to work on this amendment. However, the amendment still leaves a major problem. Staff is recommending removal of only two parcels that are on Electric Dam Road.
- 2:19:50
The remaining 1,089 acres stay in the overlay under the old, much weaker TPOD standards. Meanwhile, the same type of high intensity computing projects proposed outside the overlay will now have to meet much stronger requirements, larger setbacks, 25% green spaces, noise limits, and a mandatory development agreement. Residents living near the technology park overlay district parcels will receive less protection than residents that are living near these industrial overlay districts. So I'm asking you, please fix inconsistencies and apply the new special use permit standards in Section 230-40 to use inside the TPOD as well.
- 2:20:32
Yeah.
- 2:20:32
Or further, reduce the overlay so that any parcels that are within 1,320 feet of established homes are no longer included. Please do not recommend this amendment as currently w- written. Please strengthen the protections for the TPOD parcels before this goes to the Board of Commissioners in December. And now I have a few questions. If the county has determined that data center projects need much greater buffers and stronger standards to protect residents, why were only two parcels removed from the TPOD instead of applying those same protections to all the TPOD parcels?
- 2:21:12
Number two, under this amendment, will data center proposals on one of the remaining TPOD parcels be reviewed under the old TPOD standards or under the new, stronger special use permit standards? Number three, will the Planning Commission consider directing staff to revise the amendment so that enhanced standards apply uniformly to computing infrastructure uses both inside and outside the overlay? Four, will the Planning Commission recommend adding radon protections to the ordinance requiring developers to fund pre-blast and post-blast indoor rading- radon testing for nearby homes and to cover remediation costs if levels exceed the EPA action levels?
- 2:21:57
Five, what is the closest distance from the remaining TPOD boundary to existing homes and schools? Six, if the new standards are considered necessary to protect residential areas outside the TPOD, why are those same standards not being applied inside the remaining TPOD where thousands of residents will live? And seven, has staff evaluated how many parcels are within 1,320 feet of the remaining TPOD boundaries or outside of the boundary?
- 2:22:35
Thank you.
- 2:22:43
Uh, yeah, so I'm against any data centers, hyperscale, any type of, uh, polluting facility in a, of what you guys said, a highly residential area. Why are we trying to bring this stuff? But-
- 2:22:56
Can you state your name for the record?
- 2:22:57
Uh, Sarah Novak. Sorry. Do I have to restate everything I just said after that?
- 2:23:01
No, you're good.
- 2:23:01
Okay.
- 2:23:02
I'm just-
- 2:23:02
I just have some questions. So water security during drought conditions. Will county residents have priority access to potable water over industrial data centers? Will facilities be required to reduce or suspend consumption before residential water restrictions are imposed? Uh, will water consumption... Will the county establish enforceable limits on water withdrawal and consumption, re- require independent water audits, and make actual usage publicly available?
- 2:23:34
Air quality. How will emissions from backup generators be regulated? Will independent air quality monitoring be required? And will generator, generator testing hours be restricted? Environmental protection. Um, will independent third-party assessments of groundwater, storm water, wildlife displacement, air quality, and surrounding ecosystems be required before development approval? Blasting, radon gas, foundation damage.
- 2:24:06
Um, green space, uh, and wildlife. What requirements will protect existing mature trees, wildlife corridors, and natural habitats? Will there be minimum requirements for undisturbed green space? That's all. Thank you.
- 2:24:30
Good afternoon, commissioners. My name is John Fortmeyer. I live at 210 Tranquility Trace in the new Serenity neighborhood off of Seven Hills Boulevard, which is in County Post 4. I have just one question
- 2:24:47
With governor-elect, ah, Keisha Lance Bottoms campaigning on stronger data center regulations and a proposed statewide moratorium, will Paulding County consider pausing new rezoning and approvals until the incoming administration establishes its regulatory framework? To me, it only makes sense to wait until the legal questions here in Georgia are resolved. Thank you.
- 2:25:22
Good afternoon, commissioners. My name is Bob Suriano. I've been living here in Paulding County for a little over 31 years. And I gotta tell you, I am absolutely appalled. I am sick and tired of hearing all this about data centers. I'm totally against data centers being in Paulding County. I think Paulding County is one of the best counties in the state of Georgia. I think we should set the example, ah, for all other counties to follow. I, I'm not buying the, ah, gaslighting Kool-Aid that a data center's gonna bring in all this revenue.
- 2:25:55
I'd like for someone to show me one state, one city, one county anywhere in America where the citizens are actually benefiting from data centers.
- 2:26:04
Yeah.
- 2:26:04
There's not any. There's not any. And this is, ah, supposedly we're accused of Chinese propaganda if we say that. Well, it's not Chinese propaganda, that's fact. It's not doing anything for any of the citizens, it's not reducing their taxes, and I just don't get this whole thing about not wanting children to go to schools. And I, I would agree with my brother back there, what he said on, on that. What, what, what's, what's the big deal? I would much rather have new neighbors living in, in my backyard than a data center.
- 2:26:33
Amen.
- 2:26:34
I, I'm just totally against it, so I, I don't, I don't understand the, the reasoning for this. And I think if we would've done a better job in Paulding County many years ago, and would've developed a, an industrial area, then maybe something like that could've went into one of those areas. But not in my backyard, no way. And not in my neighbor's backyard. I don't, I don't believe that that's the right way to go. And it seems to me, and I, I g- I can't get my head wrapped around this, this is the only good idea we can come up with to get revenue for Paulding County, is data centers?
- 2:27:07
Yeah.
- 2:27:07
Really? I must have missed the bus on that one. I, I just don't get it. So I think that everyone's gonna go through with this anyway, regardless of what the citizens actually want, the ones that pay the taxes.
- 2:27:21
Mm-hmm.
- 2:27:22
I, I think, I think you guys will go against it. I think the commissioners are gonna go against it, and I can see them smiling at me over there now. But here are some of the things I think you need to put into place, or seriously at least think about this. Financial responsibility. If you move forward with this, and you put these data centers in, who's gonna take on all the financial responsibility when a data center is decommissioned and there's a hazmat issue there? Who's gonna pay for it?
- 2:27:53
Is it gonna be all of us paying for it? Or are we gonna put something into effect where the data centers are gonna have to pay for it? That is absolutely vital. There needs to be some really strong, ah, concerns when it comes to that, and some guarantees that all of that's gonna be paid for by the data centers, not by the residents. Another thing, will the county enforce the carryover of financial obligations to a new owner if the land is ever sold?
- 2:28:23
What takes place there? Do we even think about that? Another thing is the current decommissioning plan submitted for the proposed data centers is absolutely, in my opinion, inadequate. It fails to require sufficient financial guarantees to cover full site restitution, environmental cleanup, and any removal of specialized infrastructure if the facility is abandoned or becomes obsolete. Who will be financially responsible if the operator walks away?
- 2:28:57
The developer? The landowner? Or the taxpayers of Paulding County? I don't think the taxpayers wanna pay for that. I don't think we want that additional burden. Another thing is, and why hasn't the county required a fully-funded independent bond or escrow, that my friend back there said, that covers the complete cost of decommissioning before any permits are ever issued?
- 2:29:24
One minute warning.
- 2:29:25
I'm sorry?
- 2:29:26
Just a one-minute warn- It's a one-minute warning for the-
- 2:29:28
All right
- 2:29:28
... public participation.
- 2:29:29
I wanna finish up real quick here. The other thing is, is the complime- compliance enforcement. Who's gonna enforce all these things that the data centers need to follow? Who's gonna follow, who's gonna follow up on all of that? And, ah, are there gonna be some stiff fines and, fines and penalties that they're gonna have to pay? All right, thank you, guys.
- 2:29:54
We have, um, we've got 30 seconds left. So it looks like we still have some participants that would like to go, so do I have a motion?
- 2:30:01
Yeah, can I go ahead and make a motion to extend 10 more minutes?
- 2:30:04
Okay. I have a motion to extend 10 more minutes. Do I have a second?
- 2:30:09
Second.
- 2:30:09
I have a second from Mr. Callahan. All in favor? Vote, vote passes unanimously. You may proceed.
- 2:30:17
Thank you. Uh, my name's Louise Dennis. I live in Indian Creek Subdivision, and I'm gonna reiterate just a few things and briefly. Don't have a big script. Uh, the fines, the $1,000 fines, that's a joke and they don't care. They're gonna do what they wanna do. They've got the money, they got the power, and they will pay you $1,000 a day and it will not make a dent in what's going on in their world. Decibel levels.
- 2:30:48
Living, uh, off of 92, I really appreciate the upgrade of 92. However, I live .3 mile from 92 as you snake back through the neighborhood and through the trees. The decibel level at my home now is far higher than it was prior to the expansion. So now they're gonna put a data center behind my home that's merely gonna add to that.
- 2:31:23
Um, you know, I moved here 30 years ago. It's a beautiful place to live, and I hope I'm not forced to move because of data centers. Three of my neighbors have already put their homes up for sale, people that have lived in this neighborhood since it was built, and the only reason they're putting their homes up for sale is because they don't wanna live near data centers. They're sad. They're heartbroken. They're le- leaving their homes because of a proposed data center.
- 2:31:57
So... And the other thing is, one of the ladies spoke about schools and the influx of students just from workers. You can just, as a comparison level, because I worked in the school system, you can go back to Katrina and see what that did to our school system, having an influx of children come in. I think my... The school I worked for at the time, we went from, mm, close to 1,000 to 1,200 students. That's just one school.
- 2:32:29
So yeah, I see where, you know, you... We have problems. We have issues with our school system and not enough room for our students. But I don't believe that putting a data center near, uh, Hal Hudson Elementary, Bessie Baggett Elementary, Dobbins Middle School, I don't see where that's gonna do our students any good either, so. And especially when you think... And this is a little bit funny.
- 2:33:00
Come on, middle school students are crazy enough. They certainly don't need decibel level.
- 2:33:13
Good afternoon, y'all. How are y'all doing?
- 2:33:14
Did you have... Did you sign in?
- 2:33:15
Yes, sir.
- 2:33:16
Okay, awesome.
- 2:33:16
I certainly did. My name is Hunter Cook. I live in, uh, East Paulding, over off Dallas Road. Um, I actually work in data. Um, I have actually designed servers for, uh, video storage. I was talking to the guy who was here earlier. Um, I understand more about this stuff, um, than I, you know, care to talk about. But come up... I do wanna present some, ask some questions about some things that, that are true, that I know to be true in my profession. Um, gonna start with noise pollution mostly.
- 2:33:47
Um, when I work in servers, I wear earplugs, um, and I can still hear them outside the home. I, I do, uh, security, uh, work. Basically, I put the data from video onto a server that I build for a customer in their home. Um, I usually have to sound enforce that particular room, and it's like a single little rack. It's, like, about this big. Got maybe a little single blade server at the bottom. It screams, man. It's loud. Um, whenever I'm in there for extended period of times, I always wear earplugs.
- 2:34:19
Something to think about. Um, on terms of noise pollution, I would, uh, ask the county, uh, to establish enforceable noise limits of around 40 dBs at night and 55 dBs during the day, measured at the nearest residential property line, including low-frequency noise from cooling systems and generators. Um, for electricity and infrastructure, we want to de- make sure the developers will be required to pay the full cost of necessary substations, transmission lines, grid updates, and road improvements without shifting those costs to taxpayers or residential utility customers.
- 2:35:03
All of these impacts we've heard today, they are cumulative. Since the cumulative impact of multiple data centers could be far greater than that of any individual development, regardless of size, breadth, what, what they're gonna do, um,
- 2:35:20
the county will need to consider all the environmental and infrastructure impacts of all those projects in aggregate, as opposed to simply evaluating each one in isolation. Um, I wanted to add onto something I heard earlier about specifically, like, what enterprise or collocation or, you know, AI training facility or AI hyperscale. These are all different, uh, things that have changed really fast. I'm talking, like, the last 24 months. New definitions, new information, new, new, new, new, new.
- 2:35:52
Uh, half the stuff that's being... That was, let's say, a DC was put in Paul Douglas five years ago, that entire building was already out of, uh, not, not necessarily compliance, but that tech is old. It's gonna end up in a, you know, es- Half it's gonna end up in, uh, recycling places, like metal refi- metal recycling, e- et cetera. But, um, the, those things turn over so fast that when you see something as large as Switch, um, by the time these things are actually put in place, uh, none of those...
- 2:36:25
They're all gonna be out of compliance, every single thing. And I know it's like, presents, like, a good way for the county to, to get sales tax, et cetera, that kind of thing, but the, the amount of waste these things produce, uh, without having any sort of guardrails to de- kind of define those, um, you're gonna end up dealing with that in places that you might not be well equip- equipped for. I know that in Cobb, a lot of, uh, private recyclers take care of this stuff. Uh, the city doesn't really handle any of it. They handle trash and municipal, municipal kind of things.
- 2:36:57
Um, just wanted to put that out there. The, the, the, the scale and speed at which these things are moving, um, is, is kinda scary. And, um, I just pump the brakes, you know. I think what she was saying it- there's a lot of good information there. Um, we don't really know the, the total impacts they're gonna be across, uh, places like Paulding that are largely zoned residential for a reason, you know. AG and, and our zonings make sense for Paulding. Um, I just don't think that large-scale data centers of any capacity really belong here.
- 2:37:34
I mean, you... Bartow's got 'em, Douglas has got 'em, but let them have them. We're good here. Um- But I do wanna say thank you for all your hard work. I appreciate you guys, both, both commissioners. You guys are great. Um, thank you so much.
- 2:37:48
Can I add on here?
- 2:37:50
Yeah.
- 2:37:50
Sorry, can I add something? I totally forgot. Is that okay?
- 2:37:52
Yeah. Yep.
- 2:37:53
Okay, Sarah Novak. Um, so when Switch was clearing out all that land, my husband was driving home one night and we saw, like, hundreds... Well, he saw hundreds of deer. So something to think about, when they clear out all that land, there's gonna be a lot of displaced animals. People are gonna die, they're gonna hit deer, just so everyone knows. Um-
- 2:38:11
Yeah.
- 2:38:11
The deer's gonna die, but people are also gonna die 'cause it's dangerous to hit a deer. Um, and then also, ever since Switch was built, um, I can't see the night sky anymore because they have it up and running now, parts of it. So like, light pollution, we're getting rid of our night sky. It's kinda, kinda crappy 'cause when I moved out here, I was like, since I lived in Michigan, I haven't been able to see the night sky, and it was really, uh, peaceful to see that. And, um, it would suck if we got rid of that. Bye.
- 2:38:46
I wanna take just a couple quick minutes, um-
- 2:38:49
We've got, we've got, uh, two additional minute. We got two minutes-
- 2:38:53
Okay
- 2:38:53
... for, um...
- 2:38:55
Um,
- 2:38:58
so a lot of things were said. James brought up the, uh, 1,320 by 1,320, which is 40 acres. Take 50 acres, that might leave you 8 or 10 acres. I get that. Somebody told me earlier this year through our research that we've done that a data center needed to be on 2,000 acres with 4 or 500 carved out in the middle. That would probably come out to close to the same. I haven't figured that out. But that's close to what you just, what we were talking about. I happen to agree.
- 2:39:30
This is my concern. I appreciate what the staff has done. I think there's more that could be done and should be done, but I appreciate the work and I'm glad to see what's been done. But I will say this. I forget what the comment was that Ann made a few minutes ago, and it's nothing against Ann. Um, but it basically talked about the buffers being protective, so it would be protective of the residents.
- 2:40:02
So my question is, this is not on your agenda, what about the buffers and the residents on the T-pods?
- 2:40:13
Mm-hmm. Yeah.
- 2:40:13
Yes.
- 2:40:13
Because-
- 2:40:14
Yes
- 2:40:14
... if you put some of these same things in place, we wouldn't be dealing with what we're dealing with.
- 2:40:21
Mm-hmm.
- 2:40:21
It's not just about Todd Pownall on Cole Lake Road. You're taking away Electric Dam. But you got folks, so many folks in here over on 92.
- 2:40:33
Tidwell.
- 2:40:34
Tidwell.
- 2:40:35
Mm-hmm.
- 2:40:35
It's not, it's not, it's not fair. The old saying, and I won't go too deep in it, you gotta leave the 99 for the one.
- 2:40:49
Yeah.
- 2:40:49
Some of y'all get it.
- 2:40:54
I'm... They are the one, but you're leaving us. It's not fair for us to have lived here all of our life, or five years, or 30 years, or generations. I've got families on my road that have four and five generations, and I'm done.
- 2:41:16
Yeah, your time has expired.
- 2:41:18
Are... We are the number one, the, the one, and we need some help. We're, we're just as important as anybody else. Thank y'all.
- 2:41:35
Mr. Chairman, can we take a five-minute intermission?
- 2:41:39
I have a, uh, motion for a five-minute intermission. Uh, do I have a second?
- 2:41:44
Second.
- 2:41:45
I have a second from Mr. Leggett. Um, we are gonna take a five-minute intermission. Um, we... We're... Honestly, I'm sorry.
- 2:41:53
Check your mic.
- 2:41:54
Yes, sir.
- 2:41:55
Um, it's on.
- 2:41:56
Yep.
- 2:41:57
Oh, all right.
- 2:41:57
So we've got a fir- a s- a recommendation or a motion, a second. Do I have a, uh, do I have the vote? Yeah, I've gotta go, too- ... so I'm, I'm getting a little, I'm getting a little antsy. So all right, five minutes on the mark.
- 2:50:56
Order.
- 2:51:03
We wanna call the meeting back into, uh, into order. We appreciate everybody. Um, we know that was a little chaotic, but we definitely appreciate the opportunity for us to, to have a break, and I'm sure that some of y'all in the audience appreciated the opportunity, uh, to have a break as well. Um, we wanna get back into the proceedings where we left off. Um, we, we've concluded, um, because there was nobody additionally standing. So, uh, we've concluded with the, um- The opposition public aspect of this. So there was several things that were, um, brought to attention.
- 2:51:37
So I would like to call Miss- Miss Lippman back up, um, if you would like to kinda talk over some of the items that were- were presented in some of those-
- 2:51:47
I will be honest, sir. There was a lot of questions, and I was trying to write them down. But there hit a point-
- 2:51:52
Yeah
- 2:51:52
... where I c- I could not. Um, and-
- 2:51:54
But I think that some of the, you know, kind of to consolidate it down a little bit, it seems like, you know, there are some concerns with the parcels owned that were inside of the T-pod that were not removed. There were a lot of issues with environmental impacts. There were some issues with, um, you know, what we were gonna do-
- 2:52:11
Sure
- 2:52:12
... with the decommissioning aspects and things of that nature. Um, is there a way that we could kinda talk through how your proposed text amendments address some of those items? And I, I mean, I do agree, there was a lot of information, which we appreciate. Um, there was a lot of information that was- that was kinda put to us.
- 2:52:30
Chris.
- 2:52:30
I'm- I'm just gonna make a couple comments.
- 2:52:32
Okay.
- 2:52:32
Um, we've heard a lot of- a lot of information over the past many months. Uh, our commissioner from Post 4, Mr. Snyder, he asked that those two be removed. We- we already knew that there was a issue with any kind of power source getting there. Who knows down the road? I don't know what happened to the other one, but that's what we were directed to do. It, you know, we had the moratorium in place right at this moment. We can't take anything. We were wide open. If we didn't have the moratorium in these districts, they could've come in and submitted plans with no- no controls.
- 2:53:09
Yeah.
- 2:53:10
So we've moved forward as quick as we could to address m- moving this as a permit, these things as a permitted use to special uses, and putting some pretty good control and barriers on these things. And a lot of it's from public participation. And so I hope that might answer some questions.
- 2:53:32
No.
- 2:53:32
Oh, and, and another thing too, any development in Paulding County has to meet-
- 2:53:38
We, I mean-
- 2:53:39
... all the standards of our development regulation which is soil erosion control, green space requirements, everything. It- it's not just something, don't just come in here without going through and submitting plans and such, and- and having that in place before any kind of land disturbance permit goes. This also in the special use requires development agreements. On a lot of this stuff, "Hey, we're gonna save these trees over here, this buffer," a lot of that is worked through at that point in time also, not at, necessarily at the- the special use permit application if somebody does come in.
- 2:54:18
Okay. Thank you.
- 2:54:19
But yeah, there's a lot of regulation and controls, not just local, but they're state too, so.
- 2:54:24
Yeah. Thank you, sir. Do we have, uh, after hearing, um, do we have any additional questions, or is there any additional comments that the commission has?
- 2:54:43
One thing that I would like to address, um, I know that there are various things that were stated about a school system inside of this. Um, I am not the financial expert of the school system, but there is some information that I can provide. Um, it is- it is true, um, what was stated earlier about Paulding County School District being the 11th largest district in the state out of 180 districts. Um, that is very true. Um, one of the other things that I can also speak to is the elevated cost of construction. It is very expensive, and there's, uh, there's multiple, um, items and multiple expenses that go into running a school system.
- 2:55:20
So as we- we talk about develops and we talk about residential de- developments, for those of the, of you in the audience that have watched me on any of the other presentations, I will speak, uh, against some of the residential developments that we have just due to the fact of the impacts to the school system and what those impacts are. Um, again, I'm not gonna get into all the nuances, uh, of those. But when we talk about impacts, we talk about impacts that are not just inside of the classroom. We talk about impacts from administration. We talk about impacts to our transportation.
- 2:55:52
We talk about impacts to our maintenance facilities. We talk about impacts all the way across the board. So those, when we have, uh, you know, big residential developments that come in, they do create impacts that we are definitely f- that we definitely feel. My own children go to Paulding County schools, and I- I want to make sure that I'm always providing them the best and the brightest educational environment that they have. Um, it would be remiss to say that it is... We do- we do have a discrepancy in Paulding County from residential and- and commercialization, industrialization.
- 2:56:26
We are- we are kinda heavy on one side compared to- to other districts that we have around us. You know, residential is 86% inside of Paulding County. And so with that, I don't know if y'all... I- I've made the analogy before, so I wanna kinda throw a little bit of humor in this, um, because I understand this is a tough subject, and nobody is- is shying away from the fact that it's a tough subject. Um, but if anybody remembers the Kevin Costner movie Field of Dreams, you know, we're- we're not building schools to bring people in. People come to Paulding County because they want a good county, and they want a good school system, and they want the good things that the- the county are being able to provide.
- 2:57:03
Uh, uh, being able to provide a good school system is- is of utmost importance to me. That's where I have put my career. Um, and again, my children are inside of it. So having something that helps to offset in a revenue capacity is- is beneficial to us. And but I also think that it needs to be sustainable. I think that there are a lot of valid points and a lot of valid questions and a lot of valid things, and I do think that through some of the text amendments that we have heard- I think that some of those are being addressed. So from a school system perspective, having an ability to help offset some of that heavy residential is, is again, going to be beneficial not only to the students that are inside, but also to the staff members in, that we have and the employees that we try to retain.
- 2:57:50
So I just wanted to make sure that I put that out there that, um, that in some capacity we need to be able to find an ability to be able to offset and be able to kinda ch- somewhat equalize, um, what we have in Paulding. Um, so just wanna take a moment and state that.
- 2:58:13
So at this time, again, we had both text amendments that were presented to us in an effort so that way we could hear both sides and we could hear all of the information at one time without making a ruling or a recommendation, uh, on one or the other beforehand. So now we are gonna go back into, um, looking at the previous, uh, text amendment that was presented to us by Ms. Utz,
- 2:58:40
with that being application 2026-02-TAA. At this time I'm going to ask, um, if there is a recommendation, uh, for this particular application.
- 2:58:55
I make a motion on 2026-02-TAA to table it till March as requested by Ms. Utz. Right on.
- 2:59:03
Okay. So wanna clarify, uh, with the tabling, typically when we table, um, tabling would be a one-month, uh, time. We would table it to the next appropriate meeting. But however, with this being a recommendation from Ms. Utz to, uh, table it until March, we will consider that as, as her recommendation, uh, and we will take that recommendation. So I have a recommendation to table, uh, application 2026-02-TAA, uh, until March. Do I have a second?
- 2:59:32
Second.
- 2:59:33
I have a second from Ms. Fitzgerald. All those in favor? Motion passes unanimously.
- 2:59:50
If y'all would just give me a moment so I can make some notes, please.
- 3:00:28
Now we have, uh, the text amendment presentation application or application 2026-03-TAA provided by Ms. Lippin. Um, do I have a motion for this application?
- 3:00:48
I make a motion we approve, uh, changing the minimum lot size, amending the minimum lot size to, uh, 200 acres and the, uh, remainder as written.
- 3:01:02
I have a motion for approval of the text amendments, uh, as presented with the exception of changing the minimum lot size from the 50 minimum acres to the 250 acres.
- 3:01:13
200 acres.
- 3:01:13
200 acres. I'm sorry, uh, 200 acres. Do I have a second?
- 3:01:19
Second.
- 3:01:20
I have, I have a second. I wanna give it to Mr. Rakestraw. Um, I have a second from Mr. Rakestraw. All those in favor?
- 3:01:29
All those opposed? The votion passes unani- or I mean, vote passes five to one.
- 3:01:35
Mr. Chair? I, I believe it's six.
- 3:01:39
Oh, sorry. I... Man, it's getting late. It's getting late. Yep, I'll do it again. Six, six to one.
- 3:01:47
Right.
- 3:01:51
I thought you had it.
- 3:02:05
Who was the second? Rakestraw?
- 3:02:07
Uh, Rakestraw,
- 3:02:16
yeah. I believe that concludes our application presentation. Uh, is that correct?
- 3:02:21
That is correct.
- 3:02:22
Okay. So, uh, one final closing comment that I would like to put out there. Um, again, we understand, or at least I understand, and I'm speaking from my heart right now. Um, I understand that there are sensitive topics that come up in the county, so I just wanna commend everybody in the room. So I appreciate everybody being cordial, I appreciate everybody listening, and I appreciate everybody putting, putting their, their thoughts to it. Because again, this is what we do, and this is, uh, the ability to come up here and being able to speak, I think, is very valuable.
- 3:02:54
And so I definitely appreciate everybody and your respectfulness. Uh, and I appreciate everybody having, um, you know, just being neighborly in this. Again, I know that there are tough topics and there are tough s- situations. There are tough things that we have. So from me to you, I definitely appreciate the fact that y'all came out here and were respectful in what y'all were able to do, so I appreciate that.
- 3:03:16
Thank you. Thank you, Mr. Wix.
- 3:03:16
Thank you.
- 3:03:16
Thank you.
- 3:03:21
With that, uh, that concludes the meeting. So I would like to have a motion for dismissal.
- 3:03:28
So moved.
- 3:03:30
Have a motion to dismiss from Mr. Callahan. Do I have a second?
- 3:03:34
Second.
- 3:03:34
Second from Mr. Leggett. All in favor? Motion passes unanimously. Thank you very much everyone.
- 3:03:40
He's never gonna let me... He's never gonna let me
- 3:04:01
forget.