County: Troup County
Troup County Board of Commissioners work session, November 17, 2026
Georgia Commons holds no minutes of this meeting. Georgia Commons is independent and is not affiliated with Troup County Board of Commissioners.
This is a machine transcript made by Georgia Commons from the body's public recording. It is not an official record, it can mishear words, names, and numbers, and it does not say who is speaking. The recording is what was said.
Records of this meeting
Each link opens the body's own website or meeting portal.
- Video recordingBoard of Commissioners Work Session (troupcountyga.new.swagit.com)
Summary
Written by an AI model (claude-sonnet-5-5) from the machine transcript below. It is not the record: the recording is what was said.
Commissioners heard updates on a Hyundai Transys expansion, tennis court grant, dump truck trade-in and capital projects, with votes left to the evening meeting.
The commissioners heard four informational presentations at a work session and took no votes on them. A development authority director outlined an agreement with Hyundai Transys for a West Point expansion, with about $559 million in investment, 323 new jobs and a 20-year phased property tax abatement. Staff asked to apply for a matching USTA grant to rebuild clay tennis courts, and proposed trading in four dump trucks for new ones at a $60,000 net cost. The county's capital projects manager gave an update on completed, underway and upcoming projects. Those two requests were set for the evening business meeting. The chairman also listed an ordinance amending Section 6.1 for that meeting. The board went into closed session on potential litigation and a personnel matter and reported no action was needed.
Topics taken up: Hyundai Transys expansion; property tax abatement; USTA tennis grant; clay tennis court renovation; dump truck trade-in program; capital improvement projects; fire stations; recreation facility maintenance.
What the meeting took up, as said in the recording (5)
Each account is part of the AI-written summary of the machine transcript, not the record. The time opens the transcript below where the matter is taken up.
Hyundai Transys West Point expansion agreement and 20-year tax abatement
The economic development director for the West Point Development Authority presented an agreement on Hyundai Transys's planned expansion, citing about $559 million in investment and 323 new full-time jobs, with about 1,258 existing jobs retained. The abatement schedule is 100% in year one, 65% in years two through five and 50% in years six through 20. A commissioner said it averages about 56%, and the presenter said net revenue would start in year two. The presenter said the average wage is $31.36 an hour, or $63,897 a year, above the county average. Training would come through Quick Start and West Georgia Technical College. Asked about a development authority fee, the presenter said there is a fee on the bond, calculated from the investment amount. The chairman said no action was needed from the board.
Request to apply for USTA matching grant to rebuild clay tennis courts
Staff asked permission to apply for the USTA Tennis Venue Services Grant, a matching grant for renovating and rebuilding clay courts. The estimated cost is $145,000. If awarded, the USTA would provide $60,000 and the county would pay the remaining $85,000 from SPLOST. Staff said a grant from about a year ago only bought clay to patch the courts. Staff said clay courts should be renovated every three to four years, and that the original courts date to about 2004. Staff said the school system pays half of hard court resurfacing. The chairman said the matter would be taken up at the evening meeting.
Trade-in of four dump trucks under the replacement program
Staff proposed trading in four Mack dump trucks, a 2025 and three 2026 models, for four new ones. Trade-in values are $195,000 for the 2025 truck and $200,000 each for the others, against a total price of $855,000. The net cost is $60,000, about $15,000 per truck. Staff said the county can buy at lower prices because it is exempt from a 12% federal excise tax. They said trucks must be kept at least 13 months before trade-in, and have a bumper-to-bumper warranty for 12 months. They said it reduces repair costs and hired hauling. The trucks have 14,870 to 27,440 miles, and staff said this was budgeted at $60,000 in the capital improvement program. Commissioners asked about miles, tires, warranty and drivers. The item was set for the evening meeting.
Capital improvement project update across county facilities
The projects manager said new construction is nearly finished and most remaining work is maintenance, renovation and upgrades. Fire Station 14 opens Friday, Station 15 breaks ground in early December, and the Station 9 renovation finishes December 1. Staff listed future needs at the government center (HVAC, paint, floors), repairs to the historic juvenile court granite, and replacement of access controls and panic buttons. A roads and engineering building makeover was estimated at $150,000. Recreation needs include the First Tee clubhouse, due in December, the rec center, ball field lighting, and playgrounds. Active Life requests and airport bathroom repairs were also covered. A commissioner asked about the endowment fund, and recreation staff said it has been used in the past but is not enough for resurfacing. Another commissioner asked about priorities, and staff said a priority list could be provided.
Preview of evening business meeting agenda including Section 6.1 ordinance
The chairman said the evening business meeting has three special business items: the USTA tennis grant, the dump truck replacement, and an ordinance amending Troup County Zoning Ordinance, Sec. 6.1 (Appendix C, Article 6). Official County roads and streets; maintenance.
Sections of the code these records refer to (1)
Found by rule from the words of the records on this page. A reference is a pointer to the section, not a statement that the section applies, was changed, or is in force.
- Troup County Zoning Ordinance, Sec. 6.1 (Appendix C, Article 6). Official County roads and streets; maintenance: “Section 6.1” in the recording at 1:02:02
Machine transcript
This is a machine transcript made by Georgia Commons from the body's public recording. It is not an official record, it can mishear words, names, and numbers, and it does not say who is speaking. The recording is what was said.
271 turns.
Open the recording on troupcountyga.new.swagit.com. The recording opens on the site where the body published it. Nothing is played on this page.
- 0:00:04
Good morning.
- 0:00:05
Good morning.
- 0:00:06
Let me welcome everyone to our Tuesday, November the 17th, 2026 Board of Commissioners work session. Uh, if you'll, if you do happen to have an agenda, or it is also on the screen, says Reverend Johnny Freeman from First Baptist Church of Fannin Street will give the invocation. Well, unfortunately, we thought that we were gonna cancel tonight's meeting, whi- which we normally have a guest, uh, pastor come in and give an invocation. Uh, but because of some advertisement that we'd done, we will have a meeting tonight, and therefore, the Reverend Johnny Freeman from First Baptist Church will not be here this morning to give the invocation.
- 0:00:40
But instead, I'm gonna ask the county manager if he doesn't mind opening us in a word of prayer.
- 0:00:44
I'd like ... Put me, put on the spot there. All right.
- 0:00:46
Yes, sir.
- 0:00:46
All right. Uh, dear Heavenly Father, we just thank you, Lord God, for this day. Um, thank you for the sunshine. We certainly, uh, thank you for the, the cool weather. Um, just makes us, uh, thankful for the change of seasons. We ask you, Lord, that you will bless this, this meeting. Um, bless, uh, those who are coming before our Board of Commissioners, um, as well as our commissioners and the decisions that they will make today, um, on behalf of our citizens. Uh, thank you, Lord, again, for your grace, your mercy, um, and amen.
- 0:01:13
All right. Thank you. All right. I'll, uh, now turn it over to the county manager.
- 0:01:18
All right. Uh, first item on the day's agenda, we'll invite, um, Megan Duke, or Megan Richardson, sorry, Megan, apologize, um, from West Point Development Authority to present the Hyundai Transys MOU.
- 0:01:29
Okay. Thank you. Good morning, Chairman Crews and members of Troup County Commission. Again, my name's Megan Richardson. I'm the economic development director for the West Point Development Authority, as well as the City of West Point. And I'd like to provide an overview of the memorandum of understanding with Hyundai Transys Georgia Powertrain regarding the company's planned expansion of its existing manufacturing operation in West Point. This project represents a significant investment in our community with approximately 559 million in planned capital investment and creation of 323 full-time jobs.
- 0:02:05
According to the company's estimated, um, company's estimates, the project includes 156,638,000 in real property investment, 402,545,000 in personal property investment, and the 323 new full-time employees. This expansion will include production equipment and facility upgrades at the company's two existing manufacturing plants to support hybrid transmission manufacturing, as well as construction of a third state-of-the-art facility dedicated to hybrid pr- transmission motor production.
- 0:02:43
In addition to the 323 new jobs, the project is retaining approximately 1,258 employees, bringing Hyundai Transys' total employment at the West Point facility to more than 1,500 employees. Based on the company's investment and job creation commitment, the West Point Development Authority is, uh, pr- pr- providing a property tax abatement on the real and personal property financed with the proceeds of the bond. The proposed abatement schedule is structured over a 20-year period and follows year one, 100% property tax abatement, year two through five, 65% property tax abatement, year six through 20, 50% property tax abatement.
- 0:03:25
This phased approach provides an incentive to support the company's substantial capital investment and job creation commitment while establishing a defined schedule for property taxation over the life of the agreement. The pilot process and procedures established by the Troup County Board of Tax Assessors are intended to support the administration of development authority incentive programs that promote positive economic impact throughout Troup, Troup County. These incentives are designed to encourage industrial growth, create, create new employment opportunities, and retain existing jobs.
- 0:03:58
Each exemption request is evaluated on a case-by-case basis and determined whether the proposed investment and anticipated economic benefit provides suffi- sufficient justification for the incentive. This purpose is to ensure that these exemptions are used as an economic development tool and that community receives measurable benefits in return. I also want to take a moment to emphasize the important- portance of existing industry and business retention in economic development. We often talk about recruiting new companies and bringing new investment into our community, and that will always be an important part of our work.
- 0:04:35
However, retaining and supporting our companies we already have is equally important. When an existing industry chooses to reinvest and expand, we aren't starting from scratch. We are protecting the jobs that are already here, retaining an established tax base, strengthening the existing workforce, and building upon a relation, relationship that has already contributed to our community. In many ways, an expansion can bring even greater immediate benefit than recruiting a new company. We are not only securing new jobs and capital investment, but protecting the existing jobs, payroll, supplier relationships, and community partnerships that could otherwise be at risk.
- 0:05:15
Hyundai Transys currently employs more than 1,200 people in West Point. This project creates 323 additional jobs, but also reinforces the company's long-term commitment in, uh, to maintaining and growing its operation here. There is also tremendous value in having established corporate partners that already invested in our school, our workforce, and our community. Hyundai Transys has demonstrated that commitment through employee volunteer programs, literacy initiatives, work-based learning opportunities, and student engagement.
- 0:05:45
These relationships extend beyond the manufacturing floor. They help strengthen the connection between our industries, our education institutions, and the future workforce we are preparing right here in Troup County. Memorandum of understanding establishes the framework for this project and outlines the commitments associated with the proposed investment, job creation, and property tax abatement. This expansion represents a significant commitment by Hyundai Transys to the West Point operation and reinforces Troup County's position as an important location for automotive manufacturing.
- 0:06:19
More than $559 million in investment, 323 new jobs, the retention of 1200 existing, existing jobs, this project represents an important investment not only for our local economy, but for the future of our community. Ultimately, this project is about protecting the jobs we have, creating new opportunities for our residents, and building upon a long-standing partnership that benefits West Point and Troup County. We appreciate Hyundai Transys' continued confidence in our community and look forward to supporting the company's continued growth and success in Troup County.
- 0:06:51
Thank you.
- 0:06:53
Thank you.
- 0:06:54
Yes, sir. Any questions?
- 0:06:56
This come out to be, if I'm... Correct me if I'm wrong, but I think the way it's allocated out, it turned out to be 56%, right? Is that-
- 0:07:04
When you average the to- the abatement over the 20-year period.
- 0:07:09
Right.
- 0:07:09
So we'll, the, we'll start receiving net revenue in year two.
- 0:07:16
And on the average wage, it says $31.36. What... Do you have, like, a starting wage, and then how did, how is that figured as far as that goes?
- 0:07:25
Yes, sir. So the, um, hourly wage provided by the company, um, the hourly wage is $31 and 36 cents. The annual wage, um, is $63,897. So that is currently ab- ab- above the county average in regards to the hourly wage and the annual wages of Troup County.
- 0:07:47
And as far as the workforce development goes, w- how are they working? Are they working with the, with the school system, or how are they doing that as far as, uh, I guess, educating for the jobs that are available there? How are they working?
- 0:07:59
Yes, sir. So they have a robust HR department, but we, um... They qualified for the Quick Start, um, training program through the d- um, Department of Economic Development and the State of Georgia. So they'll be working with Quickstart, Quickstart on the new hires. We also have, um, a plan for retraining the employees next year with West Georgia Technical College. Um, so they are, always have some training taking place within their facility for their employees.
- 0:08:26
This abatement right here, did the, um, Development Authority get a percentage off of it, too?
- 0:08:32
Not a percentage off the abatement, no, sir. There's a fee for the bond.
- 0:08:35
Okay, a fee. The, you get a fee off that?
- 0:08:37
Yes, sir.
- 0:08:38
How much was that?
- 0:08:40
There's a calculation for it once the bond o- regarding the amount of the investment.
- 0:08:58
All right. Any other questions? All right. Is, uh... There won't be further action required by us tonight, so this is for our information, and, uh, we thank you very much for being here.
- 0:09:09
Thank you so much.
- 0:09:10
Thank you.
- 0:09:12
All right. Uh, next up, we'll invite Alan Valdez, who will be, uh, discussing the USTA Tennis Venue Services Grant. I guess along with Lance Innes.
- 0:09:24
Good morning, commissioners.
- 0:09:25
Morning.
- 0:09:26
As you don't know, this is Alan Valdez. He's our tennis pro here. Uh, he came in with some very, very big shoes to fill, Mr. Bill Champion, who had been with us forever, and he has done an outstanding job, and I'm very proud of him and all the success and the growth that we're still having at the Tennis Center. Um, we've come before you today to ask for permission to apply for the USTA Tennis Venue Services Grant. It is a matching grant, and what this is, would be for is the renovation and reconstruction of some of our clay tennis courts out there, which I'll let Alan kind of tell you a little bit about the tennis maintenance and stuff that you have to do to maintain your courts to keep them to a proper level.
- 0:10:05
Um, but basically, it's, uh, estimated cost to do what we need to do out there is $145,000. If we were to be awarded this grant, we'd receive, uh, $60,000 from the USTA, and then we would pay the remaining $85,000 out of splash six. But I'll be happy for Alan to tell you, you know, any th- questions about clay courts and the, what needs to be done with them.
- 0:10:30
Morning. Well, d- didn't, uh, didn't we have a grant or something that we've, we did about a year ago or something? Was that just to kinda patch on these co- Did we do something with-
- 0:10:40
We did. It was actually, uh, we purchased actually clay, um, to repair the existing courts, right?
- 0:10:45
So this is to-
- 0:10:47
This would, they would be regrading them.
- 0:10:49
Okay.
- 0:10:49
And you're supposed to be, I think, re- redo the lines on a clay court every three years and really turn the clay over every three years. We just used that grant money to patch and do what we could to keep it going.
- 0:11:02
Jim, and answer, what, what, what's the... How many years has the clay courts been at McCleskey?
- 0:11:09
I don't know the whole history of it, but those right there, since they've been renovated, it's about eight years since the last time anything-
- 0:11:14
Just about eight years?
- 0:11:15
Eight years is when the, the new construction was done there.
- 0:11:19
And what is the time, it's about between eight and 10 years, is that correct?
- 0:11:23
Uh, no. They, they should be doing more renovations to a clay court according... I learned this from Bill. You may know more. Every three to four years, the clay court should have some renovations, and every five years, the hard courts need to be resurfaced.
- 0:11:36
Okay.
- 0:11:36
And our deal with the hard courts is, that we've done now, is we're getting those every five years, but we're making the school system pay half of that every five years when it comes due because LaGrange High School is using it as one of their facilities to play their matches at.
- 0:11:53
The original clay courts were built in '04, I believe.
- 0:11:56
Oh, okay.
- 0:11:56
Yeah. So...
- 0:12:00
And we have some members of CHATA from our board here, too. They do excellent work for us in trying to secure, they've secured grants to help us get equipment and stuff like that for lessons and stuff, too. So some of their members are here on their board, if you had any questions for them as well. Figured we'd do this more as just kind of an educational thing of what goes on at the tennis center if any of you have any questions that are not over there on a regular basis.
- 0:12:29
All right. Does anyone have any questions?
- 0:12:34
All right. If not, then we'll take this matter up this evening then. Thank you.
- 0:12:37
Thank you.
- 0:12:37
Thanks.
- 0:12:38
All right.
- 0:12:39
All right. Uh, the next, uh, item on agenda, um, I'm gonna turn over to James Emery. I know Kevin Kendricks is here as well. Kevin, are you presenting? And James is supporting. Um, about to talk about the, uh, dump truck replacement program.
- 0:12:52
Thank you, Mr. Mosley. The, uh, dump truck replacement program has, uh, has, you might say, reached the point that we had hoped it would reach, um, many years ago when we started replacements of dump trucks. Uh, we had an old, really aging fleet, and we came across, uh, a, a program that we proposed to this Board of Commissioners, uh, originally to, uh, get started by, by trying this program with just one, uh, Mack tandem dump truck.
- 0:13:27
And it has little by little grown to the point that it is... where it is now, where we have all four of our, uh, tandem dump trucks in the program. Uh, all of you were, were here, uh, a little over a year ago when we purchased the four dump trucks that today we are, uh, proposing to trade in. That, that seems like a very, very short life for a dump truck. It obviously is. This, uh, program is something that, uh, many local governments do, uh, that can't be done in the private sector, and it's something that, uh, that works for us, uh, very well, we think.
- 0:14:12
And, um, it's something that there's no obligation to do, and we can, um, we can decide at any point to change the way we do this. But, but we need dump trucks in our fleet. We always have. Just like the fire department needs fire trucks and the sheriff's department needs patrol cars, we need dump trucks. And we think that this is the best way to utilize the county's tax dollars to keep our road department, uh, in good dump trucks that are dependable and in good condition.
- 0:14:49
And the way the program works, we can buy dump trucks through, uh, our government buying power much, at a much lower price than anyone in the private sector can. The day that we buy that dump truck, it's worth much more than what we paid for it in the private sector. Now, laws don't allow us to turn around and sell that truck the next day to the pri- to someone in the private sector.
- 0:15:19
They would pay us more than what we paid for it, but we can't do that. It would compete with the private sector, and so we don't do that. Uh, what we can do is, is, is do exactly that after 13 months. That's, that's the way the laws work on this. And so, uh, that's the minimum timeframe that we have to keep the dump trucks before we could, uh, trade those back into the private sector. Uh, the first time we did this program, uh, some of you will remember, we had purchased the dump truck for I think it was 154,000, plus or minus.
- 0:16:01
By the time, uh, we were ready to trade it, it had been maybe 15, 18 months. That, uh, was during the COVID pandemic, and the market had really gotten out of whack. Uh, it was very, very difficult due to supply chain issues, uh, for anyone to buy a new dump truck today. If you want a new dump truck, you couldn't buy a new dump truck today. You had to wait for many, many months, maybe over a year, if you wanted to buy a new dump truck. And so the, the value of these barely used trucks was that much more.
- 0:16:36
We were able to trade that dump truck in, and we, we were given by the Nextran dealer, the Mack dealer, $195,000 for our truck that we bought for 154,000. Price of the new truck at that time had gone up to 195,000, and so it was a wash for us. We got a new dump truck for $0. Um, market has fluctuated year after year. That was a, that was a very unique year. You'll all remember the COVID pandemic.
- 0:17:07
But, um, where we are today, uh, the program still is, is very similar. These Mack Granite, uh, 64FR, I believe, are the, the, uh, trucks that, that we have quoted. Um, the 64FR is a, is a very, uh, sought after dump truck in the private sector. It's one that, that everyone really wants. The program wouldn't work if, if we weren't, uh, in possession of the truck that everyone really wants.
- 0:17:41
And so we spec these trucks with a spec that is maybe a little different than what we would do if we were planning to just use it for our purposes forever, uh, the old way you might say, and keep these things forever. We might, we might buy a truck that doesn't have some of the accessories or some of the options that the contractors in the private sector do want. And so we spec these trucks, uh, with that in mind so that they are that much more marketable when it comes time to trade them in, uh, not long after we buy them So the deal that you have before you today, as you can see on the screen, is the, the trade-in of the four trucks, uh, that we have in the fleet currently, which are a 2025 and three 2026s, and the trade-in value of those is 195,000 and 200,000.
- 0:18:43
195 for the, for the 2025 Mack and 200,000 for the 2026 Macks. And the total price for the four new Macks, which are basically identical, is 855,000 for a total difference now of $60,000, which is what we're asking, uh, you to approve this evening as a, as a purchase price with trade-in, uh, basically 16,000 per truck.
- 0:19:15
Or, excuse me, 15,000 per truck, uh, for the, the four trucks.
- 0:19:23
So you, we've had them 13 months.
- 0:19:26
Right.
- 0:19:27
How many miles, how many miles we put on them in that time period?
- 0:19:30
We have between... I've got those numbers right here. Uh, the 2025 Mack actually has less miles than the other three at this point. They all vary, uh, but they vary between about 15,000 miles and 27,000 miles that we've put on these trucks. So, uh, one of them has 14,870, one has 22,208, one has 27,440, one has 25,367, so.
- 0:20:11
They get a good bit of usage, but they're not like over-the-road trucks that will get, you know, 100,000 miles in, in a year or two, um, running long distances because we keep them here in Troup County basi- most of the time, and each of them have different, different jobs they do day to day, and they don't all get exactly the same usage. We use them for a variety of different things. We spec these with the lift gate, like you can see on the screen here, which allows us to dump brush and, uh, vegetative material.
- 0:20:45
You can't do that with a typical gate on a typical dump truck. That is a, a cheaper gate, you could say, that, that you would typically see outfitted. But this more expensive and more valuable, uh, option allows us to use these dump trucks for a lot of different things. Uh, so, so instead often of, uh, using contractors for, uh, waste hauling, we can use these dump trucks for, for the same kinds of things and save the citizens of the county that, um, that expense.
- 0:21:27
Jimmy James, on these trucks, do you... Does the same driver drive this truck or do you let different drivers drive these trucks?
- 0:21:33
Kevin might answer that better.
- 0:21:35
We, uh, typically like to have a driver assigned to each truck, and what we've seen is when we do that, they kind of take ownership of that and they take good care of it. They do all their morning checks with the fluids and everything and keep them clean. That's for the most part. There's every once in a while a reason we might need to steer from that. Yeah, we, we usually have one driver for, for each truck.
- 0:22:08
And, uh, not to be redundant, but like James said, um, we do feel like this program maximizes our capabilities while using the tax dollar most efficiently. I know that, uh, any of us can probably identify with a situation where we, with our own personal vehicle when something goes wrong and we're faced with an unexpected repair cost. Um, you can magnify that to a great extent when you're dealing with the kind of trucks, the kind of equipment we deal with.
- 0:22:46
And one of the reasons we like to turn these around is because, um, the... There's, there's... You can get into some minutiae with the warranty details, but we basically have a bumper-to-bumper warranty that covers parts, labor, everything for that first 12 months. So we have really... You know, James can attest, back when we had a few old dump trucks, the amount we would spend just to keep them running was just astronomical, and we've really saved a lot of money in that regard.
- 0:23:27
And, um, having this fleet, we have really cut down on the need to hire, uh, outside dump truck hauling contractors and, like James said, uh, to, uh... When we have storms and a lot of debris, having to call in more, um, contractors with roll-offs for that kind of waste, and it, it just really maximizes our capabilities, and, uh, we feel it, it keeps our costs down and keeps, um, new trucks in our fleet, and, um, it's just worked out great for us.
- 0:24:08
On the trucks we have now, it's 14,000, 15,000 miles. Have we even put another set of tires on them?
- 0:24:16
No.
- 0:24:17
I mean, a new set of tires for them trucks would cost you what? Half of that 15,000.
- 0:24:22
More than that?
- 0:24:23
Yeah, I mean-
- 0:24:23
Yeah. More than that.
- 0:24:25
Close to nine.
- 0:24:26
If 10,000, there's 10 tires on there. Yeah.
- 0:24:30
Mm-hmm. With those... That, that size, yeah.
- 0:24:32
When you mentioned warranty, you said 12 months, I mean, pretty much bumper to bumper everything. So that's the bed, transmission, engines, all?
- 0:24:40
Now, the transmission and engine, some of those things go up even, you know, uh, 60 months, uh, whatever. But pretty much everything but, like, windshield wipers and stuff like, you know, is, uh, 100,000 miles or 12 months, whichever comes first.
- 0:25:02
So, uh-
- 0:25:02
12 months
- 0:25:02
... 12 months is it. So now we're... This will put us in a new-
- 0:25:05
Yes, that's correct.
- 0:25:06
Gotcha.
- 0:25:13
Now, where would this, where would these funds come from? It was budgeted, uh... That's, uh, that, that reminds me of one more, uh, piece of this that we didn't mention. It was budgeted in our CIP, our Capital Improvement Program. Um, and we didn't know exactly how much to budget with this program because it varies year to year just how much, um, it would cost to make this rotation. We budgeted $60,000. Um, our purchasing director actually negotiated this price down from even though we already have great buying power as a local government and using source wheel contracting and, and we get that kind of, um, uh, pricing on, on big trucks like this.
- 0:26:00
He also negotiated it down to that 60,000 mark. So, uh, it- They were able to meet exactly what we had budgeted.
- 0:26:09
That, uh, that buying power that James is referring to is specifically the federal excise tax that is automatically, uh, you know, applied to the purchase of a truck that hauls over a certain amount of weight. But being a county government, we are exempt of that, and that's a 12% add-on that the general market has to pay that we're exempt of. And we feel that that really presents us a great opportunity.
- 0:26:42
The four we have now, have we, have we had any major issues out of them?
- 0:26:49
The reason we're asking, to keep it from getting... Keep us from wanting to get the same trucks, you know? We had no issues out of the ones we have.
- 0:26:59
I mean, any, any issue we would have would be covered under warranty, and so it doesn't cost us anything.
- 0:27:05
Right. That's right.
- 0:27:11
All right. Any other questions?
- 0:27:14
I'm done.
- 0:27:15
All right. Thank you. Kevin.
- 0:27:17
All right. Our-
- 0:27:17
That will take that up this evening
- 0:27:18
... final item on the morning agenda is the, uh, capital improvement project update, and, uh, Jay has been working on that, and will present.
- 0:27:28
Good morning, Chairman, commissioners.
- 0:27:30
Good morning.
- 0:27:30
Morning.
- 0:27:33
Um, was it January or February, we went on our retreat to Rome, um, at the beginning of this year, and I presented, uh, this similar presentation at that point. And, uh, Eric and I wanna try to once a year or twice a year, um, present this to let you know where we stand 'cause basically it's presenting you on, uh, completed projects, kinda to know where we've been and what we've got done, um, ones that are currently under, under progress or ones that are in the short term or ones that are in the long term, um, to make sure that we keep these in front of you, um, especially ones that we know are coming up in the next one, two, three, four, five years just so that we know they're coming up, and we kinda have an idea of, of, you know, what we're gonna see and that therefore, you know, if I come back to you with some projects, uh, to try to move forward with, that it's not the first that you've heard about it, that you've kind of known it's been on a list and, um, you know, that, that you know it's kinda coming up.
- 0:28:27
So anyways, uh, I've updated this since January or February 'cause some of the projects, uh, were, were under construction, and now they're complete. Some of them were kind of short-term, and now they're even done or underway. So I've updated this to, to where we are today. Um, and one of the things I talked about back in, at the retreat was, um, back in January or February, is that we knew that, uh, and we had started at that time Station 14, Fire Station 14, and we had made the comment that about this time, the end of 2026, Station 14 would be done.
- 0:29:03
Um, Whitesville Road would have been completed and, and opened, and so that a lot of the projects we'd been doing were new construction, all, all new stuff, and that, uh, one of the comments we made that was really by the end of this year we'd have very little new construction projects anymore. We'd kinda be caught up on our new construction. Um, and the only new construction really in here at all is, uh, Station 15 that we're about to break ground on, and that that'll be done a year from now about this time. So, so most of this, which is what we commented on back in January or February, is just maintaining what we already have.
- 0:29:38
Maintenance, upgrades, um, renovations because we, we really have get, done a good job in the last five years or so of building what we need, new construction. And so we're, we're kind of caught up on that. And, uh, so most all of this is just maintenance, renovations, and upgrades to just, to, to make sure what we have is in good shape. So we'll start with the fire department. Um, kinda have it by departments. Um, as we know, we finished a new fire admin in 2020. I'm gonna try to fly through this, but if you have any questions, stop me.
- 0:30:11
Um, administration was built in 2020, believe it or not, six years ago. We're finishing Station 14, and as you know, our grand opening is this Friday at 10 o'clock. Um- Station 15 out at, uh, Burke's Chapel. Um, as you know, we bought the property, we've awarded that, and we actually have a pre-construction meeting this afternoon, and they're supposed to break ground, uh, first week in December. They're gonna be out there breaking ground in a couple weeks. And so that'll be done in about a year from now. That's the one new construction project I was mentioning.
- 0:30:42
Uh, but it'll be done in a year from now. The b- uh, Byrne Building was done and completed this year. That opening ribbon cutting was what? Two, three weeks ago. Um, and then the renovations that you approved us to do out at Station 9 Mountville, that has gone really, really well, and the contractor says they'll be done, um, December 1st. And then we're gonna go in, and the way I had it laid out was we're gonna do the exterior work. We're gonna... James' guys are gonna demo the old driveways and parking lots, which are all broken up, and then I've got a contractor, a concrete guy coming in to pour all new driveways, sidewalks, parking lots, do the landscaping ourselves, and then we'll be done in December.
- 0:31:24
So that project will also be done here in December, and it's looking really, really good. So we'll finish the outside in December. Uh, so then after that, all of those projects, really we only have the bottom three items coming up for, uh, fire department, is they, they would like maybe a new boat dock or boathouse out at Pine Road Park to have our boats out there, um, so that they can have quicker response. And that, some of those discussions, I believe, are already underway, um, that that might be coming back to you, uh, in the next couple months or so of being able to have our boats out there right on the lake instead of having to drive them out there on a trailer and have quicker response.
- 0:32:03
The other one would be that as soon as we finish these stations we're working on, which is gonna be very, very soon, is that we're gonna be looking at renovating Station 5 at, uh, Rosemont and Station 3 at Liberty Hill. Both of those are volunteer stations, and so we could see coming back to you January, February, March, April with some scope of works and budgets to renovate those two, uh, stations. And then that gets our stations in pretty good shape if we renovate those two. Uh, and then the last item would be, uh, trucks, pump trucks, apparatus.
- 0:32:34
As you know, those are big dollar items. So, uh, outside of finishing the projects we're working on, it's just renovating those two, uh, volunteer stations, and then really just focus on equipment that we need. Um, so those are the things coming up for fire department. Any questions on those?
- 0:32:55
Nope? Okay. We'll move forward to the government center complex here, which includes this building, the juvenile court building next door, and the parking garage. Um, we're in pretty good shape here. We've done a lot of work in the last five years. We have a new roof. We've, uh, converted a lot of our lighting to LED. We did a bunch of maintenance on the parking garage, which you have to do every 10 to 15 years, and we did that a couple years ago. We had to replace two cooling towers that are outside, which basically handles the heating and air for this building. Uh, or it's a part of the heating and air system.
- 0:33:27
But those crashed, and we replaced those a couple years ago. Um, the juvenile court building has all new heating and air, and that was replaced a couple years ago with the ARPA funds, and so their heating and air is in good shape. Um, we did a bunch of waterproofing over there. And also last year, as you're well aware, we, uh, built out Courtroom 3C upstairs. And so all of those things we've done here at this complex in the last one to five years. Um, but, um, this building i- in particular is 20 years old, and so you're starting to hit that envelope of needing maintenance, um, when you're 20 years old.
- 0:34:06
And so the next items are, uh, we know we're gonna have to start in the next two to five years addressing, uh, more heating and air equipment here, um, repainting, and floor coverings here. Um, 'cause all these things here are 20 years old, and some of them, especially out in the lobby here when you come in, they're, they're starting to get some age on them and some soiling. We have a... Obviously, this is our busiest building with the courtrooms and taxes and everything else. This, so this is, this is a very busy building, and these painting and carpet and that type thing, we're, we're starting to get to that point.
- 0:34:42
The juvenile court, second to last item. Um, if you actually go up into the courtroom at the juvenile court, which used to be the courtroom for Troup County for many, many, many years, it's all granite and marble. And we have some issues with that granite and marble, um, that we think the cause of the issues was, uh, moisture getting in the building. Um, but it has a new roof, and we did a lot of waterproofing, so we believe we have all the moisture under control. And so with the moisture under control, we can go back in now and fix the granite, uh, 'cause we think we have the root cause solved.
- 0:35:16
And actually, there's a granite company coming in next week, Monday through Wednesday before Thanksgiving, to initiate and start those repairs. Um, but I'll probably have to come back, 'cause basically, they s- we can tell there's problems, and you can see it if you go in there. Um, and what they're gonna come next week t- and do is take off those sections of granite and marble and see behind it what is really going on, and then they can kinda recommend and tell us what it takes to fix it. But they won't know until they get into the wall, if you follow me.
- 0:35:49
Um, but so they're coming next week to do what they call the exploratory to take the granite down, see what it takes to fix, and then, um, give us a price of what they think it'll take to fix, and then get it back. But, um, that's a historic courtroom. As you know, it was courtroom for a long, long time for Troup County. Any questions on that? The only other thing is the last... Whoop. Sorry, James. The last item on there, um- Technology, as we know, has only a certain lifespan and then you have to just like our 911 system or was it three years ago we had to redo the, uh, Siemens fire alarm system in here because the software, the hardware, it reaches the end of its life.
- 0:36:31
Was it last year we redid the camera system here because it was new software and new hardware for the cameras? Um, well, we have the same thing with our access controls and our panic buttons, um, that are throughout the building is that the same, the software is now not getting, um, supported anymore. And it, and so I'll be back with you. That'll probably be pretty quick. I'll be back with you to talk about the access controls for this building and the panic buttons. Um, and also if you flip to the next one, James, also at the, uh, sheriff's office in the jail, it's the same with the access controls and the panic buttons.
- 0:37:09
So we're, we're, we're putting something together to come back to you that'll handle, um, to get us back, kinda like we had to, like I said, with the fire alarm, and then we had to with 911, and we had to with the camera system. We're now kind of at that point that we need to upgrade and replace with newer technology the access controls. Dallas Street building, which as you know is we own that building, but, uh, the driver's license is in there, the health department is in there, Red Cross is in there, and our hub, our clinic is in that building, but we own the building and we maintain the, the grounds and the shell.
- 0:37:45
And those particular tenants, they, they maintain their own space though, but we maintain the grounds and the shell. And we're in really, really good shape there. I just wanted to show that, I mean, we have redone the roof, heating and air. Um, every heat and air unit was replaced in there. We redid the landscaping in the parking lots last year. We re-striped, we reseal coated, and actually resurfaced some of them, James.
- 0:38:07
Right.
- 0:38:07
Um, and so we're in pretty good shape there for now. I think we're, we're, we're sitting pretty good there. Um, it's a nice building and historic building, and we're in pretty good shape. Um, next James, please. The Ag Center, believe it or not, has been open five years, completed in '21, and the project they would like to do, um, is build a new garden potting shed teaching center kind of in the back that'll be behind the pavilion and where they already have some gardens right there. They w- And she has a plan.
- 0:38:38
Uh, Laura, Ms. Laura has a plan. I've worked with her. I've actually done an estimate on it, and it would be $125,000 to $175,000. We're kinda still working on it, um, but it's something that she would like to bring to you sometime this year. Um, it'd be a good addition to what she has. Um, I think we could get it down to the $125,000, the low end. We're kinda doing some value engineering on it right now. So, um, and roads and engineering, we talked about this at the retreat back in January, February, is that we have a plan, um, and I think James showed you the renderings and the ideas of it back at the retreat, is we need to...
- 0:39:16
That w- building was built by inmates back in the day and really hasn't had a whole lot of work. We replaced some windows, uh, two, three years ago, but the rest of it, uh, it needs some work. And so we have a plan, and actually James and I finished the budgeting of it this week, um, which we can, we'll bring back to you very soon. Matter of fact, we could approve it today if you want. But, uh, we finished, basically it's redoing the parking lot, redoing the front porch, redoing the whole front facade, painting the whole roads and engineering, putting new signage up, um, redoing the fencing kind of as you go into the laydown yard, and, uh, all of that work, uh, we can do for $150,000.
- 0:39:57
Um, and we have a whole plan and we're, we're teed up and ready to go with that. We talked about that back at the retreat, but we were more in the infancy stage then, and now we have it teed up and ready to go. Um, again, that building's been there long, 40 years, 50 years?
- 0:40:14
Probably 40.
- 0:40:15
Yep, and so it would be good to, again, upgrade and renovate that to get it back to speed. So, and that one is ready. Kind of like the access controls is just about ready. The, James' project's about ready. Next. Parks and Rec, uh, First Tee clubhouse is underway and it will be done in December. Um, they are down to final painting, floor coverings, um, setting light fixtures already in there. They think they're turning power on today, so that will be done in December.
- 0:40:46
And I've already got conversations with them where they know and they've already been packing and boxing and throwing stuff away that they don't wanna move, um, that they're gonna be, they're, they're teed up and ready to go, uh, move into the new building in December. And then James is ready to go to then demo the old building and regrade around there. So that'll be done. Um, that's going real well. The Mike Daniel Rec Center, um, they have some roof, some roof leaks, some gutter leaks. We're actually working on that right now just with our current budget.
- 0:41:17
I think we can fix that just with our budget. Um, but we're working on that. But inside, 'cause it, it's also 20 years old, um, 25 years old, JJ, um, that there's, um, kind of the same as this building, painting and floor coverings is that, that it's in need of painting and floor coverings. Some, some sheetrock repair because of some of the roof leaks has caused some sheetrock repair. Um, and I've actually got some pricing on that. Uh, we just gotta get the roof fixed first before we start the painting and repairs.
- 0:41:49
But some of that's about ready to come to you. Redoing the hockey rink, the flooring in the hockey area, which is also used for indoor pickleball and indoor soccer and several other activities. They used to do a Zumba exercise class in there and, um, upgrade some of the equipment in the fitness center. Um, new floor coverings, I already mentioned that. That's with the paint. And then the, uh, basketball courts, they have to be redone every two years, Lance, or so?
- 0:42:24
So again, kind of back to what we said, this is maintenance and upgrades, just trying to keep us in good shape. Um-
- 0:42:29
Tell me, Jay, can any of this, uh, improvements come from the endowment fund?
- 0:42:35
JJ?
- 0:42:37
Some of the, um-
- 0:42:46
Name and address, please.
- 0:42:50
Um, good morning.
- 0:42:51
Good morning.
- 0:42:52
Good morning.
- 0:42:52
So some of the repairs can ... We have patched and patched many of the things, um, especially like the hockey rink floor. We've gone in many times and re-glued the bubbles that pop up with the moisture and that sort of thing. So that floor has never been replaced. Um-
- 0:43:12
Is that wood?
- 0:43:13
No, sir. It's Mondo.
- 0:43:15
Okay.
- 0:43:15
It's Mondo. And so we've re-glued the seams multiple times and even taped them down through the help of our maintenance department. Um, we've talked about it. That facility is actually used a lot, um, between pickleball in the mornings and our hockey program in the evenings, um, along with our indoor soccer in the winter months and, um, different various small things in there as well. Um, we have replaced walls that have been broken with our current budget and maintenance in that part of it.
- 0:43:52
But as far as, um, the resurfacing, we use sometimes our current budget for that as well. Um, especially when we're just re-coating or- and sanding, we do that. But when it comes to actually resurfacing, like Lance said, every five years or whatever, that's a much more expensive item, um, that we don't have through the endowment, Morris. Um, but yes, we have in the past used some of our current endowment funds.
- 0:44:27
Um, but some of the, um, walls and flooring investment is a much higher expense than ... Because like in the gymnasium, the walls are sheetrock, and after 20 years the balls keep hitting and going down. It needs to be completely re-sheetrocked and surfaced, maintained a little bit more structurally sound to prevent that from happening again. Um, we've replaced the carpet several times. Interface has donated that.
- 0:44:59
Um, but we have not replaced the parquet floor in meeting room B since we've been there. Um, we, when we first started, I don't know if y'all remember, we had moisture issues throughout the building, and we got all of that repaired. So it's been 20-plus years since that floor has even had any issues. It's very maintained, but it's time to, um, do a little upgrade with. Did I answer that, Morris?
- 0:45:29
Yeah.
- 0:45:29
Okay. In a roundabout way.
- 0:45:31
You did.
- 0:45:32
Any other questions with the rec center?
- 0:45:36
I was in there the other night. There was volleyball in the hockey rink too.
- 0:45:39
Yes. Yes.
- 0:45:40
They were in there doing volleyball drills and warmups and practice in the hockey rink.
- 0:45:45
You know, one of the interesting things is that facility is used for multiple things. And in February we are actually gonna host the GHSA girls state sectional wrestling, um, at the Mike Daniels. So it's on a Friday. Um, it'll be all day. Um, Fridays are a good day for us because it's a little bit slower. Um, and so we'll have mats in the gym, and then we'll also have mats in the hockey rink for warmup and staging.
- 0:46:16
So, um, that's just one way that we're working with our local high schools and we're utilizing our facility for our community events as well.
- 0:46:27
And I noticed some of these, Jay, you said you've already ... In other words, these are, like, you've already got the priority list out of this. I, I take it there was ... Like you were talking about juvenile there, you're talking about floors that need to be looked at. So was that something coming up in the next ... Is there a way to, I guess, in the next year, these projects here kind of would a priority? You know, I mean, I know right now you might not, but-
- 0:46:51
Well, I guess I'm articulating some of them. I'm actually saying how some of them are ready versus others, but I could put it on a list. I could get back with you on that.
- 0:46:58
I guess all these are splash projects.
- 0:47:01
Some are. Some are, some are splash, some could come out, come with a capital fund, e- either or. Um-
- 0:47:05
Mm-hmm
- 0:47:05
... and some of them actually we think we probably can accomplish through our actual operating budget as well. The bigger ticket items, like if it was heat and air for this building and all the painting and floors, that can probably be capital because, I mean, that's a long-term investment into this building, and that's big, big dollars.
- 0:47:22
That's what I was wondering, is that, like, how far on the list is that work?
- 0:47:27
In the next two to five years-
- 0:47:29
Two to five
- 0:47:29
... I would say for this building. You can see some of the places in this building are really kind of looking a little lo- look- looking a little bad. I mean, there's some places I walk where I'm kind of like, "Ugh." But we also have, like this year, um, I know court services, property appraisal, they, they built into their budget, you know, painting and that sort of thing. So some of them are ... We're, we're handling some of the things through budget year on, year out. But typically, Sonya and I, over the course of the past decade, we have created a CIP list, um, as part of the budget so that we have a, a, a, a somewhat of a track of, of, of what's a priority based on each department.
- 0:48:06
And we were fortunate enough to replace all of the heating and air units-
- 0:48:10
Mm
- 0:48:10
... with, um, the funding back from COVID.
- 0:48:14
Uh-huh.
- 0:48:14
Yes. So as we stand, our heating and air units are in really pretty good shape. We're maintaining them. We're doing them three times a year, um, and stuff, so we're really doing pretty well on the HVAC stuff. So that's a good thing
- 0:48:30
Those are big ticket items that were handled with ARPA.
- 0:48:36
Next, James, please.
- 0:48:39
Oh, this is Dan Wooten's list that he gave me for Active Life. Is Dan here today?
- 0:48:44
No.
- 0:48:45
Um, we have done some work. Uh, has a whole new roof and gutters on, uh, La Gran- this is LaGrange Active Life here. All new roof and gutters last year, a new pavilion last year. Uh, we re-epoxied the f- kitchen floor and put a new oven in. You guys approved that probably... Actually, that was a year ago, 'cause we did it over Thanksgiving, actually. I remember. Our Thanksgiving break, we did that. Um, and that floor is still in really good shape. I was in there the other day. It looks really, really good. It's done well for a full year. So those are th- three big recent things.
- 0:49:15
Other, the things that are upcoming for Dan is resurface his two pickleball courts. Um, he is also 20, 25 years old, um, that, those two f- buildings there. And so his heating and air is actually starting to... We've had to repair some stuff recently. And so that, again, is some heating and air, and that's, that's a bigger ticket item for Dan. Um, uh, new floor coverings in the wellness center. He knows he's gonna need a new commercial mixer and a f- freezer, refrigerator soon. He says that those are holding on now, but that it could be any month, any year that those go out.
- 0:49:50
And so he knows there that the mixer is $40,000 approximately, and the freezer $15,000. Um, Dan would love to buy the property next door to him that's for sale to expand facilities. And he knows that's, what is that, 4 or $500,000. Um, and he does, though, um, this was talked about at the retreat or at one of the other meetings, a new bus for his trips. They're, they're constantly going on trips. Um, they were on one just last week, I think it was. Um, and, uh, so a, a new bus for, for taking them on these trips is $125,000.
- 0:50:25
So this is Dan's list. Um, he didn't say to me that he was bringing any of these super soon, so I think that's just he wanted you to see his list of, of things. Um, and then he also, as you know, does the Hogansville Active Life and the West Point Active Life. And so, uh, we did put a new roof, if you remember, on the Hogansville. Uh, it's also all of Active Life and what used to be the school, and so that's, that's in good shape, whole new roof. But he would like to convert the stage into a room, and he's got a quote for around $25,000.
- 0:50:59
Um, that's not a immediate need, though, or im- immediate necessary, necessity. He would like to put a walking track around his building, kinda like he has around the LaGrange Active Life. He has an outdoor walking trail. He'd like to do that there for Hogansville. I know he's contacted James about coming and looking at that, and then us doing that in-house sometime. Um, so I know James got, has that on his list to look at with Dan. Um, we could do that in-house, I think, can't we, James?
- 0:51:26
We can. We haven't, we haven't finished design and estimating, but, uh, but we've looked at it just within the last couple of weeks.
- 0:51:32
Yeah. And then West Point-
- 0:51:33
Is that-
- 0:51:34
Let, let me ask real quick. Is that not a part of Hogansville's plan that they've submitted for their park?
- 0:51:41
I don't think so.
- 0:51:43
No, it's-
- 0:51:43
It's, it's a separate-
- 0:51:44
Little further away from their park area.
- 0:51:46
It's, it, it is.
- 0:51:47
I think that park's further downhill, isn't it?
- 0:51:49
Yeah, this is the lawn that's, that's right, right at the building, right adjacent to the building in the, in the curve right there of, of, uh, what's the name of that?
- 0:51:58
Church Street.
- 0:51:59
Church Street.
- 0:52:02
Was it in the old plan, the first plan that kinda fell apart? They didn't have it in that one?
- 0:52:07
There, there was a trail, but I think it was more of, like, a mountain bike, hiking type trail through that, uh, kudzu patch that's down- ... kind of the bottom. I think that's where they were proposing it. Um, certainly could be connected. And then in West Point, he wanted to convert a porch patio into a room, but that was gonna be quite extensive, and he said he didn't really need that right now, but it's in his long-term vision. And then he already has a walking trail there at West Point, and similar to the LaGrange Active Life, the walking trail that goes around LaGrange Active Life, if you walk back behind the building towards the woods or in the woods, there are stations that you can stop and do exercise equipment that is along the trail.
- 0:52:50
He would like to do that same type of thing at the West Point trail, is to add some exercise equipment that's along the trail, and he's looking at that with James as well, 'cause I believe you all installed that in LaGrange.
- 0:53:04
Right.
- 0:53:04
So y- they could do the same in West Point. That, that one is a more, the t- the trail in Hogansville and the trail equipment in West Point, those are more, like, soon. So... Harris Baseball, um, this again is, um, it's just upgrade maintenance and, you know, making it, 'cause we don't need more fields. We've already added the parking lot. I think that's at the bottom. We've added batting cages in the last year. We've expanded and resurfaced the whole parking lot, which we've got a lot of good comments on, especially those batting cages too.
- 0:53:36
If you ever ride in there, there's always people in those covered batting cages. I'm talking all the time. Um, it has really been useful. So the main things is just upgrading what we have, which is we have old lights there. They're 20, 25 years old. Is, can we put, um, LED lights, kinda like we did Callaway Stadium? And not only would it save us money with the LED, but the lighting is, like, twice as good. It's twice the number of foot candles. So improve the lighting, um, laser grade the fields.
- 0:54:06
The bathrooms and concession stands, we've done some just regular maintenance to keep them okay, but they're 20, 25 years old, and we need to go in and, like, r- renovate the bathrooms. And this is, uh, Shuford too. This is Harris and Shuford, um, because they're, they're pretty close in age and pretty close in, I guess, condition, if you will. Um, update some of the fencing and the netting and, uh- Harris, we need to upgrade, um, the playground. It's old and it needs to be upgraded.
- 0:54:37
Um, we actually have had some maintenance on it lately from stuff that, that we could, we could really use to redo that. Lance can speak more to that than, than I can. Some of the fields there at Harris still have these open air score booths, where if it rains and it's a blowing rain, they're out in the rain. Um, and so, uh, but the other fields have an indoor, like, utility building that they're inside, and it has heat and air, and they're out of the rain. Well, there are still, I think, three fields, Lance, that just have an open-- where you're open to the elements, and so we would like to be able to put utility buildings at those similar to the others.
- 0:55:16
So that is, uh, a new score booths at a couple of the fields. I think it's three fields. Um, and then I guess that's it for Harris and Shuford. The others is complete. Next, please. Todd Templer Complex is all new, as you know, opened and everything's new. But we did recently, the last item under the Todd A. Templer, Templer is, uh, the old, used to be the bus barn, the maintenance building. Uh, we repainted it, put a new roof on it. It's in really, really good shape for the most part, but the garage doors on it, I guess we didn't realize were as bad as they are.
- 0:55:51
And two of the four garage doors have actually come off the tracks and basically gone bad. And so we, we need to redo. And actually, I think they are working on getting prices on those right now, getting three quotes to see the three quotes on replacing those garage doors because they're bad. The rest of the building's in pretty good shape right now because we've already done it, but we didn't touch the garage doors. And then on the Chris Joseph Soccer Complex, which is in the back, the older s- fields that are in the back, is-- it's be the same as the, the biggest thing would be the same as Harris and Shuford, is redo the lighting and then renovate the bathrooms.
- 0:56:31
Um, that, that's pretty much the same for Harris, Shuford, and Chris Joseph, is could we update the lighting and, and renovate the bathrooms? Next, please. Mc- McCluskey, um, part of Lance's presentation earlier with the lawn was the same, resurface the hard courts, resurface the clay courts, maybe update the lighting as well. That's still older lighting, not LED. Um, and so that's just maintenance there at McCluskey. Uh, and then at Griggs, really the only items at Griggs is, 'cause it's-- we did a lot of work there.
- 0:57:06
Y- there used to be lighting in the field behind Griggs. It was a ball field back there, and it was super bad. I mean, old, old, old lighting. So when we renovated it, we took out that, the poles and the lights, and some of them were leaning and, and, and, and that field is used. Um, and especially now when it gets dark earlier, it makes it hard. So we'd like to put some LED lighting back in that field because it is used for football practices, flag football games, tee-ball practices, baseball practices. That's a p- pretty busy field.
- 0:57:37
And, and so for the last five years, we haven't had lighting there, and it'd be good to get lighting back at that field in Griggs. And then the playground there at Griggs, um, is super, super old. It's been there for a long, long, long time, is we need to, to redo that playground. And then the tennis courts. There's two tennis courts there that are by the pool, and they don't get used much, and they're in really bad shape. But what, um, they were talking about is resurfacing and renovating that, but make it a multipurpose court where you could do tennis, pickleball, basketball, uh, similar to-- There's one like that in Hogansville.
- 0:58:13
That's a multipurpose in Hogansville, and it gets used a lot more. And I think they think, you know, because it's multipurpose, you can do lots of different things. So they'd like to renovate that for multipurpose at Griggs. Uh, Pine Road Park, um, we've done a lot of work. This is all just renovating the bathrooms and maybe some of the boat ramps, but some of that's being discussed. Um, just wanna keep it in front of you at Pine Road Park. Um, next, James, please.
- 0:58:43
I think we're about done. Callaway Stadium, we gave to the school system, so take that off of our maintenance list. Um, no more maintenance there. Um, they are handling that. Uh, three years ago, believe it or not, we renovated Gray Hill because now it is the, uh, Wayne Bartley Community Center at Gray Hill, and we had that cer- ceremony when we redid that, and that was in twenty twenty-three. It's in pretty good shape, I think, JJ, still is. Normal maintenance stuff.
- 0:59:13
Normal maintenance.
- 0:59:14
Uh, and then, uh, on Lance's list, uh, when it comes to equipment, he knows he's gonna need a new reel mower and a new tractor, and he knows those are about sixty thousand and thirty-five thousand. And those are things we gotta buy, like, every five years or so?
- 0:59:30
Ten years.
- 0:59:30
Mower maintenance right now?
- 0:59:32
Yep.
- 0:59:32
Okay. But he wanted to keep it in front of you. So. And next, and we're about done, airport. Um, we've done several new roofs at the airport, so those are done. Um, actually, I think two or three new roofs over the last three years. Um, but these are items that, um, that Dexter and Landon gave me the other day. Um, some weather stripping on T hangars, renovate the bathrooms that are in the FBO. Um, those actually have some issues. I'm actually gonna go out there this week and start trying to put a, a, a scope of work and a budget on that because the bathrooms in that FBO, um, have some, um...
- 1:00:10
I guess it's been leaking in there behind the walls, and we didn't know about it. Um, and so the, there's some issues that once you saw it, it was like, uh-oh. Like, the whole inside of this wall is, like, rotting out. And that's actually the wall that the toilets are on. Those toilets, I guess, have been leaking in the wall cavity. And so that wall that has all the urinals and toilets on is in bad shape, so we're gonna have to address that soon. Um- Renovate a parking lot at hangar one and two. Um, they're working on some budgets on some of this, and they said if we have any questions, that the airport could be its own separate meeting.
- 1:00:47
That's several different things, you know, and a lot of it has to do with FAA. If it's resurfacing runways, redoing lighting, redoing radar or the whatever, th- that that's all FAA driven. And we do get a lot of FAA funding for the majority of that stuff, as you're well aware. So this is kind of things we finished, things we got upcoming, and things that maybe are a little further out, but we wanna keep it in front of you like we did back in January. Any questions? But as I said, most of it now is maintenance, and upgrades, and just maintaining what we have because we really have very little new construction on the books.
- 1:01:25
Big list.
- 1:01:26
Yeah. Lots of different ... We have a lot of properties, too.
- 1:01:30
Y- give it to Santa Claus.
- 1:01:32
All right. Thank you. Appreciate it.
- 1:01:34
He's coming.
- 1:01:34
Thank you.
- 1:01:35
All right. Uh, so as we wrap up the meeting, I wanna share some, uh, this evening's, uh, business meeting. We have maybe Reverend Johnny Freeman, uh, attending to provide our invocation. Uh, we only have three items, um, on the agenda under special business. One is the consideration of the USTA Tennis, uh, Venue Services Grant. Uh, the second is the, uh, request to replace the dump trucks, and the final item is the, uh, consideration of the ordinance to amend Section 6.1, um, of this county manager ordinance.
- 1:02:07
That's it.
- 1:02:10
All right. No other comments, then the next item on our agenda is public, uh, executive session. Excuse me. Uh, so I'll entertain a motion we come out of work session and go into executive s- uh, session to discuss potential litigation.
- 1:02:24
So moved.
- 1:02:25
Do I have a second?
- 1:02:26
Second.
- 1:02:26
Okay. All those in favor? All right. Thank you. Motion is carried. Thank y'all for being here.
- 1:02:33
Yeah.
- 1:02:38
All right. Uh, I will, uh, entertain a motion that we come out of executive session and go back into work session. During the executive s- uh, session, we discussed two matters. One was, uh, discussing potential litigation. The other was an HR matter. Happy to report that no action is required on either one of those. Uh, so, uh,
- 1:03:01
thank y'all very much. We're in, uh, work session. We can just adjourn.
- 1:03:05
David, don't we come out of-
- 1:03:06
Yeah
- 1:03:06
... executive session and then discuss what we did in executive session?
- 1:03:12
I did. I said we come out of executive session-
- 1:03:14
I know, but-
- 1:03:14
Work se- and, and during the executive session, we did, we discussed two matters
- 1:03:18
We didn't take any action.
- 1:03:20
That's what I said.
- 1:03:20
I know, but I thought you had to make a motion to come out of executive session-
- 1:03:23
Motion
- 1:03:23
... first and then discuss what we did.
- 1:03:26
That's correct.
- 1:03:26
I mean, there is a motion that-
- 1:03:27
Oh, yeah. A motion.
- 1:03:29
Yeah.
- 1:03:29
Yeah, I m- I so move on the motion.
- 1:03:31
All right. Do I have a second?
- 1:03:32
Second.
- 1:03:33
All right. All those in favor? Thank you. Motion carried. All right. Thank y'all very much for being here. Oh, I gotta, I gotta ... All right.
- 1:03:43
Hey, James.