City: East Point
East Point Planning and Zoning Commission regular meeting, November 19, 2026
Georgia Commons holds no minutes of this meeting. Georgia Commons is independent and is not affiliated with East Point Planning and Zoning Commission.
This is a machine transcript made by Georgia Commons from the body's public recording. It is not an official record, it can mishear words, names, and numbers, and it does not say who is speaking. The recording is what was said.
Records of this meeting
Each link opens the body's own website or meeting portal.
- Video recordingPlanning and Zoning Commission (eastpointga.new.swagit.com)
Summary
Written by an AI model (claude-sonnet-5-5) from the machine transcript below. It is not the record: the recording is what was said.
Planning commission approved two variances, recommended denying a Central Avenue towing permit, and deferred the proposed citywide data center ordinance for more input.
The East Point Planning and Zoning Commission approved a variance for a multifamily property on East Woodbury Avenue, recommended denial of a towing business use permit on Central Avenue (sending it to city council), approved variances to keep a chain link fence on Bayard Street, and deferred the city's proposed data center ordinance. In the data center discussion, commissioners raised questions on noise studies, water use, power, and tax treatment. Staff also announced a December 2 public session on the zoning ordinance rewrite.
Topics taken up: variance on East Woodbury Avenue; towing use permit Central Avenue; distance from residential zoning; chain link fence variance; corner lot fence rules; citywide data center ordinance; data center water and noise; zoning ordinance rewrite.
What the meeting took up, as said in the recording (5)
Each account is part of the AI-written summary of the machine transcript, not the record. The time opens the transcript below where the matter is taken up.
Variances for multifamily development at 1780 East Woodbury Avenue
Staff recommended approval of variances from the R3 multifamily development standards. A commissioner asked the applicant about community feedback, and the applicant said the main concern was trees, that not all trees would be removed, and that trees near a small creek at the back would stay. A commissioner moved to accept the staff recommendation and another seconded. The chair announced the case approved.
Towing business use permit and distance variance at 1392 Central Avenue
Mayday Towing requested a use permit for automobile towing in the I-1 light industrial district and a variance from the rule requiring such a use to be 5,280 feet from residential zoning. The applicant said it is not a salvage yard, does not do non-consensual tows, would keep all vehicles inside a screened fence, and had cleaned up a blighted lot. The applicant described one-way entry from Harrison Road and exit onto Central Avenue. No one spoke in favor or opposition. Staff recommended denial, noting residential R1A parcels lie well within a mile, and showed a map. A commissioner moved to accept the denial recommendation. A roll call followed, with two commissioners voting nay and the others aye as stated. Staff clarified this is a recommendation of denial that goes on to city council.
Variances for chain link fence material and height at 2875 Bayard Street
The applicant's representative asked to keep a chain link fence that replaced a decades-old one on a corner lot, saying the owner did not know a permit was needed and that the tenant uses a wheelchair and has pets. Staff recommended denial because chain link is not allowed in the district, but noted corner lot fence rules are under review in the zoning rewrite, expected in March or April. Staff said the whole fence was replaced, so it lost its legal nonconforming status. Commissioners noted the survey seems to show the fence off the property and asked about conditions such as a coating. One asked whether to defer. A commissioner moved to approve the variances and another seconded. The chair announced the variance approved.
Proposed citywide data center ordinance
The city planning director presented a draft ordinance on data centers covering location, neighborhood protection, utility capacity, water, noise, buffering, and end-of-life plans, with four tiers from small to campus-like. Staff proposed lower tiers be permitted in BP, I-1, I-2, and warehouse districts and asked commissioners to weigh the one-mile residential distance and substation rules. Commissioners asked about staffing, requiring acoustic studies at the public hearing rather than at building permit, the 500-foot residential distance, and Georgia Tech guidance. One commissioner suggested closed-loop cooling, sound insulation, self-sufficient solar and storage power, and higher taxes. No one spoke for or against. Staff recommended deferral for more input, and the commission voted to defer.
Zoning rewrite public session and abandoned animals question
Staff announced a December 2 session, 6 to 8 PM in the council chambers, to present the first draft of the zoning ordinance rewrite, and invited comments by email. A commissioner asked whether the city has rules on animals left behind by renters. Staff said nothing in the ordinance reviewed addresses it and agreed to pass the recommendation to the consultant.
Machine transcript
This is a machine transcript made by Georgia Commons from the body's public recording. It is not an official record, it can mishear words, names, and numbers, and it does not say who is speaking. The recording is what was said.
390 turns.
Open the recording on eastpointga.new.swagit.com. The recording opens on the site where the body published it. Nothing is played on this page.
- 0:00:01
Good evening, everyone. Uh, my name is Will Miller. I'm Chair of the East Point Planning and Zoning Commission. At this time, I'd like to call our regularly scheduled November 19th Planning and Zoning Commission meeting to order. Staff, would you please sound a roll call to establish a quorum?
- 0:00:18
Yes. Chairman Miller? Commissioner Lovett?
- 0:00:22
Present.
- 0:00:25
Commissioner Watson?
- 0:00:27
Present.
- 0:00:27
Commissioner Wade? Commissioner Pressley?
- 0:00:33
Present.
- 0:00:34
Commissioner Demery?
- 0:00:36
Here.
- 0:00:37
Commissioner Reed? Commissioner Anderson?
- 0:00:40
Present.
- 0:00:43
Chairman, you have a quorum.
- 0:00:47
Thank you very much, Ms. Smith. At this time, I'd like for you all to join me in a moment of silence.
- 0:01:09
Thank you. If you would, um, stand, please stand and join me in the Pledge of Allegiance.
- 0:01:17
I pledge allegiance to the flag of the United States of America, and to the Republic for which it stands, one Nation under God, indivisible, with liberty and justice for all.
- 0:01:33
Thank you. Commissioners, at this time I'll entertain a motion to approve the October 2026 meeting minutes.
- 0:01:42
Mr. Chair, I move that we accept the minutes from the October 26th minutes.
- 0:01:49
Second.
- 0:01:52
It's been moved and, uh, it's been moved and properly seconded that we approve the October, excuse me, the November 19th meeting minutes. All in favor sound aye.
- 0:02:05
Aye.
- 0:02:05
Aye.
- 0:02:05
Aye.
- 0:02:05
Aye.
- 0:02:06
Aye.
- 0:02:06
All opposed sound nay. Hearing none, the ayes have it. The November meeting minutes are approved. Commissioners, at this time I'll entertain a motion to our, to adopt our agenda as presented.
- 0:02:21
Motion for adoption to the agenda.
- 0:02:24
Second.
- 0:02:25
It's been motioned by Commissioner Watson and seconded by Commissioner Pressley that we adopt our November 19th, uh, 2026 meeting minutes. All in favor sound aye.
- 0:02:36
Aye.
- 0:02:36
Aye.
- 0:02:36
Aye.
- 0:02:36
Aye.
- 0:02:37
Aye.
- 0:02:37
All opposed sound nay. Hearing none, the ayes have it. Our first case tonight is under old business. It's case number P2026V, as in Victor, -001-09. Staff, would you please sound this agenda item?
- 0:02:57
Yes. In reference to item number one under old business, case number P2025V-001-09, the applicant, Cody Snyder. The property is located at 1780 East Woodbury Avenue. The applicant is requesting variances from the R3 multifamily development district development standards. Case type is a variance.
- 0:03:22
Thank you. Are there any commissions, uh, questions from the commission? Oh, excuse me, I'm sorry. Staff, would you sound your recommendation, please?
- 0:03:45
Staff has recommended approval of the requested variances from section 10-2065, R3 multifamily development district E, development standards G and I.
- 0:04:00
Thank you. Are there any questions from the commission?
- 0:04:07
Um, Mr. Chair, I'd like to ask a question of the applicant. Just one question, I think.
- 0:04:14
Is the applicant here? Sir, would you please s- come and s- uh, address the a- uh, the question?
- 0:04:22
Yes, sir.
- 0:04:25
Uh, sir, before you start, can you, uh, give us your full name and your s- your address?
- 0:04:30
Cody Snyder. Uh, it is 1466 Central Avenue, East Point, Georgia.
- 0:04:37
Thank you. Commissioner Lovett, go ahead.
- 0:04:40
Um, thank you, uh, Mr. Snyder.
- 0:04:43
Hello.
- 0:04:44
Can you just briefly give us an, the community feedback on this application from your community meeting where th- there was feedback? Can you just cite some of that, please?
- 0:04:58
Uh, my only, uh, frame of reference to what the community is looking at is the trees. Uh, we're not knocking down all the trees in the area. We're just only landscaping to, uh, fit the actual units on the property. We actually wanna keep the trees toward the back, 'cause there's a small creek area, uh, behind the houses that we're developing.
- 0:05:20
And that was their major concern, was the, the natural-
- 0:05:24
Yeah
- 0:05:24
... growth.
- 0:05:25
Mm-hmm.
- 0:05:25
Okay, thank you.
- 0:05:26
Just the trees.
- 0:05:29
Sir, uh, you can have a seat.
- 0:05:31
Okay.
- 0:05:32
Are there any other commission... Uh, excuse me. Questions from the commission?
- 0:05:39
Uh, commission, you've heard the public hearing for this case. You've heard staff's recommendations, and I will now entertain a motion.
- 0:05:50
Motion to accept staff recommendation.
- 0:05:53
Second.
- 0:05:55
It's been motioned by Commissioner, uh, Watson and seconded by Commissioner Lovett that we, uh, accept staff's recommendation. All in favor sound aye.
- 0:06:04
Aye.
- 0:06:05
Aye.
- 0:06:05
Aye.
- 0:06:05
Aye.
- 0:06:05
All opposed sound nay.
- 0:06:08
Question. There was a public hearing about this before?
- 0:06:13
There was a public hearing.
- 0:06:14
Right, 'cause I remember. Okay. That's all for me, sir.
- 0:06:19
Going back, on the matter, it's been moved and then properly seconded that we accept staff's recommendation. All in favor sound aye.
- 0:06:26
Aye. Aye.
- 0:06:26
All opposed sound nay.
- 0:06:30
Mr, Mr. Snyder, the case is, uh, your case is approved.
- 0:06:43
Our next agenda item is under new business. It's case number P2026U, as in umbrella, -001-10, and P2026V, as in Victor, C as in Charlie, 001-01. Staff, would you please sound this agenda item?
- 0:07:03
Yes. In reference to item number one under new business, case number P2026U-001-10 and P2026VC-001-10. Applicant, Mayday Towing,
- 0:07:22
Hodari Esc- Escari, Ascari. Property is located at 1392 Central Avenue. Applicant is requesting a use permit for automobile towing in the I-1 light industrial zoning district in accordance with Section 10-2150.10 and concurrent variance from section 10-2079D to operate within 5,280 feet from residential zoned properties. Case type is a use permit with a concurrent variance.
- 0:07:56
Thank you. This agenda item does require a public hearing. I will now read our rules for public hearing. Public hearings before the Planning and Zoning Commission shall be conducted in accordance with Section 10-2219 of the East Point Zoning Code and Development Regulations as follows. Persons both favoring and opposing the proposed case will be given the opportunity to address the commission.
- 0:08:28
The applicant for the zoning case or the applicant's designated representative, if any, will be entitled to speak first, followed by other speakers in favor of the proposal for a period of n- 15 minutes. Those who oppose the, uh, proposed z- zoning case will be permitted to speak for a total of 15 minutes. By majority vote, the commission can increase the total time of speakers, provided that each side is given the same amount of time.
- 0:08:59
If there is more than one speaker for a side, the chair or the presiding officer may limit the time allotted to each individual speaker other than the zoning applicant. The zoning applicant may reserve a portion of his or her allotted time in, for rebuttal. Speakers shall m- uh, uh, a- excuse me. Speakers shall adhere to the rules of decorum. Prior to speaking, each speaker will identify hims- himself or herself and state his or her current address.
- 0:09:29
Each speaker will speak only to the merits of the proposed zoning ordinance under consideration, shall address remarks only to the commission, and shall refrain from making personal attacks on any other speaker. The presiding officer may refuse the s- a speaker the right to continue if after first being cautioned, the speaker continues to violate the rules of d- decorum. You've heard our rules for public hearings. Staff has sounded the case, and at this time, commissioners, I'll entertain a motion to open the public hearing.
- 0:10:02
Motion to open the public hearing. Second.
- 0:10:06
It's been motioned by Commissioner Lovett, seconded by Commissioner Watson, that we open the public hearing for case number P2026U, as in umbrella, -001-0, excuse me, 10, and P2026V, as in Victor, C as in Charlie, -001-10. All in favor sound aye.
- 0:10:29
Aye. Aye.
- 0:10:30
All opposed sound nay. The ayes have it. The public hearing for case or, for case number P2026U, as in umbrella, -001-10 and P2026V, as in Victor, C as in Charlie, -001-10. The applicant is Hodari Ascari. Um, Mr. Hodari, please step to the podium, state your first and last name and your, and your current address.
- 0:11:05
Thank you, Commissioner. My name is Hodari Ascari. Um, at 1392 Central Avenue, East Point, Georgia.
- 0:11:16
Thank you, sir. Go ahead with your presentation.
- 0:11:22
Is that a new one? That's the old, this one. This one. Um, we are Mayday Towing. We're requesting a special use permit, uh, and a concurrent variance to operate a tow business at 1392, uh, Central Avenue. Um, it's an important... The Central Avenue, uh, corridor is an important industrial roadway because it serves as the spine of the Willingham Industrial Park. It directly connects local heavy cor- commerce to, uh, I-85, Hapeville, and Atlanta, uh, which is key, and key rail freight networks.
- 0:11:57
Thank you.
- 0:12:03
What we do is towing and transport. T- transport is simple. Uh, it's not complicated. We're just a tow company Um, we aren't a salvage yard. We won't be dismantling or crushing any vehicles, scrap processing. Um, there won't be any spills or waste production from what we do. Uh, we don't have a non-consensual tow license, so, uh, 100% of our business is just receiving calls from motor clubs and insurance companies, picking up those cars, and taking those cars to wherever they tell us to take them to.
- 0:12:35
Um, next slide, please.
- 0:12:47
All right, we are serving an, an employment and logistics hub. The city designated this corridor as an industrial character area specifically intended to retain high-output jobs, uh, freight movement, and warehousing. And East Point seeks to protect it from a residential encroachment so businesses can operate without restrictive suburban noise and traffic conflicts. Uh, Mayday Towing, what we've done for... You can s- go to the next slide. What we've done for this lot, we've taken a bli- a blighted lot, and we have cleaned it up. Um, we've sent out over 400 mailers to people in the community, um, people within a mile of our, our business location, and we've walked the community.
- 0:13:27
We've talked to those people. Uh, they've actually come up to us while we were cleaning the lot and thanked us for cleaning that lot. There was criminal activity going on on the lot. Um, I can attest to that because we found drug paraphernalia and other things when we cleaned up the lot. Um, so that's what we're pro- projecting, I mean, proposing that we do, just continue to add value to East Point by cleaning up this lot for making it into a viable business. Um, and there was already a tow business there before.
- 0:13:59
I think they were just operating illegally, and we would like to operate as a legal tow company. Next slide. This is a picture of our... I don't know if you guy- you guys can't see it, the commission. Um, of our controlled site plan. Um, we have created a situation where on Harrison Road, which is not a main street, we... That will be our entrance for tow trucks to come in and bring cars in, so they won't be impeding traffic on the main road, which is Central Avenue.
- 0:14:30
There will be one way in, which will be Harrison Avenue. There will be one way out, uh, taking cars out of our tow yard, which will be on Central Avenue. We'll create a, create a situation where our tow, tow trucks will only turn right, so they won't impede traffic by having to, uh, wait or make people wait because they're trying to go lef- left out of the exit.
- 0:14:57
This is just our workflow. Um, it shows that trucks arrive with the car, uh, attached. Um, those vehicles are then staged. Um, and we hold those vehicles for, you know, maximum... I can't say maximum. Usually on average about three days before the insurance company notifies us of which, um, uh, collision center that they want the car to go to. Uh, there won't be any, you know, dismantling, you know, working on cars or anything like that.
- 0:15:30
Next slide.
- 0:15:35
Uh, the visual impact to the community, we've already done a, we think, a decent job of, uh, adding value by, uh, we, we've placed the screen around the fence for the, for the property. Um, every vehicle that we bring to the property will be, uh, housed, uh, inside of that fence. There won't be anything on the outside of the fence. Our entire business operates inside of the fence. So anybody driving by or walking by will only see the exterior of the fence.
- 0:16:07
There won't be, uh, any of... No- none of the cars will be visual, um, and nothing else will be visual out, uh, out through the fence. Next. Um, with that, we respectfully request approval of the special use permit, and we look forward to serving, uh, the East Point community. Uh, any questions?
- 0:16:31
Thank you, sir. Um, you can have a seat for now.
- 0:16:34
Okay, thank you. I'd like to thank you guys for having us here tonight.
- 0:16:39
Are there any other proponents here to speak in favor of this zoning case?
- 0:16:48
Are there any proponents here to speak in favor of this zoning case?
- 0:16:55
Are there a- any opponents to speak against this case? Are there any opponents?
- 0:17:05
Commissioners, at this time, I will entertain a motion to close the public hearing.
- 0:17:09
Motion to close the public hearing.
- 0:17:12
Second.
- 0:17:13
It's been motioned by Commissioner Wat- excuse me, Lovett, and Commiss- and seconded by Commissioner Watson that we close the public hearing for case number P2026U, as in Umbrella, -001-10 and P2026V, as in Victor, C, as in Charlie, -001-10. All in favor, say an aye.
- 0:17:37
Aye.
- 0:17:37
Aye.
- 0:17:37
All opposed, say nay. Hearing none, the ayes have it. The public hearing is now closed. Staff, would you please sound your recommendation?
- 0:17:59
In reference to this item, property located at 1392 Central Avenue, the applicant Mayday Towing, the applicant is requesting a use permit for automobile towing in the I-1 light industrial zoning districts in according with Section 10-2150.10 and a concurrent variance for Section 10-2079to operate within 5,280 feet from a residential zoning district.
- 0:18:24
The current land use map designates this area as town center sub-area three, Willingham Warehouse District. Typical zoning districts in this area is mixed use CR, I1, C1, C2, CL, BP, and a mixed use commercial industrial.
- 0:18:43
Staff has recommended denial of the use permit for automobile towing in the at-light industrial zoning district in accordance with Section 10-2150, and the concurrent variance in Section 1020-79D to operate within 5,280 feet from the residential zoning district based on the characteristics of it being in the Willingham Corridor area.
- 0:19:12
Thank you, Ms. Smith. Are there any questions from the commission?
- 0:19:16
Yes, I do. I have a question.
- 0:19:20
Um, the variance is 5,000... I mean, how far is it away from the residential zone properties? Is there a map or anything that shows, uh...
- 0:19:39
Staff, if you could pull up the, the map.
- 0:20:00
And just for reference, the 5,280 square, uh, feet is approximately a mile.
- 0:20:21
The parcels that are to the south of the property in the blue-greenish area, those are R1A zoning classification properties. So the property is well within a mile of residential.
- 0:20:42
No, sir.
- 0:20:45
Chenard, can you, um, can, can you change the layers? Can you put the map view in and then do a measuring for me? Uh-
- 0:20:53
I think the map should
- 0:20:55
Yeah, I know. Can you, can you do a map view?
- 0:21:02
Oh, change the layer to a map view.
- 0:21:56
There you go. From the corner, so right there.
- 0:22:03
Whatever corner
- 0:22:06
There you go.
- 0:22:21
Do I have any other questions from the commission?
- 0:22:27
Okay, thank you. Commissioners, if you've heard from the applicant, you've also heard staff's recommendations. At this time I'll entertain a motion.
- 0:22:38
Mr. Chair.
- 0:22:40
Motion to approve.
- 0:22:40
I move that we accept, um, staff's recommendation of denial.
- 0:22:46
Is there a second?
- 0:22:49
I second.
- 0:22:52
It's been moved and properly... It's been moved by Commissioner Lovett and seconded by Commissioner Demery that we accept staff's recommendation. Is there... All in favor say an aye.
- 0:23:04
Aye.
- 0:23:07
Would you like a roll call, Chairman?
- 0:23:12
Commissioner Lovett?
- 0:23:15
Aye.
- 0:23:18
Commissioner Watson?
- 0:23:20
Nay.
- 0:23:23
Commissioner Wade?
- 0:23:25
Aye.
- 0:23:27
Commissioner Presley?
- 0:23:29
Nay.
- 0:23:30
Commissioner Demery?
- 0:23:32
Aye.
- 0:23:36
Commissioner Anderson? Aye.
- 0:23:51
The ayes have it.
- 0:23:52
The ayes do have it.
- 0:24:02
Case number P2026U as in umbrella-001-10 and P2026V as in Victor, C as in Charlie-001-10. Mr. Haddari, your case is denied.
- 0:24:19
Chairman, that's a recommendation for denial to city council. This case goes on to city council.
- 0:24:24
My bad, excuse me
- 0:24:30
Next, our next case is under new business. It's case number P2026V, as in Victor, -001-10. Staff, would you please sound this agenda item?
- 0:24:47
Yes. In reference to item number two under new business, case number P2025V-001-10, the applicant is Monica Woods. Property is located at 2875 Bayard Street. The applicant is requesting a variance for materials of fence in reference to Section 10-20 27.9C and 5 and height of fence in front yard, Section 10-20 79.9D.
- 0:25:18
Case type is a variance.
- 0:25:22
Staff has sounded the case, and at this time, commissioners, I'll entertain a motion to open the public hearing.
- 0:25:27
Motion to open the public hearing.
- 0:25:29
Second.
- 0:25:31
It's been motioned by Commissioner Lovett and seconded by Commissioner Presley that we open the public hearing for case number P2026V, as in Victor, -001-10. All in favor, sound aye.
- 0:25:45
Aye.
- 0:25:46
All opposed, sound nay. Hearing none, the ayes have it. The public hearing is now open for case number P2026R, as in Richard, Z as in zebra, -001-10. The applicant is Monica Woods. Ms. Woods, please state your first and last name and your current address.
- 0:26:07
Monica Woods, 67A Boulevard Northeast, Atlanta, Georgia 30312.
- 0:26:14
Thank you. You may go ahead and present your case.
- 0:26:20
Yes. The variance request I have today, um, is for a chain link fence, um, that existed in, on the property at 2875 Bayard Street. The fence had been up a period of probably about 60 to 70 years. We know that by the type of fence it was, because I did a little research to figure out how old is this fence. Based on the, how it was made and the coloration of it over time, I determined that it had been up for a very long time in this particular neighborhood.
- 0:26:57
This lot is a corner lot, and many lots in the area have up chain link fence that exists. In this particular case, the owner did not know that you could not, uh, take it down and put it back up without a, a building permit. That's how it, that's how we're here today. Um, the fence had become in disrepair. Again, it had been up about 60 or 70 years, and they simply replaced it to make the, uh, the person that's renting the house more comfortable.
- 0:27:27
She's wheelchair-bound, and she has pets. So they just replaced it again because it had become in disrepair. You know, the animals could kinda get out on the side. And instead of replacing a section of it, they replaced the whole fence. Also, the fence existed six feet high. Um, now I think the requirement is that you have a wooden fence, but they want it to be able to have light on the corner there. And, you know, they wanted to be able to go outside, have their pets fenced in, but still be able to, uh, see what's around them.
- 0:28:00
So this variance request is so that they may keep the fence that was put up, um, to replace the old fence that had been there. Again, simple replacement in the same position, the same height, um, so on and so forth. Um, I'm here for any questions or concerns. We did do mailings. I only got one person that called me, and she was just saying, "Yes, we know the tenant in the unit really well, and we like her." Um, but there are no objections from anyone concerning the application at all.
- 0:28:32
Again, this is simply replacing what had been there for 60 to 70 years. Um, again, I'm here for any questions or any concerns. Thank you.
- 0:28:41
Thank you, Ms. Woods. Are there any, any other, uh, proponents to speak in favor of this case? Are there any other proponents?
- 0:28:54
Seeing none, are there any opponents to speak against this zoning case? Any opponents? Hearing none, commissioners, at this time I'll entertain a motion to close the public hearing.
- 0:29:07
Motion to close the public hearing.
- 0:29:09
Second.
- 0:29:11
It's been motioned by Commissioner Lovett and seconded by Commissioner Watson that we close the public hearing for case number P2026V, as in Victor, -001-10. All in favor, sound aye.
- 0:29:28
Aye.
- 0:29:29
All opposed, sound nay. Hearing none, the ayes have it. The public hearing is now closed. Staff, would you please sound your recommendations?
- 0:29:39
Chairman, in, in reference to item number two under new business, case number P2026V-001-10, the applicant Monica Woods, property located at 2875 Bayard Street, um, you can see on the screen the property is on a corner lot.
- 0:30:05
And the character area, as far as the comp plan is concerned, is redevelopment neighborhood, which provides for traditional urban neighborhood attributes, a grid street network, and small housing lots. And the future planning area is to improve housing conditions and reduce the number of vacant lots, um, in the area. Typical zoning districts are R1, RL, R1A, RT, R2, and R3.
- 0:30:37
Staff did recommend a denial of this case because it...
- 0:30:47
Staff did recommend denial of this case because chain link fences are not allowed within this district. Um, but I would like to say that, um, we are in the middle of doing a zoning ordinance rewrite, and fences just in particular that are located on property that are on corner lots are under review. Um, the current code does not allow, um, for chain link fences.
- 0:31:21
However, on corner lots, it may be something for the, the city to consider. Um, also, because of the sight distance issues, a wooden fence, um, based on the current code would actually block out, um, sight distance in some c- in some instances for properties that are located on corner lots. Um, staff did feel that we had to go with the current code is, which is why we did recommend denial, but, um, please do consider that we are looking into different standards, uh, in the upcoming zoning ordinance rewrite for properties that are located on the corner in reference to how fences are allowed and where they are allowed.
- 0:32:15
Thank you. Are there questions from the commission on this?
- 0:32:20
Could we put some conditions on this if it were to be approved?
- 0:32:27
Yes, sir.
- 0:32:28
Uh, can we go with a coated fence, like, you know, maybe black or s- something aesthetically pleasing?
- 0:32:38
If that would be part of one of your conditions, that could, that could be something that could be addressed.
- 0:32:44
I believe the fence is already installed. They re- they replaced the, the deteriorating fence, and so it's already up. And I'm not sure how coating works, if it's something that you have to order and you install, or if it's something that's sprayed on. I'm, I'm not really sure. But the fence has already been put up.
- 0:33:04
Okay. I, I, I retract that, um, the plot thickened. Uh, I resubmit. Okay.
- 0:33:13
I, I, I do have a question. What part of the fence f- was replaced from... Can you orient me on the map where, what fence that was replaced?
- 0:34:41
And it's our understanding that the entire fence was replaced.
- 0:34:45
The whole, whole thing?
- 0:34:50
So just to repeat that, you're saying that the whole fence was already replaced?
- 0:34:55
Yes.
- 0:34:58
And it, this is before or after this survey was conducted?
- 0:35:07
The survey that we, in our packet, was it before or after? 'Cause on the survey-
- 0:35:12
I'm looking, I'm looking at the, the data from Google. That is a December 2007 image.
- 0:35:21
Yeah, so I'm looking at the survey, and the survey, the fence is not on, is off the property. It's not within the property lines.
- 0:35:33
Are you referring to this... Oh, the survey.
- 0:35:35
Um, yeah. So if you look at the chain link fence, since it's the ex... um, it's beyond the property line.
- 0:35:50
Yes, that's what it shows.
- 0:35:53
So.
- 0:35:59
I have a hypothetical, um, question. So let's say the zoning ordinance rewrite makes accommodations for chain link fences like you're discussing on the corner lot. In the meantime, what happens to this particular fence? It's out of, uh, it's out of code now, but it could be coming into code after the zoning ordinance rewrite has been done and dusted. So in the meantime, what happens?
- 0:36:27
Well, right now, it's, it's, because they replaced beyond the, the 60% of it being legal nonconforming, they lost the grandfathering. When they took down the entire fence, um, it would be an illegal fence.
- 0:36:45
Thank you very much. Commissioners, does anybody else have a question about this?
- 0:36:52
I, my, I need to ask, um, staff a question, if's, Mr. Chair. So-
- 0:36:58
Go ahead
- 0:36:59
... when will the rewrite occur for this particular rewrite that will affect this?
- 0:37:10
So the, the rewrite is a, an ongoing project that we've been, um, working on for a while, for months now. Um, it's due, we, we're getting a draft this week or next week, um, and it's due to go through a series of reviews and to come before this body as well as city council in the first quarter of next year. So March, April.
- 0:37:41
So, so am I to understand the fence is al- the replacement fence is already installed, is that right?
- 0:37:48
That's my understanding. The applicant can come forward and respond.
- 0:37:58
Um, yes, the fence was installed. That, the owner did not know. That's how he found out that, hey, it's not, um, allowed anymore. Um, but they didn't know. Again, they just saw that the fence was in disrepair and wanted to, you know, make it look better and replace it. So yes, it's, it's already been installed.
- 0:38:15
Okay. So I'm gonna ask you a series of questions, and it's not a bad thing. I just need to get clarification.
- 0:38:21
Yes, ma'am.
- 0:38:22
So in repa- replacing the broken fence or the old fence, is the entire circumference of the house now with a new fence?
- 0:38:37
Yes, ma'am. That's, they, that-
- 0:38:38
So there were no repairs. There, there are no places where it's been repaired. The entire fencing for this one house has been replaced. Is that right?
- 0:38:47
Yes, ma'am.
- 0:38:48
So now you're asking to be brought into compliance with the city's code, right?
- 0:38:55
Yes.
- 0:38:56
But your replacement is exactly the same as what was already there.
- 0:39:01
Yes, ma'am.
- 0:39:02
I'm confused, city. Why is that a conflict?
- 0:39:06
The confusion is the city does not allow chain link fences, the material. They do not allow them.
- 0:39:13
It's simply the materials that is not in compliance at this point.
- 0:39:20
Well, based on what Commissioner, uh, Watson just brought to light, it appears that the fence is outside of the property lines as well.
- 0:39:32
No.
- 0:39:33
So-
- 0:39:34
And the height
- 0:39:35
... and the-
- 0:39:35
So are we ready to go forward with voting on this?
- 0:39:37
And the height as well, the height as well is out of compliance. The vari-
- 0:39:42
So, so are we ready to go with this, or do we need to defer this until it is really clear on what we're voting on?
- 0:39:53
A deferral might be a good option.
- 0:39:58
But that just defers us for one month, correct?
- 0:40:01
You can defer un- un... You don't have to give a date on a deferral. Could be a da- a date uncertain.
- 0:40:14
Can it be deferred until the rewrite is complete and then brought back, or is that-
- 0:40:20
I wouldn't put until the rewrite. You could defer and just defer it
- 0:40:25
... because now they're gonna, are they gonna have to move the fence within the boundaries of where the legal lines are, or will there have to be a survey involved in this? What are we doing?
- 0:40:38
Well, tonight the applicant is asking for a variance for the material and the height, so that's what we're doing tonight. If, uh, this body wants to defer it to get more information, to do research, to look at the zoning code, then you can defer for those reasons.
- 0:40:58
Thank you.
- 0:41:03
Commissioners, at this time you've heard from the applicant. You've also heard staff's recommendations and had your questions answered. At this time, I'll entertain a motion.
- 0:41:15
Motion to approve.
- 0:41:17
Second.
- 0:41:21
Was that a motion to approve?
- 0:41:24
To-
- 0:41:24
And a motion to second?
- 0:41:25
Wait, yeah. That's a good question. To, are we appro-
- 0:41:27
What are we approving?
- 0:41:28
Approving the city's denial-
- 0:41:29
Approving staff's, the city's-
- 0:41:30
... or approve the variance?
- 0:41:38
We're approving to leave the fence in place.
- 0:41:43
So that's im- approving the required variances, requested variances. Is that correct?
- 0:41:50
Yes. I'm going opposite of what the city's codes are.
- 0:41:55
And I second that.
- 0:41:57
It's been moved by Commissioner Pressley and seconded by Commissioner Anderson that this body recommends approval of case, of the, uh, variances for case number P2026V, as in Victor, -001-1-01. All in favor sound aye.
- 0:42:19
Aye.
- 0:42:21
All opposed sound nay.
- 0:42:27
M- Miss Woods, the variance is approved.
- 0:42:33
Our next agenda item is under new business. It's case number P2026V, as in, excuse me, T as in talent, A as in apple, -001-10. Staff, would you please sound this agenda item?
- 0:42:50
Yes. In reference to item number three under new business, case type P2026TA-001-10. The applicant is the city, and the property is citywide. It's a citywide proposed ordinance, and the applicant, we will be presenting the ordinance established for a citywide data center for provisions.
- 0:43:18
Staff has sounded the case, and at this time, commissioners, I'll entertain a motion to open the public hearing.
- 0:43:23
Motion to open the hearing.
- 0:43:26
Second.
- 0:43:28
It's been motioned by Commissioner Watson, seconded by Commissioner Pressley, that we open the public hearing for case number P2026, T as in talent, A as in apple-001-10. All in favor, sound aye.
- 0:43:42
Aye.
- 0:43:44
All opposed, sound nay. The public hearing is now open for case number P2026T, as in talent, A as in apple-001-10. The applicant is the City of East Point. Ms. Smith, please step to the podium, state your first and last name, and your current address.
- 0:44:07
Really?
- 0:44:15
Good evening, Chairman and fellow Planning Commission. My name is Kimberly Smith, and my address is twenty-seven fifty-seven East Point Street, Planning and Community Development Department, ground floor, East Point, Georgia, three O three four four.
- 0:44:34
Thank you. Go ahead and present your case, please.
- 0:44:36
All right. In reference to the data center ordinance that we're proposing for this city, um, the purpose is to provide for appropriate locations for data centers in the city of East Point for neighborhood protection, infrastructure capacity, which will deal with electric, electric service, cooling for water and sewer, as well as storm water and emergency response, and also to provide for transparency in the decisions that we make when data centers are proposed in the city of East Point.
- 0:45:13
How does the draft determine the level of review? And what the ordinance is intended to do is basically to outline the different types of the data centers that... or around the different types and functions that they have. Um, based on our research, there are enterprise types, there are co-locations, there are cloud, AI high performance in computing, there are micro or micro edge type, uh, types of data centers, as well as regional hyperscale, which Microsoft, which is currently located in the city of East Point, would be considered a hyperscale-type campus.
- 0:45:53
Um, what we also provided for in the ordinance is a regulatory tier. Um, this would impact how data centers are created and how they are built within the city. Um, it would be based on full build-out floor areas, peak electronic, electric demand, known as MW, and dedicated substations, uh, to share on the property as far as infrastructure is concerned.
- 0:46:26
The proposed tiers within the ordinance, and this is for discussion, um, it pro- it provides for different classifications. Um, these classifications are broken into four different tiers, and the types of data centers that I talked about before in a previous slide would go from tier one, which would include small, uh, classifications of data centers, tier two is a medium, and then tier three is a major, and tier four is campus-like.
- 0:47:01
And again, we would categorize the existing Microsoft campus that is currently located within the city of East Point. It's approximately two buildings, and it spans over four hundred thousand square feet in area between the two buildings.
- 0:47:20
Um, another issue that came up, um, within the ordinance and which is why we're having to come up with the ordinance for the city of East Point is to protect the homes. There are a lot of pockets within the city of East Point that are located just adjacent to industrial zone properties. And so this is very, very important to look at buffering and separation that would be needed for the different types of data centers.
- 0:47:55
Infrastructure and operation impacts. We are currently, um, working with, uh, other technical review departments to get input on how that would impact our infrastructure and our utilities, specifically for power, water, and sewer. Um, it's known through research that it use, it uses high amounts of water, so we need to know, you know, what is the impact on city of East Point's resources as far as water and power.
- 0:48:29
Um, for the Microsoft center, um, currently located within the city of East Point, the power is actually not from East Point. It's from... It's provided from Georgia Power. Um, we also will be looking at, um, noise and light impacts of the data centers based on the size and type, looking at safety, looking at site streets, and long-term phasing. Um, because data centers are popping up all over the United States, at some point, for businesses, you have a You have a business plan, and then for a lot of business, you have an exit plan.
- 0:49:10
So from a long-term perspective, we also wanna look at what is the exit plan for when and if these facilities phase in and then somehow phase out. So we wanna look at end-of-life plans and spans for how data centers work. Um, that is an overview of what's included in the data center ordinance. Um, you all were provided with copies of that, and we are going to be working over the next thirty days internally with our staff to get their input from water and sewer and power specifically.
- 0:49:44
Um, but we were working with all of our technical review committees to pretty much give us insight on what types of data centers they think would be compatible with East Point, given the fact that we are fourteen point two, uh, square miles, an area pretty small. So, um, we're just gonna be looking at all of those different types of items in the ordinance. Um, and I wanted to talk just specifically about what we're looking at, um, and what we would need your input and pay attention to while you're reading through it, um, looking at the tiers and the thresholds that are provided, um, providing for district eligibility.
- 0:50:31
Right now, we're proposing for them to go to be permitted within the BP I-1, I-2, and warehouse in the lower tiers. Um, we also would like for attention to be paid for residential compatibility, and again, the city is pocketed with different areas of the city where you have residential directly within, um, very close proximities to I-1.
- 0:51:02
Um, our current code, and this came up actually this evening with one of the cases. The current code states that you cannot be within a mile of a residential property for certain types of industrial uses. Um, we need to determine, you know, what is... Is that too much, or should it be closer? We need to think of what type of provisions can be in place, um, for these uses, um, specifically in data centers, because that's what this ordinance is about, but we need to think about just industrial uses in general.
- 0:51:40
Um, also, um, look at the existing Microsoft facility and, um, think about we already have a mega-sized data center in East Point, and is that enough?
- 0:51:56
Another issue with the current code is the electrical substation. Um, as of now, the code does not allow for electrical substations in industrial zoning district. Do we need to change that? Keep it the same? So look at that when you're reviewing the code. Um, and also, I mentioned the cooling water and noise generation. Um, we're going to be getting input from our technical review departments in reference to that.
- 0:52:27
And, um, take a look at the application. There is, um, permitted guidelines, permitted use guidelines within the, the ordinance, which includes information speaking to application and enforcement. So those are the items that, um, we would really like to have your input on. And that concludes our report. And I'll take any questions.
- 0:52:53
I do have one question, um, Director Smith. Thank you for your presentation. And this might be an off, off-beat question.
- 0:53:02
Mm-hmm.
- 0:53:03
Does your budget allow to hire any additional resources that you may need to go through this? 'Cause I have a feeling that it's, there's a lot that in-house would like to know, but they don't know.
- 0:53:24
That's a really good question. We are going to run it through our Inspire consultants that are working on our zoning code. They did provide a lot of resources for us to look at, um, when we came up with the model, um, draft. So that's a really good question.
- 0:53:45
I have a question. Um, in this ordinance, it, it talks about, um, acoustic study at permitting.
- 0:53:55
What type of study? I'm sorry.
- 0:53:56
A- acoustic study-
- 0:53:58
Mm-hmm
- 0:53:58
... at permitting, at building permit issue, I mean, submitting for the building permit. I think it should be at public hearing.
- 0:54:10
That this-- so it'll be further, you know, before it's already zoned and already... So if you had a acoustic... 'Cause sound is kinda the biggest issue with-- one of the biggest issues with being next to, and that's why you had the buffer there for landscaping buffer. Um, if it was kinda the acoustic study was presented at a earlier stage in the, in the process, I, I think that'll be more advantageous.
- 0:54:35
So having a acoustic survey or study done at the application stage is what you're saying?
- 0:54:42
No, at the public hearing stage-
- 0:54:44
At the public hearing
- 0:54:44
... versus the, um, building permit stage, which is kinda what is outlined in the draft right now.
- 0:54:52
Okay. Thank you.
- 0:54:54
Um, also, I wanted to know if this supersedes or does-- do the, the Georgia-wide ban on data center supersedes this
- 0:55:08
Yes
- 0:55:09
Okay. So, all right. Um, then also, I guess the, that's a little bit ambiguous on the 500 feet situation. Um, 500 feet from the residential. I think it, that tier is kinda ambiguous because it talks about... It's not, it's like a recommendation and not a, actually a ordinance. And so those are the three things that I wanted to kinda put on you right now.
- 0:55:43
Thank you.
- 0:55:48
I had a question about a definition. As you were going through, you mentioned co-location. Co-location, does that mean half of it's there and half of it's somewhere else?
- 0:55:59
Um, co-location is... Have you... So in, in the city of Atlanta and other different cities, they have buildings that that's all they have in there. You would look at it from the outside and think that it's just a simple office building. You go into it, and it's just full of the data center cabinets. So that would be an example of co-locating.
- 0:56:33
Thank you.
- 0:56:33
Also, I have o- two more questions. I'm sorry. Um, from, from what I'm hearing, and you can tell me if I'm wrong or right or wrong, but there is white papers at Georgia Tech that has a whole, um, whole, like, planning and zoning guidelines and things like that. Have you used that, incorporated that into this?
- 0:56:59
I believe we have that study, 'cause we have-
- 0:57:01
Mm-hmm
- 0:57:02
... we use many, many resources. But I will definitely look into that to see if that's one of them that we have. 'Cause I know we have a lot of guides from APA, ULI.
- 0:57:12
Mm-hmm.
- 0:57:13
And I wanna say we have the Georgia Tech one as well.
- 0:57:16
Okay. And, and then lastly, is anything about, like, adaptive reuse, so like office buildings being used as data centers?
- 0:57:29
That's known as the, the co-location.
- 0:57:31
Yeah, okay.
- 0:57:32
Yeah.
- 0:57:32
I'm sorry. I didn't... All right.
- 0:57:39
Um-
- 0:57:39
Any other questions from my commissioners?
- 0:57:41
Yes. The, what I have to say is possibly a statement and/or a question, and they are as follows. Can you put into the, uh, the ordinance that you're gonna propose that any company that chooses to bring one, that it's always on a closed-looped cooling system? Meaning you don't touch our water. You get enough water to fill your system, but then it's, it's closed loop going forward.
- 0:58:12
And if you, if you gotta use our water, then you need to go to another town. Um, just a thought. Another thing is, I, I'm a nature kinda guy. Can we get some acoustical insulation, um, for, you know... 'Cause we don't wanna disturb the natural beauty of what East Point is. Um, so that's on the roof, coat the walls, everything, but it needs to be under a certain decibel, if you will, to be in that building.
- 0:58:44
Um, thirdly, solar panels and energy storage that it is completely self-sufficient. So put the, the panels on the roof or something, get some Tesla or some company's generator battery to store it in. But I've had my power go out. I know nobody like their power out, so they don't need to be using our power. So it be solely self-sufficient. Um, and next is tax benefits.
- 0:59:16
They shouldn't be operating without paying their share of being in town. Just... And it needs to be maybe 10% higher than, let's say, a gas station or the Walmart on Cleveland. They shouldn't... Yeah. That's all for me. Thanks. A great presentation, by the way.
- 0:59:39
Thank you. Great comments and concerns.
- 0:59:46
Are there any other proponents to, here to speak in favor of this case?
- 0:59:53
Um-
- 0:59:53
Are there any opponents to speak against this case?
- 1:00:01
All right. Hearing none and seeing none at this time, I, I entertain a motion to close the public hearing. Motion to close the public hearing.
- 1:00:10
Second.
- 1:00:11
It's been motioned by Commissioner Watson, seconded by Commissioner Presley, that we close the public hearing for case number P20T26, T as in talent, A as in alpha, dash zero zero one dash one zero. All in favor, say aye.
- 1:00:28
Aye.
- 1:00:29
All opposed, say nay. Hearing none, the ayes have it. The public hearing is now closed. Staff, would you please sound your recommendation?
- 1:00:37
Yes. Staff has recommended deferral of this item to allow for more input and consideration from the public, from our technical review team, and from all its interested parties in reference to this. We're recommending deferral, please. Thank you.
- 1:00:56
Wonderful. Thank you. Commissioners, you've heard from the applicant. You've also heard staff's recommendation, because it was the same person. At this time, I'll entertain a motion. Motion to defer.
- 1:01:09
Second.
- 1:01:10
It's been motioned by Commissioner Watson and seconded by Commissioner Anderson that we, uh, ex- that we defer this case, case number P2026, T as in talent, A as in apple, -001-10. All in favor say an aye.
- 1:01:30
Aye.
- 1:01:31
All opposed say an nay. For case number P2026, T as in talent, A as in apple-
- 1:01:40
Aye
- 1:01:40
... -001-10, the ayes have it. Your case is deferred, City of East Point, Mrs. Smith.
- 1:01:46
Thank you so much.
- 1:01:49
That completes our cases for the evening tonight. Our next agenda item is announcements. Staff, do you have announcements this evening? Ms. Edge?
- 1:02:02
Um, so I passed out some flyers when we first got started. Um, that's our next, um, activity for the zoning ordinance rewrite. That's where we're gonna be presenting the first draft to everyone. Um, so definitely come out if you can. There'll be hot chocolate. Um, and we'll be there, and y'all seem to like us. Um, and yeah, that's, that's pretty much it. December 2nd, uh, from 6:00 to 8:00 PM here in the City Council chambers.
- 1:02:30
I have a question.
- 1:02:31
Thank you. Commissioner Lovett?
- 1:02:35
Um, Ms. Edge, I do have a question. And it may be too late, but I don't think it's ever too late.
- 1:02:43
Mm-hmm.
- 1:02:43
Does the city have an ordinance regarding animals?
- 1:02:51
You said animals?
- 1:02:52
Mm-hmm, and I'm gonna give you a spec- a, a, a case. Okay, we have renters in the city. We have people who own their own homes.
- 1:03:01
Mm-hmm.
- 1:03:02
But renters can sometimes leave their animals behind.
- 1:03:07
Mm.
- 1:03:08
I have that in my neighborhood, in my backyard as a matter of fact. Neighbor moved out. She left her chickens.
- 1:03:18
Oh.
- 1:03:18
And where are the chickens? In my yard.
- 1:03:22
Oh.
- 1:03:22
And what are the chickens doing? Eating my vegetables.
- 1:03:28
Staff-
- 1:03:28
If you can catch them, I'll take them.
- 1:03:33
I don't think we've en- encountered any part of the ordinance from what we've reviewed that speaks to anything related to animals. Um-
- 1:03:44
Yes, and I can touch bas-
- 1:03:46
Please.
- 1:03:46
That would be a code enforcement thing.
- 1:03:49
No.
- 1:03:50
It's not?
- 1:03:51
It is a code enforcement after the fact, so-
- 1:03:54
You're saying the allowance of animals. S-
- 1:03:58
What I'm looking for is the city to have something in place that... I mean, we don't have any teeth in our code to say, 'cause anybody can leave anything-
- 1:04:11
Yeah
- 1:04:11
... behind, other than a couch and a chair.
- 1:04:16
So that's something we can, um, definitely recommend for our vendor to consider.
- 1:04:21
Or, or they could even leave a boa constrictor behind.
- 1:04:25
They could.
- 1:04:26
They could.
- 1:04:26
I had a neighbor with snakes, so that's possible.
- 1:04:31
Commissioner Lovett is, I mean, just cooking for Thanksgiving.
- 1:04:34
Yes, somebody said that maybe the boa constrictor would eat the chicken.
- 1:04:48
But we will definitely s- give that recommendation, um, to Inspire so that they can s- consider it, 'cause that's definitely not something that, um, has come up in previous conversations yet. Yes. And also, you guys can continue to send any recommendations or, um, commentary that you have about the current ordinance, um, to myself or Zor, so Z-O-R, 2026 at eastpointcity.org. Um, and I can follow up with a email with that information.
- 1:05:18
What is, what's the email again?
- 1:05:20
Um, it's zor2026@eastpointcity.org.
- 1:05:29
And I've sent all of that information over to Inspire.
- 1:05:33
Thank you.
- 1:05:34
Yes.
- 1:05:36
Wonderful. Are there any other announcements from staff? Do we have any announcements from the commission? Hearing none, I will then entertain a motion to adjourn.
- 1:05:49
Motion to adjourn.
- 1:05:52
Commissioner Lovett and seconded by Commissioner Watson that we adjourn. All in favor say an aye.
- 1:05:58
Aye.
- 1:05:59
All opposed say an nay. Hearing none, the ayes have it. The motion is, the meeting is now adjourned. Thank you.