Augusta-Richmond County Planning Commission called meeting, November 23, 2026
Georgia Commons holds no minutes of this meeting. Georgia Commons is independent and is not affiliated with Augusta-Richmond County Planning Commission.
This is a machine transcript made by Georgia Commons from the body's public recording. It is not an official record, it can mishear words, names, and numbers, and it does not say who is speaking. The recording is what was said.
Records of this meeting
Each link opens the body's own website or meeting portal.
- Video recordingPlanning Commission Special Called Meeting (play.champds.com)
Summary
Written by an AI model (claude-sonnet-5-5) from the machine transcript below. It is not the record: the recording is what was said.
Planning Commission hears hours of mostly opposed comment on a 383-acre data center rezoning and votes to recommend denial to the Augusta Commission.
The Planning Commission held a special called hearing on rezoning petition Z-26-18, which asked to change about 383 acres in South Augusta from agricultural, general business and heavy industrial to the new data center district. Staff recommended approval with conditions, and the applicant's team presented. Commissioners asked about cooling, backup power, notice, electricity costs and the timing of the data center ordinance. Dozens of residents spoke, nearly all opposed, citing noise, water, power bills, wetlands, notice and missing documents. A motion to approve and a motion to defer 60 days did not carry. A substitute motion to recommend denial passed on a roll call; the chair said six to four. The Augusta Commission will take it up December 1.
Topics taken up: Z-26-18 data center rezoning; Nixon Technology Campus; data center ordinance; 500-foot buffer and noise limits; Georgia Power electricity costs; wetlands and Phinizy Swamp; public notice and process; recommendation to deny rezoning.
What the meeting took up, as said in the recording (6)
Each account is part of the AI-written summary of the machine transcript, not the record. The time opens the transcript below where the matter is taken up.
Staff report on Z-26-18 data center rezoning of 383 acres off Mike Padgett Highway
Staff presented a petition by 3G Investment LLC for the Nixon Trust to rezone about 383 acres from agricultural, general business and heavy industrial to the data center district. The concept plan shows seven buildings at least 500 feet from the nearest homes, with trees and open space preserved. Staff said it is generally consistent with the comprehensive plan and recommended approval with conditions: a pre-application review, engineering approval of roads, a 75-foot height cap, wetlands mitigation with the Army Corps, traffic and state transportation compliance, a lighting plan, and a 100-foot buffer along the main roads. Staff said approval would not approve the concept plan. Staff reread the petition into the record later.
Applicant presentation: data center campus design, setbacks, noise, traffic, jobs and power
The applicant's attorney said the project was filed under the new data center ordinance with no variances requested, and compared data centers to the interstate system. The applicant's planner said the campus would be up to 3 million square feet, with 60% open space and a 500-foot buffer. She gave noise limits of 65 dBA by day and 60 dBA at night, closed-loop cooling, and about 1,400 daily trips. She cited a fiscal analysis of about 1,000 permanent jobs and about $38 million in annual revenue. She said there is no end user yet, so studies are preliminary. Another speaker said power costs fall on the end users.
Public comment on the data center rezoning, mostly in opposition
Residents were asked to keep comments to three minutes. Most opposed the rezoning, citing noise, a 600-megawatt power demand and possible utility bills, water use, wetlands and Phinizy Swamp, health, property values, airport proximity, and the 500-foot buffer. Several raised notice and process problems: the missing decommissioning plan, a Georgia Power letter and the regional impact report, and which ordinance version applies. Two League of Women Voters speakers asked for deferral. A few speakers supported it, citing jobs, growth and the cleanup of a long-dumped site. Several residents asked who owns the applicant and for answers in writing.
Applicant and staff respond to public comments on incentives, power, wetlands and the special exception
The applicant's attorney said the developer asks for no tax incentives, bond financing or reduced taxes. He quoted Georgia Power that data centers cover their full service costs, said wetlands are regulated by the Army Corps, and said charging a closed-loop system takes one to two million gallons, not a billion. He said the noise limits are quieter than the train, paper mill and airport. Staff said that because the petition is for the data center district, no special exception was required and that fee will be refunded. Staff described the ordinance's decommissioning and enforcement provisions and the timing of the regional report.
Commissioner questions on data center special exception pathway and scope of the vote
A commissioner asked whether a major data center or campus must go by special exception under the ordinance. Staff said it can, but the applicant chose the established data center district. Another commissioner said the special exception applies where the whole parcel is heavy industrial, and this parcel has mixed zoning. A third asked the applicant about the airport as a buffer and stormwater, and the applicant said runoff must be detained on site. Staff confirmed the vote concerns land use only and no city money is involved.
Motions on Z-26-18: approve, defer 60 days, and substitute motion to deny
A commissioner moved to approve and it was seconded. A substitute motion to defer 60 days drew advice from the attorney that the body can only recommend to the Augusta Commission. The amended deferral got no second. A second substitute motion to recommend denial was seconded. In the roll call, several commissioners voted yes to deny and others no; the chair stated six to four. The recommendation of denial goes to the Augusta Commission on December 1, with speaker sign-up open until 9 AM the next day.
Machine transcript
This is a machine transcript made by Georgia Commons from the body's public recording. It is not an official record, it can mishear words, names, and numbers, and it does not say who is speaking. The recording is what was said.
682 turns.
Open the recording on play.champds.com. The recording opens on the site where the body published it. Nothing is played on this page.
- 0:00:15
Good afternoon, everyone. We have a pretty packed house this afternoon, and so, um, we appreciate you guys being here, um, with us as we conduct the business of, um, our great county. Um, we still have a few commissioners who are trying to, um, find places to park, um, and I imagine we still have some individuals who are on their wa- on their way up and, um, are signing in. So we will begin momentarily.
- 0:00:46
Um, so we just appreciate your patience, and again, thank you for being here with us. Uh, we appreciate your participation.
- 0:01:01
Okay.
- 0:01:08
All right. So, um, so I'ma, I'ma do this like church, and I'ma ask everybody if you could just please move closer and so that you fill in the empty seats, so we can have space for everyone who wants to, um, participate.
- 0:05:05
And, uh, we'll begin momentarily.
- 0:05:41
All right. All right. All right. Well, once again, I, I, I know that individuals are still coming in to, to sign in, so y'all continue to do that. Again, we thank you all for being here, for your, um, attendance and your participation. Um, welcome to the special called meeting of the, um, the Planning Commission. And so we're going to go ahead and call this meeting to order at 2:06, um, PM. Um, before I read the opening statement, just wanna address two, two things.
- 0:06:16
The first is that we do understand that there might have been a little confusion, um, on the advertisement. Um, some of it said 2:00, some of it, some of it said 3:00. So what we're going to do to rectify that is we're, we're gonna begin now, and then at 3:00, we'll pause, and then we'll let the staff reread, um, the petition into the record at 3:00. So we'll do that. Um, the second is if you viewed a prior agenda, you probably saw that there was a rezoning petition along with a special exception.
- 0:06:52
However, since that time, it's been determined that, um, the petitioner only requires a rezoning. So we'll only hear the rezoning petition on today. So again, the special exception, um, is no longer relevant.
- 0:07:11
So those are the, uh, the two things I wanted to address, um, before going into the meeting. So now I'll read the- Opening statement. The Augusta, Georgia Planning Commission is a recommended body. The final decision on all zoning matters coming before it will be made by the Augusta Commission on Tuesday, January the 5th, 2027 at 2:00 PM in the Augusta Commission Chambers at the Municipal Building. The Planning Commission makes the final decision on all variances, including subdivision regulations.
- 0:07:43
A handout describing the zoning procedures by which these cases are decided is available upon request. These procedures also require that any applicant for a rezoning action or an opponent to a application for a rezoning action who has made contributions aggregating, aggregating $250 or more to a local government official within two years of the rezoning application to file a disclosure report with the governing authority. The disclosure report must be filed within 10 calendar days of filing the application and at least 10 calendar days prior to today's hearing.
- 0:08:19
A minimum of 10 minutes shall be afforded for the presentation of data, evidence, and opinions on each side of a rezoning petition or a special exception. If more than 10 minutes is afforded to one side, then an equal amount of time shall be afforded to the other side. The Commission encourages participation in this hearing, and there is no restriction on who may address the commission within the allotted time. But the Commission asks that the public comments be brief, on subject, and non-repetitive, and directed to the commission, not to any individual or group.
- 0:08:59
All right. With that being said, um, is staff ready to present our rezoning application?
- 0:09:11
Yes, sir, Mr. Chairman.
- 0:09:23
So Z-26-18 is a petition by 3G Investment LLC on behalf of the Nixon Trust, requesting a rezoning from zones A, agricultural, B-2, that's general business, and HI, heavy industrial, to, um, a database... excuse me, a data center, um, district affecting properties containing approximately 383 acres, located at 1538 and 15504 H Club Road and 3806 M-Mike Paget Highway.
- 0:09:59
Um, and this is in District 1 under Commissioner Jordan Johnson's district.
- 0:10:07
Remember to do this.
- 0:10:13
So, um, honorable Commission,
- 0:10:19
this is a rezoning again from agricultural to the data center campus. Uh, this application involves a rezoning request, um, for, uh, on behalf of the Nixon Trust.
- 0:10:35
The property is located again in Commission, in, in Commission District 1, represented by Commissioner Jordan Johnson, and the purpose of this request is to consolidate the existing zoning classification under heavy industrial, um, under heavy industrial, general business, uh, and agricultural to accommodate a proposed development. We did have a resi- a, a conceptual plan that was submitted by the applicant. Um, it established a data center campus consisting of seven buildings.
- 0:11:10
Um, each was sit- is situated, um, at least 500 feet from the nearest residential property. And I wanna be able to show this as I go down. I'm gonna show the pictures.
- 0:11:26
There's a 500-foot buffer with preservation of a significant number of existing trees and open space. There was a, a traffic engineering report, uh, that included a realignment and improvements of the 4-H Club to meet the city standards. And then there's a, um, there's an entrance along the east side of Ma- Mike Paget Highway. Uh, additional access connection along the Nixon Farm Road, International Boulevard, and Doug Barnard Parkway.
- 0:11:59
The proposed development is generally consistent with the vision and development of, um, objectives outlined in Envision, uh, Augusta, which is our comprehensive plan for South Augusta. Um, the area contains a limited but established presence of industrial and warehousing uses scattered in the general area. However, as you, uh, are aware, uh, several weeks ago, a couple of months ago, the, uh, Augusta Commission did, uh, create a new established data center district, um, which this campus is proposed to go in.
- 0:12:34
Several criteria we- were taken into consideration, um, which the proposed development has met, uh, those, those criterias that have been outlined in the application, and there is a recommendation, um, for this proposed development. I did wanna say that the application was submitted to the, um, CSRA for the DRI study, which, uh, came back a few days ago, um, which was sent to the surrounding communities, uh, counties, um, that they did have comments and some of those just said NA.
- 0:13:14
Um, we do have that report for you. Uh, it also provided, um, information from our plan reviewers of the departments. That either provided, um, comments which was general development standards. Um, our engineer department provided, uh, several comments at, i- is laid out in the recommendations. The recommendation from the planning and development staffs, we recommend approval for the rezoning request to a data center district with the following conditions.
- 0:13:48
The proposed project must have a pre-application meeting with the Development Review Committee to provide Augusta site development standards and regulations review process. This includes required conceptual plans, studies, and supporting documents, and those are doc- documents that are laid out in the, um, data center, um, ordinance of those required documents before the su- official submission of the site development application. The development must comply with engineering, with the engineering departments regarding road ownership and design.
- 0:14:24
The final outlay of the roads and street alignment must be approved by the engineering department, which is over streets and roads, of course. The total height of any structure shall not exceed 75 feet, excluding the house of, uh, housing of elevators, um, equipment required to operate and maintain the building, and, um, parapet walls, but no structure or any space above the height limit shall be allowed for the purpose of providing additional enclosed space for the commercial use.
- 0:14:57
Five, the development shall mitigate the wetlands with the, um, Army of Corps of Engineer on the property prior to site plan approval. The proposed development shall comply with all require- requirements of traffic engineering, um, Georgia Department of Transportation at the time of submittal for the site plan approval. Uh, a lighting plan must be provided, and you'll see that in the data center, uh, ordinance as well. Um, also parking regulations, uh, as provided in a DC, uh, ordinance, um, the tree ordinance, conceptual land scape plans, the conceptual landscape plan that's dated September the 28th, 2026, uh, maintaining a minimum 100-foot buffer along the Mike Padgett Highway, Doug Bernard Boulevard, excuse me, Parkway, and Tobacco Road.
- 0:15:55
Approval of the rezoning request shall not constitute approval of the conceptual site plan submitted with this rezoning application. The proposed development shall go through the site development plan approval process in compliance with the data center and site plan standards and regulations of Augusta, Georgia. This development project shall, um, comply with all development standards and regulations set forth in the Augusta, Georgia, um, at the time of the development, and that means that all of those, uh, different agencies, your, your state agencies, your, um, county agencies, and also, of course, your departmental agencies as well.
- 0:16:43
That concludes staff report.
- 0:16:45
Yes, sir.
- 0:16:45
All right. Thank you, Director Cameron. Is the petitioner present? All right, sir. If you could come forward and give us your name, your, uh, county of residence, and the details on your petition.
- 0:16:56
Thank you, Chairman Pooser. We do have a PowerPoint presentation we'd like to load through here. I've done this a few times, but I don't wanna mess it up with the full crowd here.
- 0:17:04
That's okay.
- 0:17:41
Um, Mr. Chairman, I just wanted to say for those that are standing, there are, uh, seats available if they want to... Um, those that are standing on the wall, there are seats available if you would like to have a seat.
- 0:17:58
Oh, okay.
- 0:17:58
All right. Well-
- 0:17:58
So you heard the announcement. If you would like to have a seat, um, I know you can identify a, a empty one. Commissioner Clark, uh, are you serving as the usher? Body guard? Okay.
- 0:18:20
Thank you, Chairman Pooser. My name is Jim Trotter. I'm an attorney here in Augusta. I was born and raised here in Augusta and have been a lifelong resident of Richmond County. As many of you up here on the Planning Commission know, I've been coming before this body for probably 15 to 20 years for rezoning hearings. My first big one back in 2011 was the Buffalo Wild Wings on Robert C. Daniel Parkway, and the room was just about as full as it is here today. Residents from a number of West Augusta neighborhoods were just adamant that that Buffalo Wild Wings was gonna ruin traffic in that area.
- 0:18:55
I've handled a number of them. One of them was a self-storage on, behind the Kroger on Alexander Drive. Same objections then. I think, uh, Commissioner Spencer, Malice, and O'Neill may have been around for a number of those. Um, also was involved in the efforts to rezone that property on Eagle Drive behind Green Meadows a number of years ago. That one, the objections centered on traffic, concerns about recovering alcoholics being treated near a residential community. I've been before you for a number of apartment rezonings, town home developments, recently an infill single family home development on Pleasant Home Road that's under construction.
- 0:19:34
Most all of the objections in those centered around traffic and increased strain on the local infrastructure, and I'm sure you'll hear some of those objections today as well. We're here to try to address all of them. Today is different, though. Of all the rezonings I've argued before this body over those 15 to 20 years, there's no doubt that this one is more significant, I believe, for the future of Augusta than all those others combined. The push to develop data centers now is, is certainly top of mind for everybody, everybody in this room, everybody across the state of Georgia and nationally.
- 0:20:10
It's also akin, I believe, I've, I've read some articles, it's akin to the effort to build out the interstate highway system back in the '50s and '60s. There were a lot of communities that resisted the interstate highway system back then and did not want the interstate coming through their r- their area. Where do you think those communities are decades later? Augusta, fortunately, back then did not resist, and some in Augusta embraced it. And back in 1967, there was a 14-mile stretch of Interstate 20 that opened that linked Augusta, North Augusta, and Augusta, and Atlanta, 1967.
- 0:20:49
So what is a data center? Why are we here? Well, the internet, as we all know it, has to have a physical address, and it's got hundreds if not thousands of them. Data centers house the servers, the storage systems, and the networking equipment that power our everyday lives. These facilities keep essential s- services running, secure, and ready when people need them. All of us, all of you up here, and probably everybody in this room has used a data center today and probably before breakfast.
- 0:21:23
Did you check the weather before you went out this morning on your weather channel app? Did you text your kid somewhere? Did you tap a credit card somewhere to buy gas or coffee? All of that activity ran through a data center somewhere. In 2024, 65% of Americans accessed their medical records online. That was up from 50% in 2022, and it's only growing. All of those medical records are stored in data centers. Ninety-one percent of US adults in 2025 own a smartphone.
- 0:21:56
I bet it's close to 100% in this room. Every text, video call, and photo backdr- backup on those phones runs through a data center. The bakery down the street, the coffee shop down the street, they take orders online before they open. They run payroll from a tablet. Ninety-nine percent of small businesses last year used at least one technology platform to run their businesses. Probably many of the people in here use those same technology platforms to run their businesses. All of those run through data centers.
- 0:22:29
You will also hear today what this specific data center can do for the Augusta community. High-paying jobs and significant tax revenue top that list. However, beyond that, responsible data center developers want the communities around them to thrive. They invest locally through workforce training programs, education partnerships, infrastructure upgrades, community benefit agreements, grants and donations, and they work with the local leaders to support what the residents need most.
- 0:23:01
This developer is no different. We've got a team here today to make this presentation. I'm gonna turn it over to Deja Burt, um, from Group Engineering in just one second. But I've heard before today questions about whether or not we applied under this new data center ordinance or tried to get this application in before it was passed. We applied under the new data center ordinance. We intend to appl-- uh, we have applied and intend to follow every single regulation passed in the new Augusta Richmond County Data Center Ordinance.
- 0:23:35
It's one of the strictest in the nation from setbacks, height regulations, noise restrictions, et cetera. Our application meets all of those requirements, and we have not asked for any variances from, from any of them. Thank you again for being here today on this special called meeting. I'm gonna turn the meeting over now to Deja Burt from Group Engineering.
- 0:24:20
Technology. Okay. Good afternoon, everybody. My name is Deja Burt, and I'm from Prince William County, Virginia. Um, I am actually, uh, uh, I, I live and work in Virginia, and I was invited here, um, to make this presentation for you guys, uh, because we've been working hard for the last several months putting this application together. Um, I streamlined it with a PowerPoint presentation because I can tell you I've rehearsed it, and it took me 45 minutes to get through it, and I know you guys don't wanna hear my voice for 45 minutes.
- 0:24:53
Um, so I'm gonna try to stick to the PowerPoint. I'm gonna read it because I know it's really small text, um, and slow me down if I go too fast. Um, and I have my own personal notes here too, so forgive me if I'm looking down versus looking at you in your eyes. So again, my name is Deja Burt, and I'm the Director of Planning at The Engineering Group, a civil engineering firm based in Woodbridge, Virginia. I'm here to present the details of the Nixon Technology...
- 0:25:22
the Ni- Nixon Technology campus in Augusta, Georgia. Uh, I appreciate your patience as I rely heavily on my detailed PowerPoint and extensive notes. Um, uh, which helped, uh, to organize my thoughts and streamline the pre- streamline the presentation. That's not gonna work under there. Let's see. All right, so we've put together a pretty strong, uh, project team for this application. Jim Trotter, who you've already heard from, at Trotter Jones. Me, I'm Deja Burt, director of planning.
- 0:25:53
I brought my colleague with me, Thomas Murray, and then we have the, uh, a representative, uh, of the applicant here with 3G Investments LLC. A couple of the other, uh, consultants that we used on this project include ECS, uh, Environmental Engineering and Consulting Services, w- who, uh, helped us with our phase one ESA assessment, wetland delineation, and cultural resources, resources check. Uh, we worked with a local engineering firm, Infrastructure System Management, ISM, who, um, helped us to put together our traffic report.
- 0:26:28
We also worked with local engineering firm, Cranston Engineering, who helped us with our, um, ALTA survey. Um, we worked with Municap, who helped us with our fiscal analysis. Uh, Ramble, uh, another local firm, who did our preliminary noise assessment. And then I will touch on a few of the summaries of the data that we received from our consultants later in the PowerPoint.
- 0:26:53
So the first slide that you're seeing, um, is just a vicinity map that I put together showing you where we are, um, in South Augusta. We are, uh, west of Mike Patchett Highway. We are east of Doug Barnard Parkway, just south of Tobacco Road, um, and just south of the FedEx, uh, ground, uh, facility that was recently installed. Uh, we have a, a, another... uh, some other, uh, notable, uh, uh, subdivisions adjacent to us. Uh, we met with the Castle Pines, uh, mobile home park that's just to our south, along our southern boundary.
- 0:27:30
Uh, there are other communities. We didn't wanna, uh, miss the opportunity to recognize that there are other residential subdivisions in the vicinity as well as commercial, um, shopping centers, uh, churches, and existing homes.
- 0:27:48
So a good place to start with any, uh, planner is to look at the comprehensive plan, which, um, I have your future development map ch-character areas here. The Augusta-Richmond County Comprehensive Plan guides long-term growth, land development, and public investments projected through twenty fifty-five. The subject property is within the East Augusta character area.
- 0:28:12
All right. Go backwards. We're gonna go forwards. Uh, the East Augusta character area map includes a mix of conservation, natural resource areas, industrial land uses, with limited residential and commercial land uses. The existing residential includes twentieth century houses, apartment complexes, townhouses, and condos near and adjacent to industrial uses. Uh, the East Augusta character area is home to Augusta's warehousing light industry and heavy industry, uh, including, uh, producing chemicals, paper and wood products, clay products, transportation equipment, and food products.
- 0:28:48
Warehousing fac- facilities are, are near major highways, interstate interchanges, and railroad lines. Augusta Regional Airport is a significant regional activity center. In the vision for East Augusta, um, they, uh, conceptualize a vibrant and sustainable community that balances residential and industrial needs while preserving the natural environment. There is a projected expansion of public utilities and high-density residential facilities with the continued existence, yet distinct separation of residential and industrial uses.
- 0:29:21
New industrial development is-- should be concentrated near Augusta Regional Airport and along existing transporta- the existing transportation network. Uh, the recommended development patterns for the East Augusta character area map, um, include new businesses and industry encompassing the Augusta Regional Airport and surrounding area, with new uses appropriately distanced from established residential areas, preservation and management of natural resources. The recommended land uses are agriculture, R1, R2, R3, P1, B1, and B2, uh, L1, and H...
- 0:29:55
I'm sorry, LI and HI, c- and conservation.
- 0:30:02
All right. Um, so we start with the comprehensive plan, and then we move, of course, to the Codified Data Center Ordinance Section 24A, and a little bit of a timeline about how this came to be. After the hard work of your planning staff, there was initial dra- an initial draft that was discussed in July twenty-sixth at the Planning Commission, uh, where it was determined that, uh, the commission needed additional review and a sixty-day moratorium was in place-- was put in place. In, uh, August and September, there were three public community meetings.
- 0:30:34
Um, I could not attend them, but I was able to watch them all online, so hours and hours of YouTube, um, just so that, so that I had an understanding of the community's concerns with the potential data center application. On September ninth, the final draft of the ordinance was released, and on September fifteenth, the ordinance was approved by the Augusta Commission.
- 0:30:58
The Data Center District Classification Section 24A Data Center Zone includes a definition of the data center campus as a contiguous development of one or multiple buildings with a minimum of five hundred thousand square feet. Uh, the data center ordinance establish the a- establishes the application and review process. It establishes the annual compliance certification. It establishes the setbacks, which, which I'll talk about a little bit later. It establishes the daytime noise, uh, which is not to exceed sixty-five dBA, nighttime noise not to exceed sixty dBA.
- 0:31:32
It, uh, requires an air-cooled or a closed-loop system, uh, with limited exceptions. Uh, we're required to submit with the site plan an emergency access and safety coordination plan. We're required to have details about security fencing and visual screening. And finally, a decommissioning plan is required per the ordinance. A little bit about our application, um, specifically. Like I said, I've been working on this for months, um, and we've been riding the wave with the data center ordinance.
- 0:32:04
So originally, um, there was no data center or- center ordinance. So, m- uh, our design, uh, was originally with the heavy industrial setback standards, which if you're familiar with the ordinance, they're significant, but not, uh, 500 feet, which is what's required now. So, um, we designed the site with the HI, uh, ordinance, and then we redesigned it as new drafts of the data center ordinance were presented. So, uh, after September 15, when the data center ordinance was approved, uh, we sub- or we had a pre-application meeting on September 23rd and submitted our rezoning on September 28th.
- 0:32:46
October 15th, uh, we were hosted by the Castle Pines Mobile Home Park to, uh, field some questions and concerns from the citizens there. Very productive conversation. Um, and then today, we are having our planning commission hearing. Um, oops, I think I went backwards. Let's go forward. Uh, some project details specifically about the Nixon Technology Campus. We are an assemblage of three parcels totaling approximately 380 acres.
- 0:33:17
The existing zones are agriculture, general business, and heavy industrial. Our proposed zone is DC, data center. The maximum floor area projected for the site, uh, is 3 million square feet. Uh, the minimum open space we are proposing is 60% of the total site area. So that's approximately 228 acres of the 380 acres, which will be either in open space or preserved, uh, tree area. The setbacks for uses other than the, than the data center campus will use the HI standard.
- 0:33:49
So those are for-- That's for the area that we've designated for potential commercial uses adjacent to Mike Padgett Highway. The data center setbacks, uh, that we're using on the site without any modifications or variances are zero to 25 feet adjacent to heavy industrial or, uh, light industrial districts, a minimum of 500 feet adjacent to residential or agricultural uses. Now, we could have, um, shortened the 500-foot setback and buffer to a 300-foot buffer, um, but that would have taken a little bit more work.
- 0:34:24
Um, uh, we would have had to clear a little bit more of the site and include a landscape berm. We decided not to do that because with the 500-foot setback, we could have a significant area of tree save, which would mitigate some of the noise, air, light concerns that I'll talk about a little bit later. So saying that the shorter way, uh, we had the opportunity to have a 300-foot buffer. We maintain the 500-foot buffer per the ordinance. Uh, we are also including 100 foot adjacent to existing road frontages. Parking will be provided in accordance with the Augusta Richmond County zoning and design standards.
- 0:34:57
Stormwater management, utilities, phone call, will be designed in accordance with the county standards and FAA guidance where appropriate. I'll wait.
- 0:35:08
Happens to the best of us. And finally, the details concerning screening, fencing, and lighting will be, will be provided on the site plan in accordance with Section 24811 of the data center ordinance and applicable Augusta County regulations and standards. This is a little, uh, very little, um, view of our site. Um, as you can see, on the west side is Mike Padgett Highway. On the right side, we have Doug Barnard Parkway. Again, to the north or page top, we have Tobacco Road.
- 0:35:40
Uh, 4-H Club Road bisects the site, but as you can see with this application, we are realigning 4-H Club Road. Um, I think there was a concern from Augusta Engineering that we were cutting off access to Doug Barnard Parkway. We are maintaining that access, um, uh, which, uh, we'll-- you'll be able to see a little bit more on the site plan. We are currently showing, uh, seven buildings, uh, with up to, uh, 3 million square feet. Um, we're considering that a ceiling. Uh, we don't expect there to be any more. It could be far less.
- 0:36:11
You will have those details with the site plan. Um, we're, again, we're showing all the required setbacks of this data center ordinance. Uh, I definitely have lost my place. Let's see. Um, the realignment of the 4-H Club Road, uh, facilitated an increased building setback from neighborhood residential properties. In other words, we have the, uh, required setback, uh, 500 feet. Uh, a- and, uh, about 200 feet of that will be tree save area. And then as an, an additional setback, we put the realigned 4-H Club Road closer to the property line so that the buildings could be set back a little.
- 0:36:48
Uh, it's worth saying that we could have set the buildings back even further, but there is an area of, of existing wetlands between our property and the, uh, FedEx Ground property, and we are preserving, um, I wanna say 90% of the existing wetlands on the property. Um, let's see. I'm gonna jump to the utility plan, and I'm gonna invite my colleague, Tom, to, uh, come up and, and give a short presentation, but I will read my bullet points here. Uh, the water will be a closed-loop system as required.
- 0:37:20
The typical water consumption is less than ten single-family detached houses. Discharge pretreatment will comply with all applicable Georgia Department of Natural Resources and federal and legal requirements. The sanitary sewer will, design will comply with all, uh, Augusta Utility Department, Richmond County, uh, Department of Public Health regulations and all applicable local, state, and federal requirements. And lastly, uh, the existing high voltage transmission power lines on site, we've dedicated a substation area as part of this application, and the developer will absorb the cost for any system upgrades required to accommodate the project.
- 0:37:59
And with that, I will turn it over briefly to Tom Murray to talk to you a little bit more about the utilities on site.
- 0:38:10
Hi, my name is Tom Murray. I'm actually from Montgomery County, Maryland. I work with Dagea in Northern Virginia, um, and Dagea presented this quite well. Um, I really don't have anything more to add, um, other than what we will comply with all the, uh, state, federal, and local requirements for water, sewer, and other utilities.
- 0:38:33
Much more concise than I could ever be. Um, thanks, Tom. Moving to the next slide. Trying to. All right. Again, we are showing up to 60%, um, perhaps more, uh, uh, to be defined with the site plan, 60% open space, which you're seeing here in green, um, about, uh, 150 acres of which will be preserved, uh, forest land. Uh, let's see.
- 0:39:01
Um, again, I come from Virginia, and we are, uh, notoriously known for our data centers, and so this is a case study in how to, uh, do data centers incorrectly. Um, uh, in Arcola, there's an existing single-family detached neighborhood, um, and a, an Amazon, uh, web services data center campus came in right behind it. Um, as you can see from the street view, you can see it from your backyard, as you can see from the aerial. It's a pretty significant campus that's just behind, um, the neighborhood.
- 0:39:34
And what may be a little bit harder to see on the left side is the distance between the nearest house and the nearest, um, facade of the building, and that distance is 170 feet. Um, yeah, so that is, um... So these sort of details and these sort of, um, concerns that come from the neighbors, I think this is kind of what spoke to the planning staff when they crafted the, the data center ordinance. This is-- It, it's acceptable because it's, it's there, but it's not acceptable moving forward because we have to be more sensitive to the community needs and some of the impacts that are coming from the data center.
- 0:40:09
So, um, as a practical application to what we are showing now, they have 170-foot setback. We have a minimum 500-foot setback, in most cases more than 500 feet. And again, within that 500 feet is a significant, uh, distance, uh, a, a significant width of tree save area. Uh, so the note here says, "Setbacks and buffering, uh, meets, and in most cases, exceeds the new ordinance requirements."
- 0:40:39
Additional studies. So I went through the list of our consultants. Um, we prepared a noise study. So as a caveat to, um, this section, there's a-- we are limited to the amount of, uh, s- uh, consultant studies that we can prepare at this point because we do not have an end user. So the plan could end up a little bit different. Um, the building size could be a, a lot smaller. It could be exactly what we have. Until we have an end user, we cannot define a lot of this information that I'm about to read right now.
- 0:41:10
The important thing is we have a preliminary analysis based on what we are providing you right now, and, um, those analyses will be refined as we submit site plans. Uh, the noise study, uh, presented by Ramboll, it was a high-level acoustical feasibility assessment prepared for the project. A preliminary analysis determined the primary sources of sound, which are cooling, ventilation, air conditioning, and generators, can be mitigated to the required decibels as described in the data center ordinance with buffering and setbacks as required and other measures to be determined with the final layout.
- 0:41:45
Additional studies and acoustical modeling, modeling will be assessed with the site plan, and noise compliance testing is required every three years post-construction. And so I've also included a summary of the noise regulations, um, by Augusta County. Uh, we have to follow all these regulations, and we're not, uh, submitting for any variant-- var-variances to these regulations. The traffic study, uh, was prepared. They prepared an, uh, a signal warrant analysis and engineering report for the project. The project will generate approximately 1,400 daily trips, 177 in the morning peak, 167, 167 in the evening peak.
- 0:42:22
4-H Club Road will be realigned with full movement maintained at Mike Padgett Highway, Doug Barnard Parkway, and an, an extension of the Nixon Farms Road intersection. An additional connection will be provided to International Boulevard to the north. That's the road that's just to the east of the, uh, Fedex Ground site. Each intersection is projected to perform within an acceptable range of delay and with full, uh, with full build out. No signal installation is recommended. Uh, ECS prepared our cultural resources, um, uh, research and no, uh, NRHP-listed eligib- eligible properties, Georgia Centennial Farms, cemeteries, archeological sites, or recorded historic resources are within the project area.
- 0:43:08
I'm almost done, I promise. Uh, the fiscal analysis. So I like to call this page, um, above my pay grade because this involves a lot of analyses that are very data-driven and, um, not something that, uh... It's something that takes a lot of years to, to study and, and, and understand. But I included two charts that make sense to me, and hopefully they make sense to you. It basically says that there's a projected, uh, approximately 1,000 permanent jobs for the site.
- 0:43:38
And an approximate 38 million of annual gross revenues for Augusta-Richmond County when the project is built out. Um, power, I'll briefly touch on this, and then I'm going to, um, invite another colleague, Jim Cole, to come up and talk a little bit about it. Uh, a project intake form, which is just a Georgia Power official form, has been submitted and accepted by Georgia Power. An end user and final site plan details will need to be established in order to determine the power needed to adequately serve the proposed development.
- 0:44:12
Um, we had a meeting, as I mentioned, with, um, the Castle Pines Mobile Home Park, where there were a lot of great questions and concerns. Uh, a couple of things that we talked about and, uh, I'm hoping Jim can back me up on. Oops. Oh, crap. Oopsie, sorry. Sorry, I just made that much, much worse. All right, so resilience planning. So... Okay, I apologize. I'm gonna take my hand off that. Resilience planning, which basically means, um, when a natural or not natural disaster happens, how do we recover from that?
- 0:44:47
Um, uh, with, uh, natural disasters and system disruptions, um, something that Jim's gonna talk about, the end uter- end users will absorb infrastructure costs, contrary to the very popular theory that residents will incur increased utility bills, and the Georgia Power costs are mitigated because the end users pay more than market rate for the power. And with that, I'm gonna turn it over to Jim, who's got some great stories to share with you guys.
- 0:45:13
Thank you so much, and members of the commission, uh, it's great to be here. Um, I'll speak, uh, to some of the, uh, topics that Deja brought up, but I also wanted to put it in a little context is that, uh, I grew up in South Augusta. I lived on Pineview Drive. Uh, my mama taught at Gracewood. Daddy worked at County Oak Can. So, uh, I moved away, uh, years ago, but it's good to be back. Uh, the, the context I can bring here is that, uh, I currently live in Monroe County, Georgia, which is Forsyth, right above Macon, and we're in the process right now of developing two data centers, uh, very, very large data centers.
- 0:45:52
And so, uh, this team that has assembled are friends of mine. I've run across them in the data center world. And, um, I told them that I didn't mind coming and, and lending testament to the, to what we've gone through in Monroe County, how we've embraced it, and to provide some input with some of the, uh, questions that are out there. And what we've experienced in Monroe County, uh, we actively, six years ago, started recruiting data centers. Uh, that was our plan. We wanted to make our community a better place.
- 0:46:24
We viewed it as the least impactful way to move our county forward. Uh, but of course, along the way, uh, and first of all, I wanna say, I wanna thank the leadership of Richmond County for being proactive in these new restrictions that you've put in place. We had to kinda learn it as we went in Monroe County. We, we would have town hall meetings like this. We would take input. We would find answers. We would take people on trips to see data centers. So we did everything from A to Z, and so some of the ones that were brought up was, was power, you know, and how that it would affect our, our citizens in Monroe County, uh, because we're home to the largest coal-fired, uh, power plant in the northern hemisphere, which we all know coal has its, uh, stigma in certain ways.
- 0:47:09
But that was very important to us, uh, as a tax base. Uh, so what we researched, and if you go to Georgia Power's website, this is not my opinion. I'm not a representative of Georgia Power. But due to Georgia's growth, not only with data centers, but large usage customers like the potential Audi plant that's gonna be built in middle Georgia, the Hyun- Hyundai plant down in Savannah, Georgia Power has been able to take advantage of Georgia's, uh, proactive business stance, move the cost to those type companies, and then produce savings for the state of Georgia.
- 0:47:47
That's what we were able to, to find out in Monroe County, is that our customers actually were gonna be saving on their power bills due to how things have been, been projected around the state and benefits and savings. So I just wanted to lend a word from someone who grew up here, and I understand where you, where you live. I grew up there. I loved it. It was a way of my life. But I also have seen what these data centers can do for our county and how it's benefited our community to take things to the, to the next level.
- 0:48:18
So I appreciate your time.
- 0:48:25
All right, guys, wrapping up 'cause I feel like you have a lot to say. All right. So I, I won't, uh, uh, belabor the point of the conditions too much because you heard them earlier today. We have to comply with the site review process, which includes meetings, uh, plans of mission, site plans admissions, stu- uh, again, the studies, uh, are going to be refined, uh, and supporting documentation for review and approval. Max height is seventy-five feet. Uh, wetland, any wetland disturbance, uh, requires mitigation through the Army Corps of Engineers prior to site plan approval.
- 0:48:58
Uh, we're, we have to comply with traffic, uh, engineering department and Georgia Department of Transportation, uh, requirements. Lighting will be downcast and away from residential property lines. Future commercial development will comply with shopping center, uh, parking regulations. We are, we have to comply with the Augusta Tree Ordinance. Um, we are required to maintain that five hundred foot separation from residential properties and a hundred, one hundred feet, uh, along existing adjacent roads. Uh, we are to comply with the site plan regulations of Augusta, Georgia and the city's noise requirements.
- 0:49:32
We're required to have an eight-fence, eight-foot fence around the perimeter of the facility and finally, we are, uh, required to comply with all development standards and regulations by the City of Augusta. So the last slide, of c- of course, is hopefully to make you guys not yell at me when you're talking, when you're a- presenting your comments. But I did wanna read directly what I wrote in conclusion. Uh, we believe this project represents a strong application that is fully compliant with the data center ordinance and appropriately aligned with the comprehensive plan. We recognize residents and stakeholders w- will have legitimate questions concerning this proposal, and we hope we were, were able to alleviate some of those concerns in our presentation.
- 0:50:11
We also appreciate your patience, um, as additional information becomes available once an end user is identified and the site plan has been reviewed by the county. Our goal is to ensure this project delivers meaningful benefits to the community, community and to Augusta as a whole. Thank you guys for your time.
- 0:50:28
All right. Thank you, um, Jim Trotter and team for that presentation. Um, before we get into some questions and answers and some comments, let me say this. Um, I understand that this is a very polarizing issue, um, not just here in Augusta-Richmond County, but across our nation, and it has created strong feelings on both sides of the issue. Um, but regardless of, um, where, where you stand, um, I believe everybody deserves the right to be heard and to be respected.
- 0:50:59
So as we go into this next section of questions, answers, public comments, I just ask that, um, everybody refrain from interruptions or distractions, um, when somebody is presenting, and so I appreciate, um, your, uh, cooperation, uh, with that. So with that being said, commissioners, you've heard the presentation from staff. You've heard their recommendations, and you also have heard the presentation from the petitioner.
- 0:51:29
So are there any questions or comments from planning commissioners to the petitioner or to our staff? All right, I see Commissioner Smith, and then Commissioner McKnight.
- 0:51:47
Not for you, Jim.
- 0:51:48
Yes.
- 0:51:48
Miss Burt.
- 0:51:55
Yes.
- 0:51:55
Thank you for coming. Um, I'm not one to vote on things that I have some ambiguity about. Um, and then if you'll go back to your, um, your slide, I think it was on page two, there was a question that I wanted to know something about.
- 0:52:16
This one?
- 0:52:17
No. Keep going. Uh, maybe three or so. Stop, I think-
- 0:52:22
Comprehensive plan?
- 0:52:24
Yes.
- 0:52:26
Comp-
- 0:52:26
No, back up. You just had the right one. Here it says, "An air-cooled or a closed loop cooling system is required with limited exceptions." And I'm never one to wanna vote on something that I don't know about, and limited exceptions jumped off the page at me.
- 0:52:47
Yeah, that language comes directly from the ordinance. We have no intention of applying for those limited exceptions. In fact, I don't know if I read it or if Tom talked about it. We intend to have a closed loop system. It is the most efficient system. It is the, the trend with data centers. The limited exceptions language comes directly from the ordinance, and I just wanted to make sure I was stating that properly.
- 0:53:09
Thank you.
- 0:53:11
Commissioner McKnight.
- 0:53:11
I, I had a question for the staff mainly. What I'm... would like is some clarification on the due process of the submission, uh, and the-
- 0:53:24
Commissioner, speak into your microphone.
- 0:53:26
Yeah. Uh, I would like some clarification on the due process of the submission. I, I do not want to fall into the hole of where the public feels that they were not properly notified and did not, were not given proper discussions regarding this project. And if we could-
- 0:53:50
Oh, yes, sir, Commissioner. And thank you for that question. Yes, uh, this special called meeting was called in early November. I don't have the exact date. But what's required by law is that a notice must be published in the newspaper. The property must be posted within, prior, 15 days prior to the hearing, not further than 45 days. Those notices have gone out. The news- newspaper was published. The ad was published and notice was sent to all neighbors. I believe the applicant has submitted that proof of service to the planning commission for that notice that is gonna have the property is pro...
- 0:54:23
the property is posted and everything has been met. Uh, the hearing was posted at the Augusta County website as well as the municipal building, so everything has been met for notice purposes.
- 0:54:37
Uh, so, so I, I'm to understand that you, as far as the city legal interpretation of ordinance, all notices have been properly given out and we- we're on solid ground here?
- 0:54:50
Yes, sir.
- 0:54:52
Okay. I have one, one other question.
- 0:54:53
All right. Proceed, Commissioner McKnight.
- 0:54:54
So this, this is for the applicant, uh, mainly probably on the engineering side. I, I, I was looking at the location to, um, Bush Field, and one of the things that concerns me is that when we have our hot days or, or our cold winters, is if... I don't wanna fall into the same trap that happened in Texas. Are there gonna be, um, adequate backup power so that it does not strain the grid that could cause a cons- you know, ca- catastrophic problem at Augusta Bush Field or any of the other businesses around there?
- 0:55:34
Yeah, I'll let... Tom, if you wanna address that directly. The backup power, a lot of what you hear about the older data centers, the first several generations of data centers, the noise and-
- 0:55:43
You hear from those are diesel backup generators. These will not be have diesel backup generators. Any backup generator will be, um, fueled by natural gas. Um, this will not... My understanding is it will have its own separate, um, infrastructure connected to the power system and is not tied to the airport power system. You wanna come up and address that?
- 0:56:08
So, so that brings me... I forgot it. I'm also on the backup, will it follow the noise ordinance also on the backup power system?
- 0:56:15
It has to.
- 0:56:16
Okay.
- 0:56:16
And, and Deja talked a little bit about the noise ordinance during her presentation. I wanna put that in perspective. The, the 60 decibels overnight is the equivalent of a window unit air conditioning unit.
- 0:56:27
Right.
- 0:56:28
That is it. That is the limit of the noise that this thing can generate, and that's going to be through, and I left this slide up here, about 550 feet of buffer and existing trees that are there that are not gonna be removed. But it has to and will follow the ordinance passed by Council-
- 0:56:46
Even when, e- even when it's under backup power?
- 0:56:48
Yes.
- 0:56:48
Okay. So wha... So these things are very complicated to get all the way through. Are y'all prepared to go through to get the commitment letters from Georgia Power?
- 0:57:00
Absolutely. Commissioner McKnight, the first step is to get the zoning. You can't get the commitment on the power until you have the zoning. Georgia Power has a lot of applications in for these right now, as you can imagine, and they don't want to address any of them until you have the commitment on the zoning. They do have, um, a number of end users who are actively interested in this site, but they as well don't wanna commit until the zoning is in place. So it's a domino effect, and this is the first domino.
- 0:57:30
One last question. How long would construction last?
- 0:57:37
18 months to two years for a full build-out. Again, we're showing a full 3 million square feet of potential space. Depending on the end user, it would be less. It could not be more. You can't fit any more on this site as shown on this site plan. Because of the configuration, the buffering and the wetlands, you can't fit any more. But if it's a full 3 million square feet, it's probably a two-year build-out.
- 0:58:00
Thank you.
- 0:58:03
All right, Commissioner O'Neill.
- 0:58:05
Uh, thank you. Um, to the applicant, speaking of the, uh, backup generation, what would the neighbors expect if those units were to go online as far as methane emissions in the communities?
- 0:58:19
It would be out in the mountains.
- 0:58:28
It's a gas generator. It's a methane gas generator.
- 0:58:31
Yes. Uh, I imagine for a facility of this size, 'cause I'm gonna ask you a question about 600 megawatts, but if you're using backup generators to produce that type of power for the needs of your machinery, what would that do to our air?
- 0:58:46
I'm not sure.
- 0:58:48
Thank you. Okay. Now let me ask you about 600 megawatts. What I keep reading about 600 megawatts is that that's, uh, that's equivalent to almost 75,000 houses. You're, and you're saying that you might hit 600 megawatts peak. Is that on a daily basis or is that... What, what is that measure of?
- 0:59:16
Yeah.
- 0:59:19
It's... D- data centers are classified based on their total power usage. It's not 600 megawatts per day is my understanding, but these are classified with Georgia Power, um-
- 0:59:30
All right, to the audience. Excuse, pardon interruption.
- 0:59:33
Based on the type of-
- 0:59:34
Pardon, pardon interruption, Mr. Trotta. Again, to the audience, please refrain from the disruptions, um, or your comments or any demonstrations of approval or disapproval while the speaker has the floor. Again, we would greatly appreciate your cooperation.
- 0:59:52
All of the infrastructure necessary to deliver the power on site and from Georgia Power is paid for by the developer. It is not... I- it, it is paid for initially by Georgia Power, but funded with a bond. All of these data centers, especially the ones we've all heard about in Columbia County, they have put up tremendous, I think, 10-figure bonds with Georgia Power, so that if they don't draw the power that is used to pay for the construction of the infrastructure, there's a bond for Georgia Power to claim on.
- 1:00:24
So this infrastructure is... It was new power coming in. It's not power being drawn from existing neighborhoods, but it's new power being funded by the developer for the site.
- 1:00:35
And see, I, I tried to get clarity on this, um... Excuse me, Mr. Chair.
- 1:00:39
Continue.
- 1:00:39
But, uh, I'm thinking that we're in this capitalist society, that we're, we're... that pricing is a, a function of demand, and we have one user coming into our community that is consuming the amount of power of 75,000 houses, and y- we're saying that it's not daily. I hope to God it's not daily. But, uh, average house using 10,000 kilowatts per year, how would that not get over into the residential market? I know you're gonna say, "Well, the Public Service Commission sets rates." But we have an entity, and we saw what happened with pow, um, um, the, the Plant Vogtle, the cost overruns getting over into our bills.
- 1:01:17
I don't know what's gonna protect us from, uh, in 2028 when the rate, uh, base rate freeze is over, how they're not gonna shift that over to our community. 'Cause everybody can say, "Yes, these data centers are paying for the infrastructure," but I'm thinking you're saying you're paying for your infrastructure, not the n-n-d, energy usage.
- 1:01:36
The Public Service Commission is set up in a way to make sure that the energy usage for these data centers, the regulations that the PSC is passing says that they... that, that the energy for these cannot be passed on to the consumers, the neighbors, anyone in the county other than the end users. That's why the bonds are required to be put up, so that if for whatever reason, if a data center went away or didn't use the power that it projected to use-
- 1:02:03
There's a bond for Georgia Power to claim on and reimburse itself for the infrastructure build-out.
- 1:02:09
Okay. Last question, sir. Um, and I wanna ask Ms. Burke this one. I'm gonna ask you this question.
- 1:02:15
Okay.
- 1:02:15
It's gonna be a...
- 1:02:17
Thank you.
- 1:02:19
Ms. Burke, you had mentioned the timeline of, um... And, and again, I want a little bit more clarity. You don't have an end user in mind right now. Right now, we're just deciding on how this property is going to be used. Can it be used for a data center park, right? We don't have an end user in mind.
- 1:02:36
That's correct.
- 1:02:36
In our, in our... The, the way this was given to us when the Planning Commission was first told about this text amendment, and we had a, a certain timeframe to respond, has anyone in your organization approached the Planning Commission about this project before the Planning Commission heard it as a text review or text ordinance review?
- 1:02:58
Let me ask a follow-up question. Are you asking if we had any input on the data center ordinance? Is that your question?
- 1:03:03
Uh, my question is, because when I felt that this was rushed on us, and I, I'm still thinking that we need more time, it was brought to the Planning Commission for input on it, and we had a, a sort of kind of public hearing. And I asked the question-
- 1:03:25
Yes
- 1:03:25
... was there someone out there that was trying to apply for this, that this was being pushed on us and asked for us to turn around a decision? And that decision was not given to us. It was taken to the Commission, um, and there were some... I, I still have some issues about that. So my question to you is, had anyone in your organization approached the, the staff about potential usage of this property before we heard, um, a ordinance review needing to come?
- 1:03:54
Yeah, to my understanding, no. The first time I met, uh, Director Cl- Cameron was at our pre-application meeting. So like I, I explained a little bit in, uh, the genesis of our project, I basically got the information the same time you guys did. So when there was a draft ordinance, I refined my concept plan in accordance with those draft ordinance standards. So I didn't have any, um, uh, notice. I didn't have, uh, a plan to send to anybody to, to, uh, to have any additional input. Um, I am reviewing things as it's become, uh, available to the public.
- 1:04:26
Okay. Your organization's very efficient. Here's where I'm going, because you all were able to come with a project-
- 1:04:31
Yeah
- 1:04:31
... right behind this passing, within a month.
- 1:04:35
Yeah, and, and it, it's kind of difficult because we can't re-litigate how the data center came to be. We have to... My job is to focus on this application in, in particular, and when I initially drafted the concept plan, I used the heavy industrial standards because the data center ordinance did not exist. So when I became aware of the data center ordinance, I started to refine how this concept plan looked. So the, the ordinance informed the plan. The plan did not inform the ordinance.
- 1:05:02
Okay. Thank you. That's all my questions.
- 1:05:05
All right. Commissioner Spencer.
- 1:05:07
This is more to s- this is more to staff. Um, our... Thank you. Our, our governor-elect has asked for a pause, and my question, if after their pause, if they're more restrictive, um, than some of the things that we have in our ordinance, will that... Where, where will this fall in, in-into that?
- 1:05:34
Um, can you, can you repeat?
- 1:05:36
Well, our, the new gov- government, uh, coming in-
- 1:05:41
Yes, ma'am
- 1:05:42
... is asking, look like they're gonna go in right away asking for a pause just to look at things to make sure that the data centers are being a benefit to the communities, uh, and promising everything that they have promised. And I'm just, my... I'm just wondering, if three months down the way, the state of Georgia have a more restrictive... For example, I'm concerned about the 500 feet. That's a, a football field, a little over a football field.
- 1:06:12
It's, it's a 10th of a mile from homes, um, five, a five-minute walk. I just didn't think that, in my opinion, that that was a, um, s- was great, was a good idea to be that close to a residential neighborhood. So would the State of Georgia, after the, after their pause, and they look at what they're looking at, if it's a more restrictive policy, where will we fall with this?
- 1:06:37
Yes, ma'am. Um, thank you, Madam Spencer. Um, the 500 feet is actually about three football sizes. Um, it's not a five-minute walk, I promise you. But, um, th-that request can come from this commission. It can come from the Augusta Commission. It can come from, um, um... That request can come from anyone that I- If, if, if... It can come from a resident. They can, they can, you know, talk to their commissioner and ask for, um, a review, and that commissioner can decide to initiate that application.
- 1:07:13
So, um, it would have to be... Of course, it would have to come before this Planning Commission first and then to the Augusta Commission. But that is a, that would be a process, um, to, um, you know, to go along with the state recommendation. It's not, it doesn't just happen automatically. It would have to be an application process. Did I answer?
- 1:07:33
If the state, um... If the state is more restrictive, we would still have to, there'd still be a application. Thank you. It would still be a application process if the state was more restrictive. If they require 1,000 feet, for example. I'm just...
- 1:07:50
Yes, ma'am, because we're a home rule state.
- 1:07:53
Okay.
- 1:07:56
Commissioner Smith.
- 1:07:59
Director, I, I wanna be, I want to clear this up a little bit. Whatever the new governor decides is
- 1:08:09
A recommendation because we are a county home rule state and whatever the county commission, which is the governing authority for Richmond County, those are the rules that are propagated and relied on. So what we get from the state is a recommendation of some people in Atlanta, but they're not tied to us because our governing authority is the county commission. Am I correct in my statement?
- 1:08:38
Yes, sir. You are.
- 1:08:39
Thank you.
- 1:08:42
All right. Are there, um, any additional questions or comments from commissioners?
- 1:08:57
Okay. All right. So I was just reminded, I told you guys earlier at 3:00 we would pause so that the staff could reread the, um, petition into the record. So that's what we'll do. We'll take a brief pause and allow Director Cameron to reread the petition into the record. Director Cameron.
- 1:09:14
Thank you so much, Mr. Chairman. For, um, case number Z-26-18, a petition by 3G Investment LLC on behalf of The Nixon, uh, Trust, requesting a rezoning from zones A, which is agricultural, B-2, which is general business, and HI, which is heavy industrial, to rezone to DC, which is data center district, affecting properties containing approximately 383 plus or minus acres, located at 1538 and 1550 4-H Club Road and 3806 Mike Padgett Highway.
- 1:09:56
Uh, the property is located in District 1, which is Commissioner Jordan Johnson's district.
- 1:10:05
Um, the, the, the concept plan submitted by the applicant provided some of the following, which established, um, a, a conceptual plan of a data center campus consisting of seven buildings situated, um, at least 500 feet, um, at minimum 500 feet from the nearest residential properties or residential properties. Um, the 500-foot buffer with the preservation of a significant number of existing trees and open space.
- 1:10:36
There was a traffic, uh, engineering report that was included, uh, which showed the realignment and improvements of 4-H Club Road to meet city standards. Um, and then also a, a primary entrance along the east side of Mike Padgett Highway. There is, um, proposed additional access connections along Nixon Farm Road, International Boulevard, and Doug Bernard Parkway. Um, this proposed development is generally consistent of the vision and development, uh, objective outlined in Envision, uh, Augusta, which is our comprehensive plan for the South Augusta area.
- 1:11:16
And the reason why we said generally consistent is because even though the, the comprehensive plan does not spell out data centers, it talks about, uh, mega wa-warehouses. Um, the area contains a limited but established presence of industrial and warehousing uses scattered in the general area. Of course, in this area also, the character area is older industrial development, which is primarily clustered, um, near the Gordon Highway, while newer light in-industrial uses are generally located along arterial and collective roads near the Bobby Jones Expressway.
- 1:11:54
Uh, the proposed data center is consistent with this broader development pattern, particularly given the presence of existing industrial and light industrial uses within the South Augusta area. Its location and proposed use supports the continued development of employment generating and industrial uses in the areas where such development is already established and participated. Um, and Honorable Chair, our recommendations, planning and development, um, proposed recommendations for this rezoning request, staff recommends approval for the rezoning request of a, um, from those, um, before mentioned zoning districts to a DC or a data center district with the following conditions.
- 1:12:41
The proposed project must have a pre-application meeting with the Development Review Committee to provide a Augusta site development regulations and standards, uh, review process. Um, this includes the conceptual plan studies that was, uh, previously mentioned, um, air quality, um, a letter from the, from Georgia Power, um, traffic studies, um, you have air quality studies, um, a lot of different studies that we talked about in our meetings.
- 1:13:12
Uh, those would be those supporting documentations for review before an official submission of the site development application. The development must comply with engineer- with the engineering department regarding road ownership and design. The final layout of roads and streets alignment must be approved by the engineering department. The total height of the, any of the structure shall not exceed 75 feet. Um, and then also, you know, this is include the operating and maintaining of the, uh, parapet walls which, which will cover, uh, any, um, any of those, uh, um, structures that will support the building.
- 1:13:52
The development shall mitigate the wetlands, um, with the Corps of Engineer on the property prior to site approval. The proposed development shall comply with all requirements, uh, of traffic engineering and Georgia Department of Transportation at the time of submittal. For site plan approval. Um, a lighting plan, of course, is going to be provided, um, must be provided. A tree protection plan, landscape plans, um, and then of course, the development is subject to the parking regulations set forth in the, uh, zoning ordinance.
- 1:14:26
Um, as shown on the conceptual landscape plan, which was dated September the 28, 2026, um, the development must maintain a minimum 100-foot natural buff- buffer along the Mike Padgett Highway, Doug Barnard Parkway, and Tobacco Road. Approval of the, the, um... If this rezoning is approved, it shall not constitute approval of the conceptual plan submitted with the rezoning application. The proposed development shall go through the site development plan approval process in compliance with the data center and site plan standards and regulations of Augusta, Georgia.
- 1:15:05
This development project shall comply with all development standards and regulations set forth by the Augusta, Georgia at the time of development. And, and Mr. Chairman, this concludes staff report.
- 1:15:14
All right. Thank you, Director Cameron. Okay, so we're going to move into the public comments, but, um, this is where I need some group cooperation, um, from everybody in the audience, okay? So we can make sure we do this, um, orderly and respectfully and efficient. So, um, I just got a, a few ask. Um, the first is, there are a lot of people signed up to address the, um, the commission. So in order to hear everyone, I'm gonna ask if you keep your comments brief, um, no more than three minutes, um, so that we can hear from, um, from everybody who wants to be heard.
- 1:15:54
Um, if you, if your comments is going to exceed three minutes, then, um, on the agenda here at the bottom is a way to get in contact with planning development staff so you can submit your verbal comments, um, or written comments there to the, to the planning development staff. Um, we'll get there. Uh, so you can do that if your, if your, if you feel your comments are gonna exceed the, um, three minutes. The other thing is, um, because there's so many, the commission will just receive comments.
- 1:16:28
We won't necessarily be entertaining any questions. But again, if you do have questions, um, we just encourage you to reach out to the planning and development, um, staff, because whatever the recommendation is here today, it will not be heard by the Augusta Commission who has the, um, final, um, action until January. So you have plenty time to get your questions answered, um, with details by the staff. Um, then also, if you look around and you see somebody from your neighborhood or if you, um, are in, uh, are in the same organization, um, we just ask if you just select a spokesperson to deliver your sentiments.
- 1:17:16
Um, again, we're just trying to move through this as orderly and, um, efficiently as we possibly can. And then the last thing that I just wanna reiterate is that we are the planning commission, and our responsibility is to make decisions on land usage. And so the decision that we have to make here today is if the land use is, uh, appropriate for the desired classification, which is the DC. Now, I do understand that many have questions about the particular project that's being proposed, um, and perhaps the integrity of the process.
- 1:17:53
Um, again, you know, I just encourage you to, um, direct those questions to the planning and development staff. Um, and so again, with those couple of ask, um, you know, if we all adhere to that, everybody should be home by dinnertime. All right. So, so with that, I'm just going to ask you to, um, self-govern. If you would like to speak, um, if you could just line up to my right over here, and we'll begin the public comment.
- 1:18:25
Oh, you wanna... Okay. Yep. Yep. So, yeah.
- 1:19:02
All right, all right, all right. So, so again, if we could, if we could do this in a, in a orderly fashion, if you would like to address the commission, if you would just make your way.
- 1:19:25
You, you, you ready for me, sir?
- 1:19:28
Hold on just one second, sir.
- 1:19:30
Okay.
- 1:19:45
All right, everyone. Okay, so we're, we're, we're getting ready to begin the public comment section. And a- again, again, I just want to remind you all-
- 1:19:56
Hit it
- 1:19:56
... that, you know, we want, we wanna do this in a decent and respectful manner. And so again, knowing that, um, individuals over here who are speaking may be in support or they may oppose, but whatever it is, please give them the, the respect Um, that they deserve while they're presenting their comments. So if you would just refrain from, um, any interruptions, distractions, or demonstrations, uh, we would greatly appreciate that.
- 1:20:26
All right, sir. So again, if you could, uh, give us your name, your county of residence, and if you could keep your comments to three minutes, we would greatly appreciate it. Thank you.
- 1:20:36
Yes. Uh, my name is Bobby Wallace, Richmond County, off of Tobacco Road. I have three, uh, quick points. Uh, being that, uh, Augusta is the third largest city land-wise in the, uh, state of Georgia, why this location? That's the first one. We can move it further out where it wouldn't interrupt anyone. The second one is, uh, notification. I think that we did what we already have in place, I think that was very minimal. Just like all the elections, there were signs all over the city. So I think if the signs were bigger, where we could see them easier, it would've been better.
- 1:21:10
Newspaper, most people don't read newspapers, so I suggest a more way of advertising what we were doing. Uh, the third one, the analogy about, uh, air conditioners is like one in your house is different. I've been around a lot of tech- a lot of technical control facilities in the military all over the world. When you put a lot of air conditioners together, they're not the same size of the ones in the windows. They're huge, uh, air conditioning units. They make a lot of noise. That's the only thing I would have to say. Thank you.
- 1:21:39
Thank you so very much, sir. All right. Next. Sir, would you-
- 1:21:43
Thank you, ladies and gentlemen of the commission and the committee, um, and to the chambers here. Uh-
- 1:21:48
If you could give us your name and your county of residence before you make your comments.
- 1:21:51
William Hicks, Richmond County, lifelong resident, and I live in close proximity to the Tobacco Road site. Um, I wanna, um, share with you some thoughts and concerns of the community. This proposed data center seems to be a big secret operation in that no one knows of this LLC, what data is to be stored, from whom, what purpose. It is like a shell game or pig in the poke. Permit now, deal with later. This land would serve all of Augusta much better as schools, hotels, shops, businesses, an exclusive home neighborhood, a town center like Evans.
- 1:22:29
The water, power, noise, light are all valid concerns in that we live, grocery shop, use restaurants and business in close proximity. These and a medical center are what we need in South Augusta, not a data center. An area where, um, wells, the wells and water table are prevalent should not be considered for such project. An area that is a gateway for Augusta should not be considered for this type of project.
- 1:22:59
The right development to blend the industrial sites present to surrounding commercial, agriculture, and residential growth would be best in short term and long terms for the whole of Augusta. We hope one day when asked about surrounding areas, people will say, "What part of Augusta is that?" Not, "Where is that?" This is the case around Atlanta. However, here, our outreaches have not been included for their great potential. This is a must for a great Augusta.
- 1:23:31
Please make the best decision for Augusta and the citizens, and thank you all again for your service and your time today.
- 1:23:39
Thank you, sir.
- 1:23:43
All right. Welcome. If you'd give us your name, your county of residence, and your comments.
- 1:23:47
Okay. Good afternoon. My name is Zakiyyah Mabry, and I reside in Richmond County. And I have three points, um, that I wanted to address today. The first is questioning development is not fearing progress, as was indicated or alluded to earlier. So I wanna gently push back on the suggestion that residents questioning development are simply afa- afraid of change. Many of us have spent our professional lives embracing innovation, managing complex projects, and supporting responsible development.
- 1:24:21
Earlier development, the developer compared a data center expansion to the s- construction of an interstate highway system, but let's remember the rest of the history that was not shared. Highway construction also displaced families, divided neighborhoods, and created consequences that lasted for several generations. We didn't talk about that part. Progress, some of it came with significant cost to others. Before moving here over three years ago to the Augusta area, I lived in the DMV.
- 1:24:51
I lived in Prince William County, not far from Potomac Mills Mall. So I'm very familiar with the DMV. I know the commissioners, elected officials such as Vic Angry, um, who we attended church with. Kenny, um, Body, um, along with other community leaders and advocates who raised concerns about data center and infrastructure. Never did I imagine coming here that we would be 500 feet from a data center development, QTS, who live in Hang Station.
- 1:25:26
And let me put this out there in perspective. A data center is n- like, it takes me 10 minutes from my front door to the proposed site where they're clearing. So it's not three football fields, it's like 1.4, so it's not a far walk. All right. So Augusta, we have an opportunity here to learn from other communities. We don't have to repeat their mistakes. We have an opportunity to get it right. We just need to slow down. We need to slow down and listen. Listen to our community.
- 1:25:57
Listen to not just selected, handpicked experts, but maybe an array of different professionals. We're asking whether the people who live in, um, the areas to be heard. Their voices matter. Number two, public infrastructure and taxpayer accountability. During a, um, recent trip, we too, my, my organization, we took people to the Atlanta area for a trip, and we're gonna play a little bit of a sound.
- 1:26:30
... in someone's backyard. So yeah, taking field trips, um, learning experiences, that, that's a good idea. We did it. And we wanna talk about last week when we were talking about the easement. The city, um-
- 1:26:43
Excuse me. Could you bring your final comments to a close?
- 1:26:47
I just want to say that I'm a taxpayer. I own a home here. The presentation was almost an hour. So I came here today to not speak for just myself but also my community. So I have two more points that I want to get out. Is-- Don't you think that's fair?
- 1:27:00
But we, we're just-
- 1:27:01
I live here.
- 1:27:02
We're just... Well, let me... Well, let's, let's do this. Let's do this just, just so that we remain fair. If you can let everybody finish, and then at the end, we'll-
- 1:27:14
I'd like to finish my remarks, please.
- 1:27:16
But, um, but I'm at... I, I'm just, I'm just asking.
- 1:27:18
You're at two minutes now. Just like everybody.
- 1:27:21
Okay. All right. Proceed. Two, two more.
- 1:27:26
Okay. Thank you, um, for the grace, everyone. Um, public infrastructure and taxpayer accountability. So we're talking about $10 they sold this easement for. Why is that important? Because we saw the big structures that they put in the front of people's homes, behind their homes, and selling it for ten doll- $10 when we say we're, we're in a deficit, why wouldn't you charge more? Also, what-- how many other ones are they planning to sell? I think you need to look into that. Um, trying to go through my points as quickly as possible. I'm not reading everything.
- 1:27:58
When they talked about jobs, this is very important. They, uh... It was stated that the analysis of the project had 571 direct full-time equivalent positions. But in something else, it said that it was like, um, 40. So that's a difference of 531 positions, y'all. Make it make sense. I'm not making this up. So, um, as we're closing, 'cause I'm skipping over a lot, I wanna be clear. I, Zakia, is not opposed to technology.
- 1:28:30
My husband is an engineer. I am not opposed to economic devel-velopment, development. I'm a business owner. Own two businesses. What I am opposed is poor governance. What I am opposed is, like, stifling people's voices. What I am opposed is to rushing through processes that will affect us from the long term. That's what I'm opposed to.
- 1:28:54
Thank you. All right. All right, sir. If you could give your name-
- 1:28:58
Yes. Absolutely
- 1:28:59
... your county of residence and your comments.
- 1:29:00
Augusta-Richmond County, uh, resident here, uh, Donald McNair. Um, all right. So I'm gonna read this to make it brief. "The word that hides a building. There is a lie hiding in plain sight, and it is a single word. Everyone calls it the cloud. Back up your photos in the cloud. Store your files in the cloud. Run your questions through chatbots that supposedly live in the cloud. It's a soft word, weightless word.
- 1:29:30
A cloud floats, drifts, takes up space, weighs nothing, costs nothing. Saving something to the cloud tells you it has gone somewhere clean and airy and far away, somewhere not worth thinking about. There is no cloud. There has never been a cloud. There is only buildings. Every photo ever backed up, every email ever sent, every question ever typed into an AI system sits inside a physical building made of concrete and steel, staying on real ground and real town, drawing real electricity through real wires, and real-- often drinking real water through real pipes.
- 1:30:05
The cloud is a marketing word laid gently over a landscape of warehouses, and those warehouses are subject to, uh, the data centers. Think about a light switch. Flipping it doesn't bring the power plant to mind. Turning it on to a tap doesn't conjure the reservoir." Moral of what I'm trying to ask you is, for one, we wasn't let known about this for a short period of time. Consider our comments, please.
- 1:30:35
Thank you.
- 1:30:36
Thank you.
- 1:30:41
I have something I wanna put on the screen and show.
- 1:31:05
Too far. Go back.
- 1:31:11
Thank you.
- 1:31:14
Good afternoon.
- 1:31:15
Good afternoon.
- 1:31:15
My name is Gayla Keesee. I live in Richmond County. I am co-president of the League of Women Voters of the CSRA. The league takes no position on whether a data center should be built on this site. Our concern is the process, whether this request follows the ordinance that Augusta just adopted, and whether the record is complete enough to decide on. Our full written analysis is in this record. I sent it to k- um, Ms.
- 1:31:47
Bonner and to y'all earlier today. I was hoping that y'all would have access to it. Um, but our analysis is here. It's a nonpartisan analysis. Thank you, Zelwin, for giving us a copy of what was gonna be discussed today so that we could actually do that, since it was not provided for the public ahead of time.
- 1:32:15
Mr. Manton answered the question that I asked this morning about the rezoning. Said the property would be rezoned to DC and all requirements of ordinance number 8016 would govern. With respect, that answers a different question. The des- the signed copy he attached contains no provision creating one. Section 24-A3C permits these uses only by special exception in the underlying zoning districts on approval by the Augusta pr- Commission.
- 1:32:56
DC district classification is a heading. A heading is not a district, and a vote today cannot create what the ordinance does not. The pathway matters, because the ordinance ties into safeguards to the special exception. The decommissioning plan is due with the special exception application. The annual certification is key to the approved special exception.
- 1:33:28
A rezoning creates neither hook, neither hook. And SE26-22, the only pathway the ordinance provides, sits on today's agenda with no staff analysis and nothing that withdraws it. The record is missing what the ordinance requires now. No decommissioning plan in the 165-page packet, and the only Georgia Power document is an automated July 1st intake acknowledgement, not the coordination letter that Section 24A9, A9A requires for a 600-megawatt project.
- 1:34:12
The departmental record is mislabeled, too. The staff report lists engineering comments as none received, but Director Malek's November 12th letter is in the regional commission's DRI report addressed for this commission's consideration, questioning whether the 570-foot setback to Castle Pines is real, and advising that a relocation agreement be worked out prior to approval.
- 1:34:42
None of it appears in this package under his name. That DRI report reached the league at 10:19 this morning because it didn't come into effect and completed until last Thursday. That's what? Five days before this meeting? Over a weekend? The finding advisory Georgia's rule requiring adequate time to consider it is state law, and the report describes the application it reviewed as rezoning to heavy industrial, not the data center rezoning before you today.
- 1:35:22
The applicant's own attorney read the ordinance, as we do, on September 23rd, and again, September 24th. We have the open records request. Mr. Trotter asked the director in writing whether the file for HI with a special exception or for a direct DC zoning, and this afternoon, the applicant's presenter told you that until there is an end user, they cannot define a lot of this information.
- 1:35:53
The staff report says a petition must meet all seven of the criteria. Criteria one, I mean, not, criteria four is not met. The use is available today in heavy industrial through the special exception the ordinance provides. Our request is to defer action on Z2618 and SE2622 until the city identifies the correct legal process, the required documents are in the record, and the public has had a genuine chance to review them, as well as y'all, because you didn't get them till Friday.
- 1:36:34
Yeah.
- 1:36:36
Thank you.
- 1:36:40
Thank you. Next speaker.
- 1:36:44
My name's-
- 1:36:45
You're welcome
- 1:36:45
... Catherine Davis. I live in Richmond County. I'm co-president of the League of Women Voters of the CSRA, and I would like to point out, I'm not sure who exactly is responsible for correcting this, but our city's website has three versions of the ordinance on it. We don't know which one is the real one I believe the commissioners voted on something that was a red line. Many of the things that we were told that were going to be included in the ordinance, such as the decommissioning plan and the bond to restore the property to its former health, were removed.
- 1:37:23
A lot of the guardrails that we wanted in that ordinance were removed. We don't know why. So I agree with the commissioners. This should not be rushed. We should be doing this deliberatively. Thank you for your time.
- 1:37:39
Thank you.
- 1:37:43
All right, ma'am, could you give us your name and county of residence and your comments?
- 1:37:46
I'm Elaine Bailey. I live in Richmond County, right down the street from this place, right next to Cross Creek High in Cypress Point. Want to be very specific. All I wanna say is, if you say yes, please put an addendum to buy my house 'cause I don't want to live there. Thank you.
- 1:38:03
Thank you.
- 1:38:07
Good afternoon, sir. If you could give us your name, your county of residence, and your comments.
- 1:38:13
My name is Richard Jones. I live in Richmond County. I've spoken to you guys before. I've also spoken to the commissioners and the mayor. I presented the commissioners... I want everybody to hear this. I presented the commissioners and the mayor a 36-page international data report authority on data centers, and I also informed them, and I've informed you guys, the other one that you guys should read is the one from the United Nations da- data center report, and both of them do not speak favorably of data centers.
- 1:39:02
Okay?
- 1:39:05
S- and I spoke to this committee, to the mayor, to the commissioners and all back in, uh, July 21st. I have my receipts. I have my receipt on the phone. It'll take too long to play for you guys to hear it. I provided that 36-page report to the commissioners and the mayor, and I asked them, "Did any of y'all read the report?" None of them raised their hand saying they read the report.
- 1:39:36
I'ma say again, none of them. How do I know this? Ms. Bonner pulled her copy out of her folder, her file, and presented it to the mayor and said she put it in their binders for them to read. Okay? So therefore, moving forward, data centers, AI, Oracle, uh, Meta, if you notice since July, they wind up hacking each other accidentally.
- 1:40:12
Y'all heard the news stories.
- 1:40:13
Yeah.
- 1:40:15
Okay? They wind up hacking each other accidentally. Can you imagine if somebody put in some bad information, and then what happens? Point in case, WellStar gave up 890,000 medical information of people in Georgia. WellStar did. Okay? That's a mistake, a big one. Can you imagine what it could be going forward? Um, employment-wise, they will only provide a minimum number of jobs, as was mentioned earlier.
- 1:40:54
We approved the SPLOST fund to provi- to put the waterways in for the industrial park to recruit and hopefully get four corporations from Europe to come to Augusta, which will provide more jobs by production process than a data center or two data centers will. Keep that in mind. We approved the SPLOST fund to put the waterways in at the industrial park.
- 1:41:25
Okay? The economic development director, he came and gave a briefing to the Neighborhood Alliance on four companies from Europe wants to come to Augusta
- 1:41:38
for long-term jobs, good-paying jobs, not the small stuff that data center wants to provide. Um,
- 1:41:50
I am a strong opposition to data centers. Um, and remember, I showed y'all a map back then, how many was created in the United States. Of course, the state of Virginia was the highest. At that time, Georgia was 219, which has gone up more than that now. So, um, I asked for a moratorium of 180 days back in July.
- 1:42:18
New Governor-elect Bottoms asked for a year of moratorium. What's wrong with that? Nothing. Nothing. Okay? Because the young lady's been working on getting an ordinance, right, or try to get it stronger. Birmingham, Nashville, and Mar-a-Lago. They all turned down data centers. Okay? We can t- we can... We got one coming.
- 1:42:48
We don't need no more. Thank you for your time.
- 1:42:51
Thank you.
- 1:42:55
All right. Welcome, sir. If you could give us your name, county of residence, and your comments.
- 1:43:00
My name is Thomas Bradford. I live in Richmond County. Uh, first off, um, I just wanted to let you know that, um, according to all the reser- research I've seen
- 1:43:10
Uh, 600 megawatts is more like the equivalent of 400,000 households
- 1:43:15
Yep.
- 1:43:16
Um, which is, you know, a lot. Um, but I also wanted to talk a bit about, uh, something that they brought up, which is that they don't have an end user yet, which means that an awful lot of the assurances that they're giving us aren't really assurances at all. Their cooperation doesn't really reflect the cooperation of an end user. Uh, I have questions about enforcement. Uh, fines don't really stop these people.
- 1:43:49
Um, but more than that, they brought up the point that, you know, we all use the internet every day, but the truth of the matter is that the internet will not go away if we don't build this particular data center. Thank you.
- 1:44:07
Thank you, sir.
- 1:44:10
All right. Next speaker, welcome. If you give us your name, your county of residence, and your comments.
- 1:44:15
Could I, could I request that this, uh, this QR code get put back on the screen, please, for anyone who didn't get it the first time? And, uh, so my name is Greg. I'm, uh, I'm currently li- living in Burke County, but just barely. I'm basically touching Hephzibah. Uh, grew up here in Augusta, so that's my, uh, that's kind of my background. But let me go ahead and get started.
- 1:44:32
Sorry about that.
- 1:44:33
Thank you, sir. No, you're good. All right. First, I wanna say, I'm sorry, I don't know your names, all you, uh, Jeffrey-
- 1:44:39
Mm
- 1:44:39
... Hoosier, sir. Um, you said that this topic is polarizing, and that kind of touched me in a weird way because, um, I think you only think that because you're hearing from the people who have a vested interest and a profit motive involved. Anyone who lives here in South Augusta does not want this. It's not polarizing. There's not a single person who is for this. Not a single person who lives here is for this. The people who are here who are for it are from Maryland, Virginia, and guess why they're here.
- 1:45:09
So it's clear to me that Virginia and Maryland and all these other states these people are from, they were infected. They were infected by a virus. A- and those citizens had an immune response. They got up, and they said, "No." And what happened? That virus had to find somewhere else to go, and they came here. They're in this room with us right now, and they want to take our city for their own profit. They don't live next to data centers. They don't care about us. They're trying to ruin us for their own profit, and there's no other way around it. Anyone here who votes yes when the vote comes around, I want you to know that we are looking at you, and we know that they're in your ear.
- 1:45:45
That's why you let them talk longer than you let us talk. Anyways. I know you told me not to single out anybody, so I'm not gonna do it. But s- hypothetically, if someone was from Monroe, Georgia, and they were for putting data centers in that place, I guarantee they're not sleeping next to one. I guarantee they're sleeping in a different city altogether for the majority of the year. They're proud of where they came from, but they're not going back, guaranteed. Nobody wants to be near that. Uh, now some, uh, some of, um, objective information here. They're talking about noise levels. "Oh, we're not gonna be above 65 during the day DBA, 60 at night." Oh, that sounds pleasant, right?
- 1:46:20
But 65 is the sound of an air conditioner unit outside the house. Who here goes outside on that side of the house? Who hangs out next to their air conditioner? Nobody. And then 60 at night? Okay, that's fine. It's the sound of a conversation. So you're telling me at, at night, I'm laying in bed, and there's a sound of a conversation out my window? No. Yeah, we're within the regulations, but that is not something we can accept. That is a problem. That's a nuisance, and I'm pretty sure 300 feet is the law, at least in Hephzibah where I'm at constantly.
- 1:46:51
Uh, if someone can hear you clearly as a conversation from 300 feet away, that's a crime. And if we have a conversation-level sound at night coming from this place, that's a crime. I'm pretty sure that's a crime. All right. Megawatts, this is important. I think a lot of people get confused on megawatts and watts and watt-hours. It's a big thing. A megawatt, a watt describes how much power you're pulling continuously. This is a 600-megawatt facility. That's how much power they're pulling continuously. Every hour that they pull 600 megawatts, they are using 100, uh, 600 megawatt hours of power.
- 1:47:24
We get charged by the kilowatt hour of electricity for our electric bills. I did the math. All right? One megawatt is enough to power between 700 and 900 homes for, um, a, um, megawatt hour. I'm sorry. Uh, 600 to 900 homes for a month. All right? So an average home uses 900 kilowatts hours per month. This facility uses 600 megawatt hours per hour. That is roughly 660 months of a single house per hour at this location.
- 1:47:58
That puts it in perspective for you to, to really get the math together. Your house for 660 months is one hour of this location. Keep that in mind. All right. And then someone behind me is, "All people need data centers. They're important to us." Yeah, maybe, but you know, I don't sleep next to the, uh, the poop, you know, waste place. You know, I don't need that out my window, right? We, we put things far away for a reason, and putting it in Augusta where people already live makes no sense. I, I guess I can't say I'm against data centers all the way 'cause I do use them.
- 1:48:32
You know what? But putting them where, uh, directly across the street from Goshen, Food Lion, all, every, you know, Rack & Grill. You know, "Oh, whatever. They're poor people. It doesn't matter." No, we live there. Everyone I know lives there. And that's all. Thank you very much.
- 1:48:46
Thank you.
- 1:48:50
All right. Next speaker, welcome. If you'd give us your name, your county of residence, and your comments.
- 1:48:55
Good afternoon. I'm Dr. Jeretta Bruton-Opusani, resident of Augusta-Richmond County, retired principal from Richmond County School System, and presently a volunteer for service community. As the proverb stated, if you want to go alone and quickly-
- 1:49:14
You, if you want to, if you want to go quickly, go alone. If you want to go far, go together. Hence, we as a community go far because we go together. Even though there are pros and cons about the data center, we have no problem with good growth which can influence the economy in a positive way, as well as expand our Augusta Richmond mission and vision focus on community engagement and safety. Research has documented that data centers have significant positive impacts on local economies and communities.
- 1:49:51
They create high-paying jobs, stimulate local business growth, and enhance digital infrastructure, which is essential for modern connection and technological advancement. And some of the positive things they mentioned was job creation, generating careers, construction, et cetera. On the other hand, we are truly concerned about the long-term negative effects of the data center's location off Mike Padgett Highway, Highway 56, and the other case areas mentioned, especially with it being in close proximity of the Augusta Regional Airport, the railroad tracks, and our neighborhoods.
- 1:50:33
In addition, other negative and adverse effects of this data center's location include, but are not limited to, security and safety, additional pollution, and an increase in pollution, including noise levels, as well as an increase in household debts and expenses. While growth is inevitable for careers, employment, and economical development, having the data center strategically positioned near our neighborhoods, including being in close proximity to the Augusta Regional Airport railways, definitely poses a very, very major security and safety issue in addition to the other aforementioned concerns.
- 1:51:18
Now, according to the research, since we say research, by Brookings 26 finds, it was pointed out that the growth, e- economic growth wasn't distributed equally in communities, and that data center expansion is associated with higher local electricity prices. The Kansas City Fed identified higher electricity rates for residents as a potential cost. It was further pointed out that high housing costs benefited select groups such as homeowners and investors, but consequently increasing costs for renters and prospective buyers at 2 to 5% in home prices.
- 1:52:03
Brookings finds further documented that on county level, the data center upward pressure on public water withdrawals, which noted other resources concerns, including electricity and land that can or may eventually come under strain. Finally, Brookings Research noted that communities near proposed facilities face noise, strained infrastructure, and potential loss of farmland. Now, the impact of data centers on airports can influence each other in various ways.
- 1:52:38
Data centers contribute to air pollution, which can affect nearby airport operations and surrounding communities. For the energy demand, the high energy consumption of data centers may strain local power grids impacting our airport operations. Noise pollution, as researched by the analyst Tozzi pointed out in June of 2023. His report typically sp- stated about the noisy environments due to the operations of cooling systems, fans, and other equipments.
- 1:53:14
Noise levels can range from 75, I heard 60, but it said 75 to 85 decibels, with peaks exceeding at 90 decibels in some areas, which can pose health risk for nearby residents. The analyst further stated that the 96 decibels produced by servers is enough to cause hearing loss in people who endure the noise levels for an extended period, which is definitely bad news for those working inside the data centers, and furthermore, listen to the HVAC compressors or generators all day, and it's not exactly pleasant for folks who live near data centers, not to mention the noise levels presently from Augusta Regional Airport, which we need, the railways, the transporters, as well as regular highway traffic.
- 1:54:10
A research by ESI, ESI confirmed that research data centers are loud, much louder than many folks appreciate and can tolerate, and that noise pollution is a real issue for people both inside and outside of the data facilities. Air noise and water pollution from data centers can come with health problems for humans, according to a published study in February. Long-term impacts may include increased risk of respiratory diseases, cardiovascular diseases, mental health struggles, strokes, diabetes, and adverse reproduction outcomes like miscarriages and stillbirth.
- 1:54:54
In the published research, it also stated that data centers can pose an environmental impact. Now, the environmental impact that many residents fear that data centers contributed to increased energy consumption and carbon emission, which could harm local ecosystem. For its instance, the decaf- County Board of Commissioners unanimously rejected a $1.6 billion data center plan, emphasizing the need to prioritize community interests and environmental considerations.
- 1:55:30
Our ecosystem at the New Savannah Bluff Lock and Dam area hosts a variety of ecological features such as biodiversity, habitat types, educational opportunities, and flood control. Furthermore, environmental challenges in Augusta-Richmond County include com- pollution from industrial activities, poor air quality, and contam- contamination of water resources. These issues pose risks to public health and the local ecosystem, particularly affecting vulnerable populations in the area.
- 1:56:08
Pardon my interruption, ma'am, but could you bring your, your thoughts to a, to a close so we can move on?
- 1:56:13
Yes, sir.
- 1:56:13
Thank you.
- 1:56:14
Okay. It mentioned... It was mentioned about Virginia and Loudoun County, and how they were called the capital of the world, of the United States for data centers. They have now put a 10-point mo- a 10-month pause on new data centers' applications to, uh, reassess the, uh, regulations and standards. So in conclusion, as stated earlier, even though good growth is always the key for areas to progress and prosper, I and we as concerned citizens in our community perceive that the negative effects of the location of the data center off Mike Padgett Highway area, negative effects include, but not limited to safety and security, especially being in close proximity of the Augusta Regional Airport, the environmental impact on our ecosystem, the resources strain on our land, water, electricity, and air, noise levels, and community disruption.
- 1:57:15
Higher costs of living outweigh the benefits of strategically locating the data center in that area. Therefore, we are therefore kindly requesting that our Planning Zone Commission, mayors, commissioners reject the approval that has been noted today of the data center's location, uh, and, and rezoning of Mike Padgett Highway and the noted areas.
- 1:57:41
Thank you.
- 1:57:41
Thank you.
- 1:57:45
All right. Next speaker, please. If you could give us your name, county of residence, and your comments.
- 1:57:52
Hello, my name is Abigail Pruitt. I live off of, uh, Brown Road, eh, on, uh, Hephzibah, Georgia. Um, I'm more so asking what will happen to these massive infrastructures 30, 40 years from now when I grow up to have to deal with them, my kids grow up have to have to deal with them? Um, there's a, a data center being, uh, built in or projected to be built in Harlem that's over 1,000 acres. The projected jobs for that is 50 for a 1,000-acre facility.
- 1:58:24
Um, the US Army Corps of Engineers at Fort Gordon directly, uh, heavily, commented heavily against the data centers due to the destruction, the noise, and harm that it causes. Um, and these jobs, would these jobs, uh, be limited to only people with college, uh, college graduations in an area where the college graduation rate is only 20%, uh, 14% for bachelor's and, uh, only 6% for postgraduates degrees?
- 1:58:56
Um,
- 1:59:00
um, well, how would this revenue go into the community? Will it be through, uh, tax, tax refunds or the gaping potholes that we have to drive through every day, the sidewalks that end magically on random sides of the roads, um, traffic lights that go out after the littlest bit of storm and random rain that just go out and they flash hazardous yellow lights where people also don't know how to use them? Everybody's just going. Nobody's really stopping. Um, so I'm just honestly kinda confused on how this would really better the Augusta area.
- 1:59:36
That's all I have. Thank you.
- 1:59:37
All right. Thank you.
- 1:59:41
All right. Welcome. If you can give us your name, your county of residence, and your comments.
- 1:59:46
Hi, my name is, uh, Brittany Brown, and I live in Richmond County. I'm about, um, two miles point to point from, um, this proposed data center to my home. Um, and, uh, I wanna say that I think there's a misconception that this area is largely unpopulated, and, um, in fact, there's approximately 40,000 people who live only in a five-mile radius, um, of this provo- proposed development. Uh, I spent the last week going door to door, um, in the neighborhoods surrounding, uh, Old Waynesboro Road and, and Brown Road.
- 2:00:24
Um, I went to Goshen, Heather's Glen, Covington, Cypress Point, Woodbury, Spirit Creek, uh, Spirit Point, and probably a couple of others that I don't remember, sorry. Um, and my purpose was to make sure that people knew about this meeting today so that they could come and call, and, um, I knocked on hundreds of doors. Uh, I smoked, I spoke with a lot of people, and, um, I can tell you that the message that I heard from those people about this data center was a resounding no thank you.
- 2:01:01
And the right thing to do would be for us to vote on this, but since that's not happening, um, I think that I, that there's some things in this, um, application that really do deserve a closer wor- look, if that's what we're actually gonna be looking at. So I'd like to start with the wetlands Um, in the, the DRI filing, the devel- developmental regional impact filing, um, they answered, they, Nixon, answered no when, um, they were asked whether the development is located within or likely to affect wetlands.
- 2:01:39
No was what they selected. In that very same filing, they described plans to avoid existing wetlands, and their own environmental study, the one that we have access to, identifies wetlands and a stream on the property. That doesn't make sense. Um, and maybe there is an explanation for that, but that's an ex- explanation that we really need to look at, um, before we make a decision about whether or not this data center deserves an ex- an exemption.
- 2:02:12
Um, and to add to that, Finney Swamp encompasses 7,000 acres, and at its closest point, it's between one and two miles to this proposed data center. So to say, "No, it's not gonna affect the wetlands," I hate to call that an outli- outright lie, but I mean, come on. Um,
- 2:02:44
so, uh, next is the water. Y'all, we're... It's a couple pages of double space, folks, like a page and a half. Then there's water. Um, the applica- a- a- application explains that the, um, data center's gonna use c- closed loop cooling. We all know that the ordinance, if we've read it, um, provides exceptions to that. Uh, there's no guarantee. Anybody... Somebody can make that decision at the utility department without any actual reason or rhym- rhyme or reason. Um, but they do say it's gonna be closed, uh, loop, and it's presented as, um, the reason that there won't be significant daily water consumption.
- 2:03:18
But a closed loop system needs water to operate. It has to be charged. It has to be filled initially. Um, and water may be needed for testing, flushing, maintenance, and replenishment. How much water do we need for a campus that size? I think I read somewhere charging it was between a billion to three billion gallons of water.
- 2:03:44
Uh, but here's the problem, is that the application doesn't tell us. There's no number for that. It's absent. And then there's the electricity. We're talking about a proposed electri- electrical demand of 600 megawatts, and in the DRI filing... I hope I'm not losing you guys. Sorry. I'll be fast. Um, the applicant checks yes when asked whether ex- existing electrical infrastructure is sufficient, sufficient to serve the project. "So we don't need to build anything else. We don't need anything extra," right?
- 2:04:14
But the materials that I've seen, um, don't include, uh, any util- utility capacity study. There's no commitment to establish what the utility capacity's gonna be. Um, and there's a discussion about a possible, well, we heard, on-site, um, generators, right? Um, I'm gonna skip a little bit here and summarize.
- 2:04:42
The data center's supposed to come online, um, two years or they're g- the power-
- 2:04:47
Excuse me, ma'am. If you, if you can make your comments directly to the Planning Commission.
- 2:04:50
Oh, yeah. Sure. Sure. So the power that we need for the, um, data center, Georgia Power's not gonna connect to them full... until two years after they come online. So they have to have generators, I'm assuming, for two years before we actually connect them to Georgia Power? That's a problem, and it's not addressed.
- 2:05:12
All right. You can give us your final comments.
- 2:05:14
I sure am.
- 2:05:14
I appreciate it. Thank you.
- 2:05:17
Now, um, I understand that this is not final construction approval, and I understand that there are engineering studies, permits, and additional reviews that come later, but here's what I don't understand. Those reviews are supposed to determine whether the developer can meet technical requirements. Isn't the decision that you are making right now supposed to determine whether this decision is, this development is appropriate for the location in the first place?
- 2:05:47
And how can you make that determination when so much of the information that we need to evaluate the impact is missing or unresolved?
- 2:06:01
This isn't minor details. We're talking about water, electrical infrastructure, noise, air emissions, and environmental impacts. And that brings me back to those approximately 40,000 people who live within five miles of this property. Um, it also brings me back to Finney Swamp, which is an ecologically significant wetland system near the proposed development. We have residents who built their homes and their lives in these communities. We have a natural resource that deserves meaningful consideration, and we're being told that some of the information that we need to understand how this de- development will affect them isn't gonna be available until later.
- 2:06:41
So my question to you is, how can you determine that this is an appropriate location for a development of this magnitude without first understanding the impacts that it might have on us, the surrounding community? And if those aren't, impacts aren't understood after the land use decision has been made, then what opportunity remains to consider where it belongs at all? And as an addendum, we don't want their money.
- 2:07:13
Thank you. All right. Next speaker.
- 2:07:19
If you give us your name, and your county of residence, and your county-
- 2:07:22
Hello, commissioners. My name's Tiara Vogelsong, and I'm actually a resident of Columbia County but I'm a community farm participant at a teaching farm off of 4H Road, on 4H Road off of Mike Padgett Highway. And I'm not completely opposed to data centers, but I am completely opposed to putting them in residential areas and near large natural nature preserves. I'm also concerned that these applications have not demonstrated compliance with Augusta's recently adopted ordinance.
- 2:07:52
There are unanswered questions about the rezoning, missing documents, public notification, departmental reviews, traffic access, and the regional commission's development of regional impact report. These are important issues that reserve full review before a decision is made. I respectfully ask the planning commission to defer these applications until all required documents and reviews are complete and the public has had a fair opportunity to examine the full record. And I also urge the commission to not accept per my understanding as an answer to important questions during this process.
- 2:08:31
Our community deserves a transparent process and decisions based on complete information. Thank you for your time and consideration.
- 2:08:39
Thank you. All right. Next speaker. If you give us your name, county of residence, and your comments.
- 2:08:46
Good afternoon. My name is Janet Robinson, and I'm a resident of Richmond County. Um, y'all hear that?
- 2:08:55
Yeah.
- 2:08:55
That's the sound of money. So we need to follow the money to find out what's actually going on here.
- 2:09:06
I'm reminded of a scripture in Proverbs 4:23 that says, "Keep thy heart with all diligence, for out of it are the issues of life." You see these people here? These are the issues of life. So it's important that we pay attention to the people we serve and not dismiss what they're saying to us today. Now, I am for growth. I am for technology. I understand that we're racing against China to be the first or the best.
- 2:09:40
I understand all of that, but I want, if we do have this proposed data center here in Augusta, I want Augusta residents to see a direct benefit of their property tax bills. The project is projected to generate 38.8 million a year in local tax revenue only if it's built. I ask Augusta to show how much the city would actually receive after tax incentives and public costs.
- 2:10:13
I also ask the Augusta Commission to consider using part of that revenue to lower property taxes and to show homeowners how much they could save and when. Second, I want residents protected from higher utility bills tied to this project. I ask in writing what all seven buildings will require, who will pay for any upgrades, and what protections will keep those costs off residential electric, water, and sewer bills.
- 2:10:48
I also ask Augusta to identify any opportunities to lower household utility costs. Third, nearby residents deserve to know what they'll hear at home. I ask that the city show on the site plan where the 500-foot measurement starts. Remember, 500 foot is only 167 yards, and I know 500 sounds better, so it's a bigger number, so let's be realistic. Also, I do know that there are some proposed data centers that have a 30-decibel daytime limit and nighttime limit.
- 2:11:24
I've heard of them in Savannah, Georgia. So let's take a look at that again, okay? I also ask for projected noise levels at nearest homes during normal operations and generator use, along with a clear process for responding to noise complaints because you're gonna get them. Fourth, I want a written explanation of how these applications were handled. My understanding that they were submitted September 28th, after the moratorium expired, and before the new ordinance took effect on October 6th.
- 2:11:58
I ask the city to publish the applicable filing deadlines, explain why it accepted the applications during that gap, and identify which zoning rules governed them. If either application missed the cutoff, please identify who authorized it to proceed and under what rules. Please also state, please also state whether either application had to be updated or resubmitted. Finally, I ask 3G Investments LLC to disclose who opens, who owns and controls the company.
- 2:12:34
Please identify anyone with a direct or indirect ownership interest, provide their ownership percentages, and explain the company's relationship with Group. Residents should also know who will own and operate the campus and who can make binding commitments on the applicant's behalf. I respectfully ask that these responses and supporting documents be made public before the Augusta Commission takes its final vote. Thank you for your time.
- 2:13:08
Thank you. All right. Next speaker. Welcome. If you could give us your name, your county of residence, and your comments.
- 2:13:13
Okay. My name is Candy Padgett, and I'm here today to represent my family. My j- my husband's Jeff Padgett and my mom's Peggy Beldre. We live on Old Waynesboro Road, and to be even more specific, we live- A mile... Or excuse me, one-tenth of a mile from the data center. Okay? So we're close. We're, we're gonna be good neighbors. So, um, my concern, Jeff and I always go through Four H Club Road, okay?
- 2:13:44
It's a good, good little cutoff, but for the past decades, not years, but decades, that property has been nothing but a dump.
- 2:13:56
Yep.
- 2:13:57
I'm talking refrigerators, furniture-
- 2:14:02
Yep
- 2:14:02
... trash, dead animals. It's disgusting. Absolutely, totally disgusting. And so we've been hoping and praying that something would happen to that land that would benefit us, would benefit the county. And then lo and behold, we see a data center sign. And went, "Yes, thank you. Thank you so much." It's gonna be an influx of funds for our county. It's gonna, excuse me, it's gonna beautify the area much better than dead animals, and refrigerators cast off, and ovens, and stoves, and couches, and chairs.
- 2:14:39
It's just a... It's been a disgrace for decades, so I'm glad to see this happening. Thank you very much.
- 2:14:48
All right. Thank you for your comments. All right, next speaker. All right, if you'd give us your name, your county of residence, and your comments. To the audience, again, again, I ask you if you'd just refrain from excess comments and interruptions, um, and distractions so that the speaker can have the floor. Thank you.
- 2:15:08
Well, I think you're gonna be really happy 'cause I'm not gonna speak as long as I was originally going to. Um, but my name is Christine Conley. I'm a resident of Richmond County, and I live in Goshen Plantation. And I'm gonna just, as you stated, email all of my research to you so that you guys can sit down and look at it, and it definitely consists of everything that everyone here has spoken about, and I have it definitely in a form that you can go through it, and read it, and understand it, and see the concerns of us here in Richmond County.
- 2:15:39
Um, the other thing I have a question about, that I'm gonna address, is the lady just before the one that just spoke. She mentioned about the timeline, and that was one of my biggest concerns when I watched the presentation done by, um, is it GL Investments? The... Is that the name of the investment group? I mean, the-
- 2:15:58
It's 3G.
- 2:15:59
3G, I'm sorry. Okay, my question would be this. September 15th, the first reading of the ordinance was approved, and then they submitted their application on September 28th, the, um, Nixon develop, um, Developers. So my question is, why in her slide did she not reference the dis- the October 6th, 2026 second reading approval of the Ordinance 8016 becoming effective? So my question would be, is that because she didn't know there were two votes on it, or do they only have to follow what is in the first one that took place on September 15th?
- 2:16:41
So I would just like you guys to review her PowerPoint and see that was never referenced about the October 6th voting. And then my last, um, too, is I did reach out to the commissioners, to two of them, and of course this office email address that they had on the website, and I did email asking for staff reports and information and, like the gentleman who stated he never got any answer, I never got any answer. I never got any documents or anything to research.
- 2:17:12
And my last thing I just wanted to bring up to you is that I have residents of Goshen Plantation who were opposed to this data center, and they have given me a signed petition that they asked because they all had to work, if I would be kind enough to bring it in for you. So I don't know if I need to address that right here, or how would I go about making sure you get this petition they signed?
- 2:17:35
Yeah, you just submit it to staff.
- 2:17:37
Okay. All right. All right. Thank you. That's all I have to say. You're gonna get this in an email, guys.
- 2:17:41
Thank you.
- 2:17:41
So it might make it easier for you. Thank you.
- 2:17:43
Thank you.
- 2:17:46
All right. Next speaker. You come forward and give us your name, and county of residence, and your comments.
- 2:17:53
Good afternoon, everyone. My name's Michelle Lowry. I am a resident of Richmond County, um, five years into it. Um, I've come from a heavily populated place, California. Um, my husband and I retired here. Um, we kind of did one of these numbers and landed in Augusta. From there, I did more in-depth, um, a deeper dive into what is Augusta all about outside of the Masters.
- 2:18:23
We have a couple of friends who are avid golf players, and they were excited to know we were moving it to Augusta. Um, but aside from that, as a retired nurse of more than 35 years, to come here and see the health disparities, and a previous speaker, she s- she, she outlined every concern that I had that I was going to express, and that is how will the existence of a data center being so close to residents impact our health?
- 2:19:00
We have a multitude of acute care, prompt care facilities, as well as the cancer center, that are oversaturated. Because of my curiosity, I came out of retirement, and I worked a short time at one of the, uh, acute care facilities just to get familiar with the healthcare system in this region. I was blown away Every patient that I cared for in the nine months that I, I was there had multiple chronic illnesses.
- 2:19:40
Number one, that were not being properly addressed, but I know that there were, there was something else that was going on, a phenomenon. The type of phenomenon that we saw during COVID, but that's by no mistake because COVID was not just COVID. I think we need to recall some of the things that was occurring at that time, that time period of twenty nineteen to twenty twenty. That was during the big rollout of 5G.
- 2:20:15
5G with massive radio waves. Our bodies respond to that. Many people were developing blood clots. What they thought was simply as a result of a viral infection was more than that. Patients being placed on ventilators, but then as time went on, they realized the ventilators were not what should be the treatment that should be provided to the patients who were dying because it was pushing through blood clots.
- 2:20:54
Blood clots that was caused by inflammation that was triggered in the bodies. So what will the data center... How will that affect, how will it impact the resident's body? And I think in terms of health and safety, as I said. How would it impact our bodies living close by? There are schools, there are homes. There are a lot of homes I learned that are hidden behind trees.
- 2:21:28
We only have, from what I understand, about two hundred and seventy thousand is our population, two hundred and seventy-fi- seventy thousand or somewhere around there, which is not very much, and for Richmond County, one county. So to have a data center come in and have that type of effect in our community, I think we better take a deeper dive. I did not hear whether or not there was an in-depth geological or health research related to coming to the determination that it was okay, that it is okay for the data center to come into our area.
- 2:22:11
We have the wastewater plant. We have the paper mill that lets off, and depending on the, the, the direction of which the wind blows, residents smell that. We have Science Co. that produces, I guess, uh, different types of plastic, which also isn't good. I mean, it all lets off emissions. The data center, okay, yeah, the noise. Yeah, it can be a problem. Um, but we think about, have you ever stood inside of a copier room, a printer room, and sta- and s- just stand there for a twenty-minute period, and the fumes that are emitted from those copiers is toxic on every level, neurologically,
- 2:23:05
not to mention cardiovascularly, and we need to think it through. And thank you for your time.
- 2:23:14
Thank you. Next speaker, if you give us your name and your county of residence and your comments.
- 2:23:24
Hi, my name is Betty Ligon, and I'm in Richmond County, and I have, I have a lot to read, and then there's a few questions. Okay. Um, I'm concerned about the size of the, the data centers, and this one in particular. I think it said, is it three hundred and eighty-three acres plot? Is that... I guess that's right, right? Okay, so maybe... I'm thinking you can read numbers, but you can't really visualize it, and so this is what I just pulled off the internet.
- 2:24:02
Um, a three hundred and eighty plot is equivalent to the approximately sixteen point seven million square feet. To put this into perspective, it is roughly the size of two hundred and ninety American football fields laid end to end. Okay. The visual to, to, to see it, three hundred and eighty-three acre plot is about sixteen point seven million square feet, roughly the size of two hundred and ninety American football fields.
- 2:24:39
Okay. Well, I read that one first. Wait, wait, wait, wait, wait, wait. I'm sorry. It's the second one. A three hundred and eighty-three acre plot is equivalent to approximately sixteen point seventeen million square feet. To put this into perspective, it's saying the same thing pretty much, American football field. And the other one, it could accommodate a small neighborhood, a large industrial park, or extension, or extensive farmland and recreational facilities.
- 2:25:09
That's a whole lot of land. And then I read up on 3G investment. The story of 3G Capital involves Roger Federer, Sam Walton, and Warren Buffett. It includes the biggest beer company on Earth, the biggest football field, the biggest footwear deal in history, and a ketchup bottle with Charlie Munger's face on it. It also involves accusations of chainsaw cap- capitalism, CEOs driving freight trains, and billion-dollar companies being handed to kids in their 20s.
- 2:25:53
Buffett calls, Buffett called it the best management culture he has ever seen. But now- but until now, the story behind the culture has never been told by the people who carry it, who carry it forward. In truth, 3G would prefer you not to have ever heard of it. So there is some secrecy to what is going on with these, these, um, data centers.
- 2:26:30
But, um, my questions now is where, where did it start? I mean, is this stuff from the White House? Is it, i- is this from DT in the White House, this dirty, low-down man who is destroying the country?
- 2:26:47
Ma'am-
- 2:26:48
I mean, it's just too much. It's too much
- 2:26:50
... if you want to submit those questions to the staff, I'm sure they can get you a detailed response.
- 2:26:56
Okay. My next question is this. Are they going in all 50 states in America? Are they going in certain communities only in America? Will filthy rich communities have these same things in their community? No. Or is j- j- you... Who's choosing? How is it they're going to poor people, Black and particularly dominated, everybody know it so don't deny it, with white people, poor white people, which the rich people call poor white trash.
- 2:27:31
Right. Where are these things being planted and why? Are they going in Alpharetta? Up there in, um, wherever, Atlanta, any other parts? Whoever know the rich pe- places in the different states, are they going there? No. No. Okay. How we standing by that man DT that closed all these hospitals, all these nursing homes? You flip around and then you replace them with data centers?
- 2:28:01
That's gonna do the same thing, kill people. Now you ain't got the hospital to go to to get help. So now what? I'm not understanding the logic to this stuff. Somebody please help me. I don't understand data centers. And why do they think God need help? What are they gonna do? What are they gonna do for us? What are they gonna do for us? You gonna destroy land. Another question, we got tons of forests, uh, wilderness.
- 2:28:34
Why are they not using those, that area? Why do you need them right there up under human beings? Right. Even though I'm an animal lover, they gonna suffer too where they are. But what's the logic? Right. Somebody is making untold money from this stuff. Enough is enough.
- 2:28:59
All right-
- 2:28:59
Now-
- 2:28:59
... if you could, if you could bring your, uh, final comments to a close so we can move on.
- 2:29:04
I did have one other question, but I just get so involved in just thinking about all the wickedness that's going on. Um, but I, I, I just wanted somebody to tell me, uh, wh- where are these things being plant- Who, who, who's doing it? Who's selecting? And then is there any way or do anybody have any information where we can get a list of every state in the United States so we can see? Okay, you got, uh, California.
- 2:29:36
Let's see where the rich people are. How many is over there? 'Cause I really wanna know. I wanna be able to count them. Yes, you are.
- 2:29:44
Okay. Well-
- 2:29:44
I wanna be able to count. I need to see these things
- 2:29:46
... I, I encourage you to engage with the planning development staff, um, and they can assist you with providing answers to your questions.
- 2:29:54
So you think we can get any information out of the White House? I know DT ain't gonna give up nothing.
- 2:30:00
Well-
- 2:30:00
But how will we get any information?
- 2:30:02
Ma'am, I can't speak for the White House. This is Augusta-Richmond County Planning Commission, but, um-
- 2:30:06
Well, we already know that they connected with it 'cause I heard him saying something about it on TV.
- 2:30:11
Okay.
- 2:30:12
You know?
- 2:30:13
Well, we appreciate-
- 2:30:13
So we need to know
- 2:30:14
... we appreciate your passionate comments, ma'am, but we must move on.
- 2:30:18
Good job.
- 2:30:18
Thank you.
- 2:30:19
Enough is enough.
- 2:30:23
Next speaker. If you'd give us your name and your, um, county of residence and your comments, sir. Thank you.
- 2:30:30
Uh, good afternoon. My name is Jeremy Witt. I'm a resident of Richmond County. I live approximately seven miles from this planned site. Uh, I have approximately 15 acres there. Uh, my, my daughter sits here. She's the fourth generation to live on that land. Uh, we take pride in, in our community. We take pride in our neighbors, and y'all have heard a lot of our neighbors here. Y'all, y'all are our neighbors. We appreciate you taking the time. I appreciate you, Mr. O'Neill, for the comments and q- questions you brought up. I thank you for the, the bringing insight into what these people are, are trying to propose.
- 2:31:03
I, I do appreciate that. Thank y'all for hearing each and every one of us. Uh, my talking point is, is gonna be conservative. Uh, I, I believe in conservation. I believe in keeping our country as green as we can for as long as we can.
- 2:31:19
Uh, there's a lot of other places that these could be done. There, there's, there's dilapidated properties all over the county that, that this could be to, to re- you know, re- reinvigorate it, you know, to bring it up, but don't take away the green land. Don't take away wetlands. I see here where it's talking about no wetlands, but the, your own, your own p- ... site says that there are wetlands in that area. So I just ask that y'all consider this. Take each of ours concerns a- and comments to heart, pray over it, a- and just, just make the right decision that's best for your neighbors and best for your community, not what somebody from somewhere else thinks is best for us.
- 2:31:55
And I just, I thank y'all for hearing us. I know there's been a lot said, but I appreciate each and every one of you a- as you, you made your comments and concerns, and thank you for taking the time to listen to us. And I, I just pray that you, you make the right decision that best benefits our community and our, our, our neighbors. Thank y'all.
- 2:32:13
Thank you.
- 2:32:18
All right, sir, welcome. If you can give us your name, your county of residence, and your comments.
- 2:32:22
It's, uh, my name is Steven Joubert. I live in District 8. Uh, I wanna, uh, just step back, just a little bit of information will make sense. I went on vacation. I was due to go on a cruise October 1st. So Sep- late September, I called the mayor's office. I asked the mayor's assistant the, "Will we get to vote on this on November 3rd?" The mayor's assistant said, "Yes." I went on vacation. That's what the mayor's office told me. Okay, I come back, I find out, I s- I watched on the news.
- 2:32:54
I forget what commissioner it was, uh, Channel 12, he came out, and he said that it was, it wasn't what they wanted, but it was close enough. That's not good enough. We live here. You live here. If they are above board and doing everything they say, put it on 100% on paper, they sign, have a lawyer sign it, then go through with it. If they're not willing to do that, they need to leave, because we live here.
- 2:33:24
Okay, something that was brought up was the noise. Okay, at nighttime, it's gonna become quieter, okay? So I asked my commissioner, he didn't have an answer. I text him, I never got an answer. Never got an answer, okay? So I went online, and for N- uh, Nixon Technology Center, it said, uh, the question I put in, "Is it gonna run 24/7?" 'Cause they said it's gonna be quieter at nighttime. K- uh, not verified. Uh, is it gonna g- uh, do this? Not verified.
- 2:33:55
If you look on that site, not verified, not verified, not verified. There's gaps of information, big gaps. Okay, noise. Okay, I, I, I spent 20 years in the Army in signal, okay? Signal at nighttime travels further than daytime. During daytime, if you don't know, what it does, it goes off the street and goes up to the sky. The sky is hotter. Simple way to explain it. Nighttime, the street is hotter and the sky's colder.
- 2:34:25
It goes on the... I can... I live 2.9 miles away from the pr- uh, the proposed site. I live about two miles from the pa- paper mill. I can hear the paper mill at nighttime. I can hear the train at nighttime c- 'cause everyone sees how they cut, they're gonna cut down all these trees for s- uh, subdivisions. It takes how many years for them to go in? I can hear it, uh, uh, since they cut it down last, well, two years ago, whenever they cut the, right in front of the paper mill. I can hear it. I could hear that noise. So that's what they say, 60.
- 2:34:57
So my question is, where is this coming from? Did someone go out and measure?
- 2:35:06
Did they? Did they? And, and I go Nixon Technology Campus, not verified. Uh, the $38.8 million, uh, revenue, not verified. Tax revenue, not verified. Also in there too, these data centers can get state exemption. In other words, they could put the money in, get the money out, and, and we get, we could get possibly stuck with the power bills. Uh, I went online and I found, uh, the Power in Profits, and it's, it's written by Senator Warren, Senator Van Hollen, and Senator, uh, Buelthul.
- 2:35:47
Three senators, and they put information out about data centers. Virginia, someone talked about Virginia. Maryland, all these places, power bills went up when the data centers went in. Did they ch- did they cross the T's and dot, dot all the I's? That's all I'm asking from you in front of me. Check everything. If they're not willing to sign, they don't belong here. They're hiding something. If you go to b- if you go buy my house and I don't tell you all the facts, and it has termites, it's, it's bad.
- 2:36:19
I- if it's truthful, what difference does it make if it's a year later? None. Put all the safeties in place. Have, and, and what someone touched on, uh, every, the people in front of me touched on a lot of things I wanna say, make sure that money is spread evenly through Augusta. Not downtown, not western Augusta, not downtown. All the money seems to go down- I live in South Augusta.
- 2:36:41
That's right.
- 2:36:42
Maybe repave my street and put the yellow line down it. S- uh, 31 years. All I'm asking is spread it out evenly. That's all I'm asking. And that's all I wanna say. Do, do your due diligence. If they are above board, black and white, sign it, and I think everyone will be okay with it. And if something happens, if you have a, a contract, everyone know... Well, you guys know, most people behind me know, that you could be held to the feet, could be pulled to the fire. If it's not in that clause, you can walk away.
- 2:37:12
And if it gets stuck, who does it get stuck on? Us, the taxpayer. If it gets stuck to you, gets stuck with us. So that's all I ask is do the right thing, and I think that o- the other people basically hit what I, a lot of things I wanna talk to, but it c- it can be done. Technology is a positive thing.
- 2:37:32
Thank you, sir.
- 2:37:37
All right, sir. If you could, um, give us your name, county of residence, and your comments.
- 2:37:41
Yeah. My name's Tykeem. Um, I'm a resident of Richmond County. Uh, I own a house on 1549 Shoreline Drive. I am here to follow up on a formal written objection stamp that received by the office on, by your office on October 30 regarding the 383-acre Nixon Technology Campus. First, for the re- for the official record, my newly remodeled home borders the western edge of this project rather than the dead center. And while I did not receive a mail notice be- before the original scheduled November 2nd hearing, I did receive one today confirming my status as an immediate adjacent property owner.
- 2:38:17
Based on what is already happening on the ground, I'm asking you to deny and defer this rezoning for four crucial reasons. First, the four western buildings and the mandatory 500-foot buffer. The preliminary layout stacks four massive data center buildings directly along the western edge next to my property. Ordin- under ordinance number 8016, Section 2485B, a 500-foot buffer is required adjacent to the residential property. You cannot let the developers c- clear cut the buffer or rely on a standard perimeter wall that would not stop low-frequency hum from rooftop chillers and diesel generators from exceeding the 60 decibel limit at my property line.
- 2:39:00
Second, my water infrastructure... The second, the water infrastructure at my front door. Utility, uh, workers have already sprayed blue water lines markings on the road right beside my house on Shoreline Drive. Residents deserve tran- full transparency on whether major water ma- whether major water main extensions, trenchings, or easements are planned down our residential street to feed those four western buildings. And, um, the third one, storm runoff.
- 2:39:31
Now, my property sits at a slope, so I'm already dealing with a lot of runoff as it is, and, um, mass grading across 383 acres right next door will alter the local watershed and put my home at risk of flooding without an independent storm, storm water study. Fourth, binding protection. If the, if the project ever moves forward, it should require an undisturbed 500-foot vegetated buffer on the west, all chillers and generators placed on the east side of the buildings, and strict limits on western edge construction hours. Please enforce or- um, ordinance number 8016 and deny or defer this request until my western property line is protected on a, on a binding site plan.
- 2:40:10
Also, um, I could've invested anywhere. You know what I'm saying? I decided to invest in Richmond County. That house I bought was completely ran down. I put tons of money into it. So for y'all to... I, I'm not saying y'all gonna do it, but if y'all vote on this, y'all are gonna build a data center right behind that, that freshly remodeled house that I spent so much money on. That's not also gonna, you know, disturb my peace, but it's also gonna tank the value of my property. Nobody wants to live that close to a data center.
- 2:40:41
Obviously, I'm in a 300-foot radius, so that 500-foot, um, buffer has to be... Th- there can't be no negotiation on that. But that's all I have to say today. Thank you.
- 2:40:55
Thank you, sir.
- 2:40:59
Uh, next speaker, if you would come forward, give us your name, your county of residence, and your comments.
- 2:41:05
Hi. Yes, my name is Ashley Benton. I'm residing in Richmond County. Good afternoon, Chairman and members of the Planning Commission. I'm here concerning rezoning application Z26-18 for the proposed Nixon Technology Campus. I oppose rezoning these approximately 383 acres to the data center classification. My concerns involve the suitability of this property, its impact on surrounding communities, and whether the required evaluations support this zoning change.
- 2:41:35
On October 15th, I submitted a formal agenda request to the Augusta Commission, and I later received that I had been placed on the November 3rd agenda, but I received no confirmation of that scheduled appearance. I didn't even receive confirmation that we were still having a meeting November 3rd. Consequently, I missed my opportunity to address the commission, but here we are today. It looks like a lot of people have stepped up to come up and speak out about the data centers, that we have been blindly led on, off and on about when we were actually supposed to be able to speak.
- 2:42:06
Combined with that notification errors acknowledged concerning these hearings, these raise serious concerns about whether residents receiving these clear, timely, and accessible information are for the people we voted for and put in these seats to speak for the people. Public access should be more than the technical posting of an agenda. Residents deserve a reasonable opportunity to know when and where their voices can be heard. Now, regarding this rezoning application, I have several questions, but I'll make them brief.
- 2:42:41
First, the development of regional impact review. I previously submitted written questions concerning DR1, I mean, excuse me, DRI 4853, and I have not received a response. The state's public system now identifies the review as completed with a regional finding date of November 18th. When did Augusta receive the actual finding reports, and has it been reviewed and incorporated into the evaluation of this application? And where can the public examine it? Under Section 354 of Augusta's Comprehensive Zoning Ordinance, staff must evaluate the impact of rezoning on public facilities and surrounding land uses.
- 2:43:17
What documented findings establish that this proposed data center zoning is consistent with Augusta's comprehensive plan and compatible with nearby residential communities? Have site-specific drainage, wetlands, noise, water demand, and electrical capacity studies been completed? If so, where can we read them? With an estimated 600-megawatt electrical demand, what evidence establishes that the necessary infrastructure can support this development without unacceptable impacts on surrounding properties?
- 2:43:47
With special exception SE-2622 being removed from today's proceedings, what development rights would approval of rezoning Z-26-18 independently establish? Would further discretionary public approval be required? Will both applications return or only the rezoning? When will updated materials, public notices, and speaker registration and procedures become available? I respectfully request that any recommendations be deferred until the applicable zoning requirements, necessary findings, and unresolved procedural questions have been addressed on the public record.
- 2:44:24
And I wanna close with this reminder to the elected commissioners who will ultimately decide this matter. You are elected to represent the people of Augusta-Richmond County. We are not here merely to ask for personal opinions. We are asking you to exercise the authority that was entrusted to you by the voters. Examine the e- evidence and make decisions that protect the public interest. Our votes put you in office. Your decisions should reflect accountability to the people you serve. And my position on this proposed rezoning is clear: no data centers on this property, no rezoning without demonstrated compatibility, accountability, and adequate protections for our community.
- 2:45:01
Thank you.
- 2:45:04
Thank you.
- 2:45:08
The next speaker, if you'd come forward and give us your name, your county of residence, and your comments.
- 2:45:16
Hi, nice to see you today. My name is Laura Sparks. I'm actually a resident of Columbia County at current. I'm a military spouse, but was privileged to be a member of the Richmond County residency when I, uh, was stationed here with my husband previously, and I was able and privileged to work in the Richmond County School District. I have a deep love for this county. Um, I knew that Richmond County was gonna show up for their community, as they have done, and very clearly show the love and concern for their community. I would like to stand here and speak for the wildlife of the area, specifically Phinizy Swamp, which plays a huge role in the entire CSRA.
- 2:45:53
Thank you for Dr. Akposani and Ms. Brown, who also spent time in their minutes speaking towards it. Phinizy Swamp was a dump site when Augusta acquired it in 1973. Since then, putting money and time in cleansing up this sli- this site, it is now a huge habitat for more than 240 bird species and countless other species. The Georgia Department of Natural Resources recently awarded $3 million grant specifically for Phinizy Swamp in 2025.
- 2:46:24
Audible noise from the data center can carry miles, with the strongest low-frequency hu- frequency hum and potential vibrations affecting, effects concentrated within a mile. It's my understanding, though it is very limited in this area, from conservative biologists, that the sensory danger zone of continuous low-frequency hum, subtle ground or air vibrations can reach anywhere from half a mile to two and a half miles, and this can disrupt communication, hunting, mating, and habitat use, even with noises as low as 40 dBA.
- 2:47:02
Uh, we are stewards of this land and of the wildlife that has no power or say in and what we bring into their environment. This data center, no matter how it is built, will undoubtedly affect danger- have dangerous effects on our wildlife and in turn our environment as a whole. Please take into consideration when considering the rezoning how this plays out and also how it will impact other neighboring counties who are also facing the same situation of having data centers encroach into their communities.
- 2:47:33
I do have a deep love for Richmond County, and hopefully now that we are back, I will be able to serve in the community once again. Uh, everything today has shown me that Richmond County has only gotten better since I left, and I'm happy to be back. Please be the example to your neighboring com- your neighboring communities and counties on how you handle this situation. Thank you.
- 2:47:59
Thank you. All right, next speaker, you will come forward and give us your name and your county of residence and your comments.
- 2:48:06
Hello, I'm Melissa, and I live in Richmond County. And, um, I stay off of Highway 56, and I don't live that far from where the Nixon Technology is gonna be hopefully not built, but where they're proposing to build. And just a little, little background far as when I moved out there, I, I didn't expect the, the four-way highway being built, so I kinda got stuck with that, dealing with traffic.
- 2:48:38
And now, um, people from Plant Vogtle coming up, driving 100 miles per hour out there. That's not being regulated. So I- my concern is you guys make these decisions in our neighborhood, but you don't stand behind your decisions. You don't make sure it's regulated for us who has to deal with it every day. You guys live somewhere else. It's not your district. So I get it. I, I understand that Richmond County needs money. It's broke.
- 2:49:09
But why do we have to suffer b- because of the poor decisions of you all handling our money? And so again, you guys are making decisions, giving false information. You keep saying, "Oh, reach out to your commissioners. Reach out to the mayor's office." But everybody's here reaching out, and nobody's responding back. So why do you want us to reach out? You're not responding back to us. And, and really, it just... Y'all, people have this misconception about South Augusta.
- 2:49:43
Trust me, a lot of us out there work. A lot of us out there want our- Generational wealth to pass on to our families too. And so we just don't need to be the dumper ground. I mean, we got International Paper out there already. We got Starbucks. I mean, all these manufacturing companies out there already, and now you wanna put a data center that's gonna make noise. And for them to say it's not gonna make noise, I stay way far from the airport, the, um, International Paper, and the train track, and I c- hear all that.
- 2:50:19
I'm affected by all of that. So for the data center to be really probably the 500 feet they're talking about from my home, I know it's gonna impact me. I have a, um, a rare autoimmune disease. I'm immunosuppressed, so the air quality is gonna damage me. So I just want you guys to keep that in mind. We have children out there. I'm raising my daughter. I'm a single mother now. My husband passed away, so we all can't just up and move.
- 2:50:50
And like people said, our property values are gonna come down. Nobody's gonna wanna buy our homes, even if we do try to sell or, you know, as far as the people who are able to sell and move along and reestablish somewhere. And I keep hearing people referencing Virginia, Atlanta. We've moved here for a reason. We don't wanna be like those states.
- 2:51:12
Right.
- 2:51:12
So keep that in mind. We want to keep it simple. We want to keep it simple, and so that's why we're here. So don't compare us to Atlanta, Virginia. We know we're not those communities, and we don't want to be. We-
- 2:51:30
Yeah.
- 2:51:30
Just keep this in mind too, the old government is going out the 1st of January.
- 2:51:35
Yes.
- 2:51:36
We came out and voted for that, so we will do it again- ... if you guys don't make the right decision for us. Thank you.
- 2:51:45
Thank you. All right, sir. Welcome. You give us your name, your county of residence, and your comments.
- 2:51:54
So ladies and gentlemen up, up on the board and the people in the audience, my name is John Simon. I'm a retired veteran. I retired from out of Fort Gordon. I can tell you from my experience of dealing with things in the field, there are items called ECUs, environmental control units. We use those to give us heat and AC for while we're out in the field or we're in dangerous environments. I can tell you by my own experience, being more than 300 feet away from one of these units, I can clearly hear it, clearly, 300 yards away.
- 2:52:25
We run them 24 hours. There's never not the sound of droning and diesel and all the other things that none of us wanna hear, none of us ex- none of us wanna experience. I've also been the hand receipt holder of multimillion-dollar equipment to make sure things get back and how things get done and so on and so forth. I also built the entire internet network for the forward operating base during OIF and OEF. There's nothing that they said that could convince me otherwise because I am the guy who was the internet.
- 2:52:57
Plain and simple, your emails, getting out to Yahoo, I was the one who made that happen. I run the networks. I build networks. You cannot build things of this size and not have a significant impact in a short period of time, two, three, maybe four years max. Unless you all wanna become like a fictional movie called Erin Brockovich, when your children have cancer by eight, so on and so forth, I'm not gonna get too deep into it.
- 2:53:29
Protect your people for the long term, not for your pockets, not for what the smiles bring to you. Make sure the community that's here continues to stand. And just to be clear, I have been here for 14 years. I'm originally from Detroit, so I know what a big city looks like when things fall apart.
- 2:53:47
Mm-hmm.
- 2:53:47
Y'all don't want none of that, I promise you. That's all I got. Have a good one.
- 2:53:51
Thank you, sir.
- 2:53:55
All right, sir, if you wanna come forward, give us your name, your county of residence, and your comments.
- 2:54:00
Uh, hi, my name is Jordan, and I stay in Richmond County. I just got two things that I wanna say. One, um, my girlfriend's family, they live on 4-H Club Road, and they, the, the house they live in, they built that house from the ground up, and they were considering moving. If they were to move, that would be a potential loss of generational wealth that we want in our communities. And another thing is that, um, I can't say I'm surprised about this proposal because it seems like South Augusta is the place that the city decides that they wanna just put things that they don't want.
- 2:54:40
Ooh.
- 2:54:40
And I think that South Augusta could be a lot more than just data centers and industrial parks. I mean, the, the airport's right there, and people are gonna fly in and wonder, "Where is the city?" So, um, that, that's all I, that's all I have to say.
- 2:55:03
Thank you. All right. Welcome, sir. You wanna give us your name, your county of residence, and your comments.
- 2:55:08
Hello, my name's David Anthony Carson. I'm here in Richmond County. I can hear the drum line from Cross Creek High School. I'm a, uh, Navy veteran, if you can't tell from the tattoos. I currently work on Fort Gordon. I'm teaching cyber warfare, so when it comes to technology platforms, how they're built with the, uh, former gentleman and veteran, I know how the technology works. Ultimately, my question is, how is this better than a Denny's? How does this serve the community better? I feel like we're investing in holes instead of shovels in the hands that wield them.
- 2:55:41
So the question is, ultimately, why are, why are we investing in holes? We can make the technology that goes into these prefabs. Furthermore, leveraging massive capital by these investment companies, the question is, are they trying to take advantage of tax abatements to sell to a ne- uh, another major player? Everything that has been proposed is aspirational, including the tax, um, the tax revenue. They will flaunt the ability and the dream for you to sell the farm.
- 2:56:15
Don't sell the farm.
- 2:56:21
Thank you, sir. All right, sir. If you wanna come forward and give us your name, your county of residence, and your comments.
- 2:56:27
Yes. My name is Cody Heard. Uh, I am from Richmond County. I have been here for about 10 years since I've moved here from Georgia Southern. Uh, I live two and a half miles away.
- 2:56:38
Probably signed your petition in Goshen.
- 2:56:40
Um, we don't want this data center, and that's quite apparent. Outside of one singular person who has spoken here, nobody else wants it. So we're asking you politely and nicely, please do this to be representative as a republic. We're not a, we're not a democracy. We all know this. However, when it comes to these types of things, again, they're aspirational. The taxes? Okay, what happens when everybody's property values go down?
- 2:57:11
Taxes are gonna go down. So where is all this money coming from?
- 2:57:17
It's not gonna be staying here. It's gonna be leaving here because we all know trickle-down economics don't work either.
- 2:57:27
Maybe we wouldn't be so broke if we didn't spend extravagantly on buildings like this, or if we actually, you know, placed it back into the heart of these things instead of letting it go to the ultra-powerful and the ultra-rich, the people who can evade taxes with ease because they have the ability to do that as compared to us. Hence, the reason why they're trying to put it on us instead of themselves. It's not gonna be in those rich neighborhoods. It's gonna be here where the people are living. So again, please be representative of your constituents and vote for the people, we the people, and not data centers and not the 1%.
- 2:58:06
Thank you.
- 2:58:07
Thank you, sir.
- 2:58:13
All right, ma'am. If you could give us your name and your county of residency, your comments.
- 2:58:18
Hi, my name is Debbie Stroud. I've been a, um, resident of Richmond County since 1970. I have lived off Old Waynesboro Road for 44 years. My concerns are there's too much uncertainty, uh, not enough studies, not enough environmental studies, engineering studies.
- 2:58:48
Um, they've mentioned the, the, uh, wetlands. Um, I'm concerned about the additional traffic on Mike Padgett because when the plants down the road let out, Mike Padgett is a nightmare, nightmare. Um, also, we don't know how many people are going to be employed there. We've seen the number 40. We've seen the number 571.
- 2:59:20
Also, if they're going to get a tax abatement, they should be required to post a bond so that we're not holding an empty bucket if they decide to just close up and go away. Um,
- 2:59:41
I have other things, but one thing I want to mention, my sister lives in Loudoun County, Virginia. I have seen the data centers. My sister sold her house when they started building one within 100 feet of her backyard. We don't need a data center, not in that location, not at this time, especially since we don't know who's going to occupy it.
- 3:00:20
We don't know what kind of tax, um,
- 3:00:29
benefit w- we would get in Richmond County, what they will do for Richmond County as far as setting up community centers or schools or senior centers. None of that's been addressed, and there's just too much unknowns in this proposal, and I ask that you defer any decision until all of these studies are in and we have a more thorough picture of who's going to be there and what studies have finally been completed.
- 3:01:09
Thank you.
- 3:01:12
Thank you. Thank you.
- 3:01:15
All right. Well, we greatly appreciate, um, everyone's patience, um, your participation, and, uh, most importantly, um, taking the time out to provide this body with some insights and feedback to consider. All right. So, um, that brings our public comment section to a close. So I'll just ask the staff and/or the petitioner if they have any brief comments, um, before we entertain a motion.
- 3:01:48
Thank you, Chairman Boozer. I just wanna use just a couple minutes to clarify a few points. There was a lot mentioned in here about tax incentives and tax abatements. Let me make it abundantly clear, this developer is not asking the county- Or the Economic Development Authority or anyone for any tax incentives. They're not asking for any bond financing. They're not asking for any reduced property taxes. There are no tax incentives on this project whatsoever. Let me make that point clear. Second of all, there were questions about what would happen to the tax revenues that would be coming in.
- 3:02:23
The way the tax revenues are specified for property taxes, excise taxes, power taxes, all of that's allocated between the general fund, board of education, um, and the sheriff's department, the fire fund, all of that. Whatever's allocated to the general fund, that's up to the Augusta commissioners to determine how that money is either spent on infrastructure improvement or used to reduce, um, homestead property taxes. That's up to the full Augusta Commission to determine how those tax funds are used when they do come in.
- 3:02:57
I heard a couple... One gentleman say that were they willing to sign? Absolutely. They're willing to commit because they have to commit. In order to build this, they have to commit to all the regulations established by the data center ordinance. They're committing to that here today publicly, and if this proceeds to a full site plan and construction review, all of those commitments will be in writing for sure. They have to be. I heard some concerns that there's no assurances at all without an end user. Well, the assurances are in the data center ordinance.
- 3:03:27
Everything will be... Everything that is required in that data center ordinance will be established and assured to, or it won't be and can't be built. That's what the Augusta Richmond County Planning Department, Engineering Department, and License and Inspection Department is there to enforce. Commissioner O'Neill, you asked, and a number of people have asked about power. You don't have to take my word for it. This is a direct quote from the Georgia Power website. "Are data centers making my electricity bills go up? No, not in Georgia.
- 3:03:58
Large energy users, like data centers, pay upfront for their local infrastructure and commit to long-term contracts with collateral requirements, minimum bills, and termination payments, which ensure that large load customers like data centers cover the full cost of the service." That's not my commitment. That's Georgia Power's commitment. That's required by the Public Service Commission. We heard a lot about wetlands. Yes, wetlands are on this property, but wetlands are highly regulated, regulated by the Army Corps of Engineers.
- 3:04:31
They cannot be impacted, and if they are, there have to be mitigations. If they're... The site is laid out in a way to avoid impacting those wetlands. I heard one woman suggest that she had read that it takes one billion gallons of water to charge a closed loop system. That is not accurate. It's actually one to two million gallion- gallons to charge the system one time and that's it. Um, I heard a lot of mention about trains, the paper mill, and the airport.
- 3:05:05
The decibel requirements for this data center established by the new DC ordinance are li- are quieter than all three of those other things. Quieter than the train, quieter than the paper mill, and quieter than the airport. I'd be happy to answer any other questions.
- 3:05:22
All right. Thank you, uh, Mr. Trotta. Um, Director Cameron, you had something additional?
- 3:05:28
Yes, sir. I would like to just, um, um, bring something, uh, that a young man spoke of when he asked this commission to please enforce Ordinance 8016. I just wanted to, um, just bring to your attention, and I'm, I'm, I believe you would have a copy of the signed ordinance, um, data center ordinance. So there was a couple of things I wanted to bring to the attention of the public. This is a data center district, a separate district that was established. There's also a special exception in the data center ordinance that was, um, spoken of that, um, that this appli- this applicant actually submitted for that, um, based on what was discussed earlier.
- 3:06:13
We were previously talking about an overlay. However, um, toward the end, the, um, the, some of the commissions had requested that this be a separate district, and that's the reason why it was a separate district. But also, you have in this ordinance, in, in its, um, you'll find it under section 24-A3, um, the use permitted by special exception, you would see in the HI, you would see these different types of, uh, data centers that is, um, that will be allowed, that we'll, that will be allowed in these certain districts.
- 3:06:51
Um, as you know that in the data center district, um, newly established district, we also identified about four different types of data centers by size. Um, because this, this application, this petition was, uh, being rezoned to a data center district, the special exception was not required. Therefore, that application, those funds will be, uh, refunded to the applicant. I also wanted to also, um, just bring to your attention there is an application and review process that is also, uh, stated in the zoning ordinance, along with special technical reviews.
- 3:07:32
You'll also find, uh, standards for noises and how this measure is spelled out. Noise testing, res- reporting, and corrective action. You'll also find about the cooling system and the water use in this, um, zoning ordinance that was adopted. It talked about the cooling water discharge and, and disposal and spillovers in the clo- closed loop system. Um, it talks about the annual water use reporting, the compliance component. It talks about sanitation facilities in the, in the water supply.
- 3:08:04
The utility coordination letter that is required. It talks about, um, the, the emergency, uh, management report and safety coordinator and, and hazard containment that has to be, um, reported. It talks about screening, fen- fencing, lighting, those, um, limited architectural Design standard. It talks about external and, um, lighting. It talks about enforcement. It talks about the, the maximum building heights in certain, um, zoning districts.
- 3:08:35
It talks about, um... And, and I think something to the point about the discontinuation and abandonment of a, uh, of a facility, of a, of a facility. It talks about the requirements. It talks about parking, the decommissioning deadline and extension. It talks about cost estimates. Um, a, you know, a review and, and a update. Um, it, it, you have to give, you know, property owner has to acknowledge certain things. And I'm just going through this because very in-depth. Um, it talks about remedy, uh, that's part of your, the cost recovery for the decommissioning.
- 3:09:10
It talks about site restoration. It talks about, um, the interior equipment and materials, the res- use of a building. Um, and then lastly, it talks about, um, very, uh, uh, for the last four or five pages, it talks about, again, enforcement and penalties. It talks about abatement and s- and cost recovery. And then also you'll find some miscellaneous provision as well. Um, uh, uh, w- this, this document has been, um, on the, I wanna say, the city's website.
- 3:09:43
Um, the clerk of commission, uh, had this and, and anyone can actually access this, um, information. We have information, um, at the, at, at our office and, um, I have spoken with a, a few of our residents, um, pertaining to the staff report. The reason why the staff report, of course, was, um, it's not posted online, but it was available in our office. And I, and, you know, I said that, um, in open records requests, I said that to some individuals at last Tuesday meeting, that we should receive the report from DCA, um, from our regional commission, um, around Wednesday, Thursday.
- 3:10:24
We had to have time to get the information in, get the m- information, the staff reports to you guys, and then those staff reports were available at the planning and, and, and, and development department on Friday, um, as I had told our, our constituents. So I just wanted to make sure that our constituents were a- um, were aware. I know that some mentioned Ordinance 8016, uh, that's very in, in-depth and, and, and covers a lot of information.
- 3:10:53
All right. Thank you, Director Cameron. Okay. Commissioners, um, if there are no additional questions or comments, chair will entertain a motion. You got a question-
- 3:11:03
I have one
- 3:11:03
... Commissioner McKnight?
- 3:11:05
Ma'am, I, I'm, just wanted you to clarify. So
- 3:11:13
8016, if you go to your uses permitted by permitted locations.
- 3:11:19
Yes, sir.
- 3:11:20
All right. It talks about accessory data center as defined in minor data centers in general business zoning districts, okay?
- 3:11:27
Yes, sir.
- 3:11:28
And that's the only one that is pr- under B, permitted locations. Okay?
- 3:11:32
Yes, sir.
- 3:11:32
But when then you go to C, which is use permitted by special exception, okay?
- 3:11:38
Yes, sir.
- 3:11:39
All right. It says, "All other uses shall be permitted only by special exception." Okay?
- 3:11:44
Yes, sir.
- 3:11:45
And then it says, "Major data center and data center campuses." So does this not fall under a major data center or data center campus?
- 3:11:54
So, so it can, but they chose to go in the data center district because it's an established district, and that is what, that's what 8016 is.
- 3:12:06
Yeah.
- 3:12:07
And that's the reason, that's the reason why, um, the applicant decided, um, the applicant stated earlier they had been following this document. Uh, no one has spoken with, with this, with this applicant, and the reason why I present it to not only, um, the Augusta Commission is because we knew that Augusta is being looked at, um, just like a, a lot of other communities. That's the reason why communities were, um, a- across Georgia is trying to get data center ordinance together.
- 3:12:41
Okay. Thank you.
- 3:12:42
Okay.
- 3:12:42
Mr. McKnight, just to-
- 3:12:43
That satisfies your, um-
- 3:12:44
Mr. McKnight, just to-
- 3:12:45
... request?
- 3:12:45
Just to clarify that, Mr. McKnight, um, the special exceptions is for if your entire parcel is zoned HI, then you could apply for a special exception. This parcel is partially HI, partially agricultural, I believe, partially-
- 3:13:00
Yeah, generally
- 3:13:01
... business too. So they would not be eligible to apply for a special exception under-
- 3:13:06
HI
- 3:13:07
... HI.
- 3:13:13
Did that answer your question, Commissioner McKnight?
- 3:13:17
K- yes.
- 3:13:18
Okay.
- 3:13:18
Yes.
- 3:13:18
All right. Commissioner Smith.
- 3:13:22
I, I got two different questions in there for two different people. Um, Mr. Trotter,
- 3:13:33
you and I have been in Augusta for a long time, and, and there are many of us up here that represent South Augusta because we own homes in South Augusta, and we own property in South Augusta, and we care about what goes on. So Mr. Trotter, this property is 383 acres. Is that right, sir?
- 3:13:53
Yes.
- 3:13:54
The airport is 1,400 acres. How many times can you put this data center in the airport property? Come on, UGA grad. Come on. You're not an Auburn guy.
- 3:14:06
Not a Tech grad. I think, uh- ... five.
- 3:14:10
Okay. So and between this property that's, you're, that this private corporation is trying to build this on is the airport, and the airport stands between it, the property being developed, and the park, uh, the Phinizy Swamp. Am I right?
- 3:14:32
Yes.
- 3:14:33
So, I guess what I'm trying to get is, is the airport would serve a couple things as a buffer for any, any runoff or anything of that nature on the backside. Am I right about that?
- 3:14:47
Honors, let's, let's, let's remain respectful, please. Thank you.
- 3:14:49
Is that right?
- 3:14:50
Well, any storm order that is generated on this site as a result of rooftops and asphalt or concrete paving has to be detained on the site. It can't be discharged at fl- that's just a state law for any development anywhere. It can't be discharged at higher rates than the pre-development rate. So this site's got to comply with all of the storm order requirements.
- 3:15:10
Okay.
- 3:15:11
But I'm not a civil engineer, and I don't know the w- the watershed in this particular area, but I don't believe that it's going to be discharged into the Phinizy Swamp at all.
- 3:15:20
Okay. The, now I got a question for our director.
- 3:15:28
What we're being asked to vote on today is whether we can take a piece of property and change the zoning to put something on it. Is that correct?
- 3:15:37
That's correct, sir.
- 3:15:38
And there are no city monies involved in this private transaction. Am I correct?
- 3:15:44
You're absolutely correct. None.
- 3:15:46
So this is, this is a private, this is two private businesses that are trying to conduct a trans- a transaction that requires government approval to change a piece of property from the current zoning to what they want it zoned so they can build something on it, and we're not here to d- to argue about what goes on it. We're here to argue about whether the land is, is being zoned differently to accommodate this private transaction. Am I right?
- 3:16:16
Yes, sir. Just land use development. That's it.
- 3:16:18
Okay. That's all I wanted to know. Thank you.
- 3:16:21
All right. Additional questions, comments from commissioners? Seeing none, chair will entertain a motion.
- 3:16:35
I make a motion that this, uh, that we approve the agenda item.
- 3:16:41
Second.
- 3:16:44
Mm-hmm. All right, it's been moved and seconded to approve this rezoning petition. Can we-
- 3:16:54
Who seconded?
- 3:16:55
Who seconded?
- 3:16:55
I got a question.
- 3:17:16
All right, it's been moved and seconded once again to approve this rezoning, uh, application. Can we do a roll call vote?
- 3:17:33
Mr. Chairman, I make a motion.
- 3:17:35
You wanna make a substitute motion?
- 3:17:36
Yes, sir.
- 3:17:36
Okay. Ms. Clark.
- 3:17:39
Uh, I move that we defer action Z-26-18 until, um, the potet- practitioner has a time to actually speak to the community, and
- 3:17:55
that'll allow the, the community and the practitioners to actually, um, come to agreement or come to understanding with some of the things that's coming up in this meeting.
- 3:18:11
Second.
- 3:18:12
Okay, so just for clarification, so this is a postponement?
- 3:18:17
Yes.
- 3:18:19
Okay.
- 3:18:19
Chair, what, how much time was she-
- 3:18:21
Yeah, to the... Yeah, how long?
- 3:18:25
Six- 60 days.
- 3:18:30
We're about to go into the holiday.
- 3:18:31
So the motion is to postpone this petition until February? Is what are we... February.
- 3:18:39
February. Yes, sir. February.
- 3:18:47
Let me defer to the, to legal.
- 3:18:50
Yes. Uh, so the code as laid out in the Planning Commission code, uh, the Planning Commission shall hold a public hearing on each proposed m- amendment after proper notice of Georgia law, and they're supposed to make a recommendation to the commission. It's either approve, deny, or no recommendation, or we're asked to defer, but I don't think this body has the authority to defer this for an additional period of time.
- 3:19:12
Attorney, w- will we not be making a recommendation to the commission to defer for 60 days?
- 3:19:17
Yes, you can make that recommen- recommendation to the commission, yes.
- 3:19:22
Can I, can I amend?
- 3:19:25
Sure, yeah. Wanna amend your substitute motion?
- 3:19:28
Yes. I would like to amend my substitute motion so that we can make an amendment, uh, so we can make a recommendation, recommendation for the full commission in a total of 60 days, and in that time, that will give the practitioner and the community time to make a, a, a, come to some type of agreement, get to some type of understanding, because right now there's more questions that people have than answers.
- 3:19:56
Is there a second to the amendment?
- 3:20:04
Is there a second to that a- amended motion? All right, it seems like that, that dies, and so we're back to the original motion.
- 3:20:13
Chairman, I make a recommendation that we deny.
- 3:20:17
I second.
- 3:20:18
Okay. Yeah. Now just hold on. Wait a minute. Hold on, hold on, hold on. So let me defer to legal. So her, her substitute motion, uh, didn't get a second, right? So do we, do we have to defer back to the original motion or can we hear another substitute motion?
- 3:20:38
She amended her motion, which failed.
- 3:20:40
Right.
- 3:20:40
And then a substitute motion was made by Mr. McKnight, which I believe has been seconded, so you vote on that motion first.
- 3:20:46
Before we go back to the original.
- 3:20:47
Yes, before you go back to the original motion. Yes.
- 3:20:49
All right. So, all right, so there has been another substitute motion to deny, and that has been seconded. All right. So can we do a roll call vote to deny this?
- 3:21:03
All right, so there is a motion on the floor to deny s- um, Z-26-18. Just say yes to deny or no to deny when I call your name, okay? So Commissioner Davis, how do you vote?
- 3:21:17
Yes to deny.
- 3:21:19
Okay. Commissioner Malice?
- 3:21:20
No.
- 3:21:21
Commissioner Leary?
- 3:21:23
No.
- 3:21:24
Commissioner McKnight?
- 3:21:25
Yes.
- 3:21:26
Commissioner O'Neill?
- 3:21:28
Yes.
- 3:21:29
Commissioner Clark?
- 3:21:31
Yes to deny.
- 3:21:32
Mm-hmm. Commissioner Smith?
- 3:21:34
No.
- 3:21:35
Commissioner... He's left for today. Commissioner Spencer?
- 3:21:38
Yes to deny.
- 3:21:39
And Commissioner Cooks?
- 3:21:42
Yes to deny.
- 3:21:43
All right.
- 3:21:46
So what's the count?
- 3:21:47
Six.
- 3:21:48
Six. So it passed?
- 3:21:49
So it denied. It passed. Mm-hmm.
- 3:21:51
Hold, hold on just a second. All right, so that passed.
- 3:21:55
Mm-hmm. Six four.
- 3:21:56
Okay. So there will be a recommendation to deny this, um, this rezoning petition to the Augusta Commission, and actually that I know earlier I read that that will be heard at the January Augusta... I mean, yeah, Augusta Commission meeting, but it's actually the December 1st meeting, correct?
- 3:22:19
Yes, that is correct. The hearing will be on December 1st. It'll be on that agenda. However, the, uh, clerk of commission has opened up the ability to sign up for that meeting till 9:00 AM tomorrow, so you will have additional time to sign up if you wish to speak at that meeting on December 1st.
- 3:22:39
It is 2:00 on December 1st.
- 3:22:45
All right. Well, I think that concludes our business for today. Thank you all again.
- 3:22:52
Thank you.