--- title: HB 1381. Public utilities; require grid modernization assessments to be filed with integrated resources plans collection: bills id: 2025-2026/hb1381 cite_as: HB 1381, 2025-2026 Regular Session (Ga.) canonical_url: https://georgiacommons.org/state/legislative/bills/2025-2026/hb1381 md_url: https://georgiacommons.org/state/legislative/bills/2025-2026/hb1381.md text_url: https://georgiacommons.org/state/legislative/bills/2025-2026/hb1381/text source_url: https://www.legis.ga.gov/legislation/73370 date: 2026-02-20 status: introduced corpus_version: bills-2026-11-06 license: Public record of the Georgia General Assembly, from its website; see about.md publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/state/legislative/bills/2025-2026.md previous: https://georgiacommons.org/state/legislative/bills/2025-2026/hb1380.md next: https://georgiacommons.org/state/legislative/bills/2025-2026/hb1382.md index: https://georgiacommons.org/state/legislative/bills/index.md omitted: votes and history omitted_chars: 346 omitted_url: https://georgiacommons.org/state/legislative/bills/2025-2026/hb1381.md?full=1 bill_number: HB 1381 session: 2025-2026 Regular Session session_slug: 2025-2026 chamber: House bill_type: bill status_date: 2026-02-18 last_action: House Second Readers sponsors: - Sam Park - Todd Jones - Eric Gisler - Tangie Herring - Beth Camp - Brad Thomas text_version: Introduced has_text: true upstream_id: 73370 summaries_model: claude-sonnet-5 topic_tags: - electric utilities - power grid technology - transmission lines - Public Service Commission - electricity rates measure_type: GEN code_titles: - 46 Public Utilities and Transportation meetings: 3 --- # HB 1381. Public utilities; require grid modernization assessments to be filed with integrated resources plans ## Text House Bill 1381 By: Representatives Park of the 107th, Jones of the 25th, Gisler of the 121st, Herring of the 145th, Camp of the 135th, and others A BILL TO BE ENTITLED AN ACT To amend Chapter 3A of Title 46 of the Official Code of Georgia Annotated, relating to integrated resource planning, so as to require grid modernization assessments to be filed with integrated resources plans; to require justification for new transmission construction instead of utilizing certain new technologies; to provide for the recovery of costs; to provide for the recovery of certain savings related to new technologies; to provide for definitions; to provide for related matters; to repeal conflicting laws; and for other purposes. BE IT ENACTED BY THE GENERAL ASSEMBLY OF GEORGIA: SECTION 1. Chapter 3A of Title 46 of the Official Code of Georgia Annotated, relating to integrated resource planning, is amended in Code Section 46-3A-1, relating to definitions, as follows: "46-3A-1. As used in this chapter, the term: (1) 'Advanced reconductoring' means the replacement of traditional transmission conductors with high-performance conductors that provide higher capacity and lower line losses, specifically designed for installation on existing towers and rights of way. (1)(2) 'Capacity resource' means an electric plant, a long-term power purchase, or a demand-side capacity option. (2)(3) 'Construction' means clearing of land, excavation, or other substantial activity leading to the operation of an electric plant other than planning, land surveying, land acquisition, subsurface exploration, design work, licensing or other regulatory activity, contracting for construction, or environmental protection measures and activities associated therewith. (3)(4) 'Demand-side capacity option' means a program proposed by a utility or the commission for the reduction of future electricity requirements the utility's Georgia retail customers would otherwise impose, including, but not limited to, conservation, load management, cogeneration, and renewable energy technologies. (4)(5) 'Electric plant' means any facility, or the portion of a facility, that produces electricity or that, at the time application for certification is made pursuant to this chapter, is intended to produce electricity for a utility's Georgia retail customers. 'Electric plant' includes the realty and ancillary facilities for the construction of the plant. (6) 'Grid-enhancing technologies' or 'GETs' means a suite of hardware and software solutions that increase the capacity, efficiency, or reliability of existing transmission lines, including, but not limited to, dynamic line ratings, advanced power flow control, and topology optimization. (5)(7) 'Long-term power purchase' means a purchase of electric capacity and energy for a period exceeding one year, the principal purpose of which is to supply the requirements of the Georgia retail customers of a utility. (6)(8) 'Plan' means an integrated resource plan which contains the utility's electric demand and energy forecast for at least a 20 year period, contains the utility's program for meeting the requirements shown in its forecast in an economical and reliable manner, contains the utility's analysis of all capacity resource options, including both demand-side and supply-side options, and sets forth the utility's assumptions and conclusions with respect to the effect of each capacity resource option on the future cost and reliability of electric service. The plan shall also: (A) Contain the size and type of facilities which are expected to be owned or operated in whole or in part by such utility and the construction of which is expected to commence during the ensuing ten years or such longer period as the commission deems necessary and shall identify all existing facilities intended to be removed from service during such period or upon completion of such construction; (B) Contain practical alternatives to the fuel type and method of generation of the proposed electric generating facilities and set forth in detail the reasons for selecting the fuel type and method of generation; (C) Contain a statement of the estimated impact of proposed and alternative generating plants on the environment and the means by which potential adverse impacts will be avoided or minimized; (D) Indicate in detail the projected demand for electric energy for a 20 year period and the basis for determining the projected demand; (E) Describe the utility's relationship to other utilities in regional associations, power pools, and networks; (F) Identify and describe all major research projects and programs which will continue or commence in the succeeding three years and set forth the reasons for selecting specific areas of research; (G) Identify and describe existing and planned programs and policies to discourage inefficient and excessive power use; and (H) Provide any other information as may be required by the commission. (7)(9) 'Supply-side capacity option' means an electric plant, a long-term power purchase, or any other source of additional energy. (8)(10) 'Utility' means any electric supplier whose rates are fixed by the commission." SECTION 2. Said chapter is further amended by revising Code Section 46-3A-2, relating to filing and approval of an integrated resource plan, by adding a new subsection to read as follows: "(d)(1) Each integrated resource plan filed after July 1, 2026, shall include a dedicated grid modernization assessment that identifies all transmission corridors currently experiencing, or forecast to experience, congestion within the succeeding ten years. (2) For each proposed construction of new a transmission line or significant expansion of an existing line identified in the grid modernization assessment, the utility must file a technical and economic comparison demonstrating that grid-enhancing technologies or advanced reconductoring were evaluated as alternatives, and justify the need for such construction." SECTION 3. Said chapter is further amended by revising Code Section 46-3A-4, relating to issuance of a certificate of public convenience and necessity, and application to include plan and cost-benefit analysis, by adding a new subsection to read as follows: "(d) The commission shall not issue a certificate pursuant to this Code section for the construction of a new high voltage transmission line unless the applicant demonstrates that the immediate capacity need cannot be met by the deployment of grid-enhancing technologies or advanced reconductoring on existing rights of way." SECTION 4. Said chapter is further amended by revising Code Section 46-3A-7, relating to construction costs as part of rate base, review of construction work in progress, verification of expenditures, and recovery of costs of canceled construction, by adding a new subsection to read as follows: "(e)(1) All capital expenditures for grid-enhancing technologies and advanced reconductoring for which a certificate was obtained shall be eligible for full cost recovery through the utility's base rate. (2) The commission is authorized to allow a utility to retain 25 percent of the verified annual congestion cost savings achieved through the deployment of GETs, with the remaining 75 percent passed through to ratepayers as a direct credit on the fuel cost adjustment or similar mechanism." SECTION 5. All laws and parts of laws in conflict with this Act are repealed. ## Summaries written by Georgia Commons The following was written by claude-sonnet-5 from the text above and is not part of the bill. Quote the text, not the summary. House Bill 1381 would require Georgia's electric utilities to study grid upgrade technologies before building new transmission lines and to include a grid modernization assessment in their long-range resource plans filed with state regulators. ### Plain-language summary Georgia law requires large electric utilities to file integrated resource plans with the Public Service Commission every few years, laying out how they plan to meet future electricity demand. HB 1381 would add a new requirement: starting with plans filed after July 1, 2026, utilities must include a grid modernization assessment identifying transmission corridors that are congested or expected to become congested within the next ten years. For any new transmission line or major expansion identified in that assessment, the utility would have to compare the cost and technical performance of grid-enhancing technologies (software and hardware that boost the capacity of existing lines) and advanced reconductoring (upgrading existing wires with higher-capacity conductors) against building new lines, and justify why new construction is needed. The Public Service Commission could not approve a new high-voltage line unless the utility shows these alternatives cannot meet the need. The bill also lets utilities fully recover the cost of these technologies through customer rates and keep 25 percent of verified savings from reduced congestion, passing the rest to ratepayers. ### What it does - Requires utilities to file a grid modernization assessment with each integrated resource plan submitted after July 1, 2026, identifying congested or soon-to-be-congested transmission corridors. - Requires utilities proposing new or expanded transmission lines to compare them against grid-enhancing technologies and advanced reconductoring and justify why new construction is needed. - Blocks the Public Service Commission from approving a certificate for a new high-voltage transmission line unless the utility proves the need cannot be met with existing-line upgrades instead. - Allows utilities to recover the full cost of grid-enhancing technology and advanced reconductoring investments through their base electric rates. - Lets utilities keep 25 percent of verified annual savings from reduced line congestion achieved through these technologies, while the remaining 75 percent goes back to customers as a rate credit. - Adds legal definitions for 'advanced reconductoring' and 'grid-enhancing technologies' (or 'GETs') to Georgia's integrated resource planning law. ### Who it affects Georgia's regulated electric utilities that file integrated resource plans, the Public Service Commission that reviews and approves those plans and transmission projects, and electricity ratepayers whose bills would reflect both new cost recovery for grid technology and credits from congestion savings. ### Why it matters If enacted, utilities would need to show new transmission lines are truly necessary before building them, potentially slowing or reshaping large infrastructure projects. Ratepayers could see both new charges for grid technology investments and credits from congestion savings, changing how transmission costs show up on electric bills. ### Key provisions - Section 1 adds definitions for 'advanced reconductoring' and 'grid-enhancing technologies' (GETs) to O.C.G.A. § 46-3A-1, the definitions section of Georgia's integrated resource planning law. - Section 2 amends O.C.G.A. § 46-3A-2 to require a grid modernization assessment in integrated resource plans filed after July 1, 2026, identifying congested transmission corridors over the next ten years. - Section 2 also requires utilities to file a technical and economic comparison showing GETs or advanced reconductoring were considered before proposing new or expanded transmission lines. - Section 3 amends O.C.G.A. § 46-3A-4 to bar the commission from issuing a certificate for a new high-voltage transmission line unless the utility shows the capacity need cannot be met through GETs or advanced reconductoring on existing rights of way. - Section 4 amends O.C.G.A. § 46-3A-7 to allow full cost recovery through base rates for capital spent on GETs and advanced reconductoring that received a certificate. - Section 4 also lets the commission allow utilities to keep 25 percent of verified annual congestion savings from GETs, with 75 percent passed to ratepayers as a rate credit. ## Status - Status: Introduced (2026-02-18) - Last action: House Second Readers (2026-02-20) - Sponsors: Sam Park, Todd Jones, Eric Gisler, Tangie Herring, Beth Camp, Brad Thomas - Official page: https://www.legis.ga.gov/legislation/73370 ## Discussed in meetings (3) The House and Senate meetings that took this bill up, from their machine transcripts. Each account was written by Georgia Commons and is not part of the record; the video is. - House floor session, February 19, 2026 (legislative day 21): read aloud at [0:32:50](https://vimeo.com/1166068675#t=1970s). https://georgiacommons.org/state/legislative/meetings/2026-02-19/house-floor.md - House floor session, February 20, 2026 (legislative day 22): read aloud at [0:43:23](https://vimeo.com/1166410942#t=2603s). https://georgiacommons.org/state/legislative/meetings/2026-02-20/house-floor.md ### House Energy, Utilities & Telecommunications Committee, March 5, 2026 From [0:02:41](https://vimeo.com/1170776882#t=161s). https://georgiacommons.org/state/legislative/meetings/2026-03-05/house-energy-utilities-and-telecommunications.md The sponsor said the bill would require grid-modernization assessments and evaluations for proposed transmission lines, letting utilities retain 25% of technology-related savings while passing 75% to customers. Asked why legislation was needed when Georgia Power already uses these technologies, the sponsor cited consistent assessments and incentives for faster adoption. The sponsor said existing lines could gain 20% to 50% capacity at a fraction of new-construction costs and pledged to remove Section 3, but no amendment was adopted. A Georgia Power planning witness opposed duplicating existing requirements, citing costs and delays. The witness said the 2025 planning order already requires technology evaluations. Asked when advanced conductors would be unsuitable, the witness described a project where rebuilding was cheaper. Asked whether changes would require legislation rather than commission action, the witness was unsure. Georgia Conservation Voters supported the bill over electricity costs; the chair objected to election-related remarks. A Southern Environmental Law Center witness supported public scrutiny and permanent evaluation requirements, saying planned new lines had risen from 20 to 1,000 miles. The chair said the Public Service Commission could already demand more information, while questioning Georgia Power's past demand forecasts. With the sponsor's agreement, the chair left the bill as a hearing only and encouraged further work. No vote occurred. > The history, votes, amendments, and documents (346 characters) are at https://georgiacommons.org/state/legislative/bills/2025-2026/hb1381.md?full=1