Last action July 1, 2025 · Effective Date

House Bill 143 changes how Georgia's Environmental Protection Division installs and pays for water-measuring devices on farm irrigation permits, removing a rule that shifted installation costs to farmers after five years and letting division staff do installations when no contractor is available.

Read the full bill text

These buttons carry the bill's own text, not the summaries below. Copy for LLM, View as markdown, and Send to AI use the Markdown version: the text as filed, then the summaries under a heading that names them as ours. View raw is the text alone.

The summaries below were written by an AI model (claude-sonnet-5) from the text of the bill and are not part of it. Quote the text, not the summary. The stored text is the Enrolled version, the latest the General Assembly's website lists.

In plain language

Georgia law requires farmers who hold permits to withdraw surface or ground water for irrigation to have water-measuring devices installed so the state can track farm water use. Previously, if the state's Environmental Protection Division tried to install a state-funded device but found the farm site lacked the infrastructure to support it, the permittee would get five years before becoming responsible for installing and paying for the device themselves. HB143 removes that five-year shift-the-cost-to-the-farmer provision from both the surface water law (O.C.G.A. § 12-5-31) and the ground water law (O.C.G.A. § 12-5-105). Instead, the bill adds language allowing the division to use its own trained and certified staff to perform installations when no outside contractor is available, still at no charge to the permittee. It also removes a separate one-year deadline that had applied when a permit was modified, amended, transferred, or assigned without a device already installed. The bill also clarifies that the division may repair or replace measuring devices when needed to keep permittees in compliance with water use rules, at no cost to the permittee.

What the bill does

  • Removes the requirement that farmers become responsible for installing and paying for a water-measuring device themselves after five years if their site lacked the infrastructure for a state-funded installation.
  • Allows the Environmental Protection Division to use its own trained and certified staff to install water-measuring devices when no outside contractor is available, at no cost to the permittee.
  • Removes a one-year deadline that had required permittees to install a device themselves after a permit modification, amendment, transfer, or assignment.
  • Clarifies that the division has authority to repair or replace water-measuring devices as needed to keep permits in compliance with water use rules, at no charge to the permittee.
  • Applies these changes identically to both surface water permits (O.C.G.A. § 12-5-31) and ground water permits (O.C.G.A. § 12-5-105).

Who it affects

Farmers and other agricultural water permit holders who withdraw surface or ground water in Georgia, particularly those in the Flint River basin and other areas with metered farm-use permits, as well as the Environmental Protection Division staff and contractors responsible for installing, reading, and maintaining water-measuring devices.

Why it matters

Farmers who previously faced a five-year clock before having to pay for their own water-measuring device installation no longer face that cost shift under this bill. The division gains more flexibility to complete installations itself when contractors are unavailable, which could affect how quickly devices get installed statewide.

Key provisions

  • Section 1 amends O.C.G.A. § 12-5-31 to remove the one-year installation deadline previously tied to permit modifications, amendments, transfers, or assignments effective on or after April 20, 2018.
  • Section 1 removes the provision requiring permittees to pay for and install their own device after five years if their site initially lacked infrastructure for a state-installed device.
  • Section 1 adds authority for the division to use trained, certified staff for installations when no contractor is available, at no charge to permittees.
  • Section 1 adds explicit authority for the division to repair or replace devices as needed to maintain compliance with water use regulations, at no cost to permittees.
  • Section 2 makes the same set of changes to O.C.G.A. § 12-5-105, which governs ground water permits for farm use.
  • Section 3 repeals any conflicting laws.

From the bill

“If no contractor is available, the division may use trained and certified staff to perform installations, and no charge shall be made to the permittee for such costs”

Lets state staff install water-measuring devices directly when no outside contractor is available, at no cost to farmers.

“The division shall also have the authority to undertake repairs or replacements of water-measuring devices when such repairs or replacements are necessary to maintain compliance with water use regulations, and no charge shall be made to the permittee for such costs.”

Confirms the division can repair or replace devices to keep permits compliant, without billing the farmer.

Discussed in meetings (12)

The House and Senate meetings that took this bill up, from their machine transcripts. Each account was written by Georgia Commons with AI and is not part of the record; the video is what was said.

  1. House Rules Committee, February 18, 2025

    From 0:41:27 · Watch on the General Assembly's Vimeo channel

    Summary by Georgia Commons: The sponsor said HB 143 resulted from work between the Environmental Protection Division and farmers to add flexibility to agricultural water metering while strengthening the program and its data. The sponsor said the changes would save both farmers and the state millions of dollars in compliance costs. A committee member praised the agencies and lawmakers involved in developing the program over more than 20 years. No scheduling decision was announced.

  2. House Rules Committee, February 26, 2025

    From 0:37:02 · Watch on the General Assembly's Vimeo channel · Confirmed by the 2025 House Journal, p. 871

    Summary by Georgia Commons: The committee placed HB 143 on Thursday’s floor calendar under modified structured rules without voiced opposition. No substantive discussion occurred.

  3. House floor session, February 27, 2025 (legislative day 24)

    From 1:23:29 · Watch on the General Assembly's Vimeo channel · Confirmed by the 2025 House Journal, p. 883

    Summary by Georgia Commons: The sponsor said HB 143 would make agricultural water-meter installation more flexible, remove installation requirements for wells and lakes that do not currently need meters, and support the Environmental Protection Division's compliance program. The sponsor described a year of discussions with farmers and the division, saying the changes would expand irrigation opportunities while maintaining accurate water-use information. The sponsor said no additional state funding would be required, the state would save millions of dollars and farmers would save an estimated $9.3 million. A former Natural Resources and Environment Committee chair supported the bill, describing how earlier metering efforts helped farmers understand and conserve water during disputes with neighboring states. Another member described the bill as improving management without unnecessary burdens on farmers. No substantive questions were asked. The House adopted the committee substitute and passed the bill by 165 to 0.

  4. Senate Natural Resources and the Environment Committee, March 19, 2025

    From 0:17:57 · Watch on the General Assembly's Vimeo channel · Confirmed by the Senate Natural Resources and the Environment Committee minutes, 2025 Regular Session, p. 6

    Summary by Georgia Commons: The sponsor said the bill would update agricultural water-metering requirements following a year of discussions with the Environmental Protection Division (EPD), farmers and legislators. The sponsor said the changes would preserve accurate water-use data and compliance while giving farmers and the department more flexibility. The sponsor estimated savings of $9.3 million for farmers and millions for the department, and said accurate data remained important for water-related litigation. In response to a question, presenters clarified that the bill covers agricultural surface water and groundwater use statewide. The committee approved the bill by a show of hands, with no count announced.

  5. Senate Rules Committee, March 21, 2025

    From 0:07:02 · Watch on the General Assembly's Vimeo channel · Confirmed by the Senate Rules Committee minutes, 2025 Regular Session, p. 56

    Summary by Georgia Commons: The sponsor said HB 143 would give farmers and the Environmental Protection Division more flexibility in the agricultural water-metering program while preserving its integrity. The sponsor described it as a department bill and said it would save farmers and the division millions of dollars. Members asked no questions. Later, a committee member selected the bill for the calendar, which the committee approved unanimously.

  6. Senate floor session, March 25, 2025 (legislative day 35)

    From 1:54:33 · Watch on the General Assembly's Vimeo channel · Confirmed by the 2025 Senate Journal, p. 1895

    Summary by Georgia Commons: The presenter said HB 143 would return some responsibility for agricultural water permitting and metering to the Environmental Protection Division and remove some farmers’ meter-related requirements. The presenter said it would also authorize the division to install and maintain meters, describing the changes as helpful to agriculture. There were no questions or opposing speeches. The Senate passed the bill 53-0.

Status timeline

  1. 2025-07-01Effective Date
  2. 2025-05-08Act 72
  3. 2025-05-08House Date Signed by Governor (House)
  4. 2025-04-07House Sent to Governor (House)
  5. 2025-03-25Senate Passed/Adopted (Senate)
  6. 2025-03-25Senate Third Read (Senate)
  7. 2025-03-21Senate Read Second Time (Senate)
  8. 2025-03-20Senate Committee Favorably Reported (Senate)
Show full history (15 actions)
  1. 2025-02-28Senate Read and Referred (Senate)
  2. 2025-02-27House Passed/Adopted By Substitute (House)
  3. 2025-02-27House Third Readers (House)
  4. 2025-02-13House Committee Favorably Reported By Substitute (House)
  5. 2025-01-30House Second Readers (House)
  6. 2025-01-29House First Readers (House)
  7. 2025-01-28House Hopper (House)

Sponsors

Names link to each legislator's page on VoteGA, an independent nonpartisan site.

Votes

  1. PassedHouse voteFebruary 27, 2025

    165 yea, 0 nay (8 not voting, 7 excused)

    PASSAGE: House Vote #100

  2. PassedSenate voteMarch 25, 2025

    53 yea, 0 nay (2 not voting, 1 excused)

    PASSAGE: Senate Vote #281

Topics

  • water resources
  • farm irrigation
  • agricultural regulation
  • water permits
  • environmental protection division

Ask about this bill

Answers are written by AI from this document, and every quotation is checked against it. Not legal advice.

Machine-readable https://georgiacommons.org/state/legislative/bills/2025-2026/hb143.md · https://georgiacommons.org/state/legislative/bills/index.md · MCP https://mcp.georgiacommons.org/mcp

HB143: Water resources; water-measuring devices for farm use of surface and ground water; revise provisions | Georgia Commons