--- title: HB 402. Public Service Commission; establishment of renewable energy sources and renewable energy portfolio standard goals for electric service providers; provide collection: bills id: 2025-2026/hb402 cite_as: HB 402, 2025-2026 Regular Session (Ga.) canonical_url: https://georgiacommons.org/state/legislative/bills/2025-2026/hb402 md_url: https://georgiacommons.org/state/legislative/bills/2025-2026/hb402.md text_url: https://georgiacommons.org/state/legislative/bills/2025-2026/hb402/text source_url: https://www.legis.ga.gov/legislation/70204 date: 2025-02-13 status: introduced corpus_version: bills-2026-11-06 license: Public record of the Georgia General Assembly, from its website; see about.md publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/state/legislative/bills/2025-2026.md previous: https://georgiacommons.org/state/legislative/bills/2025-2026/hb401.md next: https://georgiacommons.org/state/legislative/bills/2025-2026/hb403.md index: https://georgiacommons.org/state/legislative/bills/index.md omitted: votes and history omitted_chars: 403 omitted_url: https://georgiacommons.org/state/legislative/bills/2025-2026/hb402.md?full=1 bill_number: HB 402 session: 2025-2026 Regular Session session_slug: 2025-2026 chamber: House bill_type: bill status_date: 2025-02-11 last_action: House Withdrawn, Recommitted sponsors: - Spencer Frye - Eric Bell - Karla Drenner - Gabriel Sanchez - Miriam Paris - Sam Park text_version: Introduced has_text: true upstream_id: 70204 summaries_model: claude-sonnet-5 topic_tags: - renewable energy - Public Service Commission - electric utilities - energy policy - Georgia Environmental Finance Authority measure_type: GEN code_titles: - 46 Public Utilities and Transportation - 50 State Government meetings: 3 --- # HB 402. Public Service Commission; establishment of renewable energy sources and renewable energy portfolio standard goals for electric service providers; provide ## Text House Bill 402 By: Representatives Frye of the 122nd, Bell of the 75th, Drenner of the 85th, Sanchez of the 42nd, Paris of the 142nd, and others A BILL TO BE ENTITLED AN ACT To amend Titles 46 and 50 of the Official Code of Georgia Annotated, relating to public utilities and public transportation and state government, respectively, so as to provide for the establishment of renewable energy sources and renewable energy portfolio standard goals by the Public Service Commission for electric service providers; to provide for the inclusion of existing or planned renewable energy resources in integrated resource plans; to authorize the Georgia Environmental Finance Authority to finance and perform certain duties in connection with projects relating to renewable energy facilities; to provide for limited liability; to revise and provide for definitions; to provide for rules and regulations; to provide legislative findings; to provide for related matters; to repeal conflicting laws; and for other purposes. BE IT ENACTED BY THE GENERAL ASSEMBLY OF GEORGIA: SECTION 1. Title 46 of the Official Code of Georgia Annotated, relating to public utilities and public transportation, is amended in Article 1 of Chapter 3, relating to generation and distribution of electricity generally, by adding a new part to read as follows: "Part 6 46-3-69.5. (a) It is the intent of the legislature to recognize the economic, environmental, and fuel diversity benefits of renewable energy resources; to encourage further development of these resources; and to encourage the establishment of a market for renewable energy in Georgia using this state's renewable energy resources. These efforts can reduce the consumption of fossil fuels for the generation of electricity and reduce this state's dependence on finite, nonrenewable resources. Accordingly, the General Assembly finds and declares that goals should be established for electric service providers to guide them in incorporating renewable resources into their resource portfolios. (b) The purpose of this part is to lessen Georgia's dependence on fossil fuels and the exposure of Georgia's consumers to volatile and rising prices for coal and natural gas by encouraging the greater use of renewable energy by establishing goals for electric service providers in implementing portfolio standards for renewable energy. 46-3-69.6. As used in this part, the term: (1) 'Biomass material' means organic matter, excluding fossil fuels and black liquor, including agricultural crops; plants; trees; wood; wood wastes and residues; sawmill waste; sawdust; wood chips; bark chips; forest thinning, harvesting, or clearing residues; wood waste from pallets or other wood demolition debris; peanut shells; cotton plants; corn stalks; and plant matter, including aquatic plants, grasses, stalks, vegetation, and residues, including hulls, shells, or cellulose-containing fibers. (2) 'Electric membership corporation' means a corporation organized under Article 4 of this chapter. (3) 'Electric service provider' means any electric utility, electric membership corporation, or municipal electric provider engaged in the business of distributing electricity to retail or wholesale electric customers in this state. (4) 'Low impact hydropower' means energy produced by a dam and powerhouse that is: (A) Certified as low impact by the Low Impact Hydropower Institute; or (B) Evaluated by the commission as being compliant with the following standards: (i) Providing river flows that are healthy for fish, wildlife, and water quality, including seasonal flow fluctuations where appropriate; (ii) Protecting water quality in the river; (iii) Providing effective fish passage and protecting fish from entrainment; (iv) Taking sufficient action to protect, mitigate, and enhance environmental conditions in the watershed; (v) Avoiding negative impact on species classified as threatened or endangered by the federal or state government; (vi) Avoiding inappropriate impact on cultural resources; (vii) Providing free access to the water and accommodating recreational activities on the river; and (viii) Avoiding any recommendation for removal by a federal or state agency due to adverse environmental impacts. (5) 'Municipal electric provider' means an entity that provides electric services and that is owned or operated by a municipal corporation. (6) 'Renewable energy' means electrical energy produced from or by renewable energy sources. (7) 'Renewable energy sources' means any of the following: wind; solar energy; low impact hydropower; geothermal resources; ocean thermal energy; wave or tidal energy; biofuels derived entirely from organic sources other than coal, petroleum, or natural gas; the combustion of landfill gas; methane gas resulting from the anaerobic decomposition of organic materials; plasma arc; pyrolysis; gasification; biomass materials; postconsumer waste paper; forest related sources, including mill residues, waste pallets, crates, and dunnage; or forest and agricultural biomass sources, including orchard tree crops, vineyard, grain, legumes, sugar, switchgrass, other crop by-products or residues, and precommercial thinning, slash, brush, or landscape trimmings, but not including old-growth timber. 46-3-69.7. (a) On or before July 1, 2026, the commission shall establish renewable energy sources and renewable energy portfolio standard goals for electric service providers to reach on an annual basis. Such goals shall not exceed 20 percent of annual net electricity sales for each electric service provider. In developing the renewable energy sources and renewable energy portfolio standard goals, the commission shall evaluate current and forecasted levelized costs in cents per kilowatt hour for all electric service providers through 2030 and current and forecasted installed capacity in kilowatts for each renewable energy generation method for all electric service providers through 2050. (b) Electric service providers are encouraged to meet and maintain the renewable energy sources and renewable energy portfolio standard goals established pursuant to subsection (a) of this Code section. 46-3-69.8. On or before July 1, 2026, the commission shall adopt rules and regulations to carry out the provisions of this part. Such rules and regulations shall, at a minimum: (1) Provide for a reporting system to monitor voluntary compliance with this part. Such reporting system shall require electric service providers to report whether they are subject to energy portfolio requirements in more than one state and the amount of such requirements, if applicable, and to indicate the sources of energy used to voluntarily comply with the renewable energy sources and renewable energy portfolio standard goals established pursuant to subsection (a) of Code Section 46-3-46.7 and the requirements of other applicable states; and (2) Provide for annual reporting by all electric service providers of renewable energy usage, how the generation costs of renewable energy compare to costs from other generation sources, and the average price paid for the sources of the renewable energy produced." SECTION 2. Said title is further amended in Code Section 46-3A-1, relating to definitions relative to integrated resource planning, by revising paragraph (7) as follows: "(7) 'Plan' means an integrated resource plan which contains the utility's electric demand and energy forecast for at least a 20 year period, contains the utility's program for meeting the requirements shown in its forecast in an economical and reliable manner, contains the utility's analysis of all capacity resource options, including both demand-side and supply-side options, and sets forth the utility's assumptions and conclusions with respect to the effect of each capacity resource option on the future cost and reliability of electric service. The plan shall also: (A) Contain the size and type of facilities which are expected to be owned or operated in whole or in part by such utility and the construction of which is expected to commence during the ensuing ten years or such longer period as the commission deems necessary and shall identify all existing facilities intended to be removed from service during such period or upon completion of such construction; (B) Contain practical alternatives to the fuel type and method of generation of the proposed electric generating facilities and set forth in detail the reasons for selecting the fuel type and method of generation; (C) Contain a statement of the estimated impact of proposed and alternative generating plants on the environment and the means by which potential adverse impacts will be avoided or minimized; (D) Indicate in detail the projected demand for electric energy for a 20 year period and the basis for determining the projected demand; (E) Describe the utility's relationship to other utilities in regional associations, power pools, and networks; (F) Identify and describe all major research projects and programs which will continue or commence in the succeeding three years and set forth the reasons for selecting specific areas of research; (G) Identify and describe existing and planned programs and policies to discourage inefficient and excessive power use; (H) Identify and describe existing and planned renewable energy resources, if any, used by the utility and whether such existing and planned renewable energy resources are sufficient to comply with the renewable energy sources and renewable energy portfolio standard goals established pursuant to subsection (a) of Code Section 46-3-46.7; and (H)(I) Provide any other information as may be required by the commission." SECTION 3. Title 50 of the Official Code of Georgia Annotated, relating to state government, is amended in Code Section 50-23-4, relating to definitions relative to the Georgia Environmental Finance Authority, by revising paragraphs (5) and (6) and adding a new paragraph to read as follows: "(5) 'Environmental facilities' means any projects, structures, and other real or personal property acquired, rehabilitated, constructed, or planned: (A) For the purposes of supplying, distributing, and treating water and diverting, channeling, or controlling water flow and head including, but not limited to, surface or ground water, canals, reservoirs, channels, basins, dams, aqueducts, standpipes, penstocks, conduits, pipelines, mains, pumping stations, water distribution systems, compensating reservoirs, intake stations, waterworks or sources of water supply, wells, purification or filtration plants or other treatment plants and works, connections, water meters, mechanical equipment, electric generating equipment, rights of flowage or division and other plant structures, equipment, conveyances, real or personal property or rights therein and appurtenances, furnishings, accessories, and devices thereto necessary or useful and convenient for the collection, conveyance, distribution, pumping, treatment, storing, or disposing of water; (B) For the purposes of collecting, treating, or disposing of sewage including, but not limited to, main, trunk, intercepting, connecting, lateral, outlet, or other sewers, outfall, pumping stations, treatment and disposal plants, ground water rechange basins, backflow prevention devices, sludge dewatering or disposal equipment and facilities, clarifiers, filters, phosphorus removal equipment and other plants, soil absorption systems, innovative systems or equipment, structures, equipment, vehicles, conveyances, real or personal property or rights therein, and appurtenances thereto necessary or useful and convenient for the collection, conveyance, pumping, treatment, neutralization, storing, and disposing of sewage; (C) For the purposes of collecting, treating, recycling, composting, or disposing of solid waste, including, but not limited to, trucks, dumpsters, intermediate reception stations or facilities, transfer stations, incinerators, shredders, treatment plants, landfills, landfill equipment, barrels, binders, barges, alternative technologies and other plant structures, equipment, conveyances, improvements, real or personal property or rights therein, and appurtenances, furnishings, accessories, and devices thereto necessary or useful and convenient for the collection, treatment, or disposal of solid waste; or (D) For the purposes of carrying out a community land conservation project or a state land conservation project pursuant to Chapter 22 of Title 36; or (E) For the purposes of generating, storing, and transmitting renewable energy, as such term is defined in Code Section 46-3-69.6, including, but not limited to, generation facilities, battery storage facilities, electric transformers, transmission lines, equipment, vehicles, conveyances, real or personal property or rights therein and appurtenances, furnishings, accessories, and devices thereto necessary or useful and convenient for the generation, storing, and transmitting of such renewable energy. (6) 'Environmental services' means the provision, collectively or individually, of water facilities, sewerage facilities, solid waste facilities, renewable energy facilities, community land conservation projects or state land conservation projects pursuant to Chapter 22 Title 36, or management services." "(12.1) 'Renewable energy facility' means any environmental facility described in subparagraph (E) of paragraph (5) of this Code section." SECTION 4. Said title is further amended in subsection (b) of Code Section 50-23-5, relating to purpose, powers, and duties, by striking "and" at the end of paragraph (33), by striking the period and inserting in lieu thereof "; and" at the end of subparagraph (J) of paragraph (34), and by adding a new paragraph to read as follows: "(35) To promulgate and adopt rules and regulations to carry out the purposes of this chapter." SECTION 5. Said title is further amended in Code Section 50-23-12, relating to personal liability of members, officers, and employees of the authority, by revising paragraph (2) as follows: "(2) The construction, ownership, maintenance, or operation of any solid waste system, sewerage system, renewable energy system, environmental facility, or water system owned by a local government; or" SECTION 6. All laws and parts of laws in conflict with this Act are repealed. ## Summaries written by Georgia Commons The following was written by claude-sonnet-5 from the text above and is not part of the bill. Quote the text, not the summary. House Bill 402 would direct Georgia's Public Service Commission to set voluntary renewable energy goals for utilities and let the Georgia Environmental Finance Authority help finance renewable energy projects. ### Plain-language summary Georgia currently has no statewide renewable energy portfolio standard for electric utilities. This bill would require the Public Service Commission to establish, by July 1, 2026, renewable energy source goals for electric service providers (investor-owned utilities, electric membership corporations, and municipal electric providers) capped at 20 percent of each provider's annual net electricity sales. The commission would study current and forecasted costs and capacity for renewable generation before setting the goals, and providers would be 'encouraged' but not legally required to meet them. The bill also requires utilities to describe existing and planned renewable energy resources in their long-term integrated resource plans, and it updates definitions used by the Georgia Environmental Finance Authority so that agency can finance, own, or help build renewable energy generation, storage, and transmission facilities, similar to how it already handles water and sewer projects. It sets up a reporting system so utilities disclose their renewable energy use and costs, and it defines terms like biomass material, low impact hydropower, and renewable energy sources for use across these programs. ### What it does - Requires the Public Service Commission to set renewable energy portfolio goals for electric utilities by July 1, 2026, capped at 20 percent of each provider's annual electricity sales. - Makes meeting those renewable energy goals voluntary rather than mandatory, since the bill only 'encourages' providers to meet them. - Adds a requirement that utility integrated resource plans describe existing and planned renewable energy resources and whether they meet the new goals. - Authorizes the Georgia Environmental Finance Authority to finance, build, and operate renewable energy generation, battery storage, and transmission facilities. - Creates new legal definitions for terms like biomass material, low impact hydropower, and renewable energy sources used throughout the new law. - Requires the commission to adopt rules for annual reporting on renewable energy usage, costs, and pricing by electric service providers. ### Who it affects Electric utilities, electric membership corporations, and municipal electric providers operating in Georgia; the Public Service Commission, which must set goals and rules; the Georgia Environmental Finance Authority, which gains new financing powers; and Georgia electricity customers whose rates and generation mix could be affected. ### Why it matters If enacted, Georgia utilities would face state-set renewable energy targets for the first time, though compliance would be voluntary, and a state authority could help finance new solar, wind, or storage projects, potentially shaping how the state's electricity is generated and priced in coming decades. ### Key provisions - Section 1 adds a new Part 6 to Title 46 creating O.C.G.A. § 46-3-69.5 through 46-3-69.8, stating legislative intent, defining renewable energy terms, and requiring the commission to set voluntary renewable portfolio goals by July 1, 2026, capped at 20 percent of sales. - Section 1 also requires the commission to adopt rules by July 1, 2026 for a voluntary compliance reporting system and annual public reporting on renewable energy usage and costs. - Section 2 amends O.C.G.A. § 46-3A-1 to require integrated resource plans to describe existing and planned renewable energy resources and whether they meet the new portfolio goals. - Section 3 amends O.C.G.A. § 50-23-4 to expand the Georgia Environmental Finance Authority's definition of 'environmental facilities' to include renewable energy generation, storage, and transmission projects. - Section 4 adds a new power letting the authority adopt rules and regulations to carry out its expanded chapter duties. - Section 5 amends O.C.G.A. § 50-23-12 to extend personal liability protections for authority officers and employees to cover renewable energy systems owned by local governments. - Section 6 repeals conflicting laws. ## Status - Status: Introduced (2025-02-11) - Last action: House Withdrawn, Recommitted (2025-02-13) - Sponsors: Spencer Frye, Eric Bell, Karla Drenner, Gabriel Sanchez, Miriam Paris, Sam Park - Official page: https://www.legis.ga.gov/legislation/70204 - Footnotes: 02/13/2025 Withdrawn from Regulated Industries and recommitted to Energy, Utilities, and Telecommunications ## Discussed in meetings (3) The House and Senate meetings that took this bill up, from their machine transcripts. Each account was written by Georgia Commons and is not part of the record; the video is. - House floor session, February 12, 2025 (legislative day 16): read aloud at [1:03:08](https://vimeo.com/1055646400#t=3788s). https://georgiacommons.org/state/legislative/meetings/2025-02-12/house-floor.md ### House floor session, February 13, 2025 (legislative day 17) From [0:48:41](https://vimeo.com/1056064523#t=2921s). https://georgiacommons.org/state/legislative/meetings/2025-02-13/house-floor.md The clerk read [HB 402](https://georgiacommons.org/state/legislative/bills/2025-2026/hb402) a second time. Later, a member moved to transfer it from the Regulated Industries Committee to the Energy, Utilities, and Telecommunications Committee, saying both committee chairs agreed. The House approved the transfer without objection. No discussion of the bill's substance took place. ### House Energy, Utilities & Telecommunications Committee, February 25, 2025 From [0:06:37](https://vimeo.com/1060260104#t=397s). https://georgiacommons.org/state/legislative/meetings/2025-02-25/house-energy-utilities-and-telecommunications.md The sponsor described [HB 402](https://georgiacommons.org/state/legislative/bills/2025-2026/hb402) as a voluntary renewable energy program requiring the Public Service Commission (PSC) to establish monitoring and reporting, with participation voluntary for power providers. The sponsor said it would compare returns on investment for alternative energy and energy sourced outside Georgia, supporting energy independence, lower prices and jobs. The sponsor described a 20% cap and said Georgia Power was already at that renewable share. The chair questioned whether the bill added resource-planning requirements; the sponsor said providers' participation would remain voluntary. One member asked about smaller utilities, and the sponsor said they understood electric cooperatives would not be affected, though broad participation was encouraged. A second member asked whether the PSC already collected the data and whether it would be public. The sponsor did not know whether it was collected and said trade secrets should not be disclosed, without resolving public availability. A third member questioned how modeling assumptions and changing costs would shape results. The sponsor agreed criteria mattered and proposed letting the PSC develop them first. Another member asked about biomass; the sponsor declined to settle which sources should qualify. The chair designated the discussion a hearing only and assigned the bill to a subcommittee. No vote occurred. > The history, votes, amendments, and documents (403 characters) are at https://georgiacommons.org/state/legislative/bills/2025-2026/hb402.md?full=1