Skip to content
Georgia Commons
Menu

Official Code of Georgia Annotated

Title 12. CONSERVATION AND NATURAL RESOURCES · Chapter 8. WASTE MANAGEMENT · Article 2. SOLID WASTE MANAGEMENT · Part 1. GENERAL PROVISIONS

12-8-25.3. Further restrictions on sites within significant ground-water recharge area or near military air space used as bombing range.

Active2 versions printed

Current through: Including Acts of the 2025 Regular Session of the General Assembly.

Effective January 1, 2026.In force today: Effective January 1, 2026.
  1. (a)

    Reserved.#

  2. (b)

    Reserved.#

  3. (c)

    No permit or modification of an existing permit shall be issued for land application of untreated municipal sewage sludge located in an area designated by Hydrologic Atlas 18 prepared by the Department of Natural Resources as a significant ground-water recharge area including, but not limited to, those areas designated as probable areas of thick soils.#

  4. (d)
    1. (1)

      Notwithstanding any other provision of law or any administrative regulation or action to the contrary, no permit shall be issued for a municipal solid waste landfill within two miles of a federally restricted military air space which is used for a bombing range. The provisions of this subsection shall apply to all permit applications pending on or after July 1, 1997, and to all permits denied prior to such date which are the subject of an appeal or judicial review pending on such date.#

    2. (2)

      This subsection shall not prohibit or prevent any municipal solid waste landfill that was permitted and operational on July 1, 1997, from expanding its operation into an area outlined in paragraph (1) of this subsection.#

The notes below are printed with the section but are not enacted law (O.C.G.A. § 1-1-1(c)). They are shown apart from the text.

History

Code 1981, § 12-8-25.3, enacted by Ga. L. 1990, p. 412, § 1; Ga. L. 1995, p. 1025, § 1; Ga. L. 1997, p. 928, § 1; Ga. L. 2020, p. 25, § 1/SB 123; Ga. L. 2025, p. 634, § 4/HB 351, effective January 1, 2026.

Delayed effective date

Code Section 12-8-25.3 is set out twice in this Code. This version is effective January 1, 2026. For version effective until January 1, 2026, see the preceding version.

Amendments

The 2025 amendment, effective January 1, 2026, substituted “Reserved” for the former provisions of subsection (a), which read: “Notwithstanding the provisions of Code Section 12-8-25.2, no permit shall be issued for a municipal solid waste landfill which accepts solid waste generated from outside the county in which such landfill is located or, in the case of a regional landfill, from outside any of the counties or special districts empowered to engage in solid waste management activities constituting such region if any part of such site is within any area that has been designated by the director as a significant ground-water recharge area”; and substituted “Reserved” for “In addition to the provisions of subsection (a) of this Code section, in the case of a regional municipal solid waste landfill where any part of such site is within any area that has been designated by the director as a significant ground-water recharge area, no permit shall be issued for such regional landfill unless the boundaries of the counties or special districts empowered to engage in solid waste management activities are contiguous and such counties or special districts have entered into a joint contract for the collection and disposal of solid waste”.

Read the official page (the state's PDF, opened at the page this text was read from).

Current through: Including Acts of the 2025 Regular Session of the General Assembly.

Text read from t12-(v10)-pdf.pdf, Volume V10, 2021 edition, 2025 supplement, pages 92 to 93; merge action: replaced; file SHA-256 61b02cff0a12.

Effective until January 1, 2026.No longer in force as printed (Effective until January 1, 2026.)
  1. (a)

    Notwithstanding the provisions of Code Section 12-8-25.2, no permit shall be issued for a municipal solid waste landfill which accepts solid waste generated from outside the county in which such landfill is located or, in the case of a regional landfill, from outside any of the counties or special districts empowered to engage in solid waste management activities constituting such region if any part of such site is within any area that has been designated by the director as a significant ground-water recharge area.#

  2. (b)

    In addition to the provisions of subsection (a) of this Code section, in the case of a regional municipal solid waste landfill where any part of such site is within any area that has been designated by the director as a significant ground-water recharge area, no permit shall be issued for such regional landfill unless the boundaries of the counties or special districts empowered to engage in solid waste management activities are contiguous and such counties or special districts have entered into a joint contract for the collection and disposal of solid waste.#

  3. (c)

    No permit or modification of an existing permit shall be issued for land application of untreated municipal sewage sludge located in an area designated by Hydrologic Atlas 18 prepared by the Department of Natural Resources as a significant ground-water recharge area including, but not limited to, those areas designated as probable areas of thick soils.#

  4. (d)
    1. (1)

      Notwithstanding any other provision of law or any administrative regulation or action to the contrary, no permit shall be issued for a municipal solid waste landfill within two miles of a federally restricted military air space which is used for a bombing range. The provisions of this subsection shall apply to all permit applications pending on or after July 1, 1997, and to all permits denied prior to such date which are the subject of an appeal or judicial review pending on such date.#

    2. (2)

      This subsection shall not prohibit or prevent any municipal solid waste landfill that was permitted and operational on July 1, 1997, from expanding its operation into an area outlined in paragraph (1) of this subsection.#

The notes below are printed with the section but are not enacted law (O.C.G.A. § 1-1-1(c)). They are shown apart from the text.

History

Code 1981, § 12-8-25.3, enacted by Ga. L. 1990, p. 412, § 1; Ga. L. 1995, p. 1025, § 1; Ga. L. 1997, p. 928, § 1; Ga. L. 2020, p. 25, § 1/SB 123.

Delayed effective date

Code Section 12-8-25.3 is set out twice in this Code. This version is effective until January 1, 2026. For version effective January 1, 2026, see the following version.

Read the official page (the state's PDF, opened at the page this text was read from).

Current through: Including Acts of the 2025 Regular Session of the General Assembly.

Text read from t12-(v10)-pdf.pdf, Volume V10, 2021 edition, 2025 supplement, pages 91 to 92; merge action: replaced; file SHA-256 61b02cff0a12.

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.