Skip to content
Georgia Commons
Menu

Forsyth · Code of Ordinances

Chapter 7 - BUILDINGS AND BUILDING REGULATIONS / Article I - IN GENERAL

Sec. 7-3. Permits.

About this text

  • As posted on the city's website, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

(a) The building developer must obtain a permit from the City Manager, or his or her designee for the new construction of any building or structure within the city. The City Manager, or his or her designee shall devise an application with reasonable design and workmanship standards to be met to receive such a permit. The cost of such a permit will be determined by resolution of the Forsyth City Council.

(b) A permit must be obtained from the City Manager, or his or her designee prior to the demolition of any building or structure within the city. The City Manager, or his or her designee shall devise an application with reasonable design and workmanship standards to be met to receive such a permit.

The cost of such a permit will be determined by resolution of the Forsyth City Council.

(c) A permit must be obtained from the City Manager, or his or her designee prior to installation of any new electrical wiring or altering of any existing electrical wiring, when the cost of such work exceeds $25.00. The City Manager, or his or her designee shall devise an application with reasonable design and workmanship standards to be met to receive such a permit. The cost of such a permit will be determined by resolution of the Forsyth City Council.

Read this code where it is posted (city website) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:forsyth/code/7-3@2026-11-11-4a4de05aab

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.