Forsyth · Código de ordenanzas
Chapter 7 - BUILDINGS AND BUILDING REGULATIONS / Article I - IN GENERAL
Sec. 7-3. Permits.
Sobre este texto
- As posted on the city's website, retrieved 2026-11-11
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
(a) The building developer must obtain a permit from the City Manager, or his or her designee for the new construction of any building or structure within the city. The City Manager, or his or her designee shall devise an application with reasonable design and workmanship standards to be met to receive such a permit. The cost of such a permit will be determined by resolution of the Forsyth City Council.
(b) A permit must be obtained from the City Manager, or his or her designee prior to the demolition of any building or structure within the city. The City Manager, or his or her designee shall devise an application with reasonable design and workmanship standards to be met to receive such a permit.
The cost of such a permit will be determined by resolution of the Forsyth City Council.
(c) A permit must be obtained from the City Manager, or his or her designee prior to installation of any new electrical wiring or altering of any existing electrical wiring, when the cost of such work exceeds $25.00. The City Manager, or his or her designee shall devise an application with reasonable design and workmanship standards to be met to receive such a permit. The cost of such a permit will be determined by resolution of the Forsyth City Council.
Leer este código donde se publica (city website) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.