Skip to content
Georgia Commons
Menu

Macon-Bibb County · Code of Ordinances

Part III - CODE OF ORDINANCES / Chapter 24 - STREETS AND SIDEWALKS / Article IV - EXCAVATIONS

Sec. 24-74. Liability for damage; removal of waste.

About this text

  • As published by Municode, retrieved 2026-11-14
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

(a) During the time occupied in making the excavation, removing earth and pavement and relaying such pavement, and from the time the excavation is begun until the completion of the relaying of the pavement, the applicant shall be liable for all damage that may be done to Macon-Bibb County property or to life, limb or property of any person.

(b) When the work is completed, Macon-Bibb County or a person authorized by the Macon-Bibb County engineer, shall remove the waste material and clean up the street. Only such old paving material as shall be accepted by the Macon-Bibb County engineer shall be used in repairing and repaving the streets excavated.

History

The history line the source prints at the end of the section.

(Ord. No. O-15-0030, § 1, 7-21-2015)

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:macon-bibb/code/24-74@2026-11-14-6a05f208c9

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.