Skip to content
Georgia Commons
Menu

Macon-Bibb County · Code of Ordinances

Part III - CODE OF ORDINANCES / Chapter 25 - SUBDIVISIONS / Article II - DESIGN AND CONSTRUCTION STANDARDS / Division 1 - GENERALLY

Sec. 25-42. Drainage.

About this text

  • As published by Municode, retrieved 2026-11-14
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Where a subdivision is traversed by a watercourse, drainageway, channel, or stream, there shall be provided a stormwater easement or drainage right-of-way conforming substantially with the lines of such watercourse, and such further width or construction, or both, as will be adequate for the purpose of drainage and maintenance, taking into account possible future development of higher land in the same drainage areas. The drainageway shall be piped when the engineer shall find that it is a hazard or that a continual maintenance problem might exist. The developer shall comply with all environmental requirements for permits required by state or federal agencies.

History

The history line the source prints at the end of the section.

(Ord. No. O-19-0065, § 1(Exh. B), 10-1-2019)

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:macon-bibb/code/25-42@2026-11-14-f88a44cfb1

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Macon-Bibb County Code of Ordinances, Sec. 25-42. Drainage | Georgia Commons