Skip to content
Georgia Commons
Menu

Macon-Bibb County · Code of Ordinances

Part III - CODE OF ORDINANCES / Chapter 29 - UTILITIES AND FRANCHISES / Article I - IN GENERAL

Sec. 29-10. Application to lay underground wires; permit required; access by MaconBibb County engineer.

About this text

  • As published by Municode, retrieved 2026-11-14
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Prior to making any opening in any street, for the laying of conduits, tubes, or pipes for electrical conductors, cables, or wires, the person desiring to lay the same shall make application to the Macon-Bibb County engineer, in writing, and shall file plans and specifica-tions showing the location, the route, and the length of the proposed conduits, pipes, and tubes.

The engineer shall have authority to issue the necessary permit for the opening of the street, as set forth in the application and plans. The opening of the street, without a permit having been first obtained, shall forfeit the right of any person to use or occupy the street. The work of laying any underground conduits, tubes, pipes, electrical conductors, cables, and wires shall be under the direction and approval of the Macon-Bibb County engineer, who shall at all times have free and unobstructed access to the conduits, tubes, pipes, electrical conductors, or cables, for the purpose of inspecting the same, or making connections therewith for wires or conductors in use or to be used by Macon-Bibb County.

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:macon-bibb/code/29-10@2026-11-14-10fbc716ae

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.