Official Code of Georgia Annotated
Title 25. FIRE PROTECTION AND SAFETY · Chapter 15. OTHER SAFETY INSPECTIONS AND REGULATIONS · Article 2. REGULATION OF BOILERS AND PRESSURE VESSELS
25-15-14. Effect on new construction and installation.
Current through: Including Acts of the 2025 Regular Session of the General Assembly.
No boiler or pressure vessel which does not conform to the rules and regulations of the office governing new construction and installation shall be installed and operated in this state after 12 months from the date upon which the first rules and regulations under this article pertaining to new construction and installation shall have become effective, unless the boiler or pressure vessel is of special design or construction and is not inconsistent with the spirit and safety objectives of such rules and regulations, in which case a special installation and operating permit may at its discretion be granted by the office.
History
Code 1981, § 34-11-5, enacted by Ga. L. 1984, p. 1227, § 1; Ga. L. 1985, p. 213, § 3; Code 1981, § 25-15-14, as redesignated by Ga. L. 2012, p. 1144, § 2/SB 446.
Read the official page (the state's PDF, opened at the page this text was read from).
Current through: Including Acts of the 2025 Regular Session of the General Assembly.
Text read from t24-t26-(v21)-2023-pdf.pdf, Volume V21, 2023 edition, page 246; merge action: carried; file SHA-256 8eab3bec6887.