Ir al contenido
Georgia Commons

Código Oficial de Georgia Anotado

Título 25. FIRE PROTECTION AND SAFETY · Capítulo 15. OTHER SAFETY INSPECTIONS AND REGULATIONS · Artículo 2. REGULATION OF BOILERS AND PRESSURE VESSELS

25-15-14. Effect on new construction and installation.

Vigente

Actualizado hasta: Including Acts of the 2025 Regular Session of the General Assembly.

El texto siguiente es la ley tal como la imprime el estado, en inglés.

  1. No boiler or pressure vessel which does not conform to the rules and regulations of the office governing new construction and installation shall be installed and operated in this state after 12 months from the date upon which the first rules and regulations under this article pertaining to new construction and installation shall have become effective, unless the boiler or pressure vessel is of special design or construction and is not inconsistent with the spirit and safety objectives of such rules and regulations, in which case a special installation and operating permit may at its discretion be granted by the office.

Las notas siguientes se imprimen con la sección, pero no son ley promulgada (O.C.G.A. § 1-1-1(c)). Se muestran aparte del texto.

History

Code 1981, § 34-11-5, enacted by Ga. L. 1984, p. 1227, § 1; Ga. L. 1985, p. 213, § 3; Code 1981, § 25-15-14, as redesignated by Ga. L. 2012, p. 1144, § 2/SB 446.

Leer la página oficial (el PDF del estado, abierto en la página de la que se leyó este texto).

Actualizado hasta: Including Acts of the 2025 Regular Session of the General Assembly.

Texto leído de t24-t26-(v21)-2023-pdf.pdf, Volumen V21, edición 2023, página 246; acción de fusión: carried; SHA-256 del archivo 8eab3bec6887.