Acworth · Zoning Ordinance
Appendix B - ZONING ORDINANCE
73-13.14. Water Supply System.
About this text
- As published by Municode, current through 2026-02-09
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
A. Each lot or other site in a subdivision shall be connected to a public water supply system by lines of sufficient size to accommodate the anticipated water demand for domestic and firefighting purposes.
Fire hydrants in residential subdivisions shall be no more than 400 feet from the center of the lot at the building line (distance shall be measured along hose lay). Nonresidential subdivisions shall have fire hydrants no more than 500 feet apart. Lot service connections shall be stubbed in so that there will be no necessity for cutting into any pavement in order to make any future connections. The subdivider shall pay the cost of, or guarantee payment for the cost of the water supply system, in a manner suitable to the City of Acworth.
B. Five copies of the plan of the water supply system of the subdivision, showing the seal of a registered professional engineer, surveyor or landscape architect, shall be submitted to, checked and approved by the Development Director prior to installation. Said system shall be designed in accordance with the State of Georgia 1983 State Highway Department Specifications, volumes I and II.
Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.