Skip to content
Georgia Commons
Menu

Adairsville · Zoning Ordinance

Appendix A - ADAIRSVILLE FEE SCHEDULE

Appendix A. ADAIRSVILLE FEE SCHEDULE

About this text

  • As published by Municode, current through 2026-08-20
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Description Fee Tier 2 (20,001—50,000 gallons) $4.31 Tier 3 (50,001—100,000 gallons) $4.61 Tier 4 (101,000 gallons or more) $4.91 Water/sewer rates—outside city limits (adjusted annually) Residential

Base rate/charge per 1,000 gallons $16.00 Tier 1 (0—5,000 gallons) $5.35 Tier 2 (5,001—10,000 gallons) $7.19 Tier 3 (10,001 gallons or more) $9.05 Commercial Base rate by meter size:

1" or less $30.00 1.5" $50.00 2" $90.00 3" $170.00 4" $210.00 6" $550.00 8" $850.00 Tier 1 (0—20,000 gallons) $5.35 Tier 2 (20,001—50,000 gallons) $5.63 Tier 3 (50,001—100,000 gallons) $5.96 Tier 4 (101,000 gallons or more) $6.27 Gas rates - inside/outside city limits Residential Base rate/charge $12.00 MCF Rate Variable Monthly Commercial Base rate/charge $20.00 MCF Rate Variable Monthly Industrial Base rate/charge $50.00 MCF Rate Variable Monthly Industrial (Interruptible) Base rate/charge $100.00 MCF Rate Variable Monthly Use of hydrant permit and water charges Hydrant Permit Deposit Cost of Meter Inside city limits, plus consumption $150.00 Outside city limits, plus consumption (only in SDS water area) $200.00 Damaged meters or other city-owned equipment

Description Fee Tampering fee—in addition to all costs associated with repair and/or replacement of equipment charged to customer

$150.00 Damaged more than two times:

Additional deposit per meter prior to service being restored $200.00 Reconnection of service

Full account balance plus reconnection fee $50.00 Request for unscheduled meter reads

If meter is in working order $20.00 If there is a problem with the meter No charge Meter recheck (after second time) $20.00

Rescheduling cut-off dates after disconnection has been made $20.00 Returned check fee $35.00

Chapter 47—Zoning Zoning fees Sign permit fee Minimum $100.00 for all signs Permit obtained prior to installation of sign $0.85 per square foot

Permit obtained after installation of sign Double fee Ground Sign (Billboard) $2,000.00 per sign

Ground Sign (Billboard) Annual Renewal Fee $100.00 per sign Rezoning, variance or annexation Fee

Single-family residential (per parcel) $65.00 Multifamily residential (per parcel) $100.00

Commercial/industrial (per parcel) $200.00 Plus advertising and mailing fee (per parcel) $200.00 Special use permit (obtained upon approval of city council) Fee Single-family residential (per parcel) $65.00 Multifamily residential (per parcel) $100.00

Industrial/commercial (per parcel) $200.00 Multi-lot residential/industrial/commercial (per parcel) $500.00 Plus advertising and mailing fee (per parcel) $200.00 Development regulations Fee

Land disturbance permit $110.00 Plus additional fee $40.00 per acre Additional state fee $40.00 per acre Civil (construction) and/or stormwater plan review fee Based on review time

Telecommunications tower or antenna application fee Construction of new tower up to 150 feet in IND-G or IND-H $1,000.00

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:adairsville/zoning/appendix-a-appendix-a-4@2026-08-20-0f8f872929

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Adairsville Zoning Ordinance, Appendix A (no. 4 so numbered). ADAIRSVILLE FEE SCHEDULE | Georgia Commons