Adairsville · Zoning Ordinance
Appendix A - ADAIRSVILLE FEE SCHEDULE
Appendix A. ADAIRSVILLE FEE SCHEDULE
About this text
- As published by Municode, current through 2026-08-20
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Description Fee Tier 2 (20,001—50,000 gallons) $4.31 Tier 3 (50,001—100,000 gallons) $4.61 Tier 4 (101,000 gallons or more) $4.91 Water/sewer rates—outside city limits (adjusted annually) Residential
Base rate/charge per 1,000 gallons $16.00 Tier 1 (0—5,000 gallons) $5.35 Tier 2 (5,001—10,000 gallons) $7.19 Tier 3 (10,001 gallons or more) $9.05 Commercial Base rate by meter size:
1" or less $30.00 1.5" $50.00 2" $90.00 3" $170.00 4" $210.00 6" $550.00 8" $850.00 Tier 1 (0—20,000 gallons) $5.35 Tier 2 (20,001—50,000 gallons) $5.63 Tier 3 (50,001—100,000 gallons) $5.96 Tier 4 (101,000 gallons or more) $6.27 Gas rates - inside/outside city limits Residential Base rate/charge $12.00 MCF Rate Variable Monthly Commercial Base rate/charge $20.00 MCF Rate Variable Monthly Industrial Base rate/charge $50.00 MCF Rate Variable Monthly Industrial (Interruptible) Base rate/charge $100.00 MCF Rate Variable Monthly Use of hydrant permit and water charges Hydrant Permit Deposit Cost of Meter Inside city limits, plus consumption $150.00 Outside city limits, plus consumption (only in SDS water area) $200.00 Damaged meters or other city-owned equipment
Description Fee Tampering fee—in addition to all costs associated with repair and/or replacement of equipment charged to customer
$150.00 Damaged more than two times:
Additional deposit per meter prior to service being restored $200.00 Reconnection of service
Full account balance plus reconnection fee $50.00 Request for unscheduled meter reads
If meter is in working order $20.00 If there is a problem with the meter No charge Meter recheck (after second time) $20.00
Rescheduling cut-off dates after disconnection has been made $20.00 Returned check fee $35.00
Chapter 47—Zoning Zoning fees Sign permit fee Minimum $100.00 for all signs Permit obtained prior to installation of sign $0.85 per square foot
Permit obtained after installation of sign Double fee Ground Sign (Billboard) $2,000.00 per sign
Ground Sign (Billboard) Annual Renewal Fee $100.00 per sign Rezoning, variance or annexation Fee
Single-family residential (per parcel) $65.00 Multifamily residential (per parcel) $100.00
Commercial/industrial (per parcel) $200.00 Plus advertising and mailing fee (per parcel) $200.00 Special use permit (obtained upon approval of city council) Fee Single-family residential (per parcel) $65.00 Multifamily residential (per parcel) $100.00
Industrial/commercial (per parcel) $200.00 Multi-lot residential/industrial/commercial (per parcel) $500.00 Plus advertising and mailing fee (per parcel) $200.00 Development regulations Fee
Land disturbance permit $110.00 Plus additional fee $40.00 per acre Additional state fee $40.00 per acre Civil (construction) and/or stormwater plan review fee Based on review time
Telecommunications tower or antenna application fee Construction of new tower up to 150 feet in IND-G or IND-H $1,000.00
Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.