Ir al contenido
Georgia Commons
Menú

Adairsville · Ordenanza de zonificación

Appendix A - ADAIRSVILLE FEE SCHEDULE

Appendix A. ADAIRSVILLE FEE SCHEDULE

Sobre este texto

  • As published by Municode, current through 2026-08-20
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

Description Fee Tier 2 (20,001—50,000 gallons) $4.31 Tier 3 (50,001—100,000 gallons) $4.61 Tier 4 (101,000 gallons or more) $4.91 Water/sewer rates—outside city limits (adjusted annually) Residential

Base rate/charge per 1,000 gallons $16.00 Tier 1 (0—5,000 gallons) $5.35 Tier 2 (5,001—10,000 gallons) $7.19 Tier 3 (10,001 gallons or more) $9.05 Commercial Base rate by meter size:

1" or less $30.00 1.5" $50.00 2" $90.00 3" $170.00 4" $210.00 6" $550.00 8" $850.00 Tier 1 (0—20,000 gallons) $5.35 Tier 2 (20,001—50,000 gallons) $5.63 Tier 3 (50,001—100,000 gallons) $5.96 Tier 4 (101,000 gallons or more) $6.27 Gas rates - inside/outside city limits Residential Base rate/charge $12.00 MCF Rate Variable Monthly Commercial Base rate/charge $20.00 MCF Rate Variable Monthly Industrial Base rate/charge $50.00 MCF Rate Variable Monthly Industrial (Interruptible) Base rate/charge $100.00 MCF Rate Variable Monthly Use of hydrant permit and water charges Hydrant Permit Deposit Cost of Meter Inside city limits, plus consumption $150.00 Outside city limits, plus consumption (only in SDS water area) $200.00 Damaged meters or other city-owned equipment

Description Fee Tampering fee—in addition to all costs associated with repair and/or replacement of equipment charged to customer

$150.00 Damaged more than two times:

Additional deposit per meter prior to service being restored $200.00 Reconnection of service

Full account balance plus reconnection fee $50.00 Request for unscheduled meter reads

If meter is in working order $20.00 If there is a problem with the meter No charge Meter recheck (after second time) $20.00

Rescheduling cut-off dates after disconnection has been made $20.00 Returned check fee $35.00

Chapter 47—Zoning Zoning fees Sign permit fee Minimum $100.00 for all signs Permit obtained prior to installation of sign $0.85 per square foot

Permit obtained after installation of sign Double fee Ground Sign (Billboard) $2,000.00 per sign

Ground Sign (Billboard) Annual Renewal Fee $100.00 per sign Rezoning, variance or annexation Fee

Single-family residential (per parcel) $65.00 Multifamily residential (per parcel) $100.00

Commercial/industrial (per parcel) $200.00 Plus advertising and mailing fee (per parcel) $200.00 Special use permit (obtained upon approval of city council) Fee Single-family residential (per parcel) $65.00 Multifamily residential (per parcel) $100.00

Industrial/commercial (per parcel) $200.00 Multi-lot residential/industrial/commercial (per parcel) $500.00 Plus advertising and mailing fee (per parcel) $200.00 Development regulations Fee

Land disturbance permit $110.00 Plus additional fee $40.00 per acre Additional state fee $40.00 per acre Civil (construction) and/or stormwater plan review fee Based on review time

Telecommunications tower or antenna application fee Construction of new tower up to 150 feet in IND-G or IND-H $1,000.00

Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:adairsville/zoning/appendix-a-appendix-a-4@2026-08-20-0f8f872929

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Adairsville Zoning Ordinance, Appendix A (no. 4 so numbered). ADAIRSVILLE FEE SCHEDULE | Georgia Commons